Page 1: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

401

Page 2: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing
Page 3: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 1 OF 20

No. Comment Response 1 Will Spec Section 011420 const phasing Part 1.5/A be strictly

enforced?

Specification applies, yes

2 Ref - Spec Sec 033000 Part 1.3/ 1&3: A. – will ACI #318 & 301 Certifications be implemented to the fullest extent?

Yes, Requirements per the specifications

3 Spec section 083326 covering Overhead Coiling Grilles appears to be missing. Please forward at your earliest convenience.

See attached specification section

4 2.1. How many ACI certified concrete contractors will be required to be on site during a single concrete pour?

At least one ACI certified flat work technician is required on every pour

5 2.2. Will concrete consultant require a pre-pour meeting?

Pre-pour meeting is advised but not required for every pour but one for every project. Please request attendance from the concrete place/finish superintendent or foreman, GC, architect, structural engineer, concrete supplier, and testing company.

6 2.2.1. Who will be required to attend the pre-pour meeting?

The concrete place/finish company, GC, and Polished Concrete Consultants shall be represented at the absolute minimum.

7 2.2.2. Will the same requirements be for every single pour? If not, then what will change?

Yes, Requirements per the specifications

8 2.2.3 Will the same requirement apply to concrete pours not associated with Polish Concrete? If not, what will be required?

Requirements per the specifications

Page 4: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 2 OF 20

9 Ref Spec Sec #064023: Is it a requirement that Millwork

Subcontractor be registered as AWI?

AWI is to be followed for material and installation procedures. Subcontractors not required to be registered.

10 We have concerns about the phasing dates: P-1A & P-1B: Will the new fixtures arrive in time to turn that phase over? Also, in conjunction with PH: 4A, & 7 – It looks like 6-Months of work, at minimum.

See revised phasing schedule. Various phases will be running concurrently

11 Additionally, P-2A, P-2B & Ph-3 looks to be 6-months of work – at minimum.

See revised phasing plan and notes. Various phases will be running concurrently

12 Asbestos is 10-days for letter to the state, about 10-days per phase once everything in identified. We see about 2-months added to the schedule for asbestos.

Contractor to include the asbestos removal as defined in the construction documents

13 Closeout usually takes about 1-month.

Refer to specifications for close out procedure

14 Restrooms are about 4-6 weeks.

See revised phasing plan and notes. Various phases will be running concurrently

15 We see this project being in the range of 15-18 months.

Currently extended to 12 months

16 We notice that LD’s on this tight project are $1,500.00 per day. In the past, the normal has been $1,000.00. Can we please get that lowered to the normal?

LD are as shown.

17 Not many GC’s or Subcontractors have the manpower to perform the work of this magnitude with the amount of phasing

Phasing has been revised in this

Page 5: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 3 OF 20

implemented. Most all of the GC’s and Sub’s that have the resources are busy with project that don’t have as many phases. For the above reasons I request that the project be extended to 18-months.

Addendum. The project will be extended to 12 months.

18 With the complexity of the project, in conjunction with 12-Options that involve 16-trades – we request that the bid date be extended to 20 March 2020.

Bid date to be extended to 2 April

19 DEMO AREA PLAN - EXCHANGE, sheet AD-113, dated 11/22/2019 -Architectural pattern states NO WORK THIS AREA, however DEMOLITION KEYNOTES with similar pattern states REMOVE MECHANICAL/ELECTRICAL EQUIPMENT. RE: MEP. Please clarify.

Mechanical demolition work is required. Legend does not apply in this area.

20 Will AAFES provide contact information for the base's roofing contractor?

No specific contractor information available

21 Will AAFES provide contact information for the base's Sprinkler and Alarm contractor?

No specific contractor information available

22 EXISTING CONCRETE SLAB RE: AD101 - Note on sheet CS401 references sheet AD101, we're missing sheet AD101.

There is not a sheet AD101 in the set. The reference

Page 6: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 4 OF 20

is incorrect, reference should be AD-111

23 Interior/Exterior Doors, Frames And Hardware - Are some of these doors hurricane rated if so is it the interior or exterior door?

The ultimate design wind speed is 120 MPH. Hurricane Wind Borne Debris regions are only required when the wind speed exceeds 140 MPH so no doors or glazing need to be hurricane rated.

24 Interior/Exterior Doors, Frames And Hardware - Are these doors Blast and if so what is the charge weight and stand-off?

This facility is within a controlled perimeter so a blast rating is not required.

Page 7: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 5 OF 20

25 HVAC Ducting - Kindly define the shading of the ducting. We appear to have dark, medium and light shading. Some have measurements and other don't. Please clarify:

Ducting will be labeled in Addendum for clarity.

26 Need the meaning of VFD, no reference in the abbreviations. Variable Frequency Drive.

Page 8: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 6 OF 20

27 Electrical disconnects - If the open box symbol is a Non-Fused Disconnect, and a single crossed box is a Fused-Disconnect, What is a double crossed box to mean?

Double crossed indicates motor starter/disconnect, Double crossed with VFD indicates Variable Frequency Drive.

Page 9: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 7 OF 20

28 Unmarked RCP areas for demolition sheet AD-122 - Below see areas in a heavily demo'd RCP area have no indication of removal, please confirm;

Only doors and light fixtures are required to be replaced in this area. Existing ceiling and mechanical systems shall remain.

Page 10: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 8 OF 20

29 Sheet AD-123 - Note: 10. REMOVE EXHAUSTS, RETURNS, AND SUPPLIES RE: MECHANICAL - Per the drawing clip below the symbol for note #10 refers to two specific mechanical diffusers to be demo (without the typ. note). What is the directions for the two not referenced and appearing to be boldened and broken perimeter and the other two with solid outside perimeter?

The bold broken perimeter is to be demoed and the solid perimeter are existing to remain.

30 Sheet A-601 Doors, Frames & Hardware - Doors 907A, 706A, 913B & 1035A are listed on the hardware schedule, however not on the door schedule, please clarify:

Existing:

New Construction:

Doors 907A and 1035A are new doors and will be added to the schedule in addenda #2. Doors 706A and 913B are not existing and shall be removed from the hardware set.

Page 11: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 9 OF 20

31 Sheet A-601 Doors, Frames & Hardware - Frame 100A - Mat'l is HM

with head, jamb & thres is listed as ETR. While Frame 101A - Mat'l is ETR with head, jamb & thres is listed as ETR. Does the material designation mean a new door or frame is install. Please clarify

All doors listed under the existing heading are only needing new hardware or paint as indicated on the hardware schedule. All doors, frames and thresholds are existing to remain. All doors and frames shall be painted and thresholds reset in sealant after flooring is installed.

32 A-121 Reflected Ceiling Plan – PX - ACT-2 shown on drawings, however not shown in Finish Schedule, please clarify

ACT-2 should be: Armstrong – Fine Fissured - #1749 White – 2’x2’ – Medium Texture – Square Lay-in W/Prelude 15-16” exposed tee grid

Page 12: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 10 OF 20

33 Sheet A-123 RCP Exchange 100 - Will the entire ceiling grid need to be replace. The lable states "Exist 12'-0" AFF" however the shading is bold to represent new 2'x4" suspended ceiling, please verify new or existing:

This ceiling is existing to remain

34 Drawing E-103 Sales Area 129 .Key Note 6 says to “install new

lights at the cornice...” These lights are not on the fixture schedule. Please provide a manufacturer and catalog number for these lights.

The cornice lights are AAFES furnished and contractor installed.

35 Drawing E-103 Women’s and Men’s toilet. Are new lighting fixture Types A1, A1E and K part of the base bid or Option 8?

Base Bid

36 Drawing E-101. Are the Type C1 and C1E lighting fixtures in MPA1 and MPA2 in the base bid or option 8?

Base Bid

37 Drawing E-102- Are all new exit and emergency fixtures part of the base bid or option 8?

Base Bid

38 Drawing E-102 Are the new occupancy switches and ceiling sensors for lighting control part of the base bid?

Base Bid

39 Drawing E-102 & FA-102. There are six kitchen exhaust hoods shown to be connected to the Optional Fire Alarm System. How do you intend to monitor the Hoods if the Fire Alarm Option is not taken?

Both options hook up the hood to the Fire Alarm panels through the AIM modules.

40 Proposal Form. Bid Option 6 Electrical Upgrades says to “upgrade electrical components no longer compliant with code.” The drawings do not identify any components that are code deficient therefore it is impossible to determine the quantity or types of code deficiencies that may exist.

Equipment that was code deficient or that needed to be replaced due to condition is labeled as Option 6.

Page 13: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 11 OF 20

41 Sheet E-501, Keyed Note #2: If the existing feeder conduits are appropriately sized, can these be reused?

Yes

42 Electrical Lighting Sheets. In the Base Bid much of the lighting is to remain as is, no removal required and ceiling is not called to be removed or replaced. In several of these areas the existing HVAC duct work is being replaced which would require ceiling grid and lighting to be removed and replaced. This is not specified on the electrical drawings.

This was determined to be means and methods for the contractor to coordinate.

43 Are the CCTV, CATV, Security, Access Control and Data/Structured Cabling systems, both new and demolition of the existing, being provided by the Owner?

Rough-in by contractor, demo and installation of cabling by AAFES EUCT (End User Computer Tech)

44 Drawing ED101 and E101: ED101 Note A calls for lighting in these areas to be removed and reused in the new layout as part of the base bid. Drawing E101 is the new layout and all new lighting fixtures are to be part of Bid Option 8. However if Bid Option 8 is not taken there is not enough existing light fixtures for the new layout

Lighting being removed for reuse on sheets ED101 and ED102 are for use on sheet E-101. Except for the fixtures indicated as existing all lighting indicated on sheet E-102 is new for base bid. Option 8 is indicated on sheets E-101A, E-102A, E-103A, E-104A

Page 14: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 12 OF 20

45 Drawing ED102- As part of the base bid, most of the existing lighting is to be removed and reused in the new layout, no new fixtures are to be provided. Drawing E102 is the new layout and all new lighting fixtures are to be part of Bid Option 8. However if Bid Option 8 is not taken there is not enough existing light fixtures for the new layout

Lighting being removed for reuse on sheets ED101 and ED102 are for use on sheet E-101. Except for the fixtures indicated as existing all lighting indicated on sheet E-102 is new for base bid. Option 8 is indicated on sheets E-101A, E-102A, E-103A, E-104A

46

Fire Alarm Symbol Legend on Drawing FA101 and Fire Alarm Drawings FA102 & FA103 There is a symbol, a Circle with a triangle inside and letters “CO”. This symbol is not identified on the Legend. Please identify what type of device this symbol indicates

Fire Alarm Legend has been updated in Addendum.

47 BID OPTION #9 PAINT EXTERIOR PAINT THE EXTERIOR OF THE BUILDING AT THE MAIN ENTRANCES. REFER TO SCOPE OF WORK IDENTIFIED ON THE ELEVATIONS: What is the extent of exterior paint required for "Bid Option #9 Paint the exterior of the building at the main entrance." Are the elevations below fairly representative of the true scope of entrance paint?

The extent of the exterior paint scope is identified on the elevations on A-201. All areas not identified with a diagonal hatch “no work this area” is to be painted.

Page 15: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 13 OF 20

48 BID OPTION #9 PAINT EXTERIOR PAINT THE EXTERIOR OF THE BUILDING AT THE MAIN ENTRANCES. REFER TO SCOPE OF WORK IDENTIFIED ON THE ELEVATIONS: Note 23 references Stucco, however points to what appears to be brick, please clarify extent of entrance paint for Bid Option #9

Keynote #23 incorrectly calls out stucco. This existing surface is brick that needs to be re-painted.

49 Drawings FA102 and FA103 Mechanical Rooms 1&2: An Emergency Power Shutoff is shown in these rooms. However, The function of these devices is not shown on the Fire Alarm Sequence of operations and there is no provision provided, such as shunt trip circuit breakers, in the electrical to shut the electrical power off. Please clarify the function of the EPO device and provide means to shut off the electrical power.

Refer to Mechanical Sheets. Fire Alarm is to monitor EPO.

50 Drawing column lines: Some drawings have numerical horizontal rows and alphabetical vertical columns, other drawings have all numerical for the same columns and do not match. Could get confusing

Unclear as to where this occurs. Please provide references to the exact sheet(s) this occurs on.

51 Sheet A-703: See below; is there a significance to the square on the floor plan? Does this represent a change in floor finish?

Yes, this box indicates a flooring transition. Refer to floor finish plan for more information.

Page 16: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 14 OF 20

52 Sheet MD103: There's note #12 referenced on Sheet MD103 however no note #12 in the Key Notes. Please clarify

Keynotes revised in Addendum for clarity.

Page 17: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 15 OF 20

53 Sheet ED102: Keynotes are boxed out (see below), what happens to the light fixtures that are shown for demo and not within the note box?

Outside of box to be removed and disposed. Keynote 2 is drawing attention to the 2-lamp fixtures to not get confused with 3-lamp in adjacent areas that are for relocation.

Page 18: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 16 OF 20

54 Option 7 has some areas missing Notification Appliances, where they were placed in Option 3: • FA102 (option 3) Cooler 305/Freezer 306 Horn Strobe placed, FA105 (option 7) Cooler 305/Freezer 306 omitted. Please clarify. • Should Remote Test Stations be supplied with Duct Smoke Detectors?

Notification Devices will be added to FA105 in the Addendum. Refer to mechanical plans for Test Stations

55 Option #7: There is an inconsistent device placement on Option 7 (FA104). Please verify.

Inconsistency is correct.

56 Option 3, FA102 has Smoke Detectors in Women’s 702 and Men’s 701: Option 7, FA FA105 has these Smoke Detectors omitted.

Smoke detectors will be added in the Addendum.

Page 19: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 17 OF 20

57 For option 7: Will the Clear Strobe appliances for fire be required to be White covers with Fire or White with Alert? If we can get special appliances manufactured with both Clear and Amber Strobes, which will have a White cover with Alert, is that acceptable?

White cover with Alert is acceptable and a combined cover with Alert is acceptable.

58 FX-101 GED Fire Suppression: What are the symbols shown below and why don't them show up on any of the symbol’s legends?

Legend has been updated in the Addendum. “X” indicated demo.

59 FA101 ENLARGED FIRE ALARM PLAN -NORTHWEST- OPTION 3: Vestibule 209 shows an FAAP, however the symbols legend only shows a FAA. What's the significance of the "P" for the FAAP shown on the drawings?

Legend has been updated in the Addendum.

Page 20: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 18 OF 20

60 FX102 ENLARGED FIRE SUPPRESSION PLAN – NORTHEAST: GNC 801 shows sprinkler heads to be demo'd, However no new sprinkler heads in their place, please confirm.

Sprinklers will be added in the Addendum.

61 Div. 21 Fire Protection: Is the "X" symbol for relocation, rather than demo'd. Will this project require all new sprinkler heads? Please confirm

“X” indicates demo. Legend has been updated in the Addendum.

Page 21: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 19 OF 20

62 FX102 ENLARGED FIRE SUPPRESSION PLAN – NORTHEAST: What do the symbols in the freezer 306/cooler 305 mean?

Legend has been updated in the Addendum.

63 FA102 ENLARGED FIRE ALARM PLAN -NORTHEAST- OPTION 3: What are Triangle inside of a circle "CO" mean? What is the scope of work for this symbol?

Legend has been updated in the Addendum.

Page 22: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

Amendment #3, Attachment #1

PAGE 20 OF 20

64 FA102 ENLARGED FIRE ALARM PLAN -NORTHEAST - OPTION 3: What is the specific difference between the symbol circled in blue and the symbol circled in green?

Legend has been updated in the Addendum.

END OF BID RFI RESPONSES

Page 23: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 1 OF 21

Amendment #3, Attachment #2 GENERAL 1. Sheet G-101 – Sheet Index, General Notes

1.1. Abbreviation Legend • Corrected notation for FLIC.

1.2. Sheet Index • Removed sheets FXS-101, FXS-102 and FXS-103 from sheet listing.

2. Sheet G-103 – Life Safety Plan 2.1. Detail 1 – Life Safety Plan

• Revised travel path at Room 1013 MPA 1. 3. Sheet G-104 – General Information

3.1. Builder Staging Map • Revised area for clarification.

3.2. Base Map • Revised map image for clarification.

4. Sheet G-105 – Construction Phasing Plan 4.1. Revised all drawings and notes on sheet in its entirety.

CIVIL 5. Sheet CS101 – Overall Site Plan

5.1. Detail 1 – Overall Site Plan • Revised plans at grease interceptor, front entry, and cooler-freezer complex

6. Sheet CS301 – Site Sections

6.1. Detail 1 – Section • Revised section

7. Sheet CS401 – Enlarged Site Plans 7.1. Detail 1 – Enlarged Site Plan

• Revised plans at cooler-freezer complex 7.2. Detail 2 – Enlarged Site Plan

• Revised plans at building addition 7.3. Detail 3 – Enlarged Site Plan

• Revised plans at grease interceptor 8. Sheet CS402 – Enlarged Site Plan Bid Option 11 and 12

8.1. Detail 1 – Bid Option 11 and 12 Enlarged Site Plan • Revised note on accessible route • Revised limits at sidewalk • Revised front entry sidewalk

9. Sheet CS501 – Site Details 9.1. Detail 10 – Bollard Detail

• Added Bollard Detail 10. Sheet CD101 – Overall Site Demolition Plan

10.1. Detail 1 – Overall Site Demolition Plan • Revised plans at grease interceptor and cooler-freezer complex

11. Sheet CD301 – Site Demolition Sections

Page 24: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 2 OF 21

11.1. Detail 1 – Demolition Section • Revised demolition section

12. Sheet CD401 – Enlarged Site Demolition Plans 12.1. Detail 1 – Enlarged Site Demolition Plan

• Revised plans at cooler-freezer complex 12.2. Detail 2 – Enlarged Site Demolition Plan

• Revised plans at building addition 12.3. Detail 3 – Enlarged Site Demolition Plan

• Revised plans at grease interceptor 13. Sheet CD402 – Enlarged Site Demolition Plan Bid Option 11 and 12

13.1. Detail 1 – Bid Option 11 and 12 Enlarged Site Demolition Plan • Revised note on accessible route • Revised limits at sidewalk

ARCHITECTURAL 14. Sheet AD111 – Demo Area Plan - PXTRA

14.1. Detail 1 – Demo Area Plan – PXTRA • Revised plans and notes for scope adjustment and clarification.

14.2. Demolition Keynotes • Added Keynotes 54, 55 57, and 58. • Revised note 51

15. Sheet AD112 – Demo Area Plan – Food Court / Mall

15.1. Detail 1 – Demo Area Plan – Food Court / Mall • Revised Subway plan for extents of work. • Added demo keynote for exterior door. • Added ACM references to ACM report. • Revised Starbucks plan for extents of work. • Added note for removal of signs

15.2. Demolition Keynotes • Added Keynotes 54, 55 57, and 58. • Revised note 51

16. Sheet AD-113 – Demo Area Plan – Exchange 16.1. Detail 1 – Enlarged Exchange Demo Plan

• Revised notes at EAS pedestals. • Revised Merchandise General Note. • Added wall removal demolition extents at Sales Area 129. • Added wall removal demolition extents at Mechanical 2 124.

16.2. Demolition Keynotes • Added Keynotes 54, 55 57, and 58. • Revised note 51

16.3. Demo General Notes • Added note section in entirety.

17. Sheet AD121 – Demo RCP - PXTRA

Page 25: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 3 OF 21

17.1. Detail 1 – Demo RCP - PXTRA • Revised ceiling areas to reflect AAFES requested changes. • Added ACM references to ACM report.

17.2. Demolition Keynotes • Added keynote 14.

18. Sheet AD122 – Demo RCP - Food Court / Mall 18.1. Detail 1 – Demo RCP - Food Court / Mall

• Revised ceiling areas to reflect Subway changes. • Added electrical transformer platform demolition plan.

18.2. Demolition Keynotes • Added keynotes 12, 13, and 14.

19. Sheet AD123 – Demo RCP - Exchange 19.1. Detail 1 – Demo RCP - Exchange

• Adjusted ceiling tile and grid in 2 locations 19.2. Demolition Keynotes

• Added keynotes 12, 13, and 14. 20. Sheet AD201 – Demo Elevations

20.1. Detail 5 – Demo Elevation 4 • Removed signage note.

21. Sheet A-101 – Overall Floor Plan

21.1. Detail 1 – Overall Floor Plan • Revised exterior of secondary entrance. • Revised gun vault and PXTRA floor plan. • Revised extents of Subway plan. • Revised exterior of main entrance. • Revised cooler/freezer plan.

21.2. General Notes • Revised/combined General Notes Legend 12 through 18.

22. Sheet A-111 – Enlarged PX Plan 22.1. Detail 1 – Enlarged PX Floor Plan

• Revised area at PXTRA sales floor. • Revised notes at EAS pedestals. • Revised note at new registers. • Added note at center of sales floor.

22.2. General Notes • Revised General Notes 11 through 18.

23. Sheet A-112 – Enlarged Food Court / Mall Plan 23.1. Detail 1 – Enlarged Food Court / Mall Plan

• Revised exterior of secondary entrance. • Revised extents of Subway plan. • Revised exterior of main entrance.

Page 26: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 4 OF 21

• Revised cooler/freezer plan. • Revised references for Qdoba. • Added dimensions at Room 202. • Added concrete infill note.

23.2. General Notes • Revised/combined General Notes Legend 11 through 18.

24. Sheet A-113 – Enlarged Exchange Plan 24.1. Detail 1 – Enlarged Exchange Floor Plan

• Revised area near Exchange entry. • Added wall tag and dimension at Bank Tenant. • Added wall tag at Office 3 103.

24.2. General Notes • Revised/combined General Notes Legend 11 through 18.

25. Sheet A-121 – Reflected Ceiling Plan - PX 25.1. Detail 1 – Reflected Ceiling Plan - PX

• Revised ceiling plan at MPA 1 area. 25.2. Reflected Ceiling Plan Legend

• Added symbols to legend. 26. Sheet A-122 – Reflected Ceiling Plan – Food Court / Mall

26.1. Detail 1 – Reflected Ceiling Plan – Food Court / Mall • Revised ceiling at Qdoba. • Revised ceiling at Subway. • Revised plan at cooler box. • Revised secondary entrance.

26.2. Reflected Ceiling Plan Legend • Added symbols to legend.

27. Sheet A-123 – Reflected Ceiling Plan - Exchange 27.1. Detail 1 – Reflected Ceiling Plan – Exchange

• Added ACT install notes. • Added bulkhead fabrication notes.

27.2. Reflected Ceiling Plan Legend • Added symbols to legend.

28. Sheet A-130 – Roof Plan 28.1. Detail 1 – Roof Plan

• Revised roof at secondary entrance. • Revised roof at main entrance. • Added references to exhaust hoods and MAUs.

29. Sheet A-201 – Exterior Elevations 29.1. Detail 1 – East Elevation

• Revised main entrance and added Starbucks signage.

Page 27: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 5 OF 21

29.2. Detail 3 – North Elevation • Revised main and secondary entrances.

29.3. Detail 5 – Northeast Elevation • Revised main and secondary entrances.

30. Sheet A-202 – Exterior Elevations 30.1. Detail 1 – Enlarged Entry Elevation

• Revised elevation. 30.2. Detail 2 – Wall Section

• Revised wall section. 30.3. Detail 3 – Wall Section

• Added entire detail. 30.4. Detail 4 – Enlarged Entry Plan

• Added Plan. 30.5. Detail 5 – Sign Detail

• Detail is unchanged, was previously indicated as Detail 3. 30.6. Detail 6 – Sign Detail

• Detail is unchanged, was previously indicated as Detail 4. 31. Sheet A-203 – Exterior Elevations

31.1. Details 1,2 and 3 – Enlarged Entry Elevations • Added sheet in its entirety to drawing set.

32. Sheet A-301 – Wall Sections

32.1. Detail 5 – NOT USED • Relocated detail to sheet A-202.

32.2. Detail 12 – NOT USED • Removed detail.

33. Sheet A-302 – Wall Sections 33.1. Detail 1 – Secondary Entrance Section Detail

• Revised detail. 33.2. Detail 2 – NOT USED

• Relocated detail to sheet A-202. 34. Sheet A-400 – Enlarged Restroom Plans

34.1. Detail 1 – Enlarged Mall Restroom Plan • Revised door tags.

34.2. Detail 1 – Restroom Equipment • Revised notes 10 and 11.

35. Sheet A-401 – Enlarged Restroom Plans 35.1. Detail 1 – Restroom Equipment

• Revised notes 10 and 11. 36. Sheet A-402 – Enlarged Restroom Plans

36.1. Detail 1 – Restroom Equipment • Revised notes 10 and 11.

37. Sheet A-403 – Enlarged Plans

Page 28: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 6 OF 21

37.1. Detail 1 – Enlarged New Drink Station Plan • Revised entire plan.

37.2. Detail 2 – NOT USED • Combined detail with Detail 1 – Enlarged New Drink Station Plan.

37.3. Detail 3 – Enlarged Relocated Drink Station Plan • Revised entire plan.

37.4. Detail 4 – Enlarged TV Showcase Plan • Revised plan.

37.5. Detail 5 – Enlarged Qdoba Plan • Revised entrance.

37.6. Detail 7 – Enlarged Customer Service Plan • Revised plan.

37.7. Detail 9 – Drink Counter Section • Relocated from Sheet A-800.

37.8. Drink Station Equipment Schedule • Revised schedule.

38. Sheet A-501 – Details

38.1. Details 1 and 2 NOT USED • Removed details.

38.2. Detail 13 – Suspended Signage • Revised installation height.

38.3. Detail 16 NOT USED • Removed Detail.

39. Sheet A-502 – Details 39.1. Detail 1 NOT USED

• Removed detail. 39.2. Detail 2 Mall Corner at Optical

• Revised note for outside corner guard 40. Sheet A-601 – Door Schedule, Door and Frame Elevations

40.1. Door and Frame Schedule • Added doors 202A, 205A, 303, 1005A, 1005B and 1007A to schedule. • Revised door 1037. • Changed 206B to 701A • Changed 206C to 702A • Revised door thicknesses as noted.

41. Sheet A-602 – Finish Schedules and Details 41.1. Detail 2 – NOT USED

• Removed Detail.

Page 29: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 7 OF 21

42. Sheet A-701 – Finish Plan - PX 42.1. Detail 1 – Finish Plan - PX

• Revised plan at PXTRA and Gun Vault. 43. Sheet A-702 – Finish Plan – Food Court / Mall

43.1. Detail 1 – Finish Plan - Food Court / Mall • Revised Subway and Cooler Box plans.

44. Sheet A-703 – Finish Plan - Exchange 44.1. Detail 1 – Finish Plan - Exchange

• Revised plan at TV wall. 45. Sheet A-704 – Floor Finish Plan – PX

45.1. Detail 1 – Floor Finish Plan – PX • Revised plan at PXTRA and Gun Vault.

46. Sheet A-705 – Floor Finish Plan – Food Court / Mall 46.1. Detail 1 – Floor Finish Plan – Food Court / Mall

• Revised floor finish at Subway and Cooler/Freezer Box. 47. Sheet A-800 – Interior Elevations

47.1. Detail 2 – Food Court Interior Elevation • Revised elevation at Subway.

47.2. Detail 5 – Mall Interior Elevation • Revised elevation at Subway.

47.3. Detail 7 – NOT USED • Relocated detail to sheet A-403.

48. Sheet A-801 – Interior Elevations 48.1. Detail 1 – Exchange Interior Elevation

• Revised elevation. 48.2. Detail 3 – Exchange Interior Elevation

• Revised elevation. 48.3. Detail 6 – Exchange Interior Elevation

• Revised elevation. 49. Sheet A-802 – Interior Elevations

49.1. Detail 2 – PX Interior Elevation 2 • Revised note at EAS pedestals.

49.2. Detail 4 – PX Interior Elevation 4 • Revised elevation.

50. Sheet A-803 – Entry Portal Details 50.1. Detail 3 – Optical Portal

• Revised dimension. 50.2. Detail 6 – Entrance Portal Base

• Revised note at base. 51. Sheet K-101 – Qdoba Equipment/Finish Plan

• Revised sheet in its entirety. 52. Sheet K-102 – Finish Schedule

• Revised sheet in its entirety. 53. Sheet K-103 – Qdoba Equipment/Finish Plan

Page 30: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 8 OF 21

• Revised sheet in its entirety. 54. Sheet K-104 – Details

• Revised sheet in its entirety. STRUCTURAL 55. Sheet S-001 – General Notes And Typical Details

55.1. Detail 3 – Equipment Housekeeping Pad • Revised slab thickness and reinforcing spacing.

56. Sheet S-101 – Keyplan 56.1. Detail 1 – Keyplan

• Edited callouts for enlarged plans to encompass new scope of work. 57. Sheet S-111 – Enlarged Plans

57.1. Detail 2 – Enlarged Plan at MPA 1 • Plan expanded.

57.2. Detail 3 – Freezer/Cooler Plan • Revised freezer/cooler footprint. • Added Housekeeping Pad at new CO2/Waste Oil Tanks

57.3. Detail 4 – Enlarged Plan at Mechanical 2 – Option 1 • Revised door opening width.

58. Sheet S-112 – Enlarged Plans

58.1. Detail 2 – Vestibule 201 – Roof Framing Plan Eyebrow Canopy 2 – Option 10 • Revised canopy.

58.2. Detail 3 –Vestibule 209- Roof Framing Plan Eyebrow Canopy 1 • Moved plans to sheet S-114 due to space constraints on sheet.

58.3. Detail 4 –Vestibule 203 – Foundation Plan Eyebrow Canopy • Moved plans to sheet S-114 due to space constraints on sheet.

59. Sheet S-113 Enlarged Plans 59.1. Detail 1 – Enlarged Framing Plan at Mechanical 1 – Option 1

• Plan revised for revised mechanical equipment. 59.2. Detail 2 – Enlarged Framing Plan South – 1

• New plan for revised mechanical equipment 59.3. Detail 3 – Mall 1 -208 Enlarged Plan

• Plan moved due to space constraints on sheet • Added Grid to aid locating enlarged plan in field

59.4. Detail 4 – Enlarged Framing Plan South – 2 • New plan for revised mechanical equipment

60. Sheet S-114 Enlarged Plans 60.1. Added entire Sheet

61. Sheet S-201 Elevations 6.1 Detail 1 – New Opening At Mechanical 1-307

• Revised opening dimension to coordinate with mechanical

Page 31: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 9 OF 21

61.2. Detail 2 – New Openings at PXtra Sales Floor 1001 • Revised elevation to coordinate with revised opening locations

61.3. Detail 3 – New Entry Frame at Vestibule 209 • Detail moved to S-502 due to space constraints on the sheet

62. Sheet S-501 Details 62.1. Detail 4 – New Openings in Existing CMU Wall

• Revised opening for mechanical louver 62.2. Detail 13 – Beam Framing Section

• Added sheathing to detail for clarity 62.3. Detail 14 – Permitted Coring Through Existing Grade Beam

• New detail 63. Sheet S-502 Details

63.1. Detail 1 – Canopy at Vestibule 209 • Detail revised for revised canopy

63.2. Detail 2 – New Entry Frame at Vestibule 209 • Expanded detail to cover new scope of work

63.3. Detail 3 – Typical Joist Reinforcement Detail • New detail

63.4. Detail 4 – Eyebrow Canopy Attachment to Building • Detail revised for revised canopy

64. Sheet S-503 Details

64.1. Detail 2 – Framing Detail at MPA2 • Added note for self-leveling topping

64.2. Detail 5 – New Opening in Existing Masonry Wall • Revised opening size and reinforcing for revised mechanical louver

64.3. Detail 7 – Detail at Interior Storefront • Relocated detail from S-502 due to sheet constraints

64.4. Detail 8 – Framing at Interior Storefront • Relocated detail from S-502 due to sheet constraints

FIRE PROTECTION 65. Sheet FA001 Fire Alarm Notes and Details

65.1. Fire Alarm Matrix • Revised for Carbon Monoxide Detectors

65.2. Fire Alarm Symbols • Added LOC

66. Sheet FA101 Enlarged Fire Alarm Plan-Northwest- Option 3 66.1. Detail 1 - Enlarged Fire Alarm Plan-Northwest- Option 3

• Revised for new architectural plan 66.2. Fire Alarm Symbols

• Added carbon monoxide detector • Added LOC

Page 32: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 10 OF 21

• Added TEXT sign 67. Sheet FA102 Enlarged Fire Alarm Plan-Northeast- Option 3

67.1. Detail 1 - Enlarged Fire Alarm Plan-Northeast- Option 3 • Revised for new architectural plan

67.2. Fire Alarm Symbols • Added carbon monoxide detector • Added LOC • Added TEXT sign

68. Sheet FA103 Enlarged Fire Alarm Plan-South- Option 3 68.1. Fire Alarm Symbols

• Added carbon monoxide detector • Added LOC • Added TEXT sign

69. Sheet FA104 Enlarged Fire Alarm Plan-Northwest- Option 7 69.1. Detail 1 - Enlarged Fire Alarm Plan-Northwest- Option 7

• Revised for new architectural plan • Added TEXT signs • Added LOC

69.2. Fire Alarm Symbols • Added carbon monoxide detector • Added LOC • Added TEXT sign

70. Sheet FA105 Enlarged Fire Alarm Plan-Northeast- Option 7 70.1. Fire Alarm Symbols

• Added carbon monoxide detector • Added LOC • Added TEXT sign

70.2. Detail 1- Enlarged Fire Alarm Plan- Northeast- Option 7 • Revised for new architectural plan • Added TEXT signs • Added LOC

71. Sheet FA106 Enlarged Fire Alarm Plan-South- Option 7 71.1. Fire Alarm Symbols

• Added carbon monoxide detector • Added LOC • Added TEXT sign

71.2. Detail 1- Enlarged Fire Alarm Plan- South- Option 7 • Revised for new architectural plan • Added TEXT signs • Added LOC

72. Sheet FX101 Sheet Enlarged Fire Suppression Plan-Northwest 72.1. Detail 1 - Enlarged Fire Suppression Plan-Northwest

• Revised for new architectural plan

Page 33: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 11 OF 21

72.2. Legend • Revised sprinkler head counts

73. Sheet FX102 Enlarged Fire Suppression Plan-Northeast 73.1. Detail 1 - Enlarged Fire Suppression Plan-Northeast

• Revised for new architectural plan PLUMBING 74. Sheet P-001 Notes, Legends, and Abbreviations

74.1. Plumbing Abbreviations • Added to abbreviations.

74.2. Kitchen Plumbing General Notes • Modified notes.

75. Sheet PD101 Plumbing DWV Demolition Plan - Northwest 75.1. Detail 1 - Plumbing DWV Demolition Plan - Northwest

• Modified Demolition Plan for clarity and to reflect existing conditions. 75.2. Plan Notes

• Revised plan notes. 75.3. Keynotes

• Revised keynotes. 76. Sheet PD102 Plumbing DWV Demolition Plan - Northeast

76.1. Detail 1 - Plumbing DWV Demolition Plan - Northeast • Modified Demolition Plan for clarity. • Added room names. • Removed existing sink from Subway (905).

76.2. Plan Notes • Modified plan notes.

76.3. Keynotes • Modified keynotes.

77. Sheet PD103 Plumbing DWV Demolition Plan - South 77.1. Detail 1 - Plumbing DWV Demolition Plan - South

• Modified Demolition Plan for clarity. 78. Sheet PD111 Plumbing WAG Demolition Plan - Northwest

78.1. Detail 1 - Plumbing WAG Demolition Plan - Northwest • Modified Demolition Plan for clarity and to add existing pipe sizes.

79. Sheet PD112 Plumbing WAG Demolition Plan - Northeast 79.1. Detail 1 - Plumbing WAG Demolition Plan - Northeast

• Modified Demolition Plan for clarity and to add existing pipe sizes. • Removed existing sink from Subway (905).

79.2. Keynotes • Modified keynotes.

Page 34: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 12 OF 21

80. Sheet PD113 Plumbing WAG Demolition Plan - South 80.1. Detail 1 - Plumbing WAG Demolition Plan - South

• Modified Demolition Plan for clarity and to add existing pipe sizes. • Removed domestic water line from Server (122).

81. Sheet P-101 Plumbing DWV Plan - Northwest 81.1. Detail 1 - Plumbing DWV Plan - Northwest

• Modified Plan for clarity and to reflect existing conditions. 81.2. Plan Notes

• Modified plan notes. 82. Sheet P-102 Plumbing DWV Plan - Northeast

82.1. Detail 1 - Plumbing DWV Plan - Northeast • Modified the DWV Plan for clarity. • Modified the sanitary sewer in the area around GI-1. • Modified GI-1’s footprint. • Added condensate lines for the walk-in condensing units and MS-2. • Added sanitary sewer and grease waste lines for future Starbucks. • Modified DWV for floor plan update.

82.2. Plan Notes • Modified plan notes.

82.3. Keynotes • Modified keynotes.

83. Sheet P-103 Plumbing DWV Plan - South

83.1. Plan Notes • Modified plan notes for clarity.

84. Sheet P-111 Plumbing WAG Plan - Northwest 84.1. Detail 1 - Plumbing WAG Plan - Northwest

• Modified WAG Plan for clarity and to add existing pipe sizes. • Modified WAG Plan for floor plan update.

84.2. Plan Notes • Modified plan notes.

84.3. Keynotes • Modified keynotes.

85. Sheet P-112 Plumbing WAG Plan - Northeast 85.1. Detail 1 - Plumbing WAG Plan - Northeast

• Modified WAG Plan for clarity and to add existing pipe sizes. • Added soda line sleeve. • Showed walk-in condensing units for consistency. • Added domestic water lines for future Starbucks. • Modified WAG Plan for floor plan update.

85.2. Plan Notes • Modified plan notes.

85.3. Keynotes

Page 35: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 13 OF 21

• Modified keynotes. 86. Sheet P-113 Plumbing WAG Plan - South

86.1. Detail 1 - Plumbing WAG Plan - South • Modified WAG Plan for clarity. • Rerouted domestic water line to avoid Server (122).

86.2. Plan Notes • Modified plan notes.

87. Sheet P-401 Enlarged Plumbing DWV Plans 87.1. Detail 1 - Enlarged DWV Plan – Northeast Tenant Area

• Modified DWV Plan for clarity. • Added condensate line for the walk-in condensing unit.

87.2. Detail 2 - Enlarged DWV Plan – South Food Tenant Area • Modified DWV Plan for clarity. • Modified venting system to separate grease vent from sanitary vent. • Relocated southwest floor sink.

87.3. Detail 3 – Enlarged Restroom DWV Plan • Modified DWV Plan for clarity.

87.4. General Kitchen Notes • Modified general kitchen notes.

87.5. Plan Notes • Modified plan notes.

87.6. Keynotes • Modified keynotes.

88. Sheet P-411 Enlarged Plumbing WAG Plans 88.1. Detail 1 – Enlarged WAG Plan – Northeast

• Modified WAG Plan for clarity and to add existing pipe sizes. 88.2. Detail 2 – Enlarged WAG Plan – South Food Tenant Area

• Modified WAG Plan for clarity and to add existing pipe sizes. • Removed existing sink from Subway (905).

88.3. Detail 3 – Enlarged Restroom WAG Plan • Modified WAG Plan for clarity.

88.4. Plan Notes • Modified plan notes.

88.5. Keynotes • Modified keynotes. • Added keynote to address painting of natural gas piping.

89. Sheet P-501 Plumbing Details 89.1. Modified detail 10. 89.2. Modified detail 15.

90. Sheet P-502 Plumbing Details 90.1. Modified detail 3. 90.2. Added detail 6.

91. Sheet P-601 Plumbing Schedules 91.1. Natural Gas Summary Schedule – North Wing New Line

Page 36: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 14 OF 21

• Modified schedule. 91.2. Pump Schedule

• Modified schedule. 91.3. Plumbing Fixture Schedule

• Modified schedule. 91.4. Hydromechanical Grease Interceptor Sizing Calculation

• Added calculation. 91.5. Gas Water Heater Schedule

• Modified schedule. 92. Specification 23 11 23

92.1. Added Section 3.9 Painting. MECHANICAL 93. Sheet M-001 Notes, Legends, and Abbreviations

93.1. HVAC Abbreviations • Added to abbreviations

94. Sheet MD101 Mechanical Demolition Plan - Northwest 94.1. Detail 1 – Mechanical Demolition Plan – Northwest

• Modified Demolition Plan for clarity and added basis of design note. 94.2. Plan Notes

• Modified plan notes. 95. Sheet MD102 Mechanical Demolition Plan - Northeast

95.1. Detail 1 - Mechanical Demolition Plan - Northeast • Modified Demolition Plan for clarity and to reflect existing conditions. Added basis of design note.

95.2. Plan Notes • Modified plan notes.

95.3. Keynotes • Modified keynotes.

96. Sheet MD103 Mechanical Demolition Plan - South 96.1. Detail 1 - Mechanical Demolition Plan - South

• Modified Demolition Plan for clarity and added basis of design note. 96.2. Keynotes

• Modified keynotes. 97. Sheet MD401 Mechanical Demolition Plans - Enlarged

97.1. Detail 1 – Enlarged Mechanical Demolition Plan – Northeast • Modified Demolition Plan for clarity.

97.2. Detail 2 – Enlarged Mechanical Demolition Plan – South • Modified Demolition Plan for clarity.

97.3. Keynotes • Modified keynotes.

97.4. Basis of Design Note • Added basis of design note.

Page 37: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 15 OF 21

98. Sheet M-101 Mechanical HVAC Plan - Northwest 98.1. Detail 1 - Mechanical HVAC Plan - Northwest

• Modified HVAC Plan for clarity and added missing duct sizes. • Revised layout for the Gun Vault and surrounding areas to reflect architectural change.

98.2. VAV Runout Schedule • Added VAV runout schedule.

98.3. Plan Notes • Modified plan notes.

98.4. Keynotes • Modified keynotes.

99. Sheet M-102 Mechanical HVAC Plan - Northeast 99.1. Detail 1 - Mechanical HVAC Plan - Northeast

• Modified HVAC Plan for clarity and to show existing conditions. • Modified ductwork layout and sizes in Mall and Food Court areas. • Added and modified mechanical systems for future Starbucks. • Showed walk-in condensing units for consistency. • Revised and added tags in the vestibule.

99.2. VAV Runout Schedules • Added VAV runout schedule.

99.3. Plan Notes • Modified plan notes.

99.4. Keynotes • Modified keynotes.

100. Sheet M-103 Mechanical HVAC Plan - South 100.1. Detail 1 - Mechanical HVAC Plan - South

• Modified HVAC Plan for clarity. 100.2. Plan Notes

• Modified notes. 100.3. Keynotes

• Modified keynotes. 100.4. VAV Runout Schedule

• Added VAV runout schedule. 101. Sheet M-104 Roof Plan - Northeast

101.1. Detail 1 - Roof Plan - Northeast • Modified Roof Plan for clarity. • Modified the plan size of IH-4.

101.2. Boxed Note • Added boxed note.

101.3. Keynotes • Modified keynotes.

102. Sheet M-105 Roof Plan – South 102.1. Detail 1 - Roof Plan - South

• Modified Roof Plan for clarity. 102.2. Boxed Note

Page 38: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 16 OF 21

• Added boxed note 102.3. Keynotes

• Modified keynotes. 103. Sheet M-111 Mechanical Piping Plan - Northwest

103.1. Detail 1 - Mechanical Piping Plan - Northwest • Modified Piping Plan for clarity. • Modified pipe sizes.

103.2. Keynotes • Modified keynotes.

103.3. VAV Runout Schedule • Added VAV runout schedule.

104. Sheet M-112 Mechanical Piping Plan - Northeast 104.1. Detail 1 - Mechanical Piping Plan - Northeast

• Modified Piping plan for clarity and to show existing conditions. • Added FCU-4.19 and MS-3 for future Starbucks. • Added refrigerant lines for walk-in condensing units. • Modified pipe layout and sizes.

104.2. Keynotes • Modified keynotes.

104.3. VAV Runout Schedule • Added VAV Runout Schedule.

105. Sheet M-113 Mechanical Piping Plan - South

105.1. Detail 1 - Mechanical Piping Plan - South • Modified Piping Plan for clarity. • Modified pipe sizes.

105.2. VAV Runout Schedule • Modified VAV Runout Schedule.

106. Sheet M-301 Mechanical Room Sections 106.1. Added Sheet

107. Sheet M-302 Mechanical Room Sections 107.1. Added Sheet

108. Sheet M-401 Enlarged Mechanical Plans 108.1. Detail 1 - Enlarged Mechanical HVAC Plan - Northeast

• Modified HVAC Plan for clarity. • Modified mechanical room mechanical layout. • Modified Qdoba mechanical layout.

108.2. Detail 2 - Enlarged Mechanical Piping Plan - Northeast • Modified Piping Plan for clarity. • Modified mechanical room mechanical layout.

108.3. Plan Notes • Modified notes.

108.4. Keynotes

Page 39: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 17 OF 21

• Modified keynotes. 109. Sheet M-402 Enlarged Mechanical Plans

109.1. Detail 1 - Enlarged Mechanical HVAC Plan - South • Modified HVAC Plan for clarity. • Modified mechanical room mechanical layout.

109.2. Detail 2 - Enlarged Mechanical Room Piping Plan - South • Modified Piping Plan for clarity. • Modified mechanical room mechanical layout.

109.3. Plan Notes • Modified notes.

109.4. Keynotes • Modified keynotes.

110. Sheet M-501 Mechanical Details 110.1. Modified details 7, 14, 18, and 19.

111. Sheet M-502 Mechanical Details 111.1. Modified details 1, 2, 7, 10, and 11.

112. Sheet M-503 Mechanical Details 112.1. Removed sheet.

113. Sheet M-601 Mechanical Schedules

113.1. Fan Coil Unit Schedule • Modified schedule.

113.2. Air Cooled Chiller Schedule • Modified schedule.

113.3. Pump Schedule • Modified schedule.

113.4. Air Separator Schedule • Modified schedule.

113.5. Kitchen Fan Schedule • Removed schedule.

113.6. Relief/Intake Hood Schedule • Removed schedule.

113.7. Air Device Schedule • Removed schedule.

113.8. Mechanical Systems Organization • Added schedule.

114. Sheet M-602 Mechanical Schedules 114.1. VAV Unit Schedule

• Modified schedule. 114.2. Exhaust Fan Schedule

Page 40: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 18 OF 21

• Modified schedule. 114.3. Air Handling Unit Schedule

• Modified schedule. 114.4. Louver Schedule

• Modified schedule. 114.5. Building Air Balance/Ventilation Data

• Modified schedule. 114.6. Air Device Schedule

• Modified schedule. 114.7. Kitchen Fan Schedule

• Added schedule. 114.8. Relief/Intake Hood Schedule

• Added schedule. 115. Sheet M-701 Controls

115.1. Modified all details. 116. Sheet M-702 Controls

116.1. Modified all details. 117. Sheet M-703 Controls

117.1. Added Sheet. ELECTRICAL 118. Sheet E-001 Notes, Legends, and Abbreviations

118.1. Electrical Symbols Legend • Added symbols for VFD and starter/disconnect

119. Sheet ED101 – Partial Lighting Demolition Plan - Northwest 119.1. Detail 1 – Partial Lighting Demolition Plan - Northwest

• Revised lighting demolition at gun vault area to accommodate revised floor plan 120. Sheet E-101 – Partial Lighting Plan - Northwest

120.1. Detail 1 – Partial Lighting Plan - Northwest • Revised lighting at gun vault and MPA areas to accommodate revised floor plan

121. Sheet E-101A – Partial Lighting Plan – Northwest – Option 8 121.1. Detail 1 – Partial Lighting Plan – Northwest – Option 8

• Revised lighting at gun vault area to accommodate revised floor plan 122. Sheet E-102 – Partial Lighting Plan - Northeast

122.1. Keynotes • Added keynote 9

122.2. Detail 1 – Partial Lighting Plan - Northeast • Revised lighting at main and side entries to accommodate revised floor plan • Revised lighting at QDoba • Revised location of mall light switches • Added lighting for Starbucks

Page 41: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 19 OF 21

• Added circuit for exterior Starbucks sign 122.3. Detail 1 – Partial Lighting Plan - Northeast

• Added can light at drink station 123. Sheet E-111 – Partial Power Plan – Northwest

123.1. Keynotes • Added keynote 11 • Added circuit for IDF

123.2. Detail 1 – Partial Power Plan - Northwest • Revised power and data at gun vault and MPA areas to accommodate revised floor plan

124. Sheet E-112 – Partial Power Plan - Northeast 124.1. Detail 1 – Partial Power Plan - Northeast

• Added power for new walk-in cooler • Added callout for enlarged Starbucks plan

125. Sheet E-113 – Partial Power Plan - South 125.1. Detail 1 – Partial Power Plan - South

• Revised power at TV area to accommodate revised floor plan • Revised power at south wall to accommodate revised floor plan • Added circuit for IDF

126. Sheet E-401 – Enlarged Plans

126.1. Keynotes • Added keynotes 12 and 13

126.2. Detail 1 – Enlarged Power Plan – QDoba, North Power/Mech Plan • Revised power and equipment ID’s to accommodate revised mechanical equipment • Added power and data for QDoba menu boards • Added transformer for Starbucks

126.3. Detail 2 – Enlarged South Power/Mechanical Plan • Revised power and equipment ID’s to accommodate revised mechanical equipment

126.4. Detail 3 – Enlarged Power Plan – Starbucks • Added enlarged power plan

127. Sheet E-501 – One-Line Diagram 127.1. Keynotes

• Added keynote 11 127.2. Detail 1 – One-Line Diagram

• Added electric service for Starbucks • Added SPD at HPA and HPB

128. Sheet E-601 – Panelboard Schedules 128.1. Panel HPA

• Added circuit for SPD 128.2. Panel MA1

Page 42: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 20 OF 21

• Revised circuits to accommodate revised mechanical equipment 128.3. Panel LA5

• Added circuits for new walk-in cooler 128.4. Panel LA7

• Revised circuits to accommodate TV area expansion • Revised circuits to accommodate Starbucks and SPD

129. Sheet E-602 – Panelboard Schedules 129.1. Panel MB

• Revised circuits to accommodate revised mechanical equipment 129.2. Panel LB1

• Revised circuits to accommodate revised mechanical equipment and Starbucks sign 130. Sheet E-603 – Panelboard Schedules

130.1. Panel LB4 • Added circuit for menu boards

130.2. Panel LB11 • Revised circuits to accommodate revised floor plan

130.3. Panel SB • Added panel for Starbucks

SPECIFICATIONS 1. Section 00 00 02 – Table of Contents (re-issue in its entirety)

• Removed Section 01 22 00 – Unit Prices • Added Section 28 16 00 – Intrusion Detection (Advantor 5.0) • Updated Appendices

2. Section 01 10 00 – Summary (re-issue in its entirety) • Revised description of work.

3. Section 01 22 00 – Unit Prices • Deleted section in its entirety.

4. Section 01 32 00 – Construction Progress Documentation (re-issue in its entirety) • Added digital photographic documentation.

5. Section 01 35 43 – Environmental Protection (re-issue in its entirety) • Revise 3.2.A to read: “Refer to Specifications Appendix A for Asbestos Containing Material (ACM) Testing

Report and for all associated ACM abatement procedures, forms, and requirements.” 6. Section 03 35 36 – Existing Polished Concrete Floor Finish

• Replaced section in its entirety. 7. Section 03 35 40 – Interior Concrete Slab Repairs and Joint Filler Replacement

• Replaced section in its entirety. 8. Section 08 33 26 – Overhead Coiling Grilles

• Added section in its entirety.

Page 43: 401 - Army and Air Force Exchange Service Rucker Image... · 2020. 3. 17. · 401. Amendment #3, Attachment #1 PAGE 1 OF 20 No. Comment Response 1 Will Spec Section 011420 const phasing

PAGE 21 OF 21

9. Section 08 71 00 – Door Hardware (re-issue in its entirety) • Added 202A, 205A, 701A, 702A, 801A, 903A, 1001C, 1005A, 1007A, and 1014A to schedule. • Revised 307B from 307A. • Removed 206A, 706A, and 913B.

10. Section 23 11 23 – Facility Natural-Gas Piping (re-issue in its entirety) • Revised section to add 3.9 Painting.

11. Section 26 05 00 – Common Work Results for Electrical (re-issue in its entirety) • Delete 1.1.A.14 through 1.1.A.17

12. Section 28 16 00 – Intrusion Detection (Advantor 5.0) • Added section in its entirety.

13. Appendices – Re-issue in their entirety: • Appendix A – Asbestos Containing Materials, Test Report & Abatement Procedures

A1 19-PR001 Bldg 9214 Asbestos Assessment Survey 3-11-2019 REV 2 A2 ENV-AS002 Asbestos Abatement Procedures A3 Form 2736 Waste Shipment Record A4 USAACE Form 2738 Asbestos Abatement Compliance Checklist (1OCT2017) A5 Form 2739 Asbestos Abatement Work Plan A6 ADEM Form 300 Solid Waste Profile Sheet A7 ADEM Form 496 Notice of Demolition and/or Asbestos Removal A8 USAACE Form 2720 Debris Recovery Plan and Statement

• Appendix B – AAFES Site Readiness Form • Appendix C – ENV-SW010 Contractor Hazardous Waste Management

• Appendix D – ENV-SW011 Recycling Program • Appendix E – FLIC Scope of Work

E1 FLIC Log Book

END OF ADDENDUM NARRATIVE