45606285 Lavasa Final

download 45606285 Lavasa Final

of 14

Transcript of 45606285 Lavasa Final

  • 7/30/2019 45606285 Lavasa Final

    1/14

    LAVASA

    1

    Project Management

    Title: LAVASA

    Submitted By:

    Mrigakshi Singal (09609022)

    Sakshi Malhotra (09609105)

    Shretima Gupta (09609138)

    Aakriti Bhasin (09609139)

    Aakansha Karnwal (09609142)

    Aayush Rustagi (09609143)

  • 7/30/2019 45606285 Lavasa Final

    2/14

    LAVASA

    2

    Contents

    1 Introduction.......................................................................................................................... 3

    Location ...................................................................................................................................... 4

    Plans............................................................................................................................................ 4

    Purposes. ................................................................................................................................... 4

    Development .............................................................................................................................. 4

    2 Social Initiatives ..................................................................................................................... 5

    2.1 Health ........................................................................................................................... 5

    2.2 Education ..................................................................................................................... 6

    2.3 Employability .............................................................................................................. 6

    2.4 Connectivity: ............................................................................................................... 6

    3 State Policy ............................................................................................................................. 7

    4 Environmental Impact: ......................................................................................................... 7

    5 Water resources: .................................................................................................................... 7

    6 Geographic Information Systems (GIS) at Lavasa: ........................................................... 8

    7 Major issues surrounding Lavasa Project........................................................................... 9

    8 Concerns ............................................................................................................................... 12

    9 SOLUTION .......................................................................................................................... 13

    10 CURRENT STATUS ........................................................................................................... 13

    11 References ......................................................................................................................... 14

  • 7/30/2019 45606285 Lavasa Final

    3/14

    LAVASA

    3

    Introduction

    Lavasa Hill City is free India's first and largest hill city with a sprawling

    township spread across the 7 hills of the Mose valley. The area is quite close to

    the major cities of Pune and Mumbai and circles the Varasgaon Lake. Lavasa is

    just about 65 Kms (an hrs drive) from Pune and about 200 Kms (3.5 hrs) from

    Mumbai. Lavasa Hill City covers 25,000 acres with 60 Kms of lakefront. It is

    spread amidst 100 sq. Kms, which is almost 1/4th the size of Mumbai.

    Lavasa city has been designed on the principles of new urbanism, and is said

    to offer the best-in-class infrastructure, international educational institutions,leading non-polluting industries, exciting avenues of leisure & tourism and

    homes for comfortable living. An ecologically sustainable environment will

    help you live, work, learn and play in harmony with nature at Lavasa. Over

    25,000 lakeside apartments and villas with over 50,000 employment

    opportunities should be available at Lavasa city. Apart from its diversity in

    work possibilities, Lavasa also present some wonderful housing options for

    permanent residents. Some other famous concepts of hill cities, but all

    developed during the British Raj, are Shimla, Kullu and Ooty.

    The Lavasa project is being developed by HCC India. Although the land is

    disputed by some, the master plan for Lavasa has already won 3 Global

    Awards. Apart from latest technologies and state-of-the-art connectivity,

    Lavasa also assures of world class infrastructure and first class roads. There

    are five access routes to the Lavasa city, one of which, the Chandni chowk-

    Pune road, has been developed. The first phase of the Lavasa Hill town is

    currently under construction and is scheduled for completion in Dec '2009.The Fortune Select Dasve Hotel is now open at Lavasa while Dasve, the first

    town, is expected to be ready by 2009-10.

  • 7/30/2019 45606285 Lavasa Final

    4/14

    LAVASA

    4

    Location

    Lavasa is located in the Western Ghats, on the banks of the Baji PasalkarReservoir behind the Varasgaon Dam (Varasgaon Dam & Reservoir) near Pune

    and Mumbai. The city is coming up on eight large hillocks that surround the

    elongated Varasgaon Dam Reservoir. Varasgaon is one of the primary sources

    of water for Pune city. The project covers approximately 25,000 acres (100

    km2) of land. Lavasa is located within 80 minutes from Pune (approximately

    50 km) and 3 hours from Mumbai (approx 180 km). There are five access

    routes to Lavasa, one of which is enhanced and developed.

    Plans

    Lavasa is planned in four phases out of which, Phase I in Dasve will be

    operational from 2010 with almost 1,000 villas and 500 apartments. The

    development of Phase II will begin next year and would be ready by 2014. The

    third and fourth phases would be ready by 2017 and 2021, respectively. There

    is a controversy around how clearance has been given to build the new Lavasa

    city that will draw water from the Varasgaon Dam. The Varasgaon Dam is one

    of the primary sources of water for Pune city, and Pune city already faces

    acute water shortage in the months preceding the annual monsoon season.

    Another controversy is around how forest lands can be given away forcommercial purposes.

    Development

    Development plans of Lavasa consists of four periods and involves the

    development of 12 towns spread across 7 hill slopes

    Period 1 - Dasve, Mugaon, Bhoini Period 2 - Dhamanhole, Gadale, Koloshi, Ugawali

    Period 3 - Sakhari, Wadavali

    Period 4 - Bhode, Mose, Saiv

  • 7/30/2019 45606285 Lavasa Final

    5/14

    LAVASA

    5

    Planned economy drivers of the city

    Research centres Hospitality and tourism

    Education

    Resident population

    Health care

    Lavasa has signed electricity supply agreements with the Maharashtra

    State Electricity Distribution Company Ltd (MSEDCL) and Tata Power

    Company Ltd.

    Social Initiatives

    2.1 Health

    Free monthly check up camps for the villagers from surrounding areas Specialist doctors and medicine are made available through these camps

    Mobile Vans are used to reach remote areas

    Primary Health center has been set up at each surrounding village and is

    staffed by professional doctors for round the clock medical service free of cost

    A 24 hour free ambulance service is also available to locals, in case of

    patient transfers to other hospitals

    Administrative assistance to the Government public healthcare staff for

    Pulse Polio campaign Water tanker facilities for providing healthy, clean, accessible drinking

    water to villagers

  • 7/30/2019 45606285 Lavasa Final

    6/14

    LAVASA

    6

    2.2 Education Schools have been handed over to each local Zilla Parishad

    Instituted a teachers development program with the Government of

    Maharashtra for staffing the Schools

    Uniforms distributed to all students

    Conducted Personality Development Activities and Aptitude Tests for

    students.

    Nisarg Shala concept has been introduced to empower the locals to

    managing the natural resources at their disposal in a better way.

    2.3 Employability Jobs have been provided through various initiatives which make the best

    use of local expertise and potential.

    Weekly bazaar, where the villagers are encouraged to buy and sell

    agricultural products, groceries and other household commodities

    2.4 ConnectivityLavasa only had access by road from Pune or Mumbai. Being in a hilly terrain

    the roads though well developed have steep inclines in some places. Also as

    per data publicly available no air connectivity is planned in the near feature

    apart from helicopters.

    Under Construction: Lavasa will be under construction for close to 1011

    years after the launch of Dasve in 2010. It remains to be seen whether the

    construction activity disturbs the life in Dasve.

  • 7/30/2019 45606285 Lavasa Final

    7/14

    LAVASA

    7

    State Policy:

    The government has not required the promoters of Lavasa to reserve

    accommodation for economic weaker sections of society. Some of the land

    used in the project was acquired for the Varasgaon dam in 1974 and was

    unused. Although the land cannot be returned to the original owners as per a

    High Court verdict the same should used for public purposes. However it is

    not clear from the verdict if it can be used for public purposes only by the

    government or a private party as is the case in Lavasa.

    Environmental Impact:

    Lavasa has been granted clearance by the state government as per a 1994

    directive from the central government directing state government to grant

    environmental clearances for projects less than 1000 m above sea level. Some

    activists contend that Lavasa is more 1000m above sea level in some places.

    Only the entry gate of the city is above 1000m.[11]Lavasa is situated in the western ghats and some activists contend that it will

    have a adverse impact on the biodiversity.[citation needed]

    Water resources:

    The Varasgaon Dam is an important dam for water supply to Pune city. The

    reservoir very nearly dries up in the hot summer months leading up to the

    monsoon. There are claims that water from Varasgaon is diverted to Lavasa

    and will result in problems in water supply to Pune city.

  • 7/30/2019 45606285 Lavasa Final

    8/14

    LAVASA

    8

    However HCC, in order to address that problem has built a mini dam that has

    created a reservoir holding of 1.8 million cubic metres of water. Pune's

    population requires about 11.5 thousand million cubic ft (TMC) water[clarification needed]/pa and the capacity of the Varasgaon Dam Reservoir is

    also about 11.5 TMC [1]. Lavasa Corporation acquired permissions to get 1.5

    TMC water (14%) from Varasgaon dam.

    However, through several dams and check dams, 0.9 TMC would be added to

    the Varasgaon reservoir. Lavasa will consume approximately 0.5 TMC of

    water. Therefore, a surplus of 0.4 TMC water would be added to the

    Varasgaon reservoir

    Geographic Information Systems (GIS) at Lavasa:

    Lavasa is a hill town project being developed by HCC Real Estate Ltd, a 100

    per cent subsidiary of HCC. Lavasa is easily accessible from Pune (approx

    65kms) and is the first planned hill town, post independence.

    Use of technology to establish new levels of world-class service and efficiencyis intrinsic to the Lavasa vision. One such technology being used in the project

    is GIS. The system provides integrated, single window e-governance services

    to the citizens of Lavasa.

    The GIS forms the core engine of Lavasa citys IT application portfolio. Lavasa

    will be the first city in Asia to operate in e-governance mode. GIS technology

    will be the backbone of the e-governance mode of the town. The entire

    landscape has been GIS / GPS mapped which will be linked to the document

    management system to offer high quality services such as logging complaintsfor any civic services, checking property related documentations and

    information on the events planned in the city besides the emergency alerts

    and disaster management system.

  • 7/30/2019 45606285 Lavasa Final

    9/14

    LAVASA

    9

    It currently provides geographically referenced data on the entire project,

    including

    Land use and town planning data Land acquisition status Physical progress of developmental activities (including all utilities)

    through color coded representation of completed, in process and

    planned works

    Environment and tourism related data Slope stability data

    Major issues surrounding Lavasa Project

    7.1 Current issue surrounding LavasaThe Lavasa project is promoted mainly by the HCC group. Its other promoters

    include the Avantha Group, Venkateshwara Hatcheries and a Pune-based

    builder. The Lavasa project about 30 km from Pune has run into a new

    roadblock. After allegations that the company violated the law to acquire large

    parts of its 25,000 acre complex, its the environmental permissions that are

    now being challenged.

    Launched in 2002, the Lavasa project is promoted by its builders as Indias

    first hill city. Everything about it is first class luxury apartments and hotels,

    world-class facilities for adventure sports.

    The Environment Ministry has now issued a show cause notice -Lavasas builders have to explain the violations of the Environment Act.

    The buildings run the risk of demolition if the explanation is not

    acceptable. For now, all construction at the project has to stop.

  • 7/30/2019 45606285 Lavasa Final

    10/14

    LAVASA

    10

    Earlier this year, an inquiry by the state government suggested theLavasa deal has deprived Maharashtra of several crores.

    An inquiry conducted by the Maharashtra revenue department says thatLavasa bought 600 hectares of land from farmers who had been givenland by the state. Lavasa should have paid 75 per cent of the price of the

    land to the state, therefore. Instead, it paid 2 per cent to the

    government.

    The government report also says Lavasa bought 98 hectares of triballand without the prerequisite clearance from the government - a charge

    Lavasa denied completely.

    The report also finds fault with the states irrigation department-MKVDC for leasing 141 hectares of land at throwaway rates to Lavasa.The government at no point sanctioned this lease. While the market

    price should have been 20 crores a year, the lease was signed for 3 lakh

    a year. Lavasa argues that the lease- signed in 2002 settled the price

    based on the market rates at that time.

    7.2 Water ResourceAnother most important issue surrounding Lavasa is related with the water

    resource. The Varasgaon dam is an important dam for water supply to Pune

    city. The reservoir nearly dries up in the hot summer months leading up to the

    monsoon. There are claims that water from Varasgaon is diverted to Lavasa

    and will result in problems in water supply to Pune city.

    However HCC, in order to address that problem has built a mini dam that hascreated a reservoir holding of 1.8 million cubic metres of water. Punes

    population requires about 11.5 thousand million cubic water and the capacity

    of the Varasgaon Dam Reservoir is about 11.5 TMC and Lavasa Corporation

  • 7/30/2019 45606285 Lavasa Final

    11/14

    LAVASA

    11

    acquired permissions to get 1.5 TMC water which is 14% from Varasgaon

    Dam.

    7.3 Other important issues are as follows: Land being acquired by hook or crook. Inadequate compensation. State machinery used to coerce farmers No proper plans to rehabilitate the farmers affected Most construction without necessary central govt. environment

    sanctions

    State environment sanctions rigged / bought. Fundamental issue of whether the state should have in the first place

    given out prime & fertile agricultural land to a private corporation

    Protesters say that Lavasa is being projected as a city for all, when inreality its only a luxury destination for the ultra rich.

    Lavasa has been granted permissions in quick time by bending /breaking the law.

    Land leased for 30 yrs by govt. which in fact will never be returnedand is as good as sold

    Land leased at throw away prices Mega corruption for Lavasa approvals & sanctions All new cities developed in the past were developed by the

    government, Lavasa is a private enterprise. Many find this improper.

    Lavasa is essentially a city for the rich. The other segments of societywill exist in Lavasa only to serve the rich.

    Shortsighted. With dam capacities dropping rapidly due to silting, thewater storage will keep dropping while Lavasa consumption will

    keep rising

    Lavasa constructions along the backwaters are bad for environment& will also stop actions like raising the dam height in the future

  • 7/30/2019 45606285 Lavasa Final

    12/14

    LAVASA

    12

    Concerns

    Many of our top banks are heavily invested in Lavasa. So, if Lavasa goesdown it will take with it a lot of public money via the banks. The mighty

    politicos might have already got the gains they desired.

    A section of the protest seems to have no interest in resolving thematter. They just want to finish off Lavasa & proclaim victory.

    There has always been a criticism of agitations led by Medha Patkar thatthe focus is on blocking rather than solving.

    India has a very bad record at bringing the corrupt to book. In allprobability the corrupt big fish will again escape. A few small players

    might get prosecuted.

    The fact is that most small farmers are barely able to make ends meetand so the status quo is really not that great an option. So like Singur

    which continues to exist in all its poverty after the Tatas left, so would

    the farmers in the Mose basin. Can Lavasa be their road to prosperity

    and out of abject poverty?

    A valid point made by one shahir was thatLavasa says they will giveus jobs but what they want in reality is for us to be dogs at their door,

    their watchmen, drivers, sweepers We are not educated, we wont get

    any dignified jobs at Lavasa, and we prefer farming.

    Most farmers have no money management or other skills & will end upblowing the sum they get after sale and end up doing menial jobs in

    Lavasa or in Pune city.

    Theres great anger in the people affected. If this is not channelizedthrough proper democratic systems and if some Sena like entity fuelsthe fire, there will be violence.

    http://www.business-standard.com/india/news/icici-invests-rs-250cr-in-lavasa-corporation/01/51/83190/http://www.business-standard.com/india/news/icici-invests-rs-250cr-in-lavasa-corporation/01/51/83190/
  • 7/30/2019 45606285 Lavasa Final

    13/14

    LAVASA

    13

    SOLUTION

    The first step has to be to investigate the corruption that seems to be a part &parcel of Lavasa. If the corruption is exposed, finding the irregularities should

    be easy.

    If the land was procured by proper means, the compensation & rehabilitation

    was just, the location & usage was eco-friendly & if the corruption was

    cleansed Lavasa doesntlook like a bad idea.

    Laws & Equity have to apply just the same to all. So while you want justice for

    the landless labourers & small farmers there also has to be justice for the bigplayers who have invested crores into Lavasa. The argument that they are

    powerful and can take care of themselves is not acceptable in our democracy.

    The corrupt must absolutely be punished but those who have invested crores

    in good faith also need to be looked as an affected party.

    CURRENT STATUS

    Developments at Lavasa are well on schedule, and with every day that passes,

    new benchmarks are being created and surpassed.

    The Dasve town center is currently under an advanced stage development.

    Lavasa has already sold a number of residences, is equipped with 1000 hotel

    rooms, and has a capacity for 10000 students.

    While the Dasve Town Centre is already functional, all structures in education,

    hospitality and leisure are fast-nearing completion.

  • 7/30/2019 45606285 Lavasa Final

    14/14

    LAVASA

    14

    Bombay High Court has asked the Environment Ministry to consider

    allowingHindustan Construction's Lavasa unit to resume construction

    activity partially. The court will now hear Lavasa case on December 21.

    The Ministry has asked Lavasa to prove it had not violated any green laws in

    building a town outside the western city of Pune.

    Earlier on December 7, Bombay High Court has stayed Environment

    Ministrys show cause notice order on Lavasa Crop in connection to the legal

    dispute for its Pune project. Lavasa's main grouse is that it received a show

    cause notice without being heard.

    References

    www.lavasa.com

    www.lavasahillcity.com

    www.moneycontrol.com

    www.archinomy.com

    http://www.moneycontrol.com/india/stockpricequote/constructioncontracting-civil/hindustan-construction-company/HCChttp://www.moneycontrol.com/india/stockpricequote/constructioncontracting-civil/hindustan-construction-company/HCChttp://www.lavasa.com/http://www.lavasa.com/http://www.lavasahillcity.com/http://www.lavasahillcity.com/http://www.moneycontrol.com/http://www.moneycontrol.com/http://www.archinomy.com/http://www.archinomy.com/http://www.archinomy.com/http://www.moneycontrol.com/http://www.lavasahillcity.com/http://www.lavasa.com/http://www.moneycontrol.com/india/stockpricequote/constructioncontracting-civil/hindustan-construction-company/HCC