3.3 Look Ahead Activities

1
30Apr15 Contractual Documentation NIL Authority Approvals RTA Design NOC and Building Permit for C2 NOC for Shoring for Water Tank Finalization of Chilled Water Connection Engineering Finalization of Shop Drawings for Steel Structure Finalization of Shop Drawings for C2 Structure Design for Shoring Design for Water Tank Finalization of Provsional Sum Items Approval of Tiles amd Flooring Materials Approval of Curtain Walls Construction Expansion A Plaster Works Flooring Works Chilled Water Chamber Works Floor Tiling Paint Works Gypsum Board Ceiling Works Expansion B Plaster Works Flooring Works Chilled Water Chamber Works Floor Tiling Paint Works Gypsum Board Ceiling Works Expansion C Block Works on Ground Floor Casting of Columns on First Floor Roof Beams & Slab Pile Works in C2 Start of Steel Structure Substation A & B Installation of MEP Equipments Water Tank & Pump Room Excavation for Water Tank Baseslab and Walls for Water Tank External Works MEP Services around Exp C1 Major Look Ahead Activities Date Date Job No : 131 Ibn Battuta Shopping Mall Expansion Expansion A, B & C Monthly Report No. 16

description

Look ahead program

Transcript of 3.3 Look Ahead Activities

  • 30Apr15ContractualDocumentation

    NIL

    AuthorityApprovals RTADesignNOCandBuildingPermitforC2NOCforShoringforWaterTankFinalizationofChilledWaterConnection

    Engineering FinalizationofShopDrawingsforSteelStructureFinalizationofShopDrawingsforC2StructureDesignforShoringDesignforWaterTankFinalizationofProvsionalSumItemsApprovalofTilesamdFlooringMaterialsApprovalofCurtainWalls

    ConstructionExpansionA PlasterWorks

    FlooringWorksChilledWaterChamberWorksFloorTilingPaintWorksGypsumBoardCeilingWorks

    ExpansionB PlasterWorksFlooringWorksChilledWaterChamberWorksFloorTilingPaintWorksGypsumBoardCeilingWorks

    ExpansionC BlockWorksonGroundFloorCastingofColumnsonFirstFloorRoofBeams&SlabPileWorksinC2StartofSteelStructure

    SubstationA&B InstallationofMEPEquipments

    WaterTank&PumpRoom ExcavationforWaterTankBaseslabandWallsforWaterTank

    ExternalWorks MEPServicesaroundExpC1

    MajorLookAheadActivitiesDateDate

    JobNo:131 IbnBattutaShoppingMallExpansionExpansionA,B&C MonthlyReportNo.16