301012-02366-SS-REP-0001 YRE Geotechnical Report Rev 0 · joint venture cpt-68 cpt-69a cpt-69...
Transcript of 301012-02366-SS-REP-0001 YRE Geotechnical Report Rev 0 · joint venture cpt-68 cpt-69a cpt-69...
?
?
?
24m
26m
28m
30m
32m
34m
36m
38m
40m
42m
44m
22m
20m
18m
24m
26m
28m
30m
32m
34m
36m
38m
40m
42m
44m
22m
20m
18m
30 40 50201000 60
PUBLIC TRANSPORT AUTHORITY
YANCHEP RAIL EXTENSION
ENGINEERING GEOLOGICAL MODEL
CROSS-SECTION - SHEET 5 OF 7
0
Government of Western Australia
Public Transport Authority
AT ORIGINAL PLOT SIZE
LANDCORP
PEET
PEET
PERPETUAL
TRUSTEES
PERPETUAL TRUSTEES
LANDCORP
BH-12
CPT-14
CPT-15
CPT-16
CPT-16A
CPT-17
CPT-17A
CPT-16B
CPT-13
800 40 120
0 4 8 12
FEATURES (PLAN)
NOTES
LEGEND
1. ALL LEVELS AND DIMENSIONS ARE IN METRES
UNLESS SHOWN OTHERWISE
2. THESE PLANS ARE FOR TRACK ALIGNMENT ONLY
AND SHOULD BE READ IN CONJUNCTION WITH
ASSOCIATED PLANS FOR ROADWORKS,
CIVILWORKS, STRUCTURES, ELECTRIFICATION etc.
3. ALLTRACK BALLASTED UNLESS SHOWN
OTHERWISE.
4. DESIGN ALIGNMENT: 141001_AlignP_Dn_HA15
1:2000 Horizontal at A3
1:200 Vertical at A3
SHEET LOCALITY
ALKIMOS
STATION
EGLINTON
STATION
YANCHEP
STATION
EXISTING
BUTLER STATION
THIS
DRAWING
SC - Subcrop (rock) exposed in cutting
OC - Outcrop (rock) exposed on surface
Test Pit (Geosite, 2010)
Cone Penetrometer Test
Borehole 0 100
3.26m EOH
qc (MPa)
CPT Trace
No RefusalNR
Silica SAND
Siliceous Calcarenite
Calcreted calcarenite
Sandstone with
carbonate cement
Safety Bay Sand (S2)
Tamala Sand (S7)
Tamala Limestone (LS1)
Test Pit
Top of Limestone
Base of Pit
LEGEND LITHOLOGY GEOLOGY
Natural Surface Level
Interpreted Rock Level Design Rail Level
LONG-SECTION
?
Inferred Rock Level
Core Loss
Cemented Safety Bay Sand (LS4)
DESIGN PASSENGER MAIN
EXISTING PASSENGER MAIN
HORIZONTAL CURVE NUMBER
PROPOSED PSP
DEVELOPER BOUNDARY
LANDCORP
DEVELOPER NAME
PROPOSED PLATFORM
EXSTING RAIL RESERVE
PROPOSED RAIL RESERVE
CADASTRE
ELEV
ATIO
N (m
AHD)
Alkimos Drive (~40m North)
LS1
S7
?
??
?
?
?
?
24m
26m
28m
30m
32m
34m
36m
38m
40m
42m
44m
46m
48m
50m
52m
24m
26m
28m
30m
32m
34m
36m
38m
40m
42m
44m
46m
48m
50m
52m
30 40 50201000 60
PUBLIC TRANSPORT AUTHORITY
YANCHEP RAIL EXTENSION
ENGINEERING GEOLOGICAL MODEL
CROSS-SECTION - SHEET 6 OF 7
0
Government of Western Australia
Public Transport Authority
AT ORIGINAL PLOT SIZE
TOKYU
CPT-50
CPT-51
CPT-52
CPT-53
CPT-54
CPT-55
CPT-56
CPT-57
CPT-58
CPT-59
CPT-60
CPT-61
CPT-62
BH-59
800 40 120
0 4 8 12
FEATURES (PLAN)
NOTES
LEGEND
1. ALL LEVELS AND DIMENSIONS ARE IN METRES
UNLESS SHOWN OTHERWISE
2. THESE PLANS ARE FOR TRACK ALIGNMENT ONLY
AND SHOULD BE READ IN CONJUNCTION WITH
ASSOCIATED PLANS FOR ROADWORKS,
CIVILWORKS, STRUCTURES, ELECTRIFICATION etc.
3. ALLTRACK BALLASTED UNLESS SHOWN
OTHERWISE.
4. DESIGN ALIGNMENT: 141001_AlignP_Dn_HA15
1:2000 Horizontal at A3
1:200 Vertical at A3
SHEET LOCALITY
ALKIMOS
STATION
EGLINTON
STATION
YANCHEP
STATION
EXISTING
BUTLER STATION
THIS
DRAWING
SC - Subcrop (rock) exposed in cutting
OC - Outcrop (rock) exposed on surface
Test Pit (Geosite, 2010)
Cone Penetrometer Test
Borehole 0 100
3.26m EOH
qc (MPa)
CPT Trace
No RefusalNR
Silica SAND
Siliceous Calcarenite
Calcreted calcarenite
Sandstone with
carbonate cement
Safety Bay Sand (S2)
Tamala Sand (S7)
Tamala Limestone (LS1)
Test Pit
Top of Limestone
Base of Pit
LEGEND LITHOLOGY GEOLOGY
Natural Surface Level
Interpreted Rock Level Design Rail Level
LONG-SECTION
?
Inferred Rock Level
Core Loss
Cemented Safety Bay Sand (LS4)
CPT-59-2
CPT-61-2
DESIGN PASSENGER MAIN
EXISTING PASSENGER MAIN
HORIZONTAL CURVE NUMBER
PROPOSED PSP
DEVELOPER BOUNDARY
LANDCORP
DEVELOPER NAME
PROPOSED PLATFORM
EXSTING RAIL RESERVE
PROPOSED RAIL RESERVE
CADASTRE
ELEV
ATIO
N (m
AHD)
Tokyu 1
LS1
S7
S2
?
?
?
?
?
?
?
?
?
24m
26m
28m
30m
32m
34m
36m
38m
40m
42m
44m
22m
20m
24m
26m
28m
30m
32m
34m
36m
38m
40m
42m
44m
22m
20m
30 40 50201000 60
PUBLIC TRANSPORT AUTHORITY
YANCHEP RAIL EXTENSION
ENGINEERING GEOLOGICAL MODEL
CROSS-SECTION - SHEET 7 OF 7
0
Government of Western Australia
Public Transport Authority
AT ORIGINAL PLOT SIZE
DEPARTMENT OF LANDS
NEW ORION
ST ANDREWS
JOINT VENTURE
CPT-68
CPT-69A
CPT-69
CPT-70
CPT-67
CPT-66
BH-65
CPT-70A
CPT-71
800 40 120
0 4 8 12
FEATURES (PLAN)
NOTES
LEGEND
1. ALL LEVELS AND DIMENSIONS ARE IN METRES
UNLESS SHOWN OTHERWISE
2. THESE PLANS ARE FOR TRACK ALIGNMENT ONLY
AND SHOULD BE READ IN CONJUNCTION WITH
ASSOCIATED PLANS FOR ROADWORKS,
CIVILWORKS, STRUCTURES, ELECTRIFICATION etc.
3. ALLTRACK BALLASTED UNLESS SHOWN
OTHERWISE.
4. DESIGN ALIGNMENT: 141001_AlignP_Dn_HA15
1:2000 Horizontal at A3
1:200 Vertical at A3
SHEET LOCALITY
ALKIMOS
STATION
EGLINTON
STATION
YANCHEP
STATION
EXISTING
BUTLER STATION
THIS
DRAWING
SC - Subcrop (rock) exposed in cutting
OC - Outcrop (rock) exposed on surface
Test Pit (Geosite, 2010)
Cone Penetrometer Test
Borehole 0 100
3.26m EOH
qc (MPa)
CPT Trace
No RefusalNR
Silica SAND
Siliceous Calcarenite
Calcreted calcarenite
Sandstone with
carbonate cement
Safety Bay Sand (S2)
Tamala Sand (S7)
Tamala Limestone (LS1)
Test Pit
Top of Limestone
Base of Pit
LEGEND LITHOLOGY GEOLOGY
Natural Surface Level
Interpreted Rock Level Design Rail Level
LONG-SECTION
?
Inferred Rock Level
Core Loss
Cemented Safety Bay Sand (LS4)
NEW ORION
ST ANDREWS
JOINT VENTURE
NEW ORION
ST ANDREWS
JOINT VENTURE
NEW ORION
ST ANDREWS
JOINT VENTURE
NEW ORION
ST ANDREWS
JOINT VENTURE
CPT-67-2
CPT-69-3
CPT-69-2
DESIGN PASSENGER MAIN
EXISTING PASSENGER MAIN
HORIZONTAL CURVE NUMBER
PROPOSED PSP
DEVELOPER BOUNDARY
LANDCORP
DEVELOPER NAME
PROPOSED PLATFORM
EXSTING RAIL RESERVE
PROPOSED RAIL RESERVE
CADASTRE
ELEV
ATIO
N (m
AHD)
Tokyu 1
LS1
S7
CPT DataAppendix C
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 6.40 m, Date: 03/05/2017
Surface Elevation: 39.94 mCoords: X:376097.84, Y:6501002.94
Cone Operator: Andrew
CPT 01
Location:
1Water Table (m): - Refusal: - Cone ID: C15513 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 2.93 m, Date: 03/05/2017
Surface Elevation: 39.84 mCoords: X:376090.17, Y:6501121.21
Cone Operator: Andrew
CPT 02
Location:
2Water Table (m): - Refusal: 70MPa Cone ID: C15513 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 1.52 m, Date: 03/05/2017
Surface Elevation: 39.26 mCoords: X:376069.90, Y:6501117.01
Cone Operator: Andrew
CPT 03
Location:
3Water Table (m): - Refusal: 80MPa Cone ID: C15513 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 1.09 m, Date: 03/05/2017
Surface Elevation: 38.04 mCoords: X:376047.02, Y:6501112.14
Cone Operator: Andrew
CPT 04
Location:
4Water Table (m): - Refusal: 75MPa Cone ID: C15513 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 6.99 m, Date: 03/05/2017
Surface Elevation: 40.28 mCoords: X:376020.64, Y:6501312.03
Cone Operator: Andrew
CPT 05
Location:
5Water Table (m): - Refusal: 80MPa Cone ID: C15513 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 4.60 m, Date: 03/05/2017
Surface Elevation: 38.31 mCoords: X:376004.54, Y:6501399.40
Cone Operator: Andrew
CPT 06
Location:
6Water Table (m): - Refusal: 80MPa Cone ID: C15513 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 7.06 m, Date: 13/06/2017
Surface Elevation: 38.85 mCoords: X:375975.94, Y:6501390.74
Cone Operator: Andrew
CPT 06-2
Location:
1Water Table (m): - Refusal: 70MPa Cone ID: C15209 CPTWest File Name: 016178CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 7.19 m, Date: 13/06/2017
Surface Elevation: 38.21 mCoords: X:376023.99, Y:6501400.62
Cone Operator: Andrew
CPT 06-3
Location:
2Water Table (m): - Refusal: 70MPa Cone ID: C15209 CPTWest File Name: 016178CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 7.42 m, Date: 03/05/2017
Surface Elevation: 36.69 mCoords: X:375992.68, Y:6501480.26
Cone Operator: Andrew
CPT 07
Location:
7Water Table (m): - Refusal: - Cone ID: C15513 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 7.26 m, Date: 03/05/2017
Surface Elevation: 37.11 mCoords: X:375972.92, Y:6501546.42
Cone Operator: Andrew
CPT 08
Location:
8Water Table (m): - Refusal: 70MPa Cone ID: C15513 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 3.19 m, Date: 13/06/2017
Surface Elevation: 38.35 mCoords: X:375953.47, Y:6501621.86
Cone Operator: Andrew
CPT 08-2
Location:
3Water Table (m): - Refusal: Inclination Cone ID: C15209 CPTWest File Name: 016178CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 8.87 m, Date: 13/06/2017
Surface Elevation: 38.52 mCoords: X:375933.95, Y:6501505.76
Cone Operator: Andrew
CPT 08-3
Location:
4Water Table (m): - Refusal: Inclination Cone ID: C15209 CPTWest File Name: 016178CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 16.17 m, Date: 13/06/2017
Surface Elevation: 34.43 mCoords: X:376059.13, Y:6501519.66
Cone Operator: Andrew
CPT 08-4
Location:
5Water Table (m): - Refusal: 50MPa Cone ID: C15209 CPTWest File Name: 016178CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 11.09 m, Date: 13/06/2017
Surface Elevation: 36.30 mCoords: X:376032.11, Y:6501627.25
Cone Operator: Andrew
CPT 08-5
Location:
6Water Table (m): - Refusal: Inclination Cone ID: C15209 CPTWest File Name: 016178CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 2.95 m, Date: 03/05/2017
Surface Elevation: 42.12 mCoords: X:375912.80, Y:6501594.38
Cone Operator: Andrew
CPT 08A
Location:
9Water Table (m): - Refusal: Inclination Cone ID: C15513 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 6.30 m, Date: 03/05/2017
Surface Elevation: 41.56 mCoords: X:375944.17, Y:6501685.19
Cone Operator: Andrew
CPT 09
Location:
10Water Table (m): - Refusal: 70MPa Cone ID: C15513 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 3.55 m, Date: 13/06/2017
Surface Elevation: 41.14 mCoords: X:375921.81, Y:6501680.80
Cone Operator: Andrew
CPT 09-2
Location:
7Water Table (m): - Refusal: Inclination Cone ID: C15209 CPTWest File Name: 016178CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 3.26 m, Date: 13/06/2017
Surface Elevation: 41.83 mCoords: X:375915.92, Y:6501675.84
Cone Operator: Andrew
CPT 09-2A
Location:
8Water Table (m): - Refusal: 70MPa Cone ID: C15209 CPTWest File Name: 016178CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 5.81 m, Date: 13/06/2017
Surface Elevation: 40.23 mCoords: X:375965.52, Y:6501693.97
Cone Operator: Andrew
CPT 09-3
Location:
9Water Table (m): - Refusal: 70MPa Cone ID: C15209 CPTWest File Name: 016178CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 2.62 m, Date: 03/05/2017
Surface Elevation: 39.12 mCoords: X:375950.38, Y:6501743.47
Cone Operator: Andrew
CPT 09A
Location:
11Water Table (m): - Refusal: Inclination Cone ID: C13136 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 2.63 m, Date: 03/05/2017
Surface Elevation: 38.98 mCoords: X:375950.90, Y:6501747.22
Cone Operator: Andrew
CPT 09A (2)
Location:
12Water Table (m): - Refusal: 80MPa Cone ID: C15513 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 3.12 m, Date: 03/05/2017
Surface Elevation: 33.25 mCoords: X:375916.18, Y:6501825.02
Cone Operator: Andrew
CPT 10
Location:
13Water Table (m): - Refusal: Inclination Cone ID: C15513 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 1.74 m, Date: 03/05/2017
Surface Elevation: 33.19 mCoords: X:375911.46, Y:6501824.86
Cone Operator: Andrew
CPT 10 (2)
Location:
14Water Table (m): - Refusal: Inclination Cone ID: C15513 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 10.91 m, Date: 03/05/2017
Surface Elevation: 34.16 mCoords: X:375873.79, Y:6501895.21
Cone Operator: Andrew
CPT 11
Location:
15Water Table (m): - Refusal: Inclination Cone ID: C15513 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 7.48 m, Date: 03/05/2017
Surface Elevation: 21.48 mCoords: X:375877.34, Y:6501999.89
Cone Operator: Andrew
CPT 11A
Location:
16Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 9.16 m, Date: 03/05/2017
Surface Elevation: 32.86 mCoords: X:375698.11, Y:6502779.63
Cone Operator: Andrew
CPT 13
Location:
17Water Table (m): - Refusal: 70MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 5.86 m, Date: 04/05/2017
Surface Elevation: 33.53 mCoords: X:375714.96, Y:6502779.89
Cone Operator: Andrew
CPT 14
Location:
18Water Table (m): - Refusal: 85MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 4.28 m, Date: 04/05/2017
Surface Elevation: 34.68 mCoords: X:375734.89, Y:6502780.80
Cone Operator: Andrew
CPT 15
Location:
19Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 1.85 m, Date: 04/05/2017
Surface Elevation: 35.44 mCoords: X:375696.43, Y:6502880.64
Cone Operator: Andrew
CPT 16
Location:
20Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 4.44 m, Date: 04/05/2017
Surface Elevation: 28.00 mCoords: X:375651.39, Y:6503086.66
Cone Operator: Andrew
CPT 16A
Location:
21Water Table (m): - Refusal: - Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 2.52 m, Date: 04/05/2017
Surface Elevation: 32.20 mCoords: X:375674.80, Y:6502946.19
Cone Operator: Andrew
CPT 16B
Location:
22Water Table (m): - Refusal: 75MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 0.08 m, Date: 04/05/2017
Surface Elevation: 31.70 mCoords: X:375621.25, Y:6503211.18
Cone Operator: Andrew
CPT 17
Location:
23Water Table (m): - Refusal: 90MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 4.15 m, Date: 04/05/2017
Surface Elevation: 29.93 mCoords: X:375624.79, Y:6503154.48
Cone Operator: Andrew
CPT 17A
Location:
24Water Table (m): - Refusal: 70MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 4.94 m, Date: 04/05/2017
Surface Elevation: 35.28 mCoords: X:375540.02, Y:6503414.72
Cone Operator: Andrew
CPT 18
Location:
25Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 3.70 m, Date: 04/05/2017
Surface Elevation: 35.14 mCoords: X:375535.62, Y:6503413.40
Cone Operator: Andrew
CPT 18 (2)
Location:
26Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 4.15 m, Date: 04/05/2017
Surface Elevation: 32.39 mCoords: X:375437.48, Y:6503567.45
Cone Operator: Andrew
CPT 19
Location:
27Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 7.51 m, Date: 04/05/2017
Surface Elevation: 28.21 mCoords: X:375349.88, Y:6503680.11
Cone Operator: Andrew
CPT 19A
Location:
28Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 2.18 m, Date: 04/05/2017
Surface Elevation: 39.80 mCoords: X:375174.82, Y:6503809.46
Cone Operator: Andrew
CPT 20
Location:
29Water Table (m): - Refusal: 70MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 8.03 m, Date: 04/05/2017
Surface Elevation: 31.97 mCoords: X:375231.62, Y:6503786.33
Cone Operator: Andrew
CPT 20A
Location:
30Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 1.84 m, Date: 04/05/2017
Surface Elevation: 46.19 mCoords: X:375063.39, Y:6503872.40
Cone Operator: Andrew
CPT 21
Location:
31Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 2.01 m, Date: 04/05/2017
Surface Elevation: 46.04 mCoords: X:375063.14, Y:6503878.62
Cone Operator: Andrew
CPT 21 (2)
Location:
32Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 0.76 m, Date: 04/05/2017
Surface Elevation: 39.16 mCoords: X:374735.29, Y:6504105.43
Cone Operator: Andrew
CPT 22
Location:
33Water Table (m): - Refusal: 80MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 4.46 m, Date: 04/05/2017
Surface Elevation: 25.87 mCoords: X:374381.44, Y:6504355.09
Cone Operator: Andrew
CPT 22A
Location:
34Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 2.71 m, Date: 04/05/2017
Surface Elevation: 41.02 mCoords: X:374129.64, Y:6504695.68
Cone Operator: Andrew
CPT 24
Location:
35Water Table (m): - Refusal: 75MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 1.11 m, Date: 04/05/2017
Surface Elevation: 46.58 mCoords: X:374090.02, Y:6504803.41
Cone Operator: Andrew
CPT 25
Location:
36Water Table (m): - Refusal: 80MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 1.47 m, Date: 04/05/2017
Surface Elevation: 47.33 mCoords: X:374107.63, Y:6504983.91
Cone Operator: Andrew
CPT 25B
Location:
37Water Table (m): - Refusal: 100MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 0.74 m, Date: 04/05/2017
Surface Elevation: 45.08 mCoords: X:374004.95, Y:6505120.20
Cone Operator: Andrew
CPT 26
Location:
38Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 2.07 m, Date: 09/05/2017
Surface Elevation: 40.44 mCoords: X:373941.97, Y:6505358.57
Cone Operator: Andrew
CPT 27
Location:
39Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 3.83 m, Date: 09/05/2017
Surface Elevation: 43.93 mCoords: X:373891.88, Y:6505458.69
Cone Operator: Andrew
CPT 28
Location:
40Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 2.94 m, Date: 09/05/2017
Surface Elevation: 38.80 mCoords: X:373877.41, Y:6505559.43
Cone Operator: Andrew
CPT 29
Location:
41Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 3.76 m, Date: 09/05/2017
Surface Elevation: 45.66 mCoords: X:373857.13, Y:6505702.60
Cone Operator: Andrew
CPT 30
Location:
42Water Table (m): - Refusal: 85MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 1.00 m, Date: 09/05/2017
Surface Elevation: 38.97 mCoords: X:373848.82, Y:6505807.04
Cone Operator: Andrew
CPT 31
Location:
43Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 6.16 m, Date: 09/05/2017
Surface Elevation: 41.08 mCoords: X:373842.42, Y:6505951.14
Cone Operator: Andrew
CPT 32
Location:
44Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 4.36 m, Date: 09/05/2017
Surface Elevation: 28.15 mCoords: X:373852.90, Y:6506058.56
Cone Operator: Andrew
CPT 33
Location:
45Water Table (m): - Refusal: - Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 4.22 m, Date: 09/05/2017
Surface Elevation: 24.59 mCoords: X:373893.78, Y:6506209.81
Cone Operator: Andrew
CPT 33A
Location:
46Water Table (m): - Refusal: 70MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 2.16 m, Date: 09/05/2017
Surface Elevation: 22.52 mCoords: X:373893.38, Y:6506358.82
Cone Operator: Andrew
CPT 34
Location:
47Water Table (m): - Refusal: 70MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 1.63 m, Date: 09/05/2017
Surface Elevation: 23.52 mCoords: X:373892.41, Y:6506551.01
Cone Operator: Andrew
CPT 36
Location:
48Water Table (m): - Refusal: 80MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 0.57 m, Date: 05/05/2017
Surface Elevation: 32.85 mCoords: X:371814.50, Y:6508335.21
Cone Operator: Andrew
CPT 42
Location:
49Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 8.25 m, Date: 05/05/2017
Surface Elevation: 35.49 mCoords: X:371711.55, Y:6508489.83
Cone Operator: Andrew
CPT 43
Location:
50Water Table (m): - Refusal: - Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 1.74 m, Date: 05/05/2017
Surface Elevation: 36.23 mCoords: X:371649.41, Y:6508599.18
Cone Operator: Andrew
CPT 44
Location:
51Water Table (m): - Refusal: 80MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 4.32 m, Date: 05/05/2017
Surface Elevation: 33.30 mCoords: X:371584.29, Y:6508688.02
Cone Operator: Andrew
CPT 45
Location:
52Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 4.30 m, Date: 05/05/2017
Surface Elevation: 38.08 mCoords: X:371452.88, Y:6508917.03
Cone Operator: Andrew
CPT 47
Location:
53Water Table (m): - Refusal: 75MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 0.70 m, Date: 05/05/2017
Surface Elevation: 34.39 mCoords: X:371476.75, Y:6508871.38
Cone Operator: Andrew
CPT 47A
Location:
54Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 0.35 m, Date: 05/05/2017
Surface Elevation: 34.22 mCoords: X:371478.49, Y:6508874.52
Cone Operator: Andrew
CPT 47A (2)
Location:
55Water Table (m): - Refusal: 100MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 1.15 m, Date: 05/05/2017
Surface Elevation: 33.98 mCoords: X:371431.25, Y:6508958.41
Cone Operator: Andrew
CPT 48
Location:
56Water Table (m): - Refusal: 75MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 0.48 m, Date: 05/05/2017
Surface Elevation: 29.78 mCoords: X:371358.29, Y:6509093.99
Cone Operator: Andrew
CPT 49
Location:
57Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 5.57 m, Date: 05/05/2017
Surface Elevation: 29.67 mCoords: X:371355.48, Y:6509093.87
Cone Operator: Andrew
CPT 49 (2)
Location:
58Water Table (m): - Refusal: - Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 5.38 m, Date: 05/05/2017
Surface Elevation: 30.77 mCoords: X:371317.85, Y:6509186.60
Cone Operator: Andrew
CPT 50
Location:
59Water Table (m): - Refusal: - Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 3.88 m, Date: 05/05/2017
Surface Elevation: 38.76 mCoords: X:371301.52, Y:6509307.80
Cone Operator: Andrew
CPT 51
Location:
60Water Table (m): - Refusal: 70MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 2.93 m, Date: 05/05/2017
Surface Elevation: 39.56 mCoords: X:371284.66, Y:6509412.23
Cone Operator: Andrew
CPT 52
Location:
61Water Table (m): - Refusal: 75MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 3.89 m, Date: 05/05/2017
Surface Elevation: 35.10 mCoords: X:371285.62, Y:6509510.72
Cone Operator: Andrew
CPT 53
Location:
62Water Table (m): - Refusal: 70MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 2.10 m, Date: 05/05/2017
Surface Elevation: 38.65 mCoords: X:371275.49, Y:6509652.47
Cone Operator: Andrew
CPT 54
Location:
63Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 1.49 m, Date: 05/05/2017
Surface Elevation: 38.19 mCoords: X:371278.52, Y:6509698.16
Cone Operator: Andrew
CPT 55
Location:
64Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 5.73 m, Date: 05/05/2017
Surface Elevation: 37.53 mCoords: X:371273.42, Y:6509775.14
Cone Operator: Andrew
CPT 56
Location:
65Water Table (m): - Refusal: 75MPa Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 1.54 m, Date: 05/05/2017
Surface Elevation: 38.53 mCoords: X:371276.86, Y:6509883.08
Cone Operator: Andrew
CPT 57
Location:
66Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999
Project: Butler to Yanchep Rail
[email protected]: 0403 370 045 Total depth: 0.87 m, Date: 05/05/2017
Surface Elevation: 39.69 mCoords: X:371272.18, Y:6509927.13
Cone Operator: Andrew
CPT 57A
Location:
67Water Table (m): - Refusal: Inclination Cone ID: C15514 CPTWest File Name: 016178 CPT Rig: 22 tonne 6x6 truck Testing completed in accordance with AS1289.6.5.1-1999