    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    SECT. A SCOPE OF WORK  

    1.0 FIRE FIGHTING SERVICES

    1.1 GENERAL

     The Contract ha!! "nc!#$e the co%&!ete #&&!', "nta!!at"on, tet"n( an$tt"n( "nto co%%""on, han$"n()o*er "n a&&ro*e$ +or"n( or$er an$%a"ntenance therea-ter -or the &er"o$ o- the Contract +or a $eta"!e$herea-ter an$ a ho+n on the $ra+"n(.

     The +or to /e carr"e$ o#t #n$er th" Contract ha!! "nc!#$e the +ho!e o- the%ater"a! an$ a!! necear' !a/o#r -or the co%&!ete "nta!!at"on tr"ct!' "naccor$ance +"th the c#rrent e$"t"on o- the FOC r#!e, the 0r"t"h Stan$ar$S&ec"1cat"on, the 0r"t"h Stan$ar$ Co$e o- Pract"ce, the re2#"re%ent o- the!oca! F"re A#thor"t' an$ a!! other re!e*ant A#thor"t"e ha*"n( #r"$"ct"on o*erthe "nta!!at"on, to(ether +"th a!! "nc"$enta! +or &erta"n"n( thereto e*entho#(h not &ec"1ca!!' %ent"one$ here"n or ho+n on the $ra+"n(.

    1.2 DESCRIPTION OF WORKS

     The +or to /e carr"e$ o#t #n$er th" Contract ha!! "nc!#$e /#t not !"%"te$,to the -o!!o+"n( "te%4 )

    • F"re a!ar% 'te% "nc!#$e a!ar% &ane!

    • Porta/!e 1re e5t"n(#"her

    • Pa"nt"n(, 1n"h"n(, tet"n( an$ co%%""on"n(

    •CO6 A#to%at"c F"re E5t"n(#"h"n( S'te%

    • Pro*""ona! 7or4 C!ean A(ent or Inert Ga tota! 8oo$"n( e5t"n(#"h"n( "n

    re&!ace%ent o- CO6 S'te%. P!eae "n$"cate the tota! a%o#nt "n Ite% 9: o- Sche$#!e o- Un"t Rate.

    1.3 WORK INSTALLED

    A!! +or "nta!!e$, e2#"&%ent an$ %ater"a! #e$ ha!! /e "n -#!! co%&!"ance tothe re!e*ant 0r"t"h Stan$ar$, the Re2#"re%ent o- Ch"e- In&ectorate o- F"reSer*"ce ;CIFS< Ma!a'"a an$ a!! other re!e*ant a#thor"t"e ha*"n( #r"$"ct"ono*er the "nta!!at"on.

    On co%&!et"on o- the "nta!!at"on, the Contractor ha!! cert"-' "n +r"t"n( to theCon#!tant an$ the F"re A#thor"t' that the "nta!!at"on " "n -#!! co%&!"ance +"ththe CIFS re2#"re%ent an$ ha!! tae a!! necear' te&, "nc!#$"n( the&a'%ent o- a!! the tet"n( -ee an$ (ett"n( the rece"&t "n or$er to o/ta"n thea&&ro*a! o- the "nta!!at"on -ro% the F"re A#thor"t'. The Contractor ha!! /e -#!!' re&on"/!e to o/ta"n the a&&ro*a! o- the&ro&oe$ 1re &re*ent"on an$ $etect"on 'te% -ro% the =a/atan 0o%/a DanPen'e!a%at Ma!a'"a. An' other cot o- +or that are $ee%e$ necear'an$ re2#"re$ /' the =a/atan 0o%/a Dan Pen'e!a%at Ma!a'"a -or a&&ro*a!ho#!$ /e cot an$ a&&eare$ on the >S#%%ar' o- Pr"ce? a >Other +or not!"te$ a/o*e /#t $ee%e$ necear' -or the a&&ro*a! o- =a/atan 0o%/a DanPen'e!a%at Ma!a'"a?.

     The Contractor ha!! ha*e "n the"r e%&!o'%ent, a &ro-e"ona! en("neerre("tere$ +"th the 0oar$ o- En("neer, Ma!a'"a to "(n, en$ore an$ #/%"ta!! the necear' $ra+"n( a "ntr#cte$ /' the Con#!tant to the CIFS "n or$er

    Part 3 FF 1 FIRE FIGHTING SERVICES

    PLS-140032-C/M&E/DPE

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    2/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    to o/ta"n en$ore%ent -ro% the F"re A#thor"t'.

    1.4 WORKMANSHIP

     The -o!!o+"n( &ec"1c re2#"re%ent ha!! a&&!' to th" er*"ce4 )

    •  The Contractor ha!! &ro*"$e a!! "$ent"1cat"on -or &aa(e o- &"&e,

    con$#"t, $#ct thro#(h /ea%, +a!!, an$ 8oor – "@e a !"%"te$ /'En("neer an$ to chec an$ o/ta"n a&&ro*a! -ro% En("neer -or "t.

    •  To /e re&on"/!e -or acc#rac' o- a!"(n%ent – &!#%/, -a!! an$ the !"e.

    •  To &ro*"$e 9 co%&etent #&er*"or on "te -#!! t"%e an$ 6 or 3 co%&etent

    +or%en to carr' o#t ;9< an$ ;6

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    3/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    SECT. B FIRE ALARM SYSTEM

    2.0 FIRE FIGHTING SERVICES

    2.1 GENERAL

     The Contractor ha!! #&&!', "nta!!, tet an$ co%%""on the co%&!ete 1rea!ar% 'te%. The $e"(n an$ "nta!!at"on o- a!! co%&onent an$ the 'te%ha!! co%&!' +"th the re2#"re%ent o- the -o!!o+"n( /o$"e or tan$ar$4 )

    • In&ectorate o- F"re Ser*"ce, Ma!a'"a

    • F"re an$ Acc"$ent Un$er+r"ter? Aoc"at"on

    • Pro&oe$ Un"-or% 0#"!$"n( 0')!a+, 9B

    • C#rrent E$"t"on o- the R#!e o- the F"re Ocer? Co%%"ttee -orA#to%at"c F"re A!ar% Inta!!at"on

    • Latet E$"t"on o- CP 9:9496. The "nta!!at"on an$ er*"c"n( o- 

    E!ectr"ca! F"re A!ar% S'te%

    On co%&!et"on o- the "nta!!at"on, the Contractor ha!! /e re&on"/!e -orcert"-' "n +r"t"n( to the In&ectorate o- F"re Ser*"ce, Ma!a'"a that the"nta!!at"on " "n -#!! co%&!"ance +"th the a/o*e)%ent"one$ re(#!at"on. TheContractor ha!! a!o /e re&on"/!e -or o/ta"n"n( +r"tten a&&ro*a! -ro% theCIFS tat"n( that the co%&!ete$ "nta!!at"on " "n &ro&er +or"n( or$er.

     The Contractor ha!! &ro*"$e a!! !a/o#r, %ater"a!, too! an$ e2#"&%entre2#"re$ to co%&!ete the F"re A!ar% S'te% "nta!!at"on. A!! %ater"a! ha!! /ene+ an$ #n#e$, /e o- /et 2#a!"t' o- the"r re&ect"*e "n$, -ree -ro% $e-ect

    an$ ha*e /een a&&ro*e$ -or #e /' the CIFS.

    A!! !ocat"on o- %an#a! ca!! &o"nt, a#to%at"c $etector an$ a#$"/!e a!ar% area&&ro5"%ate. The Contractor ha!! chec on "te !ocat"on an$ ha!! a$#taccor$"n(!' to #"t "te con$"t"on. No e5tra cot ha!! /e a!!o+e$ -or the%"nor a$#t%ent. En("neer? a&&ro*a! ha!! /e o/ta"ne$ &r"or to "nta!!at"on.

     The Contractor " re2#"re$ to #/%"t the co%&!ete !a'o#t an$ +"r"n( $"a(ra%,1re a!ar% &ane! c"rc#"tr' $"a(ra% o- the +ho!e 'te% to the En("neer -ora&&ro*a! at !eat t+o ;6< +ee &r"or to the co%%ence%ent o- +or.

     The 'te% ha!! con"t o- a %ater 1re A!ar% "n$"cat"n( &ane!, %an#a! ca!!&o"nt, a#to%at"c $etector, a!ar% /e!!, /atter"e, /atter' char(er an$ a!!aoc"ate$ +"r"n( an$ co%&onent. The 'te% ha!! o&erate on the 6 *o!tDC 'te%.

    2.2 MANUAL CALL POINTS

    Man#a! ca!! &o"nt ha!! /e o- the #r-ace %o#nt"n( t'&e "%"!ar to GentMo$e! 99:6 #"ta/!e -or 6 *o!t D.C. o&erat"on. The' ha!! /e 15e$ at ahe"(ht to /e $eter%"ne$ on "te an$ "t ha!! /e nor%a!!' o- 93:%% ; -eet "nche< to 96%% ; -eet< an$ "n !e*e! +"th e!ectr"ca! +"tche near/' "- an'.It ha!! /e o- the c!oe$ or o&en c"rc#"t 8oat"n( contact /rea (!a t'&eho#e$ "n a @"nc corro"on &roo- &re#re $"e cat"n( cae 1n"he$ "n re$ena%e! co!o#r #"ta/!' (!a@e$ +"th /o!$ +h"te !etter"n( "ncr"/e$ F"re S%ah

    G!a.

    Part 3 FF 3 FIRE FIGHTING SERVICES

    PLS-140032-C/M&E/DPE

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    4/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    2.3 ALARM BELL

     The a!ar% /e!! ha!! /e o- #r-ace %o#nt"n( t'&e +"th "nche $"a%eter (on(%a$e o- &ree$ tee! an$ to*e ena%e!!e$ re$. The /e!! ha!! /e #"ta/!e -or6 *o!t D.C. o&erat"on an$ the c#rrent con#%&t"on ha!! /e !"%"te$ to : %A. The' ha!! /e "%"!ar to Gent Mo$e! : ;D.C.

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    5/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    an$ concea!e$ ca/!e ha!! not /e %a!!er than 9.%% PVC "n#!ate$ an$rate$ at 6: *o!t to 0.S. 6::.

    F"tt"n( an$ acceor"e ha!! /e (a!*an"e$ an$ %an#-act#re$ -ro% tee! or%a!!ea/!e cat "ron to 0.S. 39.

    Con$#"t ha!! /e concea!e$ thro#(ho#t. Scre+e$ con$#"t /#r"e$ "n concreteha!! ha*e the threa$ coate$ +"th a&&ro*e$ o"nt"n( co%&o#n$ $#r"n(ae%/!' an$ o"nt treate$ +"th a r#t "nh"/"t"n( &a"nt a-ter o"nt"n(. A!!con$#"t an$ acceor"e ha!! a!o /e &a"nte$ +"th a r#t "nh"/"t"n( &a"nt+here*er the e5&oe$ (a!*an"e$ #r-ace ha /een c#t or other+"e $a%a(e$.

    Con$#"t ha!! /e 15e$ ec#re!' to &re*ent %o*e%ent an$ a!! en$, /o5eha!! /e eJect"*e!' &!#((e$ to &re*ent the "n(re o- +ater an$ $"rt /e-oreconcrete " &o#re$. A!! /en$ %#t /e %a$e +"th the &ro&er con$#"t /en$"n(%ach"ne o that the "nner ra$"# o- an' /en$ " not !e than 6 t"%e theo#t"$e $"a%eter o- the con$#"t. 7here con$enat"on " !"e!' to tae &!ace,&ro*""on ha!! /e %a$e -or the +ater to $ra"n oJ +"tho#t entr' "ntoter%"nat"on. The $eta"!e$ !a'o#t o- con$#"t +"!! /e the re&on"/"!"t' o- the

    Contractor. Con$#"t ha!! /e r#n neat!' "n tra"(ht !"ne &ara!!e! to +a!!, 8ooran$ ce"!"n( +here*er &o"/!e.

    7here %#!t"&!e con$#"t r#n occ#r, %eta! /racet %#!t")+a' a$$!e 15e$ /'%ean o- %eta! threa$ ha!! /e #e$. The en$ o- con$#"t ha!! /e c#t2#are, 1!e$ an$ rea%e$ o#t a-ter cre+"n( an$ care ha!! /e taen to en#rere%o*a! or c#tt"n( o"! an$ +a-. Con$#"t ter%"nat"on at +"tche,+"tch/oar$, $"tr"/#t"on /oar$, etc. are to /e &ro&er!' ec#re$ +"th co#&!eran$ %a!e /ra /#he. Con$#"t ter%"nat"on to a&&arat# #/ect to*"/rat"on or %o*e%ent ha!! /e %a$e o- 8e5"/!e %eta!!"c con$#"t +"th /raa$a&tor -or connect"on to the r"("$ con$#"t 'te% at each en$. 7herecon$#"t cro e5&an"on o"nt the' ha!! /e "nta!!e$ o a not to re"t

    re!at"*e %o*e%ent o- the ect"on.

    A #"ta/!e cro"n( ha!! co%&r"e con$#"t te!eco&e$ one "n"$e the other+"th the -ree en$ or en$ &roect"n( "%%e$"ate!' to one "$e o- the cro"n(.7here !on( r#n o- con$#"t are #na*o"$a/!e, a$a&ta/!e /o5e ha!! /e&ro*"$e$ -or eae o- $ra+"n()"n o- ca/!e. Dra+)"n +"re ha!! /e &ro*"$e$"n"$e each con$#"t to -ac"!"tate the $ra+"n()"n o- ca/!e. 7here e5&oe$,con$#"t ha!! /e &a"nte$ oran(e.Con$#"t "@e ha!! /e e!ecte$ o a to a!!o+ re%o*a! or re&!ace%ent o- an'one ca/!e +"tho#t $"t#r/"n( the other an$ ha!! not /e !e than $"a%eter+"tho#t the &er%""on o- the En("neer. In no c"rc#%tance, the n#%/er o- ca/!e $ra+n "nto an' one con$#"t ha!! e5cee$ that tate$ "n ta/!e 0 an$0 o- the 9th E$"t"on o- the I.E.E. Re(#!at"on. A!! con$#"t ha!! /e +a//e$

    o#t an$ -ree -ro% %o"t#re to the En("neer? at"-act"on /e-ore +"r"n( "co%%ence$.

    2.$ PVC ARMOURED MULTI%CORE CABLE INSTALLATION

    A!! e5terna! an$ /#r"e$ #n$er(ro#n$ 1re a!ar% +"r"n( ha!! /e PVC ar%o#re$)core ca/!e. No o"nt ha!! /e a!!o+e$ -or the "nta!!at"on o- %#!t")core, PVC"n#!ate$ tee! +"re ar%o#re$ ca/!e e5ce&t at #nct"on /o5e a a&&ro*e$ /'En("neer.At ter%"na! ea!"n( /o5e, ca/!e core ha!! /e carr"e$ thro#(h #n/roen to theter%"na! an$ core ha!! /e eate$ o!"$ +here the' &a thro#(h cae re"n.

     The $e"(n o- co%&reor (!an$ " to /e #ch that the ca/!e " not t+"te$+hen the (!an$ " t"(htene$. It " "%&o"/!e to erect an$ $"%ant!e an' ca/!eco%&re"on (!an$ +"tho#t the #e o- &ec"a! too!.

    Part 3 FF 5 FIRE FIGHTING SERVICES

    PLS-140032-C/M&E/DPE

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    6/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    Each core o- ca/!e ha!! /e "$ent"1e$ /' a n#%/er or co!o#r co$e.

    2.10 E&CAVATION OF TRENCHES

     The En("neer +"!! ett!e the e5act !ocat"on o- each ca/!e trench on the "te

    +hen +or " rea$' to co%%ence.

     Trenche ha!! /e e&t a tra"(ht a &o"/!e an$ ha!! /e e5ca*ate$ toa&&ro*a! -or%at"on an$ $"%en"on, an$ ha!! (enera!!' /' 3: "nche $ee&. Trenche ha!! ha*e *ert"ca! "$e an$ are to /e t"%/ere$ an$ heete$ +herenecear' to &re*ent #/"$ence.

     The e5ca*at"on o- trenche ha!! "nc!#$e, /' +a' o- a%&!"1cat"on /#t not o- !"%"tat"on, a!! t"%/er"n(, %&"n( an$ /a!"n( re2#"re$ an$ the &ro*""on o- a!!necear' !a/o#r, &!ant, too! a$$"t"ona! o"!, -#e! an$ %ot"*e &o+er -or #chr&oe an$ the cot o- th" er*"ce an$ o- the e5&en$a/!e %ater"a! ha!! /e"nc!#$e$.

    0e-ore the ca/!e are !a"$, the /otto% o- the trench " to /e !"ne$ +"th an$ or"-te$ o"!, +h"ch " to /e nne$ $o+n to a th"cne o- 3 "nche to -or% a/e$. A-ter the ca/!e are !a"$, the 1rt 3 $e&th o- co*er /ac1!! ha!! con"to- an$ or "-te$ o"! o*er +h"ch ha!! /e &!ace$ &rotect"*e co*er.

    0ac1!!"n( an$ re"ntate%ent o- o&en trenche a-ter &!ac"n( o- the ca/!e&rotect"*e co*er ha!! a!o /e carr"e$ o#t.

    Part"c#!ar attent"on ha!! /e taen to en#re that trenche are e*en!' (ra$e$&r"or to &!ac"n( the /e$$"n( %ater"a!.

    Ca/!e &a"n( #n$er roa$+a' ha!! /e "nta!!e$ "n $#ct /#r"e$ to a %"n"%#%

    $e&th o- 3: "nche.

    Ca/!e ha!! /e nae$ at e*er' o"nt or #nct"on /o5 an$ ca/!e ha!! notcro "n tra"(ht r#n o- trench or "n an' other &o"t"on e5ce&t +here a cro%a' /e &er%"tte$ "- "t " "%&o"/!e to a*o"$ /' a$*ance &!ann"n( o- the $a' o- ca/!e "n a trench.Ro#t"n( an$ e5ca*at"on o- a!! trenche ha!! /e carr"e$ o#t correct!' an$at"-actor"!' an$ at #ch t"%e an$ &!ace to #"t the &ro(ra% o- ca/!e"nta!!at"on +or.

    On!' eno#(h (ro#n$ ha!! /e o&ene$ at a t"%e #ch that ca/!e !a'"n( an$/ac1!!"n( %a' &rocee$ +"tho#t $e!a'"n( or$er to a*o"$ ha*"n( trencheo&ene$ -or !on( &er"o$.

    2.11 PROTECTIVE COVERS

    Ca/!e co*er ha!! con"t o- (oo$ 2#a!"t' ho#e /r"c an$ ha!! /e !a"$ o*era!! ca/!e "n (ro#n$ o that there ha!! /e no (a& /et+een the co*er.

     The S#&&!' an$ !'"n( o- ca/!e &rotect"*e co*er are to /e "nc!#$e$ "n the rate-or ca/!e !a'"n(.

    2.12 BACKFILLING AND REINSTATEMENT

    A-ter a!! ca/!e an$ &rotect"*e co*er ha*e /een !a"$, the trenche ha!! /ere1!!e$ "n !a'er, each !a'er /e"n( +e!! ra%%e$ an$ cono!"$ate$. The#r-ace o- re1!!e$ trenche ha!! /e te%&orar"!' re"ntate$ an$ %a"nta"ne$ "n athoro#(h!' a-e con$"t"on #nt"! co%&!ete cono!"$at"on o- the o"! " ach"e*e$.

    Part 3 FF 6 FIRE FIGHTING SERVICES

    PLS-140032-C/M&E/DPE

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    7/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    2.13 CABLE MARKERS

    Ca/!e %arer ha!! /e &ro*"$e$ an$ "nta!!e$ +"th the to& #r-ace 8#h +"th(ro#n$ !e*e! to "$ent"-' ca/!e ro#te an$ o"nt &o"t"on, other than tee o"nt

    at treet !"(ht"n( co!#%n, or ca/!e !a"$ $"rect "n the (ro#n$. Marer ha!! /e"ncr"/e$ +"th "n$ente$ !etter"n( rea$"n( F"re A!ar% Ca/!e an$ ha!! /e"nta!!e$ at e*er' 9:: -eet a!on( the ro#te an$ at an' chan(e "n $"rect"on.

    Part 3 FF 7 FIRE FIGHTING SERVICES

    PLS-140032-C/M&E/DPE

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    8/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    SECT. C PORTABLE FIRE E&TINGUISHERS

    3.0 FIRE FIGHTING SERVICES

    3.1 GENERAL

     The Contractor ha!! #&&!', "nta!!, tet an$ co%%""on the necear'e2#"&%ent a (enera!!' ho+n on the $ra+"n( an$ to the S&ec"1cat"on o- Loca! F"re A#thor"t"e. Sa%&!e o- e2#"&%ent /e-ore "nta!!at"on ha!! /e#/%"tte$ -or the En("neer? a&&ro*a!.

    3.2 PORTABLE FIRE E&TINGUISHERS

    Each F"re E5t"n(#"her ha!! /e #&&!"e$ co%&!ete +"th "t o+n a#to%at"ca-et' *a!*e, o#ter !"$, hoe no@@!e an$ %o#nt"n( /racet. The $e"(n o- thee5t"n(#"her ha!! /e #ch that "t " rea$' -or "ntant #e, "%&!e to o&erate,"nterna! &re#re a!+a' ho+n on the &re#re (a#(e an$ ea' to er*"ce. The e5t"n(#"her ha!! /e ea"!' carr"e$ to the /et &o"t"on -or 1(ht"n( a 1re

    an$ the o&erator can *ar' the $"char(e, "nc!#$"n( co%&!ete "nterr#&t"on "- $e"re$, to %eet the chan("n( nee$ o- the 1re "t#at"on an$ o (et theo&t"%a! re#!t. A!! t'&e o- e5t"n(#"her ha!! /e 1!te$ +"th a !oc"n( &"narran(e%ent to &re*ent acc"$enta! $"char(eK the a-et' &"n /e"n( ec#re$to the #n"t /' a cha"n or +"re ca/!e to &re*ent !o.

     The conta"ner ha!! /e contr#cte$ accor$"n( to re!e*ant ASME or 0S Co$ean$ a&&ro*e$ /' =a/atan 0o%/a, Ma!a'"a. The c'!"n$er ha!! ha*e /#rt"n(&re#re 6 t"%e a/o*e the +or"n( &re#re an$ each c'!"n$er ha!! /e -#!!'tete$ +"th co%&ree$ a"r $#r"n( %an#-act#re. The c'!"n$er ha!! /e coate$+"th e&o5' re"n to ("*e o&t"%a! &rotect"on a(a"nt corro"on.

     The /ra"$e$ 8e5"/!e hoe ha!! /e o- #c"ent an$ !en(th, ter%"nat"n( "n a

    #"ta/!e no@@!e. The hoe an$ no@@!e ha!! /e heat re"tant an$ $e"(ne$ -orthe &re#re an$ che%"ca! o- the F"re E5t"n(#"her #e$.

    A!! F"re E5t"n(#"her ha!! /e %o#nte$ +"th the /ae o- the c'!"n$er at thehe"(ht o- a/o*e 9:: %% a/o*e 8oor "n a con&"c#o# an$ rea$"!' acce"/!e&o"t"on. The contractor ha!! %o#nt the #&&ort"n( /racet +"th ana&&ro*e$ %etho$.

     The e5act &o"t"on o- the E5t"n(#"her ha!! /e $eter%"ne$ on "te to a*o"$$"rect e5&o#re to heat an$ #n!"(ht.

    Stan$ar$ $e"(n o- the e5t"n(#"her ha!! "nc!#$e a &re#re (a#(e.

    Pre#re (a#(e to /e &ro*"$e$ to a!! e5t"n(#"her to "n$"cate the tat# an$+hen re)1!!"n( " re2#"re$.

    3.3 ABC DRY POWDER FIRE E&TINGUISHERS

     The Contractor ha!! #&&!' an$ "nta!! A0C Dr' Po+$er F"re E5t"n(#"her o- ca&ac"t' a "n$"cate$. Dr' che%"ca! 1re e5t"n(#"her ha!! /e &re)&re#re$A0C Tr")C!a t'&e an$ ha!! conta"n a n#%/er o- &ec"a! -eat#re $e"(ne$ to("*e %ot ec"ent o&erat"on an$ %a5"%#% 1re "!!"n( eJect"*ene a(a"nt A,0 an$ C c!a 1re.

     The &o+$er ha!! /e eJect"*e on e5t"n(#"h"n( 1re on 8a%%a/!e !"2#"$. The

    &o+$er ha!! /e o- non)to5"c, non)corro"on an$ non)-ree@"n( t'&e. Onact#at"on, the $r' &o+$er ha!! /e e5&e!!e$ -ro% the conta"ner /' &re#r"e$car/on $"o5"$e or n"tro(en (a. The no@@!e ha!! /e co%&!ete$ +"th a contro!*a!*e o- (r"$ t'&e or e2#"*a!ent, to ena/!e the o&erator to ha*e co%&!ete

    Part 3 FF 8 FIRE FIGHTING SERVICES

    PLS-140032-C/M&E/DPE

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    9/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    contro! o- the trea% o- che%"ca! &o+$er. The $r' che%"ca! &orta/!e 1re e5t"n(#"her ha!! con-or% to MS 93.

     The 1n"h"n( co!o#r ha!! /e !"(ht /!#e.

    3.4 CO2 FIRE E&TINGUISHERS

     The Contractor ha!! #&&!' an$ "nta!! CO6 e5t"n(#"her a "n$"cate$. Car/onD"o5"$e F"re e5t"n(#"her ha!! /e $e"(ne$ -or e5t"n(#"her 0 C!a 1re;8a%%a/!e !"2#"$, #ch a &etro!, o"!, &a"nt, etc.< an$ C C!a 1re ;!"*ee!ectr"ca! e2#"&%ent

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    10/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    SECT. D CO2 AUTOMATIC FIRE E&TINGUISHING

    4.0 FIRE FIGHTING SERVICES

    4.1 GENERAL

     The contractor ha!! #&&!', "nta!!, co%%""on an$ %a"nta"n -or one 'ear o- an a#to%at"c CO6 1re e5t"n(#"h"n( a(ent 'te% at !ocat"on a &ec"1e$ "nthe $ra+"n(.

    Genera!!', the A#to%at"c Car/on D"o5"$e E5t"n(#"h"n( S'te% ha!! con"t o- /#t not !"%"te$ to the -o!!o+"n(4)

    • C'!"n$er o- car/on $"o5"$e co%&!ete +"th $"char(e *a!*e an$ $"char(e

    ca/!e.

    • Man#a! $"char(e /rea (!a $e*"ce.

    • P"&"n( co%&!ete +"th 1tt"n(, /racet an$ &a"nt"n(.

    • Ga $"char(e no@@!e.

    • S%oe an$ heat $etector -or $etect"on an$ act#at"on o- car/on $"o5"$e

    'te%.

    • 7"r"n( "n %eta! con$#"t.

    • Contro! &ane! co%&!ete +"th /atter' char(er, /ooter char(er, 6 D.C N")

    C$ /atter', a!ar% /e!!, (a $"char("n( 'te%, a%%eter, *o!t%eter,-#nct"on "n$"cator an$ a!ar% tet +"tche, etc. The contro! &ane! %#t /ea&&ro*e$ /' the =a/atan 0o%/a $an Pen'e!a%at Ma!a'"a.

    • An' necear' +arn"n( "(n an$ "ntr#ct"on.

    • Re$ an$ (reen 8ah"n( "n$"cat"n( !"(ht.

     The e5t"n(#"h"n( a(ent ha!! /e car/on $"o5"$e (a. The 'te% ha!! /e$e"(ne$ -or TOTAL FLOODING.  The ca&ac"t' o- the 'te% ha!! /e a

    &ec"1e$ an$ ho+n on the $ra+"n(.

    4.2 OPERATION

     The 'te% ha!! /e arran(e$ to $etect %oe an$ heat an$ act#ate the'te% a#to%at"ca!!'. Man#a! act#at"on thro#(h a PULL 0O Stat"on an$Man#a! 0rea G!a co%&!ete +"th e' +"tch ha!! /e &ro*"$e$.

     The heat%oe $etector ha!! /e o- the $#a! c"rc#"t 'te% +here/' t+on#%/er o- ne"(h/o#r"n( $etector ha*e to /e act"*ate$ /e-ore the re!eae o- the (a. The act"*at"on o- on!' one $etector ha!! ra"e the a!ar%.

     The 'te% ha!! con-or% (enera!!' to the reco%%en$at"on o- the Nat"ona!F"re Protect"on Aoc"at"on ;NFPA< ) 96.

    Part 3 FF 10 FIRE FIGHTING SERVICES

    PLS-140032-C/M&E/DPE

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    11/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    4.3 LOCATION

    HeatS%oe $etector, (a c'!"n$er ha!! /e "nta!!e$ +"th"n !ocat"on&ec"1e$. The CO6 c'!"n$er ha!! /e co%&!ete!' enc!oe$ /' the &ro*""on o- a%eta! +"re (#ar$.

    4.4 CO2 CYLINDERS

    Each c'!"n$er ha!! /e #&&orte$ "n an #&r"(ht &o"t"on /' a %"!$ tee! c'!"n$er#&&ort -ra%e #"ta/!e -or +a!! an$ 8oor %o#nt"n(. The -ra%e ha!! "nc!#$e-ac"!"t"e -or con*en"ent "n$"*"$#a! er*"c"n(.

    Each /an o- c'!"n$er ha!! /e connecte$ to a co%%on hea$er. A#to%at"c%ean ha!! /e &ro*"$e$ to &re*ent the !o o- (a -ro% %an"-o!$ "- the 'te%" o&erate$ +hen an' c'!"n$er " re%o*e$ -or %a"ntenance.

    Each c'!"n$er ha!! /e 1tte$ +"th a !e*er *a!*e. The *a!*e ha!! "ncor&orate "n aa-et' o#t!et /e"n( $e"(ne$ to /#rt an$ re!eae the (a ho#!$ the &re#re"n the c'!"n$er r"e to a $an(ero# !e*e!. The c'!"n$er ha!! /e o- the rechar(ea/!e t'&e, a contr#cte$ an$ tete$ tocon-or% +"th ASME co$e an$ to ho!$ &re#r"@e$ car/on $"o5"$e "n !"2#"$ -or%at at%o&her"c te%&erat#re, corre&on$"n( to a no%"na! &re#re o- B: &"at :oF.

     The c'!"n$er ha!! /e -a/r"cate$ to at"-' the re!e*ant Factor' an$ Mach"ner'Act, Ma!a'"a. Cert"1cate o- 1tne -or #ch c'!"n$er ha!! /e &reente$ to theEn("neer +hen re2#"re$.

    4.4.1 NOTICE

    An a&&ro*e$ not"ce "n En(!"h 'DO NOT ENTER THE ROOM( WHEN CO2SYSTEM IS ACTIVATED) ha!! /e &ro*"$e$ on the $oor o- the roo% &rotecte$/' CO6  'te%. Re$ an$ (reen !"(ht ha!! /e &ro*"$e$ at e*er' $oor to"n$"cate the tat# o- the e2#"&%ent.

    Each c'!"n$er ha!! /e &ro*"$e$ +"th a not"ce conta"n"n( the -o!!o+"n("n-or%at"on4)

    • Set +e"(ht o- (a

    • Set &re#re o- (a at te%&erat#re

    Ser"a! n#%/er• Man#-act#rer

    • Date o- tet"n(

    • Cert"1cate n#%/er

    • O+ner

    • P#r&oe

    4. DISTRIBUTION SYSTEM

    4..1 P*+*,-

    A!! &"&e /e!o+ 6:%% $"a%eter ha!! /e Sche$#!e : an$ 6: %% $"a%eter

    an$ a/o*e ha!! /e Sche$#!e B: or other %ater"a! +hen a&&ro*e$ /' the%an#-act#rer %an#a! an$ the a#thor"t' ha*"n(. A!! &"&e ha!! /e rea%e$/e-ore trea$"n(. A!! !#/r"cant an$ ch"& ha!! /e re%o*e$ -ro% the "n"$e o- &"&e /e-ore ae%/!'. A!! 1tt"n( ha!! /e tan$ar$ +e"(ht (a!*an"e$

    Part 3 FF 11 FIRE FIGHTING SERVICES

    PLS-140032-C/M&E/DPE

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    12/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    %a!!ea/!e tee!. A!! #n"on ha!! /e the (ro#n$ o"nt t'&e +"th /oth eat"n(area %atche$.

     The e5t"n(#"h"n( 'te% c'!"n$er an$ *a!*e ha!! not /e re!"e$ #&on the#&&ort o- &"&"n(. A!! &"&"n( ha!! /e r"("$!' ec#re$ /' %ean o- 9: %% ro$ tothe /#"!$"n( tr#ct#re. P"&e #&&ort ha!! /e &ace$ at "nter*a! not

    e5cee$"n( 9B:: %% -or %% to 39 %% $"a%eter &"&e, 6:: %% -or : to%% $"a%eter &"&e.

     There ha!! /e a #&&ort on the hor"@onta! r#n +"th 9: %% or  !e o- an'*ert"ca! $ro&. Latera! /rac"n( ha!! /e &ro*"$e$ at no@@!e +here re2#"re$ toa/or/ -orce $e*e!o&e$ $#r"n( $"char(e. There ha!! /e a !eat 9 %%c!earance aro#n$ &"&e or 1tt"n( +here the' &"erce 8oor or ce"!"n(. Aone)&"ece ec#tcheon ha!! /e &ro*"$e$ to $re the o&en"n(.

    4..2 D*- N556

     The $"char(e no@@!e ha!! con"t o- an or"1ce an$ an' aoc"ate$ horn,

    h"e!$ or /ae. The' ha!! /e rate$ -or #e +"th the e5&ecte$ +or"n(&re#re, /e a/!e to re"t nor%a! %echan"ca! $a%a(e, an$ +"thtan$e5&ecte$ te%&erat#re +"tho#t $e-or%at"on. Corro"on re"tant %eta! ha!!/e #e$. A!! no@@!e ha!! /e &rotecte$ +"th ca&e o a to &re*ent theentrance o- -ore"(n o/ect, #ch a "nert. Thee $e*"ce ha!! &ro*"$e an#no/tr#cte$ o&en"n( #&on 'te% o&erat"on. The $"char(e no@@!e ha!!ha*e the $"char(e character"t"c a !"te$ "n the N.F.P.A. No. 96.

    4..3 C76*,8 V69

     The c'!"n$er *a!*e ha!! /e o&erate$ e"ther %an#a!!' /' the tr"& %echan"%"n the %o#nt or e!ectr"ca!!' /' the %oeheat $etector. Va!*e %a' /e a!o

    arran(e$ to 1re /' a(ent &re#re -ro% another c'!"n$er.

     The c'!"n$er $"char(e *a!*e ha!! /e o- /ra +"th a %"ttere$ eat an$ tea%he!$ c!oe$ a(a"nt &re#re /' a %echan"ca! 2#"c)re!eae can an$ !e*e!'te%. A!! *a!*e ha!! /e #"ta/!e -or the "nten$e$ #e, &art"c#!ar "n re(ar$ to8o+ ca&ac"t' an$ o&erat"on ha!! /e !ocate$ o a to /e a-e -ro% %echan"ca!,che%"ca! or other $a%a(e an$ ha!! ha*e a %"n"%#% /#rt"n( &re#re o- ::: &".

    4.! OPERATING DEVICES

    A!! $e*"ce ha!! /e $e"(ne$ -or the er*"ce the' +"!! enco#nter an$ ha!! not/e rea$"!' ren$ere$ "no&erat"*e or #ce&t"/!e to acc"$enta! o&erat"on.

    A!! $e*"ce ha!! /e !ocate$, "nta!!e$ or #"ta/!' &rotecte$ o that the' are not#/ecte$ to %echan"ca!, che%"ca! or other $a%a(e, +h"ch +o#!$ ren$er the%"no&erat"*e. A!! %an#a! o&erat"n( $e*"ce ha!! /e "$ent"1e$ a to the ha@ar$the' &rotect.

    4." AUDIBLE ALARM

    Cont"n#o#!' rate$ "nch /e!! a#$"/!e a!ar% ha!! /e "nta!!e$ a ho+n to+arn &eronne! +"th"n the &rotecte$ area.

    4.# CONTROL PANEL

     The &ane! ha!! ha*e the -o!!o+"n(4)

    Part 3 FF 12 FIRE FIGHTING SERVICES

    PLS-140032-C/M&E/DPE

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    13/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    • Ma"n "o!ator +"th MC0

    • Ma"n on "n$"cator "n $#&!"cate ;(reen<

    • Char(er on "n$"cator ;(reen<

    • AC -a"! "n$"cator ;re$<

    • 0atter' on "n$"cator ;(reen<

    • 0atter' -a"! "n$"cator ;re$<• A!ar% *"#a! an$ a#$"o "n$"cator ;re$<

    • Ga o&erate$ "n$"cator ;re$ 8ah"n(<

    • Ga "o!ate$ "n$"cator ;re$<

    • C"rc#"t "o!ate$ "n$"cator ;re$<

    • Fa#!t "n$"cator ;re$<

    • AC -#e cre+ on t'&e

    • DC -#e cre+ on t'&e

    • Reet /#tton

    • Nor%a!Tet Fa#!tTet A!ar%Tet Io!at"on /#tton

    • Ga "o!at"on /#tton

    • A%%eter

    • Vo!t%eter

    • Man#a! o&erat"on +"th e'

    On act#at"on o- the 'te%, a#$"o an$ *"#a! "n$"cat"on ha!! /e &ro*"$e$ atthe 1re a!ar% contro! &ane!.

    4.$ GAS DISCHARGE INDICATING LIGHT

    A >Re$ an$ Green? "ncan$ecent "n$"cat"n( !"(ht " re2#"re$ at e*er' entranceto the roo% to +arn &eo&!e not to enter the roo% +hen the 'te% "

    act"*ate$.

    4.10 POWER SUPPLY 

     The contro! an$ "n$"cat"on e2#"&%ent ha!! /e a$a&ta/!e or o&erat"on e"ther onthe %a"n e!ectr"ca! #&&!', or tora(e /atter' e5c!#"*e -or th" 'te%. The&o+er #&&!' e2#"&%ent ha!! a!o "nc!#$e /atter' char(er, rect"1er,tran-or%er, &rotect"*e c"rc#"t -#e, a%%eter, *o!t%eter an$ -a#!t +arn"n($e*"ce.

     The contractor ha!! #&&!', "nta!! an$ connect a D.C. /atter' #&&!' 'te%,co%&!ete +"th a!! acceor"e -or the at"-actor' o&erat"on o- the 1re$etect"on 'te%, 1re a!ar% an$ $etect"on 'te%.

     The 'te% ho#!$ &re-era/!' o&erate on 6V #&&!'. The /atter' ha!! /e o- the n"ce! ca$%"#% t'&e o- #c"ent ca&ac"t' to %a"nta"n the tan$"n( !o or!oe o- the 'te% -or a cont"n#o# &er"o$ o- at !eat $a'. The /atter'&ro*"$e$ ha!! /e a/!e to #&&!' the %a5"%#% a!ar% !oa$ at an a$e2#ate*o!ta(e -or at !eat one ho#r. The nee$ -or /atter' char("n( ha!! /e "n$"cate$a#to%at"ca!!' /' a hort 8ah"n( "(na!.

     The /atter' ha!! /e %o#nte$ "n the !o+er co%&art%ent o- the c#/"c!e. Thechar("n( e2#"&%ent ha!! /e %o#nte$ a/o*e the /atter' an$ rea$"!'acce"/!e. The char(e$ ha!! "ncor&orate $#a! char("n(, rate, one -or 2#"c/oot"n( an$ the other -or tr"c!e char(e. The #n"t ha!! /e co%&!ete$ +"th

    o#tt *o!t%eter, char("n( a%&ere %eter;

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    14/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

     The Contractor ha!! #/%"t ca!c#!at"on on the /atter' !oa$"n( to theEn("neer to en#re "t ca&ac"t' to at"-' the con$"t"on tate$ a/o*e.

    4.11 SMOKE AND HEAT DETECTORS

    Co%/#t"on $etector ha!! /e "nta!!e$ at !ocat"on ho+n "n the $ra+"n(.

     The %oe $etector #n"t ha!! o&erate on the &hoto)e!ectr"c &r"nc"&!e an$ha!! /e ca!"/rate$ -or $etect"on o- 9)6Q %oe $en"t' &er U.L. an$ F.M.Stan$ar$.

     The $etector ha!! /e -#!!' tran"tor"e$ +"th o!"$ tate +"tch"n( an$ ha!!-#!!' con-or% to the re2#"re%ent o- 0S 4 Part 49 an$ 0S B34Part49BB.

     The heat $etector ha!! ha*e /oth RATE OF RISE an$ FIED te%&erat#reo&erat"n( character"t"c. The $etector ha!! /e rate$ -or nor%a! o&erat"n(te%&erat#re o- 9:oF, ca&a/!e o- o&erat"n( -ro% 6V DC #&&!', t+"n c"rc#"t

    t'&e.

    4.12 WIRING CABLES

    A!! +"r"n( to each &o"nt ha!! /e o- PVCPVC "n GI. The +"r"n( ha!! /e e5c!#"*eto the 1re a!ar%, "nta!!at"on an$ ha!! /e co%&!ete!' e&arate$ -ro% the+"r"n( o- an' other c"rc#"t.

    4.13 REUSING

    A!! &art o- the e5t"n(#"h"n( 'te% ha!! /e ca&a/!e o- /e"n( tete$ an$re#e$. The ent"re e5t"n(#"h"n( 'te% ha!! /e ca&a/!e o- /e"n( re1!!e$ an$rear%e$ on "te +"tho#t $"ae%/!' or re&!ace%ent o- &art.

    4.14 GRAVITY SHUTTERS :GLASS FIBRE CURTAINS;

     The (!a 1/re c#rta"n ha!! /e "nta!!e$ +here*er re2#"re$ at a!! o&en"n( o- the *ent"!at"on !o#*er, +"n$o+ etc. +h"ch ha!! /e co*ere$ to &re*ent eca&eor the $"char(e CO6 (a. The c#rta"n ha!! /e ro!!e$ #&, t"(hten an$ he!$ /'han(er co%&!ete +"th at !eat 6 no. o!eno"$ on each &"ece o- c#rta"n. Onact#at"on an$ "%%e$"ate!' /e-ore the $"char(e o- (a, each /!anet ha!! /ere!eae$ an$ $ro&&e$ +"th the (ra*"t'.

    4.1 CONSTRUCTION OF CUBICLES

    A-ter -a/r"cat"on the ca/"net ha!! /e treate$ +"th t+o coat o- r#t "nh"/"t"n(&r"%er an$ 1n"he$ +"th at !eat t+o coat o- &ra' ena%e! o- e!ecte$ co!o#r,to /e a&&ro*e$ /' the En("neer, a&&!"e$ an$ $r"e$ "n accor$ance +"th the&a"nt %an#-act#rer reco%%en$at"on. For o#t$oor "nta!!at"on, the ca/"netha!! /e &!ah &roo- t'&e.

    4.1! DESIGN OF PANEL

    A!! e2#"&%ent not re2#"re$ -or +arn"n( or "n$"cator ha!! /e concea!e$ "n the

    ca/"net /#t ha!! /e rea$"!' acce"/!e -or %a"ntenance.

    In$"cator ha!! /e o- neon !a%& an$ ha!! /e "nta!!e$ "n #ch a +a' that the'cannot /e te%&ere$ +"th /' #na#thor"e$ &eron +h"!e at the a%e t"%e,

    Part 3 FF 14 FIRE FIGHTING SERVICES

    PLS-140032-C/M&E/DPE

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    15/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    !ea*"n( the% e5&oe$ to *"e+. In$"cat"on !a%& are to "nc!#$e t+o !a%& "n&ara!!e!, each %o#nte$ /eh"n$ a e&arate /e@e! -or each "n$"cator. The !a%&are to /e %o#nte$ "n #ch a +a' that the' %a' /e chan(e$ -ro% the -ront o- the /oar$.

    4.1" MAINTENANCE

     The co%&!ete "nta!!at"on " to /e %a"nta"ne$ "n accor$ance +"th the -o!!o+"n(che$#!e4

    4.1".1D*67 T

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    16/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    a(ree%ent at th" -ee, the e5tent o- er*"ce co*ere$ /' the -ee an$&ro*""on -or rene+a!.

    4.1$ PARTICULAR RE>UIREMENT OF E&HAUST/VENTILATION FAN

     The contro! o- the e5ha#t*ent"!at"n( -an "nta!!e$ "n the a%e roo% ha!! /e"nter!oce$ +"th that o- the CO6 Contro! Pane!. 7hen theCO6  E5t"n(#"h"n(S'te% " act"*ate$ e"ther a#to%at"ca!!' or %an#a!!', &o+er #&&!' to the -an+"!! /e c#t)o#t to &re*ent o&erat"on o- the e5ha#t -an.

     The Contractor ha!! #&&!' an$ "nta!! a &a"r o- a!ar% "(na! +"r"n(, "n con$#"t-ro% the CO6 Contro! Pane! to the e5ha#t*ent"!at"n( -an contro! &ane! +herere2#"re$. A!! necear' c#t)o#t re!a' ha!! /e *,6?88.

    4.20 PRESSURE GAUGE

    A &re#re (a#(e ha!! /e 1tte$ at each CO6 c'!"n$er &ro*"$e$. The (a#(eha!! ha*e %ar"n( to "n$"cate !o+ &re#re or !o o- (a.

    SECT. E CLEAN AGENT INERT GAS FIRE FIGHTING SYSTEM

    .0 FIRE FIGHTING SERVICES

    P< 1G,6

    .1.1 SUMMARY 

     Th" ect"on "nc!#$e Tota!)F!oo$"n( e5t"n(#"h"n( 'te% an$ the -o!!o+"n(4

    • E5t"n(#"h"n()a(ent conta"ner.

    • E5t"n(#"h"n( a(ent.

    • Detect"on an$ a!ar%act#at"on $e*"ce.

    • Contro! an$ a!ar% &ane!.

    Acceor"e.• Connect"on $e*"ce -or an$ +"r"n( /et+een 'te% co%&onent.

    • Connect"on $e*"ce -or &o+er an$ "nte(rat"on "nto /#"!$"n(? 1re a!ar%

    'te%.

    .1.2 PERFORMANCE RE>UIREMENT

    • De"(n tota!)8oo$"n( e5t"n(#"h"n( 'te% an$ o/ta"n a&&ro*a! -ro%

    re!e*ant a#thor"t"e ha*"n( #r"$"ct"on. De"(n 'te% -or c!a A, 0, or C1re a a&&ro&r"ate -or area /e"n( &rotecte$ an$ "nc!#$e a-et' -actor. Tota!)8oo$"n( "n$"cate$ an$ "n concentrat"on #"ta/!e -or nor%a!!'occ#&"e$ area.

    Part 3 FF 16 FIRE FIGHTING SERVICES

    PLS-140032-C/M&E/DPE

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    17/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    • Per-or%ance Re2#"re%ent4 D"char(e +"th"n 6 %"n#te an$ %a"nta"n

    9::(%3 concentrat"on /' +e"(ht at 69 C ;: F< -or 9:)%"n#te ho!$"n(t"%e "n ha@ar$ area.

    ". Concentrat"on "n ha@ar$ area !e than 9::(%3 thro#(ho#t ho!$"n( t"%e+"!! not /e acce&te$ +"tho#t +r"tten a#thor"@at"on -ro% En("neer an$ !oca!a#thor"t"e ha*"n( #r"$"ct"on.

    "". S'te% Ca&a/"!"t"e4 Ce"!"n( or +a!! %o#nte$, @ero &re#re, @ero &re#recan"ter ca&a/!e o- co%&!ete $"char(e +"th"n 6 %"n#te a t"!ate$ "nNFPA 6:9:. S'te% ha!! re2#"re no &"&"n( net+or or 8oor &ace.

    • Cro)one$ Detect"on4 De*"ce !ocate$ "n t+o e&arate @one. So#n$a!ar% on act"*at"n( "n(!e)$etect"on $e*"ce ;%oe $etector

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    18/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    ". P!an, e!e*at"on, ect"on, $eta"!, an$ attach%ent to other+or.In$"cate $"%en"on, +e"(ht, !oa$, re2#"re$ c!earance, %etho$ o- 1e!$ae%/!', "nta!!e$ co%&onent an$ !ocat"on an$ "@e o- each 1e!$connect"on.

    "". 7"r"n( D"a(ra%4 Po+er, "(na!, an$ contro! +"r"n(.

    """. De"(n Ca!c#!at"on4 For +e"(ht, *o!#%e, an$ concentrat"on o- e5t"n(#"h"n( a(ent re2#"re$ -or each ha@ar$ area.

    "*. Re8ecte$ Ce"!"n( P!an4 Sho+ ce"!"n( &enetrat"on, ce"!"n()%o#nte$ "te%,an$ the -o!!o+"n(4

    a. E5t"n(#"h"n()a(ent conta"ner, connector an$ acceor"e.

    /. Metho$ o- attach"n( /racet to /#"!$"n( tr#ct#re.

    • Per%"t A&&ro*e$ Dra+"n(4 7or"n( &!an, &re&are$ accor$"n( to NFPA

    6:9:, that ha*e /een a&&ro*e$ /' a#thor"t"e ha*"n( #r"$"ct"on. Inc!#$e

    $e"(n ca!c#!at"on an$ $e%ontrate co$e co%&!"ance.

    • F"e!$ 2#a!"t')contro! tet &roce$#re an$ re&ort.

    • Ma"ntenance Data4 For an' an$ a!! co%&onent, "nc!#$e "n %a"ntenance

    %an#a!.

    .1.4 >UALITY ASSURANCE

    • F"re Protect"on En("neer #a!"1cat"on4 A &ro-e"ona! 1re &rotect"onEn("neer +ho " !e(a!!' 2#a!"1e$ to &ract"ce "n Ma!a'"a an$ +ho "e5&er"ence$ "n &ro*"$"n( en("neer"n( er*"ce o- the "n$ "n$"cate$.En("neer"n( er*"ce are $e1ne$ a thoe &er-or%e$ -or "nta!!at"on o- the tota!)8oo$"n( e5t"n(#"h"n( 'te% that are "%"!ar to thoe "n$"cate$-or th" Proect "n %ater"a!, $e"(n, an$ e5tent an$ %a(n"t#$e o- the&ec"1e$ 'te%.

    • Pro$#ct O&t"on4 Dra+"n( "n$"cate "@e, &ro1!e, an$ $"%en"ona!re2#"re%ent o- the tota!)8oo$"n( e5t"n(#"h"n( 'te% an$ are /ae$ onthe &ec"1c 'te% "n$"cate$.

    • E!ectr"ca! Co%&onent, De*"ce, an$ Acceor"e4 L"te$ an$ !a/e!!e$ a$e1ne$ "n NFPA :, Art"c!e 9::, /' tet"n( a(enc' acce&tance toa#thor"t"e ha*"n( #r"$"ct"on, an$ %are$ -or "nten$e$ #e.

    P< 2 P8?

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    19/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    "nc!#$e, /#t are not !"%"te$ to, Man#-act#rer &ec"1e$ "n the -o!!o+"n(&ara(ra&h, or A&&ro*e$ E2#a!.

    /. Man#-act#rer4 S#/ect to co%&!"ance +"th re2#"re%ent, &ro*"$e &ro$#ct/' one o- the %an#-act#rer &ec"1e$ "n the -o!!o+"n( &ara(ra&h, orA&&ro*e$ E2#a!.

    .2.2 E&TINGUISHING%AGENT CONTAINERS

    • Decr"&t"on4 Non)&re#r"e$ tee! conta"ner.

    ". F"n"h4 Re$ co!or, ena%e! or e&o5' &a"nt.

    "". Stora(e)Tan 0racet4 Factor' or 1e!$)-a/r"cate$ reta"n"n( /racetcon"t"n( o- tee! earK #"ta/!e -or conta"ner #&&ort, %a"ntenance, orre&!ace%ent.

    .2.3 FIRE%E&TINGUISHING AGENT

    • Hart"n$o -or Tota!)8oo$"n(.

    • Ar(on"te

    .2.4 CONTROL PANELS

    • Decr"&t"on4 FM a&&ro*e$ an$or NRTL !"te$, "nc!#$"n( e2#"&%ent

    an$ -eat#re re2#"re$ -or tet"n(, tat# #&er*""on an$ o&erat"on o- 1re )e5t"n(#"h"n( 'te%.

    • Po+er Re2#"re%ent4 6:V "n(!e)&hae AC #&&!'K +"th e!ectr"ca!contact -or connect"on to 'te% co%&onent an$ 1re a!ar% 'te%, an$tran-or%er or rect"1er a nee$e$ to &ro$#ce &o+er at *o!ta(e re2#"re$-or acceor"e an$ a!ar% $e*"ce.

    • Enc!o#re4 NEMA ICS , T'&e 9, ena%e!e$)tee! ca/"net.

    ". Mo#nt"n(4 S#r-ace.

    • S#&er*"e$ C"rc#"t4 Se&arate c"rc#"t -or each "n$e&en$ent ha@ar$

    area.

    ". Detect"on c"rc#"t e2#a! to the re2#"re$ n#%/er o- @one, or a$$rea/!e$e*"ce a"(ne$ to the re2#"re$ n#%/er o- @one.

    • Pro*"$e the -o!!o+"n( contro!)&ane! -eat#re4

    ". E!ectr"ca! contact -or h#tt"n( $o+n -an, act"*at"n( $a%&er, an$o&erat"n( 'te% e!ectr"ca! $e*"ce.

    "". A#to%at"c +"tch o*er to tan$/' &o+er at !o o- &r"%ar' &o+er.""". Ser*"ce $"connect to "nterr#&t 'te% o&erat"on -or %a"ntenance +"th

    *"#a! tat# "n$"cat"on on the Ann#nc"ator Pane!.

    • Ann#nc"ator Pane!4

    i. Gra&h"c t'&e ho+"n( &rotecte$, ha@ar$)area &!an an$ !ocat"on o- $etector, a/ort, EPO, an$ %an#a! tat"on. Inc!#$e !a%& to "n$"cate

    Part 3 FF 19 FIRE FIGHTING SERVICES

    PLS-140032-C/M&E/DPE

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    20/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    $e*"ce)"n"t"at"n( a!ar%, e!ectr"ca! contact -or connect"on to contro! &ane!,an$ ta"n!e)tee! or a!#%"n"#% enc!o#re. Ca&t"on on (ra&h $"&!a'ha!! /e En(!"h.

    • Stan$/' Po+er4

    "". Sea!e$ !ea$)ac"$ or n"ce!)ca$%"#% /atter"e +"th ca&ac"t' too&erate 'te% -or 6 ho#r an$ a!ar% -or %"n"%#% o- 9 %"n#te.Inc!#$e a#to%at"c /atter' char(er, +"th *ar'"n( char("n( rate/et+een tr"c!e an$ h"(h $e&en$"n( on /atter' *o!ta(e that "ca&a/!e o- %a"nta"n"n( /atter"e -#!!' char(e$. Inc!#$e %an#a!*o!ta(e contro!, $c *o!t%eter, $c a%%eter, e!ectr"ca! contact -orconnect"on to contro! &ane!, an$ #"ta/!e enc!o#re.

    2. DETECTION DEVICES

    A. Decr"&t"on4 Co%&!' +"th NFPA 6:9:, NFPA 6 or AFP 9B9, o- the a%e%an#-act#re a thoe "n the /#"!$"n( an$ "nc!#$e the -o!!o+"n(t'&e4

    9. Ion"@at"on Detector4 Co%&!' +"th UL 6B, $#a!)cha%/er t'&e,ha*"n( a%&!"n( an$ re-erenc"n( cha%/er, +"th %oe)en"n(

    e!e%ent.

    6. Photoe!ectr"c Detector4 Co%&!' +"th UL 6B, con"t"n( o- LED!"(ht o#rce an$ "!"con &hoto$"o$e rece"*"n( e!e%ent.

    3. Ther%a! Act"*at"on De*"ce ;TAD

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    21/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    2.# ELECTRICAL POWER AND WIRING

    A. E!ectr"ca! &o+er, +"r"n(, an$ $e*"ce a &ec"1e$.

    P< 3 @ E=?

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    22/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    3. FIELD >UALITY CONTROL

    A. Co%&!' +"th o&erat"n( "ntr#ct"on an$ &roce$#re o- NFPA 6:9:,Sect"on >A&&ro*a! o- Inta!!at"on?. Inc!#$e the -o!!o+"n( tet an$"n&ect"on to $e%ontrate co%&!"ance +"th re2#"re%ent4

    9. Chec %echan"ca! "te%.6. In&ect e5t"n(#"h"n()a(ent conta"ner an$ e5t"n(#"h"n()a(ent

    an$ chec %o#nt"n( -or a$e2#ate anchor"n( to #/trate.3. Chec e!ectr"ca! 'te%.. Chec enc!o#re "nte(r"t'. Co%&!' +"th NFPA 6:9:, Sect"on

    >Enc!o#re In&ect"on?, an$ A&&en$"5 C, >Enc!o#re Inte(r"t'Proce$#re?.

    . Per-or% -#nct"ona! &re)$"char(e tet.. Per-or% 'te% -#nct"ona! o&erat"ona! tet "nc!#$"n(, EPO, a/ort

    an$ %an#a! re!eae.. Chec re%ote %on"tor"n( o&erat"on.B. Chec contro!)&ane! &r"%ar' &o+er o#rce.

    0. Per-or% 1e!$)acce&tance tet o- each can"ter e5t"n(#"h"n( 'te%+hen "nta!!at"on " co%&!ete. Per-or% 'te% tet"n( on!' a-terha@ar$)area enc!o#re contr#ct"on ha /een co%&!ete$ an$ o&en"n(ea!e$. Co%&!' +"th o&erat"n( "ntr#ct"on an$ &roce$#re o- NFPA6:9:, Sect"on >A&&ro*a! o- Inta!!at"on?. Inc!#$e the -o!!o+"n( to$e%ontrate co%&!"ance +"th re2#"re%ent.

    9. Per-or% -#nct"ona! &re)$"char(e tet.6. Per-or% 'te% -#nct"ona! o&erat"ona! tet.3. Chec re%ote %on"tor"n( o&erat"on.. Chec contro!)&ane! &r"%ar' &o+er o#rce.

    C. The "n&ect"on an$ tet"n( o- the 'te% ha!! /e +"tnee$ /' the0o%/a an$ re!e*ant a#thor"t"e.

    D. Correct %a!)-#nct"on"n( e2#"&%ent, then re)tet to $e%ontrateco%&!"ance. Re&!ace e2#"&%ent that cannot /e correcte$ or $oe not&er-or% a &ec"1e$ an$ "n$"cate$, then re)tet to $e%ontrateco%&!"ance. Re&eat &roce$#re #nt"! at"-actor' re#!t are o/ta"ne$.Re&ort tet re#!t &ro%&t!' an$ "n +r"t"n( to En("neer an$ a#thor"t"eha*"n( #r"$"ct"on.

    Part 3 FF 22 FIRE FIGHTING SERVICES

    PLS-140032-C/M&E/DPE

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    23/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    SECTION F @ FIRE ALARM

    1. GENERAL

     The F"re In$"cat"n( Pane! ha!! /e t'&e a&&ro*e$ /' =a/atan 0o%/a DanPen'e!a%at, Ma!a'"a an$ cert"1e$ /' a&&ro*"n( a#thor"t' ;e.(. SIRIM< to 0SB3 Part 4 9BB an$  to /e !ocate$ at the &o"t"on a "n$"cate$ on the$ra+"n(. The &ane! ha!! ha*e the %ot #& to $ate $e"(n an$ canacco%%o$ate a +"$e *ar"et' o- $etector, o#n$"n( $e*"ce +"th !"ne#&er*"e$ o#tt &ro*"$e$ -or @one an$ /e!! c"rc#"t. The $e"(n ha!! /e%o$#!ar. The &ane! ha!! /e %o#nte$ at e'e !e*e! an$ o- cono!e t'&e to thea&&ro*a! o- the En("neer an$ ha!! "nc!#$e the -o!!o+"n( e2#"&%ent.)

    9.9< A "(na! #n"t 1tte$ +"th three !a%&4)

    Green to "n$"cate #&&!' on

    7h"te to "n$"cate &art"a! $"a/!e%ent

    0!#e to "n$"cate &o+er -a"!#re

    9.6< one "n$"cat"n( #n"t +"th the -o!!o+"n( !a%& "n$"cator4)

    Re$ to "(na! a 1re "n the @one

    A%/er to "n$"cate a -a#!t

    Green to "n$"cate nor%a!

    Each @one "n$"cat"n( #n"t ha!! /e e!-)conta"ne$ "ncor&orat"n( ata%&er)&roo-, e')o&erate$ rotar' e!ector +"tch +"th &ro*""on -ortet"n( c"rc#"t -a#!t an$ a!ar% con$"t"on an$ a!o -or c"rc#"t "o!at"on.

    9.3< A!ar% %#t"n( +"tch an$ "n$"cat"on -or AC #&&!' ONOFF, an$

    9.< Io!at"onnor%a! e!ector +"tch an$ "n$"cat"on -or a!ar% /e!!, -a#!t/#@@er, a#5"!"ar' tr"& an$ %an#a! e*ac#ate)

    9.< Tet +"tch -or !a%&, /atter', a!ar%, -a#!t an$

    9.< Reet +"tch -or a!ar%.

    9.< L"(ht "n$"cat"on o- tat# -or /e!!, /atter' an$ char(er.

    9.B< e' o&erate$ +"tche -or "o!at"on o- 6 *o!t D.C. 1re a!ar% "(na!r"er. e' ha!! /e +"th$ra+a/!e on!' at ON &o"t"on.

    9.< A re!a' 'te% to +"r"n( the a!ar% /e!! o- the ent"re /#"!$"n(.9.9:< S"(na! !a%& etc re!at"n( to D.C. &o+er #&&!' #n"t a &ec"1e$ "n other

    ect"on.

    9.99< A!! necear' !a/e! ;c!ear &er&e5, re*ere en(ra*e$ an$ %ach"necre+e$

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    24/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    A!! !a%& "n$"cator ha!! /e neon !a%& an$ $#&!"cate$ -or @one "n$"cat"on,arran(e$ -or ea' re&!ace%ent -ro% the -ront.

     The ca"n( -or the "n$"cat"n( &ane! ha!! /e $#t&roo- cono!e t'&e -a/r"cate$-ro% 9 +( heet tee! +"th h"n(e$ !oca/!e $oor #&on +h"ch are %o#nte$

    the "n$"cator !a%& an$ a!! other e5terna! contro!.

    A!! %eta! +or ha!! /e treate$ a(a"nt corro"on, &a"nte$ +"th &r"%er,#n$ercoat an$ -#rn"he$ o#t"$e +"th !"(ht (re' 'nthet"c ena%e! a!! a&ec"1e$ e!e+here "n thee S&ec"1cat"on.

    7"r"n( ha!! /e neat!' /#n$!e$ an$ ec#re$ /' %ean o- e!-)!oc"n( n'!onca/!e t"e. Ca/!e ter%"nat"on "n*o!*"n( $"Jerent *o!ta(e ha!! /e &ro&er!'e(re(ate$ an$ !a/e!!e$ to the a&&ro*a! o- the En("neer.

    A #"ta/!e &er&e5 +"th co!o#r re*ere$ en(ra*e$ $"a(ra% ho+"n( "n re$#ce$ca!e the area co*ere$ /' the 1re a!ar% 'te%, eca&e corr"$or, ta"rcae,heat%oe $etector, %an#a! ca!! &o"nt, @one $e!"neat"on etc., ha!! /e

    &ro*"$e$ an$ %o#nte$ on th" &ane!.

    2. P S?++67 U,*<

     The contro! an$ "n$"cat"on e2#"&%ent ha!! /e a$a&ta/!e -or o&erat"on e"theron the %a"n e!ectr"ca! #&&!', tan$/' e%er(enc' #&&!' or tora(e /atter'e5c!#"*e -or th" 'te%. The &o+er #&&!' e2#"&%ent ha!! a!o "nc!#$e/atter' char(er, rect"1er, tran-or%er, &rotect"*e c"rc#"t -#e, a%%eter,*o!t%eter an$ -a#!t +arn"n( $e*"ce.

     Three centra!"e$ D.C. &o+er #&&!' #n"t ha!! /e &ro*"$e$. Each D.C. &o+er#&&!' #n"t ha!! co%&r"e 6 *o!t n"ce! ca$%"#% /atter"e o- #c"ent

    ca&ac"t' #ch that "t " ca&a/!e o- %a"nta"n"n( the tan$"n( !o or !oe o- the &ort"on o- the 'te% -or at !eat 6 ho#r &!# the %a5"%#% a!ar% !oa$-or at !eat one ho#r. For each D.C. &o+er #&&!' #n"t, a &ro&r"etar' %ae -#!!'a#to%at"c t+o rate /atter' tr"c!er char(er ;contant *o!ta(e t'&e< co%&r""n($o#/!e)+o#n$ *ac##% "%&re(nate$ tran-or%er, -#!! +a*e /r"$(e connecte$rect"1er an$ re!a', etc ha!! /e &ro*"$e$ to ee& the /atter"e -#!!' char(e#n$er a!! con$"t"on o- er*"ce -or a!! the &ane!. The /atter' an$ char(er ha!!/e #&&!"e$ co%&!ete +"th MC0 $"tr"/#t"on /oar$, 1rt (ra$e MISC a%%eterto rea$ D.C. char("n( c#rrent an$ D.C. !oa$ c#rrent, D.C. *o!t%eter %are$ to"n$"cate /oth 8oat an$ /oot char(e *o!ta(e, %a"n on "n$"cat"n( !a%&,non)!oc"n( !oa$ tet +"tch an$ #"ta/!e rate tet !oa$ +"th the *o!t%eterca!e c!ear!' %are$ "n re$ ho+"n( the ter%"na! *o!ta(e con"$ere$ $e"ra/!e+hen -ee$"n( the tet !oa$, 8oat%an#a! e!ector +"tch, /atter' char(er

    -a"!#re a!ar%, /atter' c#t)oJ a!ar%, /atter' earth !eaa(e $etector, en(ra*e$"ntr#ct"on !a/e! -or %anner $#rat"on o- tet !a/e!, a!! necear' ca/!econnect"on etc., an$ thee "te% ha!! /e %o#nte$ "n the to& co%&art%ent o- the #n"t concerne$ or "n the aoc"ate$ 1re "n$"cator /oar$. The co%&art%ent ho#"n( the /atter"e ha!! /e 1tte$ +"th *er%"n &roo- !o#*er at the -ront &!ate. The "nterna! ha!! /e -#!!' !"ne$ +"th For%"ca, orother %ater"a! a(a"nt corro"*e e!e%ent -ro% the /atter"e.

    3. W**,- S7

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    25/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    F"re a!ar% c"rc#"t ha!! /e e&arate$ -ro% other c"rc#"t r#n an$con$#"ttr#n"n( -or 1re a!ar% 'te% ha!! not "n an' c"rc#%tance conta"n+"r"n( other than that aoc"ate$ +"th the 1re a!ar% 'te%. 7"r"n( ha!! /e%#!t")tran$ o- "@e to #"t the 'te% /#t ha!! not /e !e than 9. S2. %"nect"on, o- t"nne$ h"(h con$#ct"*"t' co&&er +"re "n#!ate$ +"th 6:: *o!t

    (ra$e 1re re"tance.

    4. O+

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    26/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    SECTION G @ PAINTING LABELLING

    1. P*,

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    27/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    2. L66*,-

    Letter"n( on &"&"n( ha!! /e &a"nte$ "n contrat"n( co!o#r an$ ha!! /e "ncentre o- /an$. The !etter"n( ha!! /e "n /!oc !etter +"th %"n"%#%$"%en"on o- W "n. h"(h -or &"&e 6 "n. an$ #n$er an$ 9W "n. H"(h -or &"&eo*er 6 "n.

    D"rect"ona! arro+ ha!! /e "n /!ac on t+o *""/!e "$e o- a!! &"&"n( at each*a!*e, 1r"n( an$ !on( r#n at -t. centre. The "@e o- arro+ ha!! /e 3 "n.!on( on &"&e #& to an$ "nc!#$"n( 6 "n. $"a%eter an$ "n. !on( on &"&e o*er6 "n. $"a%eter.

    Part 3 FF 27 FIRE FIGHTING SERVICES

    PLS-140032-C/M&E/DPE

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    28/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    SECTION H @ TESTING AND COMMISSIONING

    1. G,6

    A!! necear' /a!anc"n(, tet"n(, ca!"/rat"n( an$ ett"n( o- the e2#"&%ent an$contro! aoc"ate$ +"th th" "nta!!at"on ha!! /e $one an$ a!! "ntr#%ent an$!a/o#r necear' -or th" ha!! /e #&&!"e$ /' th" Contractor.

     The S#/)Contractor ha!! &ro*"$e a!! not"ce an$ &a' a!! -ee "n connect"on+"th a!! necear' tet to /e carr"e$ o#t to the a&&ro*a! o- the =a/atan 0o%/aDan Pen'e!a%at, Ma!a'"a an$ an' A#thor"t' ha*"n( #r"$"ct"on o*er the"nta!!at"on.

    I- tet are not &ec"1e$ "n an' c!a#e o- the S&ec"1cat"on #ch tet ha!! /ecarr"e$ o#t +hen the Con#!t"n( En("neer %a' $ee% necear' +"tho#t an'e5tra char(e.

    A!! tet ha!! /e $one "n the &reence o- an$ cert"1e$ /' the En("neer.Co%&!et"on Cert"1cate "nc!#$"n( a /r"e- $ecr"&t"on o- the tet %etho$ an$"ntr#%entat"on #e$ ha!! /e #/%"tte$ to the Con#!t"n( En("neer.

    On!' co%&etent an$ e5&er"ence$ &eronne! ha!! /e e%&!o'e$ to carr' o#t a!!the tet.

     The cot -or thee tet "nc!#$"n( e!ectr"c"t' an$ necear' "ntr#%ent an$!a/o#r ha!! /e "nc!#$e$ an$ at a!! t"%e the tet"n( "ntr#%ent an$acceor"e ha!! re%a"n the &ro&ert' o- the O+ner. Thee a&&arat# ha!! /ehan$e$ o*er to the O+ner "n (oo$ con$"t"on at the e5&"r' o- the De-ectL"a/"!"t' Per"o$.

    2. CO2 F* E=

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    29/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    SECTION I @ MAINTENANCE

    1. C,

  • 8/20/2019 3. Fire Fighting Services (Done) Modify

    30/30

    SARAWAK ENERGY BERHADSEJINGKAT 132KV/33KV SUBSTATION REINFORCENTPART 3 – SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MECHANICAL AND ELECTRICALSERVICES

    SECTION J @ MAINTENANCE E>UIPMENT

    1. G,6

     The -o!!o+"n( "te% o- e2#"&%ent ha!! /e &ro*"$e$ at the co%&!et"on o- the"nta!!at"on. The e2#"&%ent an$ &are ha!! "nc!#$e4)

    ;a< 9 no. &are %oe $etector -or each $"Jerent t'&e o- $etector #e$.

    ;/< 9 no. &are heat $etector -or each $"Jerent t'&e o- $etector #e$.

    ;c< 6 no. e' -or each $"Jerent &a$!oc #e$. Each e' ha!! /e &ro*"$e$+"th a ta( +"th "$ent"1cat"on c!ear!' +r"tten.

    ;$< 9 no. /rea (!a -or each t'&e o- /rea (!a &o"nt.

    ;e< 9 no. a!ar% /e!! -or each t'&e o- a!ar% /e!! #"n(.

    ;-< no. o- "n$"cat"n( /#!/ -or each t'&e o- "n$"cat"n( /#!/ #e$.

    ;(< 9 no. &are MCC0MC0-#e -or each t'&e o- MCC0MC0-#e.