SmartPlant Instrumentation 2013
Upgrade Procedure Via Oracle
How to upgrade to
SmartPlant Instrumentation
2013 and ra!le 11g
-
7/26/2019 5 SPI 2013 Upgrade Procedure
2/10
2
Assumptions
" #hese instru!tions are intended $or Pro%e!t &ataIntegrators' Pro%e!t Automation Spe!ialists and
&is!ipline Appli!ation Spe!ialists
" #here were signi$i!ant improvements in SPI 200(
$rom SP1 to SP2. )nough so that the upgrade routinein 200( SP* re+uires a data,ase ,e at 200( SP2 as a
minimum to upgrade. It is assumed that SPI 2013
also re+uires at least 200( SP2.
" #his pro!edure has ,een tested using SPI 200( SP3HF2 and SPI 200( SP* HF1*
-
7/26/2019 5 SPI 2013 Upgrade Procedure
3/10
Upgrade Challenges
" SPI 200( not supported on ra!le 11g" SPI 2013 not supported on ra!le 10g
" -pgrade a!ross SPI and ra!le versions
" -pgrade in a timel manner to minimi/e pro%e!t
downtime
" aintain data integrit
3
-
7/26/2019 5 SPI 2013 Upgrade Procedure
4/10
Intergraphs Recommendation
ption 1 -pgrade ra!le 10g & to ra!le 11gRepla!e SPI installation
Initiali/e new ra!le 11g $rom upgraded 11g
on re+uires !oordination with ra!le &A
ption 2 a!4up ra!le 10g to 5at!om
Initiali/e 5at!om with old SPI SA version
Repla!e SPI SA version 4eeping data,ase
-pgrade standalone data,ase to SPI 2013a!4up standalone data,ase
Initiali/e SPI SA 2013 ,a!4up in SPI 2013 11g
on re+uires SPI SA li!enses $or 2 versions
*
-
7/26/2019 5 SPI 2013 Upgrade Procedure
5/10
PreRe!uisites
"A ma!hine with the e6isting SmartPlantInstrumentation version installed on ra!le 10g
" 7ew ra!le 11g Instan!e to host the new data,ase
"A ma!hine with the e6isting SmartPlant
Instrumentation version installed on ra!le 11g
" Installation $iles $or SmartPlant Instrumentation 2013
#he same ma!hine ma ,e used in the upgradepro!ess , uninstalling and installing so$tware as
needed. Separate ma!hines were used to develop
this pro!edure to redu!e !ompli!ations.
8
-
7/26/2019 5 SPI 2013 Upgrade Procedure
6/10
Upgrade Process O"er"ie#
9
Oracle 10g
Old SPI Version
a!hine :1
-
7/26/2019 5 SPI 2013 Upgrade Procedure
7/10
Upgrade Process O"er"ie#
;
Oracle 10g
Old SPI Version
Oracle 11g
Old SPI Version
a!hine :1 a!hine :2
-
7/26/2019 5 SPI 2013 Upgrade Procedure
8/10
Upgrade Process O"er"ie#
inde6
"Appl S?@ $i6 with SS#) user.
(
-
7/26/2019 5 SPI 2013 Upgrade Procedure
10/10
$or% Instruction Summar& ' Part 2
Upgrade to SPI 2013
" reate ,a!4up B%ust in !aseC" -pgrade instan!e to SPI 2013
" Run he!4& and resolve issues
"Appl Pro!ess &ata $i6
" #est and on$irm -pgrade
" -pgrade -ser lo!al installations Bra!le' SPI' SPF !ompC