48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project...

58
Environmental and Social Monitoring Report Semi-annual Report July 2019 PNG: Sustainable Highlands Highway Investment Program- Tranche 1 Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian Development Bank. This Environmental and Social Monitoring Report is a document of the Borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgements as to the legal or other status of any territory or area.

Transcript of 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project...

Page 1: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

Environmental and Social Monitoring Report

Semi-annual Report

July 2019

PNG: Sustainable Highlands Highway Investment Program- Tranche 1

Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian Development Bank. This Environmental and Social Monitoring Report is a document of the Borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgements as to the legal or other status of any territory or area.

Page 2: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

Environmental and Social Safeguards Monitoring Report

Reporting Period: January - June 2019 Project Number: 48444-004 Loan/Grant: Loan 3547-PNG, Loan 3548-PNG / Grant 0538-PNG

PNG: Sustainable Highlands Highway

Investment Program (SHHIP) – Tranche 1

Prepared by Program Management Office, Department of Works for Government of Papua

New Guinea and Asian Development Bank.

Submission date: July 2019

Page 3: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

CURRENCY EQUIVALENTS Currency Unit – Kina (PGK)

ABBREVIATIONS

ADB - Asian Development Bank ADB PARD - ADB Pacific Regional Department APs - Affected People/Persons CAP - Corrective Action Plan CEMP - Contractor’s environmental management plan CEPA - Conservation and Environmental Protection Authority CRO - Community Relations Officer CSC - Construction Supervision Consultant CW - Civil Works DDR - Due Diligence Report DFAT - Department of Foreign Affairs and Trade DOW - Department of Works EA - Executing Agency EMP - Environmental Management Plan ESO - Environmental and Safety Officer ESSB - Environmental and Social Safeguards Branch GAP - Gender Action Plan GCC - General Conditions of Contract GESI - Gender Equality/Equity and Social Inclusion GoPNG - Government of Papua New Guinea GRC - Grievance Redress Committee GRM - Grievance Redress Mechanism HH - Highlands Highway HIV/AIDS - Human Immunodeficiency Virus/Acquired Immune Deficiency Syndrome IEE - Initial Environmental Examination IP - Indigenous Peoples IPPF - Indigenous Peoples Planning Framework IR - Involuntary Resettlement LARF - Land Acquisition and Resettlement Framework LARP - Land Acquisition and Resettlement Plan LLG - Local Level Government MFF - Multi-Tranche Financing Facility MOA - Memorandum of Agreement NTP - Notice to Proceed NTS - National Transport Strategy PCC - Particular Conditions of the Contract PMO - Program Management Office

PNG - Papua New Guinea PPE - Personnel Protection Equipment PRO - Public Relations Officer PWM - Provincial Works Manager QMP - Quarry Management Plan RIC - Rehabilitation Investment Contract (Contractor) ROW - Right of Way RWM - Regional Works Manager SCCPP - Stakeholder Communication, Consultation and Participation Plan SHHIP - Sustainable Highlands Highway Investment Program SIA - Social Impact Assessment SIP - Social Infrastructure Plan STD/Is - Sexually Transmitted Disease(s)/Infection(s) VLD - Voluntary Land Donation

Page 4: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

NOTES

(i) Prepared by the Program Management Office – Sustainable Highlands Highway

Investment Program (PMO-SHHIP)/Department of Works (DOW) with assistance from

the Construction Supervision Consultants (CSCs) and Contractors for the Government

of Papua New Guinea (GoPNG) and the Asian Development Bank (ADB)

(ii) This Safeguards Monitoring Report is a document of the Borrower. The views

expressed herein do not necessarily represent those of ADB's Board of Directors,

Management, or staff, and may be preliminary in nature

(iii) In this report, "$" refers to US dollars

(iv) In preparing any country program or strategy, financing any project, or by making any

designation of or reference to a particular territory or geographic area in this document,

the Asian Development Bank does not intend to make any judgments as to the legal

or other status of any territory or area.

Page 5: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

i

Contents

1.0 INTRODUCTION ..................................................................................................................... 1

1.1. The Program ....................................................................................................................... 1

1.2. SHHIP - Tranche 1 Overview ............................................................................................... 2

1.3 Institutional Arrangement for Program Implementation: ...................................................... 3

1.4 Civil Works Contracts ........................................................................................................... 6

2.0 SHHIP-TRANCHE 1 CONSTRUCTION STATUS .................................................................. 8

3.0 TRAININGS, MEETINGS AND WORKSHOPS ..................................................................... 11

3.1. Environmental Trainings and Meetings .............................................................................. 11

3.2. Social Safeguards Training / Skill Development................................................................. 12

4.0 ENVIRONEMNTAL SAFEGUARDS MONITORING ............................................................. 13

4.1. Environmental Safeguards Requirements .......................................................................... 13

4.1.1. Procedural Safeguard Requirements .............................................................................. 13

4.1.2. Monitoring and reporting requirements ........................................................................... 16

4.2. Environmental Management Plan (EMP) Compliance ....................................................... 17

4.2.1. Monitoring Activities ........................................................................................................ 17

4.2.2. Compliance with EMP during this monitoring period. ...................................................... 19

5.0 SOCIAL SAFEGUARDS MONITORING ............................................................................... 26

5.1. Compliance with Loan Covenants ..................................................................................... 26

5.2. Implementation of Due Diligence Report ........................................................................... 26

5.3. Implementation of Gender Action Plan .............................................................................. 27

6.0 CONSULTATION AND AWARENESS ACTIVITIES ............................................................. 29

7.0 GRIEVANCE REDRESS MECHANISM ................................................................................ 31

8.0 SUMMARY OF MAIN ENVIRONMENTAL AND SOCIAL SAFEGUARDS FINDINGS ......... 32

8.1 Key environmental challenges encountered during the reporting period ........................... 32

8.2 Key social challenges encountered during the reporting period ........................................ 32

9.0 FOLLOW-UP ACTIONS ........................................................................................................ 34

10.0 APPENDICES ..................................................................................................................... 36

Appendix 1: Status of Compliance with Loan Covenants .......................................................... 36

Appendix 2: Quarry Environmental Permits .............................................................................. 38

Appendix 3: Campsite Checklist ............................................................................................... 41

Appendix 4: Pictures of SHHIP T1 activities. ............................................................................ 49

Page 6: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

ii

List of Tables

Table 1: SHHIP Program – Implementation strategy by tranches .................................................. 2

Table 2: Environmental Safeguard Monitoring Team ..................................................................... 4

Table 3: Social Safeguard Management Team .............................................................................. 5

Table 4: Campsite establishments by contract packages ............................................................... 8

Table 5: Quarry area managed by the contractors ......................................................................... 8

Table 6: Activities of vegetation control and de-silt side drain ........................................................ 9

Table 7: Activities of road maintenance and emergency work ........................................................ 9

Table 8: Summary of environmental trainings and meetings. ....................................................... 11

Table 9: Summary of trainings and skills development. ............................................................... 12

Table 10: Project Compliance on ADB Safeguards ...................................................................... 13

Table 11: Status of safeguards documents submission and clearance ........................................ 17

Table 12: Environmental monitoring undertaken during this period .............................................. 17

Table 13: Non-compliance and issues raised in quarterly reports ................................................ 19

Table 14: Environmental monitoring findings and Corrective Measures ....................................... 21

Table 15: Local employment generation by contractors ............................................................... 28

Table 16: Community and other stakeholder consultation activities ............................................. 29

Table 17: Information on Grievance Redress Committees ........................................................... 31

Table 18: Summary follow-ups on key environmental and social safeguard action items ............. 34

List of Figures

Figure 1: Location of SHHIP Highlands Highway Sections ............................................................ 3

Figure 2: SHHIP at Glance ............................................................................................................ 6

Figure 3: Institutional Arrangement for SHHIP Tranche 1, Safeguards Management ..................... 7

Page 7: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

1

1.0 INTRODUCTION

1.1. The Program

1. The Sustainable Highlands Highway Investment Program (SHHIP), otherwise referred

to as the Investment Program, aims to rehabilitate, upgrade and maintain the Highlands

Highway (HH) through physical investment. Additionally, aligned with provisions and policy

framework of National Transport Strategy (NTS), the Investment Program provides capacity

development for the broader transport sector using the HH as a pilot project for

implementing the envisaged holistic approach to sustainable maintenance. It promotes

national cooperation and integration and widen access to social and economic opportunities

via improved land transport infrastructure in PNG through the nation’s most important road.

2. Impact and Outcome: The expected impact of the program is aligned with national

strategies1, 2, 3 where: (i) opportunity for equality and prosperity in rural areas is increased;

(ii) well integrated; safe; socially, financially and environmentally sustainable transport

systems is attained; and (iii) access to health, education and other services and living

standard of the people of PNG is improved. The expected outcome is efficient and safe

increased movement of people, goods and services between the Highlands region and the

markets.

3. The SHHIP is a 10-year Program and implements in three tranches as following:

• Tranche 1 is being implemented between 2019 and 2022 and includes (i) road

maintenance and road improvement works, (ii) drainage and slope protection

works, (iii) road safety improvements as well.

• Tranche 2 shall be implemented between 2023 and 2025 and includes (i)

continue road maintenance and road investment works, (ii) widen all 29 single

lane bridges to two lanes with pedestrian footpaths, (iii) repair, reinforce and

reconstruct as appropriate all (40) two-lane bridges.

• Tranche 3 shall be implemented between 2026 and 2028 and includes (i)

continue road maintenance and road improvement works, (ii) build a new two-

lane bypass to divert heavy and through traffic around Goroka because the

dense urban fabric cannot accommodate a four-lane highway, (iii) build about 20

km of truck climbing lanes in the steep slopes of the Kassam and Daulo Passes,

(iv) build two truck weigh stations in Jiwaka and Goroka; and build two logistics

platforms for the trade of fresh produce in Jiwaka and Goroka.

1 Department of National Planning and Monitoring. 2010. Development Strategic Plan 2 Department of Transportation. 2014. National Transport Strategy 2014 – 2030 3 Department of National Planning and Monitoring. 2014. National Strategy for Responsible Sustainable

Development for Papua New Guinea, 2014 StaRS, 2nd Edition.

Page 8: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

2

Table 1: SHHIP Program – Implementation strategy by tranches

Tranches Duration Year Major Works

T1 4 years 2019-2022 - 2 x Civil Works - RIC – Simbu

T2 3 years 2023-2025 - Upgrade single lane bridges (29) - Repair/Reconstruct 40 DL Bridges

T3 3 years 2026-2028 - Goroka bypass (2 x routes options) - 2x Climbing Lanes - 2x Trade and Logistics Platforms - 2 x Weighing Stations

Total 10 years 2019-2028

1.2. SHHIP - Tranche 1 Overview

4. Tranche 1 Outputs: The outputs financed under Tranche 1 will be: (i) 40% of the 430

kilometer of two-lane national Highlands Highway from Lae Nadzab airport to Kagamuga

airport in Mt Hagen, is rehabilitated, upgraded, and effectively maintained as required to be

safe, climate- and disaster resilient for all users; (ii) road safety increased and sustained for

pedestrians and vehicle passengers on the Highlands Highway; and (iii) program

management and institutional capacity improved to deliver the Investment Program and

sustain its benefits.

5. Main Works: The SHHIP - tranche 1 carries out main activities of rehabilitation works,

improvement works, maintenance services and emergency works, which include following

activities:

• Clearing the right-of-way;

• Removal of unsuitable materials: Trimming and shaping the existing road formation

and subgrade to form a road bed; Excavating and removing unsuitable material from

soft spots and backfill, including providing and placing a geofabric filter layer where

directed; Excavating, trimming and shaping drainage ditches and forming cut batters;

Excavating and disposing of overburden from borrow pits; Hauling and disposing of all

unsuitable material; Cleaning and removing debris as well as silt from inlets and outlets

of silted-up or blocked existing culverts;

• Storage of materials: Stockpiling excavated material for embankment construction;

Hauling material for construction of capping layer, sub-base and base course;

• Production of materials: Extracting, crushing, grading and testing material for capping

layer, sub-base, base course and concrete;

• Construction of pavement: Patching the potholes, filling the cracks, and repairing

shoulder edge breaks; Constructing and testing of embankments to form the road bed;

Pavement surfacing with bituminous layers; Reinstating existing gabion walls;

Refurbishment of existing bridge superstructure and abutments; Road strengthening

works; Road resealing works; Replacement of cross drains with conduits of larger

section; Installation of new lining of side drains; Installation of new slope protection

Page 9: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

3

works; Repair of distressed parts of the road, restoring them to a higher standard of

durability and safety;

• Construction of culvert: Replacing culverts including headwalls, curtain walls, aprons

and associated works; Reinstating culverts’ chambers and inlets/outlets parts;

• Construction of public works: Constructing market areas; Constructing 1000 m

roadside pedestrian footpaths connecting school entrance; Providing the road with bus

stops aside the road carriageway; Providing social infrastructure (laundry facility,

gender segregated toilets);

• Installation of safety devices: Installing new road safety furniture including guardrails,

traffic regulatory and control signs, culvert marker posts, milestones, and fenders at

bridge sites.

1.3 Institutional Arrangement for Program Implementation:

6. The Department of Works (DOW) is the Executing Agency while PMO is the

implementation agency based in Goroka in EHP. The PMO has the overall responsibility

to plan and coordinate implementation and monitoring environment and social

safeguards related to civil works and acquiring additional land to implement SHHIP

subprojects, as well as compensation for damages on project-affected land.

7. The DOW has established a Program Management Office (PMO) in Goroka headed by

a Program Director which manages the day to day activities of the Program. Within the

PMO there is a Consultancy Team headed by the Team Leader with an International

Environment Safeguard Specialist4 and an International Social Safeguard Specialist5

among others based also in Goroka to manage SHHIP environmental and social

4 The PMO’s International Environmental Safeguard Specialist was mobilized on 13 Feb’19 5 The PMO’s International Social Safeguard Specialist was mobilized on 09 Oct’18

Figure 1: Location of SHHIP Highlands Highway Sections

Page 10: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

4

safeguard aspects. The Environment and Social Safeguards Branch (ESSB) within the

DOW also supports in the relevant areas wherever required.

8. Environmental Safeguard Team: The composition of the Environmental Safeguards

Specialists of the Program Management Office (PMO), the Construction Supervision

Consultants (SCSs) and the Contractors. Refer to Table 2 below for more details.

9. Social Safeguard Team: The social safeguard management and monitoring team

consists of the International Social Safeguards Specialists of the Program Management

Office (PMO) and Construction Supervision Consultant-2 (Bonifica Renardet Jv;

intermittent) and Community Relations Officers (CROs) of the PMO, Public Relations

Officers of the Contractors, amongst others. Complete list of SHHIP social management

team is presented in the Table 3 below for more details.

10. Construction Supervision Consultant: two Construction Supervision Consultants have

been also engaged with Environmental and Social Safeguard Teams to support with

smooth implementation of SHHIP works:

• CSC 16, the “Construction Supervision Consultant” for CW1, and

• CSC 27, the “Construction Supervision Consultant” for CW2 and RIC.

11. PMO’s Environmental Safeguards Specialist has been closely monitoring activities and

providing active guidance and recommendation in order to facilitate the Consultants and

the Contractors for environmental safeguards compliance.

12. PMO is working closely with DoW-ESSB wherever required on management of SHHIP

safeguard issues related to the environmental and social safeguard compliances.

13. Period of the Report: This first Semiannual Safeguards Monitoring Report (SSMR) for

the year 2019 describes the implementation processes and progress of the preparation

EMP/CEMP of the compliance issues arisen and actions undertaken regarding

environmental and social safeguards of SHHIP-Tranche 1 as per the ADB and GOPNG

standards. It covers the period 1 February to 31 June 2019, as per the commencement

date of the Notice to Proceed the Works (NTP) – NTP of CW1 as of 1 Feb’19, NTP of

CW2 as of 2 Feb’19, and NTP of RIC as of 2 Feb’19.

Table 2: Environmental Safeguard Monitoring Team

Item Organization/Specialist Mobilization/on site

Remark

I Program Management Office (PMO)

1 International Environmental Specialist 13 Feb’ 19

2 National Environmental Specialist Not yet mobilized

II Consultant Supervision (CS1)

3 International Environmental Specialist.

(*The CS1 is looking for another candidate

for replacement)

11 Feb’ 19 Resigned on

31 May 2019;

4 National Environmental Specialist 16 Feb’ 19

III Consultant Supervision 2 (CS2)

6 Joint Venture of Pyunghwa Engineering Consultant Ltd., Dong IL Engineering Consultant Co., Ltd and TCGI

Engineers in Association with Gure Kule Konsultants Ltd 7 Joint Venture of Bonifica S.P.A and Renardet S.A

Page 11: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

5

Item Organization/Specialist Mobilization/on site

Remark

5 International Environmental Specialist 1 Mar’ 19 Responsibility

for CW2 and

RIC

6 National Environmental Specialist for

CW2

1 Mar’ 2019

7 National Environmental Specialist for

RIC

16 Apr’ 19

IV Civil Works Road Contract 1 (CW1)

8 International Environmental Specialist Not yet mobilized

9 National Environmental Specialist

(EHSO)

1 May’ 19

V Civil Works Road Contract 2 (CW2)

10 International Environmental Specialist Not yet mobilized

11 National Environmental Specialist 1 Apr’ 19

VI Road Investment Contract (RIC)

12 International Environmental Specialist 2 Feb’ 19

13 National Environmental Specialist 18 Mar’ 19

Table 3: Social Safeguard Management Team

Institutions Names Designations

PMO

Govind Bhatt International Social Safeguard Specialist

Simon Steven Community Relations Officer (CRO) –

Nadzab to Henganofi Section (CW1)

Jacob Rara CRO – Henganofi to Mangiro Bridge

Section (CW2)

Yapi Akore CRO – Mangiro Bridge to Miunde Bridge

(Simbu) Section (CW3/RIC)

Mathias Kin CRO – Miunde Bridge to Kagamuga

Airport Junction (CW2 Western Section)

Pyunghwa

Engineering

Corporation JV

(Construction

Supervision

Consultant -1)

Luke Jeffery

National Environment Officer (also taking

care of social aspects) - National Social

Officer required as per Contract - vacant

now

Bonifica Renardet

JV (Construction

Supervision

Consultant-2)

Dwisetia Sagiman International Social Safeguard Expert -

CW2 and RIC section

Garry Luka National Social Safeguard Expert - RIC

section

Mathias Awi National Social Safeguard Expert - CW2

section

Metallurgical

Corporation of

China (MCC – CW1

Contractor)

Willie Ameo Public Relations Officer

Augus Lesse Public Relations Officer

Dufe Tivai Public Relations Officer

Page 12: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

6

Institutions Names Designations

China Wu Yi (CWY

– CW2 Contractor)

Buffic Upegu Public Relations Officer -Henganofi to

Goroka

Steven Kuk Public Relations Officer - Daulo Top

Bamo Mingoripa Public Relations Officer - Waterbung

Luke Nema Social Officer

China Harbor

Engineering

Company (CHEC –

RIC/CW3

Contractor)

Stickson Yalgumo Public Relations Officer -RIC Section -

Sinasina

Wanpis Paul Public Relations Officer - RIC Section -

Ganigle

Komoshii Kiaga Public Relations Officer - RIC Section-

Chuave

1.4 Civil Works Contracts

14. Civil Works Contracts: For the implementation of Tranche 1 works, Environmental and

Social Safeguard teams have been engaged also with the three Civil Works Contracts

that have been signed covering the works on particular part of the Highway as depicted

in Figure 2.

Figure 2: SHHIP at Glance

A. The Civil Works Contract 1 (CW18) provides for the repair, rehabilitation, improvement, and maintenance of the 210 km CW1 sector of the Highlands Highway between Nadzab Airport Turn-Off and Henganofi Bridge (the “Road”).

B. The Civil Works Contract 2 (CW29) consists of the rehabilitation of the 161 km Henganofi Bridge to Mangiro Bridge in Eastern Highlands and Miunde Bridge to Kagamuga Hagen in the provinces of Jiwaka and Western Highlands.

C. Rehabilitation Investment Contract (RIC10) consists of the rehabilitation of the 57 km of the Simbu section of the Highlands Highway between Mangiro Bridge and Miunde Bridge.

15. Figure 3 below depicts the institutional arrangements for SHHIP safeguards management.

8 Civil Works Contractor 1. - Metallurgical Corporation of China Ltd 9 Civil Works Contractor 2. - China Wu Yi Co., Ltd 10 RIC - China Harbour engineering Company Ltd

Page 13: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

7

Figure 3: Institutional Arrangement for SHHIP Tranche 1, Safeguards Management

State Management Agency: CEPA

•Examines and evaluates compliance of clients and contractors on environmental protection,

•Participates in monitoring and compliance review.

ADB

•ADB provides safeguards support and advice as required, to PMO/DoW,

•Monitoring the implementation of safeguards and effectiveness of mitigation measures,

•Conducts review and supervision missions on safeguard compliance,

•Discloses updated documents of IEE and EMP, and monitors reports.

Client: PMO/DOW

•Establishes and maintains procedures to monitor the progress of safeguards implementation,

•Conducts monitoring and Verifies the compliance requirements with SHHIP safeguards measures,

• Identifies risks and impacts and any incompliances with ADB and GoPNG requirements,

•Provides guidance and support to Supervision Consultants and Contractors,

•Reports to GoPNG and ADB any unanticipated risks and impacts, prepares and implements required plans.

Construction Supervision Consultants: CS1 and CS2

•Examine and supervise the contractors on undertaken safeguards impacts and mitigation measures,

•Supervise environmental safeguard policy compliance of subprojects,

•Supervise implementation of social safeguard components under the jurisdiction of the Contractor

• Identify necessary corrective and preventive actions. Local People and other Stakeholders

• Participate in the implementation Process of the Program,

• Give feedback on SHHIP implementation.

Contractors: CW1, CW2 and RIC

• Mobilize human resources and necessary materials and equipment to manage environmental and designated social aspects of SHHIP implementation,

• Prepare the Contractor’s Environmental Management Plan (CEMP),

• Apply mitigation measures to Ensure CEMP is properly implemented,

• Undertake Baseline Environmental Survey and regular environmental monitoring (Quarterly),

• Submit environmental compliance reports and environment monitoring reports to Construction Supervision Consultant,

• Get the pertinent environmental and operation permits and clearances for Borrow Pits, Quarry Areas, Crushing Plants, etc.

• Get permits for waste discharge, water use, material resources, etc.

Environmental and Social Safeguards

Branch/DOW

• Provide implementation support, wherever required, to SHHIP and all Projects under the DoW

Page 14: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

8

2.0 SHHIP-TRANCHE 1 CONSTRUCTION STATUS

16. This section of the report presents status of the ongoing activities both at camp sites and on main road as per the required compliance and application of mitigation measures.

17. Site Establishment : The contractors are establishing their campsites as follows:

Table 4: Campsite establishments by contract packages

Campsites CW1 CW2 RIC

Name Singsing Creek Kainatu Kamaliki Ganigle

Location Below the foot of Kassam Pass, Markham District Morobe Province

Kainatu town, Kainatu District, Enstern Highlands Province

Kamaliki villeage, Goroka District, Enstern Highlands province

Kiwaku/Gariaku (Ganigle)/ Kerowaghi, Simbu province

Area (m²) 5,000 10,774 50,000 30,284

Population (Person)

30 25 13-50 65

Construction status

Ongoing (90%): Completed the erection of Office Conference room(partial) Other works ongoing

Ongoing (35%): Completed foundation works on contractor’s office Preparation for concreting of wash bay

Ongoing (30%): Completed fence around the Campsite

Ongoing (85%): Completed staff living quarters Completed kitchen and dining Building main office – 90% completed Building septic tank – 90% completed

18. Quarry areas have been identified by the Contractors as the follows:

Table 5: Quarry area managed by the contractors

Quarry areas

CW1 CW2 RIC

Quarry name Singsing Creek Riverine Quarry

Bena Quarry Ganigle River Quarry

Location Umi Atzera Rural Local Level Government Council, Markham District, Morobe Province

Namaro village, Unggai Bena District, Eastern Highlands Province

Ganigle River, 400 meters south from the Highlands Highway and approximately 18 kilometers from the nearest Kundiawa town

Campacity (year)

150,000 m³ 20,000 m³ 424, 000 m³

Term of Permit

10 years The Contractor is preparing an application to submit to

5 years

Page 15: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

9

CEPA for getting environment permit asap,

Status Environment permit obtained, No. EP-L2 (909) dated 15th May 2019 (Appendix 2), Quarry Management Plan under review from the Consultant, Mobilized crusher, Started subbase material production

No Environment permit obtained, Not Prepared Quarry Management Plan

Environment permit obtained, No. EP-L2 (681) dated 28th May 2019 (Appendix 2), Quarry Management Plan under review from the Consultant

19. Activities on Site: De-silt side drain and vegetation control conducted on both sides of

road to minimum width of 5m from the edge of the seal.

Table 6: Activities of vegetation control and de-silt side drain

Activities on Site CW1 CW2 RIC

Vegetation control

Location CH218+295 to CH220+584

CH 379+800, CH 379+495

Accumulated (Km) 37 15 1.5

De-Silt Side Drain

Location CH181+200 to CH179+800; CH218+413 to CH220+647

CH 265+360 -

Accumulated (Km) 28 15 -

20. The road maintenance and emergency works were undertaken in this monitoring

period are depicted bellows:

Table 7: Activities of road maintenance and emergency work

Activities CW1 CW2 RIC

Road maintenance

1. Zumin River Bridge, 2. Yafatz River Bridge, 3. Watarais Junction, 4. Watarais River Bridge, 5. Undono River Bridge, 6. Darasmpi River Bridge, 7. Orompanka River Bridge, 8. Nonompinka River

Bridge, 9. Honerangka River Bridge,

10. Umbaka River Bridge, 11. Kingkio River Bridge, 12. Kamanotina River Bridge

Goroka junction, Goroka town

Some isolated patching works using sub base materials

Page 16: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

10

Activities CW1 CW2 RIC

Emergency

work

1. CH163+200 Singsing creek

2. CH198+000, 3. Benapa Bridge, 4. Avani Slip, 5. Double Culverts, 6. Single Culverts 7. Famo; 8. Avani Bridge A1; 9. Erap Bridge A2;

10. Puri bridge, 11. Zumin Bridge, 12. Kassam Pass

Landslide at Kintunu (CH265+760), Massive landslip before Daulo pass, Faniyu landslide, Kintinu landslide

Gunigue bridge; Massive landslip at Mingende (CH392+400), CH 379+800, Ganigle bridge abutment B

Page 17: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

11

3.0 TRAININGS, MEETINGS AND WORKSHOPS

3.1. Environmental Trainings and Meetings

21. The PMO’s Environmental Safeguards Specialist had regular follow up meetings and

trainings with the Consultants and the Contractors, guiding and advising, explaining

in detail the subjects of environmental compliance during the construction period.

Table 8: Summary of environmental trainings and meetings.

Date/Venue/ Type

Key Issues/Queries/Feedback Remarks

25 Feb’19/ Goroka/ environmental safeguards meeting

Preparation of CEMP and the Contractor’s Workplan, and Directing Contractors on the environmental baseline preparation works

10 participants: PMO team, Environmental Specialists of CS1 and CS2, Health, Safety and Environmental Officers of CW1, CW2 and RIC

8 Mar’19/ Goroka/ CEMP Preparation and Review

Requirements and contents of CEMP, Provision of information related to the Civil Works Contracts and Contractors, legal frameworks, risk assessment, Organization of the Contractors related to environmental safeguard management and reporting procedures, Environmental control plan regarding the proposed mitigation measures for reducing and avoiding negative impacts during execution phase are too general and difficult to apply and monitor as well. The mitigations should be specific for each type of activity, applicable and easy to be monitored, Environmental monitoring program, to be included in two parts of (i) performance monitoring and (ii) monitoring of environmental impacts

12 participants: PMO team, Environmental Specialists of CS1 and CS2, Health, Safety and Environmental Officers of CW1, CW2 and RIC

March and June 2019/ Goroka and Kundiawa/ Preparation of the Environmental Baseline Survey

Understanding the scope of a baseline survey, Methodologies of conducting environmental baseline survey, Assessment of the capacity of laboratories and environmental monitoring, Scheduling and workplan for the survey, Completion of the chainages of monitoring location of noise, air, water and biology survey

PMO team, Environmental Specialists of CS1 and CS2, Health, Safety and Environmental Officers of CW1, CW2 and RIC

7 May’19/ Goroka/ Environmental Induction Training

Environmental Safeguards Management: Environmental Safeguards Requirements and Environmental Safeguards Compliance, Methodology for Implementation of Environmental Supervision,

20 participants: Program Director, The Project Manager of CW1, CW2 and RIC,

Page 18: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

12

Date/Venue/ Type

Key Issues/Queries/Feedback Remarks

Methodology and Procedures for Monitoring Environmental Compliance of Construction on Site, Environmental Compliance Framework for the Supervision of the Construction’s Compliance, Requirements on Environmental Safeguards Works, Templates/Forms for Contractors and Consultants

The Consultants’ Environmental Specialists and Safety Specialists, and The Contractors’ Health, Environmental and Safety Officers

3.2. Social Safeguards Training / Skill Development

22. On-the-job training is ongoing with social safeguard team members with the PMO, Construction Supervision Consultants (CSCs) and Contractors’ Public Relation Officers (PRO). Likewise, counterpart team training program have been launched on 29 Aril, 2019 targeting all social personnel engaged with PMO, SC and Contractors.

23. Orientation trainings and consultations have been also conducted for the newly established SHHIP Grievance Redress Committee members in all five Provinces.

Table 9: Summary of trainings and skills development.

Date/Venue/Type

Key Issues/Queries/Feedback Remarks

Jan ‘19/ Goroka/ Pre-inception Workshops

Briefings, Queries and feedback focused on overall SHHIP aspects, including social safeguard requirements. Deliberations on key social safeguard issues included: (i) applicable social safeguard provisions; (ii) Land acquisition needs/applicability of Involuntary Resettlement; (iii) Legacy Issues; (iv) camp locations; and (v) overall approach for implementation of social safeguard measures. Queries satiated and commitments garnered to work together for smooth implementation of SHHIP

Targeted at Construction Supervision Consultants and Contractors. Altogether 45 Attendees in multiple sessions

Feb ‘19/ Kundiawa (Simbu Province) and Goroka/Eastern Highlands Province)/ Pre-construction Orientation

Major social safeguard issues discussed during the multiple sessions with different CSC and Contractor teams focused on overall social requirements for SHHIP implementation, viz., gender mainstreaming, landownerships and legacy issues, social infrastructures, community livelihood-support initiatives, local employment generation requirements, synergistic implementation of social activities together with civil works, Contract provisions on labor standards, etc. Clarity enhanced on applicable social standards and team works.

Two events targeted at Construction Supervision Consultants and Contractors. Altogether 55 Attendees in multiple sessions

Apr ‘19/ Goroka/

Overall SHHIP social aspects, including social safeguard requirements, current implementation status and way forward. Deliberations on key social safeguard issues included:

Targeted at social counterparts working with

Page 19: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

13

Date/Venue/Type

Key Issues/Queries/Feedback Remarks

SHHIP Team Induction Training

(i) applicable social safeguard provisions, documentation and implementation; (ii) Land acquisition needs/applicability of Involuntary Resettlement and Legacy Issues; (iii) Status, reporting and Challenges; and (iv) GRM, Awareness and Consultations; and (v) overall approach for implementation of social safeguard measures.

Construction Supervision Consultants and Contractors, attended by 22 participants.

May-Jun ‘19/ Kundiawa, Lae, Goroka and Kurumul/ Grievance Redress Committee Orientation Trainings

SHHIP overall and Grievance Redress Mechanism presentations were made. Major feedback received included queries on civil work status, legacy issues, consultation activities, resolution process for various types of grievances, etc.

Four different events targeted at Grievance Redress Committees in each of the five SHHIP Provinces, altogether 84 participants attended.

4.0 ENVIRONEMNTAL SAFEGUARDS MONITORING

4.1. Environmental Safeguards Requirements

4.1.1. Procedural Safeguard Requirements

24. SHHIP - Tranche 1 has been categorized as “Category B” for Program as far as the

environmental issues, based on ADB's environment guidelines and no component of

the SHHIP-Tranche 1 is located in an environmentally sensitive or protected area.

An Initial Environmental Examination Report with an Environmental Management

Plan and implementation budget was prepared for SHHIP Tranche 1.

25. SHHIP-Tranche 1 and its associated facilities comply with ADB safeguards policy

and PNG’s regulations as follows:

Table 10: Project Compliance on ADB Safeguards

Item Requirement Current Status Remark

I SHHIP-Tranche 1 Preparation Stage

1 Based on SHHIP-Tranche 1 impacts and risks, the subproject has been assessed to belong to category B. An Initial Environmental Examination (IEE) has to be prepared

The subproject’s IEE report was prepared

Submitted to ADB in 2017

2 Environmental SHHIP’s Team has undertaken Results of

Page 20: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

14

Item Requirement Current Status Remark

Baseline Survey baseline survey on March and April 2019

Environmental Baseline Survey have been used to update IEE and EMP of SHHIP -Tranche 1

3 Updated IEE and EMP

The IEE and EMP of SHHIP Tranche 1 are reviewed

To be submitted to ADB in July 2019

II Bidding and Contract

3 Inclusion of the safeguard requirements in the bidding documents

The safeguards provisions have been included in the bidding documents:

• Section 4 – Bidding Forms: Bidders were requested to price for social and environmental works including preparation and implementation of the environmental management plan; compliance with environmental monitoring and the provision of the resettlement plan; preparation and implementation of HIV/AIDS awareness and HIV/AIDS management plan.

• Section 6 – Employer’s requirement: Related documents also were provided to bidder with the bidding document including Environmental Management Plan and HIV/AIDS Awareness Management Plan.

4 Incorporated the relevant provisions from the EMP into the Works’ contracts

The safeguards provisions are included in the Civil Works Contract:

• PCC 4.18 and GCC 4.18 of the Contracts:

The Contractor shall take all reasonable steps to protect environment and to limit damage and nuisance to people and property resulting from pollution, noise and other results of his operation The Contractor shall comply with all applicable national, provincial and local environmental laws and regulations and ADB’s Safeguard Policy Statement (2009)

• Specification The Contractor shall comply with the supplementary specifications of EMP and HIV/AIDS Awareness and

Page 21: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

15

Item Requirement Current Status Remark

Management Plan; Regulation on environmental management, social interaction, health and safety and HIV/AIDS prevention

5 Available budget for all such environmental and social measures

A budget for social and environmental implementation and monitoring was allocated in the Civil Works Contracts of CW1, CW2 and RIC

III Construction Stage

6 Compliance with GoPNG Regulations

Obtained Quarries environment permits of Singsing Creek Riverine Quarry and Ganigle River Quarry

7 Reporting

- Quarterly safeguards monitoring reports

First report prepared in April 2019; Second report prepared in July 2019

The quarterly monitoring reports were attached as Appendices to the Program Progress Report

- Semi-annual Safeguard Monitoring Report

First report prepared in July 2019 This report will be uploaded at ADB’s Website

8 A written notice of any unanticipated environmental risk

There was no major environmental risk during construction phase

9 Applicable laws and regulations related to environment, health and safety

All related laws and regulations were applied during the preparation and construction phases

26. Environmental Baseline Survey: To assess the current status of environmental

quality, the SHHIP’s Team has undertaken environmental monitoring in March and April

2019 as follows:

• Air Quality: The parameters of PM10 and PM2.5 were sampled and analyzed

at 22 locations of sensitive receptors along the corridor including schools and

residential areas. As the monitoring results, the parameter of PM10 in 8 locations

were from 118 – 125 (µg/m3) and higher that WHO Standards (50 (µg/m3). The

parameter of PM2.5 in 5 monitoring locations were from 83-84(µg/m3) and

higher that WHO Standards (25 µg/m3). These locations are in the Town center

and the business areas. Additional, dust generation and resuspension also

resulted from vehicles passing over unsealed roads particularly in the Highlands

Highway section traversing Simbu Province and make the value of PM10 and

PM2.5 higher than the standards.

• Noise Level: In-situ noise level measurements were conducted in the same

location as the selected air quality measurement. Results of monitoring indicate

Page 22: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

16

that the noise levels in 2 locations of Kundiawa Town and Waghi Market were

75 dBA and higher than WHO Standards (70 dB or less in daytime).

• Surface Water Quality: Parameters of temperature, pH, turbidity were sampled

in-situ by portable sampling equipment. Parameters of Biochemical Oxygen

Demand (BOD), Chemical Oxygen Demand (COD), Total Nitrogen, Total

Phosphorus, Total Suspended Solids (TSS), Oil and Grease, and Total Coliform

Bacteria were sampled and analyzed at Laboratory. According to surface water

analysis results, the parameters such as pH, BOD5, COD, Nitrogen, and Total

P were satisfied WHO Standards. However, the parameters such as DO, TSS

and Oil and Grease were higher than the permissible value of the regulation.

The reasons were that there were flooded in some areas during the monitoring

time and local communities are using river water for bathing, laundry, fishing and

recreational activities.

• Ground Water Quality: Parameters of temperature, pH, turbidity were sampled

in-situ by portable sampling equipment. Parameters of Total Coliform Bacteria,

E. Coli, Arsenic, Chloride, Flouride, Total Dissolved Solids, Nitrate, Nitrite,

Hardness, Sodium, and Iron were sampled and analyzed at Laboratory.

According to groundwater analysis results, the parameters of ground water were

satisfied the permissible value of WHO.

• Terrestrial and Riparian Ecosystems: Inventories of terrestrial flora and fauna

species were undertaken in 24 sites along the Highlands Highway from Nadzab

airport turnoff to Kagamuga airport turnoff. Each of these sites were surveyed

for mammals, birds, frogs and reptiles, invertebrates, insects, riparian

biodiversity and plants in general. The habitat types are modified with coffee

trees, food gardens, and patches off forests. There were no wildlife management

or protected areas along the corridor.

27. Updated IEE and EMP of SHHIP-Tranche 1: The IEE and EMP of SHHIP-Tranche 1

have been updated based on the detail civil works of SHHIP-Tranche 1 and the results

of Environmental Baseline Survey. The main updated are:

• Detail description of civil works of SHHIP - Tranche 1;

• Updated current environmental status of the project area based on the

environmental baseline survey results;

• Revised the impacts of the SHHIP Tranche 1;

• A new section referred to cumulative impacts of SHHIP-Tranche 1;

• Revised Environmental Management Plan.

4.1.2. Monitoring and reporting requirements

28. Monitoring requirements of the project during the construction phase include the

following:

Page 23: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

17

▪ Parameters: (i)Trees and vegetation control; (ii) Physical environmental

components (noise level, vibration, air quality, water quality); (iii) Biological

system (terrestrial and riparian); (vi) Health and safety; public safety; (v) social

issues (HIV/AIDS, local living conditions).

▪ Location: (i) Construction sites (along the corridor); (ii) Campsites areas; (iii)

associated facilities (quarry areas, affected communities)

▪ Frequency: daily, monthly, quarterly

29. Safeguard monitoring reports are being prepared and submitted to ADB and DOW are as follows:

▪ Quarterly safeguard monitoring report,

▪ Semiannual safeguard monitoring report

4.2. Environmental Management Plan (EMP) Compliance

4.2.1. Monitoring Activities

30. Review documents and plans: A number of required documents and plans have been

prepared by the Contractors and submitted to the Consultants and to the PMO for

review and approval respective as the contractual requirements.

31. The documents and Plans will be revised during the physical works is observed that

certain changes should be applied.

Table 11: Status of safeguards documents submission and clearance

Item Plans and documents Status

CW1 CW2 RIC

1 Contractor’ Environmental Management Plan (CEPM)

Approved Approved Approved

2 Environmental Baseline Survey Approved Approved Approved

3 Health and Safety Management Plan

Approved Approved Approved

4 Solid Waste Management Plan Approved For revision For revision

5 Traffic Management Plan Approved Approved Review

6 Emergency and Contingency Plan Approved For revision For revision

7 Site Security Management Plan Approved Not submitted Not submitted

8 Quarry Management Plan Reviewing Not submitted Reviewing

32. Site visits: Site visits were conducted and summarized during the period as the

recording follows:

Table 12: Environmental monitoring undertaken during this period

Potential Impact

Activity or Works Location Date Undertaken by

Dust and exhaust fumes, Water quality,

Visited Campsite and Quarry area at Sing Creek,

SingSing Creek, Ramu, Morobe province

12 Apr’19

Hoang Trung Thanh – Intl. Env. Specialist, PMO, Lalio Erasi – Project Manager of CW1, PMO,

Page 24: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

18

Potential Impact

Activity or Works Location Date Undertaken by

Safety Discussed on the environmental and safety measures, Environmental permission of the quarry operation

Joong-AM KWON – Team leader, CS1, Jiang Hu – Project Manager CW1

Siltation of Genige River

Emergency works Genige bridge abutment repair

CH 401+440 24

May’19

Eman lleva – Natl. Env. Specialist, CS2, P. Newman- Natl. Env. Specialist, CS2, J. Maiya - Natl. Env. Specialist, CS2, Guo Jie – Safety and Environmental Officer, RIC

Dust and exhaust fumes, Water quality, Safety

Visited Ganigle bridge, Ganegle quarry, temporary campsite, and Ganigle campsite; Discussed on the environmental and safety measures; Environmental permission of the quarry operation.

Ganigle, Chimbu Province

3

May’19 Hoang Trung Thanh - Intl. Env. Specialist, PMO, Napoleon Sta. Ines – residential Engineers of RIC, CS2, Eman lleva – Natl. Env. Specialist, CS2, Joseph Rogne - Natl. Env. Specialist, CS2, Guo Jie – Safety and Environmental Officer, RIC, Bonnie Kiak - Environmental Officer, RIC,

Dust generation, Traffic hazard, Stagnant water could increase vectors

Emergency works at Faniufa landslip, Draining of accumulated water and repair of culvert

CH 294+05 25 May’19, 28 Jun’19

Eman lleva – Natl. Env. Specialist, CS2, P. Newman- Natl. Env. Specialist, CS2, A. Tambua Environmental Officer, CW2,

Dust and exhaust fumes, Water quality, Safety

Visited the campsite, Discussed on the environmental and safety measures

Kainantu, Eastern Highland Province

7 Jun’19

Hoang Trung Thanh - Intl. Env. Specialist, PMO, Saul Nol - Safety and Environmental Officer, CW1, Guillermo Donato - Campsite manager, CW, Christopher Neil Jones – CW1;

Page 25: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

19

Potential Impact

Activity or Works Location Date Undertaken by

Peter - Site Manager, CW1

Visited the campsite, Discussed on the environmental and safety measures

SingSing Creek, Ramu, Morobe province

7 Jun’19 Hoang Trung Thanh - Intl. Env. Specialist, PMO, Saul Nol - Safety and Environmental Officer, CW1, Tony Du – Campsite manager, CW1,

Dust generation, Traffic hazard, Erosion, Siltation and Pollution

Emergency works at Kintunu landslip.; Maintenance Works Line drain clearance; Bena River Rechanneling Activity.

CH 265+575; CH 265+360; CH 279+850

25 Jun’19 28 Jun’19

Eman lleva – Natl. Env. Specialist, CS2, P. Newman- Natl. Env. Specialist, CS2, A. Tambua Environmental Officer, CW2

Dust generation; Elevated noise levels

Pavement maintenance (scraping and compacting)

CH 356+100 to CH 366+400

27 Jun’19

Eman lleva – Natl. Env. Specialist, CS2, P. Newman- Natl. Env. Specialist, CS2, J. Maiya - Natl. Env. Specialist, CS2

4.2.2. Compliance with EMP during this monitoring period.

33. Safeguards monitoring on compliance is ongoing and will be updated in the next monitoring report.

34. Table 13 highlights some of non-compliance on environmental safeguards encountered.

Table 13: Non-compliance and issues raised in quarterly reports

No. Main Issues Corrective Measures

CW1

1 Unsafe at Fuel

Storage of SingSing

Campsite

Relocated the fuel storage area in a place away from any

fire sources;

Sufficiently equip the area with warning signs and

equipment to ensure fire safety

2 No Environmental

Permit for Singsing

Greek Gravel

Extraction

An Environment Permit was issued to Metallurgical

Corporation of China Limited regarding Singsing Creek

gravel extraction at permit number EP-L2 (909) dated 15

May’19 (Appendix 2)

3 No Quarry

Management Plan

Quarry management plan has been submitted to

Consultant and to PMO for review and approval

RIC

Page 26: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

20

4 Unsafe at Fuel

Storage Area of the

Ganigle Temporary

Relocated the fuel storage area in a place away from any

fire sources;

5 No Environmental

Permission of

Singsing Greek

Gravel Extraction

An Environment Permit was issued to Ova Building

Contractor Limited regarding Ganige gravel extraction at

permit number EP-L2 (681) dated 28 May’19 (Appendix 2)

No Quarry

Management Plan

Quarry management plan has been submitted to

Consultant and to PMO for review and approval

Page 27: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

21

Table 14: Environmental monitoring findings and Corrective Measures

Environ-mental issues

Location Contractors Mitigation Measures Mitigation Measures

Implemented? Remarks

Follow-Up Action

Required

Contractor Response

Dust and exhaust fumes

Kiwaku/Gariaku; CH 356+100 to CH 366+400, CH 265+575 CH294+050

CW1, CW2, RIC

During the dry periods, water trucks were scheduled to sprinkle water on the road, along the main camp and the school

Yes

Proper mitigation and safety measures were observed

Continue monitoring

NA

CH 356+100 to CH 366+400; CH 401+440

CW1, CW2, RIC

Limited speed and cover the vehicles with canvas sheet in order to minimize the pollution

Yes No complaints were made

None

NA

Singsing Campsite, Kamaliki campsite, Ganigle Campsite

CW1, CW2, RIC

Prohibited burning debris or other materials on the site or at camps

Yes No complaints were made

Continue monitoring

NA

Campsites, construction area

CW1, CW2, RIC

Requested vehicles, while parked on the site have their engines turn off

Yes No complaints were made

Continue monitoring

NA

Singsing Campsite, Kamaliki campsite, Ganigle Campsite

CW1, CW2, RIC

Grader and roller are new equipment; Checking all equipment and machinery on the site

Yes No complaints were made

None

NA

Noise and vibration

Singsing creek campsite, Ganigle Campsite

CW1, RIC Stationary equipment’s i.e. generators located far from living quarters

Yes No complaints were made

Continue monitoring Agreed

Construction areas CW1, CW2,

RIC

Minimized using powered equipment at sensitive areas such as residential areas; construction works at daytime (8am-5pm)

Yes No complaints were made

Continue monitoring

NA

Solid Waste generation

Singsing creek Campsite, Ganigle Campsite

CW1, RIC

Office waste, kitchen waste and all soil waste at the contractor’s campsites were all disposed in clearly labeled waste bins which are provided

Yes No complaints were made

Continue monitoring

NA

Page 28: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

22

Environ-mental issues

Location Contractors Mitigation Measures Mitigation Measures

Implemented? Remarks

Follow-Up Action

Required

Contractor Response

on site. The bins to be emptied at the land fill at the Contractor’s campsites

CH 265+360 CW2 Immediately clear silt collected and deposit in designated sites

Yes No complaints were made

Continue monitoring

NA

Singsing Campsite CW1 Landfill area established at the back of the camp site

Yes No complaints were made

Continue monitoring

NA

Ganigle Campsite RIC

Kept the site reasonable free from all unnecessary obstruction and stored or disposed of any equipment or surplus materials and clear away and remove from the site any wreckage, rubbish or temporary works no longer required at the site.

Yes No complaints were made

Continue monitoring

NA

Hazardous waste

management

Singsing Campsite CW1 Hazardous waste materials are kept away from workers and secured behind fences

Yes No complaints were made

Continue monitoring

NA

Singsing Campsite, Ganigle Campsite

CW1, RIC

Materials and poisonous chemicals are stored at high level ground that prevent from flood

Yes No complaints were made

Continue monitoring

NA

Ganigle Campsite RIC

All hazardous waste to be careful handled. Sealed metal drums were used to store waste engine oil and used lubricants

Yes No complaints were made

Continue monitoring

NA

Singsing Campsite, Ganigle Campsite, Construction sites

CW1, RIC

Regular inspections to be conducted and fuel/oil drums to be replaced regularly to ensure there are no leakages

Yes No complaints were made

Continue monitoring

NA

Water quality degradation

Singsing Campsite, Ganige Campsite

CW1, RIC Wastewater at the contractor’s campsites to be diverted into the septic tank

Yes CW2 Campsite has not reach this level of

Continue monitoring

NA

Page 29: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

23

Environ-mental issues

Location Contractors Mitigation Measures Mitigation Measures

Implemented? Remarks

Follow-Up Action

Required

Contractor Response

construction yet

Genige Singsing Campsite, Kamaliki campsite, Ganigle Campsite

CW1, CW2, RIC

Provide temporary septic tank

Yes Proper mitigation and safety measures were observed

Continue monitoring

NA

CH 401+440

RIC Provide temporary sediment trap

Yes No complaints were made

Continue monitoring

NA

Singsing Campsite, Ganigle Campsite

CW1, RIC Wastewater from the campsites is also diverted via line drains into the septic tanks

Yes CW2 Campsite has not reach this level of construction yet

Continue monitoring

NA

Campsites, construction areas

CW1, RIC

Prevented chemicals, concrete agitator washing deposited into existing watercourse, stream, canal.

Yes No complaints were made

Continue monitoring

NA

Safety issues

Ganigle Camp

The Camp security to be provided by the local landowners and assisted by security forces from the nearest Kerowaghi Police station

Yes No complaints were made

Continue monitoring

NA

Singsing campsite, Ganigle Camp, Kamaliki campsite

CW1, CW2, RIC

Perimeter fence for security and erosion prevention

Yes Proper mitigation and safety measures were observed

Continue monitoring

NA

Campsites and construction sites

CW1, CW2, RIC

Imposed strict safety and security measures for its employees. Alcohol, drugs and weapons are not permitted in the camp

Yes No complaints were made

NA

Page 30: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

24

Environ-mental issues

Location Contractors Mitigation Measures Mitigation Measures

Implemented? Remarks

Follow-Up Action

Required

Contractor Response

Construction sites CW1, CW2,

RIC Provided personal safety devices for workers

Partially No complaints were made

Continue monitoring

NA

Fire Control Management

Singsing campsite, Ganigle Campsite

CW1, RIC

Safety signs are placed on site and at each location that has the risk of giving rise to fire in the campsites

Yes No complaints were made

Continue monitoring

NA

Singsing campsite, Ganigle Campsite

CW1, RIC No flammable materials are left lying around the welding site construction site

Yes No complaints were made

Continue monitoring

NA

Singsing campsite, Ganigle Campsite

CW1, RIC Fire extinguishers are located inside the campsites

Yes No complaints were made

Continue monitoring

NA

Public safety

Construction sites CW1, CW2,

RIC

Traffic and safety signages are placed along the road at the camp site to indicate speed limits

Partial

Equipped insufficiently, lacks warning signs and safety devices

Provide enough

warning signs and safety

devices

NA

Construction sites CW1, CW2,

RIC

Closely work with local agencies such as local people committee, policeman, firefighting and prevention agency;

Yes No complaints were made

Continue monitoring

NA

Construction sites CW1, CW2,

RIC

Spotters are on sites to control and slow down dump trucks and other heavy machines;

Yes No complaints were made

Continue monitoring

NA

Hygienic facilities and equipment

Ganigle Campsite RIC

Good hygienic condition for workers such as supplying fresh water, building and furnishing equipment for conduction and treatment wastewater and solid waste

Yes No complaints were made

Continue monitoring

NA

Singsing campsite, Ganigle Camp, Kamaliki campsite

CW1, CW2, RIC

All workers are provided accommodation in a dormitory, unless they are recruited from locality

Yes No complaints were made

Continue monitoring

NA

Page 31: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

25

Environ-mental issues

Location Contractors Mitigation Measures Mitigation Measures

Implemented? Remarks

Follow-Up Action

Required

Contractor Response

Singsing campsite, Ganigle Camp, Kamaliki campsite

CW1, CW2, RIC

Sanitation facilities are provided at the campsites for the employees

Yes No complaints were made

Continue monitoring

NA

Singsing campsite CW1 Lavatory area is cleaned regularly and drinking water tested to be consumable

Yes No complaints were made

Continue monitoring

NA

Firs aid base

Ganigle Campsite RIC

First aid base are provided at the main campsites with two medical officers Medical officers do daily site visits to attend to minor injuries acquired by employees

Yes No complaints were made

Continue monitoring

NA

Singsing campsite CW1 There is a first aid kit inside the campsite and medicines are also stored in the camp

Yes No complaints were made

Continue monitoring

NA

Page 32: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

26

5.0 SOCIAL SAFEGUARDS MONITORING

35. Almost all Tranche 1 activities (road maintenance, upgrading and rehabilitation works) are

mostly limited to the current road alignments and within the 40-meter widths - considered as

State Land according to the legislative provisions of the Government of Papua New Guinea

(GoPNG). There are no Involuntary Resettlement (IR) impacts or impacts on the Indigenous

Peoples – both within the definitions of the applicable Standards, Procedures, Policies and

Guidelines of SHHIP Co-Partners, viz. GoPNG, ADB and the DFAT. Thus, Tranche 1 has been

appropriately categorized as “Category C” Program for IR while Indigenous Peoples Policies,

Procedures, Guidelines, etc. have not been triggered so far (not applicable) in PNG

circumstances.

36. Implementation of social safeguards during the reporting period (Jan - Jun ‘19) has been found

to be compliant with all applicable social safeguard requirements. Following sections provide

further details in this regard.

5.1. Compliance with Loan Covenants

37. SHHIP is following relevant social safeguards covenants overall during this reporting period

(Summary Table is attached as Appendix 1). The relevant safeguard provisions as required

have been also integrated into the contract documents while their overall implementation is

being monitored by safeguard team.

38. SHHIP has been also been compliant with monitoring and disclosure as a requirements. The

initial social safeguards DDR was posted on ADB website in Mar’17. Other safeguards

documents that have been posted on ADB website include Land Acquisition and Resettlement

Framework, Indigenous Peoples Planning Framework and Gender Action Plan, etc.

5.2. Implementation of Due Diligence Report

39. Due Diligence Report (DDR) has been prepared for Tranche 1, indicating 17 identified locations

and five potential ones as resolution pending legacy issue localities. The resolution of legacy

issues has been completed in seven of such sites: (i) Keranga, Simbu; (ii) Tem Nike Creek,

Simbu; (iii) Magi, Simbu; (iv) Kuglame, Simbu; (v) Avani Culvert, Eastern Highlands; (vi)

Kolwara, Eastern Highlands; and (vii) Kassam Pass area, Eastern Highlands. Likewise,

Engineering(river/drainage management) solution is found to be preferred solution for four of

the sites: (Orange/Fruit Market, Jiwaka; (ii) Waghi, Jiwaka; (iii) Ba Creek, Simbu; and (iv) Kongo

Coffee area, Simbu. Legacy issue resolution process is ongoing for the remaining such sites

and two newly identified ones. The time-taking steps and with engagement of multiple agencies

for the purpose makes the resolution of legacy issues complicated – especially for those

pending for decades. Validating the integrity of the claims made is another challenge

contributing to the extensive efforts and time required for completion of the entire process.

PMO team has been providing supports to DoW teams in expediting the resolutions.

Page 33: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

27

40. Updating the DDR with more comprehensive details on the assessment of legacy issue sites

is being undertaken by PMO and is scheduled to be completed by Jul’19. It will be further

updated in tandem with completion of joint surveys and finalization of site-specific engineering

designs/work scopes as may be recommended by the Geo-Engineering studies currently

ongoing especially in the RIC (Simbu) section.

41. Resolution of legacy issues, specially designed Memorandum of Agreements (MoAs) with the

affected persons/people (APs) or voluntary land donation (VLD) approaches are planned to

precede locality-specific civil works, ensuring adherence to applicable social safeguards

standards/legislative provisions of the ADB and GoPNG. Required templates for the MoAs and

VLD have been prepared and consultations with the communities/private asset owners have

been ongoing.

42. For any unanticipated adverse social impacts on landowners due to involuntary resettlement

and/or on Indigenous People (IP), inter alia, required documentation, appropriate corrective

action plan (CAP) preparation and implementation shall be done, if so, triggered during

implementation of SHHIP works.

5.3. Implementation of Gender Action Plan

43. Implementation of the Gender Action Plan (GAP) is ongoing as planned. While the required

contract-linked GAP provisions have been integrated in the contract documents including local

employment generation, ongoing works include preparation of relevant plans, viz.,

HIV/AIDS/STI Awareness plan, Workers Management Plan, Community Livelihood

Enhancement Plan, etc. – aimed at their implementation in parallel with the civil works.

44. Local Employment Generation by the Contractors for female workers in road construction and

maintenance activities has been found to be challenging for all Contractors. Though this has

been reported to be so due to the traditional job-division system of local communities where

mostly male members perform construction-sector jobs, Contractors have been advised and

are being supported to make concerted efforts to hike the participation of female members of

the societies in the upcoming periods adhering to SHHIP norms in an endeavor to meet 30%

female workers out of the total local workers engaged in road construction and maintenance

activities during overall SHHIP implementation period. Table 15 below shows the current status

of local (PNG) employment generation by respective Contractors as per SHHIP requirements

for the reporting period.

Page 34: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

28

Table 15: Local employment generation by contractors

Type Total Headcount Gender

Male Female

Metallurgical Corporation of China - MCC (CW1 Section)

Staff 135 125 10

Skilled Labourers/ Workers 124 108 16

General Labourers/ Workers 379 338 39

Total 638 573 (89.81%) 65 (10.19%)

China Wu Yi Co. Ltd. (CW2 Section)

Staff 19 15 4

Skilled Labourers/ Workers 39 36 3

General Labourers/ Workers 63 62 1

Total 121 113 (93.39%) 8 (6.61%)

China Harbour Engineering Corporation (RIC Section)

Staff 11 7 4

Skilled Labourers/ Workers 194 186 8

General Labourers/ Workers 208 190 18

Total 413 383 (92.74%) 30 (7.26%)

Construction Total (Grand Total) 1172 1069 (91.21%) 103 (8.79%)

45. Social Infrastructure Plan (SIP) preparation works are ongoing- adhering primarily to SHHIP

GAP provisions. Such social infrastructure under SHHIP include market stalls, bus bays,

gender-segregated public sanitary facilities, pedestrian paths, etc. Survey works for

determining their appropriate locations and numbers based on needs and demands of the

communities have been completed within the reporting period (Jun ’19) for all three CW

sections as planned. Works are currently ongoing on data analysis, designs, costings, etc. The

demands of the communities have been found to be significantly high (preliminary analysis

indicates more than double of the current number of bus shelters, for instance). The ongoing

analysis, design and costing works will lead to finalization of the numbers and types of the

social infrastructure, culminating into a comprehensive Social Infrastructure Plan (SIP) for

SHHIP - planned to be finalized within Dec’19.

46. HIV/AIDS/STIs Awareness Plans have been prepared by the Contractors for all three SHHIP

sections. They have been reviewed/vetted by PMO and approved by the Construction

Supervision Consultant. Adhering to GAP requirements, such plans are prepared with

schedules for conducting awareness programs for the Contractors’ personnel (staff and

workers) and communities (students, general public, drivers, Church groups, etc.) living along

the Highway section under each Contractor’s jurisdiction. Implementation and monitoring

supports are ongoing.

47. Implementation of road construction safety activities is also progressing. While PMO-based

road Safety Specialist is expected to be mobilized in the beginning of the next Quarter,

counterpart Specialists engaged with the CS2 have started with road construction safety

awareness activities. One of such awareness and training programs has been organized by

Bonifica Renardet (CS2) for China Harbour teams on 02 May’19 in Simbu.

Page 35: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

29

6.0 CONSULTATION AND AWARENESS ACTIVITIES

48. During the reporting period, five different community consultation activities have been with

SHHIP communities at Yang Creek, Kolwara, Wara Simbu, Alta Creek/Orange Market and

Kuligap. Female participation in community consultations on an average remained at about

39% during the reporting period, just on the margin to make it 40% as per GAP indicator. The

highest (50%) participation of female members has been in the Orange Market community

consultation whereas the lowest (36.80%) in Yang Creek community consultation program.

Efforts continue to enhance the participation to at least above 40 percent as per GAP

provisions.

49. SHHIP general public awareness program has been launched for the entire 430km SHHIP

Highway during 14-18 Feb’19. Likewise, four different events for SHHIP awareness and

consultation have been organized targeting all three different (Provincial, District and Local)

levels of the Public Administrators during the reporting period - encompassing all five SHHIP

Provinces.

50. Multiple consultations with other SHHIP stakeholders conducted during the period include

those with the police and Defense Force representatives, DoW Provincial teams, and Daulo

and Four-mile Area Landowners’ Association representatives, amongst others. Summary of

such key activities is presented in Table 16 below.

Table 16: Community and other stakeholder consultation activities

Date/Venue/Type Key Issues/Queries/Feedback Remarks

February 2019/

Kundiawa (Simbu

Province) and

Goroka/Eastern

Highlands

Province)/ Pre-

construction

Orientation and

Consultation

Major social safeguard issues discussed during

the multiple sessions with different CSC and

Contractor teams focused on overall social

requirements for SHHIP implementation, viz.,

gender mainstreaming, landownerships and

legacy issues, social/community infrastructures,

community livelihood-support initiatives, local

employment generation requirements,

synergistic implementation of social activities

together with civil works, Contract provisions on

labor standards, etc. Clarity enhanced on

applicable social standards and team works.

Targeted at

Construction

Supervision

Consultants and

Contractors.

Altogether 55

Attendees in multiple

sessions

SHHIP General

Public Awareness-

building program

The awareness campaign focused on

disseminating comprehensive overall

information on SHHIP to the general public living

along the SHHIP section of the Highlands

Highway. The tools (recorded dialogue in Tok

Pisin language and written statements in

English) were also especially designed to clarify

some confusions as the PMO came to know of

their existence – mainly those linked to four-lane

versus two-lane works under SHHIP, land

A week of awareness

campaigns targeted

at General Public

living along all three

SHHIP 430 km

sections.

Approximate number

of audiences noted at

each of the 15 total

stopovers during the

Page 36: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

30

Date/Venue/Type Key Issues/Queries/Feedback Remarks

acquisition requirements, Highway corridor

clearance, implementation-timings, sequencing

of SHHIP components, etc. Campaign perceived

to be successful, overall, in meeting the

objectives.

three-day (Feb 14, 15

and 18) campaign.

SHHIP Public

Admin Awareness

and Consultation

program

SHHIP awareness-building focused on overall

Program presentation, including social impacts

(both adverse and beneficial ones), applicable

standards of the ADB and those of the GoPNG,

safeguard plans, current implementation status,

imminent social activities, etc. Likewise,

consultations primarily were vital in receiving

participant feedback, queries and responses

specific to resettlement, legacy issues,

appreciative social/community infrastructures

and livelihood-support initiatives, worker-

community interactions, sustainable solutions to

landslide and other pertinent SHHIP issues.

Overall happiness about the SHHIP and full-

fledged support assurances received from

almost all participants

Targeted at Public

Administrators at

Provincial, District

and Local levels of

the Government.

Four sessions

attended by 104

participants

(including DoW

representatives)

Grievance

Redress

Committee

Orientation

Training and

Consultation

SHHIP overall and Grievance Redress

Mechanism presentations were made. Major

feedback received included queries on civil work

status, legacy issues, consultation activities,

resolution process for various types of

grievances, etc.

Targeted at

Grievance Redress

Committees in each

of the five SHHIP

Provinces, altogether

84 participants

attended.

SHHIP-

Community

Consultation

programs

SHHIP awareness-building focused on overall

Program components, social and environmental

impacts (both adverse and beneficial ones),

social/community infrastructure support, etc.

Feedback, queries and responses primarily

regarding resettlement, legacy issues,

appreciative social/community infrastructures

and livelihood-support initiatives, etc. Overall

happiness about the SHHIP was received from

almost all participants

Targeted at SHHIP

communities living

along the Highway.

Altogether 222

people participated in

five different

consultation events

launched during the

reporting period.

Page 37: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

31

7.0 GRIEVANCE REDRESS MECHANISM

51. The process for establishing Grievance Redress Mechanism (GRM) has been completed by

26 Jun ‘19 in all five provinces involving SHHIP – namely Morobe, Eastern Highlands, Simbu,

Jiwaka and Western Highlands. Headed by the respective Provincial Administrator, each

Grievance Redress Committee (GRC) thus formed has representatives from concerned Local,

District and Provincial authorities and is expected to be an effective platform for resolution of

grievances performing acceptance, investigation, mediation, and advisory functions, amongst

others.

52. SHHIP GRC orientation and consultation program has also been successfully conducted for all

committees. Provincial Administrators (except for Morobe where the Deputy Administrator

participated in), Provincial Police Commanders, Provincial Deputies, Works Managers, District

and Local level representatives, amongst others, participated in the orientation and

consultation program at each venue.

53. The Program Management Office (PMO) has been supporting the GRCs in their smooth

functioning working together with the Construction Supervision Consultants’ and Contractors’

teams. Table 17 presents further information on the GRCs formed for SHHIP.

Table 17: Information on Grievance Redress Committees

Province GRC Chairperson/

Provincial

Administrator

Formation Date Orientation Date

Simbu Michael Temai 12 Mar’19 08 May’19

Morobe Bart Ipambonj 02 May’19 22 May’19

Eastern Highlands John Gimiseve 23 May’19 27 May’19

Jiwaka Michael Wandil 13 May’19 26 Jun’19

Western Highlands Joseph Neng 21 Jun’19 26 Jun’19

54. Probably due to the fact that SHHIP Tranche 1 major civil works activities are yet to start, no

grievances have been received during the reporting period (Jan-Jun’19). However, each

periodic report originating from the Contractor is planned to have a dedicated GRM section and

be submitted to the PMO through the Engineer with required inputs. Further detailed section

on GRM with brief analysis matrix is planned for the upcoming report to be shared with the

ADB, GoPNG and DoW.

55. Target has exceeded from required 2 to actual 4 female GRC members within the initial

implementation year (2019) as one of the Gender Action Plan implementation monitoring

indicators.

Page 38: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

32

8.0 SUMMARY OF MAIN ENVIRONMENTAL AND SOCIAL SAFEGUARDS FINDINGS

56. Implementation of SHHIP activities have been compliant with SHHIP applicable environmental

and social safeguard standards, policies and procedures of the Program Co-Partners, viz.,

GoPNG, ADB and the DFAT.

8.1 Key environmental challenges encountered during the reporting period

57. Human resources: Although the environmental staff of the Contractors and the Consultants are

almost 100% mobilized, they need time to study and get familiar with the Program. Additionally,

most of the mobilized staff is lacking experience in ADB environmental safeguards standards

resulting in the poor quality of documents prepared, not meeting the requirements of the

Program and demanding a lot of effort and time for revision as per the Consultants’ and PMO’s

comments. Furthermore, the resignation of the international environmental staff of CSC1 is

causing many difficulties to the management and implementation of environmental works of

the CSC1 and CW1 as well.

58. CEMP approval: CEMPs of CW1, CW2 and RIC have been prepared, and revised as per the

comments of the Consultants and PMO and have been approved. However, The CEMPs shall

be revised throughout the construction period in response to, and whenever there are any

changes in conditions such as: design, construction procedures and methods, schedule, terms

and conditions of permits and approvals, mitigation measures, and other requirements.

59. Quarry areas: Quarry areas of CW1 (Singsing Creek Extraction) and RIC (Ganigle) have got

environmental permits from CEPA and have prepared the Quarry Management Plans as well,

being submitted to the Consultants for review. The CW2 have recently secured an agreement

with the Landowner of the Quarry Area at Bena, and the application for environmental permit

is to be submitted to CEPA.

60. Application of mitigation measures at site: During the current monitoring period, the Contractors

were basically preparing the campsites, were working on vegetation control, de-silt side drain,

road maintenance and emergency works. However, the safety measures were not properly

applied such as some driver’s licenses were expired, high visibility safety vests and PPE were

not fully provided to all workers and unsafety issues in fuel storages of campsites, lack of safety

devices in sections of campsites and quarry areas, were observed.

8.2 Key social challenges encountered during the reporting period

61. Delayed mobilization of the contractors’ and Construction Supervision Consultants' social

personnel: This required enhanced engagement of the PMO social team in implementation

monitoring, plan preparation and other supports for compliance assurances and preparatory

works. Multiple interactions and follow ups have been made with each CS Consultant and

Contractor. While CS1 team is yet to have the required Social Safeguard Officer onboard, the

Page 39: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

33

other teams have been progressing with their recruitments during the end of the reporting

period. Required follow up and support is being provided by the PMO.

62. Resolution of legacy issues remains challenging: The time-taking steps and works from multiple

agencies make the resolution of legacy issues complicated – especially for those pending for

decades. PMO team has been providing supports to DoW teams in expediting the resolutions

while consultations for MOAs with in-kind supports to legacy-issue-affected landowners are

also ongoing.

63. Women/female participation in community consultation activities: Though female participation

has been progressing with each subsequent community consultation meeting, it is yet to meet

the 40% target. Efforts are being made through enhanced information dissemination and

awareness on part of the key stakeholders to hike the current 39% participation figure to meet

the target during overall SHHIP implementation period as required.

64. Meeting local employment targets remains challenging: In order to enhance local community

participation in SHHIP works, Contractors are required to engage community workers for road

construction and maintenance activities, with 30% of the local manpower engaged as female

workers. However, it remains low (below 9%) as of the reporting period. Though this has been

found to be so due to the traditional job-division system of local communities where mostly

male members perform construction-sector jobs, PMO and CSCs has been supporting

Contractors in developing their Manpower (Human Resource) Plans with concerted efforts to

increase the current overall Program-wide participation of female workers during the reporting

period to 30% as is required according to contract provisions during SHHIP implementation

period, overall.

Page 40: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

34

9.0 FOLLOW-UP ACTIONS

65. Environmental and Social safeguard follow up actions for SHHIP for the imminent

implementation period are summarized in Table 18 below.

Table 18: Summary follow-ups on key environmental and social safeguard action items

Actions Responsible Party

Timeline Status/Remarks

Environmental safeguard follow up actions

Finalization of the updated IEE

and EMP of SHHIP-Tranche 1

PMO 30

August

2019

The draft updated IEE and EMP

have been submitted to ADB.

These shall be revised and

finalized in August 2019 as per

ADB’s comments

Updated CEMPs approved CWs, CSCs,

PMO

3Q2019 The CEMPs approved shall be

revised and updated based on

the SHHIP’s updated EMP

Environment Permit and QMP

of Bena (CW2)

CW2, CSC1 3Q2019 Preparation of application is ongoing for submission to CEPA to get Environment Permit;

Preparation of QMP is ongoing

for submission to Consultant and

PMO for review

Safety issues at SingSing

Campsite of CW1

CW1, CSC2 3Q2019 Provision of warning signs, safety devices,

Traffic management and traffic

control plans

Safety issues at Ganigle

Campsite and temporary

Campsite and Quarry Area of

RIC

RIC, CSC2 3Q2019 Provision of warning signs, safety devices,

Traffic management and traffic

control plans

Fully provide PPE to workers CWs, RIC,

CSCs

3Q2019 Contractors have to provide

PPE’s to all workers and

employees

Social safeguard follow up actions

Grievance Redress

Mechanism

PMO, CS,

CWs

2Q2019 All complete; GRC support and

periodic analysis and reporting

ongoing as required

Submission and approval of

stakeholder communication,

consultation and participation

plan

PMO 30 Apr’19 Complete - implementation

ongoing

HIV/AIDS Awareness Plan PMO, CS,

CWs

2Q2019 All plans prepared;

implementation monitoring and

periodic reporting ongoing as

required

DDR Update and Submission PMO 31 Jul ‘19 Ongoing meeting target date

SHHIP Public Awareness and

Consultation Program

PMO 3Q2019 Budget approved; plan

finalization ongoing

Page 41: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

35

Actions Responsible Party

Timeline Status/Remarks

Social Safeguard Workshop PMO 3Q2019 Preparatory works are ongoing

Social Infrastructure Plan PMO, CS,

CWs

4Q2019 Survey works completed during

2Q; data analysis, design and

costing works are ongoing

Community Livelihood

Enhancement Plan

PMO 4Q2019 Initial information collection is

ongoing

Gender-Based Violence

Prevention Plan

PMO 4Q2019 Draft plans have been prepared

Workers’ Management Plan PMO, CS,

CWs

4Q2019 Works ongoing

DDR Implementation

(Resolution of Legacy Issues)

PMO 4Q2021 Issues resolved in seven

locations; resolution process

ongoing for the remaining ones

DoW and ESSB Social

Safeguards Capacity Building

Works

PMO 4Q2021 Part of Institutional Strengthening

component

Stakeholder Communication

and Consultations

PMO, CS,

CWs

3Q2022 Regular process, ongoing

Formation of Road

Construction and Maintenance

Groups

PMO, CS,

CWs

3Q2022 Ongoing

GAP and other social

safeguard implementation

monitoring (regular)

PMO, CS 3Q2022 Ongoing as required

Page 42: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

36

10.0 APPENDICES

Appendix 1: Status of Compliance with Loan Covenants

Covenant Reference

in Loan Agreement

Compliance Status

Land Acquisition and Involuntary Resettlement 7. The Borrower shall ensure that the Project does not have any involuntary resettlement impacts, all within the meaning of ADB's Safeguard Policy Statement (2009). In the event that the Project does have any such impact, the Borrower shall take all steps required to ensure that the Project complies with the applicable laws and regulations of the Borrower, with ADB's Safeguard Policy Statement and the LARF that has been prepared for the Investment Program.

Loan 3547 Sch. 5 Para. 7

Being Complied

Indigenous Peoples 8. The Borrower shall ensure that the Project does not have any indigenous peoples impacts, all within the meaning of ADB's Safeguard Policy Statement (2009). In the event that the Project does have any such impact, the Borrower shall take all steps required to ensure that the Project complies with the applicable laws and regulations of the Borrower, with ADB's Safeguard Policy Statement and the IPPF that has been prepared for the Investment Program.

Loan 3547 Sch. 5 Para. 8

Being Complied

Human and Financial Resources to Implement Safeguards Requirements 9. The Borrower shall make available or cause DOW to make available necessary budgetary and human resources to fully implement the social safeguard requirements.

Loan 3547 Sch. 5 Para. 9

Being Complied

Safeguards – Related Provisions in Bidding Documents and Works Contracts 10. The Borrower shall ensure or cause DOW to ensure that all bidding documents and contracts for Works contain provisions that require contractors to: (a) comply with the measures relevant to the contractor set forth in the IEE, the EMP and LARF (to the extent they concern impacts on affected people during construction), and any corrective or preventative actions set forth in a Safeguards Monitoring Report; (b) make available a budget for all such environmental and social measures; (c) provide the Borrower with a written notice of any unanticipated environmental risks or impacts that arise during construction, implementation or operation of the Project that were not considered in the IEE, the EMP and LARF; (d) adequately record the condition of roads, agricultural land and other infrastructure prior to starting to transport materials and construction; and (e) reinstate pathways, other local infrastructure, and agricultural land to at least their pre-project condition upon the completion of construction.

Loan 3547 Sch. 5

Para. 10

Being Complied

Safeguards Monitoring and Reporting 11. The Borrower shall do the following or cause DOW to do the following:

Loan 3547 Sch. 5

Para. 11

Being Complied

Page 43: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

37

Covenant Reference

in Loan Agreement

Compliance Status

(a) submit semiannual Safeguards Monitoring Reports to ADB and disclose relevant information from such reports to affected persons promptly upon submission; (b) if any unanticipated environmental and/or social risks and impacts arise during construction, implementation or operation of the Project that were not considered in the IEE, the EMP, the LARF and the IPPF, promptly inform ADB of the occurrence of such risks or impacts, with detailed description of the event and proposed corrective action plan; and (c) report any actual or potential breach of compliance with the measures and requirements set forth in the EMP and LARF promptly after becoming aware of the breach

Prohibited List of Investments 12. The Borrower shall ensure that no proceeds of the Loan are used to finance any activity included in the list of prohibited investment activities provided in the Appendix 5 of the SPS.

Loan 3547 Sch. 5

Para. 12

Being Complied

Labor Standards, Health and Safety 13. The Borrower shall ensure that the core labor standards and the Borrower’s applicable laws and regulations are complied with during Project implementation. The Borrower shall include specific provisions in the bidding documents and contracts financed by ADB under the Project requiring that the contractors, among other things: (a) comply with the Borrower’s applicable labor law and regulations and incorporated applicable workplace occupational safety norms; (b) do not use child labor; (c) do not discriminate workers in respect of employment and occupation; (d) do not use forced labor; (e) allow freedom of association and effectively recognize the right to collective bargaining; and (f) disseminate, or engage appropriate service providers to disseminate, information on the risks of sexually transmitted diseases, including HIV/AIDS, to the employees of contractors engaged under the Project and to members of the local communities surrounding the Project area, particularly women.

Loan 3547 Sch. 5

Para. 13

Being Complied

14. The Borrower shall strictly monitor compliance with the requirements set forth in paragraph 13 above and provide ADB with regular reports.

Loan 3547 Sch. 5

Para. 14

Being Complied

Gender and Development 15. The Borrower shall ensure that (a) the GAP is implemented in accordance with its terms; (b) the bidding documents and contracts include relevant provisions for contractors to comply with the measures set forth in the GAP; (c) adequate resources are allocated for implementation of the GAP; and (d) progress on implementation of the GAP, including progress toward achieving key gender outcome and output targets, are regularly monitored and reported to ADB.

Loan 3547 Sch. 5

Para. 15

Being Complied

Page 44: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

38

Appendix 2: Quarry Environmental Permits

2.1 Ganigle Quarry Environment Permit - RIC

Page 45: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

39

Page 46: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

40

2.2 SingSing Quarry Environment Permit - RIC

Page 47: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

41

Appendix 3: Campsite Checklist

3.1. Campsite Checklists – CW1

Page 48: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

42

Page 49: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

43

Page 50: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

44

Page 51: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

45

2. Campsite Checklists – CW2

Page 52: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

46

3. Campsite Checklists – RIC

Page 53: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

47

Page 54: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

48

Page 55: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

49

Appendix 4: Pictures of SHHIP T1 activities.

Picture 1- Pre-Inception Meeting Participants, Goroka (EHP); Jan ‘19

Picture 2- Pre-Construction Workshop Participants, Goroka (EHP; Feb ‘19

Picture 3- Interaction with Wara Simbu Women Group Consultation Participants, Simbu Province; 09 May’19

Picture 4- SHHIP-General Public Awareness Program; Feb ‘19

Page 56: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

50

Picture 5- Women workers on duty in MCC Site, Eastern Highlands Province; 5 Jun’19

Picture 6- Women Group Consultation Participants, Kolwara, EHP; 16 May’19

Picture 7- Corporate Social Responsibility Activity by RIC Contractor, Simbu Province; 24 May’19

Picture 8- Community Consultation Participants at Orange Market, Jiwaka Province; 27 Jun’19

Page 57: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

51

Picture 9–Applied Safety Measures at Construction Sites on 16 May’19 - RIC

Picture 10- Road management at Goroka Town on 20 Jun’19 – CW2

Picture 11–Traffic Control at Daulo 22 Jun’19 – CW2 Picture 12–Provide PPEs for Workers at Goroka town on 7 Jun’19

Picture 13– RIC’s Employees displaying their newly issued PPEs at the Ganigle Camp on 14 Jun’19

Picture 14–RIC’s officers conducting safety training and alcohol test on site for employees on 22 May’19

Page 58: 48444-004: Sustainable Highlands Highway Investment Program - …€¦ · Prepared by Project Management Office, Department of Works for the Government of Papua New Guinea and Asian

52

Picture 15–Clearly labelled waste Bins provided at the camp for waste disposal at Ganigle Camp on 4 Jun’19

Picture 16– Safety Signages placed at various locations in the at Ganigle Camp on 4 Jun’19

Picture 17–Water truck spray on construction site on 22 May’19

Picture 18–Machine maintenance before work in the morning on 18 Jun’19