NON-ROUTINE OPERATIONAL PROCEDURES
Document Number :
NR / PR / 04
Issue :00
Process :
Production Process
Date :01 April 2014
Procedure for SewinPae :
1 of 4
1.0 Objective: !"is procedure describes all non#routine operations
associated wit" Sewin is documented to ensure t"at t"e Sewin is carried out under
controlled conditions$ w"ene%er a de%iation or nonconformit& "appens in t"e standard wor'
operation(
2.0 Scope : !"is procedure is applicable onl& for Production all Plants
3.0 Meto! o" T#$i%i%&: )n t"e *ob trainin b& Production +anaer
'.0 ($%!)i%& !$*$&e p$%e)+ i%)i%e: ,.0
1( Sewin operation s"all be carried out wit"out
an& ,ut Panel damaes(
2(
-( If an& %ariation in panels found w"ile startin or
proressin of Sewin operation$ t"e %ariation
s"all be informed first to .A
Super%isor/ecuti%e b& Production super%isor(
4(
( Damae panels found %ariation s"all be
sereated and mar' non#conformit& ta b& .A
super%isors $ t"en inform about t"is %ariation to
cuttin Inc"are b& clear documentation N,R
Report3 raised b& .A Super%isor from
Production ine(
5(
6( !aed non#conformit& panels s"all be replaced
or repaired and issued aain to t"e line b&
creatin t"e ,ut Panel reentr& note from
,uttin(
7(
8( Issue of taed non#conformit& panels to
Sewin operation s"all be mentioned or mar'ed
about t"e non#conformit& clearl& to Sewin
operators$ .A and Production super%isors(
10(
11( Sewin operation s"all be followed up ti"tl& for
t"e non#conformed panels t"rou"out t"e
operations
12(
.0 ($%!)i%& i%)i%e Sei%& !e"ect+:
/.0
1( 9"ile doin t"e Sewin operation$ it s"all be
free from Sewin defects(
.02( If an& %ariation found w"ile doin Sewin
operation b& operators continuousl&$ s"all be
informed to .A super%isors and traffic li"t
s&stemInline .ualit& Assurance Report # 6(0
S&stem3 s"all be monitored on periodic basis for
all Sewin operations(
.010.0
11.0
-( If t"e operation carries more inline damaes b&
operator$ mac"ine$ material and met"od s"all
be monitored and followed b& .A super%isor on
periodic basis(
12.0
4( !"e Sewin defects s"all be documented on
different cateories on periodic basis$ t"en
actions ta'en for top prioritied defects b& .A
Re%ision No : Re%ision Date :
Prepared ;& : Appro%ed ;& :
-
8/17/2019 4.NR_Sewing.docx
2/4
NON-ROUTINE OPERATIONAL PROCEDURES
Document Number :
NR / PR / 04
Issue :00
Process :
Production Process
Date :01 April 2014
Procedure for SewinPae :
2 of 4
Super%isor / ecuti%e b& raisin correcti%e
action ,A3 report(
13.0
( !"e monitorin of inline damaes s"all be
documented and ends wit" correcti%e and
pre%enti%e action report dul& sined and areed
b& Production and .A inc"ares(
1'.0
5( ,orrecti%e and pre%enti%e action document s"all
be updated in wee'l& basis b& .A inc"ares
and meetin conducted reardin inline defects
to ma'e awareness on action ta'en on inline
damaes to rele%ant Super%isor / ecuti%es(
1,.0
6(
-
8/17/2019 4.NR_Sewing.docx
3/4
NON-ROUTINE OPERATIONAL PROCEDURES
Document Number :
NR / PR / 04
Issue :00
Process :
Production Process
Date :01 April 2014
Procedure for SewinPae :
- of 4
30.0
31.0
32.0
33.0
3'.0
3,.0
3.0
3/.0
3.0
3.0 ($%!)i%& *o#e t$% 2 Rec4t:
'0.0
1( !"e Production ine s"all et up to 2 >
of Recut uantit& for eac" Item wise order
uantit& as per t"e norms of factor& procedure(
2(
3. If an& de%iation is found be&ond more
t"an 2 > of allowed Recut uantit& in t"e form
of more damaes(
4(
,. Debit Note s"all be raised in order to et
etra fabric for more t"an 2 > Recut uantit& of
an Item b& Production +anaer Appro%al(
5(
/. ;ased on t"e Debit Note from
Production Department$ +erc"andiers will
proceed t"e process to et fabric for more t"an
2 > Recut of an Item(
7(
8( After arri%al of an etra fabric to recut
section$ more t"an 2 > recut uantit& is fulfilled
on time(
10(
Re%ision No : Re%ision Date :
Prepared ;& : Appro%ed ;& :
-
8/17/2019 4.NR_Sewing.docx
4/4
'1.0 Reco#!+: nd line rewor' report s"all be maintained b& ualit& c"ec'er
1( *ob issue note completion report s"all be maintained b& pac'in leader
2( Dail& button mista'e anal&sis report s"all be maintained b& ualit& c"ec'er
-(
'2.0 Re)$te! P#oce!4#e+: a3 Standard 9or' Instruction for Sewin # S9 /PR / 04
1(
'3.0 Re)$te! Doc4*e%t+: a3 Dail& nd line defect anal&sis report # B) / .A / 06
1. b3 Inline .ualit& Assurance report C 6(0 S&stem # B) / .A
/ -
b ,orrecti%e Action and Pre%enti%e Action form Sewin department # B) / .A / -0
c Dail& button mista'e anal&sis report # B) / .A / 46