4 th Exchange Programme Cluj Napoca, 19-22 October, 2005 REPUBLIC OF CROATIA Updates in the...
-
Upload
frank-lester -
Category
Documents
-
view
216 -
download
1
Transcript of 4 th Exchange Programme Cluj Napoca, 19-22 October, 2005 REPUBLIC OF CROATIA Updates in the...
4th Exchange ProgrammeCluj Napoca, 19-22 October, 2005
REPUBLIC OF CROATIAREPUBLIC OF CROATIA
Updates in the Transposition Updates in the Transposition and Implementation of IPPC and Implementation of IPPC
directivedirective
Update on the process for development Update on the process for development national IPPC legislationnational IPPC legislation
• April, 20th 2004 – EC Avis• June, 18th 2004 – Candidate Country
Decision on harmonisation of environmental legislation with Acquis Communitairre within EP, NPIEU 2004 and PEP 2004-2006.
MEPPPC has the keyrole with the support through the CARDS 2002 project “Strategy for EU Environmental Law Approximation” (started 2004).
• October, 3rd 2005 – start of negotiations• New Law on Environmental Protection - expected in 2006
and a series of implementing legislation• Methodology for transposition and implementation of
IPPC will be developed• Involved stakeholders are: competent line ministries,
Chamber of Commerce, industry sector, LRSG, NGOs and public
REPUBLIC OF CROATIA
Updates in the Transposition and Implementation of IPPC directive
Results achievedResults achieved
• An inter-ministerial working group headed by the MEPPPC with representatives of competent line ministries was established in 2004 (Ministry of Agriculture, Forestry and Water Management; Ministry of Health and Social Welfare; Ministry of Economy, Labor and Entrepreneurship; Ministry of Foreign Affairs and European Integrations)
• Section for implementation of IPPC within the MEPPPC was set up in 2005 (5 staff members)
• Working meetings with representatives of relevant inspection bodies and with representatives of Chamber of Commerce and industry sector were held in 2005
• Preliminary list of potential IPPC installations (cca 144) was drafted in 2005
REPUBLIC OF CROATIA
Updates in the Transposition and Implementation of IPPC directive
ActivitiesActivities
Implemented:• permanent education and training programmes for
environmental inspectors through BERCEN/ECENA, IMPEL, MAP, Courses for Sustainable Development ( since 2000)
Planned:• PHARE 2005 project “Enhanced environmental
inspection for enforcement of new environmental legislation” (2006- 2008)
• CARDS 2004 “Support for Further Approximation of Croatian Legislation with the Environmental Acquis ”
REPUBLIC OF CROATIA
Updates in the Transposition and Implementation of IPPC directive
Schedule for applying integrated permitSchedule for applying integrated permit
• The organisation scheme of system for applying integrated permit is in working process (CARDS 2002)
• The applying format for industry sector will be developed within the pilot permitting process (CARDS 2002)
REPUBLIC OF CROATIA
Updates in the Transposition and Implementation of IPPC directive
Pilot PermittingPilot Permitting
• Pilot project is contracted by the MEPPPC and the implementing agency will be the Croatian Cleaner Production Centre
• The pilot project will focus on 3 installations (e.g. cement industry, food industry)
• Scheduled for February 2006• Goal - to analyse the results and experience of the
process and to use them in further policy decision making
REPUBLIC OF CROATIA
Updates in the Transposition and Implementation of IPPC directive
Problems and ObstaclesProblems and Obstacles
• NDP is in working process • The assesement of expected costs for industry sector is
needed• The administrative system for IPPC permitting needs to
be defined• The administrative capacities for transposition and
implementation of integrated permit need to be enhanced
REPUBLIC OF CROATIA
Updates in the Transposition and Implementation of IPPC directive