3CDC

173

description

Cincinnati Center City Development Corporation

Transcript of 3CDC

Page 1: 3CDC
Page 2: 3CDC

WHERE WE WORKFountain Square

Page 3: 3CDC

OUR MISSION

• 3CDC was formed in 2003 by Cincinnati’s corporate leaders, in partnership with the City, to address the deterioration and disinvestment in the urban core. Our work is specifically focused in the Central Business District and Over-The-Rhine (OTR).

• 3CDC manages over $250 million in investment funds, which play an important role in downtown development activities by providing financial capital.

Page 4: 3CDC

BOARD MEMBERSAmerican Financial Group *American Modern Insurance GroupCastellini CompanyCincinnati BellCincinnati EnquirerCincinnati USA Regional ChamberCintasConvergys CorporationDeloitteDinsmore & ShohlDuke EnergyFifth Third Bank *First Financial BankGeneral ElectricGlobal NovationsHumanaJack Rouse AssociatesKPMGMacy’s *North American PropertiesPeck, Shaffer & WilliamsPNC BankProcter & Gamble *Scripps InteractiveThe Kroger Company *Towne PropertiesToyota MotorU.S. BankUnited Way Uptown ConsortiumWestern & Southern Financial Group *

* Fortune 500 Headquartered Companies

3CDC’s operations are funded privately, primarily through contributions from local corporations and civic institutions, resulting in a

total of $1.3 million.

3CDC’s consolidated operating assets are $15 million in annual revenue.

Page 5: 3CDC

Cincinnati Equity FundCincinnati New Markets Fund

Cincinnati Equity Fund $44.5 millionCincinnati Equity Fund II $50.2 millionCincinnati New Market Fund $50.0 millionCincinnati New Market Fund II $35.0 millionCincinnati New Market Fund III $18.0 millionState New Market Tax Credit $2.0 millionCincinnati New Market Fund IV $50.0 million

TOTAL $249.7 million

CEF/CNMF

Page 6: 3CDC

CEF CNMFCEF II CNMF IICastellini Foundation

Cincinnati BellCincinnati Development Group

Cintas CorporationDuke Energy

JP Morgan ChaseKey BankPNC Bank

P&GTaft Broadcasting

US BankWestern Southern

Castellini FoundationCincinnati BellDuke Energy

Fifth Third BankFirst Financial Bank

GEMacy’s

PNC BankP&G

U.S. Bank

Castellini FoundationCincinnati Bell

Cintas CorporationConvergys Corporation

Duke EnergyFifth Third Bank

GEMacy’sP&G

The E.W. Scripps CompanyKroger

US BankWestern Southern

Castellini FoundationCincinnati BellDuke Energy

Fifth Third BankGE

KrogerP&G

PNC Bank

$ 4 4 . 5 m i l l i o n $ 5 0 . 2 m i l l i o n $ 5 0 m i l l i o n $ 3 5 m i l l i o n

CAPITAL BUDGET

Page 7: 3CDC

TIF DISTRICTS

Downtown & OTR West

Downtown & OTR East

Downtown Riverfront

Page 8: 3CDC

INVESTMENTS TO DATE

Ove r t he pa s t 7 yea r s :

$269 Mi l l ion 3CDC/CEF/CNMF investment

$68 Mi l l ion pr ivate investment

$47 Mi l l ion Ci ty investment

$384 MillionInves t ed i n down town and OTR

Page 9: 3CDC

UPCOMING INVESTMENTS

Ove r t he nex t 12 mon th s :

Mercer Commons - $60 Mi l l i on

OTR Phase V - $25 Mi l l i on

Homeless to Homes - $34 Mi l l i on

dunnhumbyUSA / F i f th & Race - $122 Mi l l i on

$241 Millionin add i t i ona l i nve s tmen t s

Page 10: 3CDC

HOW WE FUNCTION

FLEX IB I L I TY TO FUNCT ION IN A VAR IETY OF ROLES

• M a s t e r D e v e l o p e r O T R M i x e d - U s e D e v .

2 1 c M u s e u m H o t e l

• D e v e l o p e r 5 t h & R a c e / d u n n h u m b y U S A

P a r v i s L o f t s ( R e s . / R e t a i l )

S a e n g e r h a l l e ( O f f i c e / R e t a i l )

F o u n t a i n S q u a r e

W a s h i n g t o n P a r k

• A s s e t M a n a g e m e n t F o u n t a i n S q u a r e

W a s h i n g t o n P a r k

• E v e n t P r o d u c t i o n U . S . B a n k I c e R i n k

M a c y ’ s L i g h t U p t h e S q u a r e

P N C S u m m e r M u s i c S e r i e s

Page 11: 3CDC

HOW WE FUNCTION

CREATE GREAT CIVIC SPACES

CREATE HIGH-DENSITY MIXED-USE DEVELOPMENT

PRESERVE HISTORIC STRUCTURES AND IMPROVE STREETSCAPES

CREATE DIVERSE,MIXED-INCOME NEIGHBORHOODS SUPPORTED BY LOCAL BUSINESSES

OUR PR IOR IT IES

Page 12: 3CDC

FOUNTAIN SQUARE

Page 13: 3CDC

After years of serving the community well, Fountain Square and the garage have outlived their 1970 design life.

Design philosophy at the time was to create a refuge from the city. Many cities’ public spaces have moved through similar lifecycles.

In today’s marketplace, signature public gathering places are open, bright, inviting to the masses and safe. They are activated by retail, entertainment, restaurants and programming creating dynamic energy that spreads from the city’s “heart” to the entire area.

FOUNTAIN SQUARE

Page 14: 3CDC

Before After

BRYANT PARKNEW YORK CITY

Page 15: 3CDC

POST OFFICE SQUAREBOSTON

Before After

Page 16: 3CDC

Before After

PIONEER COURTHOUSE SQUARE PORTLAND

Page 17: 3CDC

FOUNTAIN SQUAREA DAY IN THE LIFE

Page 18: 3CDC

FOUNTAIN SQUAREA DAY IN THE LIFE

Page 19: 3CDC

FOUNTAIN SQUAREA DAY IN THE LIFE

Page 20: 3CDC

FOUNTAIN SQUAREA DAY IN THE LIFE

Page 21: 3CDC

FOUNTAIN SQUAREA DAY IN THE LIFE

Page 22: 3CDC

FOUNTAIN SQUAREA DAY IN THE LIFE

Page 23: 3CDC

FOUNTAIN SQUAREA DAY IN THE LIFE

Page 24: 3CDC

FOUNTAIN SQUAREA DAY IN THE LIFE

Page 25: 3CDC

FOUNTAIN SQUARE

Page 26: 3CDC

FOUNTAIN SQUARE

Page 27: 3CDC
Page 28: 3CDC
Page 29: 3CDC
Page 30: 3CDC

CONSTRUCTION PROCESS

Page 31: 3CDC
Page 32: 3CDC
Page 33: 3CDC
Page 34: 3CDC
Page 35: 3CDC
Page 36: 3CDC
Page 37: 3CDC
Page 38: 3CDC
Page 39: 3CDC
Page 40: 3CDC
Page 41: 3CDC
Page 42: 3CDC
Page 43: 3CDC
Page 44: 3CDC
Page 45: 3CDC
Page 46: 3CDC
Page 47: 3CDC
Page 48: 3CDC
Page 49: 3CDC

FOUNTAIN SQUARE GARAGE -BEFORE

Page 50: 3CDC

FOUNTAIN SQUARE GARAGE -AFTER

Page 51: 3CDC

FOUNTAIN SQUARE

Page 52: 3CDC

FOUNTAIN SQUARE GARAGENET OPERATING INCOME 2007-2011

1 2 3 4 5Year 2007 2008 2009 2010 2011NOI $830,373 $1,442,144 $1,819,315 $2,143,907 $2,113,016

0

500000

1000000

1500000

2000000

2500000

Fountain Square NOI 2007‐2011

Page 53: 3CDC

ASSET MANAGEMENT

Uniformed Ambassadors answer visitors’ questions and help keep Fountain Square safe and clean. Ambassadors are present on Fountain Square 24 hours a day, 7 days a week.

Page 54: 3CDC

ASSET MANAGEMENT

Signature plantings from the Cincinnati Park Board are changed out seasonally 4 times a year.

Page 55: 3CDC

EVENT PROGRAMMINGPNC Summer Music Series, 2011 attendance – 200,000

Page 56: 3CDC

EVENT PROGRAMMING

Strauss & Troy Market on the Square , 2011 attendance – 48,000

Page 57: 3CDC

EVENT PROGRAMMING

Macy’s Light Up the Square, 2011 attendance - 25,000

Page 58: 3CDC

EVENT PROGRAMMING

Toyota’s New Years Eve Blast, 2011 attendance - 15,000

Page 59: 3CDC

EVENT PROGRAMMING

U.S. Bank Ice Rink, 2011/2012 season - 50,000

Page 60: 3CDC

CENTRAL BUSINESS DISTRICT

Proposed

3CDC/Private

Civic

Page 61: 3CDC

ECONOMIC CATALYST

Page 62: 3CDC

ECONOMIC CATALYST

Page 63: 3CDC

METROPOLE

Page 64: 3CDC

CINCINNATI

Page 65: 3CDC

CINCINNATI

Page 66: 3CDC

BOCA / 4EG

Page 67: 3CDC

• The Maisonette was the longest-operating consecutive 5-star restaurant in the country. It occupied this Sixth Street building for 39 years. It’s closing saddened the community, and its vacancy was a reminder of the once-happening street.

• The building that housed the Maisonette and LaNormandie, will soon be home to 3 new restaurant/entertainment concepts:

• Boca Restaurant Group (BRG) will move its highly successful “BOCA” restaurant from Oakley to Downtown

• BRG will open a second “trattoria” concept on the lower level

• Four Entertainment Group (4EG), a successful operator of 7 local entertainment venues and restaurants, will open “IGBY’s” in the LaNormandie space next door

• Construction started early October and is scheduled to be completed in October 2012

BOCA / 4EG

Page 68: 3CDC

BOCA / 4EG

Page 69: 3CDC

dunnhumbyUSAFifth & Race

Page 70: 3CDC

dunnhumbyUSAFifth & Race

PROJECT DETAILS:

• 3CDC would own and operate:o 630 space below grade parking facilityo 400 space above grade parking facility

• 3CDC will own:o 40,000 SF of street level retail/commercial space

• dunnhumbyUSA, through a sale and/or lease of air rights, would own:o 300,000 SF office building and air rights above

• Qualified residential developer/manager, through a sale and/or lease of airrights, would own and operate:

o 100-130 units of residential rental housing

Page 71: 3CDC

dunnhumbyUSAFifth & Race

Page 72: 3CDC

dunnhumbyUSAFifth & Race

Page 73: 3CDC

OVER-THE-RHINE

Page 74: 3CDC

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

50000

1900 1960 1980 1990 2000

OTR PopulationOTR Decline

OVER-THE-RHINE POPULATION DECLINE

Page 75: 3CDC

500VACANT

BUILDINGS

700VACANT

LOTS

1667VACANT HOUSING UNITS

OVER-THE-RHINE CHALLENGES

Page 76: 3CDC

OTR ACTION STEP: LAND BANKING

• CEF/CNMF has invested over $29.7 million in private funding to land bank properties in the Washington Park section of OTR

• 3CDC owns or controls: 200 buildings 169 vacant parcels

• Over $700,000 in annual carrying costs

Page 77: 3CDC

OVER-THE-RHINE CHALLENGES

Page 78: 3CDC

OVER-THE-RHINE CHALLENGES

Page 79: 3CDC

OVER-THE-RHINE CHALLENGES

Page 80: 3CDC

OTR ACTION STEP: CLOSING PROBLEM PROPERT IES

20-22 W. 12th (Jordan’s) 1201 Vine (Glossinger’s)3 E. 13th (Albert’s)

118 W. 15th

(Walt’s)

1331-35 Vine (AM/PM Market)

1432 Vine (Pohlar Bar) 1412 Vine (Cricket)1401 Race (Bang’s)

Page 81: 3CDC

Before:

After:

OTR ACTION STEP: ACQUIRED AND SECURED VACANT PROPERT IES

Page 82: 3CDC

Before:

After:

OTR ACTION STEP: ACQUIRED AND SECURED VACANT PROPERT IES

Page 83: 3CDC

OTR: CHALLENGES

Crime Statistics within 3CDC’s Targeted Area

Page 84: 3CDC

COMPLETED DEVELOPMENTS:

Page 85: 3CDC
Page 86: 3CDC
Page 87: 3CDC
Page 88: 3CDC
Page 89: 3CDC
Page 90: 3CDC
Page 91: 3CDC
Page 92: 3CDC
Page 93: 3CDC
Page 94: 3CDC
Page 95: 3CDC
Page 96: 3CDC
Page 97: 3CDC
Page 98: 3CDC
Page 99: 3CDC

STABIL IZED HISTORIC BUILDINGS1418-22 Race S t ree t - Wes t fa l en

Page 100: 3CDC

STABIL IZED HISTORIC BUILDINGS1418-22 Race S t ree t - Wes t fa l en

Page 101: 3CDC

STABIL IZED HISTORIC BUILDINGS1418-22 Race S t ree t - Wes t fa l en

Page 102: 3CDC

STABIL IZED HISTORIC BUILDINGS1418-22 Race S t ree t - Wes t fa l en

Page 103: 3CDC

STABIL IZED HISTORIC BUILDINGS1418-22 Race S t ree t - Wes t fa l en

Page 104: 3CDC

STABIL IZED HISTORIC BUILDINGS1418-22 Race S t ree t - Wes t fa l en

Page 105: 3CDC

STABIL IZED HISTORIC BUILDINGS1418-22 Race S t ree t - Wes t fa l en

Page 106: 3CDC

STABIL IZED HISTORIC BUILDINGS1418-22 Race S t ree t - Wes t fa l en

Page 107: 3CDC

STABIL IZED HISTORIC BUILDINGS1418-22 Race S t ree t - Wes t fa l en

Page 108: 3CDC

STABIL IZED HISTORIC BUILDINGS1418-22 Race S t ree t - Wes t fa l en

Page 109: 3CDC

RESIDENTIAL SALES

Gateway I , I I , I I I & IV : 178 of the 186 condos (96%) are sold

Page 110: 3CDC

RESIDENTIAL SALES

Gateway I , I I , I I I & IV : 178 of the 186 condos (96%) are sold

Page 111: 3CDC

RESIDENTIAL LEASING

Gateway I , I I , I I I & IV : 68 of the 68 apartments (100%) are leased

Page 112: 3CDC

RESIDENTIAL SALES SUMMARY

Average sale prices continue to increase significantly through each phase of Gateway Development.

Gateway II sale price per SF: $150Gateway III sale price per SF: $174Gateway IV sale price per SF: $198

Rental Averages:Belmain: $1.17 per SF (1-month lease-up)Parvis: $1.05 per SF (2.5-month lease-up)

Page 113: 3CDC

85% of 91,038 SF of commercial space is leased.

COMMERCIAL LEASING

Page 114: 3CDC

COMMERCIAL LEASINGBAKERSF IELD , 1213 V INE STREET

Page 115: 3CDC

COMMERCIAL LEASING1215 WINE BAR , 1215 V INE STREET

Page 116: 3CDC

COMMERCIAL LEASINGAVERAGE RESTAURANT SALES /SF

Downtown / CBD

Over-the-Rhine

Annual Sales Per SF Annual Rent Per SF

Average by SF 509 31

Annual Sales Per SF Annual Rent Per SF

Average by SF 691 42

Page 117: 3CDC

Saengerhalle Office Building, home of 3CDC

COMMERCIAL LEASING

Page 118: 3CDC

Parvis, 1400 Block of Vine

COMMERCIAL LEASING

Page 119: 3CDC

VINE STREET STREETSCAPE

• $4,000,000 project includes new street lighting, curbs, sidewalks, landscaping, signage, trees and burying overhead utilities from Central Pkwy to 15th Street

Page 120: 3CDC

Future/ Land Bank

Complete/Under Construction

Mercer Commons/ Gateway V

3CDC OTR DEVELOPMENT

Page 121: 3CDC

Phase I• 3,900 SF Commercial/Office• 28 Condos• 340-space Parking Garage• CDF committed $2.56 million

of state and federal NMTC

Phase II• 67 Apartments (30

affordable)• 10,600 SF commercial space• OHFA awarded project low

income housing tax credits and also received historic tax credits from State of Ohio

Phase III• 59 Apartments• 3,100 SF commercial space

MERCER COMMONS

Page 122: 3CDC

Walnut Street

Page 123: 3CDC

Mercer Street

Page 124: 3CDC

Vine Street

Page 125: 3CDC

Vine Street and Hart Alley

Page 126: 3CDC

• Renovation of 1400-1404 Vine

Project Cost: $4.1 million

3,680 SF restaurant space

6,000 SF office space

PAINT BUILDING

Page 127: 3CDC

PHASE V

Page 128: 3CDC

BAKERY LOFTS

Page 129: 3CDC

WESTFALEN LOFTS II

Page 130: 3CDC

NICOLAY

Page 131: 3CDC

PARVIS II

Page 132: 3CDC

15TH & REPUBLIC

Page 133: 3CDC

NASSAU

Page 134: 3CDC

1401 ELM

Page 135: 3CDC

Land Banked/ Future Projects

Complete/Under Construction

Mercer Commons/ Gateway V

3CDC OTR DEVELOPMENT

Page 136: 3CDC

Land Banked/ Future Projects

Complete/Under Construction

3CDC OTR DEVELOPMENT

Page 137: 3CDC
Page 138: 3CDC
Page 139: 3CDC
Page 140: 3CDC
Page 141: 3CDC
Page 142: 3CDC
Page 143: 3CDC
Page 144: 3CDC
Page 145: 3CDC
Page 146: 3CDC
Page 147: 3CDC

CIVIC LAWN

Page 148: 3CDC

CIVIC LAWN

Page 149: 3CDC

MUSIC HALL PLAZA

Page 150: 3CDC

MUSIC HALL PLAZA

Page 151: 3CDC

OPEN AIR STAGE

Page 152: 3CDC

OPEN AIR STAGE

Page 153: 3CDC

• 129 Total Water Jets• 6 Pop Jet Zones• 6 Arching Water Jets• Connected to Playground

WATER FEATURE

Page 154: 3CDC

• 129 Total Water Jets• 6 Pop Jet Zones• 6 Arching Water Jets• Connected to Playground

WATER FEATURE

Page 155: 3CDC

PLAYGROUND

Page 156: 3CDC

PLAYGROUND

Page 157: 3CDC

HISTORIC BANDSTAND

Page 158: 3CDC

HISTORIC BANDSTAND

Page 159: 3CDC

SIGNATURE PLANTINGS

Page 160: 3CDC

DOG PARK

Page 161: 3CDC

DOG PARK

Page 162: 3CDC

EVENT PROGRAMMING

Page 163: 3CDC

WASHINGTON PARK

Page 164: 3CDC
Page 165: 3CDC
Page 166: 3CDC
Page 167: 3CDC
Page 168: 3CDC

ANTICIPATED SCHEDULE

Site Preparation Began September 2010

General Contractor Selection September 2010

Construction Began November 2010

Garage Construction Complete April 2012

Complete Park Construction June 2012

Page 169: 3CDC

HOMELESS TO HOMESPut t i ng an End t o Home l e s sne s s

Homeless to Homes:• A comprehensive plan for the City of Cincinnati and 

Hamilton County, OH to ensure single homeless individuals have access to appropriate shelter facilities and comprehensive services which facilitate their movement from shelter to permanent housing.

Continuum of Care:• A single, coordinated and inclusive organization charged 

with coordinating the planning and management of the local (Hamilton County and City of Cincinnati) programs and related funding aimed at ending homelessness.

Page 170: 3CDC

HOMELESS TO HOMESPut t i ng an End t o Home l e s sne s s

City of Cincinnati

Continuum of Care

Women Only Shelter

Men’s    Faith‐Based Shelter

Young Adult Shelter

Men Only Shelter

Substance Abuse Treatment Center 

Hamilton County

3CDC

Page 171: 3CDC

HOMELESS TO HOMESPut t i ng an End t o Home l e s sne s s

YWCA Women’s Shelter• 60 beds: 19,850 square feet

• Site location: 2452 Kinsey Avenue

City Gospel Mission Shelter• 118 beds (42 for Exodus Program): 40,530 square feet

• Site location: 1805 Dalton Street & 1102 York Street

Drop Inn Center• 150 beds: conceptual program for 53,000 square foot facility

• Programming in development / Site selection in process

Lighthouse• 30 beds for youth (18‐24): 12,000 square feet

• Site location: 2522 Highland Ave / Complete

Talbert House / Mt. Airy Center• 65 beds for men, currently located at 2660 Diehl Rd. in Mt. Airy

• Programming in development

Page 172: 3CDC

HOMELESS TO HOMESPut t i ng an End t o Home l e s sne s s

Page 173: 3CDC

THANK YOUTHANK YOU