3rd Working Group SWM Short for HP
Transcript of 3rd Working Group SWM Short for HP
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 1/18
Satoshi Higashinakagawa
JICA Study Team
Japan International Cooperation Agency (JICA)
1
3rd Thematic Technical Working Group
for Solid Waste in Infrastructure Sector
2th October, 2013
- Development Policy and Plan of Solid Waste Management-
D
r a f t W o
r k i n g G r
o u p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 2/18
D
2
Contents
Outline of the SWM Part of the Project
Review of Second Working Group and Identified Issues
Development Vision and Policy and Planning Strategy
Consideration of Technical Options
- Collection and Transportation
- Treatment and Disposal (with consideration of land useplan in Nairobi County)
Future Demand Projection of Solid Waste Amount
(according to this socio-economic framework in this Urban
M/P) Future Action Plan
D
r a f t W o
r k i n g G r
o u p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 3/18
3
Outline of the SWM Part of the Project
(Objectives and Expected Outputs)
Expected OutputsTo implement future projection of solid waste generation
To review the current solid waste management concept
and revise it if necessary.
To consider future land use plan for solid waste treatment
facility
To review the current implementation and management
program and revise it if necessary.
Objectives To review and develop the concepts for sustainable
urban development and improvement living condition
related to solid waste management
D
r a f t W o
r k i n g G r
o u p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 4/18
4
Study of Current
Condition Survey of
SWM
Estimate solid waste generation
Review of existing SWM
plans and projects
Consider land use plan for solid
waste treatment facility
Discuss the concept of current
M/P and future action plan
New socio-economicframework
Direction of urban
development and land
use plan
Outline of the SWM Part of the Project
(Study Flow)
D
r a f t W o
r k i n g G r
o u p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 5/18
5
Contents of Study Apr May Jun Jul Aug Sep Oct NovIdentify the current
condition and
issues of SWM
Future projection
of solid wasteReview of the
current SWM
policy and concept
Input the SWM
policy and concept
to Urban M/P
My assignment
Outline of the SWM Part in the Project
(Work Schedule)
D
r a f t W o
r k i n g G r
o u p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 6/18
6
Review of Second Working Group
Issues regarding solid waste management has
been identified
Technical options has been considered.
Preliminary future amount of solid waste has beenprojected.
• How to incorporate the solid waste management facilities in
the future land use plan• Necessary of technical options except final disposal
D
r a f t W o
r k i n g G r
o u p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 7/187
Waste scattering
Illegal dumping
No proper operation
of landfill site
No sanitary landfill
site
Difficult
transportation byaccess road
Lack of operationalcapacity
Not enough capacity
for supervising
private sector
No proper legal systemand enforcement for to
prevent illegal dumping
Establishment of
CBO collectionsystem
Not enough and
suitable collection
points
Set up legal forsystem to prevent
illegal dumping
Prepare sanitary
landfill site in
suitable location
Introduction of
institutional system
to supervise PSP
No enough human
resource for landfill
operation
So many private sector
for waste collection
service
Implementation of
training for landfill
operation
Prepare suitable
collection points
and equipment
Fact (problem) Cause Issue
Review of Identified Significant Issues
D
r a f t W o
r k i n g G r
o u p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 8/18
Development Policy and Vision
Vision
• “A healthy, safe, secure and sustainable solid waste
management system fit for a world-class city”
Mission
• To improve and protect the public health of Nairobi
residents and visitors
• To protect ecological health, diversity and productivity
• To maximize resource recovery through the participatory
approach
8
D
r a f t W o
r k i n g G r
o u p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 9/18
Planning Strategy
Institutional capacity
development
Improvement of SWM
operational capacity
Enhancement of PPPP in SWM
Public Awareness and
participation of CBOs andNGOs
Promotion of 3R (reduce, reuse,
recycle)
Collection and transportation plan
3R and Intermediate Treatment Plan
Final disposal plan
Organizational restructuring and
human resource development plan
Legal and institutional reform plan
Private sector involvement promotion
plan
Community participation promotion
plan
Financial management plan
9
D r a f t W o
r k i n g G r
o u p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 10/18
Consideration of Technical Options
(Collection and transportation)
Options Merit Demerit
Handcart -Easy to collect alongsmall road
-Cheap cost
- Not effective forcollection
Compactor
vehicle
-Easy to collect and
transport effectively
-Slightly expensive
Containervehicle
-Easy to collect-Effective collection
-Necessary formaintenance
Dump truck - Not so expensive - Slightly taking time for
collection
Options Merit DemeritHouse to
house
collection
-Easy to collect
-No incentive for waste
reduction
-Taking the time for
collection
Station
collection
-Effective collection Necessary to monitor
the collection point
Area of narrow
road
Area of high
income
Area of stationcollection
Other area
Apartment,
secondary
collection area
Individual house
10
D r a f t W o
r k i n g G r
o u p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 11/1811
Consideration of Technical Options
(Treatment and Disposal)
Options Merit Demerit
Landfill -Comparatively cheaperoption
-Technically feasible
-No waste reduction
3R+Landfill -Comparatively cheaper
option
-Technically feasible
-If no cooperation with waste
generator, not enough waste
reduction
3R+Incineration+
Landfill
-Effective volume reduction
of waste
-Expensive for initial cost and
O&M cost
3R+Composting+
Landfill
-Effective volume reduction
of organic waste
-Not expensive option
-Waste separation is
necessary and necessity of
market of compost
3R + landfill + (composting) D r
a f t W o r k i
n g G r o u
p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 12/18
12
After Improvement
- Reduction of odor
- Reduction of rodents and birds
- Prevent the leachate leakage
- Improvement of unloading andwaste spreading activities
- Improvement of waste picking
activities
Open dump site (e.g.
Dandora dump site)
Image of Sanitary Landfill
Site
Current issues
- Odor problem
- Rodents and birds
- Leakage of leachate to water
course- Bad condition of inner and
access roads
- Bad condition of unloading
place
Improvement
- Cover soil
- Liner system
and leachate
treatment facility-Improvement of
access and
inner roads
-Monitoring by
waste pickers
and landfillofficers
Improvement of Treatment and Disposal System
(Difference between dump site and sanitary landfil l site)
D r a f t W o
r k i n g G r
o u p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 13/18
13
Improvement of Treatment and Disposal System
(Example of effectiveness of cover soil)
Non operation area
is covered by soil
Operation area is
only part of landfill
site
Source :JICA Preparatory Survey (2012) D r a f t W o
r k i n g G r
o u p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 14/18
14
Current Land Use in Nairobi County
D r a f t W o
r k i n g G r
o u p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 15/18
15
Thika CountyKiambu County
Machakos County
Kajiado County
Nairobi County
Consideration of the Site for New Landfil l Site
JKTA airport
D r a f t W o
r k i n g G r
o u p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 16/18
16
Future Projection of Solid Waste Amount
(Waste Generation)
0
500
1000
1500
2000
2500
3000
3500
4000
4500
2005 2010 2015 2020 2025 2030 2035
G
aeWse d
ear
Household waste
Commercial waste
Market waste
Total amount of waste (JICA Urban
Plan Study)
Total amount of waste(JICA SWM
Study in 2010)
D r a f t W o
r k i n g G r
o u p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 17/18
17
Future Projection of Solid Waste Amount
3R activities 2015 2020 2025 2030
Waste reduction rate 5.0% 7.5% 10.0% 10.0%
Reduction rate by recyclable
waste recovery
6.3% 9.3% 10.8% 12.3%
Reduction rate by
biodegradable waste
recovery
3.3% 3.4% 3.4% 3.4%
Waste collection rate 2015 2020 2025 2030
Waste collection rate 48.8% 64.6% 83.6% 100%
Self-disposal 2015 2020 2025 2030Self-disposal rate 10% 10% 10% 10%
Source :JICA SWM M/P (2010) D r a f t W o
r k i n g G r
o u p M a t e
r i a l
8/13/2019 3rd Working Group SWM Short for HP
http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 18/18
18
Let’s Consider and Discussion
1. Where should we select the location of suitablenew landfil l site?
2. Consider the solution of current issues?
Asante Sana
D r a f t W o
r k i n g G r
o u p M a t e
r i a l