April 15, 2019 40’ PARCEL REQUIRED TO CONSTRUCT OHME SUBSTATION Existing Olds Station Substation Future Ohme Substation Location of Proposed 40’ Purchase

Transcript of 40’ PARCEL REQUIRED TO CONSTRUCT OHME SUBSTATION · April 15, 2019. 40’ PARCEL REQUIRED TO...

Page 1: 40’ PARCEL REQUIRED TO CONSTRUCT OHME SUBSTATION · April 15, 2019. 40’ PARCEL REQUIRED TO CONSTRUCT OHME SUBSTATION . Existing . Olds Station. Substation. Future. Ohme. Substation.

April 15, 201940’ PARCEL REQUIRED TO CONSTRUCT OHME SUBSTATION

Existing Olds StationSubstation

FutureOhme

Substation

Location of Proposed

40’ Purchase

Page 2: 40’ PARCEL REQUIRED TO CONSTRUCT OHME SUBSTATION · April 15, 2019. 40’ PARCEL REQUIRED TO CONSTRUCT OHME SUBSTATION . Existing . Olds Station. Substation. Future. Ohme. Substation.

Proposed PropertyLine

April 15, 2019

TOPOGRAPHY OF PROPOSED 40’ AQUISITION

Page 3: 40’ PARCEL REQUIRED TO CONSTRUCT OHME SUBSTATION · April 15, 2019. 40’ PARCEL REQUIRED TO CONSTRUCT OHME SUBSTATION . Existing . Olds Station. Substation. Future. Ohme. Substation.

Neighboring Property

ExistingSubstation Property

Current Status• Additional property needed

Site Work Required• Build 4’ X 300’ retaining wall• Relocate existing waterline• 1200 cubic feet soils removal• Grading• Sum of work ~ $326K

• 2019- Targeted construction

OhmeSubstation Layout

Olds Station