3180 17 Mile Drive, Pebble Beach

20
“FILL YOUR DREAMS BY THE SEA” TIM ALLEN PROPERTIES

description

Tim Allen Properties

Transcript of 3180 17 Mile Drive, Pebble Beach

“fill Your DreAmS BY tHe SeA”tim AllenProPert ieS

A er i A l v i e w o f lot

o ce A n v i e w fro m lot

inspiration only comes from what one’s imagination can picture,

from what the mind conjures up as a dream or as a fantasy. to

find real inspiration there must be a stimulus and it is here, along

Pebble Beach’s fabled 17 mile Drive that you will find all the in-

spiration you will need. Here, on one of the last vacant parcels

to become available for sale, here on a spacious two acres of

precious land fronting the mighty Pacific, here as the waves crash

on the shore and the sun sets over the far horizon and the otters

bob in the surf, here is the ultimate when it comes to true inspira-

tion. So, dream your dreams, think your thoughts but when you

are ready for inspiration, come and…fill your dreams by the sea.

offered at $9,995,000

Presented by tim Allen

coldwell Banker Del monte realty

“ f i ll You r DreAmS BY tHe SeA”3180 Seventeen mile Drive, PeBBle BeAcH

BY tH e S e A

tH e lot

tH e v i e w

D r i v e wAY u P

lot v i e w

PA rcle m A P

co n cePt uA l D r Aw i n g

PA rcle m A P

co n cePt uA l D r Aw i n g

PeB B le B e AcH m A P

Item 1 Project Analysis 1 monthItem 2 Consultants Work 1.5 monthItem 3 Pebble Beach ARB 1 monthItem 4 Initial Planning Submittal 0.5 monthItem 5 Planning Review 5.5 monthItem 6 County Hearing 0.5 monthItem 7 Appeal Period 1 monthItem 8 Planning Final Approval 0.5 month

Total Timeline Total 11.5 months

PLANNING PERMIT TIMELINE

ERIC MILLER ARCHITECTS, INC.

co n cePt uA l D r Aw i n g

A/E FEES for PLANNING PHASE 10/3/12

.000-000-000

ARCHAEOLOGICAL 800$ SURVEY 2,200$ SURVEYOR CONSTRUCTION STAKING -$ Future

SURVEY WORK DURING CONSTRUCTION -$ Future

GEOTECHNICAL 3,250$ FIELD TEST DURING CONSTRUCTION -$ Future

BIOTECH REVIEW 2,300$ ARBORIST REPORT 1,800$ FORESTER MANAGEMENT 2,200$ STORY POLES 2,500$ LANDSCAPE ARCHITECT -$ TBD

CIVIL -$ Future

STRUCTURAL -$ Future

MECHANICAL -$ Future

ELECTRICAL -$ Future

ARCHITECT'S FEE PLANNING PHASE -$ TBD

ARCHITECT'S CONSTRUCTION DOCUMENTS -$ TBD

A/E FEES SUBTOTAL 15,050$ REIMBURSABLE 4% -$ TBD

A/E FEES GRAND TOTAL 15,050$

AGENCY & PERMIT FEESPebble Beach, California

PEBBLE BEACH ARCHITECTURAL REVIEW 8,000$ WATER PERMIT 1,000$ SEWER CAPACITY 1,200$ SCHOOL 3,381$ PARKS & RECREATION 1,000$ PB WATER ENTITLEMENT -$ by owners

WATER PERMIT (PB ADDT. PURCHASE ) -$ TRAFFIC IMPACT 1,500$ TANCE FEE 3,000$ PG&E 1,250$ PLANNING PERMIT 9,325$ estimated

COASTAL -$ TBD

BUILDING PERMIT & PLAN CHECK -$ Future

AGENCY & PERMIT FEES TOTAL 29,656$

Note: Fees are estimated only, to be confirmed.