www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Babcock Power Inc.
One Source Many Solutions One Purpose
WPCA Scrubber Seminar WFGD Maintenance
Tony Licata
Babcock Power Environmental Inc.
![Page 2: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/2.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Total Cost
Capital CostOperating & Maintenance Cost
![Page 3: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/3.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Wet Scrubbing Challenges
• Liquid to Gas Ratio• Oxidation• Chloride Concentration (Blowdown)• Gypsum• O&M• Turndown
![Page 4: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/4.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
FGD Maintenance Challenges• Mist Eliminator Washing• Plugged Nozzles/Lines• Filtering Process• Limestone/lime Storage-prep• Cleaning/Safety• Availability
–Outage schedule• Compliance
![Page 5: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/5.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
New nozzles tend not to plug Old nozzle design –
plugging problems
![Page 6: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/6.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Absorber InternalsFlue Gas Desulfurization
![Page 7: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/7.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Absorber IslandCutaway View Showing Absorber Internals
Agitators6+1 configuration
Isolation Valves
Suction & Discharge reducers15° Slope minimizes wear
4 + 1Recycle Pumps
Maintenance Floor w/Support Beams(Optional Scope)
Primary & SecondaryMist Eliminators
4+1 Recycle Spray Headers & Nozzles
Recycle Piping(Discharge)
Recycle Piping(Suction)
![Page 8: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/8.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Note: All Elevations Spray In 2Directions Except the Top Spray LevelTo Avoid Clogging of Mist Eliminators
Isometric View ShowingSpray Pattern Across Five Levels
![Page 9: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/9.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
•Spray Nozzles ArrangedTo Provide Full Coverage AcrossThe Section of the Absorber
•Outer Nozzles Arranged to EnsureMaximum CoverageAnd Reduce Impingement atThe Absorber Wall
![Page 10: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/10.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
90° Spray Pattern(Outer Nozzles)
120° Spray Pattern(Inner Nozzles)
Absorber Wall
Wall Ring
Main Recycle Spray Header Piping
![Page 11: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/11.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
•Wall Ring @ Spray Levels2 & 4 Ensure No GasesFlow Thru At Wall Unrestricted
•Spray Nozzles and Piping Arrangedto Minimize Vertical Alignment of Nozzlesand Maximize Spray Pattern Coverage
Spray Level 5Spray Level 4Spray Level 3Spray Level 2Spray Level 1
Vessel ID
Wall Ring
Spray Header/Nozzle ArrangementPlan View
![Page 12: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/12.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Absorber Wall
App. 7’ x 10’ Channel Iron GridLocated Below Bottom Spray Level
Maintenance Support Grid
![Page 13: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/13.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Scaffolding Provides ConvenientAnd Safe Access to NozzlesAllows Maintenance at the Upper LevelsTo Be Performed at the Same Time as MaintenanceIn the Reaction Tank Area (No Fall Thru).
![Page 14: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/14.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
FGD Absorber Internals
![Page 15: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/15.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Weather Protected Limestone Storage and Feeding
![Page 16: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/16.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Enclosed Ball Mill for Sound Protection and Maintenance in Cold Climate
Outdoor Ball Mill
Warm Climate
Maintenance Crane
![Page 17: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/17.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Oxidation Air Blowers in Sound Enclosure
![Page 18: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/18.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Dewatering SystemFilter Schematic
SLURRY - CAKE
VACUUM PUMPFILTRATERECEIVER
FILTRATE PUMP
BELT FILTER
AIR WASH WATERHYDROCYCLONE UNDERFLOW
![Page 19: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/19.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Hydrocyclone&
Belt Filter Arrangement
Gypsum Dewatering
![Page 20: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/20.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
![Page 21: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/21.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
![Page 22: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/22.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
![Page 23: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/23.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Design Influence• Recycle Pumps• Fans – Gas Side DP• Oxidation Air Blowers• Limestone Grinding Mills
Operational Influence• On-line Optimization• Automatic and in Real Time
Power Optimization
![Page 24: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/24.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Power OptimizationOxidation & Agitation
• Tank Sizing– Limestone Dissolution– Oxidation
• Mixing• Residence Time
– Reaction Completion• De-supersaturation
– Gypsum Crystal Growth• Size• Shape
• On-line Monitoring
![Page 25: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/25.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Power vs.SO2 Removal750 MW East. Bituminous Coal
SO2 Removal95% 97% 99%
Booster Fan kW 4,253 4,593 5,303 Recycle Pumps kW 4,160 4,593 6,961 Oxidation Air Blowers kW 2,315 2,556 3,500 Ball Mills kW 1,614 1,648 1,682 Others kW 2,660 2,710 2,772
total kW 14,572 16,100 20,218
Wet FGD Power Usage
![Page 26: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/26.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Operation and Maintenance
![Page 27: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/27.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Operational History - Inspection
![Page 28: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/28.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Operational History - Inspection
![Page 29: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/29.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Gypsum loading barge
Gypsum storage silos
Limestone unloading & Storage
Ball mills and recycle pumps
Layout Impacts Number of Operating Personnel
![Page 30: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/30.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
O & M Criteria
• Safety• Balance between initial capital cost vs. long-term
operating cost• Plant availability/redundancy• Operating economics
– Elevators vs. stairs– Weather encloses
• Wash down/Cleaning– Drains/pits/pumps
• All in one building
![Page 31: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/31.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Limestone preparation, recycle pumps, control room and gypsum system in one building for reduced operating cost
Elevator
![Page 32: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/32.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Isolation Valves for Pump Maintenance
![Page 33: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/33.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
All pumps in straight line/overhead cranes
Note wide maintenance aisles
Floor drains
![Page 34: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/34.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Overhead crane for maintenance
Room between pumps for forklift
![Page 35: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/35.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Overhead cranes
![Page 36: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/36.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Recycle pump screens to prevent pump wear and nozzle plugging
![Page 37: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/37.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Operational WFGD Testing Requirements
EPRI– I3Chloride
ASTM C471MResidual Moisture
ASTM C471MCrystal Water
EPRI – G1Particle Size
EPRI – N3Chemical Composition – Carbonate
EPRI – M1Chemical Composition – Sulfite
EPRI – L2Chemical Composition – Sulfate
EPRI – F3Wt % of Solids
EPRI – D2Density
EPRI – C1pH
Test MethodTest Description
![Page 38: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/38.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Operational WFGD Testing Requirements
XXx1x per weekWaste Water
XX1x per weekMake Up Water
XBall Mill Hydrocyclones
XWeekly composite
Limestone
XXXXXX1x per weekLimestone Slurry
XXX1x per weekGypsum
--XXXX1x per weekGypsum Slurry
XX (2/week)XXXX1x per daySlurry Recycle
Cl-Content
Particle Size
Distribution
Chemical Composition of Solids SO4 SO3
CO3 Inert
Wt% of
Solids
DensitypHFrequency of Sampling
![Page 39: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/39.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Operational WGFD Testing Manpower
• Man-hours per absorber 14.5 hours / week• Man-hours plant common systems
– Reagent system 15.5 hours / week– Water system 4.5 hours / week– Gypsum byproduct 4 hours / week
• Man-hour estimate 2 absorbers and common systems 53 hours
• Man-hour estimate 2 absorbers and common systems 2756 hours
![Page 40: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/40.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Periodic Mechanical Inspection
• Pumps – Check – Oil level– Seal leakage– High vibration– Belt tension– Bearing
temperature– Alignment
• Agitators – Check– Oil level– High vibration– Gland seal water
leakage• Strainers
– Differential pressure each shift, clean if high
![Page 41: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/41.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Periodic Electrical Inspection
• Motors – Check – Bearing temperature – Insulation resistance– Bearing vibration– Brush wear– Slip ring roughness– Motor heater current– Clean parts of carbon
dust
• Electrical– Annual inspection or per
manufactures instructions
• Relays– Differential pressure
each shift, clean if high• Instrumentation
– Per manufactures instructions
![Page 42: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/42.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Periodic Maintenance Manpower
• Man-hours per absorber 20 hours / week• Man-hours plant common systems
– Reagent system 20 hours / week– Assist with Operational Testing 20 hours / week
• Man-hour estimate 2 absorbers and common systems 80 hours
• Man-hour estimate 2 absorbers and common systems 4160 hours
![Page 43: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/43.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Operation and Maintenance Manpower
• WFGD Operator, current control room operator from each unit will monitor and control
• Assistant WFGD Operator, one required for plant, perform WFGD operational testing
• Maintenance Mechanic, two required for plant, perform periodic maintenance and assist with testing
![Page 44: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/44.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Scheduled Outage Inspection
• Absorber Tank– Inspect for corrosion, scale and
deposits– Remove loose material – Map location of deposits– Repair lining as needed
• Spray Headers and Nozzles– Check spray nozzles for plugging
and map– Clean or replace nozzles as
necessary– Check headers for erosion
• Mist Eliminators– Check for damage or
deposits– Check wash system for
valve function and coverage
• Reagent Preparation– Inspect and repair in
accordance with manufactures’instructions
![Page 45: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/45.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Outage and Maintenance Costs
• Estimated outage (3 yr) cost $250,000 / absorber including– Absorber scaffolding– Sump cleaning– Absorber vessel and header repairs
• Estimated yearly maintenance cost $150,000 / absorber including– Agitator parts– Recycle pump rebuilds– Misc. pump rebuilds
![Page 46: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/46.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Owners Decisions• Redundancy
– Pumps– Ball Mills – 3 x 50% or 2 x 100%– Dewatering– Spares
• Organic Acids• Waste Water• Gypsum Markets/landfilling
![Page 47: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/47.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Absorber Access
• Safety First– Confined Space– Fall Protection– Personal Safety Equipment– Working Conditions: Lighting, GFIs, Tools,
Noise, Welding. Flash Protection, etc.• Maintenance
– Minimize outage time– Simple PM programs– Easy access for service and cleaning
![Page 48: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/48.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
2 – Gypsum Transfer Tanks ea.207,000 gal.- Carbon Steel (Rubber Lined)- Return from 3 Recycle Pumps- Each With Agitators
1- Process Water Tank 85,500 gal.- Carbon Steel- 2 Redundant Mist Eliminator
Wash Pumps
Existing Unit 1FGD Stack
Recycle PumpsOxidation AirCompressors
2nd Stage Mist EliminatorAccess Platform
- Wrap Around Design Provides AccessTo Spray Header Valves
- A Lay Down Area for Demister Modules
Ghent Station Unit 3 Absorber IslandPlan View
![Page 49: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/49.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Ghent Station Unit 3 Absorber IslandCutaway View Showing Absorber Internals
Agitators6+1 configuration
Isolation Valves
Suction & Discharge reducers15° Slope minimizes wear
4 + 1Recycle Pumps
Maintenance Floor w/Support Beams(Optional Scope)
Primary & SecondaryMist Eliminators
4+1 Recycle Spray Headers & Nozzles
Recycle Piping(Discharge)
Recycle Piping(Suction)
![Page 50: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/50.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Equipment DeliveryIn Weeks
6472ID Fans
52-5446-48SCR Catalyst
7526-30Ball Mills
5626-30Recycle Pumps
20-248-12Structural Shapes
20082003Commodity
![Page 51: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/51.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
![Page 52: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/52.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Typical Maintenance Issues
• Mist Eliminator Plugging• Scaling and Buildup of Solids• Low SO2 Removal• Gypsum Quality• Reagent Usage
Many Common Issues or Conditions Impact Maintenance and Operations
![Page 53: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/53.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Mist Eliminator Plugging
• Water quality• Broken/missing/plugged nozzles• High gas velocity
![Page 54: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/54.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Scaling and Buildup of Solids
• Wet Dry interface• Chemistry• Oxidation air system• Limestone quality or sizing
![Page 55: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/55.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Low SO2 Removal
• Sorbent preparation/sizing/quality– Feed rate
• Blinding– Sulfite or aluminum fluoride
• Plugged nozzles• pH monitor
![Page 56: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/56.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Gypsum Quality
• Reagent preparation & utilization– Sizing/quality
• Oxidation air• Belt filter and hydrocyclones• Wash water
![Page 57: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/57.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Reagent Usage
• pH monitor • Sorbent quality and grind size• Blinding
– Sulfite or aluminum fluoride
![Page 58: 5-Wet FGD Maintenance(2)](https://reader037.fdocuments.us/reader037/viewer/2022110103/563db7d2550346aa9a8e45cf/html5/thumbnails/58.jpg)
www.babcockpower.comCopyright © 2008 Babcock Power Inc. All rights reserved.
Thank You
Questions ??