425PRR ERCOT Comments Attachment 1

Estimation of OOME Down Cost Associated with Planned Transmission Outages

Page 2: 425PRR ERCOT Comments  Attachment 1

2

Objective:Estimate OOME cost associated with Transmission Planned Outages

Case Description:1. A TRANSCO requested a planned transmission outages from mm/12 to

mm/21. To facilitate this transmission outage request, ERCOT has to limit the aggregated output of 6 units which are connected to the bus of transmission line.

2. During the outage period, ERCOT has to OOM down the output of one or more generators based on their premium and pay for the energy deployed.

3. We only provide the cost associated with energy deployed. Some other costs, like OOMC cost for voltage control, manual instructions, are not included.

Motivation

Page 3: 425PRR ERCOT Comments  Attachment 1

3

Result -1

During the outage period, ERCOT deployed totally 80,231 MW Down OOME, spent total of $3.38 million in 10 days.

The average daily capacity deployed is 334MW. Maximum daily capacity is 561MW

If this transmission outage is scheduled during the maintenance period of one of the generators with, say, 600MW, the total cost of the OOME would be Eliminated.

Page 4: 425PRR ERCOT Comments  Attachment 1

4

Result -2

Daily OOME spending

$0

$100,000

$200,000

$300,000

$400,000

$500,000

$600,000

$700,000

$800,000

$900,000

xx/12 xx/13 xx/14 xx/15 xx/16 xx/17 xx/18 xx/19 xx/20 xx/21

date

ER

CO

T s

pe

nd

ing

($

)

Page 5: 425PRR ERCOT Comments  Attachment 1

5

Result -3

Daily OOME Deployment

0.00

2,000.00

4,000.00

6,000.00

8,000.00

10,000.00

12,000.00

14,000.00

16,000.00

xx/12 xx/13 xx/14 xx/15 xx/16 xx/17 xx/18 xx/19 xx/20 xx/21

date

Da

ily O

OM

E D

ep

loy

me

nt

(MW

h)

Page 6: 425PRR ERCOT Comments  Attachment 1

6

Result -4

Daily OOME Price

0

10

20

30

40

50

60

70

xx/12 xx/13 xx/14 xx/15 xx/16 xx/17 xx/18 xx/19 xx/20 xx/21

date

Av

erg

e O

OM

E P

ric

e (

$/M

W)

Page 7: 425PRR ERCOT Comments  Attachment 1

7

Result -5

Daily OOME Capacity

0

100

200

300

400

500

600

xx/12 xx/13 xx/14 xx/15 xx/16 xx/17 xx/18 xx/19 xx/20 xx/21

date

OO

ME

Ca

pa

city

(M