35 CAMBRIDGE PARK DRIVE SPECIAL PERMIT SUPPLEMENTAL … › - › media › Files › CDD ›...

18
ARCHITECTURE | PLANNING INTERIOR DESIGN | VDC BRANDED ENVIRONMENTS 35 CAMBRIDGE PARK DRIVE SPECIAL PERMIT SUPPLEMENTAL GRAPHIC SUBMISSION | 11.08.16

Transcript of 35 CAMBRIDGE PARK DRIVE SPECIAL PERMIT SUPPLEMENTAL … › - › media › Files › CDD ›...

  • ARCHITECTURE | PLANNINGINTERIOR DESIGN | VDCBRANDED ENVIRONMENTS

    35 CAMBRIDGE PARK DRIVE SPECIAL PERMIT SUPPLEMENTAL GRAPHIC SUBMISSION | 11.08.16

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 2SGA COMMUNICATING. COLLABORATING. CREATING.

    GFA DIAGRAMS

    ZONING + SETBACK DIAGRAMS

    AERIAL PERSPECTIVE

    SOUTHEAST DAY VIEW

    SOUTHEAST NIGHT VIEW

    SOUTHWEST DAY VIEW

    PROPOSED SITE PLAN

    PROPOSED ROOF PLAN

    LANDSCAPE PLAN

    ENLARGED LANDSCAPE PLAN

    LANDSCAPE MATERIALS

    LANDSCAPE MATERIALS PLAN

    TREE SPECIES PLAN

    FLOOR PLAN | LEVEL 1

    FLOOR PLAN | LEVEL 2

    TYPCIAL FLOOR PLAN | LEVEL 3-4

    FLOOR PLAN | LEVEL 5

    FLOOR PLAN | MECHANICAL PENTHOUSE

    EAST ELEVATION

    SOUTH ELEVATION

    WEST ELEVATION

    NORTH ELEVATION

    ENLARGED BAY ELEVATIONS | MATERIALS | SOUTH ELEVATION

    ENLARGED BAY ELEVATIONS | MATERIALS | SOUTH ELEVATION AT ENTRY

    ENLARGED BAY ELEVATIONS | MATERIALS | EAST ELEVATION

    PUBLIC REALM PERSPECTIVE

    WEST RETAIL PERSPECTIVE

    ENTRY PERSPECTIVE

    LOADING DOCK PERSPECTIVE

    BUILDING CROSS SECTION

    BUILDING LONGITUDINAL SECTION

    GARAGE DIAGRAMS

    BICYCLE FACILITY PLANS

    SIGNAGE LOCATION PLAN

    SIGN FAMILY DESIGN OVERVIEW

    CONTEXT KEY PLAN | VIEWS FROM NEIGHBORING SITES

    CONTEXT VIEW 1 | ROUTE 2 OFFRAMP ONTO STEEL PLACE

    CONTEXT VIEW 2 | ROUTE 2 OVERPASS

    CONTEXT VIEW 3 | BEHIND 87 CAMBRIDGE PARK DRIVE | BIKE PATH

    CONTEXT VIEW 4 | WETLANDS | BIKE PATH

    CONTEXT VIEW 5 | 125 CAMBRIDGE PARK DRIVE

    CONTEXT VIEW 6 | ALEWIFE BROOK PARKWAY OVERPASS

    CONTEXT VIEW 7 | ALEWIFE BROOK PARKWAY OVERPASS BEYOND

    CONTEXT VIEW 8 | TERMINAL ROAD | ADJACENT TO MBTA TRAIN LINE

    CONTEXT VIEW 9 | FAWCETT STREET | ADJACENT TO MBTA TRAIN LINE

    TABLE OF CONTENTS

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36

    37

    38

    39

    40

    41

    42

    43

    44

    45

    46

    47

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 3SGA COMMUNICATING. COLLABORATING. CREATING.

    GFA DIAGRAMS

    UP

    UPUP

    1st Floor Gross Floor Area Gross Floor AreaGross Floor AreaExcluded from Gross Floor AreaDATE: 08.10.2016

    35 CAMBRIDGE PARK DRIVE

    35509 SFGROSS AREA

    UP

    4th Floor Gross Floor AreaDATE: 08.10.201635 CAMBRIDGE PARK DRIVE

    Gross Floor Area

    Gross Floor AreaExcluded from Gross Floor Area

    39992 SFGROSS AREA

    UP

    UP

    UP

    UP

    UP

    2nd Floor Gross Floor AreaDATE: 08.10.201635 CAMBRIDGE PARK DRIVE

    Gross Floor Area

    Gross Floor AreaExcluded from Gross Floor Area

    38787 SFGROSS AREA

    MECHANICAL1205 SF

    UP

    5th Floor Gross Floor AreaDATE: 08.10.201635 CAMBRIDGE PARK DRIVE

    Gross Floor Area

    Gross Floor AreaExcluded from Gross Floor Area

    30534 SFGROSS AREA

    10050 SFMECHANICAL

    UP

    24704 SFArea

    Mechanical Penthouse Gross Floor AreaDATE: 08.10.201635 CAMBRIDGE PARK DRIVE

    Gross Floor Area

    Gross Floor AreaExcluded from Gross Floor Area

    LEVEL 1 LEVEL 4

    LEVEL 2 LEVEL 5

    LEVEL 3 MECHANICAL PENTHOUSE

    FLOOR EXISTING NEW DIFF +/-LEVEL 1 48,723 35,509 -13,214LEVEL 2 47,462 38,787 -8,675LEVEL 3 41,450 39,992 -1,458LEVEL 4 0 39,992 39,992LEVEL 5 0 30,534 30,534MECHANICAL PENTHOUSE 0 0 0

    TOTALS 137,635 184,814 47,179

    FLOOR EXISTING NEW DIFF +/-TOTALS 137,635 184,814 47,179

    KEY

    GFA | GROSS FLOOR AREA

    EXCLUDED

    N

    UP UP

    3rd Floor Gross Floor AreaDATE: 08.10.201635 CAMBRIDGE PARK DRIVE

    Gross Floor Area

    Gross Floor AreaExcluded from Gross Floor Area

    39992 SFGROSS AREA

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 4SGA COMMUNICATING. COLLABORATING. CREATING.

    ZONING + SETBACKS DIAGRAM

    PROPOSED BUILDING

    PROPOSED SETBACK SITE PLAN PROPOSED BUILDING SECTION

    EXISTING GARAGE

    25’-0”

    16’

    PL

    51’- 4”

    25’- 0”16’- 0”17’- 4”42’- 0”

    70’- 9”

    Existing Parking Garage not included in FAR; it is in a 100 year flood plain and was built prior to Sept 15, 2015. (CZO 5.25.42)

    Side Yard Setback = 42’- 0”Exisiting Setback = 9’- 2”

    (H+L)/5, (CZO 20.64.1)

    Side Yard Setback = 70’- 9” (H+L)/5, (CZO 20.64.1)

    Front Yard Setback Permitted = 25’Proposed Setback = 16’- 0”(CZO 20.95.3, CZO 20.64.1)Existing Setback = 17’- 4”

    Front Yard Setback (corner lot, 2nd street) = 57’- 2” Proposed Setback = 51’- 4”(H + L)/4, (CZO 20.64.1)Existing Setback = 16’-1”

    Maximum Height Permitted = 85’- 0”(CZO 20.95.2-6)Proposed Height = 69’- 0”(roof of highest occupied floor)

    Line of proposed building profile. Shaded areas represent minimum setbacks.

    Mechanical Penthouse

    *Max. Floor Area Ratio Permitted = 1.75(CZO) 20.95.1)FAR Proposed = 1.75

    N

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 5SGA COMMUNICATING. COLLABORATING. CREATING.

    AERIAL PERSPECTIVE

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 6SGA COMMUNICATING. COLLABORATING. CREATING.

    SOUTHEAST DAY VIEW

    N

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 7SGA COMMUNICATING. COLLABORATING. CREATING.

    SOUTHEAST NIGHT VIEW

    N

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 8SGA COMMUNICATING. COLLABORATING. CREATING.

    SOUTHWEST DAY VIEW

    N

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 9SGA COMMUNICATING. COLLABORATING. CREATING.

    PROPOSED SITE PLAN

    100 CAMBRIDGE PARK DRIVE 36 CAMBRIDGE

    PARK DRIVE 30 CAMBRIDGE PARK DRIVE

    35 CAMBRIDGE PARK DRIVE

    PARKING GARAGE

    87 CAMBRIDGE PARK DRIVE

    N

    STEEL PLACE

    0 30 60 120

    CAMBRIDGE PARK DRIVE

    property line 296’-0”

    139’

    -7”

    ALEWIFE MBTA STATION

    PEDESTRIAN ACCESS

    KEY

    VEHICLE ACCESS

    BIKE ACCESS

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 10SGA COMMUNICATING. COLLABORATING. CREATING.

    PROPOSED ROOF PLAN

    ALEWIFE MBTA STATION

    35 CAMBRIDGE PARK DRIVE

    PARKING GARAGE

    N

    STEEL PLACE

    CAMBRIDGE PARK DRIVE

    property line 296’-0”

    139’

    -7”

    0 30 60 120

    100 CAMBRIDGE PARK DRIVE 36 CAMBRIDGE

    PARK DRIVE 30 CAMBRIDGE PARK DRIVE

    87 CAMBRIDGE PARK DRIVE

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 11SGA COMMUNICATING. COLLABORATING. CREATING.

    LANDSCAPE PLAN

    CAMBRIDGE PARK DRIVE

    PARKING GARAGE

    STEEL PLACE

    35 CAMBRIDGE PARK DRIVE

    N

    UP

    C

    SGA COMMUNICATING. COLLABORATING. CREATING.

    Spagnolo Gisness & Associates, Inc. 2016

    35 Cambridge Park Drive | P-101

    First Floor PlanTHE DAVIS COMPANIES

    35 CAMBRIDGE PARK DRIVE

    HC PARKING

    INTERIORLOADING

    EXTERIORLOADING

    ALEWIFE MBTA

    STATION

    0 20 40 80

    bike racks bike racksproperty line

    PEDESTRIAN ACCESS

    KEY

    VEHICLE ACCESS

    BIKE ACCESS

    296’-0”

    139’

    -7”

    87 CAMBRIDGE PARK DRIVE

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 12SGA COMMUNICATING. COLLABORATING. CREATING.

    ENLARGED LANDSCAPE PLAN

    CAMBRIDGE PARK DRIVE

    1. permeable pavers 2. permeable sustainable decking

    3. rain garden 5. pervious paver strip4. permeable pavers

    35 CAMBRIDGE PARK DRIVE

    6. permeable paver

    INTERIORLOADING

    HCPARKING

    EXTERIOR LOADING

    Nbike racks

    bike racks

    property line

    RETAIL

    PEDESTRIAN ACCESS

    KEY

    VEHICLE ACCESS

    STEEL PLACE

    8’-0”17’-6”

    0 12 24 48

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 13SGA COMMUNICATING. COLLABORATING. CREATING.

    LANDSCAPE MATERIALS

    PAVER TYPES

    PAVER TYPES

    WOOD DECKING

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 14SGA COMMUNICATING. COLLABORATING. CREATING.

    CAMBRIDGEPARK DRIVE

    STEEL PLACE

    0 10' 20'

    Scale: 1" = 20'

    40'

    C

    PROJECT NODRAWN BY

    SHEET TITLE:

    SEAL / SIGNATURE

    PROJECT TEAM:

    DATE ISSUEDSCALE

    Date Issued For:

    CHECKED BY

    PROJECT:

    SUBMISSIONS:

    REVISIONS:

    200 HIGH ST, BOSTON, MA, 02110857.300.2610 | SGA-ARCH.COM

    Spagnolo Gisness & Associates, Inc.

    1" = 20'-0"

    L-100

    LandscapeMaterialsPlan

    3932.00

    35 Cambridge Park Drive

    THE DAVIS COMPANIES

    Cambridge, MA

    00/00/00

    MM

    00/00/00

    The Davis CompaniesCLIENT

    125 High StreetBoston, MA 02110617.451.1300

    Vanasse Hangen BrustlinCivil

    99 High StreetBoston, MA 02110617-728-7777

    McNamara SalviaStructural

    101 Federal Street, 11 FloorBoston, MA 02110617.737.0040

    AHA Consulting EngineersMEP - FP

    24 Hartwell Avenue, 3er FloorLexington, MA 02421781.372.3000

    Copley Wolff Design GroupLandscape Architect

    161 Boylston StreetBoston, MA 02116617.654.9000

    Code RedCode

    Turnpike road, Suite 11Southborough, MA 01772617.500.7633

    Kalin Associates, IncSpecifications

    1121 Washington StreetNewton, MA 02465617.964.5477

    No. Date Description

    CAMBRIDGEPARK DRIVE

    STEEL PLACE

    0 10' 20'

    Scale: 1" = 20'

    40'

    C

    PROJECT NODRAWN BY

    SHEET TITLE:

    SEAL / SIGNATURE

    PROJECT TEAM:

    DATE ISSUEDSCALE

    Date Issued For:

    CHECKED BY

    PROJECT:

    SUBMISSIONS:

    REVISIONS:

    200 HIGH ST, BOSTON, MA, 02110857.300.2610 | SGA-ARCH.COM

    Spagnolo Gisness & Associates, Inc.

    1" = 20'-0"

    L-100

    LandscapeMaterialsPlan

    3932.00

    35 Cambridge Park Drive

    THE DAVIS COMPANIES

    Cambridge, MA

    00/00/00

    MM

    00/00/00

    The Davis CompaniesCLIENT

    125 High StreetBoston, MA 02110617.451.1300

    Vanasse Hangen BrustlinCivil

    99 High StreetBoston, MA 02110617-728-7777

    McNamara SalviaStructural

    101 Federal Street, 11 FloorBoston, MA 02110617.737.0040

    AHA Consulting EngineersMEP - FP

    24 Hartwell Avenue, 3er FloorLexington, MA 02421781.372.3000

    Copley Wolff Design GroupLandscape Architect

    161 Boylston StreetBoston, MA 02116617.654.9000

    Code RedCode

    Turnpike road, Suite 11Southborough, MA 01772617.500.7633

    Kalin Associates, IncSpecifications

    1121 Washington StreetNewton, MA 02465617.964.5477

    No. Date Description

    LANDSCAPE MATERIALS PLAN

    PARKING GARAGE

    35 CAMBRIDGE PARK DRIVE

    N

    296’-0”

    139’

    -7”

    0 20 40 80

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 15SGA COMMUNICATING. COLLABORATING. CREATING.

    CAMBRIDGEPARK DRIVE

    CAMBRIDGEPARK DRIVE

    STEEL PLACE

    0 10' 20'

    Scale: 1" = 20'

    40'

    C

    PROJECT NODRAWN BY

    SHEET TITLE:

    SEAL / SIGNATURE

    PROJECT TEAM:

    DATE ISSUEDSCALE

    Date Issued For:

    CHECKED BY

    PROJECT:

    SUBMISSIONS:

    REVISIONS:

    200 HIGH ST, BOSTON, MA, 02110857.300.2610 | SGA-ARCH.COM

    Spagnolo Gisness & Associates, Inc.

    10/19/16 DD SET

    1" = 20'-0"

    LP-200

    LandscapePlantingPlan

    3932.00

    35 Cambridge Park Drive

    THE DAVIS COMPANIES

    Cambridge, MA

    00/00/00

    MM

    00/00/00

    The Davis CompaniesCLIENT

    125 High StreetBoston, MA 02110617.451.1300

    Vanasse Hangen BrustlinCivil

    99 High StreetBoston, MA 02110617-728-7777

    McNamara SalviaStructural

    101 Federal Street, 11 FloorBoston, MA 02110617.737.0040

    AHA Consulting EngineersMEP - FP

    24 Hartwell Avenue, 3er FloorLexington, MA 02421781.372.3000

    Copley Wolff Design GroupLandscape Architect

    161 Boylston StreetBoston, MA 02116617.654.9000

    Code RedCode

    Turnpike road, Suite 11Southborough, MA 01772617.500.7633

    Kalin Associates, IncSpecifications

    1121 Washington StreetNewton, MA 02465617.964.5477

    No. Date Description

    0 10' 20'

    Scale: 1" = 20'

    40'

    CAMBRIDGEPARK DRIVE

    CAMBRIDGEPARK DRIVE

    STEEL PLACE

    0 10' 20'

    Scale: 1" = 20'

    40'

    C

    PROJECT NODRAWN BY

    SHEET TITLE:

    SEAL / SIGNATURE

    PROJECT TEAM:

    DATE ISSUEDSCALE

    Date Issued For:

    CHECKED BY

    PROJECT:

    SUBMISSIONS:

    REVISIONS:

    200 HIGH ST, BOSTON, MA, 02110857.300.2610 | SGA-ARCH.COM

    Spagnolo Gisness & Associates, Inc.

    10/19/16 DD SET

    1" = 20'-0"

    LP-200

    LandscapePlantingPlan

    3932.00

    35 Cambridge Park Drive

    THE DAVIS COMPANIES

    Cambridge, MA

    00/00/00

    MM

    00/00/00

    The Davis CompaniesCLIENT

    125 High StreetBoston, MA 02110617.451.1300

    Vanasse Hangen BrustlinCivil

    99 High StreetBoston, MA 02110617-728-7777

    McNamara SalviaStructural

    101 Federal Street, 11 FloorBoston, MA 02110617.737.0040

    AHA Consulting EngineersMEP - FP

    24 Hartwell Avenue, 3er FloorLexington, MA 02421781.372.3000

    Copley Wolff Design GroupLandscape Architect

    161 Boylston StreetBoston, MA 02116617.654.9000

    Code RedCode

    Turnpike road, Suite 11Southborough, MA 01772617.500.7633

    Kalin Associates, IncSpecifications

    1121 Washington StreetNewton, MA 02465617.964.5477

    No. Date Description

    0 10' 20'

    Scale: 1" = 20'

    40'

    TREE SPECIES PLAN

    PARKING GARAGE

    35 CAMBRIDGE PARK DRIVE

    N

    296’-0”

    139’

    -7”

    0 20 40 80

    CAMBRIDGEPARK DRIVE

    CAMBRIDGEPARK DRIVE

    STEEL PLACE

    0 10' 20'

    Scale: 1" = 20'

    40'

    C

    PROJECT NODRAWN BY

    SHEET TITLE:

    SEAL / SIGNATURE

    PROJECT TEAM:

    DATE ISSUEDSCALE

    Date Issued For:

    CHECKED BY

    PROJECT:

    SUBMISSIONS:

    REVISIONS:

    200 HIGH ST, BOSTON, MA, 02110857.300.2610 | SGA-ARCH.COM

    Spagnolo Gisness & Associates, Inc.

    10/19/16 DD SET

    1" = 20'-0"

    LP-200

    LandscapePlantingPlan

    3932.00

    35 Cambridge Park Drive

    THE DAVIS COMPANIES

    Cambridge, MA

    00/00/00

    MM

    00/00/00

    The Davis CompaniesCLIENT

    125 High StreetBoston, MA 02110617.451.1300

    Vanasse Hangen BrustlinCivil

    99 High StreetBoston, MA 02110617-728-7777

    McNamara SalviaStructural

    101 Federal Street, 11 FloorBoston, MA 02110617.737.0040

    AHA Consulting EngineersMEP - FP

    24 Hartwell Avenue, 3er FloorLexington, MA 02421781.372.3000

    Copley Wolff Design GroupLandscape Architect

    161 Boylston StreetBoston, MA 02116617.654.9000

    Code RedCode

    Turnpike road, Suite 11Southborough, MA 01772617.500.7633

    Kalin Associates, IncSpecifications

    1121 Washington StreetNewton, MA 02465617.964.5477

    No. Date Description

    0 10' 20'

    Scale: 1" = 20'

    40'

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 16SGA COMMUNICATING. COLLABORATING. CREATING.

    EC

    RETAILLOBBYTENANT

    INTERIOR LOADING

    EXTERIORLOADING

    HC VAN PARKING

    HC VAN PARKING

    PH N

    ELEC. OS

    TEL FIRE PUMPLSC

    N

    FLOOR PLAN | LEVEL 1

    M

    E

    E

    EC

    WF.E.

    FCC

    L

    L

    TENANT STORAGE RECEIVING

    RECYCLEVESTIBULE

    0 12 24 48

    22’-6” 22’-6”22’-6” 22’-6” 22’-6” 22’-6” 22’-6” 22’-6” 22’-6” 22’-6” 22’-6” 22’-6” 22’-6”

    296’-0”

    1’-9” 1’-9”

    21’-0

    ”21

    ’-0”

    21’-0

    ”24

    ’-0”

    24’-0

    ”18

    ’-0”

    6’-0

    138’

    -8”

    1’-9

    ”1’

    -9”

    31’-8” 9’-4” 9’-9” 9’-9”

    18’-9

    3’-3”

    5’-0”

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 17SGA COMMUNICATING. COLLABORATING. CREATING.

    OPEN TO BELOW

    TENANT

    TENANTTENANT

    MECHANICAL

    N

    0 12 24 48

    1’-9

    ”21

    ’-0”

    21’-0

    ”21

    ’-0”

    24’-0

    ”24

    ’-0”

    24’-0

    139’

    -7”

    2’-1

    0”

    LOBBY

    M

    E

    E

    EC

    LSCW

    SS

    ES FEEC

    ES

    SS

    1’-0”

    1’-0”

    canopy below

    31’-8”

    6’-0”

    22’-6” 22’-6”22’-6” 22’-6” 22’-6” 22’-6” 22’-6” 22’-6” 22’-6” 22’-6” 22’-6” 22’-6” 22’-6”

    296’-0”

    1’-9” 1’-9”

    FLOOR PLAN | LEVEL 2

  • 35 CAMBRIDGE PARK DRIVE 11.08.16 | 18SGA COMMUNICATING. COLLABORATING. CREATING.

    0 10 20 45

    C

    SGA COMMUNICATING. COLLABORATING. CREATING.

    Spagnolo Gisness & Associates, Inc. 2016

    35 Cambridgepark Drive | P-103

    Third Floor PlanTHE DAVIS COMPANIES

    N

    1’-9

    1’-0”

    1’-0”

    31’-8”

    6’-0”

    21’-0

    ”21

    ’-0”

    21’-0

    ”24

    ’-0”

    24’-0

    ”24

    ’-0”

    139’

    -7”

    2’-1

    0”

    45’-0” 45’-0”45’-0”22’-6”45’-0”45’-0”45’-0”

    296’-0”

    1’-9” 1’-9”

    TENANT

    TENANT

    0 12 24 48

    LOBBY

    M

    E

    E

    EC

    LSCW

    SS

    ES FEEC

    ES

    SS

    TYPICAL FLOOR PLAN | LEVEL 3-4