3b

1
SCHEDULE "B" .. Saudi Electricity Company CONTRACT NO. 30621127/00 such power source. As for demineralized water requirements during pre- commissioning and commissioning, COMPANY will arrange the purchase of distilled water by CONTRACTOR from Qurayyah Steam Power Plant. It is the responsibility of CONTRACTOR to build and commission the Demineralization Plant and all associated systems in time for the production storage and transfer of demineralized water. CONTRACTOR shall pay particular attention to this requirement as part of the project schedule. While COMPANY will facilitate availability of distilled water to the extent possible, CONTRACTOR shall note that the quantity of water available at any time will depend on the operating condition of the desalination plant at Qurayyah Steam Power Plant and internal requirements of the plant itself. Any delay to the project schedule on account of shortage of distilled water will therefore be CONTRACTOR's responsibility. Further, the distilled water (also called service water) transfer system installed by CONTRACTOR 8 has to cater to the requirement of the Qurayyah Open Cycle Power Plant. All of the above must be taken into consideration by the CONTRACTOR to build adequate inventory of distilled / demineralized water in time to meet project schedule. All water requirements must be pre-arranged and scheduled with COMPANY. Cost of distilled water shall be computed at the rate of Five Saudi Riyals (SR: 5.00) per cubic meter and this shall be reimbursed to the COMPANY." 4. GENERAL DESCRIPTION OF THE WORK 4.1 Base WORK: Conversion of Existing Open Cycle Gas Turbine (OCGT> Power Plant to Combined Cycle Gas Turbine (CCGT> Power Plant at Ourayyah CONTRACTOR shall design, engineer, procure, construct, test, commission and put into operation, for the Saudi Electricity Company, a complete Combined Cycle Gas Turbine (CCGT) Power Plant at Qurayyah, Saudi Arabia, inclusive of all support facilities by converting the existing Open Cycle Gas Turbine (OCGT) Power Plant to combined cycle power plant and providing water treatment systems, including MSF desalination plant, demineralization plant and chlorination plant complete in all respect, and all other support facilities. Also, CONTRACTOR shall, among the services specified in the Scope of Work and Technical Specifications, PTS No. 07EG90B, that it shall provide under this CONTRACT, provide training to COMPANY operations and maintenance personnel to ensure individual competence in the operation, troubleshooting, maintenance, administration and management of the CCGT Power Plant; provide supervision of plant operation and maintenance on 24X7 basis up to the issuance of the Preliminary Acceptance Certificate (PAC); provide all spare parts and consumables for commiSSioning period and up to the end of the warranty period; and provide special tools and test/maintenance equipment for the equipment supplied by CONTRACTOR under this CONTRACT. The detailed features of the CCGT Power Piant and the support facilties, the technical specifications, and the complete scope of the WORK that CONTRACTOR shall perform under this CONTRACT are set forth in the Scope of Work and 8-2 Conversion of Open Cycle Gas Turbines to Combined Cycle at Qurayyah Power Plant Schedule nS"

description

3

Transcript of 3b

Page 1: 3b

SCHEDULE "B"

.. I.:>~ ~.>~I :as~1

Saudi Electricity Company

CONTRACT NO. 30621127/00

such power source. As for demineralized water requirements during pre­commissioning and commissioning, COMPANY will arrange the purchase of distilledwater by CONTRACTOR from Qurayyah Steam Power Plant. It is the responsibilityof CONTRACTOR to build and commission the Demineralization Plant and allassociated systems in time for the production storage and transfer ofdemineralized water. CONTRACTOR shall pay particular attention to thisrequirement as part of the project schedule.

While COMPANY will facilitate availability of distilled water to the extent possible,CONTRACTOR shall note that the quantity of water available at any time willdepend on the operating condition of the desalination plant at Qurayyah SteamPower Plant and internal requirements of the plant itself. Any delay to the projectschedule on account of shortage of distilled water will therefore be CONTRACTOR'sresponsibility.

Further, the distilled water (also called service water) transfer system installed byCONTRACTOR 8 has to cater to the requirement of the Qurayyah Open Cycle PowerPlant.

All of the above must be taken into consideration by the CONTRACTOR to buildadequate inventory of distilled / demineralized water in time to meet projectschedule. All water requirements must be pre-arranged and scheduled withCOMPANY.

Cost of distilled water shall be computed at the rate of Five Saudi Riyals (SR: 5.00)per cubic meter and this shall be reimbursed to the COMPANY."

4. GENERAL DESCRIPTION OF THE WORK

4.1 Base WORK: Conversion of Existing Open Cycle Gas Turbine (OCGT> PowerPlant to Combined Cycle Gas Turbine (CCGT> Power Plant at Ourayyah

CONTRACTOR shall design, engineer, procure, construct, test, commission and putinto operation, for the Saudi Electricity Company, a complete Combined Cycle GasTurbine (CCGT) Power Plant at Qurayyah, Saudi Arabia, inclusive of all supportfacilities by converting the existing Open Cycle Gas Turbine (OCGT) Power Plant tocombined cycle power plant and providing water treatment systems, including MSFdesalination plant, demineralization plant and chlorination plant complete in allrespect, and all other support facilities.

Also, CONTRACTOR shall, among the services specified in the Scope of Work andTechnical Specifications, PTS No. 07EG90B, that it shall provide under thisCONTRACT, provide training to COMPANY operations and maintenance personnel toensure individual competence in the operation, troubleshooting, maintenance,administration and management of the CCGT Power Plant; provide supervision ofplant operation and maintenance on 24X7 basis up to the issuance of thePreliminary Acceptance Certificate (PAC); provide all spare parts and consumablesfor commiSSioning period and up to the end of the warranty period; and providespecial tools and test/maintenance equipment for the equipment supplied byCONTRACTOR under this CONTRACT.

The detailed features of the CCGT Power Piant and the support facilties, thetechnical specifications, and the complete scope of the WORK that CONTRACTORshall perform under this CONTRACT are set forth in the Scope of Work and

8-2Conversion of Open Cycle Gas Turbines to Combined Cycle at Qurayyah Power PlantSchedule nS"

M.elkhoury
Sticky Note
Commercial Comments and Clarifications - Compliance Statement: Bidder Comment The design and materials approved for use in the simple cycle shall be the same in the combined cycle, whenever such systems are extended under the combined cycle contract. SEC Response CONTRACTOR C may propose design and materials used by CONTRACTOR B for systems which are extended as part of CONTRACT C. However, this shall be subject to COMPANY approval on a case by case basis. Bidder Response Our comment remains. SEC 2nd Response SEC Position remains as stated earlier. Bidder comment remains as stated earlier.