5 Priority List of Projects Schemes Submiited to NEC
-
Upload
sushant-karnik -
Category
Documents
-
view
212 -
download
0
Transcript of 5 Priority List of Projects Schemes Submiited to NEC
-
8/4/2019 5 Priority List of Projects Schemes Submiited to NEC
1/6
Annexure-III.
PRIORITY LIST OF NEW PROJECTS/ SCHEMES SUBMITTED TO NEC FOR
FUNDING DURING 11TH
FIVE YEAR PLAN (2007-12) .
SI.
No.
Name of the projects/ schemes Project Cost
(Rs. In lakhs)
(1) (2) (3)
AGRI. AND ALLIED PROGRAMME
AGRICULTURE
1 Setting up of a Multipurpose Cold Storage (Capacity 4000 MT in4 Chambers) at Banderdewa, Papum Pare District by M/SArunachal Valley Cold Storage
272.00
HORTICULTURE
2 Compact Area Plantation of multiple fruit crops at Yingkiong 100.00
3 Compact Area Development of Horticulture in Raga Sub-Division of Lower Subansiri District
300.00
4 Integrated Development of Community Fruit Nursery and
Plantation at Jenewa (Khenewa) in East Kameng District
143.43
AH & VETERINARY
5 Strengthening of Central Poultry Farm at Nirjuli 150.00
6 Establishment of Dairy Unit at Daporijo 50.51
7 Integrated Piggery Development project with farmers
participation for Upper Siang and Lower Subansiri districts
386.00
ENVIRONMENT & FORESTS
8 Infrastructure development for establishment of State Pollution
Control Board (APSPCB) office viz; (1) C/O SPCB office-cum-
laboratory building ( Rs. 85.00 lakhs), (2) Computerisation ofSPCB Office (E- Governance) (Rs. 10.00 lakhs), (3) Staff
salaries. Etc. for contg. & contract employees (Rs. 15.00 lakhs),
(4) Transport (Rs. 25.00 lakhs) and (5) Development of Land FillSites in the District HQ towns for Municipa Solid Waste
Management & Handling ( MSWM & H) (Rs. 50.00 lakhs)
50.00
IFC & wsm Sector & Power Development
Power Development
Micro/ Mini HEP:-
9 Maipani MHP (60KW) 98.14
10 Ashapani MHP (60 KW) 99.98
11 Tah Pani MHP (100 KW) 122.99
12 Krawati MHP (100 KW) 119.07
13 Hathipani MHP (100 KW) 120.44
14 Kachopani MHP (200 KW) 393.33
15 Chambang MHP(30 KW) 109.9516 Bongleng MHP (100 KW) 114.27
17 Mago MHP (100 KW) 119.64
18 Thimbu MHP (100 KW) 116.18
19 Khet MHP(100 KW) 144.27
20 Shakti Nallah MHP (100 KW) 109.32
21 Chellenghang MHP Ph-II (30 KW) 54.94
-
8/4/2019 5 Priority List of Projects Schemes Submiited to NEC
2/6
22 Bramdongchung MHP (100 KW) 105.30
23 Nee Nallah MHP (40 KW) 75.52
24 Birem Korong MHP (100 KW) 123.49
25 Chu Nallah MHP (100 KW) 73.84
26 Vijay Nagar MHP (100 KW) 408.45
27 C/o 33 KV Express from Nirjuli to Pake Kesang (Khodaso) for
evacuation of Power to East Kameng District
639.34
28 C/o 33 KV Double Circuite power from Halai Pani ( Hayuliang)
to Tezu (i/c providing 2.5 MVA transformer)
1000.00
29 Construction of 33 KV line from Khupi to Seppa in East KamengDistrict
450.00
DISTRIBUTION
30 Augmentation, improvement & modification of T & D Systems incapital town of Itanagar
1482.73
31 C/o 33 KV Line Single Circuit Line from Deomali to Kanubariwith 2 X 1.6 MVA Sub- Station at Kanubari in Tirpap District
320.50
IRRIGATION & FLOOD CONTROL
32 Flood Management work in and around Hawai township and
adjoining area.
1250.00
33 Anti erosion work on Lohit River to protect Garampani, tourist
spot, PWD Bridge, Defence settlement and BRTF road underWalong circle.
479.00
34 Anti erosion work on Ampani River to protect Khupa township
and defence road.
740.00
35 Flood control work for protection of Doimara and foothill/
Kameng Bari village
354.70
36 Anti Erosion Work over Dollungmukh river at Dollungmukh
Circle under Lower Subansiri District
344.64
37 RRM Wall to protect Agricultural Field and Samsan Ghat(Crematorium ) at Nirjuli 48.00
38 Flood Water Management and beautification of Hawai township 398.30
39 Medium Irrigation project at Sille- Remi under East Siang District 2200.00
40 Anti- Erosion work Namorah, Baliso and adjoining areas inAssam
317.00
41 Anti- Erosion works of Gongai and Dobu rivers to protect Nari
township in East Siang District
316.00
42 Anti-erosion works on Papum River to protect Ramghat,
Kochubari, Pempla and Doriabill villages in Papum Pare District
440.00
TRANSPORT & COMMUNICATION
ROADS
43 Improvement of Miao- Jagun Road (26.80 KM) 331.43
44 Upgradation of Changlang- Khonsa road 5850.00
45 Upgradation of Mirem- Mikong- Jonai road (23 KM) 1440.00
46 Upgradation of Sadiya- Sunpura Paya road (23 KM) 800.00
47 Upgradation of Lhou- Jangda- Buxar road 2950.00
48 C/o Bichom- Thrizino road 5350.00
49 C/o Tamen- Dollungmukh road 1070.00
-
8/4/2019 5 Priority List of Projects Schemes Submiited to NEC
3/6
50 C/o 5(five) nos. of RCC Bridges on Rupa- Kalaktang-
Shikaridanga road (103 KM)
273.79
51 Improvement of Road from Sadiya to Tezu (65 KM) 205.92
52 Upgradation of Namsang- Deomali- Dirok road 10700.00
53 C/o Road from Doimukh to Kimin
STATE TRANSPORT DEPARTMENT
54 Acquisition of fleet 1745.00
55 Workshop facilities 310.00
56 Information Technology 120.00
57 C/o Inter- State Bus Terminus at Itanagar 1000.00
MANPOWER DEVELOPMNET
58 C/o Multipurpose Stadium at Donyi- Polo Vidya Bhavan, Itanagar 50.00
59 25 (twenty five) Days House Coaching Camp on U-14 & 16 Boys
at Itanagar
3.84
60 Training for Rural Youths on Adventure Sports for Employment
and Income Generation.
15.65
61 C/o Play Ground with gallery at Thinsa in Tirap District 70.00
62 Holding of North East Zonal and North East Inter State Open
Badminton Championship.
9.34
INDUSTRIES
63Infrastructure facilities for ITI at Miao 285.61
64Establishment of Bought Leaf Factory for tea at Ramsing inUpper Siang District by M/S Mouling Tea Processing Unit
50.00
65 C/o Boundary Wall/ Security fencing in and around 5 (five) ITIs 1000.00
66 Revival/ strengthening of only State Industrial Development &
Finance Corporation Ltd. (APIDFC), Itanagar
500.00
TOURISM
67 Construction of passenger ropeway from Itanagar to Dharia Hill,Itanagar, Papum Pare District 700.00
68 Preservation and restoration of 2nd World War memorial at
Jairampur, Changlang District
60.00
69 Preservation and restoration of Adi War memorial at Komsing,
East Siang District
70.00
70 Landscaping & renovation of Donyi Polo Dere at Along, West
Siang District
45.00
71 Development of Orchidorium-cum- aquarium at IG Park,Itanagar, Papum Pare District
200.00
72 Development of Polo Park at Naharlagun, Papum Pare District 200.00
73 Development of trekking route at Tawang, Tuting (Pemakoregion) in Upper Siang District, Mechuka to Siyum in West Siang
& Upper Subansiri district and Itanagar to Toru in Papum Pare
District
100.00
SCIENCE & TECHNOLOGY SECTOR
74 Establishment of Remote Sensing and GIS facility in theDirectorate of Town Planning, Department of Urban
Development.
333.00
-
8/4/2019 5 Priority List of Projects Schemes Submiited to NEC
4/6
75 Techno- Commercial network for lawful interception and
monitoring
305.00
76 Development of GIS based village resource management systemthrough PBR (People Bio- Diversity Register) for Arunachal
Pradesh
468.20
77 Topographical Survey and preparation of Digital Elevation Model
for Urban Areas in Arunachal Pradesh (Priority Towns-I)
309.00
78 Digitization of library for the Rajiv Gandhi Polytechnic,
Arunachal Pradesh
213.32
79 Computerisation of State Library in Library Department inArunachal Pradesh
13.37
IT School Education Infrastructure/ Education Sector
80 Self- Empoyment Opportunities for Rural Unemployed Youths of
Arunachal Pradesh.
21.00
81 C/o MIBT Girls Hostel for 50 (fifty) students at Kalapthukar (
Dollungmukh)
30.52
HEALTH AND FAMILY WELFARE
82 Provision of Non- Invasive Diagnostic Equipments to 16 districts 300.00
83 Establishment/ Upgradation of Emergency services in 16 (sixteen)
districts hospitals
1200.00
84 Establishment of Bio- Medical Waste Management Plants in
District Hospitals/ CHC.
825.00
CIVIL AVIATION/ AIRPORTS
85 Iprovement of airport at Pasighat
86 Improvement of airport at Tezu
87 Improvement of advance landing ground at Mechuka CivilAviation (SH: Cement Concrete, Drain, Metalling, Carpeting,Compound Wall and Protection works
488.00
88 Construction of a Greenfield Airport at Karsingsa, Itanagar 300.00
89 Activation/ Improvement of existing Advanced Landing Groundat Yingkiong 1500.00
90 Activation/ Improvement of existing Advanced Landing Ground
at Anini
1000.00
91 Activation/ Improvement of existing Advanced Landing Groundat Ziro
500.00
92 Activation/ Improvement of existing Advanced Landing Groundat Daporijo
500.00
93 Activation/ Improvement of existing Advanced Landing Groundat Along
500.00
94 Activation/ Improvement of existing Advanced Landing Ground
at Seppa
500.00
95 Activation/ Improvement of existing Advanced Landing Ground
at Hayuliang
500.00
96 Activation/ Improvement of existing Advanced Landing Groundat Walong
500.00
97 Activation/ Improvement of existing Advanced Landing Groundat Vijayanagar
500.00
98 C/o Advanced Landing Ground at Tawang 1500.00
-
8/4/2019 5 Priority List of Projects Schemes Submiited to NEC
5/6
99 C/o Advanced Landing Ground at Bomdila 1500.00
100 C/o Advanced Landing Ground at Roing 1500.00
101 C/o Advanced Landing Ground at Hawai 1500.00
102 C/o Advanced Landing Ground at Koloriang 1500.00
103 C/o Advanced Landing Ground at Khonsa 1500.00
104 C/o Advanced Landing Ground at Changlang 1500.00
PHE & WS
105 Providing of Water Supply to Supliang Circle 700.00ADDITIONAL PROJECTS SUBMITTED TO THE NEC
FOR INCLUSION IN THE NECS 11TH
PLAN AFTER
SUBMISSION OF ORIGINAL LIST OF 105 PROJECTS AS
MENTIONED ABOVE.
106 Development of Eco- Tourism near Pakke Wild Life Sanctuary at
Seijosa
Estimate is yet
to be submittedby the
implementing
department
107 Publicity Campaign on Buddha Mahatsava at Tawang w.e.f. 5th
7
th
November, 2006
39.80
108 C/o Spectator Gallery at Dumporijo 88.61
109 Improvement & Renovation including re-alignment of existing 33KV Line from Pasighat to Mebo & C/o Tower over river Siang
and Sikhu
132.00
110 Improvement & Upgradation of Mebo- Dola road (36.70 KM) 498.90
111. Production of documentary film TRYST WITH THE EXOTIC
on tourism potential of Arunachal Pradesh
54.50
112. Promotion of Monpas Traditional Craft Activities at Lhou village
in Tawang District.
42.71
113. Integrated Development of Horticulture in Sito village area of
Lower Subansiri District.
228.75
114. Improvement & upgradation of Mebo- Dhola Road (36.70 KM) 498.90
115. C/O. General Ground at mebo Town in East Siang District. 187.50
116. Development of Dolma Park in Lumla under Tawang District. 499.94
117. Augmentation and Improvement of L.T. Distribution System in
and around Hapoli Township (Ziro)
486.50
118. C/O. RCC Bridge over Mithun Nallah (Mabo) Span 14.00 Mtr.
On Sagalee- Toru Road at chainage 169.40 KM
59.23
119. C/O. RCC Bridge over Tabe Tara Nallah span 14.00 Mtrs on
Sagalee Toru Road at chainage 178.90 KM
73.73
120. C/O. Hostel Block for 100 Boarders Capacity for Sports
Department at Dirang.
299.82
121. C/O. Airport for 50 Seater Aircrafts in Tawang District 22758.00
122. Conducting of Talent search on under 08, 10, 13 & 15 playersw.e.f. 24th to 28th January, 2008.
9.61
123. Conducting of Junior North East Football Championship, 2007. 14.73
124. Integrated development of Tree Borne Oilseed (Jatropha) at
Tirbin Circle in West Siang District.
87.93
125. Consolidated proposal on Double Cropping in Arunachal Pradesh. 465.00
-
8/4/2019 5 Priority List of Projects Schemes Submiited to NEC
6/6
126. C/O. Science Laboratory, Computer, Library and Auditorium
Building including toilet at Govt. Hr. Secondary School, Nyapin.
330.07
127 Additional consolidated proposal on double cropping inArunachal Pradesh
409.50
128 Augmentation and Improvement of L.T. Distribution System in
and around Hapoli Township (Ziro) under Lower Subansiri
District.
486.50
File: MS word/Mydoc/ NEC Priority List of 11th FYP.- I-A (03/04/08)