5. Discussion on Tirupur Water Supply Project Case Study

41
Discussion Venkata Santosh Kumar Delhi IIT Madras

Transcript of 5. Discussion on Tirupur Water Supply Project Case Study

Page 1: 5. Discussion on Tirupur Water Supply Project Case Study

DiscussionDiscussionVenkata Santosh Kumar Delhi

IIT Madras

Page 2: 5. Discussion on Tirupur Water Supply Project Case Study

Contents

1 Public Private Partnerships

2 Tirupur Water Supply Prjoject – Case Study

Page 3: 5. Discussion on Tirupur Water Supply Project Case Study

Disclaimer: I promise to raise more

questions in your mind than provide questions in your mind than provide

answers at the end of this discussion

Page 4: 5. Discussion on Tirupur Water Supply Project Case Study

Assumption: You all DID NOT go through

the case study circulated to youthe case study circulated to you

Page 5: 5. Discussion on Tirupur Water Supply Project Case Study

As promised earlier some questions….

Page 6: 5. Discussion on Tirupur Water Supply Project Case Study

How old are How old are

PPPs?

Page 7: 5. Discussion on Tirupur Water Supply Project Case Study

Suez Canal

Concession obtained in 1850s to

construct the Suez Canal

Page 8: 5. Discussion on Tirupur Water Supply Project Case Study

What is a PPP?

Public Private PartnershipPublic Private Partnership

project delivery arrangements where the private

sector takes on risks and responsibilities that are

traditionally accepted as belonging to the

government

Page 9: 5. Discussion on Tirupur Water Supply Project Case Study

Why PPP?

Means of financing Better service

Capital Savings

Expertise Need for facilities

Operating savings

Page 10: 5. Discussion on Tirupur Water Supply Project Case Study

When should you prefer PPP over EPC?When should you prefer PPP over EPC?

Page 11: 5. Discussion on Tirupur Water Supply Project Case Study

Why not PPP?

Huge transaction costsHuge transaction costs

Private sector monopoly

Shift problematic responsibilities to private sector

Page 12: 5. Discussion on Tirupur Water Supply Project Case Study

Based on the sessions so far

How do you define a successful PPP?How do you define a successful PPP?

Page 13: 5. Discussion on Tirupur Water Supply Project Case Study

What is the best

partnership you came partnership you came

across in your life?

Page 14: 5. Discussion on Tirupur Water Supply Project Case Study

I hope some of you

thought of Marriage!!thought of Marriage!!

Page 15: 5. Discussion on Tirupur Water Supply Project Case Study

How are marriages arranged?

Page 16: 5. Discussion on Tirupur Water Supply Project Case Study

Interaction

Expectations

Commitment

Initiation

Proposals

Page 17: 5. Discussion on Tirupur Water Supply Project Case Study

Projects are no different!!

Project go

through various

iterations

Be Prepared to

abandon

Page 18: 5. Discussion on Tirupur Water Supply Project Case Study

Why is project selection and

shaping very important?shaping very important?

Page 19: 5. Discussion on Tirupur Water Supply Project Case Study
Page 20: 5. Discussion on Tirupur Water Supply Project Case Study

Successful Project shaping and award

are only half work done

Successfully awarded projects may not be

successful

Page 21: 5. Discussion on Tirupur Water Supply Project Case Study

The case of

Tiruppur Water Supply Project

Every one is wise on retrospection

Think from the perspective of decision maker

Page 22: 5. Discussion on Tirupur Water Supply Project Case Study

The Tirupur Water Supply Project

Tamil Nadu Tirupur

Tamil Nadu Tirupur

22

Page 23: 5. Discussion on Tirupur Water Supply Project Case Study

Was there a need for the project?

• Tirupur was home to a booming textile industry

• Textiles are water intensive

• Unpredictable water supply

• Drought had severely impacted the industry in the • Drought had severely impacted the industry in the

early 1990s

• THERE WAS A GENUINE NEED FOR THE PROJECT

23

Page 24: 5. Discussion on Tirupur Water Supply Project Case Study

Shaping the Project

• Tirupur Exporter’s Association drew the

government’s attention to the water situation

• IL&FS – a private infrastructure financing and • IL&FS – a private infrastructure financing and

consulting firm was called in to consult

• Given the high costs, IL&FS suggested PPPs

24

Page 25: 5. Discussion on Tirupur Water Supply Project Case Study

Structuring the Project

• Government of Tamil Nadu insisted on the following

• Water would be supplied at subsidized rates to Tirupur

Corporation and wayside villages

• A sewerage treatment plant was to be constructed in Tirupur

• In return, industry could be charged higher rates for water• In return, industry could be charged higher rates for water

• IN 1996, GoTN, IL&FS AND TEA FORMED THE NEW TIRUPUR AREA DEVELOPMENT COMPANY LIMITED (NTADCL), TO IMPLEMENT THE PROJECT ON A BOOT MODEL

25

Page 26: 5. Discussion on Tirupur Water Supply Project Case Study

The Agreement

• 28 YEAR CONCESSION PERIOD

• 20% IRR

GUARANTEED SUBSIDIZED SUPPLY TO • GUARANTEED SUBSIDIZED SUPPLY TO MUNICIPALITY AND NEARBY VILLAGES

• GOVERNMENT WOULD PREVENT GROUNDWATER EXTRACTION

26

Page 27: 5. Discussion on Tirupur Water Supply Project Case Study

Lenders DelayLenders Delay

Go

ve

rnm

en

t Ap

pro

ve

sG

ove

rnm

en

t Ap

pro

ve

s

Government ChangesGovernment Changes

Go

ve

rnm

en

t Ap

pro

ve

sG

ove

rnm

en

t Ap

pro

ve

s

27

Page 28: 5. Discussion on Tirupur Water Supply Project Case Study
Page 29: 5. Discussion on Tirupur Water Supply Project Case Study

29

Page 30: 5. Discussion on Tirupur Water Supply Project Case Study

Successful award of the contract

No major issues during constructionNo major issues during construction

Largely completed on schedule

Page 31: 5. Discussion on Tirupur Water Supply Project Case Study

What happened?

• Global recession had affected exports

• TNPCB had shut down several potential customers

• Water efficient technologies introduced

31

• Good rains had led to smaller players extracting groundwater

• Demand at 30% of estimated

NTADCL WAS IN CONSIDERABLE FINANCIAL DISTRESS

Page 32: 5. Discussion on Tirupur Water Supply Project Case Study

Success at award is only the beginning

of the partnershipof the partnership

Page 33: 5. Discussion on Tirupur Water Supply Project Case Study

Dynamics play out through out the life

of the projectof the project

How many of them are you prepared for?

Page 34: 5. Discussion on Tirupur Water Supply Project Case Study

How are PPPs different from

other projects?other projects?

Page 35: 5. Discussion on Tirupur Water Supply Project Case Study

‘The basic physical and organizational

structures and facilities (e.g. buildings,

roads, power supplies) needed for the roads, power supplies) needed for the

operation of a society or enterprise’

– Oxford Dictionary

Page 36: 5. Discussion on Tirupur Water Supply Project Case Study

Society is involved

Water supply to domestic users…

Page 37: 5. Discussion on Tirupur Water Supply Project Case Study

Huge investments are involved

1023 crores in case of Tiruppur

Page 38: 5. Discussion on Tirupur Water Supply Project Case Study

Technological challenges

Can government agencies master all the

technological advances?

Page 39: 5. Discussion on Tirupur Water Supply Project Case Study

Sticky Contracts

We cannot just move away from the

present contract and find a new partner

Page 40: 5. Discussion on Tirupur Water Supply Project Case Study

Contracts are incomplete

on such long projects

What do you do when contract does not

say anything about a situation?

Page 41: 5. Discussion on Tirupur Water Supply Project Case Study

Ultimate responsibility

with the government

and the public agencyand the public agency