Financial Project Identification Number:437744-1-52-01
���������������������������������� ��
����������������������������������� ��
������������������������
The Florida Department of Transportation
will begin work on a 8.8-mile resurfacing project along State Road 57 (U.S.19) from U.S. 27 to north
of Martin Road. Improvments inclued updated guardrails, improved striping, instillation of high-
mast lighting from Nash Road to south of I-10, and the addition of a turn lane and median opening
between Phelps Horn Road and the County Road 57A bridge over the railroad tracks. Once
complete, this project will extend the life of the roadway, enhance highway safety, provide a
smoother riding surface and improve drivability.
Contac t Information
Tony WaltersProject ManagerMidway Operations(850) 245-7939 [email protected]
Ian SatterPublic Information DirectorFDOT District 3(888) 638-0250, ext. [email protected]