3G New Site SCFT and Optimization Sales Zone N agpur DHQ N agpur Site N am e DhantoliPark Site ID N G P228 RF C luster M H_Vidarbha2 O n AirD ate 29-Jan-13 DT Com pletion D ate 1-Feb-13 D T EngineerN am e Arun C hauhan OptimizerName Ram eshwarM ishra

Transcript of 3 g ngp228

Page 1: 3 g ngp228

3G New Site SCFT and Optimization

Sales Zone NagpurDHQ Nagpur

Site Name Dhantoli ParkSite ID NGP228

RF Cluster MH_Vidarbha2On Air Date 29-Jan-13

DT Completion Date 1-Feb-13DT Engineer Name Arun Chauhan

Optimizer Name Rameshwar Mishra

Page 2: 3 g ngp228

SCFT Sheet 1:-Microsoft Office Excel Worksheet

Page 3: 3 g ngp228

SCFT Sheet 2:-

Page 4: 3 g ngp228

SCFT Sheet 3:-

Page 5: 3 g ngp228

RSCP Plot (3G Idle)Grid:300m

RSCP Idle Samples Ranges

-76 To 0

-81 To -76

-85 To -81

-91 To -85

-95 To -91

-120 To -95

Page 6: 3 g ngp228

82.20% samples are greater than -85 dbm

Idle RSCP Statistics Graph & Percentage Samples

RSCP Samples Percentage % Cumulative % -76 To 0 4563 49.10% 49.10%

-81 To -76 1664 17.90% 67.00%

-85 To -81 1410 15.20% 82.20%

-91 To -85 1267 13.60% 95.80%

-95 To -91 278 3.10% 98.90%

-120 To -95 104 1.10% 100.00%

Ranges

Page 7: 3 g ngp228

Ec/No Idle Plot (3G CS)Grid:300m

Page 8: 3 g ngp228

75.00% samples are greater than -12 db

Idle Ec/No Statistics Graph & Percentage Samples:

Ec/No Ranges Samples Percentage % -10 To 0 5227 56.30% -12 To -10 1738 18.70% -18 To -12 1913 20.60% -32 To -18 408 4.40%

Page 9: 3 g ngp228

HSDPA Physically Served Throughput PlotGrid:300m

Page 10: 3 g ngp228

HSDPA Ranges Samples Percentage % 4000 To 10000 6165 25.90% 3000 To 4000 2542 10.70% 2000 To 3000 3840 16.10% 1000 To 2000 6319 26.50% 0 To 1000 4935 20.70%

79.30% samples are greater than 1 MbpsMean HSDPA Throuhput is 2724 kbps

HSDPA Statistics Graph & Percentage Samples:

Page 11: 3 g ngp228

CQI Plot & Statistics

CQI Samples Percentage % Cumulative % 0 To 15 8549 17.80% 17.80%

15 To 25 30064 62.80% 80.60%

25 To 30 9286 19.40% 100.00%

Ranges

Page 12: 3 g ngp228

Summary of Optimization Activites Performed:-

Sector 1 Sector 2 Sector 3

Azimuth 10 130 265

Electrical Down Tilt 3 3 3

Mechanical Tilt 1 1 1