19
_____________ D-studio@_ 121015 slide1 4D Virtual Builder ‘Enabling the decision makers with an visual overview of all steps the project requires’ Frank Konings, Kliaplan Malysia ‘Effectively plan projects and demonstrate this to our clients’ Kyp Kyprianou, Bam UK

description

Presentation at Trimble SketchUp 3D Base Camp on Monday 15.10 by Koenraad Nys

Transcript of 4D VB @ Trimble SketchUp 3D Base Camp 2012

Page 1: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide1

4D Virtual Builder

‘Enabling the decision makers withan visual overview of all steps

the project requires’Frank Konings, Kliaplan Malysia

‘Effectively plan projects and demonstrate this to our clients’

Kyp Kyprianou, Bam UK

Page 2: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide2

Mechelen-Belgium / Schiedam-Holland / Luxemburg ( in development )

Software – Services – Consultancy

Markets: AEC, GIS & BIM

Expertise : CAD/BIM (1984 >..) GIS (1990 > .. ) 4D modelling (1999> .. )

Integration & Centralization & Communication of project data 4D (time)-5D (cost)-xD models Full project data integration No data duplication Workflow Automation Communication Object Level

Multiple environments: Trimble SketchUp, ..., Revit, Bentley, ... ArcGIS,...

Clients: BAM, ARCADIS, Eurostation, IBT The Netherlands, City of Amsterdam (IBA), Universities (Leuven, Sydney, Liege, ...), Deutsche Bank, Bouygues, Vinci, Utrecht City (POS), MFC France, ...

The Dimension Studio

Page 3: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide4

xD Server(windows service + web)

xD Server(windows service + web)

ExcelMSPPP…RevitAutoCAD…Database

ExcelMSPPP…RevitAutoCAD…Database

WebinterfaceWebinterface

SketchUpSketchUp Planning / MSPPlanning / MSP

Budget / EXCELBudget / EXCEL

xD Virtual Builder Solution

Page 4: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide5

irir

Design teamDesign team

PlanningPlanning

BudgetBudget……

arar

……

……

DashboardDashboard

PM TeamPM

Team

xD Network of Teams & Solutions

Page 5: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide6

SketchUp ... functional part of the complete workflow of a process integrated with other applicationsDynamic linking with SketchUp, Revit, Navisworks, AutoCAD, Microstation, Primavera, MSP, Powerproject, Relatics, SQL data, … data visualisation for it’s easy access and user friendlyness design assistant

SketchUp Base Camp: concepts

Page 6: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide7

SketchUp ... functional part of the complete workflow of a process integrated with other applicationsDynamic linking with SketchUp, Revit, Navisworks, AutoCAD, Microstation, Primavera, MSP, Powerproject, Relatics, SQL data, … data visualisation for it’s easy access and user friendlyness design assistant

5 project/product samples 4D Virtual Builder: plugins and much more ... ,

5D SuCel: Dynamic and live integartin with excel/sql (proposal phase construction projects) ,

LekkerEigenHuis: SketchUp as online House configuratur preparing production with Revit and Tekla through a webservices IT architecture and SQL webbase.

xD: Integration/visualisation with/for other GIS & thematic data ,

planned : integration with systems engineering

SketchUp Base Camp: concepts

Page 7: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide8

+4D = CAD 2D/3D + Planning

Dynamic link between 2D/3D Objecten (AutoCAD, DesignCad, Sketchup, Microstation)and Planning

xD = 4D + Attributes

Dynamic link between 2D/3D Objecten, Planning and other project data(Costs, Functions, Parking spaces, ...)

SAMPLE 1: 4D Virtual Builder

Page 8: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide9

1. 4VDB : demo

Page 9: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide10

University Cambridge, UK

Bam, UK

Research Institute, UK

Port of Rotterdam, NL

1. 4VDB: Fields of Application

Page 10: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide13

1. 4VDB : technical floor

Page 11: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide14

1. 4VDB: Zaha hadid: Port Authority Antwerp

Page 12: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide15

1. 4VDB – work in progress : dynamic charts

Page 13: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide16

On time

Delayed (<10 days)

Delayed (> 10 days)

Baseline

Actual

Concrete Pouring /day

Work progress

Like planned

Work completed

1. 4VDB – work in progress : actual vs baseline comparison

Page 14: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide17

Visual presentation of truckson queu-point

Numeric presentation of truckson queu-point

1. 4VDB – work in progress : logistics on site

Page 15: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide18

2. SUCEL: dynamic linking with excel

Page 16: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide19

4. LEH: House Configurator >>> Tekla/Revit

Page 17: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide20

3. xD Datacollection: City of Nijmegen

Page 18: 4D VB @ Trimble SketchUp 3D Base Camp 2012

_____________ D-studio@_ 121015 slide21

Plus d’info ?

http://www.4DvirtualBuilder.comhttp://www.4DvirtualBuilder.com