4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management...

18
WWW.ARCHITECTURE PLUS PC. COM 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 [email protected] 812-475-1995 A R C H I T E C T U R E P L U S F I R E S T A T I O N S

Transcript of 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management...

Page 1: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

4424 Vogel Road, Suite 404Evansville, Indiana 47715

[email protected]

812-475-1995

AR

CH

IT

EC

TU

RE

P

LU

SF

IR

E

ST

AT

IO

NS

Page 2: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

Architecture Plus is a design-orientedarchitecture and engineering firm that hasbeen providing a full range of professionaldesign and planning services to both thepublic and private sectors since 1984. Ourwork includes over 750 projects in thegreater tri-state area, and our experienceranges from a 230,000 square-foot K-8school project to complex historic buildingimprovements.

Our client base includes individuals,organizations, corporations, educationalinstitutions, commercial developers,industries, and governmental agencies.Clients from these different sectors havemarkedly different needs, and our functionas a professional design firm is tounderstand each client's needs individually.One commonality in our approach to designamong each of our clients is to listen moreand talk less. Our approach to designbegins with purpose and ends with creativespace that reflects the client's reputation,requirements, and goals. The result is adesign that captures the client's vision,functional and spatial needs, and spirit.

Two primary factors dictate the quality ofprofessional services provided byArchitecture Plus: function and aesthetics.We strive first and foremost to fulfill thespatial needs of our clients while workingwithin their budget and on an establishedtime schedule. Second, during theschematic-design and design-developmentphases of each project, emphasis is placedupon aesthetic refinement in the facilityand on the site and surroundingenvironment. Our mission is to provideyou not only with bricks and mortar, butrather with an interactive environment thatblends seamlessly into your world.

Arc

hit

ec

ture

Plu

s P

hil

os

op

hy

Page 3: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

Arc

hit

ec

ture

Plu

s S

erv

ice

s

Standard architectural services fall into thefollowing phases:

MASTER PLANNING

The first step in creating architecture is to programthe spaces and needs required for the facility. Thisinvolves one-on-one meetings with the client, toursof the existing facility, visits to similar projects, andoften a public forum for community input. The"dream" is established during this phase.

SCHEMATIC DESIGN

Once spatial, functional, and special needs areestablished, our design team will analysis "ProgramObjectives" and conceptualize potential drawingsfor the client's review. Also during this phase,three important project criteria are decided:Budget, Program, and Schedule.

DESIGN DEVELOPMENT

Following schematic-design, the DesignDevelopment stage further develops the mostworkable, approved plans and allows estimates ofprobable construction costs. Continual planrevisions (directed by the Owner) during this phasehelp ensure client satisfaction.

CONSTRUCTION DOCUMENTS

This part includes the preparation of documentationused by contractors for competitive bidding andproject construction. Typically, each drawing setcontains construction documentation packages forthe site, architectural, structural, mechanical, andelectrical sections.

BIDDING AND NEGOTIATION

During this phase of the project, competitive bidsare received and critically evaluated. A contract forconstruction is then awarded, usually to the lowestresponsible bidder, at the direction of the Owner.

CONSTRUCTION ADMINISTRATION

Almost every project's final phase involvesConstruction Field Observation, review of ShopDrawings, approval of Change orders, ProjectCoordination, and approval of Contractors'Applications for payment

BASIC SERVICES

Available in whole, part, or on a consulting basis,Architecture Plus responds to client needs invarious professional services:

PROJECT ANALYSIS STUDIES

Feasibility AnalysisFinancial AnalysisSpace Utilization StudiesFacility, Operational, and Methods Programming

PLANNING SERVICES

Functional Relationship AnalysisProject SchedulingCost EstimatingMaterials and Methods ResearchEnergy Utilization Studies

LAND PLANNING SERVICES

Land Use StudiesMaster PlanningUrban Design and PlanningLandscape Planting DesignSite Design

PRESENTATON SERVICES

Scale ModelsRenderingsDisplay Boards

INTERIOR DESIGN SERVICES

Space Analysis and PlanningConceptual Design and LayoutEquipment Inventory and AnalysisFurnishings SelectionColor Selection

CONSTRUCTION SERVICES

Project Coordination ManagementPost-Construction AnalysisBIM Drafting

HISTORIC SERVICES

National Historic Register ApplicationBuilding History ResearchConstruction History Research

ADDITIONAL SERVICES

Page 4: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

Arc

hit

ec

ture

Plu

s T

ec

hn

olo

gy

To aid client decisions at various stages of projectplanning, Architecture Plus utilizes the valuableinformation that design technologies offer. Suchtechnologies can provide clients with the abilityto visualize the aesthetics, quality, andfunctionality of various design concepts whilecomparing their cost effectiveness.

COMPUTER DESIGN AND DRAFTING

Utilizing the latest releases in computer-aideddesign and drafting software produces accuratedrawings that are created and edited efficiently.Additionally, proposed schemes can be viewedfrom an infinite number of positions usingthree-dimensional capabilities. In 3-D, a realisticfeel for the design with its spatial and functionalqualities are easily envisioned.

LIFE-CYCLE COSTING

Examining the cost-effectivemess of variousdesign concepts and construction materialsincorporated into a scheme offers clients a basisfor project budget decisions. Life-Cycle costingprovides a comparison of the initial constructioncost of a design against the projected costsincurred over time. This type of analysis revealswhen a design concept or material with a lowinitial cost may be excessively expensive overtime.

VALUE ENGINEERING

Utilizing a systematic approach of thoroughinvestigation, various engineering options can beevaluated by their anticipated short-term andlong-term expenditures. Costs vary with eachengineering option; however, value engineeringcan offer clients a basis for project constructionbudget decisions, as well as, operations andmaintenance budget planning.

DESIGN TECHNOLOGIES

Page 5: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

"... needless to say, our parish is well satisfied that we got our money's worth.Because of its liturgical and physical compatibility, Bishop Gettelfinger has chosenour church for the Chrism Mass two years in succession... I am personally grateful toMr. Henning for his accomplishment, and am convinced he will be equallyaccommodating in any given situation ..."

Reverend James Brune, St. John the Baptist Catholic Church, Daylight, IN

"... Just a short note to express my gratitude for the outstanding job you and yourstaff have performed thus far in bringing our current expansion project to where itis. Again you have proved that we made the right choice in the use of ArchitecturePlus for the project ..."

Mr. Edward F. Beller, VP Operations, Emerson Radio Corporation

"... Mr. Henning was able to take a concept that existed only in our minds and createan architectural plan that successfully captured what we were envisioning. Throughthe entire process Mr. Henning was always accessible, cooperative and took a keeninterest in assuring that the end product was one of function, beauty andaffordability ..."

Mr. Larry Dunigan, President, Holiday Home, Evansville, IN

"... Currently Mr. Henning is architect for the construction of two K-8 schoolfacilities in South Gibson School Corporation....Without reservation I wouldrecommend Timothy A. Henning and his firm of Architecture Plus Corporation forany project you may have in the future ..."

Michael W. Green, Ph.D., Superintendent, South Gibson School Corporation.

"... commend Mr. Tim Henning for his firm's architectural design of the ElberfeldElementary School...Mr. Henning and his staff assisted with the regular progressmeetings and his communication and cooperation with the contractors wereprimary reasons for a very successful project... without reservation that Irecommend Architecture Plus and Tim Henning for any construction projects ..."

James R. Martin, Superintendent, Warrick County School Corporation

"... we have had nothing but cooperation from your firm on making changes such asschool location, plans, and specifications. The contractors building the new schoolshave had no problems or delays due to the plans or specifications ..."

Nicholas Van Nielen, PE, President, South Gibson School Board

Cl

ie

nt

Q

uo

ta

ti

on

s

Page 6: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

3D Corporation, Holiday Health CareAlcoaAmbank, (Now Regions)AristokraftBabcock-WilcoxBoone Funeral HomeBurdette ParkCiholas, Inc.City of PrincetonClayton's CleanersColvin Funeral HomeCrescent PlasticsDECEM Investments, Inc.DominosFirst PodiatryHUDEarle C. Clements Job Corps Center, Morganfield, KYEdison Brothers Stores, Inc.Emerson Radio CorporationEvansville Housing AuthorityEvansville State HospitalEVSCEvansville Urban Enterprise AssociationFHAFort Branch Johnson Township Public LibrariesFirst Church of NazareneGeneral ElectricGibson County CommissionersGibson County Council on AgingHillside UMC, PrincetonHoliday HealthcareHowell Baptist ChurchIndiana Farm Bureau Cooperative Association (CountryMark)Indiana RailroadIntegrated Systems ManufacturingKerstiens Realty and Development, JasperLawrence P. Jennings, M.d., Mt. Carmel, ILLender's Quality AssuranceLouisville Tile DistributorsMater Dei High School, EvansvilleMatrixx ManufacturingMcCutchanville Community ChurchMEC Medical CenterNewburgh United Methodist ChurchNorth Gibson School CorporationOur Savior Lutheran ChurchPACE, VincennesPioneer Development, GreenwoodPreh IMA AutomationRaymond JamesRed Geranium EnterprisesSalvation ArmyState Farm InsuranceSouth Gibson School CorporationSouth Spencer School CorporationSaint Ann School, MorganfieldSaint James SchoolSaint John Church, DaylightSaint Joseph School, PrincetonSaint Martin Church, WhitfieldSaint Thomas Moore, Paducah, KYTMMI, ToyotaUnion County Public Library, Morganfield, KYUSIVelero Renewable Fuels Company, LLCVincennes UniversityWarrick County School CorporationWingsZeidler Floral Company

Pa

rt

ia

l

Cl

ie

nt

L

is

t

Page 7: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

Master Planning is essential for determiningcurrent and future phasing of the projectand anticipated construction cost.

Analysis of Existing Buildings:Code ComplianceHealth ComplianceStructural IntegrityFunction of SpacesElectrical and Mechanical Systems

Site Analysis:Water, Sewer, Gas and Electric

UtilitiesDrainageSignificant StructuresReview of Existing DrawingsNeeds Inventory

Interactive "Owner Community" Meetings"Town Hall" Brainstorming

About SiteAbout BuildingsAbout NeedsAbout "The Dream"

Meetings with Building Committee

Individual Meetings with Staff

Program ProjectDefine SpacesDefine Spatial RelationshipsDefine Room Sizes and CapacitiesDefine Equipment and Furnishings

Written Report with Color Site PlanSummary of BrainstormingSummary of MeetingsPhotos with TextProposed Recommendations

Formal Presentation to Board

Inte

ra

cti

ve

Ar

ch

ite

ctu

re

1

-

TH

E

MA

ST

ER

P

LA

N

Page 8: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

The Schematic Design Phase of a project isused to develop the buildings within thescope defined by the master plan toaesthetically combine the form andfunction of spaces.

Owner Architect Conferences:Discuss ProgramDefine Sustainability MeasuresSquare Foot Cost EstimateBuilding TechnologyScheduleConstruction Industry Practice

Project Documents Initiation:Site PlanFloor PlansElevationsMaterial SelectionOutline SpecificationsCost Spreadsheet/Graphic

Formal Presentation to Client

Inte

ra

cti

ve

Ar

ch

ite

ctu

re

2 -

TH

E S

CH

EM

AT

IC D

ES

IGN

Page 9: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

Drawings, specifications, and otherdocuments fix and describe the project'ssize and character as to architectural,structural, and MEP systems and materialsand other elements as appropriate. DesignDevelopment documents can be used toprepare preliminary construction costestimates.

Owner Architect Conferences:Discuss Schematic DesignCostSchedule

Project Documents Completion:Site PlanFloor PlansEnlarged Floor PlansElevationsMaterial SelectionsWall SectionsSpecificationsMaterial/Labor Cost Estimate

Presentation Materials:Model and/or Prespectives

Formal Presentation to ClientIn

ter

ac

tiv

e A

rc

hit

ec

tur

e

3 -

DE

SIG

N D

EV

EL

OP

ME

NT

Page 10: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

Construction Documents are the"blueprints" from which contractors bid andbuild the project. Complete and detailedConstruction Documents will save youmoney. Construction Documents mustconvey the final design for the project asChange Orders tend to add more cost to aproject verses if originally incorporated intothe project and competitively bid. TheConstruction Document Bid Package iscomprised of the bound set of drawingsheets and the bound book of specifications.

Drawing Set Includes:Cover SheetGeneral InformationSite Plan and DetailsSite Drainage PlanSite Utility PlanLife Safety PlanCode InformationFloor PlansDoor SchedulesRoom Finish SchedulesElevationsRoof Plan and DetailsBuilding SectionsWall SectionsReflected Ceiling PlansCasework DetailsPlumbing PlansHVAC PlansElectrical Power PlansElectrical Lighting PlansSchedules and Details

Specification Book Includes:Legal DocumentsMaterial Specifications

Detailed Cost Estimate

Inte

ra

cti

ve

Ar

ch

ite

ctu

re

4 -

CO

NS

TR

UC

TIO

N D

OC

UM

EN

TS

Page 11: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

Bidding is the competitive selection of aContractor(s) to build the project.

Bidding Includes:Pre-selection of Qualified

ContractorsState Construction Design ReleaseCoordination of Contractor's

QuestionsPreparation of AddendumsAnalysis of Bids and Alternate Bids

via Spread Sheet

Inte

ra

cti

ve

Ar

ch

ite

ctu

re

5

-

BI

DD

IN

G

Page 12: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

Construction Administration involves thedesign professional with the actualconstruction of the project and thecommunication of the building processwith the Owner. It is important tomaintain good relationships betweenContractor, Sub-Contractors, and Owner.A construction project built with a "team"approach will end in a better project thanone with controversy.

Construction Administration Includes:

Contract AwardLetter of IntentSite Visitation and InspectionBi-Weekly Progress MeetingsPre-Construction ConferenceShop Drawing ReviewApplication for Payment ReviewPreparing and Negotiating Change

OrdersResponding to Information NeedsSubstantial Completion DocumentsAs-Built Drawing PreparationFinal Completion and Punch ListProject Closeout DocumentsMaintenance Training

Inte

ra

cti

ve

Ar

ch

ite

ctu

re

6

-

CO

NS

TR

UC

TI

ON

Page 13: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

Architecture Plus will be ultimately mindful of the project budget.During the design phase, we will use a procedure we refer to as shortand long term life-cycle-costing. We will carefully examine the costeffectiveness of various design concepts and materials that could beincorporated into the project. Our analysis will compare initial cost tothe projected cost that may be incurred over time. Frequently, we findthat a design concept for a material with a low initial cost can actuallybe excessively expensive over the life of the facility.

The anticipated cost of the project will drive the decision to proceedwith construction. In order to arrive at an accurate cost estimate,Architecture Plus will employ a three step method.

FIRST, we will spend as much time as required to formulate a correctand detailed program for the facility before any design work actuallybegins. The program will define space, square footage, LEEDrequirements, functional needs, and the inclusion of any specialmaterials required by program design.

SECOND, we will determine the most economical means, methods, andmaterials for construction to fulfill the program requirements. We willdo extensive research to arrive at the best available constructionalternatives for the new facility.

THIRD, we will do a cost estimate by carefully determining the exactamount of materials and labor that will be involved in construction. Adetailed and accurate cost estimate will unfold.

We utilize a third party cost estimator and have tremendous confidencein our ability to stay within a project budget. By using a source thatdoes estimating on a daily basis, we address fluctuating marketconditions, which drive the cost of construction materials.

Co

st

C

on

ta

in

me

nt

Page 14: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

Client: Ohio Township, Warrick County

Location: Newburgh, Indiana

Size: 12,000 square feet

Located on property adjacent toDeaconess Gateway Hospital, theOhio Township Volunteer FireDepartment, Epworth Road Station,houses 6 fire apparatuses.

The facility includes separate men'sand women's living arreas andsupport spaces for current firefightersand anticipated career firefighters dueto the rapid growth of Evansville's fareast side.

A large meeting - training room isavailable for community use.

Ohio

Tow

nshi

p Vo

lunt

eer F

ire D

epar

tmen

t

RENDERING

RECEPTION

Page 15: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

This Emergency Medical Stationhouses two ambulances and providesoffice, living, and support spaces forfour career personnel. The projectincludes frosted glass clerestorywindows for natural lighting of theambulance bays.

Utilizing a gas furnace coupled to anelectric heat pump, with infrared gasheating in the bay, keeps the utilitybills below $800 a month even duringthe most severe weather.

Gi

bs

on

C

ou

nt

y

EM

S

DORM

CLERESTORY LIGHTING

INFRARED HEAT

Client: Gibson County Commissioners

Location: Oakland City, Indiana

Size: 2,470 square feet

Page 16: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

Client: City of Jasonville

Location: Jasonville, Indiana

Size: 8,000 square feet

The City of Jasonville needed a newfire station to replace there datedfacility. Property directly to the westof their existing building was acquiredfor that purpose. A grant was awardedto the city in the amount of $ 400,000for its construction.

The building contains 3 bays fortrucks, a smaller bay for anothervehicle, two large offices, a radio room,and men's and women's locker rooms.

The building serves a second functionas a community meeting space with akitchenette and restroom.

Above the office space is an unfinishedstorage room which can be modifiedwhen the need arises to providesleeping quarters for firemen.

The City provided in-kind services tocomplete the construction of thestation which included utility and sitework.

Ja

so

nv

ille

Fir

e D

ep

art

me

nt

TRUCK BAYS

HALL

Page 17: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

WWW.ARCHITECTURE PLUS PC. COM

Po

sey

LE

ED

Sil

ver,

Fir

e S

tati

on

SOLAR PANELS

OFFICE CEILING

Posey Volunteer Fire Station servesClay County and has many of its runsalong Interstate I-70. Receiving agrant from FEMA, Architecture Pluswas one of eight firms interviewedand was selected to design their newstation. The fire station must beLEED certified in order to receivefunding. The Fire station containstwo double bays for fire trucks andtwo slots for support trucks.

When a computer energy model wasused during the design, the buildingwas so well insulated that no readingresulted. The engineer had to addload to the building to get a number.

The facility includes InsulatedConcrete Forms for walls and 12"thick Structural Insulation Panels forthe roof. The light colored metal roofreflects heat away from the building.The HVAC system is unique. It drawswater from a 100,000 gallon cistern tooperate a water source heat pump thatruns through radiant pex tubing inthe concrete floor slabs. A patent isbeing considered for its design.

The cistern is filled with rain waterfrom the roof. The water is also usedfor "gray" water to flush the toiletfixtures.

SIPS PANELS

ICF WALLS

Page 18: 4424 Vogel Road, Suite 404 Evansville, Indiana 47715 ...€¦ · Project Coordination Management Post-Construction Analysis BIM ... President, Holiday Home, Evansville, IN "... Currently

4424 Vogel Road, Suite 404Evansville, Indiana 47715

[email protected]

812-475-1995

WWW.ARCHITECTURE PLUS PC. COM