Cranes and Derricks in Construction [1926.1400 – 1442]

2

INSPECTION DOCUMENTED & MAINTAINED

SHIFT INSPECTIONS BY A COMPETENT PERSON

EQUIPMENT INSPECTION EVERY 12 MONTHS

SIGN PERSON QUALIFICATIONS

OPERATION PROCEDURES OF EQUIPMENT

SUBPART CC

Page 3: 510 cranes 2015

Power Line Safety

• Determine if any part of the equipment, load line or load (including rigging and lifting accessories), if operated up to the equipment's maximum working radius in the work zone, could get closer than 20 feet to a power line.

1926.1408(a)(2)

Page 4: 510 cranes 2015

Power Line Safety

• Option (1)--Deenergize and ground. Confirm from the utility owner/operator that the power line has been deenergized and visibly grounded at the worksite.

1926.1408(a)(2)

Page 5: 510 cranes 2015

Power Line Safety

• Option (2)--20 foot clearance. Ensure that no part of the equipment, load line, or load (including rigging and lifting accessories), gets closer than 20 feet to the power line by implementing the measures specified in paragraph (b) of this section.

1926.1408(a)(2)

Page 6: 510 cranes 2015

Power Line Safety

• Option (3)-- Determine the line's voltage and the minimum approach distance permitted under Table A

1926.1408(a)(2)

Page 7: 510 cranes 2015

Power Line Safety

• Option (2) or Option (3) of this section, all of the following requirements must be met

• Conduct a planning meeting• Erect and maintain an elevated warning

line, barricade, or line of signs• Implement at least one of the following

measures: proximity alarm, dedicated spotter, device that automatically warns the operator when to stop movement, device that automatically limits range of movement, OR insulating link/device

1926.1408(b)

Barricades with spotters. Meeting conducted before lift.

Page 8: 510 cranes 2015

Inspections

• A competent person must begin a visual inspection prior to each shift the equipment will be used, which must be completed before or during that shift.

1926.1412(d)(1)

Page 9: 510 cranes 2015

Inspections

• Each month the equipment is in service it must be inspected in accordance with paragraph (d) of this section

1926.1412(e)(1)

Page 10: 510 cranes 2015

Inspections

• The following information must be documented and maintained by the employer that conducts the inspection:• The items checked and the results

of the inspection.• The name and signature of the

person who conducted the inspection and the date.• This document must be retained

for a minimum of three months.

1926.1412(e)(3)(i)

Page 11: 510 cranes 2015

Inspections

• At least every 12 months the equipment must be inspected by a qualified person

1926.1412(f)(1)

Page 12: 510 cranes 2015

Inspections

• The equipment must be annually inspected for all of the following:• Equipment structure (including the

boom and, if equipped, the jib):• Structural members: Deformed,

cracked, or significantly corroded.• Bolts, rivets and other fasteners:

loose, failed or significantly corroded.• Welds for cracks.• And many more………..

1926.1412(f)(2)

Page 13: 510 cranes 2015

Operations

• The employer must comply with all manufacturer procedures applicable to the operational functions of equipment, including its use with attachments.

1926.1417(a)

Page 14: 510 cranes 2015

Operations

• The procedures applicable to the operation of the equipment, including rated capacities (load charts), recommended operating speeds, special hazard warnings, instructions, and operator's manual, must be readily available in the cab at all times for use by the operator.

1926.1417(c)(1)

Page 15: 510 cranes 2015

Operations

• Whenever there is a concern as to safety, the operator must have the authority to stop and refuse to handle loads until a qualified person has determined that safety has been assured.

1926.1418

Page 16: 510 cranes 2015

Operations

• During operations requiring signals, the ability to transmit signals between the operator and signal person must be maintained. If that ability is interrupted at any time, the operator must safely stop operations requiring signals until it is reestablished and a proper signal is given and understood.

1926.1419(f)

Page 17: 510 cranes 2015

Operations

• The employer of the signal person must ensure that each signal person meets the Qualification Requirements (paragraph (c) of this section) prior to giving any signals

1926.1428(a)

Page 18: 510 cranes 2015

Operations

• The employer must make the documentation for whichever option is used available at the site while the signal person is employed by the employer

1926.1428(a)(3)