3.11 Earthquake Damage Report 1

Transcript of 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ②...

Page 1: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

3.11  Earthquake  Damage  Report

1�

Page 2: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Summary

a.  No  human  casual;es  b.  No  fatal  damages  to  the  buildings  c.  Facili;es  &  Equipment:  Further  inspec;on  

going  on  

Page 3: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Index   Map  of  the  damages  at  Tsukuba  Campus  

–  8  GeV  Electron-­‐Positron  Linear  Accelerator  –  Photon  Factory  (PF  ring/PF-­‐AR/Compact  ERL)  –  Compact  ERL  –  Photon  Factory  (PF/PF-­‐AR)  –  KEKB  Accelerator  –  Tsukuba  Experimental  Hall  (Belle)  –  Accelerator  Test  Facility  (ATF)  –  Superconduc;ng  RF  Test  Facility  (STF)  –  Radia;on  Science  Center  –  Cryogenics  Science  Center  –  Mechanical  Engineering  Center  –  Other  facili;es  

  Map  of  the  damages  at  Tokai  Campus  –  Linac  –  3  GeV  Synchrotron  –  50  GeV  Synchrotron  –  Materials  and  Life  Science  Experimental  Facility(MLF)  –  Neutrino  Facility  –  Nuclear  and  Par;cle  Physics  Facility  

・・・・・・・・・ 1

・・・・・・・・・ 2 ・・・・・・・・・ 7 ・・・・・・・・・10 ・・・・・・・・・12 ・・・・・・・・・14 ・・・・・・・・・18 ・・・・・・・・・20 ・・・・・・・・・23 ・・・・・・・・・25 ・・・・・・・・・27 ・・・・・・・・・29 ・・・・・・・・・31

・・・・・・・・・36

・・・・・・・・・37 ・・・・・・・・・42 ・・・・・・・・・46 ・・・・・・・・・49 ・・・・・・・・・53 ・・・・・・・・・56

Page 4: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

① 8  GeV  Electron-­‐Positron  Linear  Accelerator  ② Photon  Factory  (PF  ring/PF-­‐AR/Compact  ERL)  ③ Photon  Factory  (PF/PF-­‐AR)  ④ KEKB  Accelerator  ⑤ KEKB  Tsukuba  Lab.  (Belle)  ⑥ Accelerator  Test  Facility  (ATF)  ⑦ Superconduc;ng  RF  Test  Facility  (STF)  ⑧ Radia;on  Science  Center  ⑨ Cryogenics  Science  Center  ⑩ Mechanical  Engineering  Center  ⑪ North  Experimental  Hall  ⑫ Buildings,  Power  Substa;on,  Roads  etc  

②③ ④

②③ ⑥ ⑦

⑩ ⑨

1

Map  of  the  damages  at  Tsukuba  Campus

Page 5: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

8  GeV  Electron-­‐Positron  Linac

•  Girders,  2  t  each,  deformed.  Their  anchor  bolts  were  broken.  

•  A  set  of  triplet  quadrupole  magnets,  400  kg,  fell  from  the  girder.  

•  Vacuum  leaked  through  en;re  accelera;ng  structures,  due  to  damages  on  bellows  and  other  components.  

•  Two  klystrons  were  damaged  due  to  vacuum  leak.  

•  Underground  water  flew  into  the  tunnel. 2

Page 6: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

A  set  of  triplet  quadrupole  magnets  fell

  Major  part  of  the  Linac  beam  pipe  is  mounted  on  flexible  leaf  spring  mechanisms,  which  had  sustained  large  earthquakes  in  the  post.    This  ;me  the  displacement  was  so  large  a  quadrupole  magnet  put  between  the  leaf  spring  moun;ng  and  the  fixed  moun;ng  fell  to  the  floor.    The  leaf  spring  to  the  right  also  surrendered.

3

Page 7: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  The  linac  consists  of  240  units  of  2  m  accelera;ng  structures,  which  has  vacuum  pressure  at  10-­‐6  Pa.  The  earthquake  broke  the  vacuum  of  almost  all  structures  to  the  atmospheric  pressure.  The  damage  due  to  the  intrusion  of  debris  and  moisture  may  affect  the  performance.

Accelera;ng  structure  is  made  of  oxygen-­‐free  copper  (lec).    

Destroyed  manifolds

Accelera;ng  structure  

Vacuum  leaked  through  the  en;re  linac

4

Page 8: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  The  linac  is  equipped  with  60  klystrons  for  the  genera;on  of  microwave  applied  300  kV  voltage.  At  least  two  of  them  became  unusable  due  to  vacuum  leak  by  the  earthquake.  Possibili;es  of  performance  reduc;on  remain  for  other  units.

klystrons

Damages  on  the  klystrons

5

Page 9: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  Underground  water  flew  into  the  tunnel  through  the  expansion  joints  which  are  located  every  80  m.

Underground  water  flew  into  the  tunnel

6

Page 10: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Photon  Factory  (PF/PF-­‐AR/Compact  ERL)

•  Alignments  disturbed.  •  Components  turned  over.  •  Vacuum  worsened.  

7

Page 11: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

PF-­‐RF  System

Deforma;on  of  bellows  around  the  cavity.

PF-­‐AR    RF

200  kW  dummy  load  turned  over.

A  tool-­‐rack  turned  over.

Misalignment  of  power  supplies

RF  System

8  

Page 12: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

A  pumping  sta;on  fell  down  from  a  carrier.

Shielding  lead  blocks  collapsed.

Shielding  lead  brocks  around  a  vacuum  pipe  moved.

A  stored  ion  pump  ;pped  over.

Frontends

9

Page 13: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Compact  ERL

•  No  serious  damage  was  observed  in  the  facility.  

•  Some  lamps  fell  down  in  the  ERL  Test  Facility.

10

Page 14: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

•  An  ion  pump  turned  over  at  AR-­‐South.  •  The  laser  crystal  could  have  been  damaged.  •  A  worksta;on  was  turned  over.  •  The  transfer  rod  was  realigned.  •  The  cracks  on  the  floor  of  AR-­‐South  bldg  was  enlarged.  

The  damaged  ion  pump. The  damaged  worksta;on.

R&D  Area  of  the  gun  and  injector  for  Compact  ERL

11

Page 15: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Photon  Factory  experimental  halls  (PF/PF-­‐AR)

•  Not  so  serious  damage  in  the  buildings,  roads,  and  infrastructures.  

•  Many  instruments  ;pped  over  and  derailed.

12

Page 16: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

A  power  supply  ;pped  over.

An  X-­‐ray  diffractometer  derailed  from  its  posi;oning  rail.

A  vacuum  chamber  ;pped  over.

An  X-­‐ray  diffractometer  fell  down  and  was  broken.

Experimental  hall  (PF)

13

Page 17: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

KEKB  Rings

•  The  buildings  for  power  sta;ons  were  damaged.  •  The  suppor;ng  structures  of  air-­‐fin  cooler  were  

broken.  •  The  klystrons  moved:  checks  with  high  power  are  

necessary.  •  Magnets,  rf  cavi;es,  vacuum  components  in  the  

tunnel  look  safe.  •  Some  servers  and  detectors  were  flooded.  •  Stocked  wigglers  and  bending  magnets  were  

damaged.  

14

Page 18: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

A  part  of  the  outer  wall  fell. Cables  hung  down.

The  control    room  on  2F

While  damages  are  most  serious  at  the  D5  sta;on,  other  buildings  have  broken  ceilings,  walls,  and  cracks  on  the  floor.  

D5  power  sta;on

15

Page 19: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  As  the  base  on  the  roof  was  broken,  the  cooler  ;lted  at  D4.  

  The  bases  of  AFCs  at  D1,  D2,D5  were  also  broken,  

AFC  on  the  roof  of  D4  building  

Air-­‐fin  cooler(AFC)  for  klystrons

16

Page 20: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  No  serious  damage  has  been  discovered  by  looking  outside  on  the  magnets,  vacuum  components,  and  rf  cavi;es.  

  No  vacuum  leak  was  observed  in  the  ARES  and  superconduc;ng  cavi;es  as  well  as  all  beam  pipes.  

  Tests  with  electric  power  will  be  necessary  for  confirma;on.    Some  devices  even  need  beam  opera;on  for  verifica;on.

Magnets,  rf  cavi;es,  vacuum  in  the  tunnel

17

Page 21: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Tsukuba  Experimental  Hall

•  Belle  detector  (1400  ton)  slid  several  cen;meters  by  breaking  anchor  bolts  

•  Further  inspec;on  needed  to  check  the  health  of  inner  part  of  the  Belle  detector  

18

Page 22: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Belle  detector  was  posi;oned  in  the  assembly  hall  next  to  the  collision  hall,  for  the  major  upgrade  (8  meters  each,  weight:  1400  ton)   The  detector  was  fixed  with  32  anchor  bolts  thru  brackets.    All  anchor  bolts  were  broken  by  the  earthquake  and  the  en;re  detector  slid  by  about  6  cm.   No  serious  damages  were  observed  by  visual  inspec;ons.    Further  inspec;ons  are  necessary,  especially  for  inner  part  such  as  CsI  crystals  and  glass  plate  detectors.

Belle  detector

19

Page 23: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

ATF  Test  Accelerator

•  All  shuhers  of  the  building  was  deformed.  •  Some  radia;on-­‐shielding  blocks  fell  on  

the  floor.  •  The  cable  racks  for  the  power  conversion  

unit  were  destroyed.  •  Misalignments  of  the  magnets.  

20

Page 24: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

A  radia;on  area  monitor  was  broken.

A  cable  rack  420V  lines  fell  down.

Damages  at  ATF

21

Page 25: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Accelerator  Cavi;es  (most  downstream)

Q-­‐mag

A  Q-­‐magnet  driced  to  north  by  several  cm,    destroyed  vacuum  bellows  and  beam  duct

ATF  Equipment

22

Page 26: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Superconduc;ng  RF  Test  Facility  (STF)

•  No  damages  to  the  building  on  visual  inspec;on  

•  Primary  cooling  water  system  is  partly  damaged  

•  No  other  damages  to  the  equipment

23

Page 27: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  Three  broken  20A  pipes  (above  photo)    One  buckled-­‐down  300A  pipe  (right)    One  broken  air-­‐relief  valve  

Machine  room  of  the  STF  building  -­‐  Cooling  water  system

24

Page 28: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Radia;on  Science  Center

•  Two  radia;on  monitors  were  broken.  Four  Ge  detectors  for  radio-­‐ac;vity  measurements  were  broken.  

•  No  significant  damages  nor  leaks  at  Chemistry  Lab  and  Wastewater  Treatment  Facility.

25

Page 29: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

When  electric  power  supply  was  cut  off  in  KEK,  radia;on  dose  rates  were  measured  at  the  boundary  of  radia;on  control  area  using  portable  dosimeters,  and  it  was  confirmed  there  is  no  effects  from  KEK  accelerators.  Several  radia;on  monitors  at  the  site  boundary  were  powered  from  outside  of  KEK,  and  in  early  morning  on  March  15,  gamma-­‐ray  dose  rates  increased  dure  to  radio-­‐ac;vi;es  from  Fukushima  nuclear  power  plants.  Radia;on  control  building  was  powered,  and  from  March  16,  dose  data  in  KEK  site  are  shown  in  KEK  HP hhp://rcwww.kek.jp/norm/  KEK  let  eight  portable  radia;on  survey  meters  and  20  pocket  dosimeters  to  Fukushima  prefectural  office.  

We  already  tested  87  radia;on  monitors  those  send  measured  data  correctly,  though    45  ones  are  not  ready.  Two  radia;on  monitors  at  the  ATF  were  broken.  

Pb  shields  around  a  Ge  detector  were  slipped  off  in  Advanced  Instrumenta;on  Lab.  Four  Ge  detectors  were  broken,  and  remain  three  detectors  were  used  to  measure  redio-­‐ac;vity.  KEK,  in  conjunc;on  with  Na;onal  Ins;tute  for  Environmental  Study  (NIES)  have  measured  airborne  radio-­‐ac;vi;es.  I-­‐131,  Te-­‐132  etc.  were  detected,  and  these  results  are  shown  in  the  KEK  home  page.    

Radia;on  Monitors  around  accelerators.

26

Page 30: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Environmental  Safety  Office

27

•  Chemistry  office  There  was  no  major  damage  to  the  building.  

•  Chemistry  Laboratory  There  was  no  major  damage  to  the  building.  There  was  also  no  damage  to  the  analy;cal  equipments  and  we  have  checked  the  u;liza;on  of  the  equipments.  We  have  restarted  regular  water  analysis  services  from  March  22  with  a  limited  electrical  power.  

•  Wastewater  treatment  facility  Some  pipes  in  the  processing  plant  were  damaged,  but  have  been  repaired  temporary.    We  have  restarted  regular  wastewater  treatment  process  from  March  28.  There  was  no  oullow  of  wastewater  form  the  treatment  facility.  

•  PF  Area  RI  wastewater  treatment  facility  Some  wastewater  in  the  treatment  tank  was  overflowed  by  the  vibra;on  of  the  earthquake,  but  there  was  no  oullow  of  wastewater  form  the  treatment  facility.  

•  PS  Area  RI  wastewater  treatment  facility  The  dilu;on  treatment  tank  was  damaged  by  the  vibra;on  of  the  earthquake.  The  RI  wastewater  treatment  can  be  performed  without  difficulty,  because  the  damaged  tank  is  currently  not  in  use.  

Page 31: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Cryogenics  Science  Center

•  A  crane  was  damaged.  •  Mechanical  supports  of  low-­‐

vibra;on  thermal  insulated  vacuum  vessel  were  damaged.

28

Page 32: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Cryogenics  Science  Center

29

A  damaged  crane  

Ceiling  mercury  lamps  were  damaged  

He-­‐recycling  compressor  was  stalled,    and  the  gas  was  released  into  the  air.  

Bags  were  not  damaged  

A  crack  in  the  wall  of  the  Cryogenics  Bldg.  2  Mechanical  supports  of  low-­‐vibra;on  thermal  

insulated  vacuum  vessel  were  damaged  

Page 33: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Mechanical  Engineering  Center

•  58  machine  tools  and  equipments  deviated  from  the  fixed  posi;on.  A couple  of  equipments  fell  and  the  floor  of  2  machines  went  down.  

•  Recovery  status  as  of  April  1st  2011:      48  machine  tools  were  restored.      We  adjust  to  recover  10  machine  tools.

30

Page 34: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

The  cabinet  for  jigs  and  tools  fell and  the  device  on  the  cabinet  also fell  on  the  floor.

The  cabinet  and  jig  fell.  Machine tool  deviated  from  the  fixed posi;on.

Machine  Shop  Building  No.1

31

Page 35: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Other  facili;es

•  Advanced  Instrumenta;on  Lab.  ‒  Three  air-­‐condi;oning  duct  were  dropped  

from  ceiling  ‒  A  part  of  ceiling  boards  fell  

•  North  Counter  Hall  ‒  Part  of  wall  panel  fell  in  the  north  (14m)  ‒  Shuher  of  the  eastern  gate  is  broken,  a  crack  

in  the  north-­‐eastern  wall  ‒  Cables  fell  on  the  rail  of  crane  

•  Water  tank  raptures

32

Page 36: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  Panels  of  northern  wall  fell  to  the  ground  (14m  in  horizontal  width)    Damaged  cable  rack  by  the  container  house  

Northern  wall  of  North  Experimental  Hall  

33

Page 37: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  The  earthquake  shook  water  in  the  tank,  and  the  vibra;on  caused  by  the  shake  crippled  the  tank.  About  a  half  of  water  tanks  were  damaged  or  distorted,  forcing  the  site-­‐wide  water  supply  to  be  cut  by  half.

Water  tanks

34

Page 38: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  The  ground  sank  due  to  the  liquefac;on  at  several  places,  and  a  part  of  roads  were  damaged.    There  were  gaps  as  large  as  30cm,  and  are  widening  with  acershocks.

Campus  and  roads

35

Page 39: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  Half  of  12  V-­‐shape  insulator  were  damaged,  and  caused  a  site-­‐wide  power  outage.  

  The  rest  of  insulators  were  temporarily  restored  by  TEPCO.    Private  generator  provided  minimum  amount  of  electricity  for  40  hours  before  the  power  was  restore.

Acer  the  restora;on

(Equipment  owned  by  TEPCO)

Ultra-­‐High-­‐Voltage  Power  Substa;on

36

Page 40: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Map  of  the  damages  at  Tokai  Campus  (J-­‐PARC) ① Linac  ② 3  GeV  Synchrotron  ③ 50  GeV  Synchrotron  ④ Main  Control  Room  ⑤ Material  and  Life  Sciences  

Experimental  Facility  ⑥ 3NBT  ⑦ Neutrino  Experimental  Facility  ⑧ Hadron  Experimental  Facility  ⑨ Accelerator-­‐Driven  Trans  muta;on  

Experimental  Facility  

⑤ ② ⑥

⑦ ⑧

⑨ ⑦

37

Page 41: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Linac

•  Roads  around  J-­‐PARC  area  sank  and  damaged.  

•  Side-­‐buildings  were  severely  damaged.  

•  Underground  water  flew  into  the  Linac  tunnel.

38

Page 42: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  About  1.5  m  drop  as  seen  above,  over  a  wide  area.    Electric  wires  and  water  pipes  were  all  damaged.

Entrance  for  Linac

39

Page 43: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  Serious  cracks  on  the  road.  This  is  a  typical  one  and  can  be  seen  all  over  the  J-­‐PARC  area.  

Road  in  front  of  Linac

40

Page 44: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  Concerning  the  central  area  of  Linac,  no  serious  damages  were  seen  by  looking  from  outside.    As  of  March  17,  1  cm  deep  water  was  on  the  floor.

Inside  Linac  Tunnel    (March  17)

41

Page 45: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  As  of  March  24,  the  water  level  went  up  to  10  cm.    Pumping  water  of  100  t  started  on  March  25  by  using  the  motor-­‐driven  generator.    

Inside  Linac  Tunnel    (March  24)

42

Page 46: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

3  GeV  Synchrotron

•  Accelerator  itself  looks  safe.  •  Power  Substa;on,  condenser  bank  

inclined  and  waved  due  to  the  sink  of  ground  around  the  buildings.  

•  Likewise,  cables  and  air-­‐ducts  were  distorted.

43

Page 47: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  No  significant  damages.

3  GeV  Main  Ring

44

Page 48: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  The  whole  facility  is  inclined  as  above.  

Power  Substa;on

45

Page 49: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  Condenser  bank  was  waved.  Cables  were  distorted  with  heavy  weight  on  them.  

Condenser  Bank  for  3  GeV

46  

Page 50: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

50  GeV  Synchrotron

•  Accelerator  itself  looks  safe.  •  Underground  water  into  the  

tunnel.  •  No  serious  damages  to  the  Main  

Control  Room.

47

Page 51: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  Although  some  distor;on  is  observed  for  cable  rack,  the  accelerator  itself  seems  OK  as  viewed  only  from  this  area.  

50  GeV  Main  Ring

48

Page 52: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  Main  Control  Room  was  in  a  reasonable  shape.

Main  Control  Room

49

Page 53: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Materials  and  Life  Sciences  Experimental  Facility(MLF)

•  Sinking  caused  a  sharp  bend  in  the  piping  system.  

•  Beam  Lines  were  damaged  due  to  the  sink  (30  cm)  of  the  added  buildings.  

•  No  damage  observed  inside  of  the  experiment  halls.  

50

Page 54: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  West  side  road  from  MLF.    About  1.5  m  sinking  was  observed.  

Road  around  MLF

51

Page 55: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  Piping  system  is  exposed  and  disjointed  due  to  the  1m  sink  of  the  ground.  

  Exposed  manhole

Piping  System

52

Page 56: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  Interior  part  of  the  Hall  1  and  Hall  2  are  very  healthy,  thanks  to  many  underpins  for  the  building.

MLF  First  Hall  and  Second  Hall

53

Page 57: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Neutrino  Experimental  Facility

•  On-­‐site-­‐detector,  Beam  Transport  look  safe.  

•  Damages  by  the  sink  of  ground  around  the  facility.

54

Page 58: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Neutrino:  Beam  Dump  Area  and  Air  Condi;oning  

  South  side  (viewed  from  upstream  to  downstream)

55

Page 59: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  No  significant  damages  from  outside.  About  1  cm  deep  water  at  the  bohom.

Neutrino:  On  Site  Detector

56

Page 60: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

Hadron  Experimental  Facility

•  No  serious  damages  to  the  inside  of  experimental  hall  and  the  building.  

•  The  ground  sank  around  the  facility.

57

Page 61: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  Due  to  many  underpins,  hadron  hall  looks  OK.  No  significant  damages  were  observed.

Hadron  Experimental  Hall

58

Page 62: 3.11$Earthquake$ Damage$Report · ① 8 GeV$ElectronHPositron$Linear$Accelerator$ ② Photon$Factory$(PF$ring/PFHAR/CompactERL )$ ③ Photon$Factory$(PF/PFHAR)$ ④ KEKB$Accelerator$

  About  30  cm  drop  all  over  the  places.  Gas  storage  stand  is  floa;ng  up  on  the  air.

Hadron  Outside  Area

59