4Q/FY2011 Results Presentationesr-reit.listedcompany.com/misc/201210181514454_en.pdf ·...
Transcript of 4Q/FY2011 Results Presentationesr-reit.listedcompany.com/misc/201210181514454_en.pdf ·...
4Q/FY2011 Results Presentation January 2012
2 2
This material shall be read in conjunction with CIT’s financial statements for the financial period ended 31 December 2011. The value of units in CIT (“Units”) and the income derived from them may fall as well as rise. Units are not investments, liabilities or obligations of, or deposits in, Cambridge Industrial Trust Management Limited ("Manager"), RBC Dexia Trust Services Singapore Limited (in its capacity as trustee of CIT) ("Trustee"), or any of their respective related corporations and affiliates (including but not limited to National Australia Bank Limited, nabInvest Capital Partners Pty Ltd, or other members of the National Australia Bank group) and their affiliates (individually and collectively "Affiliates"). An investment in Units is subject to equity investment risk, including the possible delays in repayment and loss of income or the principal amount invested. Neither CIT, the Manager, the Trustee nor any of the Affiliates guarantees the repayment of any principal amount invested, the performance of CIT, any particular rate of return from investing in CIT, or any taxation consequences of an investment in CIT. Any indication of CIT performance returns is historical and cannot be relied on as an indicator of future performance. Investors have no right to request that the Manager redeem or purchase their Units while the Units are listed. It is intended that investors may only deal in their Units through trading on Singapore Exchange Securities Trading Limited (the “SGX-ST”). Listing of the Units on the SGX-ST does not guarantee a liquid market for the Units. This presentation may contain forward-looking statements that involve assumptions, risks and uncertainties. Actual future performance, outcomes and results may differ materially from those expressed in forward-looking statements as a result of a number of risks, uncertainties and assumptions. Representative examples of these factors include (without limitation) general industry and economic conditions, interest rate trends, cost of capital and capital availability, competition from similar developments, shifts in expected levels of occupancy or property rental income, changes in operating expenses (including employee wages, benefits and training costs), governmental and public policy changes and the continued availability of financing in amounts and on terms necessary to support future CIT business. You are cautioned not to place undue reliance on these forward-looking statements, which are based on the Manager’s current view of future events. This presentation is for informational purposes only and does not have regard to your specific investment objectives, financial situation or your particular needs. Any information contained in this presentation is not to be construed as investment or financial advice, and does not constitute an offer or an invitation to invest in CIT or any investment or product of or to subscribe to any services offered by the Manager, the Trustee or any of the Affiliates.
Important Notice
Contents • Performance Snapshot • 4Q/FY2011 Financial Results • Asset Management • Capital Management • Looking Ahead
4
4Q2011 Snapshot
• DPU increased by 3.3% over 3Q2011 to 1.118 cents.
• Properties are revalued1 upward to S$1,023.6 million.
• High occupancy rates at 98.5% and low arrears at 0.6% annualised rent.
• NTA per unit increased to 62.0 cents from 61.7 cents in 3Q2011.
1 Valuation conducted by Colliers International Consultancy & Valuation (Singapore) Pte Ltd with exception of 30 Tuas Road, which was valued by
Knight Frank Pte Ltd. The property at 1 Tuas Avenue 3 has been kept at its carrying value as at 31 December 2010.
5
DPU in FY2011
1.001
1.036
1.082
1.118
0.9
1
1.1
1.2
1Q2011 2Q2011 3Q2011 4Q2011
Cen
ts
DPU in FY2011
DPU
6
Delivering on our Strategies
In FY2011, we have delivered on all fronts of our strategic platform
• Maintained high occupancy, low arrears and high level of security deposits across the year.
• Commenced asset enhancement works at 2 properties which are yield accretive to the portfolio.
Pro-active Asset Management
• Distribution Income achieved S$50.4 million, a 12.7% increase against FY2010.
• NTA per unit increased to 62.0 cents against FY2010’s 60.7 cents. • Completed acquisition of 3 properties and commenced 2 built-to-suit
projects.
Acquisitions of Value-Enhancing
Assets
• No refinancing risk till 2014, weighted average interest cost dropped to 3.3% from 3.8% in FY2010.
• Gearing ratio decreased to 33.1% from 34.7% in FY2010. • Interest cover ratio increased to 5 times from FY2010’s 4 times.
Prudent Capital & Risk Management
• Completed divestment of 36 strata units at 48 Toh Guan Road East, with net sales proceeds of S$24.2 million, exceeding book value by approximately 10.0%.
Divestment of Non-core Assets
7
Strategically
Located Quality Assets
Built-in Rental
Escalation
Stable Income
Flow
Strong Lease
Expiry Profile
Diversified Asset Class & Tenant
Trade
Robust
Occupancy Rates
High Level Of Security Deposits
Long
Average Lease Term
Low
Arrears Ratio
Building on our Strengths As at 31 December 2011, CIT’s portfolio comprises 45 properties and
2 built-to-suit projects at an aggregate book value of S$1,027.2 million
4Q/FY2011 Financial Results
9
4Q2011 Performance
4Q2011
(S$ million)
3Q2011
(S$ million) Q-o-Q (%)
4Q2010
(S$ million) Y-o-Y (%)
Gross Revenue 20.8 20.7 0.2 19.1 9.0
Net Property Income 18.1 17.6 2.8 16.8 7.6
Distributable Income 13.3 12.9 3.3 12.0 10.6
Distribution Per Unit (“DPU”) (cents) 1.118 1.082 3.3 1.193 (6.3)
Annualised DPU (cents) 4.436 4.293 3.3 4.733 (6.3)
10
FY2011 Financial Summary
FY2011
(S$ million)
FY2010
(S$ million) Y-o-Y(%)
Gross Revenue 80.4 74.2 8.3
Net Property Income 69.1 65.1 6.2
Distributable Income 50.4 44.7 12.7
Distribution Per Unit (“DPU”) (cents) 4.237(1) 4.892 (13.4)
(1) 4.362 (excluding the effect of rights units issued in April 2011 and entitled to 1Q2011’s distributions)
11
Balance Sheet
(1) Investment properties included a property held for divestment at 7 Ubi Close.
(2) Properties under development comprised the progress of the development projects at Tuas View Circuit and at Seletar Aerospace Park
(3) Current assets comprised mainly cash of S$78.8 million ( 31 Dec 2010: S$71.1 million)
31 Dec 2011
(S$ million)
31 Dec 2010
(S$ million)
30 Sep 2011
(S$ million)
Investment Properties 1,023.6(1) 928.5 1,018.8(1)
Properties under development 3.6(2) - 1.4(2)
Current Assets(3) 80.2 72.1 87.3
Total Assets 1,107.4 1,000.6 1,107.5
Borrowings 356.6 339.2 355.7
Other Liabilities 12.9 19.2 17.8
Total Liabilities 369.5 358.4 373.5
Net Assets 737.9 642.2 734.0
Gearing ratio 33.1% 34.7% 33.1%
No. of units issued (millions) 1,189.2 1,057.1 1,189.2
NTA Per Unit (cents) 62.0 60.7 61.7
12
Distribution Timetable
Event Dates
Distribution Period 1 October 2011 to 31 December 2011
Distribution Rate 1.118 cents per unit
Last Day of Trading on a “cum” Basis Friday, 3 February 2012 (5pm)
Ex-date Monday, 6 February 2012 (9am)
Books Closure Date Wednesday, 8 February 2012 (5pm)
Distribution Payment Date Wednesday, 29 February 2012
Asset Management
14
Portfolio Details 31 Dec 2011 31 Dec 2010 30 Sep 2011
Total Portfolio GFA (sq m) 678,775 656,465 677,847
Net Lettable Area (sq m) 657,777 640,908 657,059
Portfolio Occupancy (%) 98.5 99.0 98.7
Total number of Tenants 161 110 151
Total number of Properties 45 + 2 BTS 43 45 + 2 BTS
Weighted Average Lease to Expiry (years) 3.3 4.1 3.5
Arrears Ratio (%) (against CIT’s annualised rent) 0.6 0.3 0.2
Average Security Deposits (months) 12.5 14.0 12.7
Portfolio Running Yield (%) 8.1 8.4 8.1
2013 & 2014 Lease Expiry Concentration (% of Portfolio) 49.7 54.6 49.2
Top 10 Tenants Gross Revenue (% of Portfolio) 50.6 56.6 50.8
Balance Land Lease (years) 36.0 36.5 36.1
15
Managing our Leases
• Weighted average lease expiry (“WALE”) of 3.3 years
• Active asset management improves lease expiry profile towards targeted 20-25% per annum
15.7%
26.9%
8.3%
16.8%
9.0%
2.9% 1.8%
9.2%
2.5%
4.6%
0.1%
1.2%
1.0% 0%
5%
10%
15%
20%
25%
30%
35%
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Expiring Leases of Multi-Tenanted Properties as a % of Rental Income
Expiring Leases of Single-Tenanted Properties as a % of Rental Income
16
Single-Tenanted vs Multi-Tenanted Properties (By Rental Income) as at 31 Dec 2011
Properties Tenancy Mix
Weighted Average Lease to Expiry (“WALE”) (years)
Average Security Deposits (months)
Total Portfolio (45 properties)
3.3 12.5
Single-Tenanted Properties (39 properties)
3.6 14.6
Multi-Tenanted Properties (6 properties)
2.1 3.4
20.0% 80.0%
Multi-Tenanted Properties
Single Tenanted Properties
17
Top 10 Tenants
Top 10 Tenants as % of Gross Rent (as at 31 Dec 2011)
13.4%
9.0%
5.1% 4.6% 3.8% 3.7% 3.4%
2.6% 2.5% 2.5%
0%
2%
4%
6%
8%
10%
12%
14%
16%
As at 31 December 2011, top 10 tenants account for 50.6% of Gross Rent
Reduced from 56.6% to 50.6% during FY2011
18
Diversified Rental by Sectors (as at 31 Dec 2011)
Quality Tenant Base
Logistics, 38.5%
Light Industrial, 28.2%
Warehousing, 14.4% Industrial, 11.6%
Self Storage and Warehousing, 2.5%
Car Showroom and Workshop, 4.8%
As at 31 December 2011, 46.6% of rental income contributed by tenants are from public-listed companies or their subsidiaries
19
Rental Income Contribution by Tenant Trade Sector (as at 31 Dec 2011)
Diversified Tenant Base We have a diversified tenant base from a wide range of trade sectors
Civil & Engineering Services, 4.9%
Developer, 4.9%
Computer, Electronic and Optical Products, 11.3%
Fabricated Metal Products, 4.6%
Machinery and Equipment, 2.4%
Paper and Paper Products, 3.1%
Precision Engineering, 2.2%
Rubber and Plastic Products, 2.5%
M&E Services and Gas Supply, 2.3%
Architectural and Engineering Activities and Related Technical
Consultancy, 1.9% Logistics, 18.2%
Warehousing & Container Services, 4.7%
General storage, 4.1%
Specialised storage, 6.3%
Other Services, 0.5%
Car Distribution, 5.1%
Education, 2.0%
Food Related Services, 1.9%
Wholesale of Household Goods, Textiles, Furniture & Furnishing and
Others, 4.0%
Wholesale of Industrial, Construction and IT Related
Machinery and Equipment, 13.1%
20
Portfolio Update
• Completed acquisition of 3C Toh Guan Road East.
• Two ‘Built-To-Suit’ projects undergoing development - Tuas View Circuit - Seletar Aerospace Park
• Asset enhancement works ongoing at
- 30 Toh Guan Road - 88 International Road
• Compensation claims regarding land acquisitions remain with SLA pending its review.
21
Acquisitions
3C Toh Guan Road East Location Easily accessible via the AYE and PIE
Property Description Five storey warehouse with ancillary office
Tenant Tye Soon Ltd
Land Area Approximately 79,719 sq ft
Gross Floor Area Approximately 192,864 sq ft
Land Lease Expiry/Title 30+30 years from 16 February 1991
Tenant Lease Term 3+3 years
Occupancy 100%
Valuation by JLL S$35.5 million
Purchase Consideration S$35.5 million
Timing Acquisition completed on 30 January 2012
22
Option Signed
25 Pioneer Crescent * Location Easily accessible via the AYE
Property Description
A purpose built 4-storey factory cum warehouse with ancillary office on the 3rd and 4th storey
Tenant Kalzip Asia Pte Ltd (part of the Tata Steel Group)
Land Area Approximately 75,282 sq ft
Gross Floor Area Approximately 76,003 sq ft
Land Lease Expiry/Title
30+12 years from 1 February 2009 subject to JTC’s confirmation
Tenant Lease Term
Novation of existing lease for the balance term of approximately 13 years with three consecutive 5-year options to renew
Occupancy 100%
Valuation by Colliers and DTZ S$15.0 million
Purchase Consideration S$15.0 million
Timing Option signed on 12 October 2011
* The seller is Oxley Opportunity #9 Pte Ltd, a related party of an ultimate shareholder of the Manager.
23
Built-To-Suit Development Projects Peter’s Polyethylene Industries –
Tuas View Circuit Location
A0964602 Tuas View Circuit Easily accessible via the AYE and PIE
Property Description Three level office and warehouse complex
Tenant Fully leased by Peter's Polyethylene Industries Pte Ltd
Land Area Approximately 141,416 sq ft
Gross Floor Area Approximately 121,423 sq ft
Land Lease Expiry/Title
30 years from 01 February 2008 (subject to JTC’s confirmation)
Lease terms 10 + 5 years Rental escalation of 5% in years 3, 5, 6, 7 and 9
Estimated development cost S$13.2 million
Estimated value on completion S$16.0 million
Timing Development completion forecast at 2nd half of 2012.
24
Air Transport Training College – Seletar Aerospace Park
Location Seletar Aerospace Park Easily accessible via the TPE
Property Description Part single-storey storey and part 2/3 storey industrial building with hangar and ancillary office
Tenant Fully leased by Air Transport Training College Pte Ltd (“ATTC”)
Land Area Approximately 57,286 sq ft
Gross Floor Area Approximately 52,170 sq ft
Land Lease Expiry/Title
30 years from 16 October 2011 (subject to JTC’s confirmation)
Lease terms Tenant to lease back the balance land lease upon completion of construction. Rental escalation of 1.5% annually for first 15 years.
Estimated development cost S$8.7 million
Estimated value on completion S$10.0 million
Timing Development completion forecast at 3Q2012
Built-To-Suit Development Projects (cont’d)
25
Asset Enhancement Initiatives
30 Toh Guan Road
Location Close proximity to Jurong East MRT station Earmarked for regional development under the 2008 Masterplan
Project objective Add floor space to fully utilise available plot ratio Upgrade building to present repositioned image Achieve Green Mark Certification
Detailed project works
Design and build new warehouse facility including part demolition of existing building Upgrade of existing building lifts and services to Green Mark standard
Additional gross floor area Approximately 14,000 sq ft
Estimated cost S$8.3 million
Projected Incremental NPI S$0.83 million
NPI Yield 10.0%
Timing Completion forecast at 4Q2012
26
Asset Enhancement Initiatives (cont’d)
88 International Road
Location Close proximity to Joo Koon MRT station
Project objective Add floor space to fully utilise available plot ratio
Detailed project works
Redevelopment of existing warehouse into 3-storey warehouse/production facility with basement carparking
Additional gross floor area
GFA increased from 53,500 sq ft to 155,800 sq ft, representing an additional 102,300 sq ft
Estimated cost S$16.0 million
Projected Incremental NPI S$1.86 million
NPI Yield 11.6%
Timing Work forecast to commence in 2Q2012 Completion forecast for 4Q2013
27
Asset Enhancement Initiatives (cont’d)
4 & 6 Clementi Loop (Stage 2)
Location Easily accessible via the AYE and PIE
Project objective Add floor space to fully utilise available plot ratio
Detailed project works
Development of a new 4-storey warehouse cum office facility including part demolition of the existing warehouse. Project was precommitted before asset was acquired (Stage 1) in June 2011.
Additional gross floor area GFA increased by 110,725 sq ft
Tenant Hoe Leong Corporation Ltd
Purchase Consideration S$23.25 million
Timing Completion forecast for 4Q2012
Capital Management
29
Long-term Debt Funding
The amount drawn on the Acquisition Term Loan Facility was S$46.5 million as at 31 December 2011.
As at 31 December 2011, CIT has the following outstanding borrowings: 1) A term loan of S$320.0 million comprising: - S$220.0 million maturing in June 2014 and - S$100.0 million maturing in June 2016 2) An acquisition term loan of S$46.5 million maturing in March 2014
220
100
120
0
100
200
300
400
2012 2013 2014 2015 2016
S$ M
illio
ns
Acquisition Facility Term Loan Facility
30
Financial Risk Management
87.3%
12.7%
Interest Rate Risk Management
Fixed Floating Based on amounts drawn on the respective facilities
(Acquisition Term Loan Facility) (Term Loan Facility)
Interest rate exposure is fixed at 87.3% of total debt for next 2.4 years
31
(1) Aggregate gross borrowings divided by total assets. (2) Includes amortisation of upfront fees. (3) Computed based on EBIDTA (excluding gain on disposal of investment properties and changes in fair value of financial
derivatives and investment properties) divided by interest expense.
Financial Risk Management
Debt Profile 31 Dec 2011 31 Dec 2010
Gearing ratio(1) (%) 33.1 34.7
Total outstanding debt (S$ million) 366.5 347.5
Total debt fixed (%) 87.3 93.0
Weighted average all-in cost of debt(2) (%) 4.1 5.9
Weighted average interest cost (%) 3.3 3.8
Weighted average term of debt (years) 2.9 1.2
Weighted average term of fixed debt (years) 2.4 1.1
Interest cover ratio(3) (times) 5.0 4.0
Unencumbered investment properties (S$ million) 90.0 NA
Looking Ahead
33
Kick-starting FY2012
Acquisition of 3C Toh Guan Road East at S$35.5 million • Deployment of cash for higher yielding assets. • Positive impact on DPU from 1Q2012.
Pre-lease commitment at 88 International Rd • Attained a quality anchor tenant for a lease term of 7 years
upon completion of Asset Enhancement Works. • Proactive asset management to secure tenancy ahead of
completion.
Divestment of 7 Ubi Close above book value • Divested at $18.71 million, 2.2% premium to the latest
independent valuation of S$18.3 million. • Recycling and redeploying capital for future yield accretive
assets.
34 34
Continued Focus on Strategic Platform
• Continue to identify
opportunities to acquire yield-accretive and value-enhancing properties
• Continue to adopt a
prudent approach in managing capital and risk
• Regularly review the sale of non-core assets to keep the portfolio contemporary.
• Capital recycling to maximise returns.
• Engage with tenants on lease extensions/restructuring
• Secure new leases for multi-tenanted properties
• Identify suitable assets for enhancement
Pro-actively Manage Assets
Divest Non-core Assets
Acquire Value-
enhancing Assets
Manage Capital and
Risk
35
Further Information
Please contact:
Mr David Mason Chief Financial Officer [email protected]
Mr Chris Calvert Chief Executive Officer [email protected]
Ms Nancy Tan Head of Real Estate [email protected]
Cambridge Industrial Trust Management Limited 61 Robinson Road, #12-01 Tel: (65) 6222 3339 Robinson Centre Fax: (65) 6827 9339 Singapore 068893 www.cambridgeindustrialtrust.com