Customer : CAIRN India Ltd, Barmer, Rajasthan. Transformer Details: QAP No. : 42681.QAP Project : MPT site. 01 No. 315 KVA, 33/0.433 kV Transformers (VTL Ref No. : JN 42681) Turnkey Contractor : LRV engineering solutions, Chennai. Sr. Component Characteristics Classi- Type of Quantum Reference Acceptance Format of AGENCY No. and fication Check of Check Docs. norm Records Voltamp CLIENT Operation 1 Visual a) Dimension and Major Visual & One Unit Approved Approved Logbook Assy. W Inspection completeness Measurement Drawings Drawings Insp. b) Mounting of fittings Major Visual & One Unit Approved Approved Logbook Assy. W & Accessories Measurement Drawings Drawings Insp. 2 Testing a) Routine tests Critical Test 100% IS 2026 IS 2026 Test Result Test Engg W - Ratio test - Winding Resistance - Open circuit - Short circuit - Induced over voltage - Separate source voltage - IR value - Vector group - BDV of oil - Oil Leakage Test 3 Final Fittings a) Completeness Major Visual One Unit Approved Approved Log sheet Q.C. W Drawings Drawings b) Clearance on Terminals Major Measurement One Unit Drawings/ Drawings/ Log sheet Q.C. W 4 Bought Out a) Bought Out Component - - - Approved Approved Vendor's - R Components Test Reports of Major Drawings Drawings TC Items Prepared By / Verified By : Approved by: W - Witness R - Record Lokesh Walhe (VOLTAMP) (Client) VOLTAMP TRANSFORMERS LIMITED QUALITY ASSURANCE PLAN Rev.: 0 Date: 05.03.2013

Transcript of 315 KVA STD QAP

Page 1: 315 KVA STD QAP

Customer : CAIRN India Ltd, Barmer, Rajasthan. Transformer Details: QAP No. : 42681.QAPProject : MPT site. 01 No. 315 KVA, 33/0.433 kV Transformers (VTL Ref No. : JN 42681)Turnkey Contractor : LRV engineering solutions, Chennai.

Sr. Component Characteristics Classi- Type of Quantum Reference Acceptance Format of AGENCY No. and fication Check of Check Docs. norm Records Voltamp CLIENT

Operation 1 Visual a) Dimension and Major Visual & One Unit Approved Approved Logbook Assy. W

Inspection completeness Measurement Drawings Drawings Insp. b) Mounting of fittings Major Visual & One Unit Approved Approved Logbook Assy. W & Accessories Measurement Drawings Drawings Insp.

2 Testing a) Routine tests Critical Test 100% IS 2026 IS 2026 Test Result Test Engg W

- Ratio test - Winding Resistance - Open circuit - Short circuit - Induced over voltage - Separate source voltage - IR value - Vector group - BDV of oil - Oil Leakage Test

3 Final Fittings a) Completeness Major Visual One Unit Approved Approved Log sheet Q.C. W Drawings Drawings b) Clearance on Terminals Major Measurement One Unit Drawings/ Drawings/ Log sheet Q.C. W

4 Bought Out a) Bought Out Component - - - Approved Approved Vendor's - RComponents Test Reports of Major Drawings Drawings TC

Items

Prepared By / Verified By : Approved by: W - Witness R - RecordLokesh Walhe (VOLTAMP) (Client)

VOLTAMP TRANSFORMERS

LIMITED QUALITY ASSURANCE PLAN Rev.: 0 Date: 05.03.2013