350-2077 Equipment Manufacturer 350-2077 · *playground supervision required drawn by: footing...

10
Equipment Manufacturer 350-2077 350-2077

Transcript of 350-2077 Equipment Manufacturer 350-2077 · *playground supervision required drawn by: footing...

Page 1: 350-2077 Equipment Manufacturer 350-2077 · *playground supervision required drawn by: footing legend 112" 1850 zzch 144" gz spiral slide center post footing (detail1) support post

Equipment Manufacturer

350-2077

350-2077

Page 2: 350-2077 Equipment Manufacturer 350-2077 · *playground supervision required drawn by: footing legend 112" 1850 zzch 144" gz spiral slide center post footing (detail1) support post

Equipment Manufacturer

350-2077

350-2077

Page 3: 350-2077 Equipment Manufacturer 350-2077 · *playground supervision required drawn by: footing legend 112" 1850 zzch 144" gz spiral slide center post footing (detail1) support post

0.5 1.0

05'

Meters2.0 3.0

10'

MODPODS

QUAD

CLIMBER

36"

0,92M

48"

1,22M

72"

1,83M

72"

1,83M

33'-4"

[10.17M]

35'-10"

[10.93M]

PIPEWALL

W/ TELESCOPE

(deck)

STOREFRONT

(ground)

SILO

CLIMBER

NUVO

360°

SPIRAL

SLIDE

ACCESS

GATE

ADA

STAIRS

90° HORIZONTAL

LOOP LADDER

W/ ACCESS

LADDER

GLIDE

SLIDE

LEG

LIFT

TRANSFER

STATION

W/ STEP

GLIDE

SLIDE

6'-2"

[1.88M]

6'-2"

[1.89M]

6'-2"

[1.88M]

6'-2"

[1.88M]

6'-2"

[1.89M]

6'-10"

[2.08M]

6'-2"

[1.89M]

6'-4"

[1.92M]

ADA

STAIR

6'-1"

[1.86M]

6'-8"

[2.04M]

Total Elevated Play Activities:

Total Ground-Level Play Activities:

AccessibleElevatedActivities

AccessibleGround-Level

Activities

AccessibleGround-LevelPlay Types

Required

Provided

AD

A S

CH

EDU

LE 7

4

7

2

2

2

2

2

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

BPaper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

USER CAPACITY: AGE GROUP:

AREA: PERIMETER:

EQUIPMENT SIZE:

USE ZONE:

FALL HEIGHT:

CPSC #325ASTM F1487-

350-

2077

CA

TA

LO

G P

RE

-D

ES

IG

N

350-2077 1/4"=1'-0"

M. MERTZ

02-DEC-19

23'0'' x 21'0'' x 10'6''7,01M x 6,4M x 3,2M

35'10" x 33'4"10,93M x 10,17M

941 SqFt.87,42 SqM.

111'9"34,06M

8'5"2,57M

33 5-12

11

Page 4: 350-2077 Equipment Manufacturer 350-2077 · *playground supervision required drawn by: footing legend 112" 1850 zzch 144" gz spiral slide center post footing (detail1) support post

0.5 1.0

05'

Meters2.0 3.0

10'

36"

0,92M

48"

1,22M

72"

1,83M

72"

1,83M

33'-4"

[10.17M]

35'-10"

[10.93M]

6'-2"

[1.88M]

6'-2"

[1.89M]

6'-2"

[1.88M]

6'-2"

[1.88M]

6'-2"

[1.89M]

6'-10"

[2.08M]

6'-2"

[1.89M]

6'-4"

[1.92M]

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

6'-1"

[1.86M]

6'-8"

[2.04M]

Total Elevated Play Activities:

Total Ground-Level Play Activities:

AccessibleElevatedActivities

AccessibleGround-Level

Activities

AccessibleGround-LevelPlay Types

Required

Provided

AD

A S

CH

EDU

LE 7

4

7

2

2

2

2

2

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

BPaper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

USER CAPACITY: AGE GROUP:

AREA: PERIMETER:

EQUIPMENT SIZE:

USE ZONE:

FALL HEIGHT:

CPSC #325ASTM F1487-

350-

2077

CA

TA

LO

G P

RE

-D

ES

IG

N

350-2077 1/4"=1'-0"

M. MERTZ

02-DEC-19

23'0'' x 21'0'' x 10'6''7,01M x 6,4M x 3,2M

35'10" x 33'4"10,93M x 10,17M

941 SqFt.87,42 SqM.

111'9"34,06M

8'5"2,57M

33 5-12

11

Page 5: 350-2077 Equipment Manufacturer 350-2077 · *playground supervision required drawn by: footing legend 112" 1850 zzch 144" gz spiral slide center post footing (detail1) support post

DATE:

SCALE:

DRAWN BY:

SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)

SUPPORT POST FOOTING (DETAIL 1 or 4) INDICATES POST LENGTH)

CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)

(ZZCH1850 INDICATES PART NUMBER)

GROUND ZERO POST FOOTING (DETAIL 2) INDICATES POST LENGTH)

COMPONENT FOOTING (DETAIL 3)

(112"

(144"

Page 6: 350-2077 Equipment Manufacturer 350-2077 · *playground supervision required drawn by: footing legend 112" 1850 zzch 144" gz spiral slide center post footing (detail1) support post

S

T

A

T

I

O

N

T

R

A

N

S

F

E

R

S

T

A

T

I

O

N

T

R

A

N

S

F

E

R

1

3

6

"

1

3

6

"

1

3

6

"

1

3

6

"

1

3

6

"

1

3

6

"

1

3

6

"

1

3

6

"

1

6

0

"

1

6

0

"

1

6

0

"

1

6

0

"

1

2

4

"

1

2

4

"

36"36"36"36"

36"36"

44"

18"

22"

31"

26"

41"

18"

93"

3"

14"

15"

51"

15"

5" 20"

8"

18"

16"

19"

16"

41"

32"

34"

34"

9" 17" 9"

18"

64"

158"

156"

181"

132"

MODPODS

QUAD

CLIMBER

SILO

CLIMBER

NUVO

360°

SPIRAL

SLIDE

ADA

STAIRS

90° HORIZONTAL

LOOP LADDER

W/ ACCESS

LADDER

GLIDE

SLIDE

TRANSFER

STATION

W/ STEP

GLIDE

SLIDE

ADA

STAIR

98"

88"

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

BPaper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

FOOTING LEGEND

1

1

2

"

1

8

5

0

Z

Z

C

H

1

4

4

"

G

Z

SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)

SUPPORT POST FOOTING (DETAIL 1 or 4)(112" INDICATES POST LENGTH)

CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)

(ZZCH1850 INDICATES PART NUMBER)

GROUND ZERO POST FOOTING (DETAIL 2)(144" INDICATES POST LENGTH)

COMPONENT FOOTING (DETAIL 3)

350-

2077

CA

TA

LO

G P

RE

-D

ES

IG

N

350-2077 1/4"=1'-0"

M. MERTZ

02-DEC-19

Page 7: 350-2077 Equipment Manufacturer 350-2077 · *playground supervision required drawn by: footing legend 112" 1850 zzch 144" gz spiral slide center post footing (detail1) support post

Posts

ZZCH0018 21 3.5in OD x 124in STEEL POST W/RIVETED CAP

ZZCH0028 82 3.5in OD x 136in STEEL POST W/ RIVETED CAP

ZZCH0048 43 3.5in OD x 160in STEEL POST W/ RIVETED CAP

Decks & Kick Plates

ZZCH0616 34 SQUARE COATED DECK ASSEMBLY

ADA Items

ZZCH2007 15 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)

ZZUN2019 16 APPROACH STEP FOR TRANSFER STATION

Slides

ZZCH2696 17 GLIDE SLIDE (72in DECK)

ZZCH3126 18 GLIDE SLIDE (48in DECK)

ZZCH3537 19 SLIDE- NUVO 360 SPIRAL SLIDE

Activity Panels

ZZCH4646 110 STORE FRONT PANEL

ZZUN4279 111 TELESCOPE PIPE WALL MOUNT (CH/EX)

Barriers

ZZCH4095 112 CENTERLINE PIPE WALL BARRIER

ZZCH4288 113 ACCESS GATE

Climbers

ZZCH7949 114 SILO CLIMBER (36in DECK)

ZZUN6840 115 MODPODS QUAD- VERTICAL

Overhead Events

ZZCH5770 116 LEG LIFT

ZZCH5850 117 90 DEGREE HORIZONTAL LOOP LADDER

ZZCH5970 118 OVERHEAD EVENT ACCESS LADDER (36in DECK)

Stairs and Ladders

ZZCH9168 119 12in ACCESS STEPPED PLATFORM (DECK TO DECK)

ZZCH9170 120 24in ACCESS STEPPED PLATFORM (DECK TO DECK)

Additional Tool & Maintenance Kits

ZZUN1471 121 INSTALLER HARDWARE KIT

ZZUN9910 122 SURFACING WARNING LABEL KIT

ZZUN9930 123 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL

ZZXX0678 124 LABEL KIT- COMPOSITE STRUCTURE - ASTM

ZZXXGNGUID 125 GENERAL INSTALLERS GUIDE

Part No. Description

Design Number: 350-2077 - Bill Of Material

350-2077

Ref.No. Quantity

Wednesday, April 29, 2020 Page of1 1 Playworld.com

Page 8: 350-2077 Equipment Manufacturer 350-2077 · *playground supervision required drawn by: footing legend 112" 1850 zzch 144" gz spiral slide center post footing (detail1) support post

CertifiedZZCH00181 3.5in OD x 124in STEEL POST W/RIVETED CAP

2 77.82 108 0 2.00 0.25 0

CertifiedZZCH00282 3.5in OD x 136in STEEL POST W/ RIVETED CAP

8 348.08 468 0 8.00 1.00 0

CertifiedZZCH00483 3.5in OD x 160in STEEL POST W/ RIVETED CAP

4 200.84 272 0 4.00 0.50 0

CertifiedZZCH06164 SQUARE COATED DECK ASSEMBLY 3 164.58 521 9 3.00 0.00 0

CertifiedZZCH20075 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)

1 148.40 310 2 2.00 0.09 0

CertifiedZZUN20196 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0

CertifiedZZCH26967 GLIDE SLIDE (72in DECK) 1 151.63 653 2 1.50 0.03 1

CertifiedZZCH31268 GLIDE SLIDE (48in DECK)1 119.73 492 2 1.50 0.03 1

CertifiedZZCH35379 SLIDE- NUVO 360 SPIRAL SLIDE 1 650.00 1,417 2 6.00 0.15 1

CertifiedZZCH464610 STORE FRONT PANEL 1 33.98 243 3 1.00 0.00 1

CertifiedZZUN427911 TELESCOPE PIPE WALL MOUNT (CH/EX)1 12.23 61 1 0.50 0.00 1

CertifiedZZCH409512 CENTERLINE PIPE WALL BARRIER 1 28.74 71 0 0.50 0.00 0

CertifiedZZCH428813 ACCESS GATE 1 17.34 65 0 0.50 0.00 0

CertifiedZZCH794914 SILO CLIMBER (36in DECK)1 70.33 129 1 1.50 0.06 1

CertifiedZZUN684015 MODPODS QUAD- VERTICAL 1 324.09 416 4 3.00 0.39 1

CertifiedZZCH577016 LEG LIFT 1 6.76 30 1 0.50 0.00 1

CertifiedZZCH585017 90 DEGREE HORIZONTAL LOOP LADDER1 67.90 198 2 1.00 0.00 1

CertifiedZZCH597018 OVERHEAD EVENT ACCESS LADDER (36in DECK)

1 25.12 71 1 1.50 0.06 0

CertifiedZZCH916819 12in ACCESS STEPPED PLATFORM (DECK TO DECK)

1 70.28 277 1 2.00 0.00 0

CertifiedZZCH917020 24in ACCESS STEPPED PLATFORM (DECK TO DECK)

1 135.24 296 1 2.00 0.00 0

N/AZZUN147121 INSTALLER HARDWARE KIT 1 57

CertifiedZZUN991022 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-2077 - Compliance and Technical Data

350-2077

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

Wednesday, April 29, 2020 Page of1 3 Playworld.com

Page 9: 350-2077 Equipment Manufacturer 350-2077 · *playground supervision required drawn by: footing legend 112" 1850 zzch 144" gz spiral slide center post footing (detail1) support post

N/AZZUN993023 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL

1 90

N/AZZXX067824 LABEL KIT- COMPOSITE STRUCTURE - ASTM1 0.04 TBD 0 0.08 0.00 0

N/AZZXXGNGUID25 GENERAL INSTALLERS GUIDE 1 1

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-2077 - Compliance and Technical Data

350-2077

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

330 712 6,316 33 43.33 2.602,689.01 9Totals:

6 Metric Tons320 Kg149 Kg1,210.05 Kg 1.98 m3

Wednesday, April 29, 2020 Page of2 3 Playworld.com

Page 10: 350-2077 Equipment Manufacturer 350-2077 · *playground supervision required drawn by: footing legend 112" 1850 zzch 144" gz spiral slide center post footing (detail1) support post

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-2077 - Compliance and Technical Data

350-2077

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

The lay-out for this custom playscape, design number 350-2077, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.

The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.

The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.

Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]

A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.

A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.

ASTM F1487

2010 ADA Standards for Accessible Design

Installation Times

Carbon Footprint

Pre-Consumer Recycle Content

Post-Consumer Recycle Content

Wednesday, April 29, 2020 Page of3 3 Playworld.com