PROCUREMENT PLAN
Basic DataProject Name: Local Government Enhancement Sector ProjectProject Number: 42459-013 Approval Number: 2790Country: Sri Lanka Executing Agency: Ministry of Provincial Councils &
Local Government
Project Financing Amount: US$ 68,770,000ADB Financing: US$ 59,000,000Cofinancing (ADB Administered): Non-ADB Financing: US$ 9,770,000
Implementing Agency:N/A
Project Closing Date: 31 December 2016
Date of First Procurement Plan: 29 September 2011
Date of this Procurement Plan: 22 December 2015,Version 2
A. Methods, Thresholds, Review and 18-Month Procurement Plan
1. Procurement and Consulting Methods and Thresholds
Except as the Asian Development Bank (ADB) may otherwise agree, the following process thresholds shall apply to procurement of goods and works.
Procurement of Goods and WorksMethod Threshold Comments
International Competitive Bidding for Goods US$ 2,000,000 and Above Prior Review National Competitive Bidding for Goods Between US$ 100,000 and US$ 1,999,999 The first two NCB packages subject
to prior review, thereafter post review.
Shopping for Goods Up to US$ 99,999 The first two NCB packages subjectto prior review, thereafter post review.
International Competitive Bidding for Works US$ 15,000,000 and Above Prior review National Competitive Bidding for Works Between US$ 100,000 and US$
14,999,999The first two NCB packages subjectto prior review, thereafter post review.
Shopping for Works Up to US$ 99,999 The first two NCB packages subjectto prior review, thereafter post review.
Consulting ServicesMethod Comments
Least-Cost Selection for Consulting Firm Prior review Quality- and Cost-Based Selection for Consulting Firm Prior review Individual Consultants Selection for Individual Consultant Prior review
2. Goods and Works Contracts Estimated to Cost $1 Million or More
The following table lists goods and works contracts for which the procurement activity is either ongoing orexpected to commence within the next 18 months.
PackageNumber
General Description EstimatedValue
Procurement Method
Review(Prior/Post)
Bidding Procedure
AdvertisementDate
(quarter/year)Comments
PMU-VE-09
Procurement of 28 Compactors
1,400,000.00 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Goods
Comments: Bid document ready and being tendered
3. Consulting Services Contracts Estimated to Cost $100,000 or More
The following table lists consulting services contracts for which the recruitment activity is either ongoing orexpected to commence within the next 18 months.
PackageNumber General Description
EstimatedValue
Recruitment Method
Review(Prior/Post)
AdvertisementDate
(quarter/year)
Type of Proposal Comments
DSC-SP-AT-01
Design and SupervisionConsultancy (Southern Province-Additional Towns[Pura Neguma])
115,384.62 QCBS Prior Q1 / 2016 STP Assignment: National
Quality-Cost Ratio: 80:20
Comments: Southern Province-Additional Towns
DSC-WP-AT-01
Design and SupervisionConsultancy (Western Province-Additional Towns[Pura Neguma])
115,384.62 QCBS Prior Q1 / 2016 STP Assignment: National
Quality-Cost Ratio: 80:20
Comments: Western Province-Additional Towns
4. Goods and Works Contracts Estimated to Cost Less than $1 Million and Consulting Services Contracts Less than $100,000 (Smaller Value Contracts)
The following table lists smaller-value goods, works and consulting services contracts for which the activity iseither ongoing or expected to commence within the next 18 months.
Goods and Works
PackageNumber
GeneralDescription
EstimatedValue
Number of Contracts
Procurement Method
Review(Prior/Post)
Bidding Procedure
AdvertisementDate (quarter/year)
Comments
CP-NCB-CKD-WS-06
WSS for CKD Affected areas - CP
430,769.23 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document:
Small Works
Comments: Designing in progress
CP-NCB-FRN-01
Furniture and Equipment for CPPMU
192,307.69 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Goods
Comments: Requirementbeing workedout
CP-NCB-WIL-29
Construction of Access Road with Bridge for Naminioya Crematoria for Wilgamuwa PS
130,769.23 1 NCB Post 1S2E Q1 / 2016 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments: Designing in process
NCP-NCB-CKD-WS-01A
WSS for CKD Affected areas in NCP-01A
182,307.69 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments: Designing in process
NCP-NCB-CKD-WS-01B
WSS for CKD Affected areas in NCP-01B
868,461.54 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments:
Designing in process
NCP-NCB-CKD-WS-02
WSS for CKD affected areas -NCP-P2
353,846.15 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments: Designing in progress
NCP-NCB-CKD-WS-03
WSS for CKD Afected areas - NCP-P3
238,461.54 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments: Designing in progress
NCP-NCB-CKD-WS-04
WSS for CKD Affected areas in NCP-04
384,615.39 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments: Designing in process
NCP-NCB-FRN-02
Furniture and equipment for NCP PMU
192,307.69 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Goods
Comments: Requirementbeing workedout
NWP-NCB-CKD-WS-05A
WSS for CKD Affected areas in NWP-05A
426,923.08 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments: Designing in process
NWP-NCB-CKD-WS-05B
WSS for CKD Affected areas in NWP-05B
196,923.08 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments: Designing in process
NWP-NCB-FRN-03
Furniture and Equipment for NWP PMU
153,846.15 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Goods
Comments: Requirementbeing workedout
NWP-NCB-RDM-22
Construction of Retain wall and access road to bus stand
77,000.00 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments: Bid document under preparation
PMU-EQ-08
Procurement of Dot Matrix Printerfor 108 Pradeshiya Sabhas
26,923.08 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Goods
PMU-EQ-10
Procurement of IT Hardware and Related Services for Pura Neguma Management Centre
80,000.00 1 NCB Post 1S2E Q1 / 2016 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Goods
Comments: Requirementbeing workedout
PMU-VE-13
Vehicles for SPCU & PMU
723,076.92 1 NCB Post 1S2E Q1 / 2016 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Goods
Comments: Requirementbeing workedout
SAB-NCB-FRN-04
Furniture and Equipment for SAB PMU
192,307.69 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Goods
Comments: Requirementbeing workedout
SP-NCB-FRN-05
Furniture and Equipment for SPPMU
192,307.69 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Goods
Comments: Requirementbeing workedout
SP-NCB-IMA-30
Construction of Multipurpose building - Imaduwa
230,000.00 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments: Bid document under preparation
UVA-NCB-BAN-13A
Water Supply, Bandarawela - Part 1
566,652.92 1 NCB Post 2S2E Q2 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments: Bid evaluation in progress
UVA-NCB-BAN-13B
Water Supply, Bandarawela - Part 2
484,512.05 1 NCB Post 1S2E Q2 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments: Bid evaluation in progress
UVA-NCB-BAN-13C
Water Supply, Bandarawela -
484,512.05 1 NCB Post 1S2E Q2 / 2015 Prequalification of
Part 3 Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments: Bid evaluation in progress
UVA-NCB-BAN-13D
Water Supply, Bandarawela - Part 4
484,512.05 1 NCB Post 1S2E Q2 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments: Bid evaluation in progress
UVA-NCB-CKD-WS-07A
WSS for CKD Affected areas in Uva - Part A
407,692.31 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments: Designing in process
UVA-NCB-CKD-WS-07B
WSS for CKD Affected areas in Uva - Part B
300,000.00 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments: Designing in process
UVA-NCB-FRN-06
Furniture and Equipment for UVA PMU
292,307.69 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Goods
Comments: Requirementbeing workedout
UVA-NCB-MEE-29
Construction of Access Road to Meeghakiula Busstand
250,000.00 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Comments: Bid document under preparation
WP-NCB-FRN-07
Furniture and Equipment for WP PMU
153,846.15 1 NCB Post 1S2E Q4 / 2015 Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Goods
Comments: Requirementbeing workedout
Consulting Services
PackageNumber
GeneralDescription
EstimatedValue
Number of Contracts
Recruitment Method
Review(Prior/Post)
AdvertisementDate
(quarter/year)
Type of Proposal Comments
None
B. Indicative List of Packages Required Under the Project
The following table provides an indicative list of goods, works and consulting services contracts over the life ofthe project, other than those mentioned in previous sections (i.e., those expected beyond the current period).
Goods and Works PackageNumber
General Description Estimated Value
Estimated Number of
ProcurementMethod
Review (Prior/Post)
Bidding Procedure
Comments
(cumulative) ContractsTBD-Goods
Provisional of Goods 3,500,000.00 10 NCB Post 1S2E Prequalification of Bidders: N
Domestic Preference Applicable: N
Bidding Document: Goods
Lot 1: A 350,000.00
Lot 2: B 350,000.00
Lot 3: C 350,000.00
Lot 4: D 350,000.00
Lot 5: E 350,000.00
Lot 6: F 350,000.00
Lot 7: G 350,000.00
Lot 8: H 350,000.00
Lot 9: I 350,000.00
Lot 10: J 350,000.00
TBD-Works Civil works in 7 Province 3,500,000.00 10 NCB Post 1S2E Prequalification of
Bidders: N
Domestic Preference Applicable: N
Bidding Document: Small Works
Lot 1: A 350,000.00
Lot 2: B 350,000.00
Lot 3: C 350,000.00
Lot 4: D 350,000.00
Lot 5: E 350,000.00
Lot 6: F 350,000.00
Lot 7: G 350,000.00
Lot 8: H 350,000.00
Lot 9: I 350,000.00
Lot 10: J 350,000.00
Consulting Services
PackageNumber General Description
Estimated Value
(cumulative)
Estimated Number of Contracts
RecruitmentMethod
Review (Prior/Post)
Type of Proposal Comments
None
C. List of Awarded and On-going, and Completed Contracts
The following tables list the awarded and on-going contracts, and completed contracts.
1. Awarded and Ongoing Contracts
Goods and Works
PackageNumber
General Description
EstimatedValue
Awarded Contract
Value
Procurement Method
AdvertisementDate
(quarter/year)
Date of ADB Approval of
Contract Award
Comments
PMU-EQ-02
Procurement of 10,800 New Compost Bins, for 108 PSs
357,230.77 227,497.85 NCB Q3 / 2014 15-DEC-14 $1 @ LKR130/-
PMU-EQ-12
Home Composting Bins - Part 2
357,230.77 245,292.92 NCB Q4 / 2014 31-AUG-15 $1 @ LKR130/-
SP-NCB-IMA-11
Construction of Bus Stand & Comfort Centre, Imaduwa
109,666.09 111,859.41 NCB Q3 / 2013 20-DEC-13 $1 @ LKR130/-
CP-NCB-PAN-14
Construction of Health Centre atHuluganga, Panvila
83,843.40 83,503.08 NCB Q2 / 2014 18-AUG-14 $1 @ LKR130/-
CP-NCB-AMB-04
Construction of Multipurpose Building, Ambanganga Korale
357,714.74 347,590.47 NCB Q2 / 2014 20-JUN-14 $1 @ LKR130/-
CP-NCB-THU-19
Construction of Multipurpose building,
396,315.70 373,076.92 NCB Q3 / 2013 25-NOV-13 $1 @ LKR130/-
ThumpaneSP-NCB-HAK-06
Construction of the roads, Hakmana
134,665.93 129,659.56 NCB Q1 / 2014 02-JUL-14 $1 @ LKR130/-
CP-NCB-WIL-25
Development of Internal Roads, Wilgamuwa
76,923.47 76,797.33 NCB Q2 / 2014 02-SEP-14 $1 @ LKR130/-
CP-NCB-DAM-01
PS Building with Community Hall
375,186.54 368,607.19 NCB Q3 / 2013 23-NOV-13 $1 @ LKR130/-
UVA-NCB-SIY-23
Bus stand with Comfort Centre, Siyambalanduwa
162,215.80 68,912.79 NCB Q1 / 2014 04-AUG-14 $1 @ LKR130/-
UVA-NCB-HAL-08
Completion of Multipurpose Building, Haldummulla
112,459.70 102,281.73 NCB Q2 / 2014 04-JUN-14 $1 @ LKR130/-
NCP-NCB-KEB-13
Completion of a Balance work of PS Building, Kebithigollewa
190,697.98 193,357.78 NCB Q1 / 2014 16-MAY-14 $1 @ LKR130/-
SAB-NCB-KOL-25
Construcion of Multi-purpose building, Kolonna
360,285.84 393,929.53 NCB Q3 / 2014 17-NOV-14 $1 @ LKR130/-
UVA-NCB-BDL-03
Construciton of Multi-purpose building, Badulla
379,254.08 339,031.52 NCB Q2 / 2014 20-JUN-14 $1 @ LKR130/-
NCP-NCB-WKD-23
Construction of Agro Based Economic Centre, Welikanda
315,408.86 285,673.74 NCB Q4 / 2013 17-FEB-14 $1 @ LKR130/-
NWP-NCB-GIR-09
Construction of Bus Stand and Drainage, Giribawa
105,939.81 97,766.97 NCB Q2 / 2014 22-SEP-14 $1 @ LKR130/-
SP-NCB-KAT-15
Construction of Bus Stand at Kirana, Katuwana
311,059.59 279,155.72 NCB Q3 / 2014 09-DEC-14 $1 @ LKR130/-
SP-NCB-KAM-12
Construction of Bus Stand, Kamburupitiya
423,720.38 384,615.38 NCB Q4 / 2013 23-JAN-14 $1 @ LKR130/-
NWP-NCB-MAW-14
Construction of Bus Stand, Mawathagama
374,703.76 328,821.32 NCB Q1 / 2014 26-MAY-14 $1 @ LKR130/-
UVA-NCB-MEE-11
Construction of Bus Stand, Meegahakivula
191,744.17 175,003.95 NCB Q2 / 2014 04-AUG-14 $1 @ LKR130/-
NWP-NCB-RID-18
Construction of Bus stand and Multi-purpose building, Rideegama
354,042.90 282,474.82 NCB Q2 / 2014 17-JUN-14 $1 @ LKR130/-
NWP-NCB-CHI-07
Construction of Bus stand and Public Toilets, Chilaw
250,743.02 232,250.90 NCB Q1 / 2014 28-MAY-14 $1 @ LKR130/-
UVA-NCB-MDL-18
Construction of Bus stand with Comfort Centre, Madulla
351,352.68 321,101.39 NCB Q1 / 2014 11-APR-14 $1 @ LKR130/-
SP-NCB-KIR-16
Construction of Bus stand with few shops, Kirinda
297,325.87 283,331.52 NCB Q1 / 2014 17-JUN-14 $1 @ LKR130/-
NCP-NCB-CC-03
Construction of Comfort Center, Welikanda
34,403.71 36,111.09 NCB Q3 / 2013 13-DEC-13 $1 @ LKR130/-
NCP-NCB-CC-02
Construction of Comfort Centre,
88,720.89 88,914.86 NCB Q3 / 2013 20-NOV-13 $1 @ LKR130/-
ThirappaneWP-NCB-PAL-01
Construction of Comfort centre, Palindanuwara
65,771.26 77,621.80 NCB Q4 / 2013 07-MAR-14 $1 @ LKR130/-
NCP-NCB-THI-25
Construction of Community hall, Thirappane
338,816.55 325,653.02 NCB Q1 / 2014 03-MAR-14 $1 @ LKR130/-
NCP-NCB-CC-01
Construction of Confort Center, Padaviya
99,214.39 109,033.64 NCB Q3 / 2013 15-NOV-13 $1 @ LKR130/-
CP-NCB-WIL-26
Construction of Crematorium at Hettipola, Wilgamuwa
107,692.31 118,614.77 NCB Q2 / 2014 02-SEP-14 $1 @ LKR130/-
UVA-NCB-WLW-26
Construction of Crematorium, Wellawaya
115,537.81 119,964.34 NCB Q2 / 2014 24-SEP-14 $1 @ LKR130/-
CP-NCB-MED-09
Construction of Internal Roads at Theldeniya, Medadumbara
265,343.90 309,649.41 NCB Q4 / 2014 16-FEB-15 $1 @ LKR130/-
UVA-NCB-UPG-15
Construction of Internal road at, Lunuwatta, Uva Paranagama
341,925.73 285,862.04 NCB Q2 / 2014 25-AUG-14 $1 @ LKR130/-
NCP-NCB-PAD-17
Construction of Internal roads, Padaviya
169,293.92 136,706.42 NCB Q2 / 2014 25-AUG-14 $1 @ LKR130/-
WP-NCB-AGA-04
Construction of Library Bldg., Agalawatta
114,179.10 121,805.94 NCB Q1 / 2015 30-MAR-15 $1 @ LKR130/-
WP-NCB-MAD-10
Construction of Library Building Madurawala Pradeshiya Sabha
110,455.28 119,511.21 NCB Q3 / 2014 19-NOV-14 $1 @ LKR130/-
NWP-NCB-ARA-05
Construction of Library Building and Weekly fair, Arachchikattuwa
337,211.17 314,485.27 NCB Q2 / 2014 17-SEP-14 $1 @ LKR130/-
NWP-NCB-KAL-11
Construction of Library Building, Kalpitiya
157,915.93 152,664.51 NCB Q2 / 2014 07-AUG-14 $1 @ LKR130/-
NWP-NCB-POL-16
Construction of Library Building, Polpithigama
143,766.84 138,168.78 NCB Q4 / 2013 03-MAR-14 $1 @ LKR130/-
CP-NCB-GAN-05
Construction of Multi-Purpose Bldg, Gangawata Korale
384,596.48 349,740.27 NCB Q2 / 2014 17-SEP-14 $1 @ LKR130/-
NWP-NCB-POL-17
Construction of Multi-Purpose Building with Public Toilets, Polpithigama
201,416.00 188,699.75 NCB Q2 / 2014 22-SEP-14 $1 @ LKR130/-
WP-NCB-BIY-06
Construction of Multi-Purpose Building, Biyagama
403,892.66 390,286.37 NCB Q4 / 2013 10-JAN-14 $1 @ LKR130/-
SAB-NCB-ARN-01
Construction of Multi-pourpose building, Aranayaka
363,243.18 365,798.07 NCB Q1 / 2014 08-APR-14 $1 @ LKR130/-
WP-NCB-MAD-09
Construction of Multi-purpose Building at Anguruwathota, Madurawala
199,814.10 171,695.27 NCB Q2 / 2014 09-SEP-14 $1 @ LKR130/-
SP-NCB-KAR-13
Construction of Multi-purpose buiding,
256,645.40 262,550.63 NCB Q2 / 2014 08-JUL-14 $1 @ LKR130/-
KarangeniyaSAB-NCB-PEL-26
Construction of Multi-purpose building, Pelmadulla
349,012.59 349,131.67 NCB Q1 / 2014 11-APR-14 $1 @ LKR130/-
WP-NCB-WLT-19
Construction of Multi-purpose building, Walallawita
179,702.77 179,684.39 NCB Q2 / 2014 03-SEP-14 $1 @ LKR130/-
NCP-NCB-IPA-12
Construction of Multipurpose Bldg., Ipalogama
339,972.12 314,527.63 NCB Q1 / 2014 21-APR-14 $1 @ LKR130/-
UVA-NCB-LNG-06
Construction of Multipurpose Bldg., Lunugala
380,164.89 366,941.25 NCB Q1 / 2014 26-MAR-14 $1 @ LKR130/-
CP-NCB-MIN-11
Construction of Multipurpose Bldg., Minipe
486,639.11 375,384.62 NCB Q4 / 2013 24-FEB-14 $1 @ LKR130/-
SAB-NCB-KEG-23
Construction of Multipurpose Bldg., Moronthota, Kegalla
350,973.18 346,718.31 NCB Q2 / 2014 05-SEP-14 $1 @ LKR130/-
UVA-NCB-RDM-12
Construction of Multipurpose Building
336,363.07 305,295.40 NCB Q2 / 2014 17-JUN-14 $1 @ LKR130/-
NCP-NCB-GAL-07
Construction of Multipurpose Building and Refurbishment, Galenbindunuwewa
262,472.37 246,480.38 NCB Q3 / 2014 08-SEP-14 $1 @ LKR130/-
SP-NCB-KOT-17
Construction of Multipurpose Building, Kotapola
337,241.84 346,904.14 NCB Q3 / 2014 23-OCT-14 $1 @ LKR130/-
NCP-NCB-PGL-19
Construction of Multipurpose Building, Palagala
352,798.93 336,798.05 NCB Q1 / 2014 28-MAY-14 $1 @ LKR130/-
NWP-NCB-UDU-19
Construction of Multipurpose Building, Udubaddawa
383,427.89 356,610.60 NCB Q1 / 2014 01-APR-14 $1 @ LKR130/-
CP-NCB-WLP-28
Construction of Multipurpose Building, Walapane
350,181.88 326,947.05 NCB Q3 / 2014 01-DEC-14 $1 @ LKR130/-
SP-NCB-PIT-24
Construction of Multipurpose building with auditorium, Pitabeddara
346,179.86 376,923.33 NCB Q4 / 2014 14-JAN-15 $1 @ LKR130/-
CP-NCB-NAU-12
Construction of Multipurpose building, Naula
373,033.80 353,773.82 NCB Q2 / 2014 08-AUG-14 $1 @ LKR130/-
NCP-NCB-PAD-18
Construction of Multipurpose building, Padaviya
138,259.86 133,569.34 NCB Q1 / 2014 28-MAY-14 $1 @ LKR130/-
NCP-NCB-RAM-22
Construction of Multipurpose building, Rambewa
230,520.26 218,879.11 NCB Q1 / 2014 20-MAY-14 $1 @ LKR130/-
SP-NCB-WEL-29
Construction of Multipurpose building, Welivitiya, Divithura
344,987.34 305,183.74 NCB Q1 / 2014 24-JUL-14 $1 @ LKR130/-
CP-NCB-YTW-27
Construction of PS Building Upper floor and
349,237.87 337,776.36 NCB Q2 / 2014 20-JUN-14 $1 @ LKR130/-
Library, Yatawatta
UVA-NCB-KTG-17
Construction of PS Building and Comfort Centre, Katharagama
390,987.66 380,417.68 NCB Q4 / 2013 03-MAR-14 $1 @ LKR130/-
WP-NCB-DOD-08
Construction of PS Building, Dodangoda
382,108.69 345,163.21 NCB Q4 / 2013 13-JAN-14 $1 @ LKR130/-
CP-NCB-HAR-06
Construction of PS Building, Harispattuwa
371,977.86 353,377.27 NCB Q2 / 2014 02-SEP-14 $1 @ LKR130/-
SP-NCB-PAS-23
Construction of PS Building, Pasgoda
367,330.75 371,155.49 NCB Q4 / 2013 07-JAN-14 $1 @ LKR130/-
NWP-NCB-VAN-20
Construction of PS Office
198,221.24 182,904.62 NCB Q3 / 2013 27-NOV-13 $1 @ LKR130/-
UVA-NCB-KAN-05
Construction of PS Office Building with a Library, Kandaketiya
359,965.96 338,542.55 NCB Q2 / 2014 18-AUG-14 $1 @ LKR130/-
UVA-NCB-WLW-25
Construction of PS Office building, Wellawaya
250,553.94 236,660.30 NCB Q4 / 2013 03-MAR-14 $1 @ LKR130/-
NWP-NCB-KUL-13
Construction of PS Office with Library and Health Centre, Kuliyapitiya
331,690.69 298,587.83 NCB Q1 / 2014 17-JUN-14 $1 @ LKR130/-
UVA-NCB-HAL-01
Construction of PS Office, Haldummulla
261,859.44 269,015.50 NCB Q2 / 2013 02-SEP-13 $1 @ LKR130/-
UVA-NCB-HAP-09
Construction of PS Office, Haputale
278,880.80 284,212.92 NCB Q3 / 2013 06-DEC-13 $1 @ LKR130/-
NWP-NCB-KAL-12
Construction of PS Office, Kalpitiya
215,906.68 200,884.11 NCB Q2 / 2014 17-SEP-14 $1 @ LKR130/-
SP-NCB-MUL-19
Construction of PS Office, Weekly fair, Mulatiyana
464,619.83 475,362.06 NCB Q3 / 2013 20-DEC-13 $1 @ LKR130/-(ADB Fin.LKR42,000,000)
UVA-NCB-SIY-22
Construction of PS Office,Siyambalanduwa
300,192.40 315,211.17 NCB Q3 / 2013 05-DEC-13 $1 @ LKR130/-
UVA-NCB-BAN-04
Construction of Pradeshiya Sabha Office Building, Bandarawela
290,714.26 275,813.93 NCB Q2 / 2014 02-SEP-14 $1 @ LKR130/-
SAB-NCB-RTP-27
Construction of Pradeshiya Sabha Office Building, Ratnapura
361,712.25 330,713.71 NCB Q2 / 2014 15-AUG-14 $1 @ LKR130/-
UVA-NCB-THA-24
Construction of Pradeshiya Sabha Office Building, Thanamalvila
384,159.99 332,064.39 NCB Q3 / 2014 22-OCT-14 $1 @ LKR130/-
SP-NCB-MAL-18
Construction of Pradeshiya Sabha Office, Malimbada
353,323.68 321,057.12 NCB Q3 / 2014 28-NOV-14 $1 @ LKR130/-
SP-NCB-AKU-02
Construction of Pradeshiya Sabha, Akuressa
267,104.36 261,843.11 NCB Q2 / 2014 07-AUG-14 $1 @ LKR130/-
SP-NCB-H Construction of 439,878.77 486,796.41 NCB Q4 / 2014 14-JAN-15 $1 @ LKR130/-
AM-08 Pradeshiya Sabha, Bellagaswewa, Hambantota
UVA-NCB-MDL-19
Construction of Road, Drain & Pavement, Makulla, Madulla
53,503.04 52,240.49 NCB Q2 / 2014 17-SEP-14 $1 @ LKR130/-
CP-NCB-LAG-13
Construction of WSS, Laggala-Pallegama
427,613.87 455,721.09 NCB Q4 / 2014 18-FEB-15 $1 @ LKR130/-
CP-NCB-UPT-22-P2
Construction of WSS, Udapalatha
292,282.28 304,434.93 NCB Q4 / 2014 12-FEB-15 $1 @ LKR130/-
CP-NCB-UPT-22-P3
Construction of WSS, Udapalatha
460,267.93 446,257.77 NCB Q4 / 2014 12-FEB-15 $1 @ LKR130/-
NCP-NCB-GAL-08
Construction of Water Supply Scheme for Galenbindunuwewa
322,873.04 338,988.72 NCB Q3 / 2014 02-DEC-14 $1 @ LKR130/-
NCP-NCB-LAN-15
Construction of Weekly Fair, Bus stand, Lankapura
269,541.75 235,934.35 NCB Q3 / 2014 08-SEP-14 $1 @ LKR130/-
SAB-NCB-GLG-17
Construction of Weekly Fair, Health Clinic, Galigamuwa
209,552.12 229,834.20 NCB Q1 / 2014 05-JUN-14 $1 @ LKR130/-
NWP-NCB-CHI-08
Construction of Weekly fair at Madampe,Chilaw
120,308.38 106,401.59 NCB Q1 / 2014 30-JUN-14 $1 @ LKR130/-
NCP-NCB-GLN-09
Construction of Weekly fair, Galnewa
141,770.91 130,674.70 NCB Q4 / 2013 03-FEB-14 $1 @ LKR130/-
CP-NCB-LAG-08
Construction of Weekly fair, Public Toilet, Internal roads, Laggala-Pallegama PS
219,035.55 206,834.09 NCB Q3 / 2014 21-NOV-14 $1 @ LKR130/-
SAB-NCB-IMB-20
Construction of a Mult-purpose building, Imbulpe
293,154.78 271,563.77 NCB Q3 / 2014 22-OCT-14 $1 @ LKR130/-
SAB-NCB-DER-11
Construction of a Multi-purpose building, Deraniyagala
345,059.52 338,440.33 NCB Q2 / 2014 10-JUL-14 $1 @ LKR130/-
UVA-NCB-BAD-16
Construction of a PS Sub Office,Badalkumbura
271,402.85 258,182.01 NCB Q2 / 2014 02-SEP-14 $1 @ LKR130/-
SAB-NCB-AYA-04
Construction of a bus stand with community hall, Ayagama
275,667.29 266,592.75 NCB Q2 / 2014 15-AUG-14 $1 @ LKR130/-
NWP-NCB-BIN-06
Construction of daily fair, Bingiriya
143,430.66 139,505.06 NCB Q1 / 2013 23-MAY-14 $1 @ LKR130/-
CP-NCB-UDA-20
Construction of library, health centre, Udadumbara
288,115.93 287,187.09 NCB Q1 / 2014 05-JUN-14 $1 @ LKR130/-
NCP-NCB-HOR-11
Construction of multipurpose building, Horowpathana
351,018.72 295,705.49 NCB Q1 / 2014 22-MAY-14 $1 @ LKR130/-
SAB-NCB-BUL-08
Construction of the Multipurpose
230,090.40 227,260.19 NCB Q4 / 2014 18-DEC-14 $1 @ LKR130/-
Building, Bulathkohupitiya
WP-NCB-SEE-17
Construction of the second phase of the PS Office, Seethawaka
305,247.16 282,297.53 NCB Q1 / 2014 17-JUN-14 $1 @ LKR130/-
NCP-NCB-RAJ-20
Construction of the weekly fair and Drainage, Rajanganaya
283,874.95 281,673.32 NCB Q2 / 2014 20-JUN-14 $1 @ LKR130/-
SP-NCB-THG-26
Construction of the weekly fair, Thihagoda
311,074.20 341,869.26 NCB Q2 / 2014 10-JUL-14 $1 @ LKR130/-
CP-NCB-WIL-24
Construction of water supply scheme at Hettipola, Wilgamuwa
361,881.80 347,298.54 NCB Q4 / 2014 18-FEB-15 $1 @ LKR130/-
CP-NCB-RAT-16
Construction of water supply scheme, Rattota
227,095.09 228,594.21 NCB Q3 / 2014 03-DEC-14 $1 @ LKR130/-
WP-NCB-WLT-18
Construction of weekly fair and confort centre, Walallawita
212,655.12 199,935.85 NCB Q4 / 2013 08-JAN-14 $1 @ LKR130/-
SP-NCB-NAG-20
Construction of weekly fair and multipurpose building, Nagoda
363,458.52 379,184.62 NCB Q3 / 2014 06-JAN-15 $1 @ LKR130/-
SAB-NCB-EMB-15
Construction of weekly fair and toilets, Embilipitiya
242,258.77 237,249.18 NCB Q1 / 2014 20-MAY-14 $1 @ LKR130/-
SP-NCB-ATH-05
Construction of weekly fair at Thibbotuwewa, Thuraliya
175,715.47 187,096.62 NCB Q2 / 2014 12-AUG-14 $1 @ LKR130/-
NCP-NCB-DIM-06
Construction of weekly fair with toilet facility, Dimbulagala
131,103.39 122,874.33 NCB Q2 / 2014 25-AUG-14 $1 @ LKR130/-
NCP-NCB-RAM-24
Construction of weekly fair with toilet facility, Rambewa
137,621.95 129,429.39 NCB Q1 / 2014 16-MAY-14 $1 @ LKR130/-
SAB-NCB-AYA-03
Construction of weekly fair, Ayagama
349,012.59 75,547.77 NCB Q4 / 2013 24-FEB-14 $1 @ LKR130/-
NCP-NCB-KEB-14
Construction of weekly fair, Kebithigollewa
114,492.27 111,158.71 NCB Q1 / 2014 23-MAY-14 $1 @ LKR130/-
UVA-NCB-MEE-28
Construction of weekly fair, Meegahakivula
125,107.78 155,803.63 NCB Q1 / 2014 09-APR-14 $1 @ LKR130/-
SP-NCB-TMR-27
Construction of weekly fair, Thissamaharama
358,495.38 384,615.38 NCB Q4 / 2013 03-FEB-14 $1 @ LKR130/-
WP-NCB-MAT-13
Construction of weekly fair, comfort centre, Mathugama
384,775.07 355,524.25 NCB Q1 / 2014 23-MAY-14 $1 @ LKR130/-
SAB-NCB-KAH-22
Construction of weekly fair,Drainage system, Kahawatta
323,052.04 371,281.82 NCB Q1 / 2014 20-MAY-14 $1 @ LKR130/-
UVA-NCB-HAP-10
Consturction of Road, Retaining wall & PavementImprovement,
59,776.81 59,779.81 NCB Q4 / 2014 22-JAN-15 $1 @ LKR130/-
HaputaleSP-NCB-NEL-22
Development of Internal Roads and Three wheeler park, Neluwa
56,286.60 59,076.57 NCB Q4 / 2014 06-JAN-15 $1 @ LKR130/-
CP-NCB-AMG-02
Development of Internal Roads, Ambagamuwa
319,190.88 297,149.37 NCB Q2 / 2014 09-SEP-14 $1 @ LKR130/-
WP-NCB-PAL-15
Improvement of Internal Road at Baduraliya, Palindanuwara
239,029.69 215,948.29 NCB Q3 / 2014 04-NOV-14 $1 @ LKR130/-
NCP-NCB-LAN-16
Improvement of Internal Roads, Lankapura
75,559.32 71,920.08 NCB Q2 / 2014 25-AUG-14 $1 @ LKR130/-
NWP-NCB-ALA-04
Improvement of Roads at Alawwa Town, Alawwa
367,255.75 287,187.73 NCB Q2 / 2014 22-SEP-14 $1 @ LKR130/-
SAB-NCB-DEH-10
Improvement of the Drainage system, Dehiovita
353,581.16 230,244.64 NCB Q3 / 2014 02-DEC-14 $1 @ LKR130/-
CP-NCB-UDA-21
Improvement to Existing water supply scheme, Udadumbara
370,663.27 395,983.43 NCB Q4 / 2014 23-FEB-15 $1 @ LKR130/-
UVA-NCB-MDG-02
Improvement to Weekly fair with retaining wall, Medagama
117,125.24 102,982.55 NCB Q2 / 2014 04-AUG-14 $1 @ LKR130/-
SP-NCB-IMA-10
Improvement to existing shops, Imaduwa
250,168.69 261,153.85 NCB Q4 / 2013 03-MAR-14 $1 @ LKR130/-
SP-NCB-SOO-25
Improvement to weekly fair and entrance roads, Sooriyawewa
318,236.42 349,920.72 NCB Q4 / 2014 30-JAN-15 $1 @ LKR130/-
SAB-NCB-BUL-09
Improvements tothe Internal roads, Bulathkohupitiya
160,928.10 151,990.89 NCB Q2 / 2014 18-AUG-14 $1 @ LKR130/-
NWP-NCB-NAW-15
Improvements toweekly fair and drainage system, Nawagattegama
342,091.49 308,141.25 NCB Q2 / 2014 04-AUG-14 $1 @ LKR130/-
WP-NCB-DIV-03
PS Office Building, Divulapitiya
443,913.53 419,964.26 NCB Q3 / 2013 27-AUG-13 $1 @ LKR130/-
NWP-NCB-GIR-03
PS Office Building, Giribawa
248,159.96 220,495.53 NCB Q2 / 2013 02-SEP-13 $1 @ LKR130/-
SP-NCB-LUN-01
PS Office Building, Lunugamvehera
376,639.83 351,901.29 NCB Q2 / 2013 16-AUG-13 $1 @ LKR130/-
SAB-NCB-RUW-28
PS Office Building, Ruwanwella
383,579.94 387,714.36 NCB Q3 / 2013 04-NOV-13 $1 @ LKR130/-
SP-NCB-NEL-21
PS Office Building, Weeklyfair, Neluwa
301,937.48 320,000.00 NCB Q1 / 2014 02-JUL-14 $1 @ LKR130/-
SAB-NCB-EMB-14
PS Office and Library - Embilipitiya
26,865.67 27,437.76 NCB Q1 / 2015 30-MAR-15 $1 @ LKR130/-
WP-NCB-MIR-02
PS Sub Office & Library Building, Pallewelaa
182,500.84 166,692.43 NCB Q2 / 2013 16-AUG-13 $1 @ LKR130/-
SAB-NCB-GLG-19
Rehabilitation of Ahakiyatha Road,
77,494.37 76,078.85 NCB Q2 / 2014 02-SEP-14 $1 @ LKR130/-
GaligamuwaSAB-NCB-EMB-16
Rehabilitation of Danduhathakma-Kaparalla Rd, Embilipitiya
88,762.83 93,250.55 NCB Q2 / 2014 25-AUG-14 $1 @ LKR130/-
SAB-NCB-DER-13
Rehabilitation of Pavement and Drainage System, Deraniyagala
43,972.85 46,175.05 NCB Q3 / 2014 05-DEC-14 $1 @ LKR130/-
SAB-NCB-IMB-21
Rehabilitation of Samanalagama Rd, Imbulpe
84,568.59 88,490.77 NCB Q4 / 2014 10-FEB-15 $1 @ LKR130/-
SP-NCB-ATH-04
Rehabilitation of existing suspension bridge, Thibbotuwawa, Athuraliya
78,427.65 90,090.05 NCB Q3 / 2014 02-DEC-14 $1 @ LKR130/-
NWP-NCB-VAN-21
Vanathavilluwa Water Supply Scheme
564,118.00 453,502.23 NCB Q4 / 2014 22-JUN-15 $1 @ LKR130/-
WP-NCB-AGA-05
Waste Management Centre, Agalawatta
242,388.06 201,018.94 NCB Q1 / 2015 20-MAY-15 $1 @ LKR130/-
CP-NCB-UPT-22-P1
Water Supply Scheme (Intake and Raw Water Main) for Udapalatha PS-Part 1
622,119.00 541,169.02 NCB Q4 / 2014 26-MAY-15 $1 @ LKR130/-
NCP-NCB-DIM-04A
Water Supply Scheme for Dimbulagala
170,036.01 166,315.84 NCB Q4 / 2014 09-JAN-15 $1 @ LKR130/-
NCP-NCB-DIM-04B
Water Supply Scheme for Dimbulagala PS,Dimbulagala
257,710.97 240,801.64 NCB Q4 / 2014 09-JAN-15 $1 @ LKR130/-
NCP-NCB-GLN-10
Water Supply Scheme for Galnewa
301,992.62 324,556.71 NCB Q2 / 2014 22-JAN-15 $1 @ LKR130/-
NCP-NCB-RAJ-21
Water Supply Scheme for Rajangane Town, Rajanganaya
157,409.51 161,974.60 NCB Q3 / 2014 19-DEC-14 $1 @ LKR130/-
WP-NCB-MAD-11
Water Supply, Madurawala
197,835.82 193,381.18 NCB Q1 / 2015 30-MAR-15 $1 @ LKR130/-
WP-NCB-MIR-16
Water Supply, Mirigama
183,283.58 187,252.42 NCB Q1 / 2015 30-MAR-15 $1 @ LKR130/-
WP-NCB-PAL-14
Water Supply, Palindanuwara
196,044.78 200,307.87 NCB Q1 / 2015 16-MAR-15 $1 @ LKR130/-
NCP-NCB-DIM-04C
Water Sypply Scheme for Dimbulagala
274,426.95 258,560.97 NCB Q4 / 2014 08-JAN-15 $1 @ LKR130/-
SAB-NCB-YAT-29
Weekly Fair and Comfort Centre -Yatiyantota
359,134.21 326,669.52 NCB Q3 / 2014 19-NOV-14 $1 @ LKR130/-
NWP-NCB-GIR-10
Weekly Fair and Comfort Centre, Giribawa
60,281.71 59,518.54 NCB Q1 / 2014 31-MAR-14 $1 @ LKR130/-
SP-NCB-HAM-09
Compost Plant - Hambantota
27,360.54 30,105.42 NCB Q1 / 2015 14-JUL-15 $1 @ LKR130/-
SAB-NCB-BAL-07
Compost Plant, Balangoda
77,351.68 70,750.73 NCB Q1 / 2015 12-JUN-15 $1 @ LKR130/-
SAB-NCB-GLG-18
Compost Plant, Galigamuwa
67,800.00 65,911.64 NCB Q1 / 2015 09-JUN-15 $1 @ LKR130/-
UVA-NCB-MDG-20
Construction of Library Building, Medagama
197,598.80 189,254.16 NCB Q2 / 2013 13-NOV-13 $1 @ LKR130/-
SAB-NCB- Construction of 278,134.72 272,330.91 NCB Q4 / 2014 12-FEB-15 $1 @ LKR130/-
BAL-05 Multipurpose Bldg. and Pre-school, Balangoda
CP-NCB-PAT-15
Multipurpose Building, PS Office and Library - Pathahewaheta PS
353,460.53 353,460.51 NCB Q3 / 2014 10-JUL-15 $1 @ LKR130/-
UVA-NCB-BAD-21
Road Improvement, Badalkumbura
88,463.53 98,679.70 NCB Q1 / 2015 30-MAR-15 $1 @ LKR130/-
SP-NCB-HAK-07
Water Supply Scheme, Hakmana
544,463.82 559,890.74 NCB Q1 / 2015 12-JUN-15 $1 @ LKR130/-
SP-NCB-TWM-28
Weekly Fair busstand, PS office and toilet, Thawalama
401,538.46 354,043.92 NCB Q1 / 2015 13-AUG-15 $1 @ LKR130/-
Consulting Services
PackageNumber
General Description
EstimatedValue
Awarded Contract
Value
Recruitment Method
AdvertisementDate
(quarter/year)
Date of ADB Approval of
Contract Award
Comments
DSC02 Design and Supervision Consultants - North Central Province (DSC 02)
310,000.00 576,911.17 QCBS Q1 / 2013 16-OCT-13 $1 @ LKR130/-(LKR74,998,452.55)
DSC03 Design and Supervision Consultants - North Central Province (DSC 03)
200,000.00 453,586.53 QCBS Q1 / 2013 22-OCT-13 $1 @ LKR130/-(LKR58,966,249.10)
DSC04 Design and Supervision Consultants - Sabaragamuwal Province (DSC 04)
370,000.00 470,174.98 QCBS Q1 / 2013 16-OCT-13 $1 @ LKR130/-(LKR61,122,746.90)
DSC05 Design and Supervision Consultants - Southern Province (DSC 05)
320,000.00 324,737.58 QCBS Q1 / 2013 15-OCT-13 $1 @ LKR130/-(LKR42,215,886.00)
DSC06 Design and Supervision Consultants - Uva Province (DSC 06)
240,000.00 648,132.32 QCBS Q1 / 2013 09-OCT-13 $1 @ LKR130/-(LKR84,257,201.28)
DSC 07 Design and Supervision Consultants - Western Province (DSC 07)
70,000.00 78,997.81 LCS Q1 / 2013 10-SEP-13 $1 @ LKR130/-(LKR10,269,715.00)
DSC01 Design and Supervision of consultants - Central Province(DSC 01)
400,000.00 614,466.39 QCBS Q1 / 2013 16-OCT-13 $1 @ LKR130/-(LKR79,880,631.20)
PMC-01 Project Management Consultant
1,640,000.00 1,814,794,244.00
QCBS Q1 / 2012 03-AUG-12 $1 @ LKR130/-(LKR117,589,159.28&$910,262.25)
2. Completed Contracts
Goods and Works
PackageNumber
General Description
EstimatedValue
Awarded Contract
Value
ProcurementMethod
AdvertisementDate
(quarter/year)
Date of ADB
Approval of
Contract Award
Date of Completion
Comments
NWP-NCB-BIN-01
Construction of PS Office - Bingiriya (PCSS5)
213,846.15 212,135.66 NCB Q1 / 2013 06-AUG-13 09-APR-14 $1 @ LKR130/-(LKR27,577,635.72)
CP-NCB-PAN-07
Construction of Huluganga Bridge(PCSS7)
300,000.00 289,303.47 NCB Q1 / 2013 21-JUN-13 05-MAY-14 $1 @ LKR130/-(LKR37,609,451.40)
SP-NCB-KAR-14
Improvement of Comfort Center, Karandeniya
30,063.05 18,031.11 NCB Q3 / 2013 20-NOV-13 06-JUN-14 $1 @ LKR130/-(LKR2,344,044.58)
UVA-NCB-RDM-14
Construction of weekly fair, Rideemaliyadda
37,483.58 33,798.17 NCB Q1 / 2014 27-MAR-14 30-AUG-14 $1 @ LKR130/-(LKR4,613,959.50)
UVA-NCB-MEE-07
Construction of Comfort Center, Meegahakivula
34,489.76 28,913.75 NCB Q3 / 2013 14-NOV-13 03-SEP-14 $1 @ LKR130/-(LKR3,758,787.84)
PMU-EQ-11
Procurement of 306 Unit Desktop computers
304,615.38 312,276.55 NCB Q1 / 2014 21-APR-14 15-NOV-14 $1 @ LKR130/-(LKR40,595,952.00)
CP-NCB-AMG-03
Construction of Comfort Centre, Ambagamuwa
53,941.68 53,551.70 NCB Q1 / 2014 27-MAR-14 03-DEC-14 $1 @ LKR130/-(LKR6,961,721.49)
UVA-NCB-MDG-27
Comfort Centre, Medagama
28,672.85 23,793.19 NCB Q3 / 2013 03-OCT-13 18-DEC-14 $1 @ LKR130/-(LKR3,093,115.18)
CP-NCB-RAT-17
Construction of Health and Maternity Centre, Rattota
123,061.40 119,093.37 NCB Q1 / 2014 27-MAR-14 22-JAN-15 $1 @ LKR130/-(LKR15,482,137.87)
CP-NCB-WIL-23
Construction of CommunityCentre on PS Office, Wilgamuwa
102,307.69 87,240.97 NCB Q1 / 2014 27-MAR-14 11-FEB-15 $1 @ LKR130/-(LKR11,341,325.86)
CP-NCB-RAT-18
Development of Weekly Fair, Rattota
100,000.00 92,807.16 NCB Q1 / 2014 17-JUN-14 17-MAR-15 $1 @ LKR130/-(LKR12,064,930.55)
PMU-VE-EQ-01
Solid Waste Managment -31 Nos 4-wheel tractors, othertractors and trailers (PCSS2)
400,000.00 375,235.39 NCB Q1 / 2013 17-MAY-13 28-JUN-13 $1 @ LKR130/-(LKR48,780,600)
PMU-VE-03
Solid Waste Management -Procurement of Gully Bowsers
90,000.00 56,538.46 SHOPPING Q1 / 2013 19-AUG-13 20-AUG-13 $1 @ LKR130/-(LKR7,350,000.00)
PMU-VE-0 Solid Waste 390,000.00 371,600.28 NCB Q1 / 2013 03-JUL-13 12-SEP-13 $1 @
4 Management - Procurementof Tippers
LKR130/-(LKR48,308,036.00)
PMU-VE-05
Truck Mounted Water Bowser(PCSS3)
110,000.00 111,689.85 NCB Q1 / 2013 17-MAY-13 28-NOV-13 $1 @ LKR130/-(LKR14,519,680.00)
PMU-EQ-06
Procurement of Office Equip. for PMU
69,230.77 65,752.57 NCB Q3 / 2013 27-NOV-13 31-MAR-14 $1 @ LKR130/-(LKR8,547,833.93)
PMU-EQ-07
Procurement of Office Equipment forPMU
30,769.23 30,140.62 NCB Q3 / 2013 13-DEC-13 05-APR-14 $1 @ LKR130/-(LKR3,918,280.00)
Consulting Services
PackageNumber
General Description
EstimatedValue
Awarded Contract
Value
Recruitment Method
AdvertisementDate
(quarter/year)
Date of ADB
Approval of
Contract Award
Date of Completion Comments
None
D. National Competitive Bidding
A. Regulation and Reference Documents
1. The procedures to be followed for national competitive bidding shall conform to the provisions prescribed in the Procurement Guidelines 2006 for Goods and Works issued in January 2006 by the National Procurement Agency,and the specific procedures prescribed by the Procurement Manual issued in March 2006, with the clarifications andmodifications described in the following paragraphs required for compliance with the provisions of the ADB Procurement Guidelines.
B. Procurement Procedures
1. Eligibility
2. The eligibility of bidders shall be as defined under Section I of ADB's Procurement Guidelines (2015, as amended from time to time) (the "Guidelines); accordingly, no bidder or potential bidder should be declared ineligible forreasons other than those provided in Section I of the Guidelines.
2. Registration and Sanctioning
3. Registration is acceptable under the following conditions:
(i) Bidding shall not be restricted to pre-registered firms under the national registration system of the Institute forConstruction, Training and Development (ICTAD), and such registration shall not be a condition for the submission of bids in the bidding process.
(ii) Where registration is required prior to award of contract, bidders: (i) shall be allowed a reasonable time to complete the ICTAD registration process; and (ii) shall not be denied registration for reasons unrelated to their capability and resources to successfully perform the contract, which shall be verified through post-qualification.
(iii) National sanction lists or blacklists may be applied only with prior approval of ADB.
3. Prequalification
4. Prequalification is discouraged for NCB. When used, particularly for works contracts, an individual prequalification exercise is acceptable for each contract as is the use of a registration system (or approved standing list) of contractors based on criteria such as experience, financial capacity, and technical capacity. Foreign bidders from eligible countries must, however, be allowed to register and to bid without unreasonable cost or additional requirements.
4. Advertising
5. The posting of NCB specific notices for contracts valued at less than $1 million on ADB's website is not required but is highly recommended.
5. Preferences
6. The following shall be observed:
(i) No preference of any kind shall be given to domestic bidders or for domesticallymanufactured goods.
(ii) Foreign suppliers and contractors from ADB member countries shall be allowed to bid, without registration, licensing, and other government authorizations, leaving compliance with these requirements for after award and before signing of contract.
6. Participation by Government-Owned Enterprises
7. Government-owned enterprises in the Democratic Socialist Republic of Sri Lanka shall be eligible to participate only if they can establish that they are legally and financially autonomous, operate under commercial law, and are not a dependent agency of the procuring entity, or the Project Executing Agency or Implementing Agency.
7. Rejection of Bids and Rebidding
8. Bids shall not be subjected to a test for unrealistic rates. No lowest evaluated and substantially responsive bid shall be rejected on the basis of comparison to rates, including but not limited to market, historical, or agency established rates, without prior approval of ADB.
9. Bids shall not be rejected and new bids solicited without the ADB's prior concurrence.
8. Price Negotiations
10. Price negotiation shall be allowed only where the price offered by the lowest evaluated and substantially responsive bidder substantially exceeds costs estimates. Approval of ADB is required prior to any negotiation of prices.
C. Bidding Documents
9. Acceptable Bidding Documents
11. Procuring entities shall use standard bidding documents acceptable to ADB for the Procurement of Goods,Works and Consulting Services, based ideally on the standard bidding documents issued by ADB.
10. Bid Security
12. Where required, bid security shall be in the form of a certified check, a letter of credit or a bank guarantee from a reputable bank.
11. ADB Policy Clauses
13. A provision shall be included in all NCB works and goods contracts financed by ADB requiring suppliers andcontractors to permit ADB to inspect their accounts and records and other documents relating to the bid submissionand the performance of the contract, and to have them audited by auditors appointed by ADB.
14. A provision shall be included in all bidding documents for NCB works and goods contracts financed by ADB stating that the Borrower shall reject a proposal for award if it determines that the bidder recommended for award has,directly or through an agent, engaged in corrupt, fraudulent, collusive, coercive or obstructive practices in competing for the contract in question.
15. A provision shall be included in all bidding documents for NCB works and goods contracts financed by ADB stating that ADB will declare a firm or individual ineligible, either indefinitely or for a stated period, to be awarded a contract financed by ADB, if it at any time determines that the firm or individual has, directly or through an agent, engaged in corrupt, fraudulent, collusive, coercive or obstructive practices or any integrity violation in competing for, or in executing, ADB-financed contract.