5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound...

24
May 2017 Land adjacent to Bramleymoor Lane, Marsh Lane Construction of a well site and creation of a new access track, mobilisation of drilling, ancillary equipment and contractor welfare facilities to drill a vertical hydrocarbon exploratory core well and mobilisation of workover rig, listening well operations, and retention of the site and wellhead assembly gear for a temporary period of five years on land adjacent to Bramleymoor Lane, near Marsh Lane. Application Drawings 5.

Transcript of 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound...

Page 1: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

May 2017

Land adjacent to Bramleymoor Lane, Marsh Lane

Construction of a well site and creation of a new access track, mobilisation of drilling, ancillary equipment and contractor welfare facilities to drill a vertical hydrocarbon exploratory core well and mobilisation of workover rig, listening well operations, and retention of the site and wellhead assembly gear for a temporary period of five years on land adjacent to Bramleymoor Lane, near Marsh Lane.

Application Drawings

5.

Page 2: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

List of Application Plans P300-S1-PA-00 Rev A Strategic Location Plan P300-S1-PA-01 Rev G Application Site Plan P300-S1-PA-04 Rev E Existing Ground Plan P300-S1-PA-05 Rev E Proposed Site Entrance & Highway works P300-S1-PA-06 Rev E Proposed Site Layout Plan - Construction P300-S1-PA-07 Rev E Proposed Site Layout Plan - Drilling Stage P300-S1-PA-08 Rev G Proposed Site Layout Plan - Listening Stage P300-S1-PA-09 Rev E Proposed Site Restoration P300-S1-PA-10 Rev D Proposed Lighting Plan - Drilling & Coring P300-S1-PA-11 Rev E Proposed Drainage Plan P300-S1-PA-12 Rev C Proposed Site Layout Plan - Suspension P300-S1-PA-13 Rev E Proposed Internal Access Plan P300-S1-PA-16 Rev E Proposed Sections & Details P300-S1-PA-17 Proposed Site Layout Plan - Possible workover P300-S1-PA-21 Rev C Parameter Sections - Develop. & Establish P300-S1-PA-22 Rev D Parameter Sections - Drilling & Coring P300-S1-PA-23 Rev D Parameter Sections - Suspension P300-S1-PA-24 Rev C Parameter Sections - Work over of Well P300-S1-PA-25 Rev C Parameter Sections - Listening Stage P300-S1-PA-26 Rev B Parameter Sections – Abandonment P300-S1-PA-30 Rev B Heras Fence DetailsP300-S1-PA-31 Lighting Examples

Page 3: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

1:10,000

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-00

17021

28.03.17

STRATEGIC

LOCATION PLAN

Revision:

A3

Paper Size:

Date:

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

N

A

DATEDESCRIPTIONREV

12.04.17UPDATED FOR APPROVALA

Page 4: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

POSITIONNE

CO-ORDINATE

P2P3P4

P1 378438.953439771.752

378425.248439873.636

378446.795439791.683378489.248439839.442

P5P6P7P8

378303.722439869.813

378430.276439832.274

378317.029439760.335

378436.426439790.423

B6056

BR

AM

LEY

MO

OR

LA

NE

LON

G LA

NE

HEATHERLEEFARM

TENACRESFARM

P1P2

P3

P4

P5 P6

P7P8

PASSING PLACEINCORPORATINGWHEEL WASH(SEE DRAWING No.17021-P300-S1-PA-16)

PROPOSED SITEACCESS(SEE DRAWING No.17021-P300-S1-PA-05)

PROPOSED ACCESSTRACK (FOR TYPICALSECTION SEE DRAWINGNo. 17021-P300-S1-PA-16)

1:2500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-01

17021

01.03.17

APPLICATION SITE PLAN

Revision:

A3

Paper Size:

Date:

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

N

G

DATEDESCRIPTIONREV

13.03.17UPDATED FOR APPROVALA

14.03.17UPDATED FOR APPROVALB

15.03.17UPDATED FOR APPROVALC

17.03.17UPDATED FOR APPROVALD

29.03.17UPDATED FOR APPROVALE

30.03.17UPDATED FOR APPROVALF

12.04.17UPDATED FOR APPROVALG

Page 5: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

Tp

214.00

215.42212.60210.48

211.66

212.18209.79208.54

213.42

210.36

208.45

216.11

217.75218.45

220.52

221.00

217.29

218.11

1:1250

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR COMMENT

P300 - S1

COMPOUND

P300-S1-PA-04

17021

01.03.17

EXISTING GROUND PLAN

Revision:

A3

Paper Size:

Date:

NAREA WITHIN RED LINE

BOUNDARY IS CURRENTLYIN AGRICULTURAL USE

E

DATEDESCRIPTIONREV

13.03.17UPDATED FOR APPROVALA

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

15.03.17UPDATED FOR APPROVALB

DERELICT FORMERFARM BUILDING

29.03.17UPDATED FOR APPROVALC

04.04.17ACCESS TRACK ADJUSTEDD

12.04.17UPDATED FOR APPROVALE

Page 6: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

22m

R=16m

R=16m

4m

4.5m

6m

215m

215m

HEDGEROW TO BETRIMMED TO 1m

WHERE IT IS WITHINTHE VISIBILITY SPLAY

B6056

PROPOSED SITEACCESS

1:1000/500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-05

17021

13.03.17

PROPOSED SITE ENTRANCE

AND HIGHWAY WORKS PLAN

Revision:

A3

Paper Size:

Date:

N

SITE ENTRANCE

VISIBILITY SPLAYS4.5m x 215m

E

DATEDESCRIPTIONREV

14.03.17UPDATED FOR APPROVALA

15.03.17UPDATED FOR APPROVALB

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

CCTV CAMERALOCATIONS AREINDICATIVE

17.03.17UPDATED FOR APPROVALC

29.03.17UPDATED FOR APPROVALD

HERAS FENCINGTERMINATED ATSECURITY GATES

12.04.17UPDATED FOR APPROVALE

Page 7: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

214.00

215.50

210.00

209.00

208.00

207.00

215.12

CA

R P

AR

K

WELL PAD

X

X

TOIL

ETB

LOC

KW

ELFA

RE

(IN

EOS)

+

YY

OPERATIONAL SITEFENCE POSITIONEDCENTRALLY ON TOPOF EARTH BUND

HERAS FENCE TOSITE PERIMETER

OFFICE(INEOS)

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK

SHO

WER

GEN

ERA

TOR

211.950+

211.950+

211.500+

211.650+

+211.650

211.650+

+211.650

+

++211.500

211.500

211.500

211.500

+211.500

+211.500

+211.500

+211.500

N

+212.900

+ 214.000

+218.000

GATEHOUSE

+214.000

WELLHEADCELLAR

BELOW GROUND SURFACEWATER DRAIN WITH IN-PIPESTORAGE CAPACITY

OFFICE (INEOS)

SITE

OFF

ICE

(IN

EOS)

FULL HEIGHTACOUSTIC SCREEN

HERAS FENCE POSITIONEDTO PREVENT INTERACTIONWITH TREES

HERAS FENCE POSITIONEDTO PREVENT INTERACTIONWITH TREES

EMERGENCYEXIT

MATERIALSSTORAGE AREA

TEMPORARY STORAGEAREA FOR CONSTRUCTION

STAGE ONLY

TEMPORARYHERAS FENCE

PEDESTRIANGATE

+212.900

DIE

SEL

TAN

K

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-06

17021

01.03.17

PROPOSED SITE LAYOUT

PLAN

CONSTRUCTION STAGE

Revision:

A3

Paper Size:

Date:

E

DATEDESCRIPTIONREV

13.03.17UPDATED FOR APPROVALA

15.03.17UPDATED FOR APPROVALB

Development

Stage:

STAGE 1: SITE DEVELOPMENT

AND ESTABLISHMENT

17.03.17UPDATED FOR APPROVALC

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

29.03.17UPDATED FOR APPROVALD

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

12.04.17UPDATED FOR APPROVALE

Page 8: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

CA

R P

AR

KX

X

STORE(DRILL Co.)

CA

SIN

G &

DR

ILL

PIPE

STO

RA

GE

AR

EA

WASTE AREA

TOIL

ETB

LOC

KW

ELFA

RE

(IN

EOS) YY

MU

D

CH

EMIC

AL

STO

RE

WELFARE(DRILL Co.)

OFFICE(DRILL Co.)

BIT STORE(DRILL Co.)

CEMENT

WATER OPERATIONAL SITEFENCE POSITIONEDCENTRALLY ON TOPOF EARTH BUND

HERAS FENCE TOSITE PERIMETER

OFFICE(INEOS)

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK

SHO

WER

GEN

ERA

TOR

MU

D

MU

D

WATER

N

DIE

SEL

TAN

K

CASING & DRILL PIPESTORAGE AREA

GATEHOUSE

OFFICE (INEOS)

SITE

OFF

ICE

(IN

EOS)

CABINCABINCABIN

COMP HSE

DIE

SEL

DIE

SEL

GEN

ERA

TOR

GEN

ERA

TOR

GEN

ERA

TOR

SCR

BA

CK

UP

GEN

ERA

TOR

VA

RC

O E

LEC

HSE

DOG HOUSE

CHOKE

MU

D M

IX A

REA

MU

D P

UM

P 2

MU

D P

UM

P 1

MUD TANK SETTLING TANK SHAKER TANK

CUTTINGS HANDLING

EMERGENCY VENT

SURGE TANK

KO

OM

EY

BOP AREA

FULL HEIGHTACOUSTIC SCREEN

HERAS FENCE POSITIONEDTO PREVENT INTERACTIONWITH TREES

HERAS FENCE POSITIONEDTO PREVENT INTERACTIONWITH TREES

DERRICK IN TEMPORARYLAIN DOWN POSITION

EMERGENCYEXIT

PEDESTRIANGATE

MAXIMUM AREA FOR DRILLING RIGAND ANCILLARY DRILLING EQUIPMENT

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-07

17021

01.03.17

PROPOSED SITE LAYOUT

PLAN

DRILLING STAGE

Revision:

A3

Paper Size:

Date:

E

DATEDESCRIPTIONREV

13.03.17UPDATED FOR APPROVALA

Development

Stage:

STAGE 2: DRILLING, CORING

AND SUSPENSION

15.03.17UPDATED FOR APPROVALB

17.03.17UPDATED FOR APPROVALC

ALL CABINS TO NORTH,EAST AND WEST

BOUNDARIES TO BESTACKED DOUBLE

HEIGHT

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

29.03.17UPDATED FOR APPROVALD

FENCING AROUNDTEMPORARY STORAGEAREA REMOVED

WELLHEAD CELLARCATCH PITWITH COVER

12.04.17UPDATED FOR APPROVALE

Page 9: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

X

X

YY

N

TOIL

ETB

LOC

KG

ENER

ATO

RSI

TE O

FFIC

E

GATEHOUSE

FULL HEIGHTACOUSTIC SCREEN

PEDESTRIANGATE

LISTENINGTRUCK

35m CRANE OR32m WORKOVER RIG

DIE

SEL

TAN

K

WEL

FAR

E(I

NEO

S)SU

RFA

CE

WA

TER

STO

RA

GE

TAN

K

MAXIMUM AREA FOR POSITIONINGOF LISTENING EQUIPMENT

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-08

17021

01.03.17

PROPOSED SITE LAYOUT

PLAN

LISTENING STAGE

Revision:

A3

Paper Size:

Date:

G

DATEDESCRIPTIONREV

13.03.17UPDATED FOR APPROVALA

Development

Stage:

STAGE 4: LISTENING STAGE

15.03.17UPDATED FOR APPROVALB

17.03.17UPDATED FOR APPROVALC

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

29.03.17UPDATED FOR APPROVALD

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

WELLHEAD CELLARCATCH PITWITH COVER

12.04.17UPDATED FOR APPROVALE

24.04.17UPDATED FOR APPROVALF

24.04.17UPDATED FOR APPROVALG

Page 10: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

WELL CASINGS CUTDOWN TO 2m BELOWORIGINAL GROUNDLEVEL

Tp

HEDGE TO BE RE-PLANTEDVERGE REINSTATED ASEXISTING

1:1250

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-09

17021

01.03.17

PROPOSED

SITE RESTORATION

Revision:

A3

Paper Size:

Date:

N

SITE TO BE RESTOREDTO AGRICULTURAL USE

E

DATEDESCRIPTIONREV

13.03.17UPDATED FOR APPROVALA

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

LAND WITHIN APPLICANTCONTROL

ALL IMPORTED MATERIALTO BE TAKEN OFF SITE WITHEXISTING GROUND LEVELS

REINSTATED USING STOREDSUBSOIL AND TOPSOIL.

Development

Stage:

STAGE 5: ABANDONMENT

AND RESTORATION

15.03.17UPDATED FOR APPROVALB

SITE SHOWN IN THEFINAL STAGES

17.03.17UPDATED FOR APPROVALC

DERELICT FORMERFARM BUILDING

29.03.17UPDATED FOR APPROVALD

12.04.17UPDATED FOR APPROVALE

Page 11: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

X

X

STORE(DRILL Co.)

CA

SIN

G &

DR

ILL

PIPE

STO

RA

GE

AR

EA

WASTE AREA

TOIL

ETB

LOC

KW

ELFA

RE

(IN

EOS) YY

CH

EMIC

AL

STO

RE

WELFARE(DRILL Co.)

OFFICE(DRILL Co.)

BIT STORE(DRILL Co.)WATER

OFFICE(INEOS)

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK

SHO

WER

GEN

ERA

TOR

N

DIE

SEL

TAN

K

CASING & DRILL PIPESTORAGE AREA

GATEHOUSE

OFFICE (INEOS)

SITE

OFF

ICE

(IN

EOS)

CABINCABINCABIN

PEDESTRIANGATE

2

2

1

1

1

11111

1

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-10

17021

01.03.17

PROPOSED LIGHTING PLAN

STAGE 2 DRILLING, CORING

AND SUSPENSION

Revision:

A3

Paper Size:

Date:

D

DATEDESCRIPTIONREV

17.03.17UPDATED FOR APPROVALA

1

QUADRATO 22W LED BLACKPOWDER COATED DIECASTALUMINIUM BODY SENSORCOMPATABLE SIZE 305 x 305 x145 BY DESIGNPLAN ORSIMILARSHOWN THUS:

1 LIGHT OVER DOOR:1 LIGHT OVER DOORAT BOTH LEVELS: 2

29.03.17UPDATED FOR APPROVALB

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

WELLHEAD CELLARCATCH PITWITH COVER

12.04.17UPDATED FOR APPROVALC

24.04.17UPDATED FOR APPROVALD

Page 12: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

214.00

215.50

210.00

209.00

208.00

207.00

215.12

CA

R P

AR

KX

X

+

YY

211.950+

211.950+

211.500+

FALLFALL FALL FALL

FALL

FALL

FALL

FALL

211.650+

+211.650

211.650+

+211.650

+

++211.500

211.500

211.500

211.500

+211.500

+211.500

+211.500

+211.500

BELOW GROUNDSURFACE WATERDRAIN WITH IN-PIPESTORAGE CAPACITY(POLYPIPE ORSIMILAR) I.L.= 210.000

N

+212.900

+ 214.000

+218.000

+214.000

CATCH PIT FORMEDUSING 900 Ø 'T'SECTION POLYPIPEOR SIMILAR WITHCONTENTS PUMPEDINTO WATER TANK

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK

FALL

FALLPEDESTRIANGATE

+212.900

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-11

17021

01.03.17

PROPOSED DRAINAGE PLAN

STAGES 1 - 4

Revision:

A3

Paper Size:

Date:

E

DATEDESCRIPTIONREV

13.03.17UPDATED FOR APPROVALA

15.03.17UPDATED FOR APPROVALB

17.03.17UPDATED FOR APPROVALC

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

29.03.17UPDATED FOR APPROVALD

12.04.17UPDATED FOR APPROVALE

Page 13: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

CA

R P

AR

KX

X

YY

N

FULL HEIGHTACOUSTIC SCREEN

PEDESTRIANGATE

GEN

ERA

TOR

TOIL

ETB

LOC

KW

ELFA

RE

(IN

EOS)

SUR

FAC

E W

ATE

RST

OR

AG

E TA

NK

SITE

OFF

ICE

(IN

EOS)

DIE

SEL

TAN

K

GATEHOUSE

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-12

17021

15.03.17

PROPOSED SITE LAYOUT

PLAN

SUSPENSION STAGE

Revision:

A3

Paper Size:

Date:

Development

Stage:

STAGE 3: SUSPENSION

C

DATEDESCRIPTIONREV

17.03.17UPDATED FOR APPROVALA

29.03.17UPDATED FOR APPROVALB

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

31.04.17UPDATED FOR APPROVALC

Page 14: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

CA

R P

AR

KX

X

YY

NPEDESTRIANGATE

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-13

17021

01.03.17

PROPOSED INTERNAL

ACCESS PLAN

Revision:

A3

Paper Size:

Date:

E

DATEDESCRIPTIONREV

13.03.17UPDATED FOR APPROVALA

15.03.17UPDATED FOR APPROVALB

17.03.17UPDATED FOR APPROVALC

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

29.03.17UPDATED FOR APPROVALD

SWEPT PATH PROVIDED BYCURTINS CONSULTING LTD.USING A 16.5m ARTICULATEDVEHICLE(FOR DETAILS SEE CURTINSDRAWING No. TPMA1529-110)

12.04.17UPDATED FOR APPROVALE

Page 15: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

900 Ø DRAIN & STORAGEPIPE OR SIMILARI.L.= 210.000

OPERATIONALSITE FENCE

PROFILE OF EXISTINGGROUND

EXISTING HEDGE

HERAS FENCE

TEMPORARY SOILSTORAGE AREA

TOP SOIL REMOVED AND REPLACEDWITH COMPACTED GRANULAR FILLTO MAKE UP LEVELS

PROFILE OF EXISTINGGROUND

EXISTING HEDGE

HERAS FENCE

TEMPORARY SOILSTORAGE AREA

HDPE LINER INSTALLEDACROSS THE SITE TOPROVIDE IMPERMEABLEBARRIER

OPERATIONALSITE FENCE

900 Ø DRAIN & STORAGEPIPE OR SIMILARI.L.= 210.000

PROFILE OF EXISTINGGROUND

HERAS FENCE

TEMPORARY SOILSTORAGE AREA PERMEABLE FINISH COMPRISING

150mm TYPE 1 STONE ON 300mmRECYCLED AGGREGATE

TOP SOIL REMOVED AND REPLACEDWITH COMPACTED GRANULAR FILLTO MAKE UP LEVELS

OPERATIONALSITE FENCE

300mm COMPACTEDRECYCLED AGGREGATE

TYPE1 STONE FINISH

TERRAM GEOTEXTILEMEMBRANE (OR SIMILAR)

4000

TYPICAL SECTION THROUGH ACCESS TRACK(1:50)

150

FALLFALL

HERAS FENCE

42000 10000

3500

4000

10000

PASSING PLACE WITH WHEEL WASH(1:500)

20m x 3.4m DRY WHEEL WASH BY DRIVEONV-TECH WHEEL CLEANING SYSTEMS OR SIMILAR

X - X

EXTENT OF WELL PAD

CONCRETE SURROUNDTO WELL CELLAR

HDPE LINER

PERMEABLE FINISH COMPRISING150mm TYPE 1 STONE ON 300mmRECYCLED AGGREGATE

300mm COMPACTED RECYCLEDAGGREGATE BELOW LINER ONTERRAM GEOTEXTILEMEMBRANE (OR SIMILAR)

(1:50)

450

2mm HDPE LINER TAKEN UP THE INSIDEFACE OF THE BUND AND TUCKED INWITH ADDITIONAL SOIL OVER TOPROVIDE FIXING FOR COVAMAT

150

GREENFIX COVAMAT - PLUS TYPE 3OR SIMILAR APPROVED FIXED TOFACE OF BUND

300mm THICKNESS OFRECYCLED AGGREGATE

COMPACTED GRANULAR FILL

150mm TYPE 1 STONE FINISH

CAR PARK

PROFILE OF EXISTINGGROUND

TEMPORARY SOILSTORAGE AREA

HDPE LINER INSTALLED ACROSS THESITE TO PROVIDE IMPERMEABLEBARRIER TAKEN UP FACE OF BUND

OPERATIONALSITE FENCE

HERAS FENCE

900 Ø DRAIN & STORAGEPIPE OR SIMILARI.L.= 210.000

PERMEABLE FINISH COMPRISING150mm TYPE 1 STONE ON 300mmRECYCLED AGGREGATE

Y - Y

EXTENT OF WELL PAD

CONCRETE SUPPORTSFOR SKID BEAMS

HDPE LINER

PERMEABLE FINISH COMPRISING150mm TYPE 1 STONE ON 300mmRECYCLED AGGREGATE

300mm COMPACTED RECYCLED AGGREGATEBELOW LINER ON TERRAM GEOTEXTILEMEMBRANE (OR SIMILAR)

SECTION THROUGH WELL CELLAR(1:25)

SKID SUPPORT COMPRISING 300 DEEPREINFORCED CONCRETE STRIP

211.500

REMOVABLE ACCESSCOVER

150 TYPE 1 STONE DRESSING

DRILL PIPE CASING

300mm THICKNESS OFRECYCLED AGGREGATE

300mm THICKNESS OFRECYCLED AGGREGATE

2mm HDPE LINER INSTALLED TOMANUFACTURERS SPECIFICATIONWITH 1000 GSM NEEDLE PUNCHEDGEOTEXTILE MEMBRANE ABOVEAND BELOW FOR PROTECTION

MASS CONCRETESURROUND

HDPE LINER SEALEDAGAINST DRILL PIPECASING

MIN 600 DEEP MASSCONCRETE POUREDAGAINST DRILL PIPECASING

2.4m Ø MANHOLE RINGSSUPPORTED ON MASSCONCRETE

1:500/200/50/25

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-16

17021

01.03.17

PROPOSED SECTIONS

& DETAILS STAGE 1

SITE DEVELOPMENT

& ESTABLISHMENT

Revision:

A3

Paper Size:

Date:

E

DATEDESCRIPTIONREV

13.03.17UPDATED FOR APPROVALA

BUNDS FORMED USING GRANULAR SUB-SOIL EXCAVATEDFROM SITE WITH A TOP SOIL FINISH TO PROVIDE A GROWING

MEDIUM FOR COVAMATS.TERRAM GEOTEXTILE MEMBRANE (OR SIMILAR) TO BE USEDAS A SEPARATION LAYER BETWEEN IMPORTED GRANULAR

MATERIALS AND EXCAVATED SITE MATERIALS

TEMPORARY SOIL STORAGE AREAS

15.03.17UPDATED FOR APPROVALB

17.03.17UPDATED FOR APPROVALC

30.03.17UPDATED FOR APPROVALD

12.04.17UPDATED FOR APPROVALE

Page 16: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

X

X

YY

N

TOIL

ETB

LOC

KG

ENER

ATO

RSI

TE O

FFIC

E

GATEHOUSE

FULL HEIGHTACOUSTIC SCREEN

PEDESTRIANGATE

DIE

SEL

TAN

K

WEL

FAR

E(I

NEO

S)SU

RFA

CE

WA

TER

STO

RA

GE

TAN

K

32m WORKOVER RIG

MAXIMUM AREA FOR POSITIONINGOF WORKOVER EQUIPMENT

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-17

17021

01.03.17

PROPOSED SITE LAYOUT

PLAN

POSSIBLE WORKOVER

Revision:

A3

Paper Size:

Date:

DATEDESCRIPTIONREV

Development

Stage:

STAGE 3a:

POSSIBLE WORKOVER

APPLICATION BOUNDARYAND EXTENT OF SURFACEWORKS

MONITORING BOREHOLELOCATIONS AREINDICATIVE AND WILLBE AGREED WITH THEENVIRONMENT AGENCY

CCTV CAMERALOCATIONS AREINDICATIVE

MOVEABLE LIGHTINGCOLUMNS

WELLHEAD CELLARCATCH PITWITH COVER

Page 17: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

Y - Y

WELL PAD LEVEL

GROUND LEVEL VARIES

5.5m

9m

2m

9m

CAR PARK

X - X

5.5m

9m WELL PAD LEVEL

GROUND LEVEL VARIES

2m

5.5m 2m

KEY:

ZONE FOR HERRAS FENCINGMAXIMUM HEIGHT 2m

MAXIMUM HEIGHT OF DOUBLESTACKED CABINS 5.5m

ZONE FOR OPERATIONAL SITEFENCING MAXIMUM HEIGHT 7mLIGHTING & CCTV COLUMNSMAXIMUM HEIGHT 9m

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-21

17021

17.03.17

PARAMETER SECTIONS

Revision:

A3

Paper Size:

Date:

Development

Stage:

STAGE 1: SITE DEVELOPMENT

AND ESTABLISHMENT

DATEDESCRIPTIONREV

30.03.17UPDATED FOR APPROVALA

C

24.04.17UPDATED FOR APPROVALB

25.04.17UPDATED FOR APPROVALC

Page 18: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

Y - Y

WELL PAD LEVEL

GROUND LEVEL VARIES

60m

15m

5.5m

9m

2m

9m

CAR PARK

X - X

60m

15m

5.5m

9m WELL PAD LEVEL

GROUND LEVEL VARIES

2m

5.5m 2m

KEY:

ZONE FOR HERRAS FENCINGMAXIMUM HEIGHT 2m

MAXIMUM HEIGHT OF DOUBLESTACKED CABINS 5.5m

ZONE FOR OPERATIONAL SITEFENCING MAXIMUM HEIGHT 7mLIGHTING & CCTV COLUMNSMAXIMUM HEIGHT 9m

ZONE FOR SUBSTRUCTURE &ANCILLARY DRILLING EQUIPMENTMAXIMUM HEIGHT 15m

ZONE FOR DRILLING RIGMAXIMUM HEIGHT 60m

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-22

17021

17.03.17

PARAMETER SECTIONS

Revision:

A3

Paper Size:

Date:

Development

Stage:

STAGE 2: DRILLING, CORING

AND SUSPENSION

DATEDESCRIPTIONREV

30.03.17UPDATED FOR APPROVALA

D

12.04.17UPDATED FOR APPROVALB

24.04.17UPDATED FOR APPROVALC

25.04.17UPDATED FOR APPROVALD

Page 19: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

Y - Y

WELL PAD LEVEL

GROUND LEVEL VARIES

5.5m

9m

2m

9m

CAR PARK

X - X

5.5m

9m WELL PAD LEVEL

GROUND LEVEL VARIES

2m

5.5m 2m

KEY:

ZONE FOR HERRAS FENCINGMAXIMUM HEIGHT 2m

MAXIMUM HEIGHT OF DOUBLESTACKED CABINS 5.5m

ZONE FOR OPERATIONAL SITEFENCING MAXIMUM HEIGHT 7mLIGHTING & CCTV COLUMNSMAXIMUM HEIGHT 9m

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-23

17021

17.03.17

PARAMETER SECTIONS

Revision:

A3

Paper Size:

Date:

Development

Stage:

STAGE 3: MAINTENANCE

AND SUSPENDED WELL

DATEDESCRIPTIONREV

30.03.17UPDATED FOR APPROVALA

D

12.04.17UPDATED FOR APPROVALB

24.04.17UPDATED FOR APPROVALC

25.04.17UPDATED FOR APPROVALD

Page 20: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

Y - Y

WELL PAD LEVEL

GROUND LEVEL VARIES

5.5m

9m

2m

9m

CAR PARK

32m

X - X

5.5m

9m WELL PAD LEVEL

GROUND LEVEL VARIES

2m

5.5m 2m

32m

ZONE FOR WORK OVER RIGMAXIMUM HEIGHT 32m

KEY:

ZONE FOR HERRAS FENCINGMAXIMUM HEIGHT 2m

MAXIMUM HEIGHT OF DOUBLESTACKED CABINS 5.5m

ZONE FOR OPERATIONAL SITEFENCING MAXIMUM HEIGHT 7mLIGHTING & CCTV COLUMNSMAXIMUM HEIGHT 9m

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-24

17021

17.03.17

PARAMETER SECTIONS

Revision:

A3

Paper Size:

Date:

Development

Stage:

STAGE 3a: POTENTIAL

WORK OVER OF WELL

DATEDESCRIPTIONREV

30.03.17UPDATED FOR APPROVALA

C

24.04.17UPDATED FOR APPROVALB

25.04.17UPDATED FOR APPROVALC

Page 21: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

Y - Y

WELL PAD LEVEL

GROUND LEVEL VARIES

5.5m

9m

2m

9m

CAR PARK

35m

X - X

5.5m

9m WELL PAD LEVEL

GROUND LEVEL VARIES

2m

5.5m 2m

35m

ZONE FOR CRANE AND LISTENINGEQUIPMENT MAXIMUM HEIGHT 35m

KEY:

ZONE FOR HERRAS FENCINGMAXIMUM HEIGHT 2m

MAXIMUM HEIGHT OF DOUBLESTACKED CABINS 5.5m

ZONE FOR OPERATIONAL SITEFENCING MAXIMUM HEIGHT 7mLIGHTING & CCTV COLUMNSMAXIMUM HEIGHT 9m

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-25

17021

17.03.17

PARAMETER SECTIONS

Revision:

A3

Paper Size:

Date:

Development

Stage:

STAGE 4: LISTENING STAGE

DATEDESCRIPTIONREV

30.03.17UPDATED FOR APPROVALA

C

24.04.17UPDATED FOR APPROVALB

25.04.17UPDATED FOR APPROVALC

Page 22: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

1:500

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

FOR APPROVAL

P300 - S1

COMPOUND

P300-S1-PA-26

17021

17.03.17

PARAMETER SECTIONS

Revision:

A3

Paper Size:

Date:

Development

Stage:

STAGE 5: ABANDONMENT

AND RESTORATION

SITE TO BE RESTORED TOORIGINAL LAND PROFILE

SITE TO BE RESTORED TOORIGINAL LAND PROFILE

DATEDESCRIPTIONREV

30.03.17UPDATED FOR APPROVALA

B

12.04.17UPDATED FOR APPROVALB

Page 23: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

2000

3500

HERAS ROUND TOP PANEL

HERAS PANEL SPECIFICATIONS

PANEL DIMENSIONS 2000mm (H) 3500mm (W)HORIZONTAL TUBE 38.1mmVERTICAL TUBE 38.1mmREINFORCED CORNERS YESWEIGHT 17kgFINISH COLOUR TO BE AGREED WITH MINERALS PLANNING AUTHORITY

POST AND ROPE FENCE SPECIFICATIONS

POSTS 1500mm (L) 75mmØ TREATED SOFTWOODPOST CENTERS 2000mm - 3000mm

ROPE TYPE COLOUR AND MATERIAL TO BE AGREED WITH MINERALS PLANNING AUTHORITY

POST AND ROPE FENCE

1000

1:20

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

P300 - S1COMPOUND

P300-S1-PA-30

17021

24.04.17

FENCE DETAILS

Revision:

A3Paper Size: Date:

B

DATEDESCRIPTIONREV

25.04.17SPECIFICATION UPDATED.A

NOTISSUED

POST AND ROPE FENCE DETAILSADDED.B

Page 24: 5. Application Drawings - Ineos · drawing number: drawing status:for approval p300 - s1 compound p300-s1-pa-01 17021 01.03.17 application site plan revision: paper size: a3 date:

N.T.S.

Project Title:

Drawing Title:

Drawing Scale:

Project Number:

Drawing Number:

Drawing Status:

P300 - S1COMPOUND

P300-S1-PA-31

17021

26.04.17

LIGHTING EXAMPLES

Revision:

A3Paper Size: Date:

DATEDESCRIPTIONREV

EXAMPLES OF THE PROPOSED LIGHTING UNITS ARE:

TOWARDS TOMORROWENERGY - TTE-FL-80

80W LED FLOODLIGHTSILVER POWDER COATED ALLOYSENSOR COMPATIBLESIZE 365mm x 285mm x 120mm

DESIGNPLAN LIGHTING -QUADRATO

22W LEDBLACK POWDER COATED DIECAST ALUMINIUM BODYSENSOR COMPATIBLESIZE 305mm x 305mm x 145mm

DESIGNPLAN LIGHTING -BERGEN

21W LEDTITANIUM POWDER COATED STEELSIZE 400mm x 200mm x 100mm

VT1 ECO LIGHTINGTOWER 9m

10kva MOVABLE UNITWITH 360° ROTATION