Satoshi Higashinakagawa JICA St udy Team Japan International Cooperation Agency (JICA) 1 3 r d  Thematic Technical Working Group for Sol i d W aste i n I nfr astruct ure Se ctor 2 th  October, 2013 - Development Policy and Plan of Solid Waste Management-    D   r   a    f    t     W   o   r    k    i   n   g    G   r   o   u   p     M   a    t   e   r    i   a    l

Transcript of 3rd Working Group SWM Short for HP

Page 1: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 1/18

Satoshi Higashinakagawa

JICA Study Team

Japan International Cooperation Agency (JICA)

1

3rd Thematic Technical Working Group

for Solid Waste in Infrastructure Sector

2th October, 2013

- Development Policy and Plan of Solid Waste Management-

D

  r  a   f   t    W  o

  r   k   i  n  g    G  r

  o  u  p    M  a   t  e

  r   i  a   l

Page 2: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 2/18

D

2

Contents

Outline of the SWM Part of the Project

Review of Second Working Group and Identified Issues

Development Vision and Policy and Planning Strategy

Consideration of Technical Options

- Collection and Transportation

- Treatment and Disposal (with consideration of land useplan in Nairobi County)

Future Demand Projection of Solid Waste Amount

(according to this socio-economic framework in this Urban

M/P) Future Action Plan

D

  r  a   f   t    W  o

  r   k   i  n  g    G  r

  o  u  p    M  a   t  e

  r   i  a   l

Page 3: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 3/18

3

Outline of the SWM Part of the Project

(Objectives and Expected Outputs)

 Expected OutputsTo implement future projection of solid waste generation

To review the current solid waste management concept

and revise it if necessary.

To consider future land use plan for solid waste treatment

facility

To review the current implementation and management

program and revise it if necessary.

 Objectives To review and develop the concepts for sustainable

urban development and improvement living condition

related to solid waste management

D

  r  a   f   t    W  o

  r   k   i  n  g    G  r

  o  u  p    M  a   t  e

  r   i  a   l

Page 4: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 4/18

4

Study of Current

Condition Survey of

SWM

Estimate solid waste generation

Review of existing SWM

plans and projects

Consider land use plan for solid

waste treatment facility

Discuss the concept of current

M/P and future action plan

New socio-economicframework

Direction of urban

development and land

use plan

Outline of the SWM Part of the Project

(Study Flow)

D

  r  a   f   t    W  o

  r   k   i  n  g    G  r

  o  u  p    M  a   t  e

  r   i  a   l

Page 5: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 5/18

5

Contents of Study Apr May Jun Jul Aug Sep Oct NovIdentify the current

condition and

issues of SWM

Future projection

of solid wasteReview of the

current SWM

policy and concept

Input the SWM

policy and concept

to Urban M/P

My assignment

Outline of the SWM Part in the Project

(Work Schedule)

D

  r  a   f   t    W  o

  r   k   i  n  g    G  r

  o  u  p    M  a   t  e

  r   i  a   l

Page 6: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 6/18

6

Review of Second Working Group

Issues regarding solid waste management has

been identified

Technical options has been considered.

Preliminary future amount of solid waste has beenprojected.

• How to incorporate the solid waste management facilities in

the future land use plan• Necessary of technical options except final disposal

D

  r  a   f   t    W  o

  r   k   i  n  g    G  r

  o  u  p    M  a   t  e

  r   i  a   l

Page 7: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 7/187

Waste scattering

Illegal dumping

 No proper operation

of landfill site

 No sanitary landfill

site

Difficult

transportation byaccess road

Lack of operationalcapacity

 Not enough capacity

for supervising

 private sector

 No proper legal systemand enforcement for to

 prevent illegal dumping

Establishment of

CBO collectionsystem

 Not enough and

suitable collection

 points

Set up legal forsystem to prevent

illegal dumping

Prepare sanitary

landfill site in

suitable location

Introduction of

institutional system

to supervise PSP

 No enough human

resource for landfill

operation

So many private sector

for waste collection

service

Implementation of

training for landfill

operation

Prepare suitable

collection points

and equipment

Fact (problem) Cause Issue

Review of Identified Significant Issues

D

  r  a   f   t    W  o

  r   k   i  n  g    G  r

  o  u  p    M  a   t  e

  r   i  a   l

Page 8: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 8/18

Development Policy and Vision

Vision

• “A healthy, safe, secure and sustainable solid waste

management system fit for a world-class city”

Mission

• To improve and protect the public health of Nairobi

residents and visitors

• To protect ecological health, diversity and productivity

• To maximize resource recovery through the participatory

approach

8

D

  r  a   f   t    W  o

  r   k   i  n  g    G  r

  o  u  p    M  a   t  e

  r   i  a   l

Page 9: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 9/18

Planning Strategy

Institutional capacity

development

Improvement of SWM

operational capacity

Enhancement of PPPP in SWM

Public Awareness and

participation of CBOs andNGOs

Promotion of 3R (reduce, reuse,

recycle)

Collection and transportation plan

3R and Intermediate Treatment Plan

Final disposal plan

Organizational restructuring and

human resource development plan

Legal and institutional reform plan

Private sector involvement promotion

plan

Community participation promotion

plan

Financial management plan

9

   D  r  a   f   t    W  o

  r   k   i  n  g    G  r

  o  u  p    M  a   t  e

  r   i  a   l

Page 10: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 10/18

Consideration of Technical Options

(Collection and transportation)

Options Merit Demerit

Handcart -Easy to collect alongsmall road

-Cheap cost

- Not effective forcollection

Compactor

vehicle

-Easy to collect and

transport effectively

-Slightly expensive

Containervehicle

-Easy to collect-Effective collection

-Necessary formaintenance

Dump truck - Not so expensive - Slightly taking time for

collection

Options Merit DemeritHouse to

house

collection

-Easy to collect

-No incentive for waste

reduction

-Taking the time for

collection

Station

collection

-Effective collection Necessary to monitor

the collection point

 Area of narrow

road

 Area of high

income

 Area of stationcollection

Other area

 Apartment,

secondary

collection area

Individual house

10

   D  r  a   f   t    W  o

  r   k   i  n  g    G  r

  o  u  p    M  a   t  e

  r   i  a   l

Page 11: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 11/1811

Consideration of Technical Options

(Treatment and Disposal)

Options Merit Demerit

Landfill -Comparatively cheaperoption

-Technically feasible

-No waste reduction

3R+Landfill -Comparatively cheaper

option

-Technically feasible

-If no cooperation with waste

generator, not enough waste

reduction

3R+Incineration+

Landfill

-Effective volume reduction

of waste

-Expensive for initial cost and

O&M cost

3R+Composting+

Landfill

-Effective volume reduction

of organic waste

-Not expensive option

-Waste separation is

necessary and necessity of

market of compost

3R + landfill + (composting)   D  r

  a   f   t    W  o  r   k   i

  n  g    G  r  o  u

  p    M  a   t  e

  r   i  a   l

Page 12: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 12/18

12

 After Improvement

- Reduction of odor

- Reduction of rodents and birds

- Prevent the leachate leakage

- Improvement of unloading andwaste spreading activities

- Improvement of waste picking

activities

Open dump site (e.g.

Dandora dump site)

Image of Sanitary Landfill

Site

Current issues

- Odor problem

- Rodents and birds

- Leakage of leachate to water

course- Bad condition of inner and

access roads

- Bad condition of unloading

place

Improvement

- Cover soil

- Liner system

and leachate

treatment facility-Improvement of

access and

inner roads

-Monitoring by

waste pickers

and landfillofficers

Improvement of Treatment and Disposal System

(Difference between dump site and sanitary landfil l site)

   D  r  a   f   t    W  o

  r   k   i  n  g    G  r

  o  u  p    M  a   t  e

  r   i  a   l

Page 13: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 13/18

13

Improvement of Treatment and Disposal System

(Example of effectiveness of cover soil)

Non operation area

is covered by soil

Operation area is

only part of landfill

site

Source :JICA Preparatory Survey (2012)   D  r  a   f   t    W  o

  r   k   i  n  g    G  r

  o  u  p    M  a   t  e

  r   i  a   l

Page 14: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 14/18

14

Current Land Use in Nairobi County

   D  r  a   f   t    W  o

  r   k   i  n  g    G  r

  o  u  p    M  a   t  e

  r   i  a   l

Page 15: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 15/18

15

Thika CountyKiambu County

Machakos County

Kajiado County

Nairobi County

Consideration of the Site for New Landfil l Site

JKTA airport

   D  r  a   f   t    W  o

  r   k   i  n  g    G  r

  o  u  p    M  a   t  e

  r   i  a   l

Page 16: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 16/18

16

Future Projection of Solid Waste Amount

(Waste Generation)

0

500

1000

1500

2000

2500

3000

3500

4000

4500

2005 2010 2015 2020 2025 2030 2035

G

aeWse d

  ear

Household waste

Commercial waste

Market waste

Total amount of waste (JICA Urban

Plan Study)

Total amount of waste(JICA SWM

Study in 2010)

   D  r  a   f   t    W  o

  r   k   i  n  g    G  r

  o  u  p    M  a   t  e

  r   i  a   l

Page 17: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 17/18

17

Future Projection of Solid Waste Amount

3R activities 2015 2020 2025 2030

Waste reduction rate 5.0% 7.5% 10.0% 10.0%

Reduction rate by recyclable

waste recovery

6.3% 9.3% 10.8% 12.3%

Reduction rate by

biodegradable waste

recovery

3.3% 3.4% 3.4% 3.4%

Waste collection rate 2015 2020 2025 2030

Waste collection rate 48.8% 64.6% 83.6% 100%

Self-disposal 2015 2020 2025 2030Self-disposal rate 10% 10% 10% 10%

Source :JICA SWM M/P (2010)   D  r  a   f   t    W  o

  r   k   i  n  g    G  r

  o  u  p    M  a   t  e

  r   i  a   l

Page 18: 3rd Working Group SWM Short for HP

8/13/2019 3rd Working Group SWM Short for HP

http://slidepdf.com/reader/full/3rd-working-group-swm-short-for-hp 18/18

18

Let’s Consider and Discussion

1. Where should we select the location of suitablenew landfil l site?

2. Consider the solution of current issues?

 Asante Sana