5 WaysZero Ready Walls
Spring Training CampHidden Valley Resort, Huntsville ON | 2016.04.26
Chris Schumacher, B.Tech.(ArchSci), B.A.Sc.(CivEng), M.A.Sc.(BldgSci)
Principal, Senior Building Science Specialist
![Page 2: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/2.jpg)
2
Requirements for Zero-Ready Walls
• Energy Efficient
• Affordable
• Buildable
• Durable
![Page 3: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/3.jpg)
3
Approaches to Zero-Ready Walls
Deep Cavity
• Create a thick wall assembly and fill the cavity with insulation
• Double Stud Wall
• Truss Wall
• I-joist wall
• All insulation in the framed space!
Exterior Insulated
• Minimize framed assembly then add continuous exterior insulation
• Foam Board (XPS or PIR)
• Spray Foam (2pcf ccSPF)
• Semi-rigid mineral fiber (stonewool)
• Framing configuration and size for structure and utility distribution not insulation!
![Page 4: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/4.jpg)
4
Deep Cavity vs. Exterior Insulated
( Straube and Smegal, 2009)
![Page 5: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/5.jpg)
5
Deep Cavity Challenges
• Structural sheathing is at the coldest point in the assembly
• Cold = Higher RH
• Cold = Higher Moisture Content
• Cold = Greater Potential for Condensation
• Air tightness is paramount!
![Page 6: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/6.jpg)
6
Exterior Insulation Challenges
• Cladding Support
• Window Support
• Trim Details
• Drainage Plane Location
• Integrating Drainage at Windows
• Rainwater control is paramount!
![Page 7: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/7.jpg)
7
5 Zero Ready Walls(that could be adopted now)
• Deep Cavity
– Double Stud
– I-joist
• Exterior Insulation
– Polyisocyanruate (PIC)
– Extruded Polystyrene (XPS)
– Stonewool (e.g. Roxul)
![Page 8: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/8.jpg)
8
Double Stud
I-JoistStud
R-43RSI 7.5
(installed)
R-36 RSI 6.4
(installed)
![Page 9: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/9.jpg)
9
Polysio
XPS
Mineral Wool
R-38 RSI 6.6
(installed)
R-37 RSI 6.5
(installed)
R-37 RSI 6.5
(installed)
![Page 10: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/10.jpg)
10
Wall Assembly – Thermal Details
• Average Nominal RSI of the High RSI walls was RSI 6.2
• I Joist Stud wall had highest calculated RSI through the stud• 2-D heat transfer simulation gives (RSI 4.7) for 241 mm stud• 286 mm I-Joist would be RSI 5.5 – significantly better than DS
Installed RSI
![Page 11: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/11.jpg)
12
University of WaterlooField Exposure Study
Objective: to improve the understanding of the moisture-related durability performance of exterior insulated, high-R, wood-framed wall systems
Approach: Natural exposure field testing with additional (controlled) moisture exposure
Recognition: The bulk of this work was done by T. Trainor & M. Fox. Both are past M.A.Sc. Students and current RDH-BSL team members.Also, a special thanks is owed to NRCan for supporting this project.
![Page 12: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/12.jpg)
13
The BEG HutSto
new
ool
R-3
4
X P
SR
-35
P I
CR
-35
Datu
mR
-24
• Natural weather exposure• North and South elevations were used for testing
I-Jo
ist
R-3
9
Db
lStu
dR
-39
University of Waterloo
![Page 13: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/13.jpg)
14
Test Walls
![Page 14: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/14.jpg)
15
• Fibre-cement lap siding• ¾ “ (19 mm) strapping• SBPO WRB and air barrier• 7/16” (11 mm) OSB sheathing• 2” X 6” SPF framing- 24” O.C.• 6 mil poly vapour barrier• ½ “ (12.7 mm) gypsum wall board
R-24 (installed)
Conventional (Datum) Assembly
![Page 15: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/15.jpg)
16
Deep Cavity AssembliesI-Joist Double Stud
![Page 16: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/16.jpg)
17
PIC XPS Stonewool
Exterior-Insulated Assemblies
![Page 17: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/17.jpg)
18
• Passive background performance evaluation
– Controlled indoor conditions 30-50% RH and 21° C
• Active testing to determine potential for wetting and drying
– Air Injection – constant flow rate of indoor air injected into cavity space to simulate air leakage
– Water injection test
Performance Evaluation
![Page 18: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/18.jpg)
20
Calibrated Air leak
![Page 19: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/19.jpg)
21
Air Injection Testing
• Energy Star air leakage limit = .02 l/s/m2 at 50 Pa
• Power Law: Q = C * (delta P)n (n=0.65, delta P = 4 Pa)
this was converted to an in-service air leakage rate of 0.2 l/s/m2
• Applying this to the area of the center bay (1.3 m2), results in a leakage rate of .26 l/s per test wall
• 30 CFH (.24 l/s) was used
![Page 20: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/20.jpg)
22
Calibrated Rain Leak
• Location and distribution to simulate a window leak
• Manually inject 30 ml of water twice a day
![Page 21: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/21.jpg)
23
Testing Protocol
Phase 1- Baseline (as-built condition)
October 2012 to February 18th, 2012
Phase 2- Air Leak Testing
February 19th to April 9th
Phase 3- Drying
April 10th to June 4th
Phase 4- Rain Leak Testing
June 3rd to July 5th
Phase 5 – Drying
July 6th to October
![Page 22: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/22.jpg)
24
BASELINE RESULTS
So what actually happened?
![Page 23: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/23.jpg)
25
Sheathing Temperature: Cold Weather
![Page 24: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/24.jpg)
26
Sheathing Temperature: Cold Weather
Wall Datum - N PIC - N XPS-N RW - N Double - N
Average -7.7 -0.1 1.6 2.5 -8.9
Min. -16.3 -5.6 -3.7 -2.5 -17.7
St. Dev. 5.0 3.6 3.2 3.1 5.1
Coldest Week of the Year
![Page 25: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/25.jpg)
27
Effective R-Values at 3 Temperature Conditions
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
-15° C 3.5 30° C -15° C 3.5 30° C -15° C 3.5 30° C
PIC PIC PIC XPS XPS XPS RW RW RW
Eff
ecti
ve
R-V
alu
e
at 3 Exterior Temperatures
![Page 26: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/26.jpg)
28
RH at Inside of Sheathing
0
50
100
150
200
250
300
Dbl. Stud - S Datum - S PIC - S XPS - S RW - S Dbl. Stud - N Datum - N PIC - N XPS - N RW - N
Re
lati
ve
Hu
mid
ity
(R
H)
Peak and Average Cavity RH - No Air LeakagePeak and Average Sheathing RH – Baseline (No Air leakage)
![Page 27: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/27.jpg)
29
Condensation hours - RH sensors less reliable near 100% RH
• Stud Cavity RH/T sensor data
• Pw – Stud cavity RH/T data [partial vapour pressure in cavity]
• Pws – T-data at sheathing / plates [saturation vapour pressure]
Possible errors include sensor location, non-uniform moisture distribution in the cavity
t
RH
t
ASHRAE Fundamentals, 2009
Potential for Air Leakage Condensation
![Page 28: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/28.jpg)
30
Potential for Air Leakage Condensation
Percentage of hours that could be expected to see condensation(if there was air leakage)
![Page 29: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/29.jpg)
31
Moisture Content of Sheathing
Moisture Content: Lower Sheathing, North Elevation – Baseline (No Air leakage)
![Page 30: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/30.jpg)
32
Moisture Content Distribution
Double Stud Wall – Baseline (No Air Leakage)
Double Stud Wall (South)
Double Stud Wall (North)
![Page 31: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/31.jpg)
33
Moisture Content Distribution
I-Joist Wall – Baseline (No Air Leakage)
I-Joist Stud Wall (South)
I-Joist Stud Wall (North)
![Page 32: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/32.jpg)
34
OSB MC – Exterior Insulated South
PIC Wall (South)
XPS Wall (South)
StonewoolWall
(South)
![Page 33: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/33.jpg)
35
OSB MC – Exterior Insulated North
PIC Wall (North)
XPS Wall (North)
StonewoolWall
(North)
![Page 34: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/34.jpg)
36
AIR INJECTION RESULTS
What about measured Air Leakage?
![Page 35: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/35.jpg)
37
L
M
L
L
Measured Moisture ContentAir Injection Wetting followed by Drying
Double Stud Wall (North)
I-Joist Stud Wall (North)
![Page 36: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/36.jpg)
38
M
M
PIC Wall (North)
XPS Wall (North)
Stonewool Wall (North)
![Page 37: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/37.jpg)
39
Condensation Hours – Baseline Period
Condensation Hours – Air Injection Period
Condensation Hours – Drying Period
Datum Datum
DblS
I-JoistS
DatumS
PICS
XPSS
StnwoolS
DblN
I-JoistN
DatumN
PICN
XPSN
StnwoolN
DblS
I-JoistS
DatumS
PICS
XPSS
StnwoolS
DblN
I-JoistN
DatumN
PICN
XPSN
StnwoolN
DblS
I-JoistS
DatumS
PICS
XPSS
StnwoolS
DblN
I-JoistN
DatumN
PICN
XPSN
StnwoolN
![Page 38: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/38.jpg)
40
Condensation Potential-Change in M.C. Due to Air Injection
0 10 20 30
Bottom Plate
Lower OSB
Middle OSB
Upper OSB
Top Plate
Bottom Plate
Lower OSB
Middle OSB
Upper OSB
Top Plate
Bottom Plate
Lower OSB
Middle OSB
Upper OSB
Top Plate
Bottom Plate
Lower OSB
Middle OSB
Upper OSB
Top Plate
Bottom Plate
Lower OSB
Middle OSB
Upper OSB
Top Plate
Do
ub
le-
So
uth
Da
tum
-S
ou
thP
IC-
So
uth
XP
S-
So
uth
RW
-S
ou
th
0 10 20 30
Bottom Plate
Lower OSB
Middle OSB
Upper OSB
Top Plate
Bottom Plate
Lower OSB
Middle OSB
Upper OSB
Top Plate
Bottom Plate
Lower OSB
Middle OSB
Upper OSB
Top Plate
Bottom Plate
Lower OSB
Middle OSB
Upper OSB
Top Plate
Bottom Plate
Lower OSB
Middle OSB
Upper OSB
Top Plate
Do
ub
le-
So
uth
Da
tum
-N
ort
hP
IC-
No
rth
XP
S-
No
rth
RW
-N
ort
h
![Page 39: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/39.jpg)
41
• Mould growth thresholds
• Moisture content and temperature
• Lower limit of 16% for onset (Temp>5°C)
• Lower limit of 20% for fast growth (Temp>10°C)
• Decay
• Wood below 20% MC - decay does not occur
• Above 26-28% MC decay initiated
• Decay continues until MC returns below 20%
ASHRAE, 2009; FPL, 2010; Straube, 2005; Wang et al., 2010
Potential Impact?
![Page 40: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/40.jpg)
42
Mould – Slow Growth (MC >16%, T > 5°C)
DblS
I-JoistS
DatumS
PICS
XPSS
StnwoolS
DblN
I-JoistN
DatumN
PICN
XPSN
StnwoolN
DblS
I-JoistS
DatumS
PICS
XPSS
StnwoolS
DblN
I-JoistN
DatumN
PICN
XPSN
StnwoolN
DblS
I-JoistS
DatumS
PICS
XPSS
StnwoolS
DblN
I-JoistN
DatumN
PICN
XPSN
StnwoolN
![Page 41: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/41.jpg)
43
Mould – Fast Growth (MC >20%, T > 10°C)
Decay risk
Total hours above 20% MC after exceeding 28% MC
DblS
I-JoistS
DatumS
PICS
XPSS
StnwoolS
DblN
I-JoistN
DatumN
PICN
XPSN
StnwoolN
DblS
I-JoistS
DatumS
PICS
XPSS
StnwoolS
DblN
I-JoistN
DatumN
PICN
XPSN
StnwoolN
![Page 42: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/42.jpg)
44
The Warming Effects of Air Leakage
-10.0
-5.0
0.0
5.0
10.0
15.0
20.0
25.0
30.0
1/5 1/12 1/19 1/26 2/2 2/9 2/16 2/23 3/2 3/9 3/16 3/23 3/30 4/6 4/13 4/20 4/27 5/4 5/11
Te
mp
era
ture
(D
eg
. C
)
Date (D/M)
The Warming Effect of Exfiltrating Air
Actual Sheathing Temp.
Predicted Sheathing Temp.Air Injection Phase
![Page 43: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/43.jpg)
45
WATER INJECTION RESULTS
What if a Window Leaks?
![Page 44: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/44.jpg)
46
• Injected via tubing into the absorbent sheet on exterior of OSB [ 30 ml – twice daily ]
• 1st Interval – 300 ml
• 2nd Interval – 420 ml
Water Injection Test
![Page 45: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/45.jpg)
47
Deep Cavity
Exterior Insulated
Water Injection Test
Wett
ing 1
Wett
ing 2
![Page 46: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/46.jpg)
49
Drying Capacity
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
5/25 6/1 6/8 6/15 6/22 6/29 7/6 7/13 7/20 7/27 8/3 8/10 8/17 8/24 8/31 9/7 9/14 9/21 9/28 10/5 10/12
Mo
istu
re C
on
ten
t (%
)
Date
Moisture Content of North Walls
Datum-N
PIC-N
XPS-N
RW-N
Double-N
Wetting mat
injections (1)
Wetting mat
injections (2)
![Page 47: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/47.jpg)
50
Drying Capacity
0.0
2000.0
4000.0
6000.0
8000.0
10000.0
12000.0
14000.0
16000.0
South North South North South North South North South North
Datum PIC XPS RW Double
![Page 48: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/48.jpg)
51
SUMMARY
![Page 49: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/49.jpg)
52
Zero Ready Wall Options
• University of Waterloo Study considered 5 Zero Ready Wall assemblies
• Design and construction use variations on techniques and materials common to current industry standard walls
• Field study to assess hygrothermal performance and potential durability
![Page 50: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/50.jpg)
53
Baseline
• Deep Walls showed elevated sheathing moisture contents in baselines condition
– Upper sheathing up to 17% and upper plate up to 24%
• All exterior insulated walls exhibited baseline sheathing moisture content similar to the datum wall
![Page 51: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/51.jpg)
54
Air Leakage
• Both Deep Walls showed an increased sensitivity to air leakage and a greater potential for condensation
• All exterior insulated walls studied showed a significant reduction in condensation potential due to air leakage
• Don’t underestimate the potentially greater moisture risk associated with tighter walls
![Page 52: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/52.jpg)
55
Rain Leakage
• The XPS and PIC walls showed a significant reduction in outward drying capacity, while the Stonewool wall was similar to non-exterior insulated walls
• For wetting at the structural sheathing layer, Deep Walls exhibited similar rain leakage response standard wall
![Page 53: 5 Ways Zero Ready Walls - Building Knowledge · 2016. 5. 4. · rdh.com | buildingsciencelabs.com 1 5 Ways Zero Ready Walls Spring Training Camp Hidden Valley Resort, Huntsville ON](https://reader035.fdocuments.us/reader035/viewer/2022062611/61350571dfd10f4dd73c1abd/html5/thumbnails/53.jpg)
56
Contact me at:
Download the presentation in .pdf format from:
RDH Building Engineering Ltd. and Building Science Consulting and Labs Inc. have merged. Effective November 1, 2015,we are operating as one integrated firm. The merger brings two of the leading building science firms in North Americatogether to provide a combination of cutting-edge research with leading design and implementation capabilities. Theresult is a unique offering for our clients–an ability to explore new and innovative ideas based on science and ourpractical knowledge of what can be built. We are excited about the possibilities as we launch the new firm.
[email protected]@rdh.com
buildingsciencelabs.com/presentations