WCDMA Initial Tuning Report
DOCPROPERTY "Information" \* MERGEFORMAT
Ericsson InternalREPORT4 (8)
Prepared (also subject responsible if other)No.
Ahmed Hassan DOCPROPERTY "DocNo" "LangCode" \* MERGEFORMAT
ApprovedCheckedDateRevReference
DOCPROPERTY "ApprovedBy" \* MERGEFORMAT DOCPROPERTY "Checked" \* MERGEFORMAT 2011-03-15PA1 DOCPROPERTY "Reference" \* MERGEFORMAT
GRY075 WCDMA Initial Tuning ReportTable of Contents41Site Summary
Error! Bookmark not defined.2Drive Test Measurement
52.1.1Drive route
62.1.2Service Test Result Table.
Error! Bookmark not defined.2.2RF Pilot Coverge Analysis
72.2.1RSCP coverage Plot
72.2.2EcNo coverage Plot
82.2.3Ec Coverage by Sector
93KPI Performance Monitoring
93.1Speech performance
93.2Video performance
93.3PS performance
94Event Analysis and Recommendations
94.1Accessibility /Retainabilty
95Conclusion
The following report shows results of Initial Tuning performed for new integrated site GRY075 . The site is accepted by NDI department and delivered to NPOC
1 Site SummaryTable 1: Site Summary Information1.1.1 Drive route
The following route was driven for GRY075
1.1.2 Service Test Result Table.Service TestedCell
Circuit SwitchedNo of CallsRemarksGRY075AGRY075B GRY075C
Voice5passpasspass
Video5passpasspass
SMS5passpasspass
Packet SwitchedFile Size[MB]
HSDPA64MHSDPA Mean Throughput1.3Mbps1.2Mbps1.2Mbps
Mobility Measurement
Softer Handoverpasspasspass
SHOpasspasspass
IRAT HOpasspasspass
2G -3G Cell Reselectionpasspasspass
Table 3: Service Test Result summary1.1.3 RSCP coverage Plot
1.1.4 EcNo coverage Plot
1.1.5 Ec Coverage by Sector
2 KPI Performance Monitoring
2.1 Speech performance
To be obtained from Optimization Team with OSS access2.2 Video performance
To be obtained from Optimization Team with OSS access2.3 PS performance
To be obtained from Optimization Team with OSS access3 Event Analysis and Recommendations3.1 Accessibility /Retainabilty
No blocked or Dropped calls were experienced during the test4 Conclusion
Site GRY075 seems to be performing properly.Site Accepted By NDI
Name:
Title:
Phone:
Date:
Signature:
Site Accepted By NPOC
Name:
Title:
Phone:
Date: