Deliverables for Each Phase Phases Deliverables Reservoir Engineering 1. Reservoir Engineering Reservoir Data Well Test Data Reserves Estimation Production Forecast 2. Reservoir Simulation • Model Set-Up • STOIIP value Sensitivity Analysis 3. Reservoir management Reservoir Management Reservoir Surveillance Drilling Engineering 1. Rig Selection 2. Well Trajectories 3. Casing Design 4. Bit Selection 5. Drilling Fluids System 6. Casing Cementation 7. Potential Drilling Hazards 8. Time and Cost Estimates 9. Drilling Optimization 10. New Drilling Technology Consideration Production Technology 1. Design Philosophy 2. Well Completion Plan 3. Wellhead and Christmas Tree Design 4. Inflow/Outflow Performance Predictions 5. Artificial Lift Selection 6. Possible Production Problems Facilities Engineering 1. Design Basis and Philosophy 2. Concept Selection 3. Pipeline Sizing 4. Host Tie-In Facilities 5. Surface Facilities, Equipment 6. Platform Utilities and Service Facilities 7. Operation and Maintenance Philosophy 8. Abandonment

description

georgetown

Transcript of 3 FDP Deliverables File

Page 1: 3 FDP Deliverables File

Deliverables for Each Phase

Phases Deliverables

Reservoir Engineering 1. Reservoir Engineering

Reservoir Data Well Test Data Reserves Estimation Production Forecast

2. Reservoir Simulation • Model Set-Up • STOIIP value

Sensitivity Analysis

3. Reservoir management

Reservoir Management Reservoir Surveillance

Drilling Engineering 1. Rig Selection 2. Well Trajectories 3. Casing Design 4. Bit Selection 5. Drilling Fluids System 6. Casing Cementation 7. Potential Drilling Hazards 8. Time and Cost Estimates 9. Drilling Optimization 10. New Drilling Technology Consideration

Production Technology

1. Design Philosophy 2. Well Completion Plan 3. Wellhead and Christmas Tree Design 4. Inflow/Outflow Performance Predictions 5. Artificial Lift Selection 6. Possible Production Problems

Facilities Engineering 1. Design Basis and Philosophy 2. Concept Selection 3. Pipeline Sizing 4. Host Tie-In Facilities 5. Surface Facilities, Equipment 6. Platform Utilities and Service Facilities 7. Operation and Maintenance Philosophy 8. Abandonment

Page 2: 3 FDP Deliverables File

Economics 1. Fiscal Term 2. Economic Assumptions 3. Development Options and scenarios 4. Results 5. Net cash flow profile 6. Revenue Split 7. Sensitivity Analysis 8. Conclusion and Recommendation

HSE/Sustainable Development

1. HSE Management System and Leadership 2. Safety and Risk Management 3. Occupational Health Management 4. Quality Management 5. Environmental Management 6. Abandonment Options 7. Consideration of Sustainable Development Option