42048743 Installation and Commissioning of NodeB Bhopal
-
Upload
princetonymes -
Category
Documents
-
view
22 -
download
9
description
Transcript of 42048743 Installation and Commissioning of NodeB Bhopal
NODE B (Compact Smart 9312 )INSTALLATION & COMMISSIONING DOCUMENT
1. Refer Installation Guide (PDF File) for Installation. Snapshot of Node B with Cabling shown below .
HARDWARE INSTALLATION
RF and Power Cabling
PCM and Digital Cabling
DDF INSTALLATION
Pair/ Shield FunctionPCM 1 Receive 1PCM 2 Receive 2PCM 3 Receive 3PCM 4 Receive 4PCM 5 Receive 5PCM 6 Receive 6PCM 7 Receive 7PCM 8 Receive 8PCM 9 Transmit 1PCM 10 Transmit 2PCM 11 Transmit 3PCM 12 Transmit 4PCM 13 Transmit 5PCM 14 Transmit 6PCM 15 Transmit 7PCM 16 Transmit 8
2. Before Power ON of Node B , Ensure the following :-
(a) TRCU power cable is connected to 32 Amps MCB .
(b) D2U shelf Power cable is connected to 10 Amps MCB.
(c) Grounding of Node B is connected to IGB (refer to installation).
(d) Check the Voltage with multimeter at Node B end .
Data and software requirements:
a. Laptop with Windows XP with Internet explorer or mozilla
b. Cross LAN Cable
c. Alcatel Node-B commissioning doc
d. Java6 update5
e. Node-B software UNB06D00205
f. IP sheet
3. Connecting Laptop Locally to NODE B .
(a) Cross LAN Cable is Required
(b) Java should be Installed in the Laptop (set up file is attached)
(c) Change the IP Address of Laptop , As given Below
Connect to the TIL Port ( Port 1 of XCCM Card) .
Go to Internet Explorer and open the U
And following Window will appear
Put your name and Default Path where you want to save all Commissioning Reports .
And Following Board Screen will Appear
Upgrade the Node B Software to “ UNB06D00205”
4. Software Upgrade Procedure
Go to the Tools then Software upgrade then New software download , As shown below
Below Window will appear
Just show the Path where you have kept UNB06D00205 software and Select FILE0_UNDB06D00205 , As shown Below
And Click “Choose a Delievery File “:
“ This will take 15 minutes”
5. Activating New Software Release
Close the Connection ( Internet Explorer) and Reconnect . Once reconnected the new software will have username and password.
Username: nodeb
Password: nodeblnx
6. Procedure for Change of I&C Parameters (PCM , IP Address and IMA)
(a) Before making Changes , Save I&C Parameters
Save with name “OLD I&C site name”.
(b) Now Change I&C Parameters , only (PCM , IP Address and IMA)
PCM Modification:
Change PCM E1 Frame to Automatic Multiframe
IP Modification:
Reference:
Existence of a DHCP Server = NO
BTS IP address = 10.136.110.XX (get from excel sheet)
OMC-B IP address =
10.136.130.164
OMC-B Port = 6301
OMC-B VP identifier = 1
OMC-B VC identifier = 32
Subnetwork Mask =
255.255.255.0
BTS Port = 6301
IMA Modification:
Choose PCM&IMA Tab
Select IMA
SENDING CHANGES OF I&C PARAMETERS TO NODEB
Press Send to IBTS
Change in progress (20secs)
Success Message
SAVE CHANGES IN I&C PARAMETERS
Select Save I&C parameters
Change file name to “new_sitename.til”, press save
RESET NodeB (to activate changes in I&C parameters)
Reset in connected Mode
Confirm reset window
Note: NodeB will reset for approximately 5 mins.
Reconnect to BTS
7. MCA Backup File
Confirmation that MCA file created on CCM
Confirmation that MCA file copied on default directory
8. Global Inventory File
Go to Files Global Inventory File
Save
File will be saved on default path
END OF COMMISSIONING
IMPORTANT!!!!
After successful commissioning send a email to ALCATEL attaching the following files and information:
1. Site Name and Address.
2. Software Successfully upgraded to UNB06D00205 – (YES/ NO)
3. Global Inventory File
4. New I&C Parameter File
5. MCA File