Demolition
The Contractor shall be deemed to have visited the site and ascertained the full extent and nature of the demolitions.Allow for all necessary temporary supports, which must be agreed with the Structural Engineer prior tocommencement of the works. The demolition work comprises of removal of internal and external masonry and/orstudwork partitions where indicated on the drawings. Please note that any traces of asbestos discovered on site mustbe reported immediately to the CA and disposed of strictly in accordance with all current legislation relating to theremoval and disposal of asbestos.
Groundworks
The contractor is to adjust levels over the area of the new extension as necessary, inclusive of the formation of thenew ground floor slab area. Allow for removal of excavated material. Excavate for drain trenches and soakaway.Excavate trenches for strip footings and pad foundations to the required widths and depths as required by the SE /Building Inspector and as shown on the drawings.
Concrete
All concrete work is to be carried out in accordance with the relevant British Standards and Codes of Practice.Cement shall be Portland Cement ordinary grade to BS 12, in accordance with Structural Engineers spec. Concretestrength, mix, reinforcement, cube tests etc. to be as specified by the Structural Engineer.
Foundations
Foundation trenches are to be dug for the full extent of all new walls. Excavate trenches for foundations to dimensionsas indicated on the drawings.
CONSTRUCTION
SUSPENDED CONCRETE GROUND FLOOR CONSTRUCTION TOACHIEVE 0.22 W/m²K
75mm Screed on75mm Celotex GA4000 PIR insulation (or similar with thermalconductivity of 0.022 (W/mK) onPolythene DPM min 1200 guage on225mm thick RC suspended slab to SE Spec on150mm Ventilated voidBelow void lay hardcore and install anti-root protection
CONSTRUCTIONCAVITY WALL CONSTRUCTION TO ACHIEVE 0.28 W/m²K
Brickwork to match existing on100mm Cavity with 60mm Ecotherm Eco-Cavity with 40mm air gap or
105mm Cavity with 75mm Celotex CW4000 with 30mm air gap on100mm Thermalite blockwork (to SE spec) on
15mm wet plaster finish
Cavity walls to include cavity closers to all openings, Ancon HRT4 wall ties and cavity trays inaccordance with insulation manufacturer installation guides and best practice and
structural engineers information
Cement shall be Portland Masonry Cement above d.p.c. level. Sulphate-resisting cement toBS 4027 to be used below d.p.c. level. Sand for mortar shall comply in all respects with BS
1200. Plasticizers may be used at the discretion of the architect and used strictly inaccordance with the manufacturer's directions. Damp-proof courses shall be 'Hyload' laid
full width and length of walls, stepped as required, with laps in the length not less than100mm as necessary. Trim to the face of the render and point up.
Allow for making good any areas of the existing external or internal brick and block wallsthat are damaged by the demolitions. Allow for DPCs to all new external walls and any
parapet up stand at a minimum 150mm above prevailing ground level.
Movement joints to SE details
FD20
FD20
FD20
SVP
Floor Finish - HallwayTiling - black and white checker
sizing TBC
Floor Finish - UtilityTBC
Fireplace 1Install Wood burning
stove. Line breast with flue
Fireplace 2To be removed
Main Communal Sewer runningas existing
Main Communal Sewer runningas existing
New connection to mainssewer
Chimney to be removed subject toneighbour agreement - otherwise
potential boxing for chimney
Floor Finish - Living RoomTBC
Floor Finish - Living Room TBC
AC
O d
rain
to th
resh
old
1473
1515
2500
1041
3750
2355
600 982 900
2191
7352
Install rodding point to drainage
17 / 73W / C 100
date
drawing no.
OCT 2017
scale
1:25 @ A1
client
MR & MRS MANTELL
revision
A
73 WALDRON, EARLSFIELD, SW18 3TA
CONSTRUCTION
PROPOSED GROUND FLOOR PLAN
M I K E B E C K D E S I G N
t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]
Copyr
ight -
Mike
Bec
k Des
ign
bedroom
3bed
room 2
bedroom
1
bathroomlanding
Extensionconstructed fullywithin boundary
edge of v o i d edge of v o i d
PAINTING AND DECORATING
Decoration work will consist of painting all new and existing walls, ceilings, internal timberwork and external timberwork. All paint to be applied strictlyin accordance with the Manufacturer's instructions.
PreparationPreparation of all new surfaces (walls ceilings and joinery) to be strictly in accordance with manufacturer's written recommendations.New plastered walls are to be prepared and then painted using 1 mist coat and 2 full coats of vinyl matt emulsion, colour to be advised by client
Apply 1 mist coat and 2 full coats of white vinyl matt emulsion to all ceiling areas.
Joinery (Internal and External)Prime new r internal joinery and paint in 1 undercoat and 2 top coats to a white satin gloss finish. Apply two coats of Shellac to internal oak doors,where required.
Existing ceilings and walls are, where applicable, to have all cracks filled with interior 'Polyfiller' and are to be rubbed down and cleaned so as toprovide a smooth, clean and stable surface for repainting.
GLAZING
Glazing within zone between finished floor level and 1500mm above(800mm in any internal glazed paritions) must be either:
a. toughened or toughened and break safely to B.S 6206 orb. robust i.e 8mm annealed glass in panes not exceeding 1.1m in bothheight and width orc. 6mm annealed glass in small panes i.e max width 250mm and area0.5m2 all in accordance with Building Regulation Approved Document1991 Part N1. All opening lights (and doors) to be fitted with effectivedraught-strips.
STAIRCASES
New Softwood staircase
Pine riser and treads, fixed using battens with solidwall / double floor joist support as specified by SE.Risers. treads and pitch below 42°.2.0m headroom to be maintained in all instances.Handrail fixed to wall.
New ballustarding to landing to be 900mm above FFL
Spindles installed to match existing. Centres to ensuregaps between verticals do not exceed 95mm
FIRE RESISTANCE
All steelwork to be encased to provide half-hour fire protection, in accordance with approveddocument. Where meter boxes are situated externally, they are to be non-combustable, lockedand fully sealed.Smoke detectors to latest Relevatn Building Standards: To be BS 5446: Part 1. To be mains poweredand interlinked on all levels. All structural steel to be encased with 12.5mm Gyproc Fireline board.
All new doors from habitable room opening onto the stairwell to be ½ hr fire resistance onto 35 x 25stop screwed and glued to door lining. All structural steel to be encased with 12.5mm GyprocFireline board.Existing first floor ceiling retained. Install fireline board between first floor structure and existing ceilingif required by Building Control. Use 50mm mineral wool to floor zone.
For any escape route serving a second floor (or above), confirm with building control any requiredfire upgrade. Minimum to be 2 layers of plasterboard and skim (to acheive 30 min fire protection) tonew staircase serving the second floor. Other upgrades to be confirmed once build-ups have beenconfirmed.
Escape windows: Any window being used as part of fire strategy for means of escape to beminimum 0.33m² in area. To be min dimension of 850mm high and 500mm wide. Cill dimension to bebetween 800mm - 1100mm.
FD20 FD20
FD20
STRUCTURAL DESIGN - ANY STRUCTURAL ITEMS SHOWNWITHIN DRAWINGS, ARE FOR PRICING PURPOSES ONLY.ALL STRUCTURE MUST BE CONSTRUCTED FROMSTRUCTURAL ENGINEER'S DRAWINGS AND CALCULATIONS.
GENERAL NOTEALL MATERIALS AND COMPONENTS MUST BE SUITABLE FORTHEIR INTENDED PURPOSE AND LOCATION AND MUST BEMANUFACTURED AND INSTALLED IN ACCORDANCE WITHALL RELEVANT, CURRENT BRITISH STANDARDS AND CODESOF PRACTICE, NHBC REQUIREMENTS ANDMANUFACTURER'S SPECIFICATION.
To entire house. Strip wallpaper whererequired. New skim to all walls
SVP
Waste to track acrossceiling to SVPLowered ceiling to hidepipe
485
1040
485
1805
1160
date
drawing no.
OCT 2017
scale
1:25 @ A1
client
revision
A
73 WALDRON, EARLSFIELD, SW18 3TA
CONSTRUCTION
PROPOSED FIRST FLOOR PLAN
M I K E B E C K D E S I G N
t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]
17 / 73W / C 101
MR & MRS MANTELL
Copyr
ight -
Mike
Bec
k Des
ign
1250mm
master
bedroom
landing
1500mm
1750mm
2000mm
2250mm
Ensuite
Full Height
CONSTRUCTION
INTERMEDIATE FLOOR CONSTRUCTION
Floor finish to Client Spec on22mm Caberfloor P5 Chipboard (water resistant tokitchens and bathrooms (density 15kg/m²) onFloor joists to SE Spec with min 50mm fibreglass insulation between on25x38mm battens withstandard plasterboardFor first floor ceiling install12.5mm Gyproc SoundBloc plasterboard(density 10.6kg/m²) with3mm skim to underside
FD20
NEW STUD PARTITIONS
Construct the new studwork partitions and in-fill stud partitions withrockwool as detail. 70mm Gypframe 'C' Studs at 600mm centres.
Board to either side to be12.5mm plasterboard with 3mm lightweight gypsum plaster skim.Use Moisture Resistant plasterboard to all wet areas (bathrooms,shower rooms, utility and kitchen) . Include for scrim or eml tojunctions between existing plasterwork and new partitions prior toapplying the setting coat.
NEW WINDOWS AND DOORS
New window to be aluminium framed & to contain doubleglazed units - U-Value to be below 1.6 W/m²K
All New external doors to be Aluminum framed, double glazedunits. All windows to meet the security requirements in BS PAS24:2012.
Door sets to meet security requirements in BS PAS 24:2012.
For any new habitable rooms, the opening vent of window to bemin 1/20th of floor area.
FIREPLACE AND CHIMNEYChimney re-lined as required to
accommodate wood burningstove - as confirmed by client
Combustible material should notbe located within close proximity
of fireplace or chimney
DORMER WALL BUILD-UP TO ACHIEVE 0.28 W/m²K
Vertically hung tiles on25 x 25mm treated s/w timber battensTyvek Breather membrane draped between battens25 x 32mm treated s/w timber counter battens100mm Timber Stud with 70mm GA400 between (pushed to inside of timber) withboards sealed as Vapour control layer & air leakage barrier on27.5mm PL4015 Plasterboard with Foil backed insulation to underside of timberwith3mm plaster skim finish
Joinery:
New doors to be 4 panel Georgian doors (FD20 to habitable rooms where noted onplans)
New Architrave throughout: 21mm thick, 95mm high Pine Victorian Architrave,Ogee profileNew Skirting board throughout: 21mm thick, 95mm high Pine Skirting Board OgeeprofileOriginal coving retained and repaired with matching profile, where repair isrequired
910
265 800
750
142
7071
571
557
6
VOID
1119
950
637
2721
MAKESHOWER1100 X1100mm
SVPTo vent throughroof at head of
drainage system- set sufficientdistance from
Velux Windows
5501
1891
1247
1729
date
drawing no.
OCT 2017
scale
1:25 @ A1
client
revision
A
73 WALDRON, EARLSFIELD, SW18 3TA
CONSTRUCTION
PROPOSED SECOND FLOOR PLAN
M I K E B E C K D E S I G N
t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]
17 / 73W / C 102
MR & MRS MANTELL
Copyr
ight -
Mike
Bec
k Des
ign
SOFFIT BOARDS, EAVES, GUTTERS AND RAINWATER PIPES REPLACEMENT
New Soffit and Fascia Boards to be UPVC
Rainwater downpipes and gutters replaced with black UPVC
New Soil vent Pipes and existing SVPs replaced with black UPVC
Eaves vent to all new eaves, to provide ventilation to top of rafters. intall flyscreened vent to deter insects.
ROOFLIGHTS
New top hung Velux Rooflights to be Velux - See drawing for sizes - to beconfirmed on site and with client prior to installment.
Rooflight cill level to be above 800mm to comply with Building Regs Part K
Clear glazed flat roof lightsVelux Flat Roof Rooflight Ref:100150(1000x1500mm)
Pitched roof lightsVelux Pitched Rooflight: ProductID:
GGL MK08 2070 (780 x 1400 mm)
PITCHED ROOF BUILD UP - COLD ROOF CONSTRUCTION:
New Tiles to match existing (with correct headlap asmanufacturer's specification fixed to25 x 38mm s/w battens onKingspan Nilvent breathable sarking membrane draped between38 x 38mm s/w tanalised counter battens onSE specified rafters @ SE Specified ctrs with62.5mm Celotex GA4000 Insulation fitted between but to undersideof timber allowing min 50mm well ventilated cavity above withboards sealed as Vapour control layer & air leakage barrier onCelotex PL4050 Insulated plasterboard under rafters fully fillingspace between rafters lined internally on3mm skim finish
FLAT ROOF BUILD UP - WARM ROOF CONSTRUCTION:
GRP finish and undercoat / fleece on18mm OSB board on120mm Celotex XR4000 insulation onVCL as BS6229:2003 on22mm WBP plywood onTimber joist / rafter with no insulation betweenPlasterboard to underside
date
drawing no.
OCT 2017
scale
1:25 @ A1
client
revision
A
73 WALDRON, EARLSFIELD, SW18 3TA
CONSTRUCTION
PROPOSED ROOF PLAN
M I K E B E C K D E S I G N
t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]
17 / 73W / C 103
MR & MRS MANTELL
Copyr
ight -
Mike
Bec
k Des
ign
living room
hall
Utility inBasem
ent
wc
5000
utility
MECHANICAL & ELECTRICAL PLANS
SD
R1
R1
R1
R1
E
IN BASEMENTNew Consumer Unit installed in location of
existing CU.
TAP
HD
Megaflo cylinder
Electric underfloor heating to hall and utilityroom. Radiators to all other rooms
B
Electrical layout withinkitchen, to kitchen
designers requirements
Electrical layout withinkitchen, to kitchen
designers requirements
VENTILATION
Allow for trickle vents in accordance with the building regulations. (8000 cubic mm per habitable room & 2500mm² for kitchens andbathrooms)
Glazing to all windows to be sealed DG Units consisting of 2no. sheets of 6.4mm toughened if below 800mm safety glass with a mimimum6mm cavity. Cavity closers to be in Black.
Kitchen hood and all wet rooms and utility room to be ventilated by mechanical extract fan, operated intermittently.
Ventilation rates in litres / second as follows:Kitchens - 60I/s if incorporated in cooker hoodBathroom/Shower Rooms - 15 I/sWC's - 6 I/s (where applicable)
Intermittent mechanical extract ventilation to utility is to have output rating off at least30 litres/second, any windowless accommodation to have 15 minute over run facility.
Whole house ventilation system with heat recovery, to be installed in loft zone, in line with client requirements.
All vent runs to be in-line with manufacturer's requirements with no lengths exceeded.Ensure all ducting within cold loft spaces, are fully lagged/Ensure a 10mm gap is maintained to all internal doors to maintain air flow.
DOUBLE SWITCHED SOCKET OUTLET
T.V.& FM AERIAL SOCKET (& CABLE)
SMOKE DETECTOR
M&E LEGEND
SWITCHED FUSED SPUR
* N.B. EXACT POSITIONS OF ALL NEW SOCKET, SWITCH, AERIAL AND BT SOCKETPOSITIONS TO BE CONFIRMED BY CLIENT
EXTRACT FAN - VENTAXIA
SHAVER SOCKET
TV
RADIATOR WITHTHERMOSTATIC VALVE
HEATED TOWEL RAIL
R1
THERMOSTATTH
CEILING MOUNTED SPEAKERS
LIGHT SWITCH
LV RECESSED DOWNLIGHT,IP RATED TO SHOWER/BATHROOMS
WALL MOUNTED LIGHT
CEILING MOUNTED PENDANT LIGHT
LIGHT SWITCH - WITH DIMMERD
LV UNDER KITCHEN CUPBOARDDOWNLIGHT
cupboard spotlights on dooractivated push switch
FLOOR MOUNTED SOCKETSRJ45BT
HEAT DETECTOR
EXTERNAL RATED LIGHT
ELECTRIC DOOR BELL
HD
♫
SD
SECURITY LIGHT ON MOTION SENSOR
WWEATHERPROOF SOCKET OUTLET
LIGHT SWITCH - 2 WAY2
VENTILATION TERMINAL VIA AIRBRICK
CONDENSING BOILER FLUE
NEW BOILERB
INCOMING GAS MAINS
WWATER MAINS STOP COCK
METERM
G
ELECTRIC CONSUMER UNITE
date
drawing no.
OCT 2017
scale
1:25 @ A1
client
revision
A
73 WALDRON, EARLSFIELD, SW18 3TA
MECHANICAL AND ELECTRICAL
PROPOSED GROUND FLOOR PLAN
M I K E B E C K D E S I G N
t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]
MR & MRS MANTELL
17 / 73W / C 200
Copyr
ight -
Mike
Bec
k Des
ign
1250mm
master
bedroom
landing
1500mm
1750mm
2000mm
2250mm
Ensuite
Full Height
Duel FuelHot water with
Electric overide
SD
WATER SUPPLIES
All hot and cold supply pipework to be in copper to BS6700 with non-lead solders and pipework sized to suit byplumber. In line isolation valves to be fitted just beforeany fitting.
Hot water supply to any new fixed bath equipped withtemperature control valve to ensure maximumtemperature 48°
Commissioning certificate to be provided to BuildingControl on completion of installation.
Extend alter all existing gas services as necessary toservice the new hob and boiler positions.
EXTERNAL DRAINAGE
Foul DrainageNew drainage runs in 100mm UPVC pipework and connections to existingdrainage system. To be agred with building control, prior to installation.Pipes to be bedded in 100mm granular material to BS882 and covered aminimum of 300mm selected granular fill free from stones greater than 40mmdiameter. The drainage is to be tested prior to covering up to the satisfaction ofthe Building Inspector. Testing to be in accordance with BSCP 301.
Drainage design all subject to investigation and confirmation of existingdrainage runs.Allow for rodding point to drainage point - with access panel.
Rainwater Drainage
Rainwater to main roof to run into existing drainage run. Rainwater from groundfloor extenion roof (i.e the area where the footprint is extended) to fall tosoakaway - which should be located minimum 8000mm from house.
PLUMBING AND WASTE
Shower room and bathroom to comply with Approved Document Hand BS5572.All plumbing to be copper pipe or Hep 20 pipe.Waste to W.H.B 50mm - uPVCWaste to bath and shower 50mm - uPVCWaste to W.C 100mm - uPVC
SANITARY GOODS
All waste fittings to have 75mm deep seal traps and separateconnections to s.v.p's and to be installed in accordance with B.S. 5572.Soil stack to be extended 0.9m above highest window and to be fittedwith balloon cage terminal.
SOIL AND VENT PIPES AND BOXING
SVP's to be 100mm diameter upvc to B.S.5572 and connected via flexible ductingto proprietary vent, tile or ridge vent. Outlet to terminate min 900mm above anyopening into the building. Soil pipes to be encased in boxing constructed toachieve min, mass of 15kg/m2 formed from 38mm x 38mm s.w. framing faced with2 layers 12.5mm plasterboard, joints staggered, finish with plaster skim. Provisionsto be made for acces to s.v.p at each floor level s.v.p's to be surrounded with25mm thick unfaced mineral wool throughout their length.
Any top end ventilating stack to finish at least 900mm above any opening within3000mm and to be caged. Discharge and stub stacks terminating within thebuilding to be fitted with 100mm DURGO air admittance valve or similar.
Rodding eyes at all changes of direction of waste and soil pipes all comply to thesatisfaction of Building Control.Where necessary, pipes and hot water storage to be thermally insulated tocomply with Approved Document L1, Section 3.
Drainage Work to be in accordance with B.S 8301 and engineering drawings.
DOUBLE SWITCHED SOCKET OUTLET
T.V.& FM AERIAL SOCKET (& CABLE)
SMOKE DETECTOR
M&E LEGEND
SWITCHED FUSED SPUR
* N.B. EXACT POSITIONS OF ALL NEW SOCKET, SWITCH, AERIAL AND BT SOCKETPOSITIONS TO BE CONFIRMED BY CLIENT
EXTRACT FAN - VENTAXIA
SHAVER SOCKET
TV
RADIATOR WITHTHERMOSTATIC VALVE
HEATED TOWEL RAIL
R1
THERMOSTATTH
CEILING MOUNTED SPEAKERS
LIGHT SWITCH
LV RECESSED DOWNLIGHT,IP RATED TO SHOWER/BATHROOMS
WALL MOUNTED LIGHT
CEILING MOUNTED PENDANT LIGHT
LIGHT SWITCH - WITH DIMMERD
LV UNDER KITCHEN CUPBOARDDOWNLIGHT
cupboard spotlights on dooractivated push switch
FLOOR MOUNTED SOCKETSRJ45BT
HEAT DETECTOR
EXTERNAL RATED LIGHT
ELECTRIC DOOR BELL
HD
♫
SD
SECURITY LIGHT ON MOTION SENSOR
WWEATHERPROOF SOCKET OUTLET
LIGHT SWITCH - 2 WAY2
VENTILATION TERMINAL VIA AIRBRICK
CONDENSING BOILER FLUE
NEW BOILERB
INCOMING GAS MAINS
WWATER MAINS STOP COCK
METERM
G
ELECTRIC CONSUMER UNITE
date
drawing no.
OCT 2017
scale
1:25 @ A1
client
revision
A
73 WALDRON, EARLSFIELD, SW18 3TA
MECHANICAL AND ELECTRICAL
PROPOSED SECOND FLOOR PLAN
M I K E B E C K D E S I G N
t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]
MR & MRS MANTELL
17 / 73W / C 202
Copyr
ight -
Mike
Bec
k Des
ign
225
225
75
75
GROUND BEARING SLAB FLOOR CONSTRUCTION TOACHIEVE 0.22 W/m²K
75mm Screed on75mm Celotex GA4000 PIR insulation (or similar with
thermal conductivity of 0.022 (W/mK) onPolythene DPM min 1200 guage on
Suspened Concrete slab & build up to SE Spec
STEEL IN LINE WITH SE DESIGNSteel located next to wall (for
ease of installation) tosupport wall above using aprojecting plate. Twisting to
be countered with use ofposts at either side. See SE
details and calcs.
Level ceiling to be maintained.drop existing ceiling by up to50mm (if required).ENSURE NO DOWNSTAND /BULKHEAD FOR THE STEEL.
Cavity closer to all head of walls,abutments and window heads, cills and
jambs
PFC with plate below - as SE Design
PITCHED ROOF BUILD UP - COLD ROOF CONSTRUCTION:
New Tiles to match existing (with correct headlap asmanufacturer's specification fixed to25 x 38mm s/w battens onKingspan Nilvent breathable sarking membrane drapedbetween38 x 38mm s/w tanalised counter battens onSE specified rafters @ SE Specified ctrs with62.5mm Celotex GA4000 Insulation fitted between but tounderside of timber allowing min 50mm well ventilatedcavity above withboards sealed as Vapour control layer & air leakagebarrier on62.5mm Celotex PL4050 Insulated plasterboard underrafters fully filling space between rafters lined internally on3mm skim finish
RIW to face of brickwork belowground level
Lean mix concrete fill tobottom of cavity to prevent
compression
Independent foundation toStructural Engineer's detail,
wth slip joint to existingfoundation
Locate steel belowVertical wall
PITCHED ROOF BUILD UP -COLD ROOF
CONSTRUCTION:Insulation between &
Below
FLAT ROOF BUILD UP - COLDROOF CONSTRUCTION
Insulation between & Below
Ventilationvia Eaves
vents totop ofrafters
Ventilation atridge
Ventilation viaEaves vents to topof rafters
Roof and floorsteels, in linewith SE Design
INTERMEDIATE FLOOR CONSTRUCTION
Floor finish to Client Spec on22mm Caberfloor P5 Chipboard (water resistant tokitchens and bathrooms (density 15kg/m²) onFloor joists to SE Spec with min 50mm fibreglass insulationbetween on25x38mm battens withstandard plasterboardFor first floor ceiling install12.5mm Gyproc SoundBloc plasterboard(density 10.6kg/m²) with3mm skim to underside
date
drawing no.
OCT 2017
scale
1:25 @ A1
client
revision
A
73 WALDRON, EARLSFIELD, SW18 3TA
CONSTRUCTION
PROPOSED SECTION
M I K E B E C K D E S I G N
t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]
17 / 73W / C 200
MR & MRS MANTELL
Copyr
ight -
Mike
Bec
k Des
ign
2750
Min
150
Min
150
3155
Box gutter formed withcoping stone, lapped with
lead flashing and turned upbelow tiling to form fullylapped, weather proof
gutter
Level of ground, to beascertained on site, prior to
start on site. level to berecorded with photo &
tape.
Velux rooflights to beW 800 x H 1000mm
To be electronicallyopening
1000
Entire extension Set withinboundary
Cavity trays, to be installedby all openings and to
discharge at rear ofproperty
date
drawing no.
OCT 2017
scale
1:25 @ A1
client
revision
A
73 WALDRON, EARLSFIELD, SW18 3TA
CONSTRUCTION
PROPOSED SECTION
M I K E B E C K D E S I G N
t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]
17 / 73W / C 201
MR & MRS MANTELL
Copyr
ight -
Mike
Bec
k Des
ign
Boun
dar
y
Boun
dar
y
Existing Chimney Retained.Dormer stepped aroundchimney
Roof of dormer set belowexisting ridge
Dormer set-back 200mmfrom Edge of roof
200
Dormer cheeks in tiling tomatch existing roof
Clear glazed rooflightswithin pitched roof
Tiling to match existing
2750
3750
All new walls in LondonStock Brickwork
Boun
dar
y
Boun
dar
y
Clear glazed windows withfixed pane to lower half tophung opening to upperpane. Timber frame tomatch existing house
Tiling to match existinghouse
Dormer stepped aroundexisting chimney
2700
2700
Alumasc fascia board -colour to match doors
Brickwork to match Existing
Aluminum framed bi-folddoors
17 / 73W/ C300
date
drawing no.
SEP 2017
scale
1:50 @A1
client
revision
A
73 WALDRON, EARLSFIELD, SW18 3TA
PROPOSED COMBINED - ELEVATIONS
MRS ANETTE MANTELL
0 1 2 3 4 5metres
scale bar for 1:50
Proposed Rear Elevation 1:50 @A1
Proposed Side Elevation1:50 @A1
Proposed Rear Elevation 1:50 @A1
Proposed Side Elevation1:50 @A1
M I K E B E C K D E S I G N
t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]
Copyr
ight -
Mike
Bec
k Des
ign