    "ethod #tatement $or Piling Work Work Date:

    "%&'OD #&A&%"%N& FO P(L(N) WO *

    CONTENTS

    Sr. No. TITLE

    + (N& OD,-&(ON

    #-OP% OF WO * / %F% %N-%# AND #&ANDA D

    0 WO * P O) A""%

    1 "A-'(N% (%# 2 %3,(P"%N&

    4 "%&'ODOLO)5

    4.+ )%N% AL %3,( %"%N

    4. -ON#& ,-&(ON OF BO %D -A#&6(N6#(&, P(L%#

    4./ -ON&(N,(&5 (N -ON#& ,-&(ON

    4.0 #(&% -L%AN6,P

    4.1 %-O D(N) OF DA&A

    7 3,AL(&5 A##, AN-%

    8 '#% 9 '%AL&' #AF%&5 AND %N;( ON"%N&

    8.+ (#* (D%N&(F(-A&(ON

    8. (#* "AN)%"%N&

    #P-L ABFPL

    #ignature

    Name

    Date

    Page 1 of 12

  • 8/11/2019 3. MS for Piling Work

    2/12

    SHAPOORJI PALLONJI & CO.LTD.

    Proposed Plant and Ofce Building Works For Alstom Bharat Forge Power Limited

    Doc. No.:

    e!. No.:

    "ethod #tatement $or Piling Work Date:

    1. INTRODUCTION:

    &his method statement descri

  • 8/11/2019 3. MS for Piling Work

    3/12

    SHAPOORJI PALLONJI & CO.LTD.

    Proposed Plant and Ofce Building Works For Alstom Bharat Forge Power Limited

    Doc. No.:

    e!. No.:

    "ethod #tatement $or Piling Work Date:

    . -oncrete $or

  • 8/11/2019 3. MS for Piling Work

    4/12

    SHAPOORJI PALLONJI & CO.LTD.

    Proposed Plant and Ofce Building Works For Alstom Bharat Forge Power Limited

    Doc. No.:

    e!. No.:

    "ethod #tatement $or Piling Work Date:

    4. &he inside portion o$ the casing shall

  • 8/11/2019 3. MS for Piling Work

    5/12

    SHAPOORJI PALLONJI & CO.LTD.

    Proposed Plant and Ofce Building Works For Alstom Bharat Forge Power Limited

    Doc. No.:

    e!. No.:

    "ethod #tatement $or Piling Work Date:

    head.

    &he piling Drilling withBentonite "ud method is adopted $or o$ *ell>

  • 8/11/2019 3. MS for Piling Work

    6/12

    SHAPOORJI PALLONJI & CO.LTD.

    Proposed Plant and Ofce Building Works For Alstom Bharat Forge Power Limited

    Doc. No.:

    e!. No.:

    "ethod #tatement $or Piling Work Date:

    + . &he depth o$ drilling shall measured in regular inter!alstill reaching the toe o$ pile. #oil sample will thene

  • 8/11/2019 3. MS for Piling Work

    7/12

    SHAPOORJI PALLONJI & CO.LTD.

    Proposed Plant and Ofce Building Works For Alstom Bharat Forge Power Limited

    Doc. No.:

    e!. No.:

    "ethod #tatement $or Piling Work Date:

    longitudinal steel

  • 8/11/2019 3. MS for Piling Work

    8/12

    SHAPOORJI PALLONJI & CO.LTD.

    Proposed Plant and Ofce Building Works For Alstom Bharat Forge Power Limited

    Doc. No.:

    e!. No.:

    "ethod #tatement $or Piling Work Date:

    0. &he speci c gra!it> o$ $resh Bentonite slurr> used shall

  • 8/11/2019 3. MS for Piling Work

    9/12

    SHAPOORJI PALLONJI & CO.LTD.

    Proposed Plant and Ofce Building Works For Alstom Bharat Forge Power Limited

    Doc. No.:

    e!. No.:

    "ethod #tatement $or Piling Work Date:

    o$ the tremie pipe and to a!oid the distur

  • 8/11/2019 3. MS for Piling Work

    10/12

    SHAPOORJI PALLONJI & CO.LTD.

    Proposed Plant and Ofce Building Works For Alstom Bharat Forge Power Limited

    Doc. No.:

    e!. No.:

    "ethod #tatement $or Piling Work Date:

    11. ate o$ placing concrete in the pile sha$t shall not it shall

  • 8/11/2019 3. MS for Piling Work

    11/12

    SHAPOORJI PALLONJI & CO.LTD.

    Proposed Plant and Ofce Building Works For Alstom Bharat Forge Power Limited

    Doc. No.:

    e!. No.:

    "ethod #tatement $or Piling Work Date:

    +. All the acti!ities shall plan.

    8 . HSE < HEALTH= SAFET" AND EN>IRONMENT:

    All necessar> precautions shall .5. (mproper lead to in ur>.6. (mproper #teel shi$ting 2 mishandling ma> result in to shoulder 2 hand

    in ur>.7. (mproper use o$ electric sa$et> e=uipment ma> lead to ma or in ur>.8. (n ur> during cutting?welding o$ steel.9. During concreting proper PP% s re=uired like gum anal>sis. &he risk management can consideration and those that are particularl> applica precautions shall

  • 8/11/2019 3. MS for Piling Work

    12/12

    SHAPOORJI PALLONJI & CO.LTD.

    Proposed Plant and Ofce Building Works For Alstom Bharat Forge Power Limited

    Doc. No.:

    e!. No.:

    "ethod #tatement $or Piling Work Date:

    7. A rst aid person shall Ofcer

    ,se o$ re=uired PP% s #ite %ngineer)ood housekeeping in workingareas

    #ite %ngineer?#a$et>Ofcer

    -onduct tool Ofcer

    / "anual 'andling %ngage good ph>sic personnel #ite %ngineerDo not tr> to li$t alone a hea!>load seek others help

    #ite %ngineer