300-2... · Connection to the Public Sewer from the last inspection chamber within the property to...

1

Transcript of 300-2... · Connection to the Public Sewer from the last inspection chamber within the property to...

Page 1: 300-2... · Connection to the Public Sewer from the last inspection chamber within the property to 150mm for storm and 100mm for foul swept into sewer in direction of flow. The maximum