2X800 MW, YERMARUSHIGH PRESSURE HT COMPLETED
ON 25.09.2015 IN THE PRESENCE OF
JOINT DIRECTOR OF BOILERS KARNATAKA
POOJA PERFORMED BY JDB & TEAM
Shri. T G Manjunatha
JDB Karnataka
Shri. Sundara Rajan
AGM Site Incharge
Shri. Parimala Jana AGM
Shri. Venugopal SE, RPCL
Shri. S SridharAGM
THE HIGHEST PRESSURE - BFD HT
HT PRESSURE 675 kg/cm2
THE BFD HT (INCLUDING HEATERS) HT PRESSURE 525 kg/cm2
EXTRACTION 3,4 & 8 HT
HT PRESSURE 142.5 kg/cm2
HT PRESSURE 10.5 kg/cm2
TESTED CIRCUITSUNIT#1BFD FROM PUMP TO HP HEATERS &
RECIRCULATIONBFD FROM HP HEATER TO BOILER TPEXTRACTIONS 3,4,5,6 & 8AUX STEAM HFO HEATING AND ATOMISING
LINESUNIT#2 CRH FROM NRV TO BOILER TP INCLUDING HPBP
DOWNSTEAM TO CRH, CRH TO DEAERATOR, EXTRACTION FROM CRH TO TDBFP A&B, CRH TO PRDS, EXTRACTION FROM CRH TO HPH -7A & 7B.
THE PROTOCOLS
THE PROTOCOLS
THE
PROTOCOLS
THE
PROTOCOLS
THE
PROTOCOLS
THE PROTOCOLS
RECORD BREAKYERMARUS TEAM HAS ACHIEVED A
RECORD COMPLETION OF HT FOR MORE THAN 10 CIRCUITS CONSECUTIVELY FOR SECOND TIME
HYDRO TEST COMPLETION OF 16 NOS. OF CIRCUITS ON 25-09-2015.
HYDRO TEST COMPLETION OF 12 NOS. OF CIRCUITS ON 10-08-2015.
BREAK A RECORD
TEAM MEMBERS (JDB/BHEL/RPCL/STEAG/ICPL)
THANK YOU