3G STC_GRY075_Initial Tuning Report

11
Ericsson Internal REPORT 1 (11) Prepared (also subject responsible if other) No. Ahmed Hassan Approved Checked Date Rev Reference 2011-03-15 PA1 GRY075 WCDMA Initial Tuning Report

description

Network tuning in STC 3G

Transcript of 3G STC_GRY075_Initial Tuning Report

WCDMA Initial Tuning Report

DOCPROPERTY "Information" \* MERGEFORMAT

Ericsson InternalREPORT4 (8)

Prepared (also subject responsible if other)No.

Ahmed Hassan DOCPROPERTY "DocNo" "LangCode" \* MERGEFORMAT

ApprovedCheckedDateRevReference

DOCPROPERTY "ApprovedBy" \* MERGEFORMAT DOCPROPERTY "Checked" \* MERGEFORMAT 2011-03-15PA1 DOCPROPERTY "Reference" \* MERGEFORMAT

GRY075 WCDMA Initial Tuning ReportTable of Contents41Site Summary

Error! Bookmark not defined.2Drive Test Measurement

52.1.1Drive route

62.1.2Service Test Result Table.

Error! Bookmark not defined.2.2RF Pilot Coverge Analysis

72.2.1RSCP coverage Plot

72.2.2EcNo coverage Plot

82.2.3Ec Coverage by Sector

93KPI Performance Monitoring

93.1Speech performance

93.2Video performance

93.3PS performance

94Event Analysis and Recommendations

94.1Accessibility /Retainabilty

95Conclusion

The following report shows results of Initial Tuning performed for new integrated site GRY075 . The site is accepted by NDI department and delivered to NPOC

1 Site SummaryTable 1: Site Summary Information1.1.1 Drive route

The following route was driven for GRY075

1.1.2 Service Test Result Table.Service TestedCell

Circuit SwitchedNo of CallsRemarksGRY075AGRY075B GRY075C

Voice5passpasspass

Video5passpasspass

SMS5passpasspass

Packet SwitchedFile Size[MB]

HSDPA64MHSDPA Mean Throughput1.3Mbps1.2Mbps1.2Mbps

Mobility Measurement

Softer Handoverpasspasspass

SHOpasspasspass

IRAT HOpasspasspass

2G -3G Cell Reselectionpasspasspass

Table 3: Service Test Result summary1.1.3 RSCP coverage Plot

1.1.4 EcNo coverage Plot

1.1.5 Ec Coverage by Sector

2 KPI Performance Monitoring

2.1 Speech performance

To be obtained from Optimization Team with OSS access2.2 Video performance

To be obtained from Optimization Team with OSS access2.3 PS performance

To be obtained from Optimization Team with OSS access3 Event Analysis and Recommendations3.1 Accessibility /Retainabilty

No blocked or Dropped calls were experienced during the test4 Conclusion

Site GRY075 seems to be performing properly.Site Accepted By NDI

Name:

Title:

Phone:

Date:

Signature:

Site Accepted By NPOC

Name:

Title:

Phone:

Date:

Signature: