45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

19

Transcript of 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

Page 1: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.
Page 2: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.
Page 3: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.
Page 4: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.
Page 5: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

45 Kws: 5 separate solar power plants: only fully solar electrified campus in India

Page 6: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

Between 2004 and 2009 the barefoot approach has reached almost all the Least Developed Countries in the Continent of Africa

Page 7: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

The very poor in Africa use these wick lamps called by many names in different countries

Page 8: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

Each Family spends $ 3-5 on kerosene per month

Page 9: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

What is the barefoot approach in Africa?

Page 10: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

Call a meeting of the whole village to decide: 1. How much each family is prepared to pay in writing for the use of the solar unit

Page 11: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

Each house will get one fixed solar light(11 watt) in the house, one LED Light, one solar lantern and one plug to charge mobiles costing $ 350 each

Page 12: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

2. Form a Village level Committee to Collect the monthly contribution for repair and maintenance and paying the women engineer

Page 13: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

Select the illiterate rural grandmother to be sent to india for 6 months to be trained as a solar engineer

Page 14: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

Community must agree to donate a room to establish a Rural electronic Workshop to carry out instant repairs

Page 15: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

Rural Electronic Workshop-Sierra Leone

Page 16: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

The best solar engineers all over the continent of Africa have been the illiterate rural grandmothers.

Page 17: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

Women Barefoot Solar Engineers of Africa

Page 18: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

$ 2 million each per village over 5 years

Page 19: 45 Kws: 5 separate solar power plants: only fully solar electrified campus in India.

15 COUNTRIES; 75 VILLAGES ; 6,000FAMILIES ; 100 WOMEN BAREFOOT SOLAR ENGINEERS; TOTAL COST: $ 2 MILLION.