Dredged material management in the Elbe River and the Port ...
30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged...
Transcript of 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged...
![Page 1: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/1.jpg)
1Axel Netzband
30 years Dredged Material Management in the Port of Hamburg
![Page 2: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/2.jpg)
2
Natural Suspended Matter Transport in the North Sea
Source: Kappenberg (2007)
from ICONA, 1992; Eisma and Irion, 1988
Hamburg
North Sea
![Page 3: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/3.jpg)
3
Need for Water Depth Maintenance
Sedimentation rates up to several meters / year
![Page 4: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/4.jpg)
4
Disposal in the 1960‘s
![Page 5: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/5.jpg)
METHA – Treatment since 1993
1993: Investment 70 Mio. Euro | Annual expenditure 15 Mio. Euro
Throughput 1.000.000 m³ per year
![Page 6: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/6.jpg)
6
Mechanical treatment …
Hydrocyclones….
…. Band filter press
![Page 7: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/7.jpg)
… and Land Disposal
![Page 8: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/8.jpg)
Beneficial use of treated sediments
Dyke construction
Harbour Basin Backfilling
… have shown: These options arevery limited!
Large scale tests...
![Page 9: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/9.jpg)
9
Open Water Placement
Buoy E3
Nesssand
![Page 10: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/10.jpg)
10
E L
Dewatering
METHAJV
Feldhofe
Francop
Land TreatmentRelocation
Today‘s Dredged Material Management Concept
~ 3 Million m³cost effectivedependancy
max. 1 Million m³costlylimited
![Page 11: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/11.jpg)
11
Mercury in fresh Sediments (mg/kg TS)
Research started METHA into operation
![Page 12: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/12.jpg)
12
River Basin Sediment Management
The Elbe:
Length 1,100 km
Population 25 Million
![Page 13: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/13.jpg)
13
Tidal ElbeOrganotin
HavelOrganotin, Zn
Schwarze Elster HCH; Cd, Zn, Hg
Czech RepublicDDX, HCB, PCB, TBT, PAK, Haloether, Cd, Zn, Hg
MuldeOrganotin, HCH, HCB, Dioxin/Furan, Cd, As, Zn, Hg, Cu, Pb
SaaleOrganotin, PCB, PAH, HCB, Pentachlorbenzene, Pb, Cd, Zn, Hg, CuDioxin/Furan
Source: „Hintergrundpapier zur Ableitung der überregionalen Bewirtschaftungsziele für die Oberflächengewässer im deutschen Teil der Flussgebietseinheit Elbe für den Belastungsschwerpunkt Schadstoffe,“ FGG Elbe 2009
Elbe Watershed Contamination Sources
![Page 14: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/14.jpg)
Remediation of most significant contaminated sites
Sou
rce:
Ran
k 20
02
Sources = Burdens of the past.
River Basin Sediment Management = Task for the International Elbe River Community.
EC Water Framework Directive = Legal tool for source control.
![Page 15: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/15.jpg)
Pillars of Tidal Elbe Management
15
River Engineering- andSediment Management Concept
RIVER ENGINEERING
Construction of shallow areas for tidalvolume
Win-win with floodprotection and climatechange adaptation
OPTIMIZATION ofRELOCATION
Relocation of freshsediments
Flexible, adaptive approach
Sediment traps toconcentratesedimentation
ELBE REMEDIATION
International Elbe Sediment Management Concept
Hamburg supportsupstream measures
LAND DISPOSAL UNTIL 2025
Third disposal site in Hamburg
![Page 16: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/16.jpg)
16
Thank you for your attention!
Axel Netzband | Hamburg Port Authority Neuer Wandrahm 4 | D - 20457 Hamburg+49.40.42847-2791 | [email protected]
![Page 17: 30 Years Dredged Material Management in the Port of Hamburg · Land Treatment. Today‘s Dredged Material Management Concept ... River Basin Sediment Management = Task for the International](https://reader034.fdocuments.us/reader034/viewer/2022042311/5ed95232f59b0f56f45f4539/html5/thumbnails/17.jpg)
17
Pilot ProjectKreetsand / Spadenländer Busch