250 Gore Street & 221 Moor Street Fitzroy
I Om 5 25 RCA O Dn enantilidn0 .; O
All SCALE 1.100
0 ..FD MS OM 11.08,2014
CONCEPT LANDSCAPE MASTERPLAN - LEVEL 6 COMMUNAL ROOF GARDEN
250 GORE & 221 MOOR STREETS, FITZROY
DAY BED
O
LEVEL 6APARTMENTS
GROUND FLOOR COURTYRARD -
REFER MPOO
PRELIMINARY PLANT SCHEDULE - LEVEL 6 ROOF GARDEN pr.., to be selected from the indicative 1151 below All plants to be mocro-oiled to suet aspect
Botanical Name 'Common Name J Mature Size Hew Install Size Spacing
Trees
Lagerstroemla Indica 55p.
Pyres sp Citrtis a !anon
Crepe Myrtle
Ornamental pear
Lemon Tr.
4-am a 3-5m
7- tam a 6-am
4-Sm x 3-5m
2 Dm high 75L1 Container
2 Om high 75Lt Container
2 Om high, 7SLt Container
As Shorn,
As Shown
As Shown
Shrubs, Clknbers and Groundeovers
Correa Ma Whrle Correa 1-15m x 2rn 330norn pot 51m2
&Warn Haronswood Woe' Pride of Madeira 2nt x 2m 330rnm pot 5182
Prunus lusitenica Portugal laurel Sox 3m 33Ornm pot Sim2
Viburnum odorebssimum Sweet Viburnum 3-4xm x 2m 330mm pot 5182
Acacia cognate VIVOI7 Misr Dwarf Bower Wattle ems 1.5m 2013nm pat 01m2
Acanthus morns Choler Plant Int aim 200enm pot 3482
Arthropodlum LiffinIttl New Zealand Rock my 0.7rn x 0.7m 200mm pat egn2
Gardenia evade Ronda' Fragrant Gardenia 1m x tea 200mrn pot 6/m2
CAM* /*nista Kea, LIN 0.5m x 0.51n 200mm pot 5102
Convolvulus .040. Grourd Morning Glory mare a 1.58 200mm pot Etim2
Dichondre 'Um Fes' Silver Dichondra 0.158 x I .13n1 2001nrn pot 6/n12
Lirlope muscarl 'Eteetio Giant Ibtaktillowering ti rhaf 0.13m it 0.arn 200mm pot ttier2
Productive garden
escorted vepatablu & herbs
COMMUNAL TABLE
PERGOLA STRUCTURE WITH CLIMBERS
BBQ & OUTDOOR KITCHEN
LEVEL 5 PRIVATE TERRACES
BELOW. REFER MW!
DAY BED
PRODUCTIVE GARDEN
TIMBER BENCH SEAT
GYM
■ • U
Project No 1870 25© Hayball
250 Gore Street & 221 Moor Street Fitzroy
4.0 Architectural Drawings
TP 00 Site Plan
TP 00B Existing and Demolition Site Plan
TP 00C Shadow Analysis - Existing
TP 00D Shadow Analysis - Proposed
TP 01 Basement Floor Plan
TP 02 Ground Floor Plan
TP 03 Typical Level 1-3 Floor Plan
TP 04 Level 4 Floor Plan
TP 05 Level 5 Floor Plan TP 06 Level 6 Floor Plan
TP 07 Level 7 Floor Plan
TP 08 Roof Plan
TP 09 North Elevation
TP 10 South Elevation
TP 11 South Internal Elevation
TP 12 East Elevation
TP 13 West Elevation
TP 14 Section 1
TP 15 Section 2
TP 16 (not used)
TP 17 Section 3
TP 18 Section 4
TP 18B Section 5
TP 18C Section 6
TP 19 Detail Section
REVISION [B] - ISSUE FOR RFI RESPONSE24 OCTOBER 2014
Project No 1870 26© Hayball
250 Gore Street & 221 Moor Street Fitzroy
4.0 Architectural DrawingsTP 00 Site Plan
HODGSON STREET
GO
RE
ST
RE
ET
MOOR STREET
SM
ITH
ST
RE
ET
SUBJECT SITE250 GORESTREET & 221MOOR STREET
95°32'50"45.04
PROPERTYBOUNDARY
186°1
8'
18.3
5P
RO
PE
RT
YB
OU
ND
AR
Y
275°58'20"30.22
PROPERTYBOUNDARY
332°40'
3.37
6°5
0'
15.3
1P
RO
PE
RT
YB
ON
DA
RY
275°53'30"16.30
PROPERTYBOUNDARY
185°5
4'5
0"
36.1
55
PR
OP
ER
TY
BO
UN
DA
RY
PR
OPER
TY
BO
UN
DA
RY
TOWN PLANNING
TITLEPROJECT
Builders/Contractors shall verify job dimensions before any job commences. Figured dimensions shall take precedence over scaled work. Work shall also conform to the specification, other drawings and jobdimensions. All shop drawings shall be submitted to the Architect/Consultant and manufacture shall not commence prior to the return of inspected shop drawings signed by the Architect/Consultant. © Copyright2008 All rights reserved
Hayball Pty Ltd4/ 135 Sturt Street SouthbankVictoria Australia 3006T 03 9699 3644 F 03 9699 3708www.hayball.com.au
ARBV Registered Directors:Len Hayball, Richard Leonard RobertStent, Tom Jordan, Sarah Buckeridge,David Tweedie. Director: Luc BaldiABN 84 006 394 261
DATE PRINTEDCHECKED
SCALE
DRAWN BYPROJECT NODWG NO
1 : 250@ A124/10/2014 11:16:50 AM
250 GORE STREET & 221 MOORSTREET, FITZROY
SITE PLANCM,JYTJ
1870TP-00
0
0
5
2.5
10
5
15
7.5
25m
12.5m
1:500 @ A3
1:250 @ A1
Revision No Date Description
2 xx.xx.14 VCAT Issue RE.RFI
1 02.09.14 VCAT Issue
SCALE 1:500 @ A3
0 6.25 12.5 18.75 25M
REVISION [B] - ISSUE FOR RFI RESPONSE24 OCTOBER 2014
Project No 1870 27© Hayball
250 Gore Street & 221 Moor Street Fitzroy
4.0 Architectural DrawingsTP 00B Existing and Demolition Site Plan
SCALE 1:500 @ A3
0 6.25 12.5 18.75 25M
HODGSON STREET
GO
RE
ST
RE
ET
MOOR STREET
SM
ITH
ST
RE
ET
DEMOLISH EXISTING 2STOREY BRICK BUILDING -NO.250 C/T VOL 9826 FOL978
DEMOLISH EXISTING 2STOREY BRICK BUILDING -NO.250 C/T VOL 2754 FOL775
DEMOLISH EXISTING 2STOREY BRICK BUILDING -NO.250 C/T VOL 9813 FOL024
DEMOLISH EXISTINGCROSSOVER
DEMOLISH EXISTINGCROSSOVER
DEMOLISH EXISTINGCROSSOVER
DEMOLISH EXISTING 2STOREY BRICK BUILDING -NO.250 C/T VOL 9814 FOL087
DEMOLISH EXISTING1 STOREY BRICKHOUSE AND BRICKWALL ANDPERIMETER FENCE
TOWN PLANNING
TITLEPROJECT
Builders/Contractors shall verify job dimensions before any job commences. Figured dimensions shall take precedence over scaled work. Work shall also conform to the specification, other drawings and jobdimensions. All shop drawings shall be submitted to the Architect/Consultant and manufacture shall not commence prior to the return of inspected shop drawings signed by the Architect/Consultant. © Copyright2008 All rights reserved
Hayball Pty Ltd4/ 135 Sturt Street SouthbankVictoria Australia 3006T 03 9699 3644 F 03 9699 3708www.hayball.com.au
ARBV Registered Directors:Len Hayball, Richard Leonard RobertStent, Tom Jordan, Sarah Buckeridge,David Tweedie. Director: Luc BaldiABN 84 006 394 261
DATE PRINTEDCHECKED
SCALE
DRAWN BYPROJECT NODWG NO
1 : 250@ A124/10/2014 11:16:56 AM
250 GORE STREET & 221 MOORSTREET, FITZROY
DEMOLITION SITE PLANJYTJ
1870TP-00B
0
0
5
2.5
10
5
15
7.5
25m
12.5m
1:500 @ A3
1:250 @ A1
Revision No Date Description
2 xx.xx.14 VCAT Issue RE.RFI
REVISION [B] - ISSUE FOR RFI RESPONSE24 OCTOBER 2014
Project No 1870 28© Hayball
250 Gore Street & 221 Moor Street Fitzroy
HODGSON STREETGO
RE S
TREE
T
MOOR STREET
SMIT
H ST
REET
HODGSON STREET
GORE
STR
EET
MOOR STREET
SMIT
H ST
REET
HODGSON STREET
GORE
STR
EET
MOOR STREET
SMIT
H ST
REET
HODGSON STREET
GORE
STR
EET
MOOR STREET
SMIT
H ST
REET
TOWN PLANNING
TITLEPROJECT
Builders/Contractors shall verify job dimensions before any job commences. Figured dimensions shall take precedence over scaled work. Work shall also conform to the specification, other drawings and jobdimensions. All shop drawings shall be submitted to the Architect/Consultant and manufacture shall not commence prior to the return of inspected shop drawings signed by the Architect/Consultant. © Copyright2008 All rights reserved
Hayball Pty Ltd4/ 135 Sturt Street SouthbankVictoria Australia 3006T 03 9699 3644 F 03 9699 3708www.hayball.com.au
ARBV Registered Directors:Len Hayball, Richard Leonard RobertStent, Tom Jordan, Sarah Buckeridge,David Tweedie. Director: Luc BaldiABN 84 006 394 261
DATE PRINTEDCHECKED
SCALE
DRAWN BYPROJECT NODWG NO
1 : 500@ A124/10/2014 11:17:05 AM
250 GORE STREET & 221 MOORSTREET, FITZROY
SHADOW ANALYSIS - EXISTINGJYTJ
1870TP-00C
SHADOW ANALYSIS - 22 SEPT - 1PM SHADOW ANALYSIS - 22 SEPT - 3PM
SHADOW ANALYSIS - 22 SEPT - 9AM SHADOW ANALYSIS - 22 SEPT - 11AM
0
0
10
5
20
10
30
15
50m
25m
1:1000 @ A3
1:500 @ A1
Revision No Date Description
2 xx.xx.14 VCAT Issue RE.RFI
4.0 Architectural DrawingsTP 00C Shadow Analysis - Existing Plan
HODGSON STREET
GORE
STR
EET
MOOR STREET
SMIT
H ST
REET
HODGSON STREET
GORE
STR
EET
MOOR STREET
SMIT
H ST
REET
HODGSON STREET
GORE
STR
EET
MOOR STREET
SMIT
H ST
REET
HODGSON STREET
GORE
STR
EET
MOOR STREET
SMIT
H ST
REET
TOWN PLANNING
TITLEPROJECT
Builders/Contractors shall verify job dimensions before any job commences. Figured dimensions shall take precedence over scaled work. Work shall also conform to the specification, other drawings and jobdimensions. All shop drawings shall be submitted to the Architect/Consultant and manufacture shall not commence prior to the return of inspected shop drawings signed by the Architect/Consultant. © Copyright2008 All rights reserved
Hayball Pty Ltd4/ 135 Sturt Street SouthbankVictoria Australia 3006T 03 9699 3644 F 03 9699 3708www.hayball.com.au
ARBV Registered Directors:Len Hayball, Richard Leonard RobertStent, Tom Jordan, Sarah Buckeridge,David Tweedie. Director: Luc BaldiABN 84 006 394 261
DATE PRINTEDCHECKED
SCALE
DRAWN BYPROJECT NODWG NO
1 : 500@ A124/10/2014 11:17:05 AM
250 GORE STREET & 221 MOORSTREET, FITZROY
SHADOW ANALYSIS - EXISTINGJYTJ
1870TP-00C
SHADOW ANALYSIS - 22 SEPT - 1PM SHADOW ANALYSIS - 22 SEPT - 3PM
SHADOW ANALYSIS - 22 SEPT - 9AM SHADOW ANALYSIS - 22 SEPT - 11AM
0
0
10
5
20
10
30
15
50m
25m
1:1000 @ A3
1:500 @ A1
Revision No Date Description
2 xx.xx.14 VCAT Issue RE.RFI
HODGSON STREET
GORE
STR
EET
MOOR STREET
SMIT
H ST
REET
HODGSON STREET
GORE
STR
EET
MOOR STREET
SMIT
H ST
REET
HODGSON STREET
GORE
STR
EET
MOOR STREETSM
ITH
STRE
ET
HODGSON STREET
GORE
STR
EET
MOOR STREET
SMIT
H ST
REET
TOWN PLANNING
TITLEPROJECT
Builders/Contractors shall verify job dimensions before any job commences. Figured dimensions shall take precedence over scaled work. Work shall also conform to the specification, other drawings and jobdimensions. All shop drawings shall be submitted to the Architect/Consultant and manufacture shall not commence prior to the return of inspected shop drawings signed by the Architect/Consultant. © Copyright2008 All rights reserved
Hayball Pty Ltd4/ 135 Sturt Street SouthbankVictoria Australia 3006T 03 9699 3644 F 03 9699 3708www.hayball.com.au
ARBV Registered Directors:Len Hayball, Richard Leonard RobertStent, Tom Jordan, Sarah Buckeridge,David Tweedie. Director: Luc BaldiABN 84 006 394 261
DATE PRINTEDCHECKED
SCALE
DRAWN BYPROJECT NODWG NO
1 : 500@ A124/10/2014 11:17:05 AM
250 GORE STREET & 221 MOORSTREET, FITZROY
SHADOW ANALYSIS - EXISTINGJYTJ
1870TP-00C
SHADOW ANALYSIS - 22 SEPT - 1PM SHADOW ANALYSIS - 22 SEPT - 3PM
SHADOW ANALYSIS - 22 SEPT - 9AM SHADOW ANALYSIS - 22 SEPT - 11AM
0
0
10
5
20
10
30
15
50m
25m
1:1000 @ A3
1:500 @ A1
Revision No Date Description
2 xx.xx.14 VCAT Issue RE.RFI
HODGSON STREET
GORE
STR
EET
MOOR STREET
SMIT
H ST
REET
HODGSON STREET
GORE
STR
EET
MOOR STREET
SMIT
H ST
REET
HODGSON STREET
GORE
STR
EET
MOOR STREET
SMIT
H ST
REET
HODGSON STREET
GORE
STR
EET
MOOR STREET
SMIT
H ST
REET
TOWN PLANNING
TITLEPROJECT
Builders/Contractors shall verify job dimensions before any job commences. Figured dimensions shall take precedence over scaled work. Work shall also conform to the specification, other drawings and jobdimensions. All shop drawings shall be submitted to the Architect/Consultant and manufacture shall not commence prior to the return of inspected shop drawings signed by the Architect/Consultant. © Copyright2008 All rights reserved
Hayball Pty Ltd4/ 135 Sturt Street SouthbankVictoria Australia 3006T 03 9699 3644 F 03 9699 3708www.hayball.com.au
ARBV Registered Directors:Len Hayball, Richard Leonard RobertStent, Tom Jordan, Sarah Buckeridge,David Tweedie. Director: Luc BaldiABN 84 006 394 261
DATE PRINTEDCHECKED
SCALE
DRAWN BYPROJECT NODWG NO
1 : 500@ A124/10/2014 11:17:05 AM
250 GORE STREET & 221 MOORSTREET, FITZROY
SHADOW ANALYSIS - EXISTINGJYTJ
1870TP-00C
SHADOW ANALYSIS - 22 SEPT - 1PM SHADOW ANALYSIS - 22 SEPT - 3PM
SHADOW ANALYSIS - 22 SEPT - 9AM SHADOW ANALYSIS - 22 SEPT - 11AM
0
0
10
5
20
10
30
15
50m
25m
1:1000 @ A3
1:500 @ A1
Revision No Date Description
2 xx.xx.14 VCAT Issue RE.RFI
22 SEPTEMBER - 9AM 22 SEPTEMBER - 11AM
22 SEPTEMBER - 1PM 22 SEPTEMBER - 3PM
SCALE 1:500 @ A3
0 6.25 12.5 18.75 25M
REVISION [B] - ISSUE FOR RFI RESPONSE24 OCTOBER 2014
Project No 1870 29© Hayball
250 Gore Street & 221 Moor Street Fitzroy
TOWN PLANNINGTENDER ISSUEPRELIMINARY ISSUESKETCH DESIGNDESIGN DEVELOPMENTCONSTRUCTION ISSUE
TITLEPROJECT
Builders/Contractors shall verify job dimensions before any job commences. Figured dimensions shall take precedence over scaled work. Work shall also conform to the specification, other drawings and jobdimensions. All shop drawings shall be submitted to the Architect/Consultant and manufacture shall not commence prior to the return of inspected shop drawings signed by the Architect/Consultant. © Copyright2008 All rights reserved
Hayball Pty Ltd4/ 135 Sturt Street SouthbankVictoria Australia 3006T 03 9699 3644 F 03 9699 3708www.hayball.com.au
ARBV Registered Directors:Len Hayball, Richard Leonard RobertStent, Tom Jordan, Sarah Buckeridge,David Tweedie. Director: Luc BaldiABN 84 006 394 261
DATE PRINTEDCHECKED
SCALE
DRAWN BYPROJECT NODWG NO
1 : 200@ A124/10/2014 10:47:18 AM
250 GORE STREET & 221 MOORSTREET, FITZROY
SUN STUDYAuthorChecker
1870SD-19
1 : 200
SUN STUDY 9AM1 1 : 200
SUN STUDY 11AM2
1 : 200
SUN STUDY 1PM3 1 : 200
SUN STUDY 3PM4Revision No Date Description
TOWN PLANNINGTENDER ISSUEPRELIMINARY ISSUESKETCH DESIGNDESIGN DEVELOPMENTCONSTRUCTION ISSUE
TITLEPROJECT
Builders/Contractors shall verify job dimensions before any job commences. Figured dimensions shall take precedence over scaled work. Work shall also conform to the specification, other drawings and jobdimensions. All shop drawings shall be submitted to the Architect/Consultant and manufacture shall not commence prior to the return of inspected shop drawings signed by the Architect/Consultant. © Copyright2008 All rights reserved
Hayball Pty Ltd4/ 135 Sturt Street SouthbankVictoria Australia 3006T 03 9699 3644 F 03 9699 3708www.hayball.com.au
ARBV Registered Directors:Len Hayball, Richard Leonard RobertStent, Tom Jordan, Sarah Buckeridge,David Tweedie. Director: Luc BaldiABN 84 006 394 261
DATE PRINTEDCHECKED
SCALE
DRAWN BYPROJECT NODWG NO
1 : 200@ A124/10/2014 10:47:18 AM
250 GORE STREET & 221 MOORSTREET, FITZROY
SUN STUDYAuthorChecker
1870SD-19
1 : 200
SUN STUDY 9AM1 1 : 200
SUN STUDY 11AM2
1 : 200
SUN STUDY 1PM3 1 : 200
SUN STUDY 3PM4Revision No Date Description
TOWN PLANNINGTENDER ISSUEPRELIMINARY ISSUESKETCH DESIGNDESIGN DEVELOPMENTCONSTRUCTION ISSUE
TITLEPROJECT
Builders/Contractors shall verify job dimensions before any job commences. Figured dimensions shall take precedence over scaled work. Work shall also conform to the specification, other drawings and jobdimensions. All shop drawings shall be submitted to the Architect/Consultant and manufacture shall not commence prior to the return of inspected shop drawings signed by the Architect/Consultant. © Copyright2008 All rights reserved
Hayball Pty Ltd4/ 135 Sturt Street SouthbankVictoria Australia 3006T 03 9699 3644 F 03 9699 3708www.hayball.com.au
ARBV Registered Directors:Len Hayball, Richard Leonard RobertStent, Tom Jordan, Sarah Buckeridge,David Tweedie. Director: Luc BaldiABN 84 006 394 261
DATE PRINTEDCHECKED
SCALE
DRAWN BYPROJECT NODWG NO
1 : 200@ A124/10/2014 10:47:18 AM
250 GORE STREET & 221 MOORSTREET, FITZROY
SUN STUDYAuthorChecker
1870SD-19
1 : 200
SUN STUDY 9AM1 1 : 200
SUN STUDY 11AM2
1 : 200
SUN STUDY 1PM3 1 : 200
SUN STUDY 3PM4Revision No Date Description
TOWN PLANNINGTENDER ISSUEPRELIMINARY ISSUESKETCH DESIGNDESIGN DEVELOPMENTCONSTRUCTION ISSUE
TITLEPROJECT
Builders/Contractors shall verify job dimensions before any job commences. Figured dimensions shall take precedence over scaled work. Work shall also conform to the specification, other drawings and jobdimensions. All shop drawings shall be submitted to the Architect/Consultant and manufacture shall not commence prior to the return of inspected shop drawings signed by the Architect/Consultant. © Copyright2008 All rights reserved
Hayball Pty Ltd4/ 135 Sturt Street SouthbankVictoria Australia 3006T 03 9699 3644 F 03 9699 3708www.hayball.com.au
ARBV Registered Directors:Len Hayball, Richard Leonard RobertStent, Tom Jordan, Sarah Buckeridge,David Tweedie. Director: Luc BaldiABN 84 006 394 261
DATE PRINTEDCHECKED
SCALE
DRAWN BYPROJECT NODWG NO
1 : 200@ A124/10/2014 10:47:18 AM
250 GORE STREET & 221 MOORSTREET, FITZROY
SUN STUDYAuthorChecker
1870SD-19
1 : 200
SUN STUDY 9AM1 1 : 200
SUN STUDY 11AM2
1 : 200
SUN STUDY 1PM3 1 : 200
SUN STUDY 3PM4Revision No Date Description
9 AM SHADOW
1 PM SHADOW
11 AM SHADOW
3 PM SHADOW SCALE 1:500 @ A3
0 6.25 12.5 18.75 25M
4.0 Architectural DrawingsTP 00D Shadow Analysis - Proposed Plan
REVISION [B] - ISSUE FOR RFI RESPONSE24 OCTOBER 2014
Project No 1870 30© Hayball
250 Gore Street & 221 Moor Street Fitzroy
4.0 Architectural DrawingsTP 01 Basement Floor Plan
UP
1TP-18
CAR STACKER SYSTEM A
GO
RE
ST
RE
ET
HODGSON STREET
MOOR STREET
83 CARPARKS
69 STORES
47.0 m²
1 BED01
7.2 m²BAL
JOSTA 2-TIER
BICYCLERACKS
(16)
5556
14750
32.280
33.080
5994
95°32'50"45.04
PROPERTYBOUNDARY
186°1
8'
18.3
5P
RO
PE
RT
YB
OU
ND
AR
Y
275°58'20"30.22
PROPERTYBOUNDARY
332°40'
3.376°5
0'
15.3
1P
RO
PE
RT
YB
ON
DA
RY
275°53'30"16.30
PROPERTYBOUNDARY
185°5
4'5
0"
36.1
55
PR
OP
ER
TY
BO
UN
DA
RY
PR
OPER
TY
BO
UN
DA
RY
1739
8
1145
0
6694
6594
R 350032.280
SERVICES
26.0 m²WASTE
6028
1:14GRADIENT
1:14GRADIENT
1050
1000
RAMP
RAMP
1:14
GRAD
IENT
RAM
P
CAR STACKER SYSTEM B CAR STACKER SYSTEM C
3m³ 3m³3m³3m³3m³3m³3m³3m³3m³
3m³ 3m³
3m³ 3m³
3m³ 3m³ 3m³ 3m³ 3m³ 3m³ 3m³
3m³3m³3m³3m³3m³3m³
3m³3m³
3m³ 3m³
3m³3m³
3m³ 3m³ 3m³ 3m³
3m³
3m³ 3m³
3m³3m³
3m³ 3m³
3m³
3m³
3m³
3m³
3m³
3m³
3m³ 3m³ 3m³ 3m³ 3m³ 3m³ 3m³ 3m³
5500
5600
5600
5600
5500
TRENVARIO 4300
2700 2700 250 2700 2700 2700
2600 2750 250 2700 2700 2700 250 2700 2700 2700 250 2700
TRENVARIO 4000
TRENVARIO 4000
TRENVARIO 4000
TRENVARIO 4000
TRENVARIO 4000
TRENVARIO 4300
TRENVARIO 4300
2050660 LG/D
2m³ RECYCLINGWASTE STORAGE
1069.0 m²
BASEMENTCAR PARK
1:14GRADIENT
RAMP
3m³ 3m³ 3m³ 3m³ 3m³ 3m³
3m³3m³ 3m³
26 BIKE RACKS
1TP-17
3m³
3m³
3m³
1TP-19
30,000L RAIN WATERTANK BELOW STORAGEROOM
2TP-15
3m³
SECTIONAL GARAGE DOOR
1450
660 LREC
660 LREC
660 LREC
660 LREC
660 LREC
660 LREC 6
60 L
RE
C
660 LG/D
660 LG/D
660 LG/D
1TP-18C
1TP-18B
01
SMALLCAR
SMALLCAR
SMALLCAR
SMALLCAR
SMALLCAR
TOWN PLANNING
TITLEPROJECT
Builders/Contractors shall verify job dimensions before any job commences. Figured dimensions shall take precedence over scaled work. Work shall also conform to the specification, other drawings and jobdimensions. All shop drawings shall be submitted to the Architect/Consultant and manufacture shall not commence prior to the return of inspected shop drawings signed by the Architect/Consultant. © Copyright2008 All rights reserved
Hayball Pty Ltd4/ 135 Sturt Street SouthbankVictoria Australia 3006T 03 9699 3644 F 03 9699 3708www.hayball.com.au
ARBV Registered Directors:Len Hayball, Richard Leonard RobertStent, Tom Jordan, Sarah Buckeridge,David Tweedie. Director: Luc BaldiABN 84 006 394 261
DATE PRINTEDCHECKED
SCALE
DRAWN BYPROJECT NODWG NO
1 : 100@ A124/10/2014 11:17:09 AM
250 GORE STREET & 221 MOORSTREET, FITZROY
LEVEL BASEMENTCM,JYTJ
1870TP-01
0
0
2
1
4
2
6
3
10m
5m
1:200 @ A3
1:100 @ A1
Revision No Date Description
2 xx.xx.14 VCAT Issue RE.RFI
1 02.09.14 VCAT Issue
REVISION [B] - ISSUE FOR RFI RESPONSE24 OCTOBER 2014
Project No 1870 31© Hayball
250 Gore Street & 221 Moor Street Fitzroy
1TP-18
49.6 m²
1 BED003
71.2 m²
2 BED 2 BATH004
52.2 m²
1 BED006
67.6 m²
2 BED 2 BATH005
42.2 m²
1 BED011
65.1 m²
2 BED014
67.2 m²
2 BED015
54.2 m²
1 BED008
61.8 m²
2 BED 2 BATH013
46.1 m²
1 BED009
13.8 m²BAL
11.6 m²BAL
16.0 m²BAL
49.9 m²LOBBY
36.280
GO
RE
ST
RE
ET
HODGSON STREET
MOOR STREET
VOID OVERCARPARK ENTRY
52.5 m²
1 BED007
49.2 m²
1 BED001
27.0 m²BAL
95°32'50"45.04
PROPERTYBOUNDARY
186°1
8'
18.3
5P
RO
PE
RT
YB
OU
ND
AR
Y
275°58'20"30.22
PROPERTYBOUNDARY
332°40'
3.37
6°5
0'
15.3
1P
RO
PE
RT
YB
ON
DA
RY
275°53'30"16.30
PROPERTYBOUNDARY
185°5
4'5
0"
36.1
55
PR
OP
ER
TY
BO
UN
DA
RY
PR
OPER
TY
BO
UN
DA
RY
55.9 m²
1 BED002
11.9 m²BAL
10.5 m²BAL
18.7 m²BAL
12.7 m²BAL
31.0 m²BAL
45.7 m²
1 BED010
1TP-14
MAIL ROOM
36.280
36.280
36.280
36.280
36.130
36.930
37.2
4
37.3
2
36.9
2
36.8
2
36.2
735
.84
36.6
8
36.8
9
37.1
4
37.0
7
36.8
136
.02
35.8
035
.56
35.8
235
.47
35.2
0
34.8
8
34.4
5
34.2
333
.80
36.9
3
37.0
1
36.4
1
37.1
3
35.130 36.28036.280
36.280
1TP-15
SERVICES
17.9 m²SUBSTATION
SERV
ICES
BOUNDARYWALL 2.24M
HEIGHT
2050
59.1 m²CORE/CIRC
1TP-17
14.9 m²BAL
11.2 m²BAL
10.3 m²BAL
12.2 m²BAL 7.1 m²
BAL
18.4 m²BAL
1TP-19
8X
V.B
.R.
OPERABLESCREENS
OPERABLESCREENS
DDA LIFT
1:14
9000
3165
1242
1200
1119
1001
1014
1:14 RAMPGRADIENT
LOCATION OF NEWCROSSOVER
SETB
ACK
FROM
BD Y
2000
2052
855
7263
18
SETB
ACK
FROM
BD Y
3353
FROM
BDY
2050
SETB
ACK
FROM
BDY
1715
6700
5800
5625
DOTTED RED LINEDENOTES PREVIOUSLYAPPROVED VCATCONDITIONS (PLN11/1077)
1464
0
36310 6592SETBACK FROM BDY
2049
25600 2700
3241
8
28300
1250
0
42897
1800
5
1TP-18C
1TP-18B
57.8 m²
2 BED012
001 002 003 004
005006
007
008
009 010
011012013
014
015
EX. WINDOW EX. WINDOW EX. WINDOW EX. WINDOW
8X BIKE RACKEXISTINGPRIVATE OPENSPACE
EX. W
INDO
W
EX. WINDOWL1
EX. WINDOWL1
EX. WINDOWL1
EX. WINDOWL1
EX. WINDOWL1
EX
IST
ING
PR
IVA
TE
OP
EN
SP
AC
E
TOWN PLANNING
TITLEPROJECT
Builders/Contractors shall verify job dimensions before any job commences. Figured dimensions shall take precedence over scaled work. Work shall also conform to the specification, other drawings and jobdimensions. All shop drawings shall be submitted to the Architect/Consultant and manufacture shall not commence prior to the return of inspected shop drawings signed by the Architect/Consultant. © Copyright2008 All rights reserved
Hayball Pty Ltd4/ 135 Sturt Street SouthbankVictoria Australia 3006T 03 9699 3644 F 03 9699 3708www.hayball.com.au
ARBV Registered Directors:Len Hayball, Richard Leonard RobertStent, Tom Jordan, Sarah Buckeridge,David Tweedie. Director: Luc BaldiABN 84 006 394 261
DATE PRINTEDCHECKED
SCALE
DRAWN BYPROJECT NODWG NO
1 : 100@ A124/10/2014 11:17:17 AM
250 GORE STREET & 221 MOORSTREET, FITZROY
LEVEL GROUND FLOOR PLANCM,JYTJ
1870TP-02
0
0
2
1
4
2
6
3
10m
5m
1:200 @ A3
1:100 @ A1
Revision No Date Description
2 xx.xx.14 VCAT Issue RE.RFI
1 02.09.14 VCAT Issue
4.0 Architectural DrawingsTP 02 Ground Floor Plan
EXISTING PRIVATE OPEN SPACE
REVISION [B] - ISSUE FOR RFI RESPONSE24 OCTOBER 2014
Project No 1870 32© Hayball
250 Gore Street & 221 Moor Street Fitzroy
1TP-18
51.5 m²
1 BED103
42.1 m²
1 BED104
47.6 m²
1 BED111
63.2 m²
2 BED112
62.8 m²
2 BED113
60.1 m²
2 BED115
60.2 m²
2 BED116
49.3 m²
1 BED109
5.7 m²
BAL103
5.7 m²
BAL104
5.5 m²
BAL109
6.0 m²
BAL111
6.6 m²
BAL110
53.4 m²
1 BED110
8.0 m²
BAL112
5.5 m²
BAL108
5.7 m²
BAL116
5.8 m²
BAL115
7.1 m²
BAL114
GO
RE
ST
RE
ET
HODGSON STREET
MOOR STREET
59.0 m²
2 BED108
40.3 m²
1 BED107
5.8 m²
BAL106
95°32'50"45.04
PROPERTYBOUNDARY
186°1
8'
18.3
5P
RO
PE
RT
YB
OU
ND
AR
Y
275°58'20"30.22
PROPERTYBOUNDARY
332°40'
3.37
6°5
0'
15.3
1P
RO
PE
RT
YB
ON
DA
RY
275°53'30"16.30
PROPERTYBOUNDARY
185°5
4'5
0"
36.1
55
PR
OP
ER
TY
BO
UN
DA
RY
PR
OPER
TY
BO
UN
DA
RY
8.3 m²
BAL105
6.5 m²
BAL1025.7 m²
BAL101
57.7 m²
1 BED+ST106
6.2 m²
BAL107
63.5 m²
2 BED105
1TP-14
5.5 m²
BAL117
67.6 m²
2 BED 2 BATH117
60.4 m²
1 BED101
48.2 m²
1 BED102
1TP-15
SERVICESSERV
ICES
1500
1500
2050
1500
1500
1500
121.5 m²CORE/CIRC
1TP-17
1TP-19
8.1 m²
BAL113
9000
39.280
1136
1525
2400
15001500
2550
1550
FROM
BDY
3360
1098
1750
2450
1700
EX. WINDOWL2-4
EX. WINDOW L2-4
EX. WINDOWL1
EX. WINDOWL1
EX. WINDOWL1
EX. WINDOWL1
EX. WINDOWL1
EX. WINDOWL1
EX. WINDOWL1
3613
3
29118
9020
3480
44930
1462
6
26042
11344
1TP-18C
1TP-18B
DOTTED RED LINEDENOTES PREVIOUSLYAPPROVED VCATCONDITIONS (PLN11/1077)
103
1750
1750
1750
1366
1516
1480
60.9 m²
2 BED114
R 9000
R 9
000 R 9000
R 9000
R 9000
R 90
00
R 90
00 R 9000
METALLIC PRIVACYSCREEN - FIXED
EX. WINDOWL1
EX. WINDOWL1
TOWN PLANNING
TITLEPROJECT
Builders/Contractors shall verify job dimensions before any job commences. Figured dimensions shall take precedence over scaled work. Work shall also conform to the specification, other drawings and jobdimensions. All shop drawings shall be submitted to the Architect/Consultant and manufacture shall not commence prior to the return of inspected shop drawings signed by the Architect/Consultant. © Copyright2008 All rights reserved
Hayball Pty Ltd4/ 135 Sturt Street SouthbankVictoria Australia 3006T 03 9699 3644 F 03 9699 3708www.hayball.com.au
ARBV Registered Directors:Len Hayball, Richard Leonard RobertStent, Tom Jordan, Sarah Buckeridge,David Tweedie. Director: Luc BaldiABN 84 006 394 261
DATE PRINTEDCHECKED
SCALE
DRAWN BYPROJECT NODWG NO
1 : 100@ A124/10/2014 11:17:24 AM
250 GORE STREET & 221 MOORSTREET, FITZROY
TYPICAL LEVEL 1-3 FLOOR PLANCM, JYTJ
1870TP-03
0
0
2
1
4
2
6
3
10m
5m
1:200 @ A3
1:100 @ A1
Revision No Date Description
2 xx.xx.14 VCAT Issue RE.RFI
1 02.09.14 VCAT Issue
4.0 Architectural DrawingsTP 03 Typical Level 1-3 Floor Plan
REVISION [B] - ISSUE FOR RFI RESPONSE24 OCTOBER 2014
Project No 1870 33© Hayball
250 Gore Street & 221 Moor Street Fitzroy
1TP-18
63.5 m²
2 BED404
81.0 m²
2 BED 2 BATH401
6.5 m²
BAL402
6.5 m²
BAL403
57.9 m²
1 BED+ST405
5.5 m²
BAL407
5.8 m²
BAL405
50.2 m²
1 BED409
74.0 m²
2 BED 2 BATH410
73.7 m²
2 BED 2 BATH411
GO
RE
ST
RE
ET
HODGSON STREET
MOOR STREET
1500
6.2 m²
BAL406
40.3 m²
1 BED406
95°32'50"45.04
PROPERTYBOUNDARY
186°1
8'
18.3
5P
RO
PE
RT
YB
OU
ND
AR
Y
275°58'20"30.22
PROPERTYBOUNDARY
332°40'
3.37
6°5
0'
15.3
1P
RO
PE
RT
YB
ON
DA
RY
275°53'30"16.30
PROPERTYBOUNDARY
185°5
4'5
0"
36.1
55
PR
OP
ER
TY
BO
UN
DA
RY
PR
OPER
TY
BO
UN
DA
RY
7.9 m²
BAL404
49.7 m²
1 BED402
50.1 m²
1 BED403
61.6 m²
2 BED414
58.6 m²
2 BED407
65.0 m²
2 BED 2 BATH408
59.8 m²
2 BED413
59.2 m²
2 BED412
8.0 m²
BAL408
11.2 m²
BAL409
8.0 m²
BAL410
1TP-14
18.6 m²
BAL411
15.2 m²
BAL412
15.0 m²
BAL413
17.9 m²
BAL414
17.7 m²
BAL401
1TP-15
SERVICES
1500
1500
1500
2050
NON-TRAFFICABLE ROOF
1TP-17
107.8 m²
CORE/CIRC680
1TP-19
NON-TRAFFICABLE ROOF
NON-TRAFFICABLE ROOF
47.980
4386
9000
2550
1550
2652
2500
1700
1830
ANGLED BALUSTRADE
1000
EX. WINDOW EX. WINDOW
22577SETBACK FROM BDY
3137SETBACK FROM BDY
4454
3614
0
40505
SETB
ACK
FROM
BDY
3345
1464
7
26042
8207
1250
0
1TP-18C
1TP-18B
DOTTED RED LINEDENOTES PREVIOUSLYAPPROVED VCATCONDITIONS (PLN11/1077)3500
1500
1830 10
85
2180
R 9000
R 9000
R 9000
R 9000METALLIC PRIVACYSCREEN - FIXED
TOWN PLANNING
TITLEPROJECT
Builders/Contractors shall verify job dimensions before any job commences. Figured dimensions shall take precedence over scaled work. Work shall also conform to the specification, other drawings and jobdimensions. All shop drawings shall be submitted to the Architect/Consultant and manufacture shall not commence prior to the return of inspected shop drawings signed by the Architect/Consultant. © Copyright2008 All rights reserved
Hayball Pty Ltd4/ 135 Sturt Street SouthbankVictoria Australia 3006T 03 9699 3644 F 03 9699 3708www.hayball.com.au
ARBV Registered Directors:Len Hayball, Richard Leonard RobertStent, Tom Jordan, Sarah Buckeridge,David Tweedie. Director: Luc BaldiABN 84 006 394 261
DATE PRINTEDCHECKED
SCALE
DRAWN BYPROJECT NODWG NO
1 : 100@ A124/10/2014 11:17:34 AM
250 GORE STREET & 221 MOORSTREET, FITZROY
LEVEL 4 FLOOR PLANCM, JYTJ
1870TP-04
Revision No Date Description
2 xx.xx.14 VCAT Issue RE.RFI
1 02.09.14 VCAT Issue
0
0
2
1
4
2
6
3
10m
5m
1:200 @ A3
1:100 @ A1
4.0 Architectural DrawingsTP 04 Level 4 Floor Plan
REVISION [B] - ISSUE FOR RFI RESPONSE24 OCTOBER 2014