mcdonline.gov.inmcdonline.gov.in/mcdengg/content/Docs/(2)MLA_05-06(1).… · XLS file · Web...
Transcript of mcdonline.gov.inmcdonline.gov.in/mcdengg/content/Docs/(2)MLA_05-06(1).… · XLS file · Web...
2005-06
SUMMERY OF MLA FUND RELEASED BY MIN. OF UD
AC No. Name of MLA Amt. released on Date
AC No. 1 Sh. Ashok AhujaAC No. 2 Smt.Sheila DikshitAC No. 3 Smt.Taj Dar BabarAC No. 4 Sh.Sushil ChoudharyAC No. 5 Sh.T.S. MarwahAC No. 6 Sh. Parvez HashmiAC No. 7 Sh.Subhash ChopraAC No. 8 Sh Yoganand ShastriAC No. 9 Smt Kiran Walia
AC No. 10 Smt Barkha SinghAC No. 11 Sh.Karan Singh TanwarAC No. 12 Sh.Jagdish MukhiAC No. 13 Sh.Harcharan Singh BalliAC No. 14 Sh.O.P.BabbarAC No. 15 Sh.Ramesh LambaAC No. 16 Sh.Mala Ram GangwalAC No. 17 Sh.Anil BhardwajAC No. 18 Sh.S.C. VatsAC No. 19 Sh Ravindra Nath BansalAC No. 20 Sh.Jai Bhagawan AggarwalAC No. 21 Sh.Kulwant RanaAC No. 22 Sh.Surendra KumarAC No. 23 Sh Jai Kishan AC No. 24 Sh Raj Kumar ChouhanAC No. 25 Sh Bejinder Singh AC No. 26 Sh.Dayanand ChandelaAC No. 27 Sh.Mukesh SharmaAC No. 28 Sh Ranbir KharbAC No. 29 Sh. Mahabal MishraAC No. 30 Sh.Dharam Dev SolankiAC No. 31 Sh Vijay LochavAC No. 32 Sh. Balram TanwarAC No. 33 Sh Vijay JollyAC No. 34 Sh.Prem SinghAC No. 35 Sh.Ramesh BidhuriAC No. 36 Sh.Ram Vir Singh BidhuriAC No. 37 Sh.Brahm PalAC No. 38 Sh.Amrish Singh GautamAC No. 39 Smt.Meera BhardawajAC No. 40 Sh.Ashok Kumar WaliaAC No. 41 ShArvindra Singh LovelyAC No. 42 Sh HarshwardhanAC No. 43 Sh. Naseeb SinghAC No. 44 Sh Narendra NathAC No. 45 Sh.Veer Singh DhinganAC No. 46 Sh.Baljor Singh AC No. 47 Sh.Ram Babu SharmaAC No. 48 Sh Vinay SharmaAC No. 49 Sh.Mateen AhmadAC No. 50 Sh.Bhishm SharmaAC No. 51 Sh Sahib Singh ChauhanAC No. 52 Sh Mohan Singh BishtAC No. 53 Sh Mange Ram GargAC No. 54 Sh.Charan Singh KanderaAC No. 55 Sh.Jile Singh ChauhanAC No. 56 Sh.Mangat Ram SinghalAC No. 57 Smt..Anjali RaiAC No. 58 Sh.Shoaib IqbalAC No. 59 Sh.Haroon YushufAC No. 60 Sh.Prahlad Singh SawhneyAC No. 61 Sh.Surender Pal Singh BitooAC No. 62 Sh.Kunvar Karan SinghAC No. 63 Sh.Shadi RamAC No. 64 Sh.Rajesh JainAC No. 65 Sh.Subesh SachdewaAC No. 66 Sh. Ramakant GosomiAC No. 67 Sh. P.C. YogiAC No. 68 Sh S.P. RatawalAC No. 69 Sh M.L. Sodhi
AC No. 70 Sh. Rajesh Lilothiatotal 0 0 0 0 0 0 0 0
SUMMERY OF MLA FUND RELEASED BY MIN. OF UD
000000000000000000000000000000000000000000000000000000000000000000000
Total Amt. Released
00 0 0
upto 31.12.11MUNICIPAL CORPORATION OF DELHI
STATUS REPORT OF MLA FUND FOR THE YEAR 2005-06 upto 31.12.11Zone Name of MLA Interest AMOUNT BOOKED BILLS VERIFIED Under Progress Completed
CIVIL ELECT HORT. C.S.E CIVIL ELECT HORT. C.S.E Works WorksNos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Amt
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 321 NDMC Mr Ashok Ahuja 0 0.002 NDMC 0 0.00
3 City Smt.Taj Dar Babar 85.00 45.70 130.70 18 69.06 0 0.00 0 0.00 0 0.00 18 69.06 61.64 17 56.09 0 0.00 0 0.00 0 0.00 17 56.09 1 18.97 16 37.12 7.87
4 Central 101.00 56.51 157.51 37 106.57 0 0.00 0 0.00 1 1.10 38 107.67 49.84 34 91.58 0 0.00 0 0.00 1 0.98 35 92.57 4 6.04 40 104.84 8.52
5 Central Sh.T.S. Marwah 100.00 43.93 143.93 29 90.55 0 0.00 0 0.00 0 0.00 29 90.55 53.38 28 71.56 0 0.00 0 0.00 0 0.00 28 71.56 4 10.26 34 87.27 7.006 Central 101.71 40.25 141.96 8 31.03 0 0.00 0 0.00 0 0.00 8 31.03 110.93 7 20.57 0 0.00 0 0.00 0 0.00 7 20.57 2 3.31 5 17.25 6.66
7 Central 155.50 56.14 211.64 33 75.23 0 0.00 0 0.00 0 0.00 33 75.23 136.42 28 55.59 0 0.00 0 0.00 0 0.00 28 55.59 5 8.58 23 47.00 15.63
8 South 176.68 16.40 193.08 48 178.70 0 0.00 0 0.00 0 0.00 48 178.70 14.38 46 142.40 0 0.00 0 0.00 0 0.00 46 142.40 15 65.50 33 79.13 16.11
9 South Smt Kiran Walia 186.60 41.79 228.39 56 145.49 9 18.23 0 0.00 8 19.13 73 182.85 45.54 55 141.65 9 17.52 0 0.00 7 15.15 71 174.31 28 83.78 43 90.52 5.3510 South Smt Barkha Singh 104.05 9.59597 113.65 53 104.97 0 0.00 0 0.00 4 6.06 57 111.03 2.62 52 98.09 0 0.00 0 0.00 3 3.87 55 101.96 11 21.63 44 80.33 3.68
11 West 100.00 101.461 201.46 50 132.29 0 0.00 0 0.00 0 0.00 50 132.29 69.17 42 84.65 0 0.00 0 0.00 0 0.00 42 84.65 7 15.73 44 81.84 28.35
12 West 176.30 79.2836 255.58 31 92.59 4 3.73 0 0.00 0 0.00 35 96.32 159.26 28 77.83 4 3.53 0 0.00 0 0.00 32 81.36 3 6.48 29 74.88 10.59
13 West 160.00 130.40 290.40 55 202.94 9 15.68 0 0.00 0 0.00 64 218.62 71.78 52 183.56 9 15.16 0 0.00 0 0.00 61 198.72 5 18.23 56 180.49 14.22
14 West Sh.O.P.Babbar 191.34 46.11 237.45 38 122.23 43 77.66 0 0.00 0 0.00 81 199.89 37.57 38 111.38 43 73.93 0 0.00 0 0.00 81 185.31 4 12.99 77 172.31 3.80
15 West 175.18 53.61 228.79 38 121.97 20 49.30 0 0.00 0 0.00 58 171.27 57.51 30 93.01 20 47.71 0 0.00 0 0.00 50 140.72 6 24.30 44 116.42 26.86
16 West 185.85 30.3387 216.19 14 52.05 0 0.00 0 0.00 0 0.00 14 52.05 164.14 12 31.66 0 0.00 0 0.00 0 0.00 12 31.66 2 4.76 18 48.65 10.15
17 Rohini Sh.Anil Bhardwaj 100.00 102.848 202.85 42 171.36 0 0.00 0 0.00 1 1.98 43 173.33 29.52 42 167.76 0 0.00 0 0.00 1 1.79 43 169.55 2 6.18 42 165.32 2.10
18 Rohini Sh.S.C. Vats 192.64 20.29 212.93 27 98.98 0 0.00 0 0.00 0 0.00 27 98.98 113.95 27 78.34 0 0.00 0 0.00 0 0.00 27 78.34 5 11.56 22 66.78 6.3019 Rohini 129.89 34.88 164.77 30 93.44 0 0.00 0 0.00 0 0.00 30 93.44 71.32 29 80.23 0 0.00 0 0.00 0 0.00 29 80.23 1 8.31 46 100.87 3.22
20 Rohini 188.34 51.11 239.45 47 138.94 0 0.00 0 0.00 0 0.00 47 138.94 100.51 46 119.15 0 0.00 0 0.00 0 0.00 46 119.15 7 9.74 56 131.21 8.41
21 Rohini Sh.Kulwant Rana 100.00 23.00 123.00 22 71.20 0 0.00 0 0.00 0 0.00 22 71.20 51.81 20 61.84 0 0.00 0 0.00 0 0.00 20 61.84 2 2.96 40 100.23 3.9122 Narela 200.00 51.80 251.80 69 217.77 5 9.99 0 0.00 0 0.00 74 227.76 24.03 68 203.44 5 9.17 0 0.00 0 0.00 73 212.61 5 12.72 68 199.89 3.86
23 N.Garh Sh Jai Kishan 176.93 21.7406 198.67 27 104.99 11 24.45 0 0.00 0 0.00 38 129.44 69.23 27 104.67 11 23.56 0 0.00 0 0.00 38 128.23 0 0.00 38 128.23 0.0024 N.Garh 200.00 42.62 242.62 67 214.55 0 0.00 0 0.00 0 0.00 67 214.55 28.07 67 216.12 0 0.00 0 0.00 0 0.00 67 216.12 6 13.29 61 202.83 0.22
A/C NO
FUNDS RELEASE
D
Previous unbooked Amt.
TOTAL AMT.
AVAILABLE FOR BOOKING
TOTAL AMOUNT BOOKED
* FUNDS AVAILABLE
FOR BOOKING
TOTAL AMT. OF BILLS
VERIFIED
Remarks (Liabilites)
`lacsExpenditure
ExpenditureAmt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt. (`lacs) Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)
Smt.Sheila Dikshit
Sh.Sushil Choudhary
Sh. Parvez Hashmi Sh.Subhash ChopraSh Yoganand Shastri
Sh.Karan Singh Tanwar Sh.Jagdish MukhiSh.Harcharan Singh Balli
Sh.Ramesh LambaSh.Mala Ram Gangwal
Sh Ravindra Nath BansalSh.Jai Bhagawan Aggarwal
Sh.Surendra Kumar
Sh Raj Kumar Chouhan
Zone Name of MLA Interest AMOUNT BOOKED BILLS VERIFIED Under Progress Completed
CIVIL ELECT HORT. C.S.E CIVIL ELECT HORT. C.S.E Works WorksNos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Amt
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 32
A/C NO
FUNDS RELEASE
D
Previous unbooked Amt.
TOTAL AMT.
AVAILABLE FOR BOOKING
TOTAL AMOUNT BOOKED
* FUNDS AVAILABLE
FOR BOOKING
TOTAL AMT. OF BILLS
VERIFIED
Remarks (Liabilites)
`lacsExpenditure
ExpenditureAmt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt. (`lacs) Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)
25 N.Garh 100.00 9.62 109.62 8 83.77 0 0.00 0 0.00 0 0.00 8 83.77 25.86 8 82.24 0 0.00 0 0.00 0 0.00 8 82.24 1 21.88 11 70.21 0.41
26 West 100.00 58.7092 158.71 9 33.42 2 2.45 0 0.00 0 0.00 11 35.87 122.84 5 19.87 2 2.38 0 0.00 0 0.00 7 22.24 0 0.00 7 22.24 12.10
27 West 199.30 170.142 369.44 89 270.87 0 0.00 0 0.00 0 0.00 89 270.87 98.57 84 227.92 0 0.00 0 0.00 0 0.00 84 227.92 25 66.20 65 174.45 36.21
28 N.Garh Sh Ranbir Kharb 134.17 31.91 166.08 39 125.26 0 0.00 0 0.00 0 0.00 39 125.26 40.82 39 116.62 0 0.00 0 0.00 0 0.00 39 116.62 2 6.97 55 127.32 2.8829 N.Garh 200.00 18.43 218.43 65 188.96 0 0.00 4 3.90 0 0.00 69 192.86 25.57 65 162.55 0 0.00 4 3.74 0 0.00 69 166.29 5 8.29 64 158.01 5.48
30 N.Garh 100.00 61.8637 161.86 33 76.33 0 0.00 0 0.00 0 0.00 33 76.33 85.53 33 71.25 0 0.00 0 0.00 0 0.00 33 71.25 5 9.13 46 79.59 0.43
31 N.Garh Sh Vijay Lochav 100.00 36.7482 136.75 30 102.86 1 1.70 0 0.00 0 0.00 31 104.56 32.19 29 97.61 1 1.65 0 0.00 0 0.00 30 99.26 2 4.93 38 104.27 3.9632 South 180.00 43.1109 223.11 45 99.35 0 0.00 0 0.00 0 0.00 45 99.35 123.76 44 89.09 0 0.00 0 0.00 0 0.00 44 89.09 3 6.51 45 90.29 7.31
33 South Sh Vijay Jolly 125.00 41.27 166.27 36 122.22 3 11.50 0 0.00 0 0.00 39 133.72 32.55 36 104.13 3 11.08 0 0.00 0 0.00 39 115.22 10 21.91 29 93.31 3.98
34 South Sh.Prem Singh 100.00 206.131 306.13 48 101.40 0 0.00 20 19.45 3 23.24 71 144.08 162.05 46 93.71 0 0.00 16 15.57 3 22.89 65 132.17 1 13.83 64 118.33 8.0635 Central 100.00 56.68 156.68 45 146.32 0 0.00 0 0.00 0 0.00 45 146.32 10.35 44 109.41 0 0.00 0 0.00 0 0.00 44 109.41 15 40.34 29 69.08 15.52
36 Central 144.80 119.02 263.82 44 163.05 0 0.00 0 0.00 0 0.00 44 163.05 100.77 44 141.83 0 0.00 0 0.00 0 0.00 44 141.83 18 76.86 26 64.97 18.05
37 Sh.Brahm Pal 199.87 18.21 218.08 10 131.43 6 24.51 0 0.00 0 0.00 16 155.94 62.14 10 123.69 6 20.33 0 0.00 0 0.00 16 144.01 1 10.95 15 133.07 7.52
38 192.61 30.57 223.18 25 130.54 0 0.00 0 0.00 0 0.00 25 130.54 92.64 25 128.13 0 0.00 0 0.00 0 0.00 25 128.13 2 13.87 23 114.26 0.38
39 100.00 82.25 182.25 0 0.00 5 29.34 0 0.00 0 0.00 5 29.34 152.91 0 0.00 5 21.54 0 0.00 0 0.00 5 21.54 0 0.00 5 21.54 0.00
40 200.00 46.09 246.09 44 135.66 0 0.00 0 0.00 0 0.00 44 135.66 110.43 44 124.65 0 0.00 0 0.00 0 0.00 44 124.65 0 0.00 44 124.65 0.00
41 192.68 52.0576 244.74 59 198.79 1 2.00 0 0.00 0 0.00 60 200.78 43.95 59 187.64 1 1.93 0 0.00 0 0.00 60 189.57 5 11.48 55 178.09 1.29
42 Sh Harshwardhan 182.06 66.1821 248.24 39 160.10 7 11.60 0 0.00 0 0.00 46 171.71 76.54 39 158.93 7 10.85 0 0.00 0 0.00 46 169.78 2 6.04 44 163.73 0.32
43 Sh. Naseeb Singh 173.00 13.7889 186.79 26 182.35 2 1.48 0 0.00 0 0.00 28 183.83 2.96 26 159.08 2 1.35 0 0.00 0 0.00 28 160.43 1 6.14 27 154.29 0.00
44 Sh Narendra Nath 200.00 89.51 289.51 60 158.78 0 0.00 0 0.00 2 11.81 62 170.58 118.92 59 146.17 0 0.00 0 0.00 1 3.26 60 149.44 1 3.26 59 146.17 14.03
45 134.70 5.40 140.10 30 110.66 13 16.74 0 0.00 0 0.00 43 127.40 12.70 26 78.95 13 14.05 0 0.00 0 0.00 39 93.00 2 14.50 37 78.50 15.14
46 Sh.Baljor Singh 131.30 25.27 156.57 38 137.76 11 16.24 0 0.00 0 0.00 49 154.00 2.57 37 112.72 11 15.84 0 0.00 0 0.00 48 128.56 2 6.49 46 122.07 5.39
47 120.00 31.1839 151.18 24 105.09 0 0.00 0 0.00 0 0.00 24 105.09 46.09 24 99.27 0 0.00 0 0.00 0 0.00 24 99.27 2 2.60 22 96.67 0.41
Sh Bejinder Singh
Sh.Dayanand ChandelaSh.Mukesh Sharma
Sh. Mahabal MishraSh.Dharam Dev Solanki
Sh. Balram Tanwar
Sh.Ramesh BidhuriSh.Ram Vir Singh Bidhuri
Shah (s)
Shah (s)
Sh.Amrish Singh Gautam
Shah (s)
Smt.Meera Bhardawaj
Shah (s)
Sh.Ashok Kumar Walia
Shah (s)
ShArvindra Singh Lovely
Shah (s)
Shah (s)
Shah (s)
Shah (N)
Sh.Veer Singh Dhingan
Shah (N)
Shah (N)
Sh.Ram Babu Sharma
Zone Name of MLA Interest AMOUNT BOOKED BILLS VERIFIED Under Progress Completed
CIVIL ELECT HORT. C.S.E CIVIL ELECT HORT. C.S.E Works WorksNos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Amt
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 32
A/C NO
FUNDS RELEASE
D
Previous unbooked Amt.
TOTAL AMT.
AVAILABLE FOR BOOKING
TOTAL AMOUNT BOOKED
* FUNDS AVAILABLE
FOR BOOKING
TOTAL AMT. OF BILLS
VERIFIED
Remarks (Liabilites)
`lacsExpenditure
ExpenditureAmt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt. (`lacs) Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)Amt.
(`lacs)
48 Sh Vinay Sharma 100.00 84.92 184.92 26 125.00 11 16.86 0 0.00 0 0.00 37 141.87 43.05 21 87.02 11 15.94 0 0.00 0 0.00 32 102.96 1 7.69 31 95.27 26.92
49 114.94 43.9376 158.88 45 154.85 1 1.48 0 0.00 0 0.00 46 156.33 2.54 44 139.20 1 1.44 0 0.00 0 0.00 45 140.64 2 3.87 43 136.77 3.86
50 197.48 16.3259 213.81 43 176.29 6 11.10 0 0.00 0 0.00 49 187.39 26.42 43 154.35 6 10.63 0 0.00 0 0.00 49 164.99 1 5.12 48 159.87 1.52
51 200.00 27.9459 227.95 49 165.62 17 28.76 0 0.00 0 0.00 66 194.38 33.57 49 152.27 16 25.29 0 0.00 0 0.00 65 177.56 1 2.65 64 174.91 2.08
52 151.52 2.14 153.66 31 150.17 0 0.00 0 0.00 0 0.00 31 150.17 3.48 28 115.83 0 0.00 0 0.00 0 0.00 28 115.83 2 9.94 26 105.89 7.35
53 Rohini 110.22 113.526 223.75 80 183.69 0 0.00 0 0.00 0 0.00 80 183.69 40.05 77 167.84 0 0.00 0 0.00 0 0.00 77 167.84 12 23.82 83 172.14 5.87
54 Narela 200.00 31.94 231.94 52 187.59 2 2.99 0 0.00 0 0.00 54 190.58 41.36 52 166.05 2 2.59 0 0.00 0 0.00 54 168.63 5 12.49 49 156.15 4.68
55 240.00 46.0612 286.06 45 232.10 0 0.00 0 0.00 0 0.00 45 232.10 53.96 42 219.41 0 0.00 0 0.00 0 0.00 42 219.41 2 20.95 40 198.46 11.47
56 127.40 53.3621 180.76 10 107.47 23 32.17 0 0.00 0 0.00 33 139.64 41.13 10 105.58 23 24.30 0 0.00 0 0.00 33 129.88 0 0.00 33 129.88 0.00
57 S.P. Smt..Anjali Rai 195.95 15.28 211.23 60 137.90 0 0.00 0 0.00 0 0.00 60 137.90 73.33 58 123.11 0 0.00 0 0.00 0 0.00 58 123.11 0 0.00 58 123.11 6.1758 City Sh.Shoaib Iqbal 165.00 10.95 175.95 44 136.86 0 0.00 0 0.00 0 0.00 44 136.86 39.08 37 120.68 0 0.00 0 0.00 0 0.00 37 120.68 1 4.24 36 116.44 12.1159 City 100.00 22.2874 122.29 21 75.29 0 0.00 0 0.00 0 0.00 21 75.29 47.00 18 55.92 0 0.00 0 0.00 0 0.00 18 55.92 0 0.00 18 55.92 6.85
60 City 100.00 178.53 278.53 24 114.04 5 8.14 0 0.00 0 0.00 29 122.18 156.34 22 82.03 5 7.99 0 0.00 0 0.00 27 90.02 3 27.70 24 62.32 17.22
61184.87 43.86 228.73 47 142.01 1 2.00 0 0.00 0 0.00 48 144.00 84.73 40 117.59 1 1.67 0 0.00 0 0.00 41 119.26 0 0.00 43 126.81 13.20
62 195.00 27.05 222.05 25 95.37 0 0.00 0 0.00 0 0.00 25 95.37 126.68 23 74.69 0 0.00 0 0.00 0 0.00 23 74.69 2 24.11 21 50.58 19.76
63 Sh.Shadi Ram 100.00 3.12966 103.13 14 88.44 7 9.30 0 0.00 0 0.00 21 97.74 5.39 14 64.10 7 7.39 0 0.00 0 0.00 21 71.49 1 8.90 20 62.58 4.66
64 S.P. Sh.Rajesh Jain 100.00 29.7063 129.71 39 77.35 5 9.41 0 0.00 0 0.00 44 86.76 42.94 38 74.87 5 7.03 0 0.00 0 0.00 43 81.90 1 1.19 42 80.71 0.3765 West 175.59 36.5772 212.17 66 147.15 0 0.00 0 0.00 0 0.00 66 147.15 65.02 60 133.17 0 0.00 0 0.00 0 0.00 60 133.17 0 0.00 81 165.17 9.42
66 K.Bagh 100.00 51.3677 151.37 13 48.87 0 0.00 0 0.00 0 0.00 13 48.87 102.50 13 38.45 0 0.00 0 0.00 0 0.00 13 38.45 0 0.00 0 0.00
67 K.Bagh Sh. P.C. Yogi 100.00 89.11 189.11 67 176.11 0 0.00 1 1.09 0 0.00 68 177.20 11.90 67 139.09 0 0.00 1 1.09 0 0.00 68 140.18 0 0.00 68 140.18 0.0068 K.Bagh Sh S.P. Ratawal 198.69 9.26 207.95 32 93.82 1 2.86 0 0.00 0 0.00 33 96.68 111.27 31 82.39 1 2.78 0 0.00 0 0.00 32 85.17 0 0.00 32 85.17 2.6169 S.P. Sh M.L. Sodhi 125.04 60.79 185.83 56 121.77 8 15.32 0 0.00 0 0.00 64 137.10 48.73 51 105.89 8 13.27 0 0.00 0 0.00 59 119.17 5 9.40 54 109.76 8.8770 K.Bagh 100.00 92.608 192.61 36 88.49 0 0.00 0 0.00 0 0.00 36 88.49 104.12 35 84.98 0 0.00 0 0.00 0 0.00 35 84.98 0 0.00 35 84.98 1.76
Total 10078.20 3504.61 0.00 13582.81 2610 8628.16 239 456.99 25 24.44 19 63.31 2893 9172.89 4409.91 2494 7531.12 238 411.88 21 20.41 16 47.94 2769 8011.36 269 879.58 2684 7411.62 518.43Remarks:- Balance unbooked amount has already been sent back to UD department, Govt. of NCT of Delhi.
Shah (N)
Shah (N)
Sh.Mateen Ahmad
Shah (N)
Sh.Bhishm Sharma
Shah (N)
Sh Sahib Singh Chauhan
Shah (N)
Sh Mohan Singh Bisht Sh Mange Ram Garg Sh.Charan Singh Kandera
Civil Line
Sh.Jile Singh Chauhan
Civil Line
Sh.Mangat Ram Singhal
Sh.Haroon Yushuf Sh.Prahlad Singh Sawhney
Civil Line
Sh.Surender Pal Singh Bitoo
Civil Line
Sh.Kunvar Karan Singh
Civil Line
Sh.Subesh SachdewaSh. Ramakant Gosomi
Sh. Rajesh Lilothia
33
,,,,,
,,,,,
,,,,,,,,,,
,,,,,
,,,,,
,,,,,,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,,,,,,
,,,,,
,,,,,,,,,,
,,,,,,,,,,
Liabilities details
Div(No.,Amt.`lacs)
33
Liabilities details
Div(No.,Amt.`lacs)
,,,,,
,,,,,
,,,,,
,,,,,,,,,,
,,,,,
,,,,,,,,,,
,,,,,
,,,,,,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
33
Liabilities details
Div(No.,Amt.`lacs)
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,,,,,,,,,,,
,,,,,
,,,,,
,,,,,
,,,,,
,,,,,,,,,,
,,,,,
,,,,,,,,,,,,,,,,,,,,
deptt. deptt. deptt. deptt. Div. Div. Div. Div. Div. Div.
civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)
Status Report of MLA, Sh. Ashok Ahuja, AC No. 1 2005-06S.No. Name of Work deptt. Div. Name of agency D.O.S D.O.C Expenditure
Pertains to NDMC AREAPertains to NDMC AREA
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Present Position
Status Report of MLA, Smt.Sheila Dikshit, AC No. 2 2005-06
S.No. Name of Work deptt. Div. Name of agency D.O.S D.O.C Expenditure
Pertains to NDMC AREAPertains to NDMC AREA
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Present Position
Status Report of MLA,Smt.Taj Dar Babar, AC No. 3 2005-06
S.No. Name of Work deptt. Div. Name of agency D.O.S D.O.C Expenditure
1
Civil EE-II 27.6.05 17.6.05 334700.00 02.12.05 02.03.06 235325.00
Completed
2
Civil EE-II 12.7.05 17.6.05 191590.00 21.12.05 27.01.06 191590.00
Completed
3Civil EE-II 12.7.05 17.6.05 213467.00 18.03.06 16.06.06 213467.00
Completed
4Civil EE-II 18.8.05 8.8.05 191300.00
5Civil EE-II 18.8.05 8.8.05 278919.00 13.01.06 30.05.06 278919.00
Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Present Position
Imp to road adjoing and behind ex -press Building upto corner of Qabristan road by pdg c.c. in w no 1 (B) city zone.
344/25.11.05/EE-II
M/s Deen Dayal Enterprises
Imp to drainage system as Ranjeet singh flyover to Gandhi Market chowk & open space by providing c.c. infront of Shop NO 24, 25 in Gandhi mkt in W.No -1 ( A) CZ
126/21.12.05/EE-II
M/s Rashtrya Const.Co.
Imp to drainage system and road by providingc.c. at Jahangir road and press road in W.No I (A) CZ
177/10.03.06/EE-II
M/s Deen Dayal Enterprises
Imp of foot path by C/o flower Bed at Dargah Faizilai Asaf Ali road in C-I A CZ
Imp of Kaccha road side berms of providing c.c. at Mata Sundri road (LHS) in C-1(B) CZ
140/05.01.06/EE-II
M/s Rashtrya Const.Co.
6
Civil EE-II 18.8.05 17.6.05 172389.00 17.03.06 15.05.06 172263.00
Completed
7Civil EE-II 12.9.05 25.8.05 307800.00 17.03.06 12.05.06 110430.00
Completed
8Civil 16.9.05 26.5.05 2493000.00 M/s Arun Kapoor 02.11.06 P 1896820.00
In Prog.
9Civil EE-II 4.10.05 9.9.05 249500.00 M/s Jai Bhagwan 10.03.06 05.05.06 205743.00
Completed
10
Civil EE-II 4.10.05 12.9.05 129933.00 10.04.06 01.06.06 129035.00
Completed
11Civil EE-II 11.11.05 19.10.05 199500.00 01.04.06 15.07.06 147926.00
Completed
12Civil EE-II 24.11.05 19.10.05 330711.00 03.05.06 27.06.06 329506.00
Completed
13 Civil EE-II 24.11.05 16.11.05 477906.00 03.04.06 26.05.06 435824.00 Completed
14Civil EE-II 24.11.05 16.11.05 252352.00 03.04.06 30.05.06 252352.00
Completed
15Civil EE-II 28.11.05 19.10.05 268875.00 01.11.06 28.11.06 267718.00
Completed
Imp to Surrounding of various religious places/ Mandir by Kota/c.c. at Asaf Ali road , West Barroon road in W.No (A) CZ
175/09.03.06/EE-II
M/s Shree Madhav Builders
Imp of drainage system , footpath and P/L C.C chequred tiles in Gandhi Mkt. In W.No C 1 A ,city Zone.
173/09.03.06/EE-II
M/s Ajay Const.Co
C/o Barat Ghar/ Community Hall a reading room and recreation Centre at Jangpur "B" City Zone.
EE-PR. CZ
16/18.01.06/EE(Pr.)CZ
I/Stg of road surface by P/l bitumen Mastic surfacing at Shakur Ki Dandi in w.No C IA City Zone.
462/01.03.06/EE-II
Imp/ Stg. Of B/wall of park by gril wash & C/o footpath at the inter secter of Gandhi Mkt Chowk in C-I(A) city Zone.
527/24.03.06/EE-II
M/s Bansal Enterprises
Imp of Gali no 4C by Providing C.C. in Darya Ganj in w.No 2 (B) City Zone.
528/24.03.06/EE-II
M/s Bansal Enterprises
Imp of back lane by interlocking tiles from h.no.G 49 to G-64 in Nizamuddin West C -2 A CZ
518/16.03.06/EE-II
M/s Indian Supply Agency
Imp of back lane by CC tiles from H.no. F 1 to F 38 in Nizamuddin west C-2A CZ
522/24.03.06/EE-II
M/s Vinod Const.Co
Raising of B/wall of park and Imp of berms by interlocking tiles adj H.no. B-40 Nizamuddin West C-2ACZ
524/24.03.06/EE-II
M/s Kejriwal Builders
Imp o lane adj H.no. 143 and 134 in Sunder Nagar bny pdg Interlocking tiles C -2B CZ
81/03.05.06/EE-II
M/s Ajay Const.Co
16
Civil EE-II 23.12.05 20.12.05
170000.00
03.04.06 31.05.06 109040.00
Completed
17Civil EE-II 28.12.05 20.12.05
420527.00M/s V.K.Traders 19.05.06 20.06.06 409614.00
Completed
18Civil EE-II 8.2.06 20.12.05
223795.0003.05.06 03.07.06 223221.00
Completed
Imp oflane by interlocking pavers from H.no. 66 and 146 Bauligate to K-556 and upto Naiwali Masjid along H.no.75 in Nizamuddin Basti C -2A CZ
530/24.03.06/EE-II
M/s Bansal Enterprises
Imp of lane by pdg Interlockingpaver near Chopal to T-86 and h.no. 142 in Sarai Kale Khan C 2A CZ]
79/03.05.06/EE-II
Imp to back lane from H.no. G-1 to G -8 and side berms along G-19 to G-1 Nizamuddin West w.no. 2 A CZ
82/03.05.06/EE-II
M/s Ajay Const.Co
Status Report of MLA,Sh.Sushil Choudhary, AC No. 4 2005-06
S.No. Name of Work deptt. Div. Name of agency D.O.S D.O.C ExpenditureDate of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Present Position
1 Civil IX 15.6.05 10.5.05 157800.00 247/04.08.05 M/s A.K & Co. 16.08.05 12.10.05 157800.00 Completed
2 Civil IX 15.6.05 10.5.05 196183.00 168/22.07.05 22.08.05 07.10.05 196183.00 Completed
3 Civil IX 15.6.05 10.5.05 184598.00 172/25.07.05 M/s R.K.Const.Co 07.09.05 15.06.06 179685.00 Completed
4 Civil IX 15.6.05 10.5.05 188417.00 180/25.07.05 M/s Sunil Const. 26.12.05 P 110650.00 In Prog.
5 Civil IX 15.6.05 10.5.05 171740.00 249/04.08.05 M/s A.K & Co. 16.08.05 12.10.05 169346.00 Completed
6 Civil IX 15.6.05 10.5.05 187781.00 08.11.05 27.02.07 186533.00 Completed
7 Civil IX 15.6.05 10.5.05 191091.00 243/04.08.05 16.08.05 12.10.05 190878.00 Completed
8 Civil IX 15.6.05 10.5.05 196692.00 248/04.08.05 M/s A.K & Co. 16.08.05 12.10.05 196692.00 Completed
9 Elect. 26.07.05 10.05.05 177229.00 160/19.12.05 26.12.05 24.01.06 172228.00 Completed
10 Elect. 26.07.05 28.6.05 198536.00 105/06.12.05 06.12.05 14.12.05 179232.00 Completed
Imp of gali by pdg CC pav from H.no. 1657/1 to 1590 up to 1594 in Saini Basti KM Pur in Wno 3
Imp of lane by pdg CC Pav from H.no. 1660 ti 1663 yp to 1804/2 near Kurd KM Pura in W.no. 3.
M/s Dwarka Perneel Goel
Imjp of Gali by opdg CC pav from H.no. 1663 to around in KM Pur in Wno. 3.
Imp of Gali by pdg CC Pav from H.no. 1678 to 1668 & 1676/3 to 1677/1 and its link gali in K.M. Pur in W>no. 3
Imp of gali by dg CC Pav from H.no. 1612 to 1619 upto 1628 in Guljari Gali K.M. Pur w.no. 3.
Imp of Gali by pdg CC Pav from H.no. 1645 to 1652 upto 1649 & its link gail in Umrau Gali K.M Pur in W.no.3
319/07.09.05/EE-IX
M/s Plan Up Const.
Imp of lane by pdg CC Pav from H.no. 1731A to 1706 & 1728 to 1730/2 and its link lane in Saini Basti K.M Pur in Wno. 3
M/s L.Gee Const.Co
Imp of lane by pdg CC from H.no. 1715 to 1790 & 1706 to Gurudwara Rd in Saini Basti K.M Pur in W.no. 3.
Prov. Of Lighting arrangment at park Sawal nagar, National park, Amar Cly, W.n. 4
EEE-IV
M/s Eminent Traders (India)
P/o 35 nos improve type street light in Lajpat Nagar -IV W.no. 4
EEE-IV
M/s Chnadra Electrical Contrctor & Builders
11 Elect. 26.07.05 28.6.05 184447.00 150/09.12.05 18.12.05 26.12.05 167076.00 Completed
12 Elect. 26.07.05 28.6.05 190492.00 64/28.10.05 29.10.05 14.11.05 172723.00 Completed
13 Civil IX 29.7.05 27.06.05 240000.00 30.06.06 28.06.06 227850.00 Completed
14 Civil IX 29.7.05 27.06.05 421300.00 M/s Pappu Seth 19.03.06 16.10.06 332064.00 Completed
15 Civil IX 29.7.05 27.06.05 154450.00 408/07.11.05 27.11.05 07.01.06 124811.00 Completed
16 Civil IX 29.7.05 27.06.05 127600.00 01.04.06 15.11.06 127317.00 Completed
17 Civil IX 29.7.05 27.06.05 225900.00 451/09.12.05 09.01.06 10.02.06 175677.00 Completed
18 Civil IX 29.7.05 27.06.05 612600.00 M/s Pappu Seth 19.03.06 10.09.07 561368.00 Completed
19 Civil IX 29.7.05 1.7.05 153450.00 450/09.12.05 13.01.06 16.02.06 107585.00 Completed
20 Elect. IX 29.7.05 30.6.05 183061.00 88/06.12.05 14.12.05 12.01.06 177110.00 Completed
P/O Imp type 32 nos street light on Defence Cly in W>n. 4
EEE-IV
M/s Illuminator & Craiters
P/O 33 nos improved type street ight Andrews Ganu and NDSE-II W.n. 4.
EEE-IV
M/s Sharma Electicals
Const/ of Rain Shelter in park in back of H.no. 34/212 Vikram Vihar Lajpat Nagar IV in W.no. 4
626/31/03.06/EE-IX
M/s Malik Siri Ram
Imp of back lane of h.no. C1 to C 45 in C block Defence Cly,by pdg RMC in W>no. 4
593/10.03.6/EE-IX
Imp of sid eberms & SW Drainage System opp A-34 to A-26 in A block, Defence Cly in W.no. 4.
M/s Deepak Const.Co
Imp of Back lane by CC flooring Pav of H.no. M 19 to M 24 in M block, Lajpat Nagar,-III in W.no. 4. CZ
395/14.10.05/EE-IX
M/s Sona Consultant & Contractors
Imp fo back lane of H.no. J-1 ri J-4 in J block, Lajpat Nagar-IV, by pdg CC in W. no. 4. CZ
M/s Kejriwal Builders
Imp of Side berms by RMC in GF block FromH.no. H1 to H 18 & Back lane of H.-22 to H-1 Lajpat Nagar-III in Wno. 4 CZ site change to A block Dayanand colony
594/10.03.06/EE-IX
Const of Walkway in park opp H.no. J-59 Lajpat Nagar-III in w.no. 4.
M/s Kejriwal Builders
P/O Lighting arrangment in park Prem Nagar near Shop no 3 near Gurudwara opp Community Centre, Ali Ganj in W.no. 3
M/s Mannu Electricals
21 Elect. IX 29.7.05 30.6.05 340636.00 81/02.12.05 M/s Repair Shop 03.12.05 13.12.05 331165.00 Completed
22 Elect. IX 3.08.05 28.6.5 222828.00 82/02.12.05 03.12.05 P 184492.00 In Prog.
23 Civil IX 16.8.05 12.8.05 136500.00 422/18.11.05 M/s J.B.Tanwar 21.11.05 24.02.06 107860.00 Completed
24 Civil IX 16.8.05 12.8.05 183900.00 459/12.12.05 12.12.05 P 114783.00 In Prog.
25 Civil IX 16.8.05 27.6.05 258300.00
26 Civil IX 16.8.05 27.6.05 145985.00 M/s R.K Const.Co 25.11.05 31.01.07 145478.00 Completed
27 Civil IX 16.8.05 1.7.05 398250.00 492/29.12.05 09.01.06 18.02.06 321814.00 Completed
28 Civil IX 16.8.05 1.7.05 320000.00 496/29.12.05 10.01.06 18.02.06 262593.00 Completed
29 Civil IX 16.8.05 1.7.05 349450.00 550/13.02.06 14.03.06 24.03.06 349450.00 Completed
30 Civil IX 16.8.05 1.7.05 232250.00 445/09.12.05 21.01.06 23.02.06 131069.00 Completed
31 Civil IX 16.8.05 11.7.5 323600.00 502/12.01.06 01.02.06 09.03.06 318099.00 Completed
32 Civil IX 16.8.05 11.7.5 379400.00 493/29.12.05 09.01.06 10.02.06 277401.00 Completed
P/O 60 nos street light arrangment at Poles at Prem Naga, Kotla, Bapu park, Aliganj, Pilanji in w.no. 3
P/O SHML at Amar Cly Murjecy park in w.no. 4
M/s Khanna Sales Corporation
Imp of D/System of Defence Cly Mkt along shops front side in w.no. 4 CZImp of D/System of Defence Cly Mkt along shops back side in w.no. 4 CZ
M/s Kanwaljit Singh Khurana
Imp of rd by CC Interlocking pavers in G block Lajpat Nagar -III in w.no. 4 C Z from G -51 to G 40 & F-1 to F 16
Imp of Gidwari Marg from Vikaram Hotel to 27 Block and Central Rd Old Double Storey in W>no. 4 CZ
438/23.11.05/EE-IX
Imp of FP on rod from C 108 to Gurudwara Daya Nand Cly in w.n. 4 C Z
M/s Juneja Const.Co
Imp of FP on road from D 33 Amar Cly to CSE Office opp Gurudwara in W. no. 4 CZ
M/s Juneja Const.Co
Imp by Raisnig of Grill of B./wall of Nallah in National Park in W.no. 4 CZ
M/s Subhash Kapoor
Const of Walkway in park opp H.no. A 61 Defence Cly in W.no. 4 CZ
M/s Juneja Const.Co
Imp of back lane of H.no. J -8 to J 19 in J block Lajpat Nagar -III in w.no. 4 CZ
M/s Kishore & Co.
Imp of Side berms by CC i/l Pavers along MC pry school in block Lajpat Nagar -III in .w.no. 4 CZ
M/s Juneja Const.Co
33 Civil IX 16.8.05 8.8.05 157300.00
34 Civil IX 6.09.05 25.8.05 167750.00 M/s R.K.Const.Co 15.04.06 27.06.06 166619.00 Completed
35 Civil IX 6.09.05 25.8.05 133700.00 18.07.06 26.08.06 129175.00 Completed
36 Civil IX 6.09.05 25.8.05 199800.00 426/18.11.05/ 24.05.06 03.07.06 196993.00 Completed
37 Civil IX 14.11.05 24.10.05 132400.00 507/12.01.06 16.01.06 06.03.06 128944.00 Completed
38 Civil IX 14.11.06 24.10.06 196850.00 506/12.01.06 12.01.06 06.03.06 190033.00 Completed
39 Civil IX 14.11.06 7.11.05 250100.00
40 Elect. 20.01.06 05.01.06 218965.00 15.06.06 04.07.06 183787.00 Completed
41 Elect. 23.01.06 05.01.06 272111.00 15.06.06 11.07.06 263696.00 Completed
42 CSE 30.01.06 05.01.06 109600.00 24.04.07 11.06.07 98467.00 Completed
Imp of side berms in back of H.no. 207 to 202 in A block, Defence Cly by pdg Interlocking pavers in Wo. 4 CZ
Imp of side berms by interlocking pevers from H.no. 38 to C 59 upto along Tomp in D block NDSE-I in w.no. 3 CZ
390/14.10.05/EE-IX
Imp & Re-const. Of SW Drain from H.no. D 43 to D 55 in D block NDSE-I in w.no. 3 CZ
92/18.07.06/EE-IX
M/s Planup Consts.
Imp of lane by CC from H.no. 1717 to 1589 & 1735 to 1619 7 its link lane in K M Pur in w.no. 3 C Z
M/s Ganpati Const.Co
Imp of lane by CC pavement from house No 1893 to 1890 up to House No 1885 & its link in K.M. pur Ward No 3 C.Z
M/s L.Gee Const.Co
Imp of lane by CC pavement from house No 1881 to Mother Dairy Booth and Jag ram Mandir to House No 1882 in K.M. pur Ward No 3 C.Z
M/s L.Gee Const.Co
Wid of lane adj to MC Pry school NDSE-I and Re-cosntrution of B/wall (RHS) in W.no. 3 CZ
P/o Semi high mast light at Park 'B' Block Amar Colony in Word no. 4/C.Z
EEE-IV
70/13.06.06/EE(E)-IV
M/s M.K.Enterprises
Pdy. Street light arrangment at Lajpat Nagar III,IV, NDSE-I,NDSE-II Sawal Nagar, Kotla in A/c-04/CZ
EEE-IV
67/08.06.06/EE(E)-IV
M/s Pragati Engineers
Construction of toilet Blode in Wazir nagar in W.NO-3 CZ
EE-CSE-IX
09/17.04.07/EE-IX
M/s O.V Singh Const.Co.
43 Civil 01.03.06 25.02.06 194500.00 23.05.06 12.07.06 193901.00 In Prog.
44 Civil 01.03.06 25.02.06 194500.00 M/s Sunil Const. 01.10.06 06.12.06 194159.00 Completed
45 Civil 01.03.06 25.02.06 199150.00 M/s S.S Engineers 12.06.06 30.06.06 198444.00 Completed
46 Civil 01.03.06 25.02.06 199500.00 07.06.06 26.07.06 193083.00 Completed
47 Civil 08.03.06 07.02.06 2494500.00 10.04.07 08.05.07 2493824.00 Completed
Imp. Of back lane from H.NO. 80 to Park in National park 1 in ward no. 4 CZ (By Pdg.cc)
EE-IX
26/22.05.06/EE-IX
M/s Ganpati Const.Co
Imp of lane along Park from Frank Anthony School to Children Park in National Park in W.no 4 CZ (By Pdg cc)
EE-IX
53/27.06.06/EE-IX
Construction of back lane around park by R.M.C near H.no. J-53 to mandir in J-Block Lajpat nagar-III Ward no.4 CZ
EE-IX
50/12.06.06/EE-IX
Constrction of walk Way in Park near I-37 in I-Block Lajpath Nagar-II in ward no.4 CZ
EE-IX
34/22.05.06/EE-IX
M/s L.Gee Const.Co
Imp.& Strenghtheing of road by pdg. Dense Carpetting from H.NO. A-50 to A-30, A-1 to B-29, B-16 to B-1, C-1 to G-1, J-21 to J-34, J-91 to J-107, F-24 to F-34, K-1 to F-38, K-8 to F-44, F-43 to F-39, K-16 to K-9, D-60 to G-26, B-50 to B-65, B-35 to B-49 in NDSE-I in W.NO. 3 CZ
EE-IX
379/19.02.07/EE-IX
M/s Arian Resurfacing of road/
Status Report of MLA,Sh.T.S. Marwah, AC No. 5 2005-06
S.No. Name of Work deptt. Div. Name of agency D.O.S D.O.C Expenditure
1 Civil IX 20.6.05 16.6.05 85300.00 M/s Kejriwal Builders 13.12.05 06.02.06 84440.00 Completed
2 Civil IX 20.6.05 16.6.05 159600.00 332/12.9.05 19.9.05 14.11.05 135429.00 Completed
3 Civil IX 20.6.05 16.6.05 249000.00 335/23.9.05 M/s Girish Const Co. 14.10.05 12.12.05 212116.00 Completed
4 Civil IX 20.6.05 16.6.05 437800.00 M/s Akriti Decore's 22.01.07 29.03.07 323082.00 Completed
5 Civil IX 20.6.05 16.6.05 98300.00 353/23.9.05 14.10.05 22.12.05 79716.00 Completed
6 Civil IX 20.6.05 16.6.05 379800.00 M/s Akriti Decore's 07.02.07 3.03.07 297201.00 Completed
7 Civil IX 20.6.05 16.6.05 276500.00 483/28.12.05 13.01.06 30.03.06 199542.00 Completed
8 Civil IX 20.6.05 16.6.05 202900.00 354/23.09.05 14.10.05 23.03.06 180039.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Present Position
Const of B/wall of park near H.no. C 11/78 in C-11 block, Lajpat Nagar, -II w.n. 5.
423/18.11.05/EE-IX
P/L U/G Drainage near round about C-11 H.no. 133 to 138 & imp of road side berms by pdg CC pav in C 11 blocmk lajpat Nagar -II in
w.no. 5 CZ
M/s Kwality Enterprises
P/L U/G Drainge from H.no. 149 to 161 H.no. 171 to 170 & 170 to open mohalla in A block
Lajpat Nagar-I W>no. 5P/L U/G Draigne from H.no. F1/157 to F1/122, F1/131 TO F1/136,F1/147 TO F/146 & F1/38 TO F1/35 IN F block Lajpat Nagar -I w.no. 5.
311/09.01.07/EE-IX
P/L U/G Drainage fromH.no. 37 to 38 in B block, Lajpat Nagar-II in w.no. 5. CZ
M/s Yogender Const Co.
Imp of back lane from H.no. H1/82 to H-1/104 by opdg CC pav in H block, Lajpat Nagar-I in
w.no. 5 CZ
310/09.01.07/EE-IX
Imp of back lane by pdg CC pav from h.no. H1/32 to 1/21 in H block, Lajpat nagar-I in
w.no. 5 CZ
M/s Bansal Enterprises
Imp of back lane by pdg CC Pav from H.no. h1/55 to H1/60B & H1/50 to 1/47 in H block
Lajpat Nagar-I W>no. 5 CZ
M/s Yogender Const Co.
9 Civil IX 19.7.05 18.7.05 210650.00 424/18.11.05 M/s Kajriwal Builders 12.12.05 18.01.06 146375.00 Completed
10 Civil IX 19.7.05 18.7.05 381250.00 448/09.12.05 M/s Khatri Builders 07.01.06 02.03.06 286937.00 Completed
11 Civil IX 19.7.05 18.7.05 555400.00 530/30.01.06 M/s Khatri Builders 30.01.06 21.02.06 418155.00 Completed
12 Civil IX 19.7.05 18.7.05 538650.00 04.04.07 07.05.07 454574.00 Completed
13 Civil IX 19.7.05 5.7.05 665500.00 536/30.01.03 10.02.06 27.02.06 650944.00 Completed
14 Elect. 4.8.05 15.6.05 199372.00 130/09.12.05 M/s Grover Electricals 16.12.05 14.08.06 182092.00 Completed
15 Elect. 4.8.05 15.6.05 490319.00 79/25.11.05 26.11.05 P 369572.00 In Prog.
16 Elect. 4.8.05 15.6.05 485059.00 163/19.12.05 M/s Repair Shop 26.12.05 20.01.06 366718.00 Completed
17 Elect. 4.8.05 15.6.05 484844.00 15.12.05 P 374900.00 In Prog.
18 Civil IX 12.8.05 9.8.05 145650.00 344/14.9.05 M/s RK Const Co. 26.9.05 19.12.05 127525.00 Completed
19 Civil IX 12.8.05 9.8.05 195000.00 372/29.09.05 M/s Sunil Const. 08.10.05 28.12.05 195000.00 Completed
20 Civil IX 10.08.05 9.8.05 197450.00 M/s Plan Up Consts. 26.09.05 P 101305.00 In Prog.
21 Civil IX 10.08.05 9.8.05 193400.00 301/29.8.05 12.9.05 20.10.05 192929.00 Completed
22 Civil IX 10.08.05 9.8.05 153950.00 302/29.8.05 12.9.05 20.10.05 150102.00 Completed
Const of & Imp of Walkway in park near H.no. C19 & C-1/200 in C block, Lajpat Nagar-I in
w.no. 5 CZImp of back lane fromH.no. K-14 to K 26 by pdg CC pav in K block Lajpat Nagar-II in
w.no. 5 CZ
Imp of back lane by pdg CC pav from H.no. K 1 to K 4, K2 to K 95, K 91 to K 94 ^ k 71 to 77
in K Block Lajpat Nagar-I in w.no. 5 CZImp of back lane by pdg U/G Driange & CC
Pav in C block Lajpat Nagar -I from H.no. 1 to 128, 115 to 105, 156 to 169, 125 to 141, 188 to 196 & 18 to 156 in front side H.no. 124 to 731
in front soide in w.no. 5.
435/26.03.07/EE-IX
M/s Bansal Enterprises
Imp of Premixing of interbnal rd in I.H.D.E. & block Jangpura ext & Pant Nagar in w.no. 5 CZ
M/s Bansal Enterprises
Prov. Of 40 nos street light arrangement on pole at Lodhi Rd (MCD Area) w.no. 5 CZ
EEE-IV
P/L SHML at C block Lajpat nagar I park and A 69 Lajpat nagar-II park w.no. 5 CZ
EEE-IV
M/s Sushma Electricals
P/L SHML at Pant nagar park near mandir A 44 Park Lajpat nagar-I park w.no. 5 CZ
EEE-IV
P/O SHML at Bhogal Park Sarodya bazar and Church rd park Bhogal W.no. 6 CZ
EEE-IV
106/07.12.05/EE(E)-IV
M/s Chandra Elect.Const.&
Builders
Imp of back lane by CC interlocking Pav from H.no. F 1/69 to F1/78 in F 1st Block, Lajpat
Nagar-I in w.no. 5 CZConst of FP and rd berms infornt of Temple in
Block no 2, Nehru Nagar in w.no. 6 CZConst of FP along Kashimir park in Double
Story Jung pura in w.no. 5 C Z329/07.09.05/
EE-IXImp of main Jeevan Nagar ed by Metalling from Ring rd to Tikona Park in w.n. 6 CZ
M/s Ganpati Const Co.
Imp of road by Metalling from Tikona Park to BhagwnNagar xing in Jeevan Nagar in W.no. 6
CZ
M/s Ganpati Const Co.
23 Elect. 16.8.05 8.8.05 84481.00 91/06.12.05 M/s Maanu Electricals 15.12.05 24.12.05 75075.00 Completed
24 Elect. 30.8.05 15.6.05 410249.00 165/31.03.06 20.12.05 16.02.06 405430.00 Completed
25 Elect. 30.8.05 15.6.05 407513.00 125/09.12.05 M/s Grover Electricals 10.12.05 20.12.05 404564.00 Completed
26 Civil IX 6.9.05 28.7.05 450800.00 491/29.12.05 M/s Juneja Const.Co 14.03.06 22.03.06 411318.00 Completed
27 Civil IX 6.9.05 28.7.05 462800.00 535/30.01.06 14.02.06 27.02.06 461740.00 Completed
28 Civil IX 21.11.05 12.09.05 78600.00 M/s Kejriwal Builders 03.07.06 17.08.06 66324.00 Completed
29 Civil IX 21.11.06 12.09.06 458100.00 16.05.06 31.07.06 319466.00 Completed
30 Civil IX 21.11.07 12.09.07 415450.00 16.05.06 07.09.06 280451.00 Completed
31 Elect. 14.12.05 19.9.05 211297.00 21.06.06 P 180678.00 In Prog.
32 Elect. 14.12.05 19.9.05 67667.00 M/s Maanu Electricals 11.03.06 16.03.06 53420.00 Completed
33 Elect. 20.01.06 19.9.05 191209.00 17.07.06 14.08.06 185231.00 Completed
34 Civil EE-IX 15.02.06 12.09.05 519400.00 08.11.06 02.12.06 432162.00 Completed
35 Civil EE-IX 15.02.06 12.09.05 309100.00 M/s Kejriwal Builders 15.11.06 18.01.07 265342.00 Completed
36 Civil EE-IX 15.02.06 12.09.05 112100.00 M/s Kejriwal Builders 01.01.07 24.01.07 105362.00 Completed
Prov. Of Lighting arrangement & Pump set at Pipa Wala Park H.no. 441 in Sunlight Cly-II in
W.no. 6 CZ
EEE-IV
P/O Lighting arrangement SHML in parks in w.no. 5 Lajpat Nagar Jungpura, C Z
EEE-IV
M/s Eminent Traders (India)
P/O Lighting arrangement SHML in parks in w.no. 6 Lajpat Nagar Jungpura, C Z
EEE-IV
Imp/Stg of front alne all around park by premxixing of rds in K-11, L-11, I-11 & D 11
block Lajpat Nagar in 11 in W.no. 5I/S of front lane all around park by premixing
of rds in A 11, B-11, F-11, M-11 & O-11 block, Lajpat Nagar in C11 W.no. 5
M/s Bansal Enterprises
Construction of walkway in park near House no D-24 in Lajpat Nagar II Ward No 5 Central
Zone
629/31.03.06/EE-IX
Providing U/G Drainge system on birbal road from round above to open Nallah (L.H.S) in Jungpura Extn. In Ward No 5, Central Zone
12/01.05.06/EE-IX
M/s Bansal Enterprises
Providing U/G Drainge system in back lane and front side of B-Block Jungpura Extn. In Ward
No 5, Central Zone
13/01.05.06/EE-IX
M/s Bansal Enterprises
P/O SHML at E -31, Lajpat Nagar-II, Park W.no. 5 CZ
EEE-IV
71/13.06.06/EE(E)-IV
M/s Krishna Ekectricals
Prov. Of lIghting arrangment at E-65 Lajpat Nagar -II park and-I-100 Lajpat nagar Park and
W.no. 5.
EEE-IV
231/10.03.06/EE(E)-IV
Prov. Of Lighting arrangment at D 29, Lajpat Nagar -II park and C 36 Lajpat Nagar-II park
W.no. 5 CZ
EEE-IV
83/10.07.06/EE(Elect.)IV
M/s Sachdeva Electricals
Imp. Of back lane by pdy. Cc purement in B-Block Jungpure Extn. In word no. 5 CZ
207/07.11.06/EE-IX
M/s Bansal Enterprises
Imp. Of lane by pdy. Cc purement in D-Block from H.NO.D-32 to D-34, D-22 to D-23, D-33 in front of D-37 & D-7 to D-9 Lajpat Nagar-II
in Ward No. 5 CZ
210/13.11.06/EE-IX
Imp of park near H.NO. D-11/13 by Pdy. M.S. Grill etc in Lajpat Nagar-11 in W.no.5 CZ
184/20.10.06/EE-IX
37 Civil EE-IX 02.03.06 14.02.06 404150.00 M/s Gagandeep Singh 27.11.06 06.07.07 308394.00 Completed
38 Civil EE-IX 02.03.06 14.02.06 375800.00 08.02.07 30.07.07 269842.00 Completed
39 Civil EE-IX 02.03.06 14.02.06 342400.00
Construction of B/wall and Walk Way of park in front of Shop no. 108 in Central Market in
Lajpat Nagar-11 in W.no. 5 CZ
166/28.09.06/EE-IX
Providing and laying U/G Drainage system from H.NO. A-Ist/192 to A-Ist/214, A-Ist/134
to Park, near A-1/44 & A-1/185 A-Block Lajpath Nagar I in W.no.5 CZ
350/29.01.07/EE-IX
M/s Khurana Associates
Pdoviding & Laying U/G Drainage system and imp. Of side beems by pdy. Cc interlocking
tiles alaround park near H.no. B-1/160 in B-Ist Block Lajpath Nagar-I in W.no.5 CZ
Status Report of MLA,Sh. Parvez Hashmi, AC No. 6 2005-06
S.No. Name of Work deptt. Div. Name of agency D.O.S D.O.C Expenditure
1 Civil Br-I 3.8.05 25.7.05 198725.00 M/s Sunil Const. 01.12.05 12.01.06 195092.00 Completed
2 Civil Br-I 3.8.05 25.7.05 673800.00 17.05.06 29.05.06 672961.00 Completed
3 Civil Br-I 25.8.05 10.8.05 149000.00 M/s Ganpati Const. 18.11.05 P 88840.00 In Prog.
4 Civil Br-I 7.12.05 24.11.05 292000.00 M/s Rana Builders 12.12.06 P 242582.00 In Prog.
5 Civil Br-I 7.12.05 24.11.05 556800.00
6 Civil Br-I 7.12.05 24.11.05 546100.00 M/s Capital Const.Co 03.07.06 04.09.06 305447.00 Completed
7 Civil Br-I 21.12.05 5.12.05 385700.00 M/s R.K Const. 31.05.07 28.08.07 332029.00 Completed
8 Civil Br-I 5.1.06 19.12.05 301300.00 M/s R.K Const. 24.07.06 03.08.07 219724.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Present Position
Pdg and Laying CC on berm near H.no. 268, Sukhdev Vihar W.no. 7
290/21.10.05/EE(Br.)-I
Pdg and laying mastic from Sweet Corner towards DDA Flats sarai Jullena W.no. 7, Okhla.
33/03.05.06/EE(Br)-I
M/s Balaji & Associates
Imp of lane by Pdg interlocking tiles near H.no. 66 in Friends Cly west in w.no. 8 CZ
310/27.10.05/EE(Br.)-I
Imp to berms by CC & Open Surface drain in DDA Flats Pkt 8, Sukhdev Vihar, in W .no. 8 Cz
167/08.06.06/EE(Br.)-I
Imp of road by pdg Mastic from H.no. 120B to 90B and 180 B to 63B in DDA flats, pkt B Sukhdev Vihar W>no. 8.Imp to road / berms by interlocking tiles in C -2 and C 7 Block in C block East of Kailash W>no. 6, SN Puri
198/30.06.06/EE(Br)-I
Imp to lane by pdg CC near Mata Mandir towards I G Bharat nagar near H.no. 20 Bharat Nagar Okhla I W .no. 7.
586/19.03.07/ EE-Br-I
Imp to Drain & Drainage system from H.n. 118A to 113D in DDA Flats pkt A in Sukhdev Vihar W.no. 8 CZ
151/07.06.06/EE(Br.)-I
Status Report of MLA, Sh.Subhash Chopra, AC No. 7 2005-06
S.No. Name of Work deptt. Div. Name of agency D.O.S D.O.C Expenditure
1 Civil IX 10.6.05 31.5.05 285755.00 M/s Pappu Seth 24.10.05 12.03.07 285755.00 Completed
2 Civil IX 10.6.05 31.5.05 135600.00 M/s L.Gee Const.Co 12.09.05 06.10.05 130600.00 In Prog.
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Present Position
Imp of B/wall of park near flat no 433, Flat no 106A & walkway in Childern Park in Neelgiri Apptt. Alaknanda in W>no. 9
383/14.10.05/EE-IX
Imp of Parking by pdg Inter locking tiles near Entry Gate no 1 in Neelgiri Apptt in w.no. 9.
241/04.08.05/EE-IX
3 Civil IX 10.6.05 31.5.05 199700.00 M/s Sunil Const 15.9.05 P 191210.00 In Prog.
4 Civil IX 10.6.05 31.5.05 199900.00 25.11.05 07.01.06 195354.00 Completed
5 Civil IX 10.6.05 31.5.05 198900.00 M/s L.Gee Const.Co 12.09.05 28.10.05 193900.00 In Prog.
6 Civil IX 10.6.05 31.5.05 161200.00 M/s Sunil Const 15.09.05 02.11.05 160163.00 Completed
7 Civil IX 29.7.05 27.7.05 175000.00
8 Civil IX 29.7.05 27.7.05 194740.00 M/s Sunil Const 21.09.05 05.03.07 193345.00 Completed
9 Civil IX 4.8.05 27.7.05 583650.00 M/s Juneja Const.CO 14.04.06 09.12.06 436220.00 Completed
10 Civil IX 10.08.05 8.8.05 199750.00 M/s A.K Aco. 07.10.05 27.06.06 178264.00 Completed
11 Civil IX 10.08.05 8.8.05 198200.00 M/s Plan UP Consts. 27.07.06 05.03.07 198200.00 Completed
12 Civil IX 10.08.05 8.8.05 194400.00 M/s Sunil Const 19.10.05 P 160238.00 In Prog.
13 Civil IX 10.08.05 8.8.05 199700.00 M/s Ajay Associates 01.04.06 20.11.06 199700.00 Completed
14 Civil IX 15.9.05 10.8.05 199000.00 M/s Ganpati Const.Co 10.02.06 17.08.06 199000.00 Completed
15 Civil IX 15.9.05 10.8.05 197600.00 M/s L.Gee Const.Co 13.05.06 09.10.06 196948.00 Completed
16 Civil IX 15.9.05 10.8.05 195800.00 M/s Sunil Const 08.03.06 30.04.07 195800.00 Completed
Covering of open surface drainf rom DDA Mkt to end of Neel giri Apptt, Alaknanda in w.no. 9 CZ (main rd side) by pdg RCC
179/25/.7.05/EE-IX
Covering of open surface drainf rom main road to gate no 4 in Neel giri Apptt, Alaknanda in w.no. 9 CZ (side rd) by pdg RCC
274/22.08.05/EE-IX
M/s Sona Consulttant & Contractor
Imp of open surface drain from Flat no 353,352,378,17,58,137,154 Neel giri Apptt, Alaknanda in W.no. 9 CZ bty pdg RCC Pipe
240/04.08.05/EE-IX
Const of Rear side B.wall in Gangotri Aoppt in Pkt-B, Alaknanda in w.no. 9 CZ by pdg B works
178/25.07.05/EE-IX
Const of Tennis Court in the Ashok Vatika Park in Masjid Moth GK-II in W>no. 9 CZImp of back lane by pdg interlocking tiles from H.no. D2 to D-12 in GK-II Encl in w.no. 9 CZ
347/14.09.05/EE-IX
Imp fo back lnae by pdg Interlocking from H.no. A-1 to BB-8 in GK-II Encl in w.no. 9 CZ
495/29.12.05/EE-IX
Imp of back lane by pdg Kota stone flooring from H.no. F1218 to F 1203 in F block CR park in W.no. 9 CZ
368/28.09.05/EE-IX
Imp of back lane by pdg Kota Stone flooirng from H.no. F 1168 to F 1153 inF block CR Park inw.no. 9 CZ
89/18.07.06/EE-IX
P/F interlocking tiles of Common Space near Flat no 49 to 56 in Pkt-C, Gangotri Apptt, in w.no. 9 CZ
373/29.9.05/EE-IX
P/F interlocking tiles of Common Space near Flat no 1 to 12 in Pkt-C, Gangotri Apptt, in w.no. 9 CZ
413/07.11.05/EE-IX
Imp of back lane by pdg H.no. C 473 to C 487 ni CR park W.no. 9, CZ
427/18.11.05/EE-IX
Imp of back lnae by pdg Interlocking tiles from H.no. I 1640 to I 1648 & I 1639 in CR park in w.no. 9 CZ
441/23.11.05/EE-IX
Imp fo FP from H.no.W 130 to W 110 in GK-II in W.no. 9 CZ
558/27.02.06/EE-IX
17 Civil IX 15.9.05 10.8.05 195300.00 M/s R.K Const.Co 11.02.05 28.02.07 195300.00 Completed
18 Civil IX 15.9.05 14.9.05 127400.00 M/s Plan UP Consts. 05.09.06 21.11.06 125637.00 Completed
19 Civil IX 15.9.05 14.9.05 188500.00 M/s A.K & Co. 20.03.06 28.03.07 188500.00 Completed
20 Civil IX 15.9.05 14.9.05 192700.00 M/s Sunil Const 07.03.06 30.03.07 192700.00 Completed
21 Civil IX 21.9.05 10.8.05 608200.00
22 Civil IX 21.9.05 19.9.05 199150.00 M/s L.Gee Const.Co 22.04.06 12.12.06 197859.00 Completed
23 Civil IX 21.9.05 19.9.05 199990.00 28.08.06 18.09.06 190074.00 Completed
24 Civil IX 21.9.05 19.9.05 199300.00 16.07.06 21.08.06 198038.00 Completed
25 Civil IX 21.9.05 19.9.05 198900.00 M/s Gnapati Const.Co 25.02.06 15.06.06 198900.00 Completed
26 Civil IX 22.9.05 14.9.05 220800.00
27 Civil IX 22.9.05 14.9.05 258500.00 M/s Shri Ravi Gupta 10.04.06 15.11.06 145036.00 Completed
28 Civil IX 22.9.05 14.9.05 235000.00
29 Civil IX 22.9.05 14.9.05 313450.00 M/s Chajju Bedwal 18.03.06 28.01.07 313450.00 Completed
Pdg Premix Carpet near H.no. 52/93 to gate bi 1&52/36 to 52/44, 52/103 to 52/104, 52/5, 0-1, 0-9 & 0-2 to gate No E in CR park in W.no. 9 CZ
442/23.11.05/EE-IX
Imp of Back lane of G blockf romH.no. G 31 to G 34, G 35 to G 151 & G 25 by pdg CC in W.no. 10, Kalkaji CZ
93/18.07.06/EE-IX
Imp fo lane by RMC around opark infront of side of block no 2 from H.no. 1 to H.no. 9 in Kalkaji Ext w.no. 10 Kalkaji CZ
539/30.01.06/EE-IX
Pdg interlocking tles in back alne of Rampuri from H.no.1 to 17 & 17 to 24, 44 to 76 in W>no. 10 Kalkji CZ
559/27.02.06/EE-IX
Pdg Dense Carpeting of road from h.no. W 140 to W 110 in GK -II w.no. 9 CZImp of back lane by pdg CC interlocking pavers from H.no. B 337 to B 344 & BV 344 to b 350 in B block CR Park in CZ
420/07.11.05/EE-IX
Imp of back lane by CC interlocking pavers from H.no. B 331 to b 336 in B block CR Park inW.no. 9 CZ
85/07.07.06/EE-IX
M/s Sona Consulttant & Contractor
Raising of Existing B./wall from flat no K-5 to DDA office in K block Sheikh Sarai Ph-II in W.no. 9 CZ
86/07.07.06/EE-IX
M/s Sona Consulttant & Contractor
Raising of Existing B./wall from DDA office to flat no K-53 in K block Sheikh Sarai Ph-II in W.no. 9 CZ
428/18.11.05/EE-IX
Imp of Existing passage by CC & KS in Block No 1,2,3,4,5 & 6 in Double Storey, Kalkaji in w.no. 10 CZImp of rd side berms of rd by interlocking pavers in block 14&19 from H.no. 14/11 to 19/11 in W.no. 10 CZ
613/10.03.06/EE(Br.)-I
Imp to gali no 7 by CC from H.no. 755/7 to 750/7 in Govind Puri in W.no. 10 CZImp of lane by CC from H.no. 1851/10 to 1833/10 in Govind Puri Ext in W.no. 10 Kalkaji CZ
573/09.03.06/EE-IX
30 Civil IX 30.9.05 19.9.05 259300.00
31 Civil IX 30.9.05 27.9.05 215000.00 M/s Shri Ravi Gupta 18.03.06 15.11.06 118761.00 Completed
32 Civil IX 7.12.05 7.12.05 194300.00 M/s Sunil Const 12.01.06 P 182340.00 In Prog.
33 Civil IX 10.1.06 7.1.06 198000.00 M/s Sunil Const 05.03.06 17.07.06 197467.00 Completed
Contruction of west portion of B/Wall & Grit wash in Mahila Park. MandakiniEnclave in Ward no 9 ,Cenral Zone in Alak Nanda Improvement to back lane by pdg interlocking pavers of B Block from Hno B 127 to B 132 in Ward No 10 Kalka ji Central Zone
614/10.03.06/EE-IX
Pdg CC in the lanes from H.no. J 3/363 & h. n.J-4/73A to park in DDA Flats, Kalkaji in W.no. 9 C
509/12.01.06/EE-IX
Pdg CC in the lanes from Raheja Sweets to flat No. J-4/66A in Dda janta Flats Kalkahi in w.no. 9 CZ
561/27.02.06/EE-IX
Status Report of MLA,Sh Yoganand Shastri, AC No. 8 2005-06
S.No. Name of Work deptt. Div. Name of agency D.O.S D.O.C Expenditure
1 Civil 8.6.05 7.5.05 464508.00 18.11.05 P 438579.00 In Prog.
2 Civil 8.6.05 7.5.05 464542.00 18.11.05 P 407037.00 In Prog.
3 Civil 8.6.05 7.5.05 460287.00 18.11.05 P 351081.00 In Prog.
4 Civil 8.6.05 7.5.05 456464.00 18.11.05 P 433560.00 In Prog.
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Present Position
Stg of roads from G-block to Hauz Rani Village opp N-1 and M-1 to M-19 Malviya Nagr in S/zone ( by dense carpatings)
EE(pr
) south
182/17.11.05/EE(Pr)South
M/s Sanjeev Kumar & Bros.
stg of road from Happy child school to Khirki vill. In S/Zone by dense carpetting.
EE(pr
) south
182/17.11.05/E
E(Pr)South
M/s Sanjeev Kumar & Bros.
Stg of road from A.P.J school to Happy Child School in Malviya Nagar by dense carpetting.
EE(pr
) south
182/17.11.05/E
E(Pr)South
M/s Sanjeev Kumar & Bros.
Stg of road from M.c pry School to L block Malviya nagar in South Zone by dense caretting.
EE(pr
) south
182/17.11.05/E
E(Pr)South
M/s Sanjeev Kumar & Bros.
5 Civil 8.6.05 7.5.05 449059.00 18.11.05 P 402845.00 In Prog.
6 Civil 8.6.05 7.5.05 458009.00 18.11.05 P 427504.00 In Prog.
7 Civil 9.6.05 28.5.05 199763.00 245/EE-IV M/s Jindal Builders 24.9.05 26.10.05 199763.00 Completed
8 Civil 9.6.05 28.5.05 199763.00 274/EE-IV M/s Arora Associ 6.9.05 15.10.05 199655.00 Completed
9 Civil 9.6.05 28.5.05 198888.00 M/s Neelam Const 24.8.05 28.11.05 198475.00 Completed
10 Civil 9.6.05 28.5.05 198881.00 M/s Bagga Builders 16.12.05 10.02.06 198629.00 Completed
11 Civil 9.6.05 28.5.05 199456.00 246/EE-IV M/s Jindal Builders 1.9.05 26.10.05 199456.00 Completed
12 Civil 9.6.05 28.5.05 199230.00 138/6.7.05 M/s Dinesh kumar 7.7.05 12.8.05 199058.00 Completed
13 Civil 9.6.05 28.5.05 199000.00 137/6.7.05 M/s Dinesh kumar 11.7.05 28.7.05 198829.00 Completed
14 Civil 9.6.05 28.5.05 199464.00 210/10.8.05 11.8.05 5.9.05 199464.00 Completed
15 Civil 10.6.05 20.5.05 471700.00 20.01.06 02.03.06 447446.00 Completed
Stg of road from E-109 to E-203 and from E-217 to E-299 in E block Greater Kailash -I South Zone by dense carpetting.
EE(pr
) south
182/17.11.05/E
E(Pr)South
M/s Sanjeev Kumar & Bros.
Stg of roads from Sr. Sec School to Malviya Nagar Mkt. Block No.80/23 to 80/332 , H-12 lane, and C-71 to PNB Malviya Nagr in south zone by dense carpetting.
EE(pr
) south
182/17.11.05/E
E(Pr)South
M/s Sanjeev Kumar & Bros.
Imp of back lane from HNO A-3 to B-26 , Swami Nagr W.No 12/SZ by pdg c.c. interlocking perfab pavers.
EE(pr
) south
Imp to back lane from A-4 to B-36 Swami Nagr inw.NO-12 south Zone by pdg c.c. interlocking Prafab pavers.
EE-IV
Imp to lane between park and Balmiki Bash Shahpur Jatt towards Panchsheel market w.no-12/ SZ by pdg c.c. pavement.
EE-IV
243/ EE-IV 23.8.05
Imp to lane ner HNO 118, DDA flats Shahpur jat in w.no-2 /SZ by pdg c.c pavement.
EE-IV
432/07.12.05/E
E-IV Imp to lane HNO 100 and Old chanpal, Shahpur jat vill w.no 12/SZ by pdg c.c.pavement.
EE-IV
Imp to lane near HNO 24, DDA flats, Shahpur jat W.No 12/SZ by pg c.c. pavement.
EE-IV
Imp to back lane from HNO E-77 to E-101 Greater Kailash-I W.No 12/SZ by pdg c.c. interlocking prefab pavers.
EE-IV
Imp to road berms infront of DAV School and park G block East of Kailash W.NO-12 /SZ by pdg c.c. interlocking prefab pavers.
EE-IV
M/s Sona Consultant & Constractor
P/L RMC front of Shiv Mandir towards Kasai Gate in chirag Delhi W.No 11/SZ
EE-IV
526/20.01.06/E
E-IV
M/s Chatter Singh Const.
16 Civil 10.6.05 20.5.05 259900.00 M/s Mangal Singh 17.03.06 24.04.06 181368.00 Completed
17 Civil 10.6.05 20.5.05 198240.00 186/29.7.05 18.7.05 1.9.05 196231.00 Completed
18 Civil 10.6.05 20.5.05 197464.00 166/18.7.05 M/s J.K Const Co. 13.9.05 16.10.05 197464.00 Completed
19 Civil 10.6.05 20.5.05 491300.00 525/EE-IV 20.01.06 06.03.06 470486.00 Completed
20 Civil 10.6.05 29.4.05 448800.00 M/s Ramkesh 05.01.06 14.02.06 367969.00 Completed
21 Civil 10.6.05 29.4.05 448100.00 17.11.05 14.02.06 364626.00 Completed
22 Civil 10.6.05 13.5.05 499600.00 15.11.05 14.02.06 408398.00 Completed
23 Civil 10.6.05 13.5.05 260700.00 M/s Pusp Const co 21.9.05 14.11.05 184329.00 Completed
24 Civil 10.6.05 13.5.05 465000.00 M/s Bagga Builders 03.01.06 10.06.06 239495.00 Completed
25 Civil 10.6.05 20.4.05 279900.00 08.02.06 P 158990.00 In Prog.
26 Civil 10.6.05 20.4.05 397600.00
27 Civil 13.6.05 11.6.05 499000.00 25.04.06 P 270211.00 In Prog.
28 Civil 13.6.05 11.6.05 461800.00 M/s Harit Kumar 24.02.06 P 278599.00 In Prog.
Const & raising of B/wall of the park near Balmiki Temple Chirag Delhi W.No-11 SZ
EE-IV
358/14.10.05/E
E-IV Imp to lane by c.c. from HNO 584 to 565 in chirag Delhi W.NO-11/SZ
EE-IV
M/s Kuldeep Const Co.
Imp to lane by c.c. in Khaliya Wala Mohalla chirag Delhi W.No-11/SZ
EE-IV
P/l RMC from Chirag Auto Mobiles towards Kasai gate wish S.W drain in Chirag Delhi W.no-11/SZ
EE-IV
M/s Chatter Singh Const.
Imp to Service road by RMc from HNO 90/77 to Dust Bin near Hospital at Malviya Nagr W.No-11/SZ
EE-IV
499/30.12.05/E
E-IV Imp to road by RMc from HNO 80/75 to M_84 at Malviya Nagar W.No-11/SZ
EE-IV
382/10.11.05/E
E-IV
M/s Smart Enginers & Cont.
Imp to Service road around Malviya park in A block by RMC at Malviya Nagr W.No-11/SZ
EE-IV
383/10.11.05/E
E-IV
M/s Smart Enginers & Cont.
Imp to lanes by c.c. near & around H NO 31,51,77, upto 144 at Hauz Rani W.no-11 S/Z
EE-IV
306/EE-IV 21.9.05
P/l interlocking tiles on road berm from HNI 122 to Secondary school Hauz Rani W.NO-11/SZ
EE-IV
426/02.12.05/EE-IV
P/L c.c. intrlocking tiles in the parking space near flat NO C-237 & B-139 in SFS flats Sheikh Sarai Ph-I W.No-11/SZ
EE-IV
509/02.01.06/E
E-IV
M/s Sharma Consts.
P/l c.c. interlocking tiles in the parking space ner flats no c-483 SFS flats seikh
Sarai PH_I W.NO 11/SZ
EE-IV
Imp to back lanes from HNO M-34 to 70 in G.K.I c-12/SZ by pdg c.c. interlocking prefab pavers.
EE-IV
656/10.03.06/E
E-IV
M/s Bagga Builders
Imp to park infront of F-101, East of Kailash in c-12/Sz by pdg M.S .Grill & Grat wash.
EE-IV
586/15.02.06/E
E-IV
29 Civil Pr(s) 15.7.05 15.7.05 86944.00 For PIO 86944.00 Completed
30 Civil 18.7.05 15.7.05 197474.00 06.12.05 P 197474.00 In Prog.
31 Civil 18.7.05 15.7.05 197425.00
Civil. 23.11.05 25.10.05 114664.00 10.05.06 15.05.06 114664.00 Completed
Civil. 23.11.05 25.10.05 108375.00 18.05.06 20.09.06 108375.00 Completed
32 Civil 16.02.05 05.11.05 674800.00 20.12.06 P 640434.00 In Prog.
33 Civil 16.02.05 05.11.05 679000.00 20.12.06 P 645909.00 In Prog.
34 Civil 16.02.05 05.11.05 676300.00 20.12.06 P 637186.00 In Prog.
35 Civil 16.02.05 05.11.05 666000.00 21.12.06 P 609826.00 In Prog.
36 Civil 16.02.05 05.11.05 679000.00 21.12.06 P 650794.00 In Prog.
37 Civil 16.02.05 05.11.05 190853.00 M/s J.K Const Co. 22.03.06 31.07.06 157908.00 Completed
38 Civil 16.02.05 05.11.05 196425.00 M/s J.K Const Co. 14.08.06 26.09.06 196425.00 Completed
Towards expences of PIO as per letter of Dy Dir. /Press & inf) dt 13.7.05 For NIT No-14/Dt 12.7.04) Imp /stg of road portion by dense carpetting on Geetanjali road infront of cblock Malyiya nagr W.NO-11/SZ
EE-IV
299/07.09.05/E
E-IV
M/s Sona Consultant & Constractor
I/s of road partion by dense carpetting on Geetanjali road front of Navjeevan vihar
W.No-11/SZ.
EE-IV
Addl.Booking
I/s road infront of cremination ground towards M.C school of Khirkhi by bitumen mastic in w.no-/52
EE-IV
657/10.03.06/E
E-IV
M/s Sona Consultant & Constractor
Addl.Booking
I/s road infront by bitumen mastic from Krishna Mandir to K-4 Malviya Nagr. C-11/SZ.
EE-IV
655/10.03.06/E
E-IV
M/s Sona Consultant & Constractor
I/s of T-Jugstion on road by bitween mastik in C-Block in on area of 1520 m2 at Malvi
Nagar W.No.11 S.Z
EE-IV
452/15.12.06/E
E-IV
M/s Sona Consultant & Constractor
I/s of Road and T-Jugstion by bitumen mastic in on area 1530 m2 from nil-53 to nil-35 and nil-4 to nil-20 at Malvi Nagar
W.NO-11 S.Z
EE-IV
454/15.12.06/EE-IV
M/s Sona Consultant & Constractor
I/s of T-jugstion and road front of H-Block Gurudwara by Bitumen mastic at Malviya
Nagar W.No-11 W.Z
EE-IV
453/15.12.06/EE-IV
M/s Sona Consultant & Constractor
I/s of road and T-jugstion by bitumen mastic front of Market Mandir and C-24 front at Geetanjali Enclave W.N-11 S.Z
EE-IV
456/15.12.06/EE-IV
M/s Sona Consultant & Constractor
I/s of T-jugstion of Navjewan Vihar by bitumen mastic on Geetanjali Road in
W.NO-11 S.Z
EE-IV
455/15.12.06/EE-IV
M/s Sona Consultant & Constractor
Imp. To S.W drain & Pdg. Inter locking tiles on road berms of road front of C-24
Geetanjali Enclave W.NO 11 S.Z
EE-IV
684/22.03.06/EE-IV
Pdg. Inter locking tiles on road berms and C.C in the lane front of H.NO 46 to 48 at
Navjeevan Vihar W.NO-11 S.Z
EE-IV
714/31.03.06/EE-IV
39 Civil 16.02.05 05.11.05 194421.00 12.04.06 30.05.06 157004.00 Completed
40 Civil 16.02.05 05.11.05 198215.00 17.04.06 30.05.06 195073.00 Completed
41 Civil 16.02.06 05.11.05 197563.00 12.04.06 10.06.06 195769.00 Completed
42 Civil 16.02.06 07.05.05 579700.00 18.07.06 08.09.06 475548.00 Completed
43 Civil 16.02.06 13.02.06 470000.00 M/s Jitender Kumar 13.06.06 14.09.06 270222.00 Completed
44 Civil 16.02.06 13.02.06 370000.00 26.07.06 22.09.06 223944.00 Completed
45 Civil 16.02.06 13.02.06 496700.00 M/s R.K Const. 18.07.06 18.09.06 283451.00 Completed
46 Civil 16.02.06 13.02.06 434200.00 M/s Ajay Associates 18.07.06 25.09.06 244084.00 Completed
47 Civil 16.02.06 13.02.06 479900.00 M/s Vijay Pal 29.09.06 18.09.06 275690.00 Completed
48 Civil 16.02.06 13.02.06 478800.00 M/s R.K Const. 18.07.06 18.09.06 276303.00 Completed
Pdg. CC inter locking tiles on road berms along Park Opp. H.NO. 57 at Navjeevan
Vihar in W.NO-11 S.Z
EE-IV
690/22.03.06/EE-IV
M/s Kuldeep Const Co.
Pdg. CC inter lockin tiles on road berms from Mkt. To H.NO.119 at Navjeevan Vihar
W.NO-11 S.Z
EE-IV
688/22.03.06/EE-IV
M/s Kuldeep Const Co.
P/L CC interlocking tiles on road berm from H.NO 16 to H.NO 64 at Navjeevan Vihar
W.NO-11 S.Z
EE-IV
01/12.04.06/EE-IV
M/s Kuldeep Const Co.
Reasing of B/wall with MS grill and Grit finishing of the park near B-34 at Geetanjli
Enclave W.no-11.SZ
EE-IV
105/12.06.06/EE-IV
M/s Kuldeep Const Co.
Imp to back lane from H.no. 59 to 65 in hem kund Colony in C-12 SZ by pdg CC
intelocking prefab pavers
EE-IV
104/12.06.06/EE-IV
Imp to back lane from H.NO. M-1 to M-31 in Greater Kailash I c-12 by pdg CC
interlocking prefab pavers
EE-IV
156/17.07.06/EE-IV
M/s Prakash Khanna
Imp to back lane from H.no 23 to 39A in East of Kailash in c-12 /SZ By pdg CC
interlocking prefab pavers
EE-IV
153/17.07.06/EE-IV
Imp to back lane from B-10 toB-18 and E-64 to E-74 G.K Enclave C-12 SZ by pdg
interlocking prefab pavers
EE-IV
155/17.07.06/EE-IV
Imp to back lane by pdg intrelocking tiles from H.NO 98 to 103 and h.NO 116 to 119
in F-block east of kailash C-12 SZ
EE-IV
106/12.06.06/EE-IV
Imp to back lane by pdg interlocking tiles from H.no 50 to 55 and H.NO 91 to 97 in
F-blcok east of Kailash C-12 SZ
EE-IV
154/17.07.06/EE-IV
Status Report of MLA,Smt Kiran Walia, AC No. 9 2005-06
S.No. Name of Work deptt. Div. Name of agency D.O.S D.O.C Expenditure
1 Civil 3.6.05 25.5.05 198782.00 13.08.05 22.09.05 198782.00 Completed
2 Civil 3.6.05 25.5.05 198880.00 20.08.05 25.08.05 198509.00 Completed
3 Civil 3.6.05 25.5.05 199160.00 09.03.06 27.03.06 196811.00 In Prog.
4 Civil 3.6.05 25.5.05 198980.00 09.03.06 27.03.06 195880.00 In Prog.
5 Civil 3.6.05 25.5.05 199109.00 14.07.05 13.08.05 198998.00 Completed
6 Civil 3.6.05 25.5.05 199044.00 M/s Radhey Shyam 13.08.05 02.12.06 195571.00 In Prog.
7 Civil 6.6.05 28.5.05 199173.00 30.07.05 28.08.06 196176.00 In Prog.
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Present Position
I/S of road by dense carpeting from C-1 to C-41, C-16 to C-8 and C-28 to C-25 in Hauz Khas C-14.
EE(pr
)
82/04.07.05/E
E(pr)South
M/s C.Parkash & Co.
I/s of roads by dense carpeting from D-26 to D-43 in Hauz Khas, C-14.
EE(pr
)
85/04.07.05/E
E(pr)South
M/s Asian Resurfacing of
Road Agg. Prt.Ltd.I/S of road by dense carpeting from E-1 to E-11 in Hauz Khas Market road ,C-14.
EE(pr
)
236/06.03.06/E
E(Pr)South
M/s Mukesk Associates Pvt.ltd.
I/S of roads by dense carpeting from E-24 to E-35 in Hauz khas Mkt in c-14
EE(pr
)
242/06.03.06/E
E(Pr)South
M/s Mukesk Associates Pvt.ltd.
I/s of road by dense carpeting from E-23 to E-12 Market road in Huaz khas C-14
EE(pr
)
87/04.07.05/E
E(pr)South
M/s Ram Karan Goyal
I/s of road by dense carpeting from E-36 to E-52 in Hauz khas Mkt. Road in C-14
EE(pr
)
88/04.07.05/EE(Pr.)South
Zone.
I/s of roads by dense Carpeting from P-1 to K-18 and from K-27 to K_20 in K and P block SDA in South Zone.
EE(pr
)
101/20.07.05/E
E(Br.)South
M/s Sona Consultant & Contracter
8 Civil 6.6.05 28.5.05 199225.00 09.03.06 22.03.06 197052.00 In Prog.
9 Civil 6.6.05 28.5.05 199045.00 14.07.05 13.08.05 199036.00 Completed
10 Civil 6.6.05 28.5.05 199272.00 M/s Radhey Shyam 26.10.05 P 195518.00 In Prog.
11 Civil 6.6.05 28.5.05 199289.00 27.10.05 P 197252.00 In Prog.
12 Civil 6.6.05 28.5.05 199143.00 13.08.05 P 197113.00 In Prog.
13 Civil 6.6.05 28.5.05 199044.00 21.03.06 07.04.06 196998.00 In Prog.
14 Civil 6.6.05 28.5.05 198846.00 M/s Echo Builders 05.09.05 07.09.05 196411.00 In Prog.
15 Civil 6.6.05 28.5.05 198880.00 19.09.05 20.09.05 198880.00 Completed
16 Civil 6.6.05 28.5.05 198700.00 14.07.05 13.08.05 198700.00 Completed
17 Civil 6.6.05 2.5.05 1918852.00 05.02.06 P 1907232.00 In Prog.
18 Civil 6.6.05 2.5.05 1756487.00 15.02.06 P 1751181.00 In Prog.
19 Civil 15.6.05 2.6.05 198559.00 9.8.05 31.8.05 198559.00 Completed
20 Civil 15.6.05 2.6.05 105692.00 22.02.06 28.03.06 105692.00 Completed
I/S of road by dense carpeting from K-62 to K-70 in K&P block SDA in South Zone.
EE(pr
)
237/06.03.06/E
E(Pr)South
M/s Mukesk Associates Pvt.ltd.
I/S of road by dense carpeting from P-8C to P-4/a and K-29 to K-36 in K&P block SDA in SZ
EE(pr
)
91/04.07.05/E
E(pr)South
M/s Ram Karan Goyal
I/s of road by dense carpeting from H.No K-120 ti Kalilashpati Mandir in K&P block SDA in South Zone.
EE(pr
)
92/04.07.05/E
E(pr)South I/S of roads from K-17 to K-8 upto P-1 in K& P block SDA in south Zone
EE(pr
)
99/20.07.05/EE(Pr)South
M/s Competent Const.Co.
I/S of roads by dense carpeting from H.NO K-81 to K-85 and K-1 to K-8 in K& P block SDA in Wouth Zone.
EE(pr
)
93/04.07.05/EE(Pr)South
M/s Sanjeev Kumar & Bros.
I/s of road by dense carpeting from H.No K-80 to K-70 and from K-94 to K-101 in K&P block SDA in South Zone.
EE(pr
)
295/27.03.06/E
E(Pr)South
M/s Mukesk Associates Pvt.ltd.
I/s of road farom K-85 to K-120 in K&P block in South Zone
EE(pr
)
105/01.08.05/E
E(pr)South I/s of road by dense carpeting from H.No 29 and from Gate NO.1 to H.No 2 in C-5 block SDA in South Zone.
EE(Iv
)
83/04.07.05/E
E(pr)South
M/s C.Parkash & Co.
I/s of road by dense carpeting from H.No 28 to 12 in C-5 block SDA in South Zone .
EE(Iv
)
94/EE(pr)Sout
h
M/s Ram Karan Goyal
I/s of internal roads of Green park in C-13/South Zone
EE(Iv
)
218/06.02.06/E
E(Pr.)South
M/s Sanjeev Kumar & Bros.
I/S of intrnal roads of Green park in c-13/SZ
EE(Iv
)
218/06.02.06/E
E(Pr.)South
M/s Sanjeev Kumar & Bros.
Imp to street/ lane by preo c.c. from H.No 151 to near Dustbin in Kumhar Basti Mohammadpur C-13
EE(Iv
)
201/ EE-IV/8.8.05
M/s Dwarka Prasand Goyal
Imp to street/ lane by pg c.c. from 112 D to D-102 & H.No 14 to H.No 18 in Mohammadpur in c-13
EE(Iv
)
591/22.02.06/E
E-IV
M/s Kuldeep Const.Co.
21 Civil 15.6.05 2.6.05 122223.00 M/s Dinesh Kr 14.7.05 27.7.05 121554.00 Completed
22 Civil 15.6.05 2.6.05 58050.00 M/s Suni l Kr 11.10.05 14.12.05 58050.00 Completed
23 Civil 15.6.05 2.6.05 97012.00 M/s Jindal Builders 23.8.05 29.10.05 97012.00 Completed
24 Civil 15.6.05 2.6.05 194998.00 09.12.05 08.03.06 194998.00 Completed
25 Civil 15.6.05 2.6.05 334427.00 M/s Ravi Gupta 21.11.05 27.12.05 334427.00 Completed
26 Civil 15.6.05 2.6.05 253196.00 M/s Mahender Kr 23.9.05 3.12.05 253196.00 Completed
27 Civil 14.7.05 13.7.05 86944.00 for PIO 86944.00 Completed
28 Civil 20.11.05 18.8.05 166269.00 M/s Sachin Gupta 09.03.06 19.04.06 166269.00 Completed
29 Civil 20.11.05 18.8.05 147251.00 28.04.06 27.07.06 147251.00 Completed
30 Civil 20.11.05 18.8.05 102926.00 19.06.06 P 96656.00 In Prog.
31 Civil 20.11.05 18.8.05 145935.00 M/s Sachin Gupta 31.03.06 07.08.06 145027.00 Completed
32 Civil 20.11.05 18.8.05 310419.00 27.04.06 09.06.06 309890.00 Completed
33 Civil 20.11.05 18.8.05 259545.00 10.03.06 17.06.06 259545.00 Completed
Imp to park by pdg walkway with interlocking pavers near H.No A-1/280 in Safdarjung Enclave in c-13/SZ
EE(Iv
)
156/EE-IV 18.7.05
Imp of B/wall of park near Parmaratha Mandir Krishna Nagar in c-13
EE(Iv
)
350/EE-Iv 11.1.05
Imp to street/lane by pdg c.c. in main Market Mohammad pur village in c-13
EE(Iv
)
249/ EE-Iv 23.8.05
Imp to street/lane by prov precast RCC slab cover from B-10 to A-14 A & A-15 to M-15 in Green park ( main) in C-13/SZ
EE(Iv
)
425/02.12.05/E
E-IV
M/s Bagga Builders
Imp to park by pdg dividing wall & walkway with intrlocking pavers near H.No B-6/11 Extn. In Sajdarjung Enclave in c-13/SZ
EE(Iv
)
406/ EE-IV 21.11.05
Imp to B/wall of park near B-2/45 J.J Enclave by Grit wash in C-13/SZ
EE(Iv
)
307/EE-IV 23.9.05
Towards expences of PIO as per letter of Dy Dir ( press & Inf) dt 13.7.05 ( for NIT 13/dt 12.7.05
EE(Iv
) Deve of street / lane by RMC from S-1 to S-6to S-10 in Green park Extn. C-13/SZ
EE(Iv
)
628/09.03.06/E
E-IV Const of B/wall of park near C-10 in Green park Extn in C-13 S/Z
EE(Iv
)
29/28.04.06/E
E-IV
M/s Jitender Kumar
Const of B/wall of park near C-10 in Green park with Grit wash near flat No BE-9 in DDA Flats Munirka in C-13 S/Z
EE(Iv
)
629/09.03.06/E
E-IV
M/s Chowker Const.Co
Dev of road side parking by prov interlocaking pavers infront of B-4/41 in S.J. Enclave in C-13/SZ
EE(Iv
)
708/31.03.06/E
E-IV Dev of footpath by red Sand stone flooring from Y-14 A to R-1 in Green park in C-13/SZ
EE(Iv
)
25/27.04.06/E
E-IV
M/s Bansal Enterprises
Dev of road side parking by prov interlocking pavers near B-4/89/ in S.J. Enclave in C-13/SZ
EE(Iv
)
636/10.03.06/E
E-IV
M/s Vinod Const.Co
34 Civil 20.11.05 18.8.05 375373.00 17.03.06 12.01.07 375373.00 Completed
35 Civil 2.11.05 18.8.05 399883.00 10.03.06 06.09.06 399883.00 Completed
36 Civil 2.11.05 18.8.05 403523.00 18.03.06 20.09.06 403070.00 Completed
37 Civil 2.11.05 18.8.05 190351.00 10.07.06 P 190269.00 In Prog.
38 Civil 2.11.05 18.8.05 230459.00 M/s M.K.Enterprises 10.03.06 10.05.06 230459.00 Completed
39 Civil 2.11.05 18.8.05 126584.00 M/s Jitender Kumar 19.05.06 P 126450.00 In Prog.
40 Civil 2.11.05 18.8.05 83487.00 19.06.06 P 44427.00 In Prog.
41 Civil 2.11.05 18.8.05 180791.00 10.03.06 23.05.06 180568.00 Completed
42 Civil 2.11.05 18.8.05 328343.00 23.04.06 28.06.06 312977.00 Completed
43 Civil 18.11.05 8.11.05 199206.00 17.02.06 P 196029.00 In Prog.
44 Civil 18.11.05 8.11.05 199681.00 206/23.01.06/ 23.01.06 28.03.06 199525.00 Completed
45 Civil 18.11.05 24.10.05 198128.00 25.02.06 01.04.06 196128.00 In Prog.
Dev. Of street/lane by prov RMc from 138 B Mohammed pur to Afrika Avenue Marg in C-13/SZ
EE(Iv
)
634/10.03.06/E
E-IV
M/s R.S Sirasiya Const.Co
Dev. Of street/lane by RMC from S-20 to R-10 in Green park in C-13/SZ
EE(Iv
)
638/10.03.06/E
E-IV
M/s R.S Sirasiya Const.Co
Dev of street/ lane by park RMC from B-2/101 D to ST Mery School in S.J. Enclave in c-13/SZ
EE(Iv
)
635/10.03.06/E
E-IV
M/s R.S Sirasiya Const.Co
Dev of back lane by interlocking pavers from K-34 to E-18 in Green park in C-13/SZ
EE(Iv
)
625/09.03.06/E
E-IV
M/s Bansal Enterprises
Dev of street/ lane by park RMC from K-41 jto K_47 & K_54 to K-60 in Green park in C-13/SZ
EE(Iv
)
633/10.03.06/E
E-IV Const of B/wall of park with R/R Masonary near H-45 in Green park Extn. In C-13/SZ
EE(Iv
)
624/09.03.06/E
E-IV Const of B/wall of park with Grit wash along side of Nala behind MCD store in Green park Extn. In C-13/SZ
EE(Iv
)
623/09.03.06/E
E-IV
M/s Chowker Const.Co
Const of B/wall of park with Grit wash along side of Nala Digamber Jain Mandir in Green park Extn. In C-13/SZ
EE(Iv
)
652/10.03.06/E
E-IV
M/s Bansal Enterprises
Deve of road side parking by RMC in various lanes in R& S block near S-20 green park in C-13/SZ
EE(Iv
)
27/28.04.06/E
E-IV
M/s R.K.Construction
I/S of road by dense carpeting from C-6/53 ti H.no-15 in K&P block SDA in south Zone
EE(pr)Sout
h
209/23.01.06/E
E(pr)South
M/s Sanjeev Kumar & Bros.
Const of outfall to open surface drain behind DPP School in B-4 Safdarjung Enclave in South Zone
EE(pr)Sout
h
M/s Ganpati Const.Co
I/s of road by dense carpeting from C-5/44 to c-6/54 in SDA in South Zone
EE(pr)Sout
h
227/24.02.06/E
E(Pr)South
M/s Mukesk Associates Pvt.ltd.
46 Civil 18.11.05 8.11.05 198128.00 20.02.06 P 196128.00 In Prog.
47 cse 8.12.05 8.8.05 543599.00 M/s J.P Saini 31.05.06 06.07.06 541711.00 Completed
48 cse 8.12.05 8.8.05 130144.00 M/s Sai Enterprises 20.08.06 04.09.06 130144.00 Completed
49 cse 8.12.05 8.8.05 313672.00 18.07.06 19.08.06 234047.00 Completed
50 cse 8.12.05 8.8.05 182000.00 M/s Virendra Singh 05.10.06 20.10.06 169373.00 Completed
51 cse 8.12.05 8.8.05 149000.00 24.07.06 01.09.06 119098.00 Completed
52 Civil 17.03.06 09.03.06 199346.00 21.08.06 21.08.06 197001.00 In Prog.
53 Civil 17.03.06 09.03.06 199021.00
54 Civil 17.03.06 09.03.06 199501.00 23.06.06 24.06.06 198903.00 Completed
55 Civil 17.03.06 09.03.06 198712.00 22.03.06 11.04.06 196367.00 In Prog.
56 Civil 17.03.06 09.03.06 198932.00 03.04.06 P 195654.00 In Prog.
57 Civil 17.03.06 09.03.06 198601.00 01.04.06 P 198489.00 In Prog.
58 Civil 17.03.06 10.03.06 199655.00 22.03.06 11.04.06 195100.00 In Prog.
I/s of road by dense carpeting from C-5/36 to C-5/44 in SDA, South Zone
EE(pr)Sout
h
210/23.01.06/E
E(pr)South
M/s Sanjeev Kumar & Bros.
Dev of drian in DDA flat Munirka along street "B" from outer Ring road to culvert
near park on Marg "c" in w.no-13/*SZ
EE-CSE-IV SZ
67/16.01.06/C
SE-IV Dev. Of Arjun Nagr Nallah near Delhi
Police Public School on Harsukh Marg in w.no-13/SZ
EE-CSE-IV SZ
93/20.03.06/EMS-IV
Dev of drian from BE-10 A to BE -5 in DDA flats Munirka in W.No-13/SZ
EE -IV
69/07.07.06/EMS-IV
M/s Anoop Const.CO
Dev of drain from C-2/58 SDA to Arbindo Marg Drain in W.No 13/SZ
EE -IV
72/07.07.06/EE (DEMS)
Reconst /Remodelling of Urinal as Urinal Cum toilet village opp F-128 in
Mohammadpur village I W.No-13/SZ
EE -IV
94/20.03.06/CSE-IV
M/s Pooja Enterprises
I/s of road by dense carpetting from B-4/229 to B-4/70 and B-4/62 to B-4/69 in
Safdarying Enclave in C-13/SZ
EE(Pr.)Sout
h
319/31.03.09/EE(Pr.)South
M/s Mukesk Associates Pvt.ltd.
I/s of road by dence carpetting from C-2/11 to C-2/1 in SDA in C-13/SZ
EE(Pr.)Sout
hI/s of road by dence carpetting from C-2/62 to C-2/38 upto -2/45 in SDA in C-13/SZ
EE(Pr.)Sout
h
324/31.03.06/EE(Pr.)South
M/s Mukesk Associates Pvt.ltd.
I/s of raod by dence carpetting from G-1 to G-16 in Hauz Khas in C-14/SZ
EE(Pr.)Sout
h
323/31.03.06/EE(Pr)South
M/s Mukesk Associates Pvt.ltd.
Imp to berm by interlocking tiles from H.NO 2/33 to 1/13 and lane along H.NO 2/16 in Sarvapriya in C-14/SZ
EE(Pr.)Sout
h
314/31.03.06/EE(Pr)South
M/s Pushpa Const.Co
Imp to berm by interlocking tiles from H.no -12 to 28 in C-5 block SDA in C-13/SZ
EE(Pr.)Sout
h
313/31.03.06/EE(Pr)South
M/s Kuldeep Const.Co.
I/s of roads from G-48 to G-56 in Main market road of Green park in C-13/SZ Pdg dense carpetting
EE(Pr.)Sout
h
322/31.03.06/EE(Pr)South
M/s Mukesk Associates Pvt.ltd.
59 Civil 17.03.06 10.03.06 198866.00 22.08.06 22.08.06 196671.00 In Prog.
60 Civil 17.03.06 10.03.06 199192.00 19.08.06 P 147969.00 In Prog.
61 Civil 17.03.06 10.03.06 199501.00 23.03.06 11.04.06 195998.00 In Prog.
62 Elect 31.03.06 02.02.06 200025.00 12.05.06 24.05.06 194958.00 Completed
63 Elect 31.03.06 02.02.06 200949.00 12.05.06 04.06.06 193660.00 Completed
64 Elect 31.03.06 02.02.06 200868.00 12.05.06 24.05.06 195916.00 Completed
65 Elect 31.03.06 02.02.06 201055.00 12.05.06 18.06.06 194776.00 Completed
66 Elect 31.03.06 02.02.06 191034.00 23.06.06 24.07.06 185053.00 Completed
67 Elect 31.03.06 10.02.06 206524.00 15.06.06 27.06.09 198943.00 Completed
68 Elect 31.03.06 10.02.06 205815.00 18.06.06 15.07.09 198549.00 Completed
69 Elect 31.03.06 10.02.06 206997.00 19.06.06 P 185726.00 In Prog.
70 cse 31.03.06 08.08.05 288657.00 M/s Shobi Builders 30.10.06 02.12.06 213354.00 Completed
71 cse 31.03.06 08.08.05 157448.00 21.08.06 19.09.06 106819.00 Completed
72 cse 31.03.06 08.08.05 148960.00
I/s of road by dense carpetting from B-6/110 to NCC Bhawan in B-6 safdarying enclave in C-13/SZ
EE(Pr.)Sout
h
325/31.03.06/EE(Pr.)South
M/s Mukesk Associates Pvt.ltd.
I/s of road by dense carpetting from G-18 to G-30 in Green park C-13 SZ
EE(Pr.)Sout
h
321/31.03.06/EE(Pr.)South
Zone.
M/s Mukesk Associates Pvt.ltd.
I/s of road from P-1 to P-12 in K & P Block SDA in C-13/SZ SH:-pdg dense carpetting
EE(Pr.)Sout
h
320/31.03.06/EE(Pr)South
M/s Mukesk Associates Pvt.ltd.
Prov of street lighting arrangment in safdarying Dev Area C-1,C-2,C-4,C-6,C-7 under SZ
EE(E)-IV
42/10.05.06/EE-IV
M/s Sushma Electriclas
Prov of street lighting arrangment in Nili Bagh Uday park Masjid Moth Gulmohar park under SZ
EE(E)-IV
44/10.05.06/EE(E)-IV
M/s Akansha Electriclas
Prov of street lighting arrangment in Arjun Nagar, green Park, Hemayapur S.J Enclave under SZ
EE(E)-IV
43/10.05.06/EE(E)-IV
M/s Sushma Electriclas
Prov of street lighting arrangment in Gautam Nagar Hauj Khas Appartmant, Hauj Khas Enclave under SZ
EE(E)-IV
45/10.05.06/EE(E)-IV
M/s Pragati Engineers
Prov of lighting arrangment in park Hauj Khas Appartmant under SZ
EE(E)-IV
78/21.06.06/EE(E)-IV
M/s M.J Electricals & Electronics
P/o Sami high mast light at T.point of Arunido marg and Hauj Khas marg under sz
EE(E)-IV
73/13.06.06/EE(E)-IV
M/s Sushma Electriclas
P/o sami high street light at T.point Anudo marg and Church road to Hauj Khas village under SZ
EE(E)-IV
72/13.06.06/EE(E)-IV
M/s Chandra Electrical Contractor
& BuilderP/o sami high Mast light at T.point of Arundo marg and Houj Khas Appartment under SZ
EE(E)-IV
74/14.06.06/EE(E)-IV
M/s Perfect Electric Works
Dev of drain opp. Adya Jha Hospital to Arbindo Mang drain in SDA in W.No 13/SZ
CSE-IV
80/31.08.06/EMS-IV
C/o urinal cum tiolte near colverd of Arjun Nagar Nallah in W.no 13/SZ
CSE-IV
74/17.07.06/DEMS-IV
M/s Anoop Const.CO
Reconst /Remodelling of Urinal cum toilte near bus stand Green Park W.No 13/SZ
CSE-IV
73 Elect 31.03.06 10.02.6 209233.00 15.08.06 10.09.06 203956.00 Completed
Status Report of MLA,Smt Barkha Singh, AC No. 10 2005-06
S.No. Name of Work deptt. Div. Name of agency D.O.S D.O.C Expenditure
P/O lighting arrangement at park C-4, C-5, C-7 S.D Apartment w.no.13 South Zone.
EE(E)-IV
92/14.08.06/EE(E)-IV
M/s Sushma Electriclas
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Present Position
1 Civil 3.6.05 26.4.05 199827.00 M/s Echo Buildrs 08.09.05 P 197827.00 In Prog.
2 Civil 3.6.05 26.4.05 199250.00 30.07.05 P 197203.00 In Prog.
3 Civil 3.6.05 26.4.05 198950.00 08.03.06 P 196645.00 In Prog.
4 Civil 3.6.05 26.4.05 198356.00 27.03.06 12.04.06 196230.00 In Prog.
5 Civil 3.6.05 26.4.05 199952.00 08.11.05 10.11.05 197215.00 In Prog.
6 Civil IV 10.6.05 12.5.05 198935.00 M/s Dinesh Kr. 15.7.05 30.9.05 192957.00 Completed
7 Civil IV 3.6.05 26.4.05 199234.00 19.8.05 15.9.05 193325.00 Completed
8 Civil IV 3.6.05 26.4.05 163332.00 M/s Satish Kr. 25.7.05 7.9.05 158443.00 Completed
9 Civil IV 10.6.05 12.5.05 145888.00 1.9.05 28.9.05 141498.00 Completed
10 Civil IV 10.6.05 12.5.05 186937.00 M/s Arora Ass. 03.12.05 27.01.06 186600.00 Completed
11 Civil IV 10.6.05 12.5.05 198258.00 19.8.05 16.9.05 192384.00 Completed
I/s of roads by dense carpeting from toilet block near market to flat 293 in secr.2 R.K.
Puram,c-15/SZ
EE(pr)Sout
h
104/01.08.05/E
E(pr)South
I/s of roads by dense carpeting from Grah Kalyan Kendra to flat NO-1085 in Sect-2
R.K. Puram c-15/52
EE(pr)Sout
h
98/20.07.05/E
E(pr)South
M/s Competent Const.Co
I/S of roads by dense carpeting from flat no-1 to flat no 1227 in sec. 2 R,K, Puram
EE(pr)Sout
h
239/06.03.06/E
E(pr)South
M/s Mukesh Associates
I/s of roads by dense carpeting from flat No-84 to flat no 47 and from flat no 201 to
240 in Munirka Vihar C-16
EE(pr)Sout
h
297/27.03.06/E
(Pr)South
M/s Mukesh Associates Pvt.Ltd.
I/s of roads by dense carpeting from flat no 70 to flat No-1 and from flt no 47 to shop
No-9 in Munirka vihar in C-16
EE(pr)Sout
h
100/20.07.05/E
E(r.)South
M/s Sona Consulatant & Cont
Imp of road from H.No 30 to H.No 43 & shop No-23 to 90 by P/L R.Mc in Vasant
village in w.No 16/SZ
139/EE-IV/6.7.
05 Imp of road from H.No 75 to 79 A & H,No 61 to 59 by P/l RMc in Vasant village in c-
16
200/EE-IV/8.8.
05
M/s Dwarka Parsad Goyal
Imp of road from H.No 121 c to h.No 98 & H.No 687 A to H.No 585 by P/l R.Mc in
Munirka village in c-16
154/EE-IV/18.7
.05 Imp of road from H.No 205 E to Shop no 2 V-211 by P/L R.Mc in Munirka village in C-
16
194/EE-IV /3.8.05
M/s Kuldeep Const Co
Imp of road from H.No E-107 to H.No 211 D by pdg & laying RMc in Munrika village
in C-16
414/28.11.05/E
E-IV Imp of road from H.NO 109 to kenra Bank Street by P/l RMc in Munirka village in C-
16
211/EE-IV/10.8
.05
M/s Sona Consulatant & Cont
12 Civil IV 10.6.05 12.5.05 193505.00 M/s Neelam Const 7.11.05 5.12.05 193014.00 Completed
13 Civil IV 10.6.05 12.5.05 198980.00 M/s Neelam Const 05.01.06 28.03.06 193008.00 Completed
14 Civil IV 10.6.05 12.5.05 190373.00 M/s Jindal Builder 2.9.05 16.11.05 184828.00 Completed
15 Civil 22.6.05 6.6.05 190222.00 M/s Neelam Const 23.8.05 14.9.05 190089.00 Completed
16 Civil 22.6.05 6.6.05 490800.00 08.12.05 27.01.06 354735.00 Completed
17 Civil 22.6.05 6.6.05 193400.00
18 Civil 22.6.05 6.6.05 196213.00 M/s Pappu Seth 08.10.05 06.03.06 196213.00 Completed
19 Civil 22.6.05 6.6.05 97085.00 07.11.05 21.01.06 97085.00 Completed
20 Civil 20.7.05 6.6.05 199501.00 14.12.05 28.12.05 199501.00 Completed
21 Civil 22.6.05 6.6.05 198535.00 5.10.05 26.10.05 197454.00 Completed
22 Civil 20.7.05 15.7.05 199857.00 M/s Puppu Seth 30.8.05 20.9.05 199857.00 Completed
23 Civil 20.7.05 15.7.05 193563.00 M/s Harshit Jaggi 29.9.05 29.10.05 189000.00 Completed
24 Civil 20.7.05 15.7.05 193174.00 30.8.05 15.9.05 193174.00 Completed
25 Civil 20.7.05 15.7.05 195630.00 27.09.05 15.12.05 195630.00 Completed
P/l RMc in lane from H.No 113/6 Baba Ganj Nath Mkt to shop No 69 A in Munrika
village in C-16
376/ EE-Iv /7.11.05
Imp of road from H.No 30 to H.No 149 & shop NO-164 to H.No 154 by P/L RMc in
Vasant village in W./No 16
510/05.01.06/EE-IV
Imp of road from H.NO 180 to shop No 108 by P/L RMC in Vasant village in w.no C-16
248/ EE-IV 23.8.05
Imp of back lane between H.No D-91 to d-94 & behind d-83 to D-90 by RMc in Anand
Niketan C-15
EE-IV
196/EE-IV/8.8.
05 Const of B/wall of park opp c-83 with Red Sand stone & grill in Anand Biketan c-15
EE-IV
403/21.11.05/E
E-IV
M/s Vinod Enterprises
Imp of back lane from H.No G-8 to g-14 by RMc in Anand Niketan C-15
EE-IV
Imp of back lane from H.No C-1 to c-10 & C-19 to c-26 ,26 by P/L RMC in anand
Niketan c-15
EE-IV
282/05.09.05/E
E-IV Const of storem Water drain faorm H.,No 235 to Nballah in Sec -8, R.K. Puram c-15
EE-IV
215/10.08.05/E
E-IV
M/s B.M.B Enterprises
Imp of road along Mother Dariy South Moti Bagh Mky by pg laying RMc ion c-15
EE-IV
438/07.12.05/E
E-IV
M/s Bagga Builders
Imp of open Area along south Moti Bagh Mkt ( back side ) in c015/SZ by RMC
EE-IV
339/EE-IV 4.1.05
M/s Sona Consulatant & Cont
Const of foot path by P/L Kerb Stone & interlocking tiles along road behind RBI colony in Sec-6 R.K.Puram in c-15/Sz
EE-IV
259/ EE_IV 29.8.05
Const of strom water drain along park opposite in Sec 12 R,K, Puram in C-15/SZ
EE-IV
320/ EE-IV/23.9.05
Const of wall along drain from H.No 299 to DJB office G block Nanakpura C-15/SZ
EE-IV
294/EE-Iv /7.9.05
M/s Dwarka Parsad goyal
Imp of drainage System of road infront of Mkt Sec -12 R,K, Puram c-15/SZ
EE-IV
298/07.09.05/E
E-XXIV
M/s Sona Consulatant & Cont
26 Civil 21.7.05 15.7.05 320700.00 17.10.05 11.11.05 257012.00 Completed
27 Civil 27.7.05 15.6.05 175000.00 7.9.05 15.9.05 175000.00 Completed
28 Civil 9.8.05 8.8.05 96000.00 4.10.05 21.10.05 95392.00 Completed
29 Civil 10.8.05 9.7.05 189723.00 M/s Arora Ass. 28.10.05 15.02.06 186538.00 Completed
30 Civil 10.8.05 9.7.05 240200.00 05.01.06 27.03.06 148179.00 Completed
31 Civil 10.8.05 9.7.05 188755.00 16.11.05 19.12.05 185431.00 Completed
32 Civil 3.10.05 26.9.05 198339.00 09.11.05 10.11.05 198339.00 Completed
33 Civil 3.10.05 26.9.05 198700.00 09.11.05 10.11.05 198700.00 Completed
34 cse 4.10.05 16.9.05 150209.00 26.05.06 27.07.06 124720.00 Completed
35 cse 4.10.05 16.9.05 150209.00 08.05.06 07.07.06 124468.00 Completed
36 cse 4.10.05 16.9.05 150209.00
37 Civil 4.10.05 30.9.05 198915.00 23.01.06 08.03.06 198915.00 Completed
38 Civil 4.10.05 30.9.05 181340.00 M/s A.K. const 3.11.05 5.12.05 179664.00 Completed
39 Civil 4.10.05 30.9.05 192970.00 19.11.05 18.01.06 192933.00 Completed
Const of walkway with c.c. Kerb stone and Red Stone in park opp Kerala School in
Sec -8 R.K.Puram C-15
EE-IV
340/EE-Iv /4.10.05
M/s Hawka Const co
P/L R.M.C on lane from H.No 378 to H.No 18 A in Vasnat Enclave ( Janta flat) in c-
16/SZ
EE-IV
293/EE-IV/7.9.
05
M/s Dwarka Parsad Goyal
P/L C.C. pavement on parking space in front of Tammana School Vasant Vihar in
C-16
EE-CSE-
IV
333/EE-IV/4.10
.05
M/s Ganpati Const Co
Imp of parking area by P/L RMc opp. Mkt sec-12 R.K. Puram C-15
EE-IV
374/EE-IV 24.10.05
Const of walkway with C.C Kerb Stone & Red Sand stone in park front of H.No 4/20
in Shanti Niketan c-15
EE-IV
472/27.12.05/E
E-IV
M/s Nidhi Construction Co.
P/L RMC open area along park opp Mkt sec-12 R.K. Puram C-15
EE-IV
388/14.11.05/E
E-IV
M/s B.M.B Enterprises
I/s of road by dense carpeting farom H.NO 75 to H.NO 19 through H.NO 10 in Vasant
Enclave in C-16/SZ
EE-IV
169/31.10.05/E
E(pr)South
M/s Asian Resurfacing Pvt.Ltd.
I/s of road by dense carpeting farom H.NO 961 to Holy Chield School and its
approach in sector -12 R.K. puram in C-15/S.Zone
EE-IV
170/31.10.05/E
E(Pr)South
M/s Asian Resurfacing Pvt.Ltd.
Const of Urinal block in Sctor-7 Mkt NO-2 R.K. Puram in W.No 15/S.Z
EE-IV
104/24.03.06/CSE-IV
M/s Ravindra Builders
Const of Urinal block in sector -8 Mkt R.K. Puram in W.no 15/SZ
EE-IV
105/24.03.06/EE-IV
M/s B.L Sharma & Co.
Const of Urinal block in sector -9 Mkt R.K.Puram in w.No 15/SZ
EE-IV
Imp of road by P/L RMC infront of shop No 17 & sho NO-5 in sector -3 R.K. Puram Mkt
in C-16/SZ
EE-IV
536/23.01.06/EE-XXIV
M/s Sona Consulatant & Cont
Imp of road by P/l RMC infront of shop No 24 & near Shop No-5 in Sector-3 R.K
puram
EE-IV
373/ EE-IV 24.10.05
Imp of road by P/l RMC infront of Shop No-13 and near park in sector -3 R.K. Puram
Mkt in c-16/SZ
EE-IV
379/10.11.05/EE-IV
M/s Ganpati Const Co
40 cse 5.10.05 16.9.05 154992.00 M/s Shobi Builder 29.08.06 12.10.06 137913.00 Completed
41 Civil EE-IV 21.10.05 19.9.05 244600.00 M/s Vijey Pal 15.05.06 03.07.06 161742.00 Completed
42 Civil 21.10.05 19.10.05 145435.00 M/s A.K. const 13.01.06 10.03.06 145435.00 Completed
43 Civil 2.11.05 18.8.05 198700.00 07.03.06 P 196219.00 In Prog.
44 Civil 18.11.05 8.11.05 199450.00 M/s Echo Buildrs 04.01.06 06.01.06 197376.00 In Prog.
45 Civil 18.11.05 8.11.05 178439.00 13.12.05 30.12.05 178439.00 Completed
46 Civil 18.11.05 24.10.05 182396.00 20.03.06 19.05.06 141579.00 Completed
47 Civil EE-IV 23.11.05 21.11.05 199590.00 04.10.06 23.10.06 199590.00 Completed
48 Civil EE-IV 23.11.05 21.11.05 199488.00 M/s Ajay Associates 07.09.06 14.10.06 199488.00 Completed
49 Civil EE-IV 28.11.05 23.11.05 198583.00 24.02.06 11.03.06 198583.00 Completed
50 Civil EE-IV 28.11.05 23.11.05 198894.00 M/s Harishi Joggi 04.04.06 28.04.06 198884.00 Completed
51 Civil EE-IV 17.1.05 15.12.05 189887.00 M/s Dinesh Kr. 15.02.06 07.03.06 189887.00 Completed
52 Civil EE-IV 17.1.05 15.12.05 193413.00 22.02.06 07.03.06 193413.00 Completed
53 Civil EE-IV 17.1.05 15.12.05 174992.00 24.02.06 22.03.06 173821.00 Completed
Const of Urinal block in Nanak Pura Mkt.in w.no-15 S.Z
EE-CSE-
IV
68/07.07.06/EE-IV
Const of walkway in park front of H.NO D-91 in Anand Niketan Stone & Red Sand
stone.
44/28.04.06/EE-IV
Imp of road byP/l RMC from Venkateswar road to Church road in R.K. Puram
C-15/CLZ
EE(-IV
511/05.01.06/EE-IV
I/s of road by dense carpeting from H.NO 1058 to CPWD Enquary in Sect. 12 in R.K.
Puram in C-15/SZ
EE(Pr) S-IV
238/06.03.06/EE(Pr)South
M/s Mukesh Associates
I/S of road by dense Carpeting from H.No 210 to H.NO 198 and from H.NO 245 to gate No-13 in Vasant Enclave in c-16/SZ
EE(Pr) S-IV
196/29.12.05/EE(pr)South
Imp of labe by P/l interlocking tiles infornt of H.No 381 to 505 in R,K, Puram Sec-2
under S.Z W.No-=-16
EE(-IV)
453/EE-IV 13.12.05
M/s Ganpati Const Co
Rasing & Stg of Boundary wall of park infront of flat No 107 in Munirka Enclave C-
16 S.Z
EE(-IV)
639/10.03.06/EE-IV
M/s Bansal Enterprises
Imp of road from by P/L RMC post office to Civil Enguiry in Sec -8 , R.K. Puram C-
15/SZ
308/27.09.06/EE-IV
M/s B.M.B Enterprises
Imp of Park area by P/L RMC along Mkt sec-9 R.K. Puram C-15/SZ
260/05.09.06/EE-IV
P/l RMC on road along shop No.8 to 28 in sec -1 R.K. Puram in C-15/SZ
552/31.01.06/EE-IV
M/s Kuldeep Const Co
Imp of road by P/L RMC front of Khalsa Restaurent sec-I R.K. Puram C-15/SZ
711/31.03.06/EE-IV
Const of B/wall of park front of H.No 5/10 in Shanti Niketan C-15/SZ
581/15.02.06/E-IV
P/L RMC on road along H.No 3/39 in Shanti Niketan C-15/SZ
590/22.02.06/EE-IV`
M/s Kuldeep Const Co
Const of walkway in park front of H.No D-98 hy P/f C.C. kerb stone and interlocking tiles in Anand Biketan C-15/SZ in Anand
Niketan Stone & Red Sand stone.
589/22.02.06/EE-IV
M/s Kuldeep Const Co
54 Civil 02.03.06 28.02.06 197924.00 08.05.06 P 192854.00 In Prog.
55 Civil 02.03.06 28.02.06 197135.00 21.06.06 P 196988.00 In Prog.
56 Civil 17.03.06 28.02.06 198712.00 20.04.06 24.04.06 195687.00 In Prog.
57 Civil 17.03.06 28.02.06 199175.00 20.06.05 P 198993.00 In Prog.
I/s of road by dense carpeting from Africa Avenue to water Takan in sector-3 R.K
Puran C-15/SZ
EE(Pr.)Sout
h
329/31.03.06/EE(Pr.)South
M/s Mukesh Associates Pvt.Ltd.
I/s of road by dense carpeting from Dustbin to Vasant place Market in Sector-6 R.K
Puran C-15/SZ
EE(Pr.)Sout
h
328/31.03.06/EE(Pr.)South
M/s Mukesh Associates Pvt.Ltd.
I/s of road by dense carprting from Venkateshwar Mandir to CPWD enquiry in
sector -3 R.K Puran in C-16/SZ
EE(Pr.)Sout
h
327/31.03.06/EE9Pr)South
M/s Mukash Associates Pvt.Ltd.
I/s of road by dense carpeting from H.NO. 179 to market in sector- 6 R.K puran C-
15/SZ
EE(Pr.)Sout
h
326/31.03.06/EE(Pr.)South
M/s Mukesh Associates Pvt.Ltd.
Liabilities Rs.lacs
Liabilities Rs.lacs
0.00
0.00
0.00
1.91
0.00
Liabilities Rs.lacs
0.00
5.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.007.87
Liabilities Rs.lacs
0.00
0.00
0.00
0.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.38
0.00
0.69
2.58
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.57
0.00
0.00
0.00
0.00
0.00
2.50
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
8.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
1.21
0.00
1.10
0.00
0.00
0.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.42
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.007.00
0.00
0.00
0.60
0.49
5.57
0.00
0.00
0.00
0.000.000.000.00
Liabilities Rs.lacs
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.006.66
0.00
0.05
Liabilities Rs.lacs
0.08
0.00
0.05
0.00
1.75
0.00
0.00
0.00
0.00
0.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.08
0.00
0.00
0.00
0.00
2.21
0.00
2.35
0.00
2.59
0.00
0.12
0.00
0.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.00
15.63
0.25929
0.57505
1.09206
0.22904
Liabilities Rs.lacs
0.46214
0.30505
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1.2091
3.976
2.28789
1.83201
0
0
1.97425
0
0
0.34366
0.33091
0.39114
0.56174
0.28206
0
0
0
0
0
0
0
0
0
0
0
0
0000000
00000000000000000000000000000000
000
16.11
0
0
0.02349
0.031
0
0.03473
0.02997
Liabilities Rs.lacs
0.02173
0
0.03754
0.02037
0.0203
0.02046
0.02435
0
0
0.1162
0.05306
0
0
0
0
0
0
0
0
0
0
0
0.0627
0
0
0
0
0
0
0.00082
0
0.00134
0.3906
0
0
0.03177
0
0.02
0.02
0
0
0
0
0
0.02345
1.99021
0
0.02345
0.03278
0.00112
0.04555
0.02195
0.51223
0.03503
0
0
0
0
0
0
0
0.21271
0
0
1.4896
0
000000000000000000
5.35
Liabilities Rs.lacs
0.02
0.02
0.02
0.02
0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.50
0.00
0.00
0.00
0.00
0.00
0.00
0.02
0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.05
0.00
0.03
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.003.68
deptt. deptt. deptt. deptt. Div. Div. Div. Div. Div. Div.
civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)
Status Report of MLA,Sh.Karan Singh Tanwar, AC No. 11 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil 02.05.05 09.04.05 168652.00 15.06.06 24.07.06 168593.00 Completed
2 Civil 02.05.05 09.04.05 268473.00 17.01.06 28.02.06 216120.00 Completed
3 Civil 02.05.05 09.04.05 154404.00 15.06.06 24.07.06 154327.00 Completed
4 Civil 02.05.05 09.04.05 206069.00 06.02.06 P 178979.00 In Prog.
5 Civil 02.05.05 09.04.05 141343.00 10.03.06 12.04.06 141300.00 Completed
6 Civil 02.05.05 09.04.05 136097.00 15.06.06 24.07.06 135889.00 Completed
7 Civil 02.05.05 09.04.05 195300.00 17.01.07 24.05.07 161261.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp to FP by pdg Interlocking tiles from WZ -312 on Jail Rd along Nangal Raya Market C-18/(NR)/WZ
EE-XXIII
110/06.06.06/E
E-XXIII
M/s Gupta Engg. &
Contractors
Imp to lane by pdg RMC from D 2A/88 to d-2/22C in D-2 Block Janakpuri C-18/(NR)/WZ
EE-XXIII
332/08.12.05/E
E-XXIII
M/s Rajan Builders
Imp to lane by pdg RMC from WZ 1206 to D-2A/10A in D-2 Bvlock Janakpuri C-18/(NR)/WZ
EE-XXIII
109/06.06.06/E
E-XXIII
M/s Rohit Const.Co
Imp to FP by pdg Interlocking tiles from WZ-19 to 1672 on Jail Rd aloong Lajwanti Garden Mkt C-18/(NR)/WZ
EE-XXIII
395/30.12.05/E
E-XXIII
M/s Deepak Gupta
Imp of lane by pdg RMC from D-2A/42 to D2A/47B to D2A/3C in D-2 Block Janakpuri C-18/(NR)/WZ
EE-XXIII
518/08.03.06/E
E-XXIII
M/s Rohit Const.Co
Imp to lane by pdg CC and Kota Stone flooring from WZ 1598 A to 1598J in Nangal Raya C-18/(NR)/WZ
EE-XXIII
112/06.06.06/E
E-XXIII
M/s Rohit Const.Co
Imp of lane by pdg RMC from D2A/4A to D2A/1A in D-2 Block Janakpuri C-18/(NR)/WZ
EE-XXIII
509/28.11.06/E
E-VII
M/s Shalabh Gupta
8 Civil 02.05.05 09.04.05 140017.00 23.06.06 24.07.06 139838.00 Completed
9 Civil EE-VII 31.05.05 27.05.05 199200.00 26.05.06 14.12.06 194176.00 Completed
10 Civil 31.05.05 27.05.05 156769.00 18.02.06 12.04.06 156749.00 Completed
11 Civil 31.05.05 27.05.05 199200.00
12 Civil 31.05.05 27.05.05 186897.00 01.03.06 23.03.06 185644.00 Completed
13 Civil 31.05.05 09.04.05 274168.00 M/s Varun 17.01.06 25.05.06 181297.00 Completed
14 Civil 01.06.05 09.04.05 247524.00 12.12.05 28.02.06 244961.00 Completed
15 Civil 01.06.05 9.4.05 243300.00
16 Civil EE-IV 06.06.05 19.05.05 398500.00 16.02.06 25.03.06 380720.00 Completed
17 Civil EE-IV 06.06.05 19.05.05 292800.00
18 Civil EE-IV 06.06.05 19.05.05 493400.00 26.12.05 13.1.06 353364.00 Completed
Imp to lane by [pdg Kota/CC from WZ-1472 to WZ 808 in Nangal Raya in C-18/(NR)/WZ
EE-XXIII
111/06.06.06/E
E-XXIII
M/s Gupta Engg. &
Contractors
C/o Designer gate Out side Sanatan Dharam Mandir lane in Khazan basti C-19(PN)-II/WZ
818/31.03.06/E
E-VII
M/s A..K & Co.
C/o Designer gate at the Entrance of D1A Eastern Wing near H.no,. D1A/129 in C-18/(NR)/WZ
EE-XXIII
480/17.02.06/E
E-XXIII
M/s Malhotra Const.Co
C/o Designer gate at the Entrance of Nangal Raya near Gurudwara D Block Janakpuri C-18/(NR)/WZ
EE-XXIII
C/o Designer gate at the Entrance of D-1 Block near H.no. 14, 15 in C-18/(NR)/WZ
EE-XXIII
459/13.02.06/E
E-XXIII
M/s Vanish Const.Co
Imp of lane by [pdg RMC from WZ 1391 to 1390, 1357 to 1278 in Nangal Raya C-18/(NR)/WZ
EE-XXIII
333/08.12.05/E
E-XXIII
Imp to Passange by pdg Red Sand Stone near Aditya Shopping Complex in Nangal Raya in C-18/(NR)/WZ
EE-XXIII
331/08.12.05/E
E-XXIII
M/s Eagle Enterprises
Imp to rd by MP in Aditya Shopping Complex Nangal Raya in C-18/(NR)/WZ
EE-XXIII
Imp to FP from Gurudwara to Park by P/L CC Kerb Stone CC Slabs in Mochi Gaon in C-15 SZ
551/25.01.06/E
E-IV
M/s Bagga Builders
Imp of back lane from H.no. 214 to 231 and 19 to 36 by P/F Interlocking tiles in Satya Niketan in C-15 SZ
Imp of Street along H.no. 11/78, 55, 61 and near by by P/L RMC in Mochi Gaon in C-15 SZ
465/16.12.05/EE-IV
M/s Aay. Kay Const co.
19 Civil EE-IV 06.06.05 19.05.05 91000.00 02.12.05 04.01.06 64546.00 Completed
20 Elect. 28.6.05 24.6.05 177508.00 7.11.05 8.12.05 167251.00 Completed
21 Elect. 28.6.05 24.6.05 177508.00 26.05.06 12.07.06 152005.00 Completed
22 Elect. 28.6.05 24.6.05 177508.00 8.10.05 28.10.05 175211.00 Completed
23 Elect. 28.6.05 24.6.05 177508.00 24.05.06 04.07.06 172531.00 Completed
24 Elect. 28.6.05 24.6.05 177508.00 25.02.05 14.11.06 163947.00 Completed
25 Elect. 28.6.05 24.6.05 99897.00 18.10.05 28.10.05 96779.00 Completed
26 Elect. 28.6.05 24.6.05 133651.00 14.10.05 5.11.05 125904.00 Completed
27 Civil EE-IV 20.7.05 19.7.05 484700.00 10.11.05 26.12.05 328340.00 Completed
28 Civil EE-IV 20.7.05 19.7.05 434400.00 23.10.06 P 159854.00 In Prog.
29 Civil EE-IV 20.7.05 19.7.05 38500.00 12.01.06 27.03.06 24385.00 Completed
Imp of FP ner Arya samaj Mandir in Shatri Mkt in C-15 SZ by CC Kerb Stone and CC Slabs.
419/01.12.05/EE-IV
M/s Bagga Builders
P/O Boring with Submersible Pump Set in the park opp D 1C-16A, Janakpuri, Under WZ
EE(E)-III
256/3.11.05/EE(
E)-III
M/s A.K. Electicals
P/O Boring with Submersible Pump Set in the Sehyogi Park Nangal Raya under WZ
EE(E)-III
483/03.02.06/E
E(E)-III
M/s Paras Const.Comp.
P/O Boring with Submersible Pump Set in the Nursery park near Sewage Park Nangal Raya, under WZ.
EE(E)-III
124/7.10.05/EE(E)-III
M/s Sri Bala ji Electicals
P/O Boring with Submersible Pump Set in the park W block park Mayapuri Ph-II under WZ
EE(E)-III
123/07.10.05/EE(E)-III
M/s Sri Bala ji Electicals
P/O Boring with Submersible Pump Set in the park WS block Maya puri, Ph-II,under WZ
EE(E)-III
443/29.12.05/EE(E)-III
M/s Khanna Sales Corp.
P/O Special Juno Intergral Post Lantern by the fitting with pole in the park in Lajwanti Garden under WZ
EE(E)-III
177/18.10.05 EEE-III
M/s Pragati Engineers
P/O Lighting arrangment with 2x250 watt flood lightin the Nursery park nea Salwage park Nangal Raya under WZ.
EE(E)-III
151/10.10.05EE(E)-III
M/s Super Shine
Associates
C/o Storm Water drain along rd from Ring Rd to Gate (near qtr No 289) Moti Bagh in C15. SZ
362/21.10.05 EE_IV
M/s Karam Bir Tanwar Const Co
Imp of FP along Both side study centre with Kerb Stone and Interlocking tiles in Shahstri Mkt in C-15. SZ
587/15.02.06/EE-IV
M/s Pappu Seth
Imp to Drainage system at Shastri Mkt near Ring Rd by P/L RCC Pipe in C-15.SZ
473/27.12.05/EE-IV
M/s Nidhi Const.Co
30 Civil EE-IV 20.7.05 19.7.05 496600.00 23.01.06 17.03.06 353168.00 Completed
31 Civil EE-XXIII 27.7.05 21.7.05 107000.00 31.08.05 24.10.05 106389.00 Completed
32 Civil EE-XXIII 27.7.05 21.7.05 186000.00 06.09.05 16.11.05 185601.00 Completed
33 Civil EE-XXIII 27.7.05 21.7.05 44900.00 9.9.05 13.10.05 41499.00 Completed
34 Civil EE-VII 2.8.05 26.7.05 180700.00 17.04.06 17.06.06 177008.00 Completed
35 Civil EE-VII 2.8.05 26.7.05 199600.00 12.09.05 22.10.05 199180.00 Completed
36 Civil EE-VII 2.8.05 26.7.05 174800.00 19.09.05 16.12.05 174436.00 Completed
37 Civil EE-VII 2.8.05 19.7.05 199600.00 07.10.05 29.12.05 198891.00 Completed
38 Civil EE-VII 2.8.05 19.7.05 199600.00 20.11.05 3.02.06 199457.00 Completed
39 Civil EE-VII 2.8.05 19.7.05 199700.00 07.10.05 25.11.05 199124.00 Completed
40 Civil EE-VII 2.8.05 19.7.05 127900.00 14.10.05 08.02.06 127051.00 Completed
41 Civil EE-XXIII 18.8.05 5.8.05 359188.00 8.12.05 3.10.06 226942.00 Completed
42 Civil EE-XXIII 18.8.05 5.8.05 257055.00 6.12.05 3.05.06 243154.00 Completed
C/o Storm Water drain along rd from rd from Gate (near H.no. No 209) to study Centre 2nd gate in Shastri Mkt in C15.SZ
516/09.01.06/EE-IV
M/s Karam Bir Tanwar Const Co
Imp of Passage by Pdg RMC near Subzi Mkt in Old Khazan basti in C-18-II (NR) WZ
182/25.08.05/EE-XXIII
M/s Om Mark Builders
Imp of lanes by Pd RMC from D-1B-6A to D 1B/10a and D-1B/32A to D 1B/25A in Janak Puri in C 18(NR) WZ
188/25.08.05/EE-XXIII
M/s Kritika Consts.
C/o Culvert near 1390/II and 1390/I Parkha Rd in Nangal Raya in C-18 WZ
192/25.8.05/EE_XXIII
M/s Gaurav Associates
Imp of lane by pdg RMC from, A -16 to 37 A in Khazan Basti in C 19-II WZ
19/10.04.06/EE-VII
M/s Kumar Const.Co.
Imp of lane by pdg RMC from B-1 to C 62 in Khazan Basti in C19-II in WZ
349/8.9.05/EE-VII
M/s Raghav Engineers
Imp of Drain from C 10 to Corner of Hee Park in Khazan basti in C-19II in WZ
365/16.09.05/EE-VII
M/s Deep Const.Co
Imp of lane by pdg RMC from B 1 to B-12 in Khazan basti in 19-II in WZ
378/28.09.05/EE-VII
M/s Om Mark Builders
Imp of lane by pdg RMC from C-74 to C 63 in Khazan basti in 19-II in WZ
435/24.10.05/EE VII
M/S N.K.Consts.
Imp of lane by pdg RMC from C-88 to C -83 and B-14 to B-24 in Khazan basti in 19-II in WZ
375/28.9.05EE-VII
M/S Mukesh Builders
Imp of lane by Pdg RMC from C-6 to C 34 Khazan Basti in C 19-II WZ
392/06.10.05/EE VII
M/S Som Sons.
Imp of side berms (Both side) by P/L CC (RMC) from D 2A/88A to D2A/65B in D 2A block, Janak puri in C 18 (NR) WZ
303/2.12.05/EE-XXIII
M/s Sumay Vir
Imp of side berms (Both side) by P/L CC (RMC) from D 2A/39C to D2A/22C in D 2A block, Janak puri in C 18 (NR) WZ
302/3.12.05/EE-XXIII
M/s Sumay Vir
43 Civil EE-XXIII 18.8.05 5.8.05 269300.00 08.03.06 16.10.06 172114.00 Completed
44 Civil EE-XXIII 18.8.05 5.8.05 295300.00
45 Civil EE-XXIII 18.8.05 5.8.05 287900.00
46 Civil EE-XXIII 18.8.05 5.8.05 127200.00
47 Elect. 18.8.05 24.6.05 49525.00 10.11.05 05.12.05 47214.00 Completed
48 Civil EE_IV 15.9.05 14.9.05 468200.00 18.05.06 07.08.06 320175.00 Completed
49 Civil EE_IV 15.9.05 14.9.05 467700.00 20.03.06 P 160502.00 In Prog.
50 Civil EE_IV 15.9.05 14.9.05 400600.00 18.01.07 P 217631.00 In Prog.
51 Civil EE_IV 15.9.05 14.9.05 344000.00 M/s Vijay pal 15.03.06 05.06.06 213922.00 Completed
52 Civil EE_IV 15.9.05 14.9.05 438600.00 06.09.06 P 321366.00 In Prog.
C/o Walkway in the park D 2A block infornt of D2A/40C in Janakpuri in C 18(NR) WZ
330/08.12.05/EE-VII
M/s L.G Consts.
Imp of side berms (Both side) by P/L CC (RMC) from D2/64 to D2/72 and D2/50 to Bhagat Nursing Hs in D 2 block, Janak puri in C 18 (NR) WZ
Imp of side berms (Both side) by P/L CC (RMC) from D2/83 to D2/99 in D 2 block, Janak puri in C 18 (NR) WZ
Imp of side berms by P/L CC (RMC) from D2/1 (Main rd) to Bhagat Nursing Hs in D 2 block, Janak puri in C 18 (NR) WZ
P/o lighting arrangement in the park near Sanatan Dharam Mandir Janka puri D block under w..z
EE(E)-III
267/03.11.05/EEE-III
M/s Eminent Traders(India)
Imp of drainage system by providing RCC pipe from H.NO 18 to H.NO 299 in Satya Niketan in C-15 /S.Z
649/10.03.06/EE-IV
M/s R.K Builders
Imp of drainage system by providing Rcc from H.NO 82 to H.NO-72 ( both Side ) is Satya Nikatan C-15/SZ
588/21.02.06/EE-IV
M/s Shalabh Gupta
Imp of drainage system by providing RCC pipe from H.NO 19 & 36 & H.No 83 to 37 is Satya Nikatan in C-15 S.Z
651/10.03.06/EE-IV
M/s Pushpa Const.Co
Imp of drainage system by providing RCC pipe from H.NO 299 to 164 & Satya Niketan in C-15/SZ
558/07.02.06/EE-IV
Imp of road by P/L bitumen mastic from H.NO 255 to 263 & H.NO 214 to 231 Satya Niketan C-15/S.Z
627/09.03.06/EE-IV
M/s Sona Consultaint &
Contractors
53 Civil EE_IV 15.9.05 14.9.05 467200.00 06.09.06 P 297062.00 In Prog.
54 Civil EE_IV 15.9.05 14.9.05 452100.00
55 Civil EE_IV 15.9.05 14.9.05 483200.00
56 Civil XXIII 15.9.05 10.8.05 322470.00 21.02.06 P 237393.00 In Prog.
57 Civil XXIII 15.9.05 10.8.05 323462.00 01.03.06 24.04.06 323406.00 Completed
58 Civil XXIII 15.9.05 12.8.05 198838.00 12.12.05 13.02.06 198700.00 Completed
59 Elect. 8.2.06 7.2.06 196549.00 28.04.06 28.05.06 191644.00 Completed
P/l bitumen mastic from H.NO 147 to 282 in Satya Niketan in C-15 S.Z
6265/09.03.06/EE-IV
M/s Sona Consultaint &
Contractors
Imp to road by P/L bitumen Mastic as road from H.NO 147 to 164 & H.NO 181 to H.NO 195 in Satya Niketan in C-15 S.Z
Imp of road by P/L bitument mastic from h.No 299 to 164 in Satya Niktan in C-15 S.Z
Imp of lane by providing RMC from WZ 1179 to WZ 1179 C.1079 c 1024 chowk road t Wz-1218 tp Dispensary in Mangal Raya in C-18(NR) W.Z
485/21.02.06/EE-XXIII
M/s Rohit Const.Co
Imp of lane by providing RMc from WZ 553 to WZ 1596 B and WZ-1596 to Wz-1590 in Mangal Raya in C-18 ( NR WZ
484/21.02.06-EE-XXIII
M/s Rohit Const.Co
Imp of lane by providing RMc from T-8 to T-3 old khajan basti C 18 WZ
334/08.12.05/EE-XXIII
M/s Ricky Consts.
P/O 70 watt Juneo integral Post Top Lantern Fittings in the park D-1, Janakpuri and D block, Khajan Basti C 18 WZ
EE(E)-III
39/25.04.06/EE(E)-III
M/s Super Shine
Associates
Status Report of MLA, Sh.Jagdish Mukhi, AC No. 12 2005-06
S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil 25.8.05 24.8.05 179000.00 29.10.05 23.01.06 178757 Completed
2 Civil 25.8.05 24.8.05 71400.00 07.04.06 22.06.06 71400 Completed
3 Civil 25.8.05 24.8.05 195200.00
4 Civil 25.8.05 24.8.05 573000.00 25.05.06 18.06.06 398307 Completed
5 Civil 25.8.05 24.8.05 389937.00 10.04.06 27.05.06 389403 Completed
6 Civil 25.8.05 24.8.05 197600.00 223/19/10/05 11.10.05 21/8/07 188967 Completed
7 Civil 25.8.05 24.8.05 335913.00 03.04.06 24.04.06 335458 Completed
8 Civil 25.8.05 24.8.05 225024.00 02.03.06 22.03.06 224774 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp of lane by MP fromH.no. RZ 159 to 168 and RZ 123 to RZ 118 in Indira Park, Uttam nagar in C 117 WZ
EE-XXIII
228/19.10.05/
EE-XXIII
M/s Khurana Const.Co
Imp of berms by RMC from Mother Dairy corner to Park Corner in B block , Uttam Nagar in C 17 WZ
EE-XXIII
616/28.03.06/
EE-XXIII
M/s Rohit Const.Co
Imp of laen by MP from H.no. A 155 to 102, WZ 100 to A 26, A 19 to A 186, WZ 95 to A 16 in A-B block Uttam nagar niC 17 Wz
EE-XXIII
Imp of lane by RMC & Drain from H.no. WZ 134 to A 131 Gali No 41 in A block and from A 94 to A 91 in A block, Uttam nagar C 17 WZ
EE-XXIII
550/10.03.06/
EE-XXIII
M/s Eagle Enterprises
Imp of lane by RMC & Drainf from H.no. C 155 to WZ 156 gali no 64 in C blocka and fromj A 114/A to A 127 Gali no 39 in A block, Uttam Nagar, in C 17 Wz
EE-XXIII
446/01.02.06/
EE-XXIII
M/s K.S Contractors
Imp of lane by MP from C 19 & D 173 & from C 167 to D 152 in C-D block, Uttam Nagar inC 17 Wz
EE-XXIII
M/s Neetam Const co
Imp of lane by RMC from H.no. 181A to Gate no 5 (opp Mandir) in A4C block, Janakpuri, C 17 Wz
EE-XXIII
521/08.03.06/
EE-XXIII
M/s Netra Kumar
Imp of lane by RMC & Drainf rom h. no. W Z 5A to 34/3 & from WZ 34/2 to 5A in Asalat pur village Janakpuri in C 17 Wz
EE-XXIII
491/27.02.06/
EE-XXIII
M/s J.K Builders
9 Civil 25.8.05 24.8.05 320480.00 25.05.06 04.06.06 319733 Completed
10 Civil 25.8.05 24.8.05 404904.00 01.07.06 09.09.06 404508 Completed
11 Civil 25.8.05 24.8.05 360570.00 28.07.06 P 328161 In Prog.
12 Civil 26.8.05 16.4.05 554100.00
13 Civil 2.9.05 24.8.05 171800.00 07.04.06 22.06.06 105722 Completed
14 Civil 5.9.05 26.8.05 447775.00 25.05.06 30.06.06 447311 Completed
15 Civil 5.9.05 26.8.05 533866.00 02.03.06 01.06.06 371144 Completed
16 Civil 5.9.05 26.8.05 437119.00 03.07.06 01.08.06 436409 Completed
17 Civil 5.9.05 26.8.05 109700.00 02.03.06 01.06.06 109700 Completed
Imp of D/system from H.n 158 to 153 in A-3 block, Janakpuri, C 17 Wz
EE-XXIII
433/30.01.06/
EE-XXIII
M/s Gaurav Const.Co-II
Imp of lane by RMC and Drain from H.no. RZ 13 to Rz 6 (Gali no 22) and from Wz 20 to Wz 16 (Gali no 24) back lane in Prem nagar in Uttam
EE-XXIII
551/10.03.06/
EE-XXIII
M/s Eagle Enterprises
Imp of lane by RMC & drain from H.no. RZ 10 & Rz /L-19 (Gali no 7) & from RZ-10 to 19 (Gali No 9)in Prem Nagar in C 17 Wz
EE-XXIII
82/05.05.06/E
E-XXIII
M/s Sandeep Consts.
Imp of rd by pdg BM and Mix Seal cornecting Choti Subzi mandi rd to B 2 marg Janakpuri in C 17 Wz
Pr. West Z.
Imp of back lane by pdg CC from H.No. Rz 76 to Rz 84B in Prem Nagar, uttam nagar, C 17 Wz
EE-XXIII
616/28.03.06/
EE-XXIII
M/s Rohit Const.Co
Imp of FP by pdg MS grill and Grit Wash from h.no. C1/106 to C1A/34A in Service Lane along C-1 block, janakpuri C 17 Wz
EE-XXIII
72/25.04.06/EE-XXIII
M/s Bhardwaj Const.co
Imp of FP by pdg MS grill and Grit Wash from H.No.. C2/404 to C2D/Gate on Service Lane C-2 block, janakpuri C 17 Wz
EE-XXIII
482/21.02.06/EE-XXIII
M/s Manish Nayyar
Imp of FP by pdg MS grill and Grit Wash from H.No.. C1A/35A to H.No. C2/390 on Service Lane of Pnaka Rd in C 17 Wz
EE-XXIII
123/21.06.06/EE-XXIII
M/s Manish Nayyar
Imp of FP by pdg MS grill and Grit Wash infornt of DESU Office in C 2 D block, janakpuri C 17 Wz
EE-XXIII
482/21.02.06/EE-XXIII
M/s Manish Nayyar
18 Civil 5.9.05 26.8.05 457536.00 25.05.06 29.06.06 457140 Completed
19 Civil 20.9.05 12.9.05 262454.00 11.12.05 08.03.06 262433 Completed
20 Civil 20.9.05 12.9.05 260299.00 11.12.05 08.03.06 260299 Completed
21 Civil 20.9.05 12.9.05 255244.00 11.12.05 06.03.05 255238 Completed
22 Civil 20.9.05 12.9.05 259826.00 11.12.05 08.03.06 259821 Completed
23 Civil 20.9.05 12.9.05 259836.00 11.12.05 08.03.06 259819 Completed
24 Civil 20.9.05 12.9.05 266479.00 11.12.05 06.03.06 266471 Completed
25 Civil 20.9.05 12.9.05 259826.00 11.12.05 06.03.06 259817 Completed
26 Civil 20.9.05 12.9.05 257569.00 11.12.05 08.03.06 257553 Completed
27 Civil 20.9.05 12.9.05 262454.00 05.12.05 06.03.06 262294 Completed
28 Elect EEE_III 7.12.05 6.12.05 42152.00 02.06.06 04.07.06 35292 Completed
Imp of FP by pdg MS grill and Grit Wash from H.no. C 2/391 to H.no. C 2/403 on Service Lane of Pankha Rd C 17 Wz
EE-XXIII
73/25.04.06/EE-XXIII
M/s Bhardwaj Const.co
Const of rain shelter in C 6A block near( Janak Complex) park in C 18 Janak Puri WZ
EE-XXIII
310/02.12.05/EE-XXIII
M/s Rohit Const.Co
Const of rain shelter in C 3 block Central Park in C 18 Janak Puri WZ
EE-XXIII
304/02.12.05/EE-XXIII
M/s Rohit Const.Co
Const of rain shelter in B 3 block infornt of Hs no. 104 park in C 18 Janak Puri WZ
EE-XXIII
305/02.12.05/E-XXIII
M/s Rohit Const.Co
Const of rain shelter in C-5 D block transformer park in C 18 Janak Puri WZ
EE-XXIII
308/02.12.05/EE-XXIII
M/s Rohit Const.Co
Const of rain shelter in C-5 A block (Near MC School) park in C 18 Janak Puri WZ
EE-XXIII
309/02.12.05/EE-XXIII
M/s Rohit Const.Co
Const of rain shelter in B-1block Park in C 18 Janak Puri WZ (Opp B1/613)
EE-XXIII
311/02.12.05/EE-XXIII
M/s Gupta Engineers & Contractors.
Const of rain shelter in B-1block Park in C 18 Janak Puri WZ (Opp B1/611)
EE-XXIII
312/02.12.05/EE-XXIII
M/s Gupta Engineers & Contractors.
Const of rain shelter in C-3 block Park in C 18 Janak Puri WZ (near Arya samaj Mandir)
EE-XXIII
306/02.12.05/EE-XXIII
M/s Rohit Const.Co
Const of rain shelter in Prem Nagar Central park C-18 Janak Puri WZ
EE-XXIII
307/02.12.05/EE-XXIII
M/s Rohit Const.Co
P/o lightting Arragement with 1*150 watt flood light in park of Gurunanakpura w.no-18 W.Z
129/29.05.06/EE(E)-III
M/s Perfect Electirc works
29 Elect EEE_III 7.12.05 6.12.05 43098.00 19.05.06 29.05.06 34858 Completed
30 Elect EEE_III 9.1.06 6.12.05 119701.00 22.03.06 18.05.06 117305 Completed
31 Elect EEE_III 9.1.06 6.12.05 168007.00 24.03.06 23.05.06 165333 Completed
32 Civil 24.2.06 8.2.06 353524.00 30.06.06 27.09.06 352669 Completed
33 Civil 24.2.06 8.2.06 177971.00 02.11.06 08.05.07 160062 In Prog.
34 Civil 24.2.06 8.2.06 241079.00
35 Civil 24.2.06 8.2.06 177862.00 02.11.06 08.05.07 160032 In Prog.
P/o lightting Arragement with 1*150 watt flood light in park of A 2 A Janakpuri w.no-17 W.Z
118/18.05.06/EE(E)-III
M/s Forward Engineers
P/o Boring and Installation of Pump set in the park C-4 A Janakpuir W.NO-18 W,Z
521/17.03.06/EE(E)-III
M/s A.K.Electricl
as
P/o Boring and Installation of Pump set in the park C-4 E block, Janak puri W.NO-18 W,Z
522/17.03.06/EE(E)-III
M/s Bindra Motors & Electriclas
Raising of B/wall and P/F MS Grill of park near Rd side near H.no. 235 and 105 in C 4/E, 269 in C 4/F, Block Hs no 324 and 335 in C 4B near Hs.no. 328 in C4/Cblock in C 18 Janakpuri West Zone
EE-XXIII
121/21.06.06/EE-XXIII
M/s Shanti Enterprises
Pdg MS Arches at Entrance of parks in C 4/A,C 4/B, C4/C and C 4/D, C 4/E, C 4/F, C 4/G, C 4/H Blocks in C 18 Janakpuri Wz
EE-XXIII
145/25.07.06/EE(M)-III
M/s Ravunder
Const.
Pdg MS arches at Entracne of parks in C 5/A, C5/B, C 5/C, C 5/D, C6/A, C6/B, C3 block, C 3(Single Story) C 3/A, C 3(SFS) block in C 18 Janakpur
EE-XXIII
Const of Protection wall along Nallah from Hs no. 315 to 322 in C 5A(Part-II) in C 18 Janakpuri Wz
EE-XXIII
145/25.07.06/EE(M)-III
M/s Ravunder
Const.
36
37
38
39
Status Report of MLA,Sh.Harcharan Singh Balli, AC No. 13 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C ExpenditureDate of
BookingDate of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
1 Elect EEE-III 30.05.05 27.5.05 149942.00 21.9.05 24.10.05 148452.00 Completed
2 Elect EEE-III 31.5.05 30.5.05 149942.00 23.9.05 24.10.05 148359.00 Completed
3 Elect EEE-III 31.5.05 27.5.05 199076.00 23.11.05 14.12..05 196209.00 Completed
4 Elect EEE-III 31.5.05 27.5.05 199076.00 21.10.05 18.11.05 192257.00 Completed
5 Elect EEE-III 15.06.05 10.06.05 162324.00 6.12.05 14.12.05 157907.00 Completed
6 Elect EEE-III 15.06.05 10.06.05 155877.00 20.10.05 16.11.05 149204.00 Completed
7 Civil EE-VII 16.6.05 6.6.05 338684.00 M/s AK& Co. 20.11.05 20.01.06 338661.00 Completed
8 Civil EE-VII 16.6.05 6.6.05 429068.00 27.11.05 16.01.06 428663.00 Completed
9 Civil EE-VII 16.6.05 1.6.05 437556.00 30.11.05 3.1.06 436316.00 Completed
10 Civil EE-VII 16.6.05 31.5.05 459454.00 28.11.05 10.02.06 459422.00 Completed
11 Civil EE-VII 16.6.05 31.5.05 463487.00 490/5.12.05/VII M/s Y.K Sahni 5.12.05 11.2.06 462574.00 Completed
12 Civil EE-VII 16.6.05 31.5.05 463612.00 30.11.05 3.1.06 461714.00 Completed
13 Civil EE-VII 6.7.05 20.5.05 245000.00 M/s A.K & Co. 02.04.06 22.01.07 193463.00 Completed
14 Civil EE-VII 6.7.05 10.05.05 291624.00 M/s A.K.& Co. 17.11.05 25.02.06 291544.00 Completed
P/O Boring Subermsible Pump Set in the park of DA Block Opp flat NO 100 Under W.no. 19 WZ
51/20.9.05/EEE-III
M/s Sri Bala JI Electicals
P/O Boring Subermsible Pump Set in the park of CA Block Hari Nagar W.no. 19 WZ
55/209.05/EEE_II
I
M/s A.K. Electicals
P/O Lighting arrangment with 1x150 watt flood light in the parks of Subhash Nagar Block 1-2, 3-4, 6-9 10-11 and 12-14 under WZ
309/12.11.05/EE
E_III
M/s Neeraj Electicals
P/O Lighting arrangment with 1x150 watt flood light in the parks of Hari Nagar B, BE, MS, CA, CB Maya Encl in under WZ
188/21.10.05/EE
E_III
M.s S.G. Enterprises
p/O 70 Watt Juno Intergral Post Top Lantern fittings int eh park of 14 block Subhash Nagar and Mahila park 7 block Subhash Nagar under WZ
355/5.12.05/EEE
_III
M/s Akansha Electicals
p/O 70 Watt Juno Intergral Post Top Lantern fittings in the park of Hari Nagar Ghanta ghar under WZ
179/18.10.05/EE
E-III
M/s Punjab Elect.Co.
Imp to rd by pdg RMC from H.no.4/33 to 4/64 in 4 block Subhash nagar in C-20 WZ
452/17.11.05/EE-
VII Imp to rd by pdg RMC from H.no. 4/65 ti 4/96 in 4 Block in Subhash Nagar C-20 WZ
450/17.11.05/EE-
VII
M/s Anand Consts.Works
C/o rd by pdg RMC from H.no. 7/83 to 7/122 in 7 block subhas Nagr in C-20 WZ
453/17/11/05/EE
_VII
M/s Manish Nayyar
Imp to lane by pdg RMC from H.no. 16/22 to 16/60 in 16 B block Subhas Nagar C-20 WZ
476/22.11.05/EE-
VII
M/s Shalabh Gupta
Imp to lane by pdg Pdg RMC from H.no. 16/61 to 16/98 in 16 block Subhas Nagar C-20 WZ
Imp to lane by pdg RMC fromH.no. 15/34 to 15/78 in 15 Block Subash nagar in C-+20 WZ
454/17/11/05/EE
_VII
M/s Manish Nayyar
Imp to rd by pdg RMC from H.no. WZ-12 to WZC-8 in Ram Pura BE block Hari Nagar C-19(PN)-I WZ
768/24.03.06/EE-
VII Imp to lane and chwok by RMC from H.n. 6A to 9A, 15A iSFS flats green view Apptt Hari nagar, in C-19 WZ
451/17.11.05/EE-
VII
15 Civil EE-VII 6.7.05 20.05.05 182285.00 30.03.06 22.08.06 181012.00 Completed
16 Civil EE-VII 6.7.05 15.3.05 192232.00
17 Civil EE-VII 6.7.05 20.5.05 196400.00 20.04.06 18.08.06 186831.00 Completed
18 Civil EE-VII 6.7.05 26.5.05 199700.00 2.9.05 24.11.05 188957.00 Completed
19 Civil EE-VII 6.7.05 26.5.05 199400.00 10.08.05 18.11.05 189874.00 Completed
20 Civil EE-VII 6.7.05 26.5.05 199000.00 19.10.05 23.11.05 189315.00 Completed21 Civil EE-VII 21.7.05 27.6.05 197700.00 2.9.05 10.10.05 160513.00 Completed
22 Civil EE-VII 18.7.05 15.3.05 166955.00 24.03.06 15.03.07 112623.00 Completed
23 Civil EE-VII 21.7.05 20.7.05 1891310.00 15.02.07 22.12.08 1881300.00 Completed
24 Civil EE-VII 12.8.05 26.5.05 406956.00 25.02.07 08.03.07 406693.00 Completed
25 Civil EE-VII 12.8.05 1.6.05 498400.00
26 Civil EE-VII 12.8.05 1.6.05 335495.00 30.03.06 24.04.06 335181.00 Completed
27 Civil EE-VII 12.8.05 1.6.05 337590.00 M/s A.K & Co. 16.02.06 29.03.06 337100.00 Completed
28 Civil EE-VII 12.8.05 6.6.05 362494.00 M/s Y.K Sahni 15.05.06 16.10.06 279518.00 Completed
29 Civil EE-VII 12.8.05 6.6.05 567800.00
30 Civil EE-VII 12.8.05 6.6.05 427186.00 24.02.06 12.09.06 427100.00 Completed
Imp to rd by pdg RMC from H.no. EB-1 to 196 in EB Pkt Maya encl in C-19(PN) -I WZ
800/30.03.06/EE-
VII
M/s A.R & Co.
Imp to lane by Red Stone Flooring between Janak Park and Mini Stadium in CC block, Hari Nagar C-19 (PN)-I WZImp to rd by MP in GA Pkt Maya Encl. C-19(PN)-I WZ(from H.no. 1 to 19, 43 to 25, near H.no. 75, 95 to 120, 169 to 185 and 203 to 214)
483/23.11.05/EE-
VII
M/s Pankaj Singhal
Imp to rd by MP in DB block Hari nagar C-19(PN)-I WZ( H.no. 97 to 94 and 93 to 88, 1 to 14)
330/2.9.05/EE-VII
M.s Vikas Bansal
Imp to rd by MP in DA block Hari nagar C-19(PN)-I WZ( H.no. 98 to 101, 107 to 102 and 22 to 54)
308/10.08.05EEE-VII
M/s G.Pee Const. Co.
Imp to rd by MP in CA Block Hari nagar (PN)-I WZ(H.no. 9 to DESO office, 97 to 109)
416/19.1.05/EE-VII
M/s Satish Kumar & CoC/o FP inside park opp H.no. 7/83 in 7 Block
Subhas Nagar in C-20 WZ 332/2.9.05/EE-
VII M/s Pankaj Builders
C/o Basket Ball Court in the Park opp H.no. EC -386 in EC Pkt Maya Encl in C 19 (PN)-I/Wz
766/24.03.06/EE-VII
M/s Neel Traders
C/o Mini Stadium at Shyam Vatika Hari nagar Sh C/o Steps for sitting in west portion and Ladies Lav. Block at Mini Stadium at Shyam Vatika, Hari nagar, C-19 (PN) WZ
813/15.02.07/EE(M)-I
M/s Pankaj Builders
Stg of rd by Dense Carpet from Shop No6 to A 127 and 128 to A 144 in Asha Park in C-19(PN)-I WZ
309/22.09.06/EE-VII
M/s R.P Singal & Co.
C/o Rd by pdg RMC from H.no. 6/78 to 6/127 in 6 block Subhash Nagar in C 20 WZC/o rd by pdg RMC from H.no. 6/128 to 6/173 in 6 block Subhash Nagar in C20 WZ
788/24.03.06/EE-VII
M/s Shalabh Gupta
C/o rd by pdg RMC from H.nl 7/26 to 7/63 in 7 block, Subash Nagar in C-20 WZ
599/16.02.06/EE-VII
Imp rd by pdg RMC from H.no.3/197 to 3/157 in 3 block, Subash Nagar in C-20 WZ
654/09.03.06/EE-VII
Imp of rd by pdg RMC from H.no.3/119 to 3/156 in 3 block, Subash Nagar in C-20 WZImp of rd by pdg RMC from H.no. 3/41 to 3/83 in 3 block, Subhas Nagar in C20
579/10.02.06/EE-VIII
M/s Pankaj Builders
31 Civil EE-VII 12.8.05 27.6.05 401200.00 23.02.06 28.04.06 286315.00 Completed
32 Civil EE-VII 12.8.05 27.6.05 288035.00 20.05.06 P 225983.00 In Prog.
33 Civil EE-VII 12.8.05 27.6.05 291083.00 M/s A.K & Co. 18.02.06 12.05.06 289866.00 Completed
34 Civil EE-VII 12.8.05 12.8.05 202240.00 16.09.06 26.10.06 202186.00 Completed
35 Civil EE-VII 12.8.05 10.8.05 479903.00 5.12.05 P 461439.00 In Prog.36 Civil EE-VII 12.8.05 10.8.05 420181.00 10.12.05 P 410099.00 In Prog.
37 Civil EE-VII 12.8.05 10.8.05 414834.00 04.07.06 P 351668.00 In Prog.
38 Civil EE-VII 12.8.05 20.7.05 283874.00 18.02.06 06.07.06 282989.00 Completed
39 Civil EE-VII 12.8.05 20.7.05 96797.00 24.03.06 16.02.07 69732.00 Completed
40 Civil EE-VII 12.8.05 19.7.05 255507.00 M/s A.K& Co. 16.02.06 29.03.06 254535.00 Completed
41 Civil EE-VII 12.8.05 10.8.05 279892.00 16.02.06 24.05.06 278914.00 Completed
42 Civil EE-VII 12.8.05 20.5.05 383724.00 8.12.05 P 373723.00 In Prog.
43 Civil EE-VII 12.8.05 15.3.05 219701.00 20.12.06 28.03.07 148575.00 Completed
44 Civil EE-VII 12.8.05 1.6.05 306525.00 M/s A.K & CO. 16.02.06 29.03.06 306215.00 Completed
45 Civil EE-VII 23.8.05 12.8.05 68300.00 08.06.07 16.07.07 68300.00 Completed
C/o rd by pdg RMC from H.n 4/271 to 4/300 in 4 block, Subash Nagar in C-20 WZ
606/22.02.06/EE-VII
M/s Arora Const.Co
C/o rd by pdg RMC from H.n 4/270 to 4/245 in 4 block, Subash Nagar in C-20 WZ
652/09.03.06/EE-VII
M/s Pankaj Builders
C/o rd by pdg RMC from H.n 4/244 to 4/219 in 4 block, Subash Nagar in C-20 WZ
592/16.02.06/EE_VII
Pdg Kota Stone flooring at Baradari in Cremation Ground Tihar Village in C 20 WZ
262/15.09.06/EE-VII
M/s Bajrang Engineers & Contractors
Stg of rd by Dense Carpet from H.no. F-40 to 37, F 41 to F 44, F61 to 62 F 53 to Mother Dairy both side lane F pkt Hari nagar in C-19 (NR) C-19(PN)-I WZ
477/23.11.05/EE-VII
M/s Mukash Associates
Pvt.Ltd.Stg of rd by Dense Carpet from H.no. HL=16 to GL-27 and along Petrol Pump in L block, Hari Nagar, C 19(PN) WZ
478/23.11.05/EE-VII
M/s Mukash Associates
Pvt.Ltd.Stg of rd by Dense Carpet from H.no. F 1/IA to F 14A, F-1/17A to 20A & DESU office to F 1/15A in F-1 Pkt Hari nagar, C-19 WZ
485/25.11.05/EE-VII
M/s Vinod Kumar
Imp of lane by pdg RMC fromH.no. C 49 to Jailrd in Fateh nagar in C-19(PN) WZ
593/16.02.06/EE-VII
M/s Sunil Bansal
Imp to lane by pdg Kota Stone floorint from H.no. 468C to 468G in MS Block, Hari Nagar in (PN) WZ
765(A)/24.03.06/EE-VII
M/s Neel Traders
Imp of lane by pdg RMC from H.no. 459 to 445 and 470 M/2 to 470 H in MS Bliock, Hari Nagar in C19(PN) WZ
596/16.02.06/EE-VII
Imp of rd by RMC fromH.no.K-7 to 21 in Fateh Nagar in C19 (PN) WZ
597/16.02.06/EE-VII
M/s Pankaj Builders
Stg of rd by Dense Caret from H.n BL-65 to BL-76 & BL-87 to 97 from Park Corner to gali no 4 in L block Hari nagar, C 19(PN) WZ
479/23.11.05/EE-VII
M/s Mukash Associates
Pvt.Ltd.C/O Hut in the park opp H.no. 321 in EC Pkt Maya Encl. in C 19 (PN) WZ
570/20.12.06/EE-M-I
M/s Neel Traders
Imp of back lane by RMC starting from H.no. 7/1 to 7/25 and 7/70 in 7 block, Subhash Nagar in C20 WZ
595/16.02.06/EE-VII
C/o Mini Stadium at Shyam Vatika Hari nagar Sh Pdg Strectural Design for the C/o steps for sitting ni West portion and Ladies Lav Block at Mini Stadium at Shyam Vatika Hari ngr C0-19 (PN) WZ
15/16.07.07EE_VII
M/s Allied Engg.
46 Civil EE-VII 14.9.05 1.9.05 195572.00 19.12.05 16.1.06 193114.00 Completed
47 Civil EE-VII 14.9.05 1.9.05 198696.00 465/22.11.05/VII 11.12.05 20.01.06 197996.00 Completed
48 Civil EE-VII 14.9.05 1.9.05 171571.00 15.12.05 23.1.06 171218.00 Completed
49 Civil EE-VII 20.9.05 31.5.05 488660.00 M/s A.K & Co. 08.02.06 28.03.06 488606.00 Completed
50 Elect EEE-III 12.12.05 20.10.05 154440.00 30.05.06 05.07.06 137111.00 Completed
51 Elect EEE-III 20.12.05 20.10.05 198602.00 05.05.06 26.05.06 193291.00 Completed
52 Elect EEE-III 20.12.05 20.10.05 198341.00 28.04.06 26.05.06 192894.00 Completed
53 Civil EE-VII 8.2.06 6.2.06 670700.00 16.12.06 18.01.07 670700.00 Completed
54 Civil EE-VII 8.2.06 6.2.06 210315.00 M/s Jattin Joggi 30.05.06 07.07.06 208654.00 Completed
55 Civil EE-VII 8.2.06 6.2.06 229205.00 M/s Jattin Joggi 30.05.06 07.08.06 228539.00 Completed
56 Civil EE-VII 8.2.06 1.9.05 147150.00 24.05.06 18.10.06 147034.00 Completed
57 Civil EE-VII 8.2.06 1.9.05 695300.00 16.12.06 18.01.07 695106.00 Completed
58 Civil EE-VII 8.2.06 27.6.05 391021.00 15.05.06 11.08.06 390998.00 Completed
C/o FP inside park opp H.no. I/216 in I Block Subhas Nagar C 20 Wz
486/2.12.05/EE-VII
M/s R,K Enterprises
C/o FP inside park opp H.no. 1/70 in A block Subash Nagar C 20 Wz
M/s Apoorv Buildre and Contractors
C/o FP inside park opp H.no. 17/171 in 17 block Subhash Nagar C 20 Wz
495/8.12.05/EE-VII
MS Shanti Builder
Imp to lane by pdg RMC and drainge syteme from Hs. N. BE-290 to BE-301 in BE Block Subhash Nagar C 20 WZ
594/16.02.06/EE-VII
P/o of lightting arrangement with 1*150 watt flood light in the park of cc. Block Hari
Nagar , 1&2 block Subhash Nagar & Partap Nagar Near Gurudwar in W.Z
142/29.05.06/EE(E)III
M/s Perfect Electric Works
P/o 3*70 watt Juno Integral post top laleran fitting in the park of DA 100,CD block pkt. 1F& 2F Hari Nagr under W.Z
49/03.05.06/EE(E)-III
M/s M.J Electricals & Electronics
P/o 3*70 watt Juno Integral post top laleran fitting in the park of 17 block Subash Nagr , Rajoiri Apptt. Maya Kunj , MIG flats Vikrant Enclave under WZ
26/21.04.06/EE(E)-III
M/s Best Electricals & Electronics
Stg of road by Dense Carpet Starting from H.no. 7/1 to 7/123 and 7/148 to 7/155 in 7 Block, Subhash Nagar, C 20 WZ
524/05.12.06/EE-VII
M/s R.P Singal & Co.
Imp to B/wall of park by pdg Grit Wash in 5 block, Subhash Nagar in C 20 WZ
85/01.05.06/EE-VII
C/o Walkway & Imp of B/wall opp. H.n. 2/418 and Imp to B/wall of Mahila Park in 7 Block Subhash Nagar C 20 WZ
84/01.05.06/EE-VII
Const of Water Body in 17 block park Subhash Nagar C 20 WZ
101/15.05.06/EE-VII
M/s Bajrag Engineers & Contractors
Stg of rd by Dense Carpet starting from H.no. 17/1 to 17/63 back side and along park 17 block in Subhash Nagar in C 20 WZ
524/05.12.06/EE-VII
M/s R.P Singal & Co.
imp to rd by pdg RMC from H.no. 1/178 to 1/216 in 1 block Subhash Nagar in C 20 WZ
88/01.05.06/EE-VII
M/s Anand Consts.Works
59 Civil EE-VII 8.2.06 27.6.05 297400.00 08.05.06 15.07.06 296661.00 Completed
60 Civil EE-VII 8.2.06 27.6.05 386698.00 12.05.06 18.07.06 385569.00 Completed
61 Civil EE-VII 8.2.06 27.6.05 381855.00 26.06.06 13.07.06 381474.00 Completed
62 Civil EE-VII 8.2.06 27.6.05 339980.00 12.05.06 18.07.06 339856.00 Completed
63 Civil EE-VII 24.03.06 06.02.06 811200.00 02.04.07 16.04.07 811200.00 Completed
64 Civil EE-VII 24.03.06 06.02.06 797800.00 02.04.07 16.04.07 790458.00 Completed
imp to rd by pdg RMC from H.no. 5/181 to 5/216 in 5 block Subhash Nagar in C 20 WZ
90/01.05.06/EE-VII
M/s V.K.Choudhary
& Co.imp to rd by pdg RMC from H.no. 1/217 to 1/240 in 1 block Subhash Nagar in C 20 WZ
86/01.05.06/EE-VII
M/s V.K.Choudhary
& Co.
imp to rd by pdg RMC from H.no. 1/1 to 1/36 in 1 block Subhash Nagar in C 20 WZ
87/01.05.06/EE-VII
M/s Pankaj Builders
imp to rd by pdg RMC from H.no. 1/143 to 1/178 in 1 block Subhash Nagar in C 20 WZ
92/01.05.06/EE-VII
M/s V.K.Choudhary
& Co.Stg.of road in S.F.S flats, Rajouri Apptt. In
Subhash Nagar C-20/W.Z 793/12.02.07/EE-
VIIM/s Asuan
Resurfacing of row Agency
Pvt.Ltd.
Stg. Of road by dense carpet strating from A-street to E-street in 654 M.I.G Flats Maya puri C-20 W.Z
793/12.02.07/EE-VII
M/s Asuan Resurfacing of row Agency
Pvt.Ltd.
Status Report of MLA,Sh.O.P.Babbar, AC No. 14 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil EE-XV 7.6.05 03.06.05 490818.00 23.12.05 28.1.06 490191.00 Completed
2 Civil EE-XV 7.6.05 03.06.05 197400.00 24.11.06 29.12.06 197400.00 Completed
3 Civil EE-XV 7.6.05 03.06.05 136800.00 24.11.06 29.12.06 136800.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp of Service lane along NG rd by opdg RMC from B1 to B-19 Ganesh Nagar C-22./WZ
247/23.12.05/X
V
M/s Manish Const co
Imp FP along NG rd by pdg Red Stone flooring from Malik Jewellers to 5B/6 Tilak Nagar C-22./WZ
278/24.11.06/E
E-XV
M/s Nirmal Const.CO
C/O of Ornamental Gate of park opp H.no. 5B/6 in Tilak Nagar C-22./WZ
278/24.11.06/E
E-XV
M/s Nirmal Const.CO
4 Civil EE-XV 7.6.05 03.06.05 161000.00 24.11.06 29.12.06 144613.00 Completed
5 Civil EE-XV 7.6.05 03.06.05 168000.00 23.03.06 06.11.06 168000.00 Completed
6 Civil EE-XV 7.6.05 03.06.05 209400.00 23.03.06 06.11.06 209400.00 Completed
7 Civil EE-XV 7.6.05 03.06.05 429943.00 20.10.05 7.12.05 425176.00 Completed
8 Elect EEE-III 7.6.05 6.6.05 169388.00 7.11.05 14.11.05 159737.00 Completed
9 Elect EEE-III 7.6.05 6.6.05 205854.00 3.10.05 26.10.05 197197.00 Completed
10 Elect EEE-III 7.6.05 6.6.05 131723.00 3.10.05 27.10.05 126923.00 Completed
11 Elect EEE-III 7.6.05 6.6.05 112383.00 20.9.05 3.10.05 101079.00 Completed
12 Elect EEE-III 7.6.05 6.6.05 137574.00 3.10.05 26.10.05 128812.00 Completed
13 Elect EEE-III 7.6.05 6.6.05 137574.00 3.10.05 25.10.05 129929.00 Completed
14 Elect EEE-III 7.6.05 6.6.05 177650.00 14.10.05 26.10.05 160059.00 Completed
C/O Hut in park opp H.no. 5B/6 in Tilak Nagar C-22./WZ
278/24.11.06/E
E-XV
M/s Nirmal Const.CO
Imp of lane from 1/1 to 1/16 Duble Story near Lahori Dairy Tilak Nagar by pdg RMC in Tilak Nagar C-22./WZ
364/13.03.06/E
E-XV
M/s Bhardwaj Const.Co
Imp to lane by pdg RMC opp 4B/35 in Tilak Nagar C-22./WZ
364/13.03.06/E
E-XV
M/s Bhardwaj Const.Co
Imp ofl ane byu pdg RMC and Pipe Drainge from 19/39 to 22/38 and chowk opp 19/37 Tilak Nagar C-22./WZ
168/20.10.05/E
E-XV
M/s Manish Const co
Prov. Of Semi High Mast light in Parks back side of B 61, Shankar Garden, Under WZ
269//7.11.05/EE
E_III
M/s Forwards Engineers
P/O Lighting arrang. In park near 17/1 to 17/30 Tilak Nagar under Wz
98//3.10.05/EE
E_III
M/s Pragati Engineers
P/O Lighting arrang. In park near 4A/4 to 4A/13 Tilak Nagar under Wz
97//3.10.05/EE
E_III
M/s Pragati Engineers
P/O Lighting arrang. in park 3 and 4 block Ashok Nagar under Wz
50//20.9.05/EE
E_III
M/s Saksham Electical & Electronic
P/O Lighting arrang. in park near K-67 Krishan Park Ext under Wz
79//26.9.05/EE
E_III
M/s Khanna Sales Corp.
P/O Lighting arrang. in park block 6 in Tilak Nagar under Wz
75//26.9.05/EE
E_III
M/s Eminent Traders ( India)
P/o Semi High mast Light in Central Park opp KG-II/358 Vikas puri under WZ
139/7.10.05/EE
E_III
M/s Himanshu Enterprises
15 Elect EEE-III 7.6.05 6.6.05 194848.00 22.9.05 30.9.05 185400.00 Completed
16 Elect EEE-III 7.6.05 6.6.05 262389.00 1.11.05 5.12.05 250782.00 Completed
17 Elect EEE-III 7.6.05 6.6.05 262389.00 22.12.05 28.12.05 250844.00 Completed
18 Elect EEE-III 15.06.05 10.06.05 193427.00 38/18.7.05 19.7.05 25.7.05 186906.00 Completed
19 Elect EEE-III 15.06.05 10.06.05 136769.00 01.09.05 18.09.05 134022.00 Completed
20 Elect EEE-III 15.06.05 10.06.05 179238.00 37/18.7.05 19.7.05 25.7.05 175077.00 Completed
21 Elect EEE-III 15.06.05 10.06.05 196083.00 36/18.7.05 19.7.05 25.7.05 188997.00 Completed
22 Elect EEE-III 15.06.05 10.06.05 124251.00 35/18.7.05 19.7.05 25.7.05 118520.00 Completed
23 Elect EEE-III 15.06.05 10.06.05 194606.00 34/18.7.05 19.7.05 26.7.05 189458.00 Completed
24 Civil EE-XV 15.06.05 9.6.05 522186.00 17.02.06 18.02.06 522156.00 Completed
25 Civil EE-XV 15.06.05 8.6.05 301547.00 20.10.05 15.12.05 301483.00 Completed
P/O 3x70 watts Juno intergal post tp Lantern in the park opp E-294 (80)yrds) Tagore Garden Ext,. Under WZ(4 no)
46//20.9.05/EE
E_III
M/s S.G. Enterprises
P/O 3x70 watts Juno intergal post tp Lantern fittings in the park opp WZ-40 Chowkhandi Ext. Under WZ
213/28.10.05/E
EE_III
M/s Sangwan Electicals
P/O 3x70 watts Juno intergal post tp Lanternin ther park opp D-555 (80 yrds) Tagore Garden ExtUnder WZ
418/21.12.05/E
EE-III
M/s Sachdeva Electricals
P/o Street light (Sodium Light) in Chowkhandi Ext Ram Nagar Ext. and Ram Nagar under WZ
M/s Bansal Elect Store
P/o Street light (Sodium Light) with pole in Titar Pur and Tagore Garden WZ
43/23.08.05/EEE-III
M/s Pragati Engineers
P/o Street light (Sodium Light) in block E (80 yrds) Tagore Garden Ext. and 608 Slam qtrs Tagore Garden Ext near Central School under WZ
M/s Anil Kumar
P/O Street light in Block F (25 yards) Raghubir Nagar under WZ
M/s A N Const CO.
P/o Street light (Sodium Light) in Tagore Garden D block, Tagore Garden and Titar Pur under WZ
M/s Bindra Motors & Electricals
P/o Street light (Sodium Light) in AB Chowkhandi and Sant Nagar Ext. under WZ
M/s A N Const CO.
Imp of rd by Dense Carpet from H.n WZ-118 to 122/8(Gali no 2) and Wz 58 to 62 (gail no 4) in Meenakshi Garden AC-14 WZ
250/23.12.05/EE-XV
M/s R.P Singhal
C/o Ornamental gate and Imp of B/wall with Red Sand Stone linning in park opp 7/35 Tilak Nagar C-22 WZ
167/20.10.05/EE_XV
M/s Manish Const co
26 Civil EE-XV 15.06.05 3.6.05 212501.00 06.12.05 P 196653.00 In Prog.
27 Civil EE-XV 15.06.05 3.6.05 255573.00 13.1.06 P 176925.00 In Prog.
28 Civil EE-XV 27.6.054 03.06.05 212118.00 30.01.06 118545.00 Completed
29 Civil EE-XV 27.6.054 03.06.05 285219.00 15.04.06 15.09.06 283789.00 Completed
30 Civil EE-XV 27.6.054 8.6.05 463579.00 05.01.06 30.03.06 458577.00 Completed
31 Civil EE-XV 27.6.054 8.6.05 210124.00 30.01.06 15.09.06 152145.00 Completed
32 Civil EE-XV 27.6.054 8.6.05 218493.00 29.11.05 08.03.06 211235.00 Completed
33 Civil EE-XV 27.6.054 8.6.05 293724.00 08.11.05 07.02.06 289657.00 Completed
34 Elect EEE-III 28.6.05 17.6.05 193340.00 07.12.05 20.12.05 186256.00 Completed
35 Elect EEE-III 28.6.05 17.6.05 193340.00 1.12.05 12.12.05 187255.00 Completed
36 Elect EEE-III 28.6.05 17.6.05 160519.00 1.11.05 22.11.05 157252.00 Completed
Imp of W/way by pdg Kota Stone and CC tiles in park opp MCD staff qtrs Ashok Nagar C-22 WZ
218/06.12.05/EE-XV
M/s Cheema Builders
C/o FP in park opp 7/35 Tilak Nagar C-22 WZ
264/13.1.06 EE-XV
M/s Manish Const co
C/o 2 nos Huts in each park I one in 13 Block park Ashok Nagar and other in 18-19 Block park Tilak Nagar in C-22 WZ
277/20.01.06/EE-XV
M/s Tanya Const.
156.09.06
Imp of front of B/wall of park along NG Rd opp Shankar G arden by pdg Red Sand Stone Flooring in C-22 WZ
4/05.04.06/EE-XV
M/s Prince Enterprises
Imp to rd by pdg MP from SD Mandir Ashok Nagar to 27/1 Double Story, Ashok nagar in C-22 WZ
254/05.01.06/EE-XV
M/s Nand Kishore
C/o 2 nos onramental gates in park near k-19 New Mahavir Nagar in C--22 Wz
278/20.01.06/EE-XV
M/s Tanya Const.
C/o 2 nos Huts i.e. one in 12 block park Tilak Nagar & other at parki opp A -50 Vikas Puri C-2 WZ
213/29.11.05/EE-XV
M/s Manish Const co
Imp of 12 block park FP by pdg CC tiles and Imp of Fountain in Tilak Nagar in C-22 WZ
181/08.11.05/EE-XV
M/s Ravindra Const.Co-II
P/O Boring with Submersible set and Imp of Water fall in the park of E block opp E-82 Tagore Garden Ext in WZ
360/06.12.05/EEE-III
M/s Pahwa Builders
P/O Boring with Submersible set and Imp of Water fall in the park of Block E opp E-294, Tagore Garden Ex under wZ
338/30.11.05/EEE_III
M/s Sri Bala Ji Electcials
P/O Boring with Submersible set and Imp of Water fall in the park of B block near Shiv Shakti Mandir Chawkhandi under Wz
224/28..10.05/EEE-III
M/s SG Enterprises
37 Elect EEE-III 28.6.05 17.6.05 157757.00 3.11.05 12.11.05 149469.00 Completed
38 Elect EEE-III 28.6.05 17.6.05 159371.00 1.11.05 21.11.05\ 157842.00 Completed
39 Elect EEE-III 28.6.05 17.6.05 207132.00 21.02.06 27.02.06 197961.00 Completed
40 Elect EEE-III 28.6.05 17.6.05 199073.00 12.10.06 23.10.06 130392.00 Completed
41 Elect EEE-III 15.7.05 6.6.05 181670.00 1.12.05 5.12.05 166126.00 Completed
42 Elect EEE-III 15.7.05 6.6.05 170038.00 1.12.05 7.12.05 168414.00 Completed
43 Elect EEE-III 19.7.05 17.6.05 503346.00 22.03.06 08.03.07 494894.00 Completed
44 Civil EEE-XV 29.7.05 3.6.05 180500.00 23.03.06 06.11.06 180500.00 Completed
45 Elect EEE-III 15.9.05 9.8.05 197000.00 18.11.05 02.12.05 193247.00 Completed
46 Elect EEE-III 16.9.05 12.9.05 159556.00 30.11.05 15.12.05 159135.00 Completed
P/O Boring with Submersible set in the park of E block (24 yards) opp E-100, Raghubir Nagar WZ
255/3.11.05/EEE_III
M/s A.K Electicals
P/O Boring with Submersible set in the park of infront of plot nop 36 (134 altenative plot) along Chowkhandi area behind park Hosp. Under WZ
211/28.10.05/EEE-III
M/s Sangwan Electicals
P/o 70 watts Material Holid Juno Integral post top Lantern fittings in the park of ED block Tagre and in the park infront of WZ 69 Tatar pur under WZ
493/21.02.06/EEE-III
M/s Sachdeva Electricals
P/O Lighting and other accessories to fountain in the park of Block ED Tagore Garden under Wz
280/12.10.06/EE(E)-III
M/s Sachdeva Electricals
P/o Semi High Mast Light in the Park of Chowkhandi ext under Wz
327/30.11.05/EEE_III
M/s Neeraj Electicals
P/o Semi High mast Light in the park of opp plot no 36/134 alternative plot) chowkhandi behind park Hosp. Under WZ
324/30.11.05/EEE_III
M/s Sachdeva Electricals
P/O Electric fittins to water fall in the park of Tagore garden (Near Water Tank) E D block under WZ
492/21.02.06/EEE-III
M/s Sachdeva Electricals
Imp of B/wall of park of P block by pdg Red Sand Stone lining in Tilak Nagar in C22 WZ
364/13.03.06/E
E-XV
M/s Bhardwaj Const.Co
Prov of Sodium Light (250 watt)in vikas puri, Shankar garden, Tilak nagar, Ganesh Nagar krishna Park and krishna puri under WZ
280/10.11.05/EEE-III
M/s Perfect Electric Works
P/o Boring with submersible pump in park of 17 Block Tilak Nagar unde Wz
333/30.11.05/EEE_III
M/s Sri Bala Ji Electcials
47 Elect EEE-III 16.9.05 12.9.05 138055.00 08.12.05 23.12.05 134478.00 Completed
48 Elect EEE-III 16.9.05 12.9.05 163075.00 16.12.05 26.12.05 152392.00 Completed
49 Elect EEE-III 16.9.05 12.9.05 159556.00 30.11.05 9.12.05 140875.00 Completed
50 Elect EEE-III 16.9.05 12.9.05 138056.00 30.11.05 26.12.05 133881.00 Completed
51 Elect EEE-III 16.9.05 12.9.05 138056.00 16.12.05 26.12.05 134463.00 Completed
52 Elect EEE-III 16.9.05 12.9.05 138056.00 30.11.05 15.12.05 134516.00 Completed
53 Elect EEE-III 16.9.05 12.9.05 138056.00 9.12.05 2.1.06 130901.00 Completed
54 Elect EEE-III 16.9.05 12.9.05 138056.00 16.12.05 29.12.05 131453.00 Completed
55 Elect EEE-III 16.9.05 12.9.05 131071.00 30.11.05 8.12.05 105938.00 Completed
56 Elect EEE-III 16.9.05 12.9.05 32773.00 22.02.06 01.03.06 30629.00 Completed
57 Civil EE-XV 28.11.05 4.8.05 450232.00 08.03.06 30.03.06 449990.00 Completed
58 Civil EE-XV 28.11.05 4.8.05 422886.00 19.05.06 13.10.06 422363.00 Completed
59 Civil EE-XV 19.12.05 17.12.05 282816.00 30.03.06 23.09.06 282816.00 Completed
P/o Boring with submersible pump in B block park Shankar Garden unde Wz
364/08.12.05/EEE-III
M/s Master Electric Store
P/o Boring with submersible pump in park of Ajay Encl. Under WZ
388/16.12.05/EEE_III
M/s Bharat Electicals & Electronic
P/o Boring with submersible pump in park of 1 Block Ashok NagarUnder WZ
328/30.11.05/EEE_III
M/s A.K Electicals
P/o Boring with submersible pump in park of A block Vikas Puri Under WZ
332/30.11.05 EEE-III
M/s Sri Bala Ji Electcials
P/o Boring with submersible pump in park of 7 Block Tilak Nagar Under WZ
384/16.12.05/EEE_III
M/s Dev Engineers
P/o Boring with submersible pump in park of 22 Block Tilak Nagar Under WZ
334/30.11.05/EEE_III
M/s Sri Bala Ji Electcials
P/o Boring with submersible pump in park of 18 Block Tilak Nagar Under WZ
376/9.12.05/EEE-III
M/s S.T Electic CO.
P/o Boring with submersible pump in park of KG-3 Vikas Puri Nagar Under WZ
385/16.12.05/EEE-III
M/s Gurmeet Enterprises
P/o Boring with submersible pump in park of ED Block Tagore Garden Under WZ
329/30.11.05/EEE_III
M/s A.K Electicals
P/o Boring with submersible pump in park fountain park of AD Block Tagore Garden Under WZ
490/21.02.06/EEE-III
M/s Sri Bala Ji Electcials
Imp of back lane by providing RMC form WZ-1 to 19 Minashi Garden C-22/ WZ
358/08.03.06/EE-XV
M/s Aashu Enterprises
Imp of road by providing M/P from Harijan Coloney to Tilak Nagr Maket on NG road in Tilak Nagr C-22 WZ
438/31.03.06/EE-XV
M/s Neel Traders
C/o N.G road service lane footpath by pdg c.c. Kerbstone and c.c. tiles
outside Tilak Nagar Market in C-22/WZ
403/20.03.06/EE-XV
M/s Manish Const co
60 Civil EE-XV 19.12.05 17.12.05 403673.00 20.03.06 08.05.06 403381.00 Completed
61 Civil EE-XV 19.12.05 17.12.05 600170.00 10.06.06 25.10.06 599900.00 Completed
62 Civil EE-XV 20.12.05 17.12.05 320434.00 10.05.06 18.10.06 320252.00 Completed
63 Civil EE-XV 20.12.05 17.12.05 276033 24.04.06 26.06.06 275969.00 Completed
64 Civil EE XV 20.12.05 17.12.05 189212.00 20.04.06 05.06.06 186600.00 Completed
65 Civil EE XV 20.12.05 17.12.05 380727.00 30.04.06 29.07.06 380636.00 Completed
66 Elect EEE_III 9.1.06 29.12.05 170000.00 01.06.06 10.06.06 170000.00 Completed
67 Elect EEE_III 9.1.05 29.12.05 200000.00 20.03.06 31.03.06 195314.00 Completed
68 Elect EEE_III 17.1.06 9.8.05 524979.00 16.03.06 31.03.06 512197.00 Completed
Beautificatan of Ashok Nagr Mkt ar N.G road adj. To Tilak Nagr Police station by pdg kerb stone , c.c. tiles grills and RMC in Ashok Nagar ,C-
22/WZ
402/20.03.06/EE-XV
M/s Manish Const co
C/o Cetral verge from S.D. Mandir Ashok Nagar to 60 block Ashok Nagar
by pdg Kerb stone c.c. cheqed tiles &M.S grills in Ashok Nagr C-22/ Wz
90/01.06.06/EE-XV
M/s Paramvir Const.Co
C/o Boundary wall under Tilak Nagar fly over with M.S Grills in Tilak Nagar
C-22/WZ
39/01.05.06/EE-XV
M/s Parveen Kumar
Contractor
C/o Front boundary wall & out side foot path of park opp Janak Puri Distt.
Central on NO- G road in New Krishna Park by pdg wood facing walls in C-
22/WZ
30/24.04.06/EE-XV
M/s Manish Const co
Providing Red sand stone/white sand stone lining on ornamental B/wall of park opp. I Block, Ashok Nagar C-
22/WZ
24/20.04.06/EE-XV
M/s Manish Const co
C/o Ornamental Strcuturs of fountain in 5,6 and 7 Block parks of Tilak Nagar in
C-22/WZ
19/20.04.06/EE-XV
M/s Garg Const.Co
Pro. Of Semi hight mast ligh at D-460 Tagore Garden Extn. Under WZ
136/29.05.06/EE(E)-III
M/s S.T Electic CO.
Prov of street lighting in block D Tagore Garden Extn in under wz
530/20.03.06/EE(E)-III
M/s Forwards
Engineers
P/o Soduim lights (150 Watts) in Krishana Puri, Ganesh Nagar, Mahavir Nagr , Shankar Garden , Shyam Nagar
and Tilak Nagar under WZ
520/16.03.06/EEE-IIII
M/s S.T Electic CO.
69 Elect EEE_III 17.1.06 9.8.05 100000.00 20.03.06 31.03.06 97794.00 Completed
70 Civil EE-XV 17.1.06 6.1.06 277800.00 12.06.06 08.09.06 216384.00 Completed
71 Civil EE-XV 17.1.06 6.1.06 295700.00 28.04.06 17.07.06 171791.00 Completed
72 Civil EE-XV 17.1.06 6.1.06 502541.00 05.05.06 07.08.06 414510.00 Completed
73 Civil EE-XV 25.1.06 14.1.06 197706.00 05.04.06 30.05.06 194911.00 Completed
74 Civil EE-XV 25.1.06 14.1.06 197353.00 06.04.06 30.05.06 196221.00 Completed
75 Civil EE-XV 25.1.06 14.1.06 199174.00 06.04.06 30.05.06 198748.00 Completed
76 Elect EEE_III 27.1.06 27.7.05 157654.00 17.03.06 29.03.06 156171.00 Completed
77 Civil EE-XV 2.2.06 16.1.06 668800.00 15.05.06 04.12.06 438232.00 Completed
P/o street lights in Chaukhandi village A& B block under wz
527/20.03.06/EE(E)-III
M/s Sachdeva Electricals
C/o of Designer gate Kishti wala park in AE Block Tagore garden C-21 WZ
80/01.06.06/EE-XV
M/s Om Mark
Builders
Imp to footpath in side park in Tagore Garden AE block in C-21 WZ(by pdg Red stone )
25/20.04.06/EE-XV
M/s Subharwal Const.Co
P/L RMC on road between Govt. Co. Edu. Sec School Tagore Garden and E block Raghiver Nagar C-21 WZ
48/02.05.06/EE-XV
M/s Paramvir Const.Co
Imp of road side berms by pdg Interlocking tiles / RMC from D-142 to 154,D-141 to D-90 , D-122 to D-81, D-102to D-121 in Ajay Enclave C-22 WZ
436/31.03.06/EE-XV
M/s Madan Lal Gupta
Imp of road side berms by pdg Interlocking tiles / RMC in A block Vikash puri from A 31 to A-14, and back side of Vikash puri police station C-22 WZ
424/28.03.06/EE-XV
M/s Goyal Const.CO
Imp of road side berms by pdg Interlocking tiles / RMC in gali no -1 , 2 and 4 in Minasksh Garden in C-22 WZ.
425/28.03.06/EE-XV
M/s Madan Lal Gupta
P/o of boring with submersible pumps set in park in front of MCD flats Ashok
Nagar WZ
523/17.03.06/EEE-III
M/s Neeraj Electicals
Pdy RMC from H.No B-5 to B-10 back side, road berms from B-5 to B-10 front
side and B-19 to B-23 in Tagor Garden C-21 WZ
56/11.05.06/EE-XV
M/s Parveen Kumar
Contractor
78 Civil EE-XV 10.03.06 2.03.06 199313.00 26.05.06 13.06.06 198560.00 Completed
79 Civil EE-XV 10.03.06 2.03.06 198108.00 05.04.06 30.05.06 197362.00 Completed
80 Civil EE-XV 28.03.06 27.03.06 521253.00 22.05.06 P 405882.00 In Prog.
81 Civil EE-XV 28.03.06 20.03.06 690000.00 08.09.06 P 519858.00 In Prog.
Imp of road side berns by pdy inter locking tiles behind vikas puri police
station from vikas puri police station to A-290 in C/22/WZ
75/26.05.06/EE-XV
M/s Goyal Const.CO
Imp of road side berns by pdy inter locking tiles/R.M.C in gali from D-11 to D-25,D25 to D10, D52 to D61 and D25
to D35 in Ajay Encalve in c/22/WZ
439/31.03.06/EE-XV
M/s Sachin Kumar Gupta
C/O various intersections by Pdy. Mastic Surface from H.NO W.Z-42 to
W.Z-72 in Chaukhandi Extn. C-21/W.Z
10/05.04.06/EE-XV
M/s Balaji Associates
C/O front boundry wall of park opp. Dholi Pio red lights in New Krishna
Park by Pdy.red sand stone lining and grills and water fountain in side it in
New Krishna Park C-22/W.Z
165/08.09.06/EE-XV
M/s Manish Const co
Status Report of MLA,Sh.Ramesh Lamba, AC No. 15 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Elect EEE-III 27.4.05 9.4.05 90000.00 16.10.05 15.11.05 87481.00 Completed
2 Elect EEE-III 30.5.05 21.5.05 158917.00 14.10.05 5.11.05 153655.00 Completed
3 Elect EEE-III 30.5.05 21.5.05 171678.00 17.11.05 05.12.06 163182.00 Completed
4 Elect EEE-III 03.06.05 21.5.05 157757.00 9.11.05 18.11.05 150565.00 Completed
5 Elect EEE-III 03.06.05 21.5.05 157757.00 15.10.05 15.11.05 154753.00 Completed
6 Elect EEE-III 03.06.05 21.5.05 64343.00 03.03.06 25.05.06 56249.00 Completed
7 Elect EEE-III 03.06.05 21.5.05 157757.00 26.10.05 07.11.05 155462.00 Completed
8 Elect EEE-III 28.6.05 25.6.05 525125.00 19.10.05 18.11.05 479425.00 Completed
9 Elect EEE-III 29.6.05 24.6.05 170038.00 9.11.05 18.11.05 163349.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
P/O Lighting arrang. With 2x250 watt flood light in the park opp C-228 Tagroe Garden Ext under WZ
117/7.10.05/EE
E-III
M/s GS Electricals
P/O Boring and Subermsible Pump set in the park opp V-288 Rajouri Garden W.n. 23 under WZ
91/3.10.05/EEE
-III
M/s Dev Engineers
P/O Boring and Subermsible Pump set in the park of LIG flat Rajouri Garden W.n. 23 under WZ
288/10.11.05/E
E(E)-III
M/s Master Electric Store
P/O Boring and Subermsible Pump set in Tikona Park Tagroe Garden Ext opp,. C-85 under WZ
272/8.11.05/EE
E_III
M/s Gurmeet Enterprises
P/O Boring and Subermsible Pump set in Shaheed Bhagat Singh park opp A-52 Janta Cly, W.no. 24, under WZ
136/7.10.05/EE
E_III
M/s Bhima Electicals
P/O Subermsible Pump set with panel in park near A-607, JJ Cly, Raghubir Nagar, under WZ
501/21.02.06/E
E(E)-III
M/s Ankur Eletricals
P/O Boring and Subermsible Pump set in the park of B-500 JJ cly, Raghubir Nagar, under WZ
198/25.10.05/E
EE-III
M/s Sangwan Electricals
P/o 70 watt Juno Intergral Post top Lantern fittings in the park Bali Nagar under WZ
178/18.10.05/E
EE-III
M/s Pragati Engineers
P/O Semi High Mast Light in the park of FD Block Shivji Encl. Opp H.no. 36, under WZ
274/8.11.05/EE
E_III
M/s Siwach Engineers &
Traders
10 Elect EEE-III 5.7.05 24.6.05 321083.00 01.11.05 18.11.05 310877.00 Completed
11 Civil EE-VII 26.7.05 21.6.05 180000.00 13.10.05 28.10.05 171114.00 Completed
12 Civil EE-VII 26.7.05 21.6.05 194000.00 20.9.05 1.12.05 183029.00 Completed
13 Elect EEE-III 8.8.05 1.8.05 129710.00 4.11.05 12.11.05 129613.00 Completed
14 Elect EEE-III 8.8.05 1.8.05 236902.00 24.12.05 17.1.06 235804.00 Completed
15 Civil EE-VII 29.8.05 26.8.05 378975.00 07.07.06 08.01.07 374,213.00 Completed
16 Civil EE-VII 29.8.05 26.8.05 567900.00
17 Civil EE-VII 29.8.05 26.8.05 271000.00
18 Civil EE-VII 29.8.05 26.8.05 198400.00 28.04.06 P 179322 In Prog.
19 Civil EE-VII 29.8.05 26.8.05 174014.00 23.05.06 23.10.06 142829.00 Completed
20 Civil EE-VII 29.8.05 26.8.05 188100.00 28.12.05 25.05.06 176671.00 Completed
21 Civil EE-VII 29.8.05 26.8.05 359439.00 26.05.06 P 231362.00 In Prog.
P/o 70 watt Juno Intergral Post top Lantern fittings in the park of 4 storey Tenaments, Rahgubir nagar under WZ.
215/28.10.05/E
EE-III
M/s Punjab Electric Co.
Imp of rd surface by MP from N-1 toN 24 in Rajori Garden ni C23 WZ
400/6.10.05/EE-
VII
M/s B.P. Dabas Bros.
Imp of rd surface of MP from H--1 to H-75, in Rajori Garden ni C23 WZ
357/8.9.05/EE-VII
M/s Shree Shyam ji Entprises
P/o Lighting arrangement near M 402 Raghbir Nagar under Wz
266/3.11.05/EE
E-III
M/s Eminent Traders (India)
P/O 70watt Juno Integral Post top Lantern fittings in park of B block Raghbir Nagar (25 yards) under wZ
406/21.12.05/E
EE-III
M/s Bindra Motors and Electricals
Imp to walkway by pdg Red sand Stone in park adjecnt of J-5 to J 6 near H.no, J-5/171 to J-5/101 in Rajouri Garden in C 23 Wz
620/09.03.06/E
E-VII
M/s Santosh Singh
Imp to walkway by pdg Red sand Stone in park adjecnt of J-5 to J 6 near H.no, J-5/101to J 5/52 in Rajouri Garden in C 23 Wz
C/o SW Drain fromH.no.F 78 toF 84 in Bali Nagar in C 23 Wz
Imp of back lane by RMC near H.no. C 60 Bali Nagar in C 23 Wz
18/10.04.06/EE-VII
M/s Kumar Const.Co
C/o SW Drain fromH.no.F38 to F 34 in Bali Nagar in C 23 Wz
657/09.03.06/EE-VII
M/s Santokh Singh
Imp to back lane by RMC near H.no. F 67 Bali Nagr in C 23 Wz
421/19.10.05/EE-VII
M/s Hari Const.
Const Designer Gate in "V" block park and Hut in janta Mkt park in Rajouri Garden C 23 WZ
699/10.03.06/EE-VII
M/s Ravider Const.Co-II
22 Civil EE-VII 29.8.05 26.8.05 296258.00 26.05.06 P 270313.00 In Prog.
23 Civil EE-VII 29.8.05 26.8.05 176000.00 15.10.05 28.11.05 171259.00 Completed
24 Civil EE-VII 29.8.05 26.8.05 275169.00 22.05.06 11.09.06 235015.00 Completed
25 Civil EE-VII 29.8.05 26.8.05 309920.00 04.03.06 02.06.06 308331.00 Completed
26 Civil EE-VII 29.8.05 26.8.05 610800.00 25.04.06 P 595417.00 In Prog.
27 Civil EE-VII 29.8.05 26.8.05 261630.00
28 Civil EE-VII 29.8.05 26.8.05 362300.00
29 Civil EE-VII 29.8.05 26.8.05 281993.00 17.05.06 04.09.06 231874.00 Completed
30 Civil EE-VII 29.8.05 26.8.05 216809.00 19.05.06 28.09.06 179367.00 Completed
31 Civil EE-VII 29.8.05 26.8.05 361871.00 6.1.06 9.2.06 361757.00 Completed
32 Civil EE-VII 29.8.05 26.8.05 208300.00
33 Civil EE-VII 29.8.05 26.8.05 276900.00
Const Designer Gate in "V" block park opp V 242 and Hut in Patel Park in Rajouri Garden in C 23 wZ
658/09.03.06/EE-VII
M/s Ravider Const.Co-II
Imp to lane by RMC fom Z 7 to Z 13A in Rajouri Garden in C 23 Wz
390/6.10.05/EE-VII
M/s Bansal Consts Co-IV
Imp to rd by RMC near H.no. J -198 to J-199 in J block in Rajouri Garden in C 23 Wz
624/09.03.06/EE-VII
M/s Cheema Builders
Imp of lane and by Lanes by CC near H.no,. M 55 to 48 to M 46, M 40, M 39 and M 39 to M 38 C in M block Rajouri Garden in C 23 Wz
614/03.03.06/EE-VII
M/s Davinder Vaid
Stg of rd by pdg Dense Carpet in F block Shivaji Encl. from FC-34 to FC 103,FC 69 to FC 116, FD-19 to FD 36 and FD 1 to FA 45 in C 24 Wz
63/25.04.06/EE-VII
M/s Echo Builders
Pdg RMC on rd in L block 25sqy from Ambedkar Mkt rd to Rd no 28 along Nallah in Raghubir Nagar in C 24 Wz
pdg RMC on the rd B-II block from Rd no 29 to H.no. B2/460 in R/L Raghbri Nagar in C 24 Wz
C/o SW Drain from J 4/1 to J4/24 in Rajouri Garden inC 23 Wz
675/10.03.06/EE-VII
M/s Vijender Associates
Imp to lane by CC near H.no,. S 36 to S 54 in S block, Rajouri Garden in C 23 Wz
619/09.03.06/EE-VII
M/s Santokh Singh
Imp to rd by Mp fromR 5 to E-29 in Rajouri Garden in C 23 Wz
513/5.1.06/EE_VII
M/s Neel Traders
Imp of D./system by lowering of RCC slab from h.no. Z-7 to Z 13A nd Z 5A in Z block, Rajouri Garden in C 23 Wz
Const of B.wall of Shivaji Park in J-4 block Rajouri Garden inC 23 Wz
34 Civil EE-VII 29.8.05 26.8.05 103800.00 11.10.06 03.01.07 103800.00 Completed
35 Civil EE-VII 29.8.05 26.8.05 121900.00 16.10.05 P 119155.00 In Prog.
36 Elect EEE-III 30.8.05 26.8.05 226198.00 01.02.06 12.02.06 226125.00 Completed
37 Civil EE-VII 15.9.05 26.8.05 625833.00 15.04.06 19.05.06 625650.00 Completed
38 Civil EE-VII 15.9.05 26.8.05 662874.00 12.04.06 08.08.06 662742.00 Completed
39 Civil EE-VII 15.9.05 26.8.05 1066500.00 25.04.06 P 1034092.00 In Prog.
40 Elect EEE-III 23.9.05 26.8.05 535772.00 20.12.05 17.01.06 521863.00 Completed
41 Elect EEE-III 23.9.05 26.8.05 118865.00 1.12.05 12.12.05 115103.00 Completed
42 Elect EEE-III 23.9.05 26.8.05 467457.00 9.12.05 13.1.06 455319.00 Completed
43 Elect EEE-III 26.9.05 26.8.05 316302.00 10.11.05 2.12.05 308395.00 Completed
Imp of rd by MP from H.no. WZ 408/C 2 to Wz 408/C on Tanwaer Marg in Basia Darapur in C 23 Wz
340/10.10.06/EE-VII
M/s Neel Traders
Imp of rd by Mp from H.no. 55 to 40 and 57 to 79 in Raja Garden in C 23 Wz
402/6.10.05/EE_VII
M/s Mukash Builders
P/O 70 watt Juno Integral Post Top lantern Fittins in the ark of C block (80 sqys) Tagore Garden Ext under Wz
473/24.01.06/EEE-III
M/s Forward Engineers
Imp to rd by RMC opp. 3 sides of Patel Park near J-13/1 to IDBI Bank in J block Rajouiri Garden C 23 WZ
789/30.03.06/EE-VII
M/s Arora Const.co
Stg f rd by RMC from J 4/1 to J4/24 and from j 12 to Z 5A and Z3 in Rajouri garden in w.Z
792/30.03.06/EE-VII
M/s Bansal Consts Co-IV
S/I of rd by pdg Dense carpet in Green MIG flats rajouri Garden WZ C 23
63/25.04.06/EE-VII
M/s Echo Builders
P/o 70 watt June Interigal Post Top latern fittings in the park G block Rajouiri Garden and left portion of CHIldren Park J-3 Rajouri Garden wz
394/19.12.05/EEE-III
M/s Perfect Electric Works
P/o 70 watt June Interigal Post Top latern fittings in the park situated at opp. 207A MIG green apptts Rajouri Garden wz
340/30.11.05/EEE_III
M/s Sachdeva Electicals
P/o 70 watt June Interigal Post Top latern fittings in the park at Janta Mkt Rajouri Garden wz
365/8.12.05/EEE-III
M?s Bansal Electric Store
P/o 70 watt June Interigal Post Top latern fittings in the park at J3, Beck side Arya samaj Mandir in Rajouri Garden wz
275/8.11.05/EEE_III
M/s Best Electicals & Electronics
44 Elect EEE-III 28.9.05 5.9.05 196928.00 28.10.05 14.12.05 193181.00 Completed
45 Elect EEE-III 28.9.05 5.9.05 191938.00 28.10.05 16.12.05 188989.00 Completed
46 Elect EEE-III 28.9.05 5.9.05 535772.00 30.12.05 27.01.06 521793.00 Completed
47 Civil EE-VII 28.2.06 6.9.05 271058.00 29.09.06 16.12.06 270964 Completed
48 Civil EE-VII 28.2.06 6.9.05 191000.00 23.05.06 04.07.06 190716.00 Completed
49 Civil EE-VII 28.2.06 6.9.05 154007.00 15.06.06 29.06.06 153781.00 Completed
50 Civil EE-VII 28.2.06 6.9.05 176724.00 12.06.06 04.10.06 176289.00 Completed
51 Civil EE-VII 28.2.06 6.9.05 997895.00 13.02.07 15.06.07 996511.00 Completed
52 Civil EE-VII 28.2.06 6.9.05 137044.00 2.05.06 9.07.07 136231 Completed
53 Civil EE-VII 28.2.06 6.9.05 122256.00 8.02.07 29.05.07 120164 Completed
54 Civil EE-VII 28.2.06 6.9.05 348742.00 12.04.07 02.07.07 347876.00 Completed
P/O Semi High Mast Light arrangment with 2x250 watts installed in the park of j1 to J-13 LIG Red and green Apptt WZ
234/28.10.05/EEE-III
Ms/ Perfect Electric Works
P/O Semi High Mast Light arrangment with 2x250 watts installed in the park of Bali Nagar, Raja garden, Sudharshan ark and Basai Dara pur WZ
223/28.10.05/EEE-III
M/s S.G Enterprises
P/o 70 watt June Interigal Post Top latern fittings in the Patel park at Rajouri Garden wz
427/29.12.05/EEE-III
M/s S.G Enterprises
Imp to side berms from F B 18 to FD 65 and RMC pavment from FD 63 to Temple In shivaji Enclave, in C 24 WZ
257/12.09.06/EE-VII
M/s Anand Const.Works
Const of Walkway inpark 4 storey quarter in Raghubir Nagar near H.no. 221 in C 24 Wz
56/17.04.06/EE-VII
M/s J.M.Const.Co
Imp to rd surface by RMC from H.no. S 56 to W 31 in Rajour Garden in C 23 Wz
78/26.04.06/EE-VII
M/s Heel Traders
Imp to Front and Back lane by RMC from J-3/131 to J 3/137 in Rajouri Gaden in C 23
147/18.05.06/EE-VII
M/s Anand Const.Works
Imp to lanes by RMC from F 1 to E 41 and F 208 to F 340 and F 350 Sudharshan Park in C 23 Wz
794/12.02.07/EE-VII
M/s Pankaj Builders
Imp to lane by RMC from WZ 933 to wz 936 A in Basai Dara Pur in C 23Wz
77/26.04.06/EE-VII
M/s Manish Nayyar
Imp to back lane byRMC from J 5/52A to J 5/52C and from J 8/92 to J 8 in Rajouri Garden I C 23 WZ
114/18.05.06/EE-VII
M/s Prince Ent.
Imp to lanes by RMC from WZ 501 A/12 Wz 501 A/1 and WZ 501A/3 to wz 500 /A in Basai Dara pur in C 23 WZ
330/29.09.06/EE-VII
M/s Pankaj Builders
55 Civil EE-VII 28.2.06 6.9.05 338337.00 03.12.06 03.05.07 337340.00 Completed
56 Civil EE-VII 28.2.06 6.9.05 293373.00
57 Civil EE-VII 1.3.06 3.1.06 220928.00
58 Civil EE-VII 1.3.06 3.1.06 214944.00 11.09.06 17.11.06 213488.00 Completed
Imp to laneby RMC from B-542 to B 604 in Sudarshan Park in C 23 WZ
391/02.11.06/EE-VII
M/s Pankaj Builders
Const of SW Drain on Vishal Enclave rd from NG Rd to A Block Shiv Mandir, IN C 24 WZ
Pdg RMC on the rd in A block in Vishal Enclave from H.no. A 104 to A 111 and H.no. A 74 to A 84 in C 24 Wz
C/o Designer Gate in A block park Vishal Enclave in C 24 Wz
251/08.09.06/EE-VII
M/s Malhotra Const.Co
Status Report of MLA,Sh.Mala Ram Gangwal, AC No. 16 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil EE-XX 03.06.05 14.2.05 183770.00 115/13.12.04 20.12.04 24.6.05 182699.00 Completed
2 Elect. EEE-III 03.06.05 23.6.05 167190.00 18.10.05 31.10.05 142903.00 Completed
3 Elect. EEE-III 03.06.05 23.6.05 167190.00 03.02.06 31.03.06 144341.00 Completed
4 Elect. EEE-III 03.06.05 23.6.05 167190.00 28.10.05 06.12.05 154073.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
C/o Designer Gate in Ram Lilawala park in A block of RC Madipur C-25A WZ
M/s J M Const CO.
P/o boring with submersible pump set in park of Paschim Vihar Ext under WZ
160/18/10/05 EE(E)_III
M/s Master Electic store
P/o boring with submersible pump set in park LIG flats Rohtak road Modi Pur, under WZ
478/31.01.06/E
EE-III
M/s Shivam Electriclas
P/O Boring with subermsible pump set in park Ambedkar Park, Madi pur under WZ
194/25.10.05/E
EE-III
M/s Sangwan Electricals
5 Elect. EEE-III 5.7.05 23.6.05 465309.00 8.11.05 24.11.05 427000.00 Completed
6 Elect. EEE-III 5.7.05 23.6.05 348982.00 09.12.05 18.01.06 320121.00 Completed
7 Elect. EEE-III 5.7.05 23.6.05 465309.00 25.10.05 09.12.05 420764.00 Completed
8 Elect. EEE-III 5.7.05 23.6.05 465309.00 26.10.05 16.12.05 421760.00 Completed
9 Civil EE-XX 15.7.05 5.7.05 312800.00 M/s Rajiv 10.02.06 07.04.06 203311.00 Completed
10 Civil EE-XX 15.7.05 5.7.05 413100.00 M/s Rajiv 10.02.06 07.04.06 268498.00 Completed
11 Civil EE-XX 15.7.05 5.7.05 388600.00 29.05.06 P 240909.00 In Prog.
12 Civil EE-XX 15.7.05 5.7.05 486800.00
13 Civil EE-XX 15.7.05 5.7.05 295100.00
14 Civil EE-XX 15.7.05 5.7.05 458400.00 M/s Rajiv 10.02.06 07.04.06 297991.00 Completed
P/O Liighting arrangment in Centre Parks of A5B, A 4 Janta Qtrs A 4/80 Sq yards Kothie Pragate Apptt Pascim Vihar under Wz
278/8.11.05/EE
E-III
M/s Khanna Sales Corp.
P/O Lighting arrangment in centre park of M<eera bagh b block State Bank Nagar, Reserve Bank Cly under WZ
374/08.12.05/E
EE-III
M/s S.K.Enterprise
s
P/O lighting arrangment in Centre park of LIG Flat Madi pur, Pacshim Vihar Ext Arihant Nagar and Tikona Park Madipur under Wz
201/25.10.05/E
EE-III
M.s A.C.E.Engine
ers Bureau
P/o Lighting arrangment in central Park of Janta qtrs pkt-II, LIG Flats, Paschim Puri Pkt-II, Opp Bhagwati mandir and shivangi Kunj under Wz
180/18.10.05/E
EE-III
M/s Pragati Engineers
Covering of drian from Rohtak rd to Annual Van in A 4 block paschim Vihar in C 26
72/01.02.06/EE-
XX
C/o Drian from Sun shivne Apptt to Kali mandir in A 4 Block, Paschim Vihar C 26.
73/01.02.06/EE-
XX
Covering of Drian infront of Anand Van and Matri Apptt. To Raksha Kunj in A 4 block, Paschim Vihar C 26 WZ
67/17.01.06/EE-
XX
M/s Ram Consts.Co.
Imp to rd by Pdg RMC from h.no. 151 to 168 in A 3 block, Paschim Vihar in C 26 Wz
C/o Walkway by Red Sand Stone in park near H.no.l 330 in A 1 block, Paschim Vihar in C 26
C/o Drain from both side from H.no. 40 to 52 in A 1 block,. Paschim Vihar in C 26 Wz
74/01.02.06/EE-
XX
15 Civil EE-XX 15.7.05 5.7.05 320029.00 03.03.06 P 234750.00 In Prog.
16 Civil EE-XX 15.7.05 5.7.05 542500.00 20.02.06 28.02.06 392958.00 Completed
17 Civil EE-XX 15.7.05 5.7.05 594800.00 12.07.06 12.09.06 452055.00 Completed
18 Civil EE-XX 15.7.05 5.7.05 299000.00 M/s Rajiv 10.02.06 07.04.06 194318.00 Completed
19 Civil EE-XX 15.7.05 5.7.05 369500.00 27.02.06 20.04.06 260738.00 Completed
20 Civil EE-XX 15.7.05 5.7.05 241400.00 20.03.06 31.03.06 229828.00 Completed
21 Civil EE-XX 15.7.05 5.7.05 299400.00 24.06.06 24.10.06 208021.00 Completed
22 Elect. EEE-III 4.8.05 3.8.05 167190.00 7.10.05 18.10.05 143198.00 Completed
Imp to rd by pdg RMC from H.no. 96 to 105 and 114 to 123 in B 2 block, Paschim Vihar in C 26.
85/22.02.06/EE-
XX
M/s Shalabh Gupta
Imp to rd by pdg RMC from H.no. 143 to 154 in A 1 block & H.No. 16 to 33 in A2 block, Paschim Vihar in C-26.
62/16.01.06/EE-
XX
M/s Ram Consts.Co.
Imp to rd by pdg RMC fromj H.No. 132 to 168 ni G block, Paschim Vihar in C 26 Wz
125/16.03.06/E
E-XX
M/s Ram Consts.Co.
C/o Drain from H.no. 151 to 168 in A 2 block, Paschim Vihar in C 26.
71/01.02.06/EE-
XX C/o Drain from H.no. 154 to park in B-I block, Paschim Vihar in C 26.
88/24.02.06/EE-
XX
M/s A.B.Builders
Imp to rd by pdg RMC infront of Manav Apptt in A 4 block, Paschim Vihar in C 26.
364/20.12.05/E
E-XXIII
M/s Sareen Const.Co
C/o Drain from H.no. 151 to 168 in A 3 block, Paschim Vihar in C 26.
126/16.03.06/E
E-XX
M/s Ashish Const.Co
P/O Boring with subermsible pump set in park Tikona park B block, Madi pur under WZ
138/7.10.05/EE
E_III
M/s A.K Electicals
Status Report of MLA,Sh.Anil Bhardwaj, AC No. 17 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil R-I 16.6.06 26.5.05 100241 28.11.05 98019 Completed
2 Civil R-I 16.6.06 21.5.054 142300 199/29.6.05 1.7.05 141903 Completed
3 Civil R-I 16.6.06 24.5.05 188500 196/29.6.05 9.7.05 185774 Completed
4 Civil R-I 27.6.05 21.5.05 334664 08.03.06 334479 Completed
5 Civil R-I 27.6.05 21.5.05 172500 18.07.05 172395 Completed
6 Civil R-I 27.6.05 24.5.05 398898 680/17.03.06 18.03.06 398750 Completed
7 Civil R-I 27.6.05 26.5.05 108427 227/14.07.05 23.07.05 108106 Completed
8 CSE CSE/RZ 30.06.05 24.06.05 197650 31/27.7.05 10.08.05 30.8.05 178919 Completed
9 Civil R-I 30.06.05 21.05.05 297741 18.03.06 297199 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
P/L CC fromH.no. 2745 to 2748/248 in Onkar Nagar in C-27 RZ
432/21.11.05/EE(R) -I
M/s Roshan Lal Builders-II
27.02.06
C/O FP from Rly xing Onkar Nagar upto Rohtak Rd near Ashoka park in C 27 RZ
M/s RL Builders
28.11.05
Cosnt of FP in lane no 5n Jai Mata Mkt in C 27 RZ
M/s Pankaj Builders
31.10.05
Imp to B/wall of Tikona Park by Marbel Wash near Preshu Ram Chowk on Lal Lajpat Rai Marg in Tri Nagaer C-27 RZ
662/08.03.06/EE(R)-I
M/s Anil Kumar
09.06.06
Const of Free U-Turn road and Side FP under Zakhira Fly Voer in C27
223/14.07.05/EE(R)-I
M/s Govind Gupta
23.01.06
P/L CC from H.No. 4498/11 to 4489/11 in Jai Mata Mkt in C 27m RZ
M/s Anil Kumar
24.06.06
P/L CC around Joor Bagh Chopal in C -27 RZ
M/s Pankaj Singh
21.11.05
Imp of Drainage system by pdg RCC pipes in fornt of Golden park at Rohtak road in w.no. 271 RZ
M/s Raj Const Co.
Imp to berms from H.no. 43 to 52 and P/L C C from H.no. 73 to 81 in Ashoka Park in C -27.
682/17.03.06/EE(R )-I
M/s Anil Kumar
24.06.06
10 Civil R-I 30.06.05 24.05.05 334226 386/19.10.05 27.10.05 311150 Completed
11 Civil R-I 30.06.05 24.05.05 109444 226/14.7.05 15.7.05 5.10.05 104344 Completed
12 Civil R-I 30.06.05 26.05.05 365879 07.02.06 364625 Completed
13 Civil R-I 30.06.05 26.05.05 370739 25.03.06 370629 Completed
14 Civil R-I 30.06.05 26.05.05 350058 18.03.06 349931 Completed
15 Civil R-I 06.07.05 10.05.05 656361 19.03.06 655820 Completed
16 Civil R-I 13.07.05 21.05.05 197749 406/03.11.05 05.11.05 197627 Completed
17 Civil R-I 15.07.05 18.05.05 541750 09.12.05 P 380550 In Prog.
18 Civil R-I 19.07.05 10.05.05 306682 521/29.12.05 02.01.06 306479 Completed
19 Civil R-I 19.07.05 10.05.05 151037 535/02.01.06 12.01.06 150847 Completed
20 Civil R-I 19.07.05 10.05.05 388012 399/26.10.05 05.11.05 388012 Completed
Const of B.wall near Marble side and P/F MS grills along passage in Mam Chand park Rampura village in C -27
M/s Nimit Const co.
27.01.06
P/L CC near H.no.c 1689 to 1688 in Shanti Nagar in C 27.
M/s Bajaj Enterprises
Imp of FP with Red Sand Stone from Dahav Marg toParshu Ram Chowk on Lajpat Rai marg in C 27.
585/31.01.06/EE(R )-I
M/s Singhal builders
08.06.06
P/L S W Drianage on Agarsen marg rom kanhiya Nagar Drain to H.no. 3424/2 in Tri nagar in C 27.
683/17.03.06/EE(RD)-I
M/s Anil Kumar
24.06.06
P/L SW Drainage from Railway xing upto Rohtak rd near Goden Park in C -27.
681/17.03.06/EE(R )-I
M/s Anil Kumar
24.06.06
Imp of road by pdg RMC between G .30 and G 40/3 at Dr. Lohiya Indil ara. At C 28.
668/09.03.06/EE(R.D)-I
M/s Vijay Builders
04.08.06
P/L CC in lane no 32 from 36/7 to 191/9 in Onkar Nagar in Tri nagar in C 27
M/s Mukesh Kumar Bansal
06.02.06
Const of B./wall at Ramleela Park at Shree nagar at C 28.
473/09.12.05/EE-(R-I)
M/s Anil Kumar
Const of Walkway in Central park of MIG Flats Ram Pura at C 28
M/s Vijay Builders
24.02.06
Const of B/wall with Grill at MIG Flat Rampura Mohalla at C 28.
M/s Pritam Lal
28.03.06
Imp to drain and main lane at B 2 Pkt flats, Keshav Puram, C 28.
M/s Vinod Associates
28.04.06
21 Civil R-I 19.07.05 18.05.05 364304 400/26.10.05 06.11.05 363924 Completed
22 Civil R-I 19.07.05 10.05.05 445203 401/26.10.05 5.11.05 444175 Completed
23 Civil R-I 21.07.05 20.07.05 199395 287/18.08.05 22.08.05 183537 Completed
24 Civil R-I 25.07.05 18.05.05 478944 03.01.06 478609 Completed
25 Civil R-I 25.07.05 21.05.05 603398 538/31.01.06 12.01.06 602377 Completed
26 Civil R-I 25.07.05 21.05.05 580520 398/26.10.05 28.10.05 579856 Completed
27 Civil R-I 25.07.05 21.05.05 585897 369/11.10.05 21.10.05 585614 Completed
28 Civil R-I 25.07.05 21.05.05 726350 627/28.02.06 02.03.06 725990 Completed
29 Civil R-I 25.07.05 21.07.05 274181 502/23.12.05 02.01.06 274102 Completed
30 Civil R-I 27.07.05 24.05.05 560129 527/02.01.06 05.01.06 533524 Completed
Imp to main lane and drain in C 5 Pkt Keshav Puram C 28.
M/s Mehandi Ratta Traders
03.03.06
Imp to drain on road near G 30 and G 40/3 in Dr Lohiya Indl Area at C 28.
M/s Vijay Builders
20.01.06
P/L CC From H.no. 599/38 to 602/38 in Joor Bagh 430/1 to 35/7 in Onkar nagar B & 1427/1 to 1407/96 in Ganesh Pura, C 27.
M/s Mohan Lal & Co.
26.11.05
Imp to lane and Drainage system of C 4 Pkt at Keshav Puram, C 28.
504/23.12.05/EE(RD)-I
M/s Gupta & Company
12.11.06
Stg of Centre Verge and xing at Madhav marg from C block Indl. Area turning to NDPL office at Keshav Puram. C 28.
M/s R.S Building Mate.& Supp.
28.03.06
Stg of Center Verge and xing at Madhav Marg from C 2 Pkt xing to C 4 Pkt xing at Keshav Puram, C 28.
M/s D.R.Builders
07.02.06
Stg of Cetre verge and xing at Madhav Marg from C 4 Pkt to C 8 Pkt xing at Keshav Puram, C 28.
M/s C.B.Gupta & Co
26.04.06
Stg of C/V and xing at 100' Rd from Rd no 37 to Narang Cly chowk, Keshav Puram, C 28
M/s Vijay Builders
30.05.06
Imp to alnes by Pdg CC from 3177 to 3128 & 3128 to 3167 and 3175 to 3253 to 3262, 376 to 3134 and adj lane at Mahender Park at C 28.
M/s Ravinder Const.Co
28.03.06
Const of entrance gates of Vardhman Vatika Park in C 27 RZ
M/s Satish & Co.
21.06.06
31 Civil R-I 01.08.05 18.05.05 443239 18.03.06 442963 Completed
32 Civil R-I 01.08.05 18.05.05 412144 402/28.10.05 01.11.05 411928 Completed
33 Civil R-I 01.08.05 18.05.05 546853 440/21.11.05 01.12.05 546743 Completed
34 Elect. EEE-VII 05.08.05 25.06.05 198818 68/24.10.05 27.10.05 195283 Completed
35 Civil R-I 05.08.05 18.05.05 785702 520/28.12.05 30.12.05 785392 Completed
36 Civil R-I 26.08.05 21.07.05 301211 519/27.12.05 06.01.06 300785 Completed
37 Civil R-I 26.08.05 21.07.05 286641 13.02.06 P 237948 In Prog.
38 Civil R-I 19.9.05 12.9.05 133751 07.12.05 105922 Completed
39 Civil R-I 19.9.05 12.9.05 122683 30.01.06 110828 Completed
40 Civil R-I 5.1.06 12.9.05 2387261 20.09.06 2387261 Completed
Imp to D/Sys and FP on main rd form Madhav Mar gto C 4 Pkt xing at Keshav Puram at C 28.
657/08.03.06/EE(RD)-I
M/s Vijay Builders
16.11.06
Const of Designer gate at C 4 and C 7 Pkt Park at Keshav Puaram C 28.
M/s A&T Const.
09.02.06
Const of Designer gate at Ram Leela Park ande Tikona park at main bazar road of Raja Park in C 28
M/s Aand T Const.
08.03.06
Prov of 43 nos Street light arrangment in Tri nagar, Keshav Puram and Shakur pur village C no 17 under RZ
M/s Farward Engineers
21.11.05
Const of Drian on Railway line rd from C 4 to C 5 Pkt xing at Keshav Puram C 28.
M/s C.B.Gupta & Co
20.05.05
Upliftment and Imp of C 7 Mkt at Keshav Puram in C 28.
M/s Arun Builders
01.03.06
Imp of lane by CC in C 8 Pkt enar C 8/43 lane and C 8/41 to 86 and adj lane at keshav Puram inC 28.
594/03.02.06/EE®-I
M/s Manoj Builders
Const of entrance boundary gate of Mamchand park in Rampura village in C 27
458/20.11.05/EE®-I
M/s Manoj Builders
31.08.06
P/L CC in lane No. 43 from H.no. 1905 to 1910 in Ganesh Pura, Tri nagar in C 27 RZ
567/27.01.06/EE®-I
M/s R.L Builders
05.05.06
Stg of road of C-4 to C-8 Pkt by pdg (Dense) BM/AC at Keshav Puram, in C -28
109/11.09.06/EE( R)-I
M/s Sanjeev Kumar & Bros.
15.11.06
41 Civil R-I 6.2.06 31.1.06 426804 08.04.06 426694 Completed
42 Civil R-I 13.2.06 31.1.06 346330 04.04.06 333160 Completed
43 Civil R-I 13.2.06 1.02.06 374913 05.05.06 363948 Completed
44 Civil R-I 27.2.06 31.1.06 234460 01.05.06 234204 Completed
P/L CC from H.no. 1042-169 to 1050/69 in Deva Ram Park, 487/36 to 523/36 in Onkar Nagar and 417/5 to 468/19 in Jai Mata Mkt in Tri Nagar in C 21 RZ
755/31.03.06/EE(R )-I
M/s Naresh Enterprises
08.07.06
Const of FP on Aggersen Marg from H.no. 2523/193 to 617/2004 in Tri Nagar in C 27
766/31.03.06/EE-(R )-I
M/s Rakesh Kumar Goel
22.07.06
Const of FP on Old Bus stand along Vishram Nagar in Tri Nagar in C 27
30/03.05.06/EE(R )-I
M/s Rakesh Kumar Goel
10.08.06
Const of Planter at Narang colony Chowk near Subzi Mkt in Tri Nagar in C 27
16/25.04.06/EE®-I
M/s SeeKay Enterprises
27.09.06
Status Report of MLA,Sh.S.C. Vats, AC No. 18 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil R-I 04.08.05 02.08.05 350800.00 528/02.01.06 02.01.06 10.04.06 264850.00 Completed
2 Civil R-I 04.08.05 02.08.05 226083.00 07.06.06 27.11.06 187273.00 Completed
3 Civil R-I 04.08.05 02.08.05 271400.00 499/23.12.05 M/s V.K.Gupta 23.12.05 30.03.06 249009.00 Completed
4 Civil R-I 04.08.05 02.08.05 397200.00 21.07.06 27.11.06 267460.00 Completed
5 Civil R-I 04.08.05 02.08.05 561800.00 20.02.06 09.06.09 249187.00 Completed
6 Civil R-I 04.08.05 02.08.05 389321.00 08.12.05 P 349829.00 In Prog.
7 Civil R-I 04.08.05 02.08.05 362100.00 542/28.11.05 28.11.05 26.12.05 362091.00 Completed
8 Civil R-I 04.08.05 02.08.05 290404.00 08.05.06 29.05.06 241279.00 Completed
9 Civil R-I 04.08.05 02.08.05 543100.00 17.03.06 24.06.06 504088.00 Completed
10 Civil R-I 04.08.05 02.08.05 248931.00 08.03.06 14.07.06 248931.00 Completed
11 Civil R-I 18.08.05 04.08.05 573400.00 26.03.06 21.06.06 531987.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
imp of back lane by CC from H.no. C 23 to C 34 in New Multan nagar in C 30
M/s Raghav Const.
Imp to ane by pdg CC from h.no. 677 to 545 in Rishi Nagar in C 30
481/09.12.05/EE(RD)-I
M/s Surender Pal Singh
Imp to lane by pdg CC from H.no. 6 to 14, 47 to 52 and 101 to 102 in Hari Singh Park in C
30Imp to SW Drain and Road side berms by interlocking pavers fromH.nolD 28 to 31(Both
side) and Imp to lane along District park in New Multan Nagar in C 30.
717/27.03.06/EE(RD)-I
M/s Surender Pal Singh
Imp to rd sid berms by P/L Interlocking paver from Bnnu Biradari Apptt. To Parwana ed
(both side) in H 4/5 in C 30.
595/03.02.06/EE(RD)-I
M/s Manoj Builders
Imp of SW drain & Rd side berms (both side) by interlocking paver from Brij Vihar Society
to Parwana rd in H 4/5 inC 30.
479/09.12.05/EE-(R-I)
M/s Surender Pal Singh
Imp of SW Drain back side at Brij Vihar Society to Bal Bharti Public School in H 4/5 C
30.
M/s Friends const and Bldg
Ma SupplierImp of lane by pdg CC from H.no. 1424 to 1402, 1674 to 1655, 1675 to 1687 in Ram
Singh in C 30.
480/09.12.05/EE(RD)-I
M/s Surender Pal Singh
Imp of back lane by CC form D 1 to 22 and laong D 11 in Pushpanjali Encl in C 30.
678/17.03.06/EE(R )-I
M/s Shri Vinayak
EnterprisesImp of drainge system &Rd Side berms by
interlocking paver opp H.no. C 432 to C 447 in Saraswati Vihar in C 30.
653/08.03.06/EE®-I
M/s Satyam Const.CO
Imp of 45' ROW rd fromH.no. 82 to 146 in Rajdhani Encl in C 29.
677/17.03.06/EE(R )-I
M/s Anil Kumar
12 Civil R-I 18.08.05 04.08.05 545200.00 01.01.06 14.08.06 402168.00 Completed
13 Civil R-I 18.08.05 04.08.05 582200.00 M/s Dua Broth. 18.01.06 27.07.06 430639.00 Completed
14 Civil R-I 18.08.05 04.08.05 108150.00 349/23.09.05 03.10.05 23.01.06 108071.00 Completed
15 Civil R-I 18.08.05 04.08.05 169913.00 21.01.06 P 130604.00 In Prog.
16 Civil R-I 18.08.05 04.08.05 266100.00 393/20.10.05 30.10.05 14.12.05 144887.00 Completed
17 Civil R-I 18.08.05 04.08.05 169400.00 405/3.11.05 3.11.05 27.11.05 150435.00 Completed
18 Civil R-I 18.08.05 04.08.05 177650.00 464/01.12.05 10.12.05 03.03.06 177128.00 Completed
19 Civil R-I 18.08.05 04.08.05 356907.00 456/29.11.05 08.12.05 07.03.06 343926.00 In Prog.
20 Civil R-I 23.08.05 04.08.05 275100.00 629/28.02.06 09.03.06 25.05.06 177451.00 Completed
21 Civil R-I 23.08.05 04.08.05 193900.00 524/30.12.05 08.01.06 P 71578.00 In Prog.
22 Civil R-I 23.08.05 04.08.05 323700.00 507/23.12.05 24.12.05 23.1.06 246421.00 Completed
23 Civil R-I 30.08.05 04.08.05 751900.00 563/18.01.06 27.01.06 22.05.06 531783.00 Completed
24 Elect. EEE-VII 26.9.05 2.9.05 280400.00
25 C/o Toilet in E block Shakurpur JJ Cly C-29. Civil R-I 28.12.05 4.12.05 396200.00 05.04.06 P 260488.00 In Prog.
26 Civil R-I 13.1.06 27.9.05 491221.00 30.03.06 27.12.06 491221.00 Completed
27 Civil R-I 13.1.06 27.9.05 434679.00 23.06.06 04.10.06 392469.00 Completed
Imp of 45' Rd by pg RMC from Rd no. 43 to 81 in Rajdhani Encl in C 29.
497/23.12.05/EE(R )-I
M/s Subhash Chander-III
Imp of 45' Rd by pdg RMC from H.no. 157 to 235 in Rajdhani Encl in C 29.
542/09.01.06/EE (R )-I
Imp to space by pdg CC outside MC Pry school G block (MGH rd) and along opark in G block
Shakur Pur in C-29.
M/s Om Mark Buider
Imp/Const of walkway in park infront of I-1 in JJ Cly Shakur pur in C 29.
547/12.01.06/EE(R )-I
M/s Neeraj Const.Co
Imp to rd side berms in front of H.no. 23 Rohit Kunj to Mkt in Rohit Kunj in C 29-II in
(Interlocking tiles)
M.s Subhash singh
Const of passage in park opp H.no. 234 & Gurudwara in Kohat Encl in C 29-II
M.s KP Associates
Imp of intenal road by Premixing Carpet in Gate No 3 in MP encl in C 29
M/s Vijay Bansal
Imp to Drainge system near I-464, I-569 to Kabir Dass margf along MC school I block
Shakur Pur JJ Cly C 29.
M/s Manoj Builders
Const of passage in park opp H.no. 64 in Rohit Kunj inC 29.
M./s Surender & Co.
Imp to kabristan in G block Shakurpur JJ cly in C 29.
M/s Jasvinder Gulati
Imp to Open Space by RMC along Park opp H.No. G 1106 in Shakurpur, JJ Cly in C 29.
M/s Rakesh Kr Goel
Imp of rd by pdg CC Pav alogn H.no. 110, 159 in Rajdhani Encl in c 29
M/s Surander & Company
Prov. Of 12mtr long High Mast Pole Raising and lowering type with Flood Light fixtuer in Mpl park opp, H.no. G 280, Shakurpru JJ Cly
under RZ
722/27.03.06/EE(R )-I
M/s Sharma & Co.
P/L CC on road side berms and P/L CC Slab no F P o approach rd to Pundrik Vihar from Parwana Rd to Back of JJ Cluster in C 30
718/27.03.06/EE®-I
M/s Chauhan Const.CO
P/L CC on road side berm and P/L CC Slab FP fromParwnan rd to NDPL Transformer alogn
Harvard Public School in C 30
11/10.04.06/EE®-I
M/s Sharma & Co.
28 Civil R-I 13.1.06 4.1.06 441100.00 13.06.06 11.10.06 319015.00 CompletedRemodelling SW Drainf rom H.no. 113 to 120 in Shakti Vihar on Mahatma Hans Raj marg in
C 30.
711/27.03.06/EE®-I
M/s Vijay Kumar Gupta &
Co.
Status Report of MLA,Sh Ravindra Nath Bansal, AC No. 19 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil RD-I 17.5.05 31.12.04 196060 239/22.7.05 23.2.05 14.10.05 195757 Completed
2 Civil RD-I 25.5.05 18.5.05 1076600 12.05.06 P 830873 In Prog.
3 Elect. EEE-VII 26.5.05 28.4.05 172552 108/16.11.05 21.11.05 30.11.05 164808 Completed
4 Elect. EEE-VII 26.5.05 30.4.05 173097 186/06.12.05 08.12.05 20.12.05 165397 Completed
5 Elect. EEE-VII 26.5.05 21.4.05 172806 107/16.11.05 18.11.05 29.11.05 172257 Completed
6 Elect. EEE-VII 26.5.05 23.4.05 173439 120/16.11.05 18.11.05 29.11.05 171382 Completed
7 Elect. EEE-VII 03.06.05 20.4.05 172172 112/16.11.05 17.11.05 22.11.05 172111 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Const of Walkway in the park opp. H.no,. 362 & 121 in SD Block Pitampura C -32.
M./s Kanhiya Lal
Strong thening of Approach rd of singal pur Village Chowk near 102 in font of 100,110,105 chowk near 105 near 106 chowk along 121,121 to 114 chowk near DJB Pump House 58 to 46 in AD block 15 to 27, 44 to 58, 1023 to 91 and 109 to 123 in BL block and 110 t
539/09.01.06/EE(R )-I
M/s Dhingra Const.Co
P/o Semi High Mast Lights in opark Situated between AD & AE block and on the back side of Sarvodya Vidyalaya B block A 4 block and on the one side of AF block Shalimar Bagh under RZ
M/s Sushma Etecticals
Prov. Of Semi High Mast light in park opposite Sad Guru Dham Mandir UP block Pitampura under RZ
M/s Perfect Elect. Works
Prov of Semi High Mast light in park near H.no. BC-8(West) Shalimar bagh under RZ
M/s Sri Bala ji Electricals
Prov. Of Semi High Mast Light in park near H.no. BL-7 (West) Shalimar Bagh RZ
M/s Siwach Engineers & Traders
Prov of Semi High Mast light in park in near H.no. BM-108(West) Shalimar bagh under RZ
M/s Khanna Sales Corp.
8 Elect. EEE-VII 3.6.05 1.5.05 173439 113/16.11.05 24.11.05 19.12.05 167286 Completed
9 Elect. EEE-VII 3.6.05 25.04.05 172045 146/22.11.05 24.11.05 30.11.05 172045 Completed
10 Elect. EEE-VII 3.6.05 29.04.05 172210 185/6.12.05 8.12.05 19.12.05 172160 Completed
11 Elect. EEE-VII 3.6.05 25.4.05 172679 226/23.12.05 31.12.05 12.01.06 165409 Completed
12 Civil RD-I 3.6.05 31.5.05 78700 301/24.08.05 24.08.05 31.10.05 73689 Completed
13 Elect. EEE-VII 9.6.05 3.6.05 154401 64/21.9.05 22.9.05 30.9.05 127679 Completed
14 Civil RD-I 10.06.05 25.5.05 414472 364/29.9.05 29.9.05 20.04.05 413780 Completed
15 Civil RD-I 10.6.05 25.5.05 575790 465/5.12.05 5.12.05 12.03.06 575790 Completed
16 Civil RD-I 10.6.05 25.5.05 104492 254/29.7.05 29.7.05 16.9.05 104458 Completed
17 Civil RD-I 10.6.05 10.5.05 325200 763/31.03.06 07.04.06 31.03.08 252857 Completed
18 Elect. EEE-VII 10.6.05 17.2.05 199696 58/24.08.05 M/s G.S Elect. 25.08.05 12.09.05 158060 Completed
19 Civil RD-I 06.07.05 07.06.05 112329 455/29.11.05 02.12.05 16.01.06 101107 Completed
20 Civil RD-I 06.07.05 07.06.05 89579 342/20.0.9.05 22.9.05 26.11.05 89513 Completed
21 Civil RD-I 06.07.05 07.06.05 332400 03.04.06 05.07.06 267764 Completed
Prov. Of Semi High Mast Light in park adj Central Schoool TP block, Pitampura under RZ
M/s ST Electic Co.
Prov. Of Semi high Mast light in park Opp H.No. AA-86, AA Block, Shalimar Bagh, under RZ
M/s Sangwan Electricals
Prov. Of Semi High Mast Light in park situated behind Petrol Pump in BU block Pitampura RZ
M/s Prince Engg. Works
Prov of Semi High Mast Light in parks near Situated on the back side of MCD Pry School, AB Block shalimar Bagh under RZ
M/s Pragati Engineers
Argumentation of Water Supply by P/L GI Pipe line in park in AG block and AN Blcok in Shalimar Bagh in C-31 RZ
M/s Modeen Bldg. Matarial Suppilers
Prov. Of Lighting arrangment in Mpl park opp flat no 587-A BN-C(Poorvi) block, Shalimar bagh under RZ
M/s Khanna Sales Corp.
Imp of lane by pdg Drianage and RMC from H.no. 47 to 62 front & Bacl in AG block in Shalimar Bagh C-31.RZ-I
M/s Supreme const.
Imp. Of Drainage System from H.no. 31 to 82 and 154 to 97 in AA block Shalimar Bagh, Delhi
M/s Chauhan Const Co.
Const of Walkway in the park in BC (West) block in Shalimar Bagh in C-31 RZ
M/s Supreme const.
Resurfacing of Existing Walkway by Red Sand Stone flooring in park Situated between AD & AE block in Shalimar Bagh C-31 RZ
M/s Anil Kumar
Imp of Semi High Mast Lights in Mpl parks in Shalimar bagh & PUItampura C-19 under RZP/F barded wire fencing in "SD" blcok, Pitampura C 32
M/s Manoj Builders
Const of Walkway in the park opp H.no. LP-23A in LP Block Pitmapura in C 32.
M/s Pankaj Cost co.
Imp to lane by pdg CC along Central School in TP block from 1A to 8A in 4 P block and side of mkt in YP block Pitampura in C 32.
764/31.03.06/EE(RD)-I
M/s Anil Kumar
22 Civil RD-I 06.07.05 07.06.05 167565 02.01.06 03.08.06 158025 Completed
23 Civil RD-I 06.07.05 28.06.05 119174 02.01.06 03.07.06 107501 Completed
24 Civil RD-I 06.07.05 05.07.05 109400 295/22.8.05 25.8.05 30.11.05 109311 Completed
25 Civil RD-I 19.07.05 28.06.05 245468 416/09.11.05 11.11.05 20.02.06 245332 Completed
26 Civil RD-I 19.07.05 28.06.05 295769 371/11.10.05 15.10.05 30.01.06 295632 Completed
27 Civil RD-I 19.07.05 05.07.05 191758 372/11.10.05 15.10.05 12.12.05 191591 Completed
28 Civil RD-I 20.07.05 05.07.05 361200 590/03.02.06 08.02.06 25.08.06 223232 Completed
29 Civil RD-I 20.07.05 05.07.05 99800 01.12.05 08.02.06 99800 Completed
30 Civil RD-I 29.07.05 11.07.05 466732 376/14.10.05 14.10.05 20.01.06 466620 Completed
31 Civil RD-I 02.08.05 22.07.05 437006 03.05.06 16.11.06 436904 Completed
32 Civil RD-I 02.08.05 22.07.05 280700.00 591/03.02.06 08.02.06 05.08.06 171560 Completed
33 Civil RD-I 02.08.05 22.07.05 645400.00 589/03.02.06 08.02.06 25.08.06 425575 Completed
34 Elect. EEE-VII 08.08.05 06.07.05 155809.00 207/19.12.05 27.12.05 12.01.06 146221 Completed
Const of Walkwa in the park opp H.no. 83A WP block, Pd grit wash (Inner Portion) and gate in parks opp 32A and 83A in WP block and Pdg and fixing of grill on B.wall of park opp H.no. 54 A in YP block Pitampura in C 32.
407/09.11.05/EE( R)-I
M/s Laxmen Const.Co
Const of Walkway in DU blcok park near H.no. 85 in Pitampura in C 32.
409/09.11.05/EE(R )-I
M/s Laxmen Const.Co
Imp of rd from 127 to 140 and 20 to 1 in NP block Pitampura in C 32(By MP)
M/s Anil Kr Gupta
Imp to open space by KSF of SU block Mkt in Pitampura in C 32.
M/s Vinod Associates
Imp ot D/system from Corner of MC Pry school CP block to opp H.no. 132 in CP block Pitampura in C 32.
M/s Satish Gupta & Co
Imp to D/system and lane from 99 to 104 and 126 to 121 and opp Jain Sthanak inNP block and 56 to 88 in PP block Pitampura in C 32
M/s Satish Gupta & Co
Imp ot Drainage sytem from H.no. 48 to 40, 31 to 39, 11 to 19, 28 to 20 and 51 to 59 in FD block, Pitampura inC 32.
M/s Manoj Kumar Gupta
P/F bateed wire fencing along Dda park in BN & BM (Poorvi ) and B K-2 Block in Shalimar Bagh C 31.
461/01.12.05/EE(RD)-I
M/s Chauhan Const Co.
Imp of lane by pdg RMC from H.no. 90 to 99 in AM block in Shalimar Bagh in C 31
M/s Ess Kay Const co.
Imp ot D/system from 105A to 109A, 128A to 121A, 120 A to 117A, 140A to 143A, 129A to 145A 141A to park & 116 A to 114A in U & V block in Shalimar Bagh in C 32.
503/23.12.05/EE(R )-I
M/s Ravinder Const.Co
Imp of D/system from H.no. 1 to 45 & 155 to 46 in FU block Pitampura
M/s Manoj Kumar Gupta
Imp to D/system from H.no. 111A to Park 110A to 46A, 140A to 11A, and 124A to 12A in VP blcok, Pitampura .
M/s Manoj Kumar Gupta
p/O Semi High Mast light in MCD parkl situated in LK (New ) Block, Pitampura under Rz
M/s Malhotra Elect.
35 Elect. EEE-VII 08.08.05 16.07.05 182403.00 115/16.11.05 17.11.05 25.11.05 180133 Completed
36 Civil EEE-VII 08.08.05 22.07.05 75800.00
37 Elect. EEE-VII 23.08.05 10.08.05 189723.00 150/22.11.05 1.12.05 30.12.05 180051 Completed
38 Elect. EEE-VII 23.08.05 11.08.05 189381.00 184/06.12.05 14.12.05 09.01.06 178277 Completed
39 Elect. EEE-VII 31.8.05. 25.8.05 182534.00 322/14.03.06 16.03.06 31.03.06 134457 Completed
40 Elect. EEE-VII 31.8.05. 27.8.05 183832.00 308/07.03.06 08.03.06 16.03.06 133777 Completed
41 Elect. EEE-VII 20.10.05 6.10.5 183001.00 307/07.03.06 08.03.06 16.03.06 133256 Completed
42 Civil RD-I 23.11.05 22.11.05 64850.00 04.07.06 21.02.07 64735 Completed
43 Civil RD-I 13.1.06 13.12.05 131400.00 05.05.06 19.06.06 84354 Completed
44 Civil RD-I 3.2.06 2.2.06 238232.00 15.06.06 18.07.06 221555 Completed
45 Civil RD-I 3.2.06 2.2.06 147700.00 02.06.06 08.09.06 142190 Completed
46 Civil RD-I 3.2.06 2.2.06 596900.00 765/31.03.06 03.05.06 26.06.06 428208 Completed
47 Civil RD-I 14.2.06 2.2.06 1165867.00 21.06.06 08.12.06 1105383 Completed
Prov. Of semi high mast light opp Man Singh Sewa sadan KP Block Community Centre, Pitam pura under RZ
M/s Himanshu Enterprises
P/F barbed wire ofacneing in Vaishali opp H. no. 230 to 222 and to 138 and C/o B/wall opp no. 150(Near Mkt ) in Viahshali, Pitampura in RZ
Prov of Semi High Mast Lights in MPl park opp Govt Sarvodya School FU block Pitampura unnder RZ
M/.s S.K. Enterprises
Prov of Semi High Mast Light in Mpl park adj LU Block Mkt, Pitam pura under RZ
M/s Pragati Engineers
P/O Semi Hgih Mast light in MCD park adj H.no. BT-44, Shalimar bagh RZ
M/s Saksham Elect.& Electronic
Pro. Of Semi High Mast ligth inj MCD park adj House No. BK-I,/192,, shalimar Bagh under Rz
M/s Khanna Sales Corp.
P/O Semi High Mast Light in MCD park Situated in AJ block, Shaliamrg Bagh, RZ
M/s Khanna Sales Corp.
P/F MS Grills flowers bneds along DAV School at Shaheed Udham singh Marg in Shalimar Bagh in C -31.
50/22.06.06/EE®-I
M/s Pawan Kumar
Pdg Red Sand Stone on outer face of Shelter in BD-FD park G & JV Park and HP Block park in Pitampura C 32
676/17.03.06/EE(R )-I
M/s Pee Kay Const.
Pdg Kota Stone Floorig inOpen space of MP Block Market in Pitampura in C 32
10/10.04.06/EE(R )-I
M/s Lalit Const.Co
Pdg RMC from H.no. C V -53 to CU-104 & opposite CV -44 (along park) and oppsoite CU 40 to CU 37 in CU Block Pitampura in C 32.
22/25.04.06/EE(R )-I
M/s Manoj Kumar Gupta
Remodelling to Drainage system and pdg CC on side berms from SU Block park corner to RU 169 in Pitam,pura in C 32.
M/s Rakesh Kumar Goel
Pdg RMC in opne space and Kota Stone Flooring in Passage of CUI block kota in Pitampura in C 32
29/03.05.06/ EE ( R) -I
M/s Lalit Const.Co
48 Civil RD-I 20.02.06 16.2.06 198100.00 18.05.06 19.07.06 140007 CompletedConst of back lane from H.no. 54 ti 67,67 to 70 in LU Bloc in Pitampura in C 32
743/31.03.06/EE(R )-I
M/s Shree Balaji Const.Co
Status Report of MLA,Sh.Jai Bhagawan Aggarwal, AC No. 20 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Elect. EEE-VII 17.5.05 9.9.04 172082.00 51/12.8.05 17.8.05 26.8.05 140670.00 Completed
2 Elect. EEE-VII 9.6.05 2.6.05 145089.00 50/12.805 16.8.05 26.8.05 119630.00 Completed
3 Elect. EEE-VII 9.06.05 2.6.05 174482.00 59/24.8.05 26.8.05 5.9.05 143280.00 Completed
4 Elect. EEE-VII 9.06.05 2.6.05 173216.00 52/12.805 13.8.05 29.8.05 145590.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Prov. Of Semi High Mast Lights in Mpl park opp. Aggarwal Bhawan, G-5,S ect-16,R Z
M/s Master Electric Store
Prov. Of Semi High Mast Lights in Mpl park at H-1/H-2 Block, Sector-16, R Z
M/s Master Electric Store
Prov. Of Semi High Mast Lights in park at F-17, Sect-8, RZ
M/s SG Enterprises
Prov. Of Semi High Mast Lights in Mpl park at G-2 Block, Sec-16, RZ
M/s Bansal Electric Store
5 Civil R-II
01.07.05
27.06.05 186600.00 22.07.05 30.07.06 186500.00 Completed
6 Civil R-II
01.07.05
27.06.05 171700.00 167/20.07.05 5.8.05 8.10.05 151927.00 Completed
7 Civil R-II
01.07.05
27.06.05 161400.00 04.08.05 02.01.06 161248.00 Completed
8 Civil R-II
01.07.05
15.06.05 150820.00 176/27.7.05 7.8.05 P 150288.00 In Prog.
9 Civil R-II01.07.05 15.06.05 521117.00
370/22.11.05 23.11.05 14.03.06 521037.00 Completed
10 Civil R-II01.07.05 15.06.05 132200.00
14.04.06 27.06.06 103180.00 Completed
11 Civil R-II
01.07.05 22.06.05 267128.00
326/21.10.05 2.11.05 21.12.05 265764.00 Completed
12 Civil R-II
01.07.05 22.06.05 283781.00
357/18.11.05 14.12.05 25.02.06 283278.00 Completed
13 Civil R-II
01.07.05 22.06.05 271060.00
310/11.10.05 20.10.05 10.02.06 270105.00 Completed
14 Civil R-II
01.07.05 22.06.05 280265.00
349/16.11.05 M/s Anil Goel 17.11.05 06.02.06 279070.00 Completed
15 Civil R-II
01.07.05 22.06.05 261359.00
343/16.11.05 20.11.05 12.12.05 260771.00 Completed
16 Civil R-II
01.07.05 22.06.05 369800.00
297/5.10.05 6.10.05 8.12.05 265993.00 Completed
17 Civil R-II
01.07.05 22.06.05 392900.00
298/06.10.05 28.11.05 26.12.05 284313.00 Completed
Const. Of Ahatas by providing interlocking pevers of H.No.37 to 54 and H.No. 173 to 179 in pkt. B-5 sec-V, Rohini C-33 R-II.
172/20.07.05/EE(R )-II
M/s Amandeep Consts. Co
Const. Of back lane & side berms by blg. Interlocking tiles from H.No. 1to6 in pkt. H-4 Sec-II, Rohini C-33 R-II.
M/s Khatri Const oc.
Const. Of Parking Area & berms by blg. Interlocking tiles in the surrounding of E-Block Prashant Vihar Market in Prashant Vihar C-33 R-II.
166/20.07.05/EE(R )-II
M/s Vikas Bansal
Imp. of Ahatas by interlocking paversfrom H.No. 301 to 314 & 293 to 300 in pkt. D-II sec-7 Rohini in C-33 R-II.
M/s Vijay Bansal
Const of lane by pd RMC near H NO 30 in E-4 Sect. 11 Rohini C-33 R II
M/s Vijay Kumar-II
Imp of park by quit wash & M.S grill near H No 23 in E -4 sec. 11 Rohini C-33 R II
481/09.03.06/EE( R)-II
M/s A.D Const.Co
Const of Ahatas by i/ locking pavers of H No 361 to 378 & 211 to 224 in pkt Pkt E-16 sec 7 Rohini in C-33 R II
M/s Ajay Enterprises
Const of Ahatas by pdg i/locking prefeb parvers of H No 37 to 48 & 85 to 96 in pkt A -3 ,sec 7 Rohini C-33 R II
M/s Surander Kumar verma
Const of Ahatas by pdg i/locking prefeb parvers of H No 9 to 22 & 95 to 112 in pkt E -16,sec 8 Rohini in C-33 R II
M/s Hindustan Const Co.
Const of Ahatas by pdg i/locking prefeb parvers of H No 49 to 60 pkt A-3 sec 7 & H No 383 to 396 pkt D -11,sec 7 Rohini in C-33 R II
Const of Ahatas by pdg i/locking prefeb parvers of H No 9 to 22 in pkt D -16,pkt -21 sec 7 Rohini in C-33 R II
M/s Hindustan Const Co.
Const of Ahatas by pdg i/locking prefeb parvers of H No 9 to 22 &40 to 54 in pkt B -4 sec 8 Rohini in C-33 R II
M/s Bhagwati Const co.
Const of Ahatas by pdg i/locking prefeb parvers of H No 1 to 12 & 13 to 24 in pkt A -3 sec 7 Rohini in C-33 R II
M/s Ajay Enterprises
18 Civil R-II
05.07.05 23.06.05 291250.00
307/10.10.05 M/s Anil Goel 21.10.05 27.02.05 290713.00 Completed
19 Civil R-II
05.07.05 23.06.05 400700.00
306/10.10.05 M/s Anil Goel 20.10.05 27.02.06 286383.00 Completed
20 Civil R-II
05.07.05 23.06.05 401700.00
305/10.10.05 M/s Anil Goel 22.10.05 27.02.06 288504.00 Completed
21 Civil Br-IV
06.07.05 04.06.05 514900.00
30/20.10.05 1.11.05 28.12.05 466298.00 Completed
22 Civil Br-IV07.07.05 30.05.05 1126400.00
40/22.02.06 20.02.06 24.05.06 1035764.00 Completed
23 Civil R-II
25.07.05 04.07.05 471500.00
17.04.06 p 297775.00 In Prog.
24 Civil R-II25.07.05 13.07.05 370000.00
442/03.02.06 04.02.06 07.03.06 346172.00 Completed
25 Civil R-II
04.08.05 12.07.05 752449.00
325/21.10.05 28.10.05 05.03.06 599127.00 Completed
26 Civil R-II
04.08.05 12.07.05 199200.00
227/25.8.05 3.9.05 2.12.05 191903.00 Completed
27 Civil R-II04.08.05 12.07.05 199900.00
223/25.08.05 M/s Anil Goel 03.09.05 28.12.05 197503.00 Completed
28 Elect. EEE-VII
08.08.05 30.07.05 177935.00
121/16.11.05 24.11.05 22.12.05 177860.00 Completed
29 Civil Br-IV 9.11.05 26.10.05 270000.00 64/31.03.06 10.04.06 15.06.06 218775.00 Completed
30 Civil Br-IV 9.11.05 26.10.05 500000.00 65/31.03.06 10.04.06 20.06.06 405025.00 Completed
31 Elect. EEE-VII 9.11.05 26.10.05 178939.00 245/12.1.06 13.1.06 16.1.06 170710.00 Completed
32 Elect. EEE-VII 9.11.05 25.8.05 185978.00 246/12.1.06 10.05.00 16.1.06 174322.00 Completed
Const of B/ wall with M.S Girll and grit wash of park near H no G-9 /172 sector 16 , Rohini in C-33 II
Const of B/ wall with M.S Girll and grit wash of park near H no G-8/113 in sector 16 , Rohini in C-33 II
Const of B/ wall with M.S Girll and grit wash of park near H no G-3/50 in sector 16 , Rohini in C-33 II
I/S of 8.5 metre Row lane by pdg RMC H NO 75 to 84 . 99 to 108in PKt A -3 sector 11 Rohini.
M/s Sajjan Engineers &
BuildersImp/stg of 9 mtr. Row internal lanes by pgdin B-4 block RMC sector 11 Rohini H No33
M/s Sunil Enterprises
Const of B/Wall of Park by grit wash of M.S grill opp. H No 94 in Pkt A-1 sec 8 Rohini in C-33 R II
488/09.03.06/EE(R )-I
M/s S.S Rana Const.Co
Imp. of lane by pdg RMC from H No 19 to 24 in Pokt G-8 sec 11 Rohini in C-33 R II
M/s Rajeev Gupta
Cost of drain L.H.S on Sizra road village Libas pur from Khasra No9/12 to Khasra No 5/18 in C-34 I R II
M/s Raja Const.Co
Imp. to drainage system by pdg O.S drain in village samaipur from Laxmi Dharam Kanta to H no 11 (both sides) in C-34 (R) II
M/s Shri Varshnay Const
co.Imp to road by M/P from Auchandi road to H No 10 in Samai pur Villae in C-34 I (R) II
Provision of Semi high mast lights in mpl park opp. H NO E-25 , Prashant Vihar under R .T
M/s Kamal Electrical
Imp of road & drainage from H;no. 152 to 162 in Block H-1 in Sec-11 Rohini by pdg RMC
M/s D.R.builders
Imp of rd and driange from H.no. 55 to 62 and 72 to 80 in Block H-3, in Sec-11 Rohini by pdg RMC
M/s D.R.builders
Prov. Of Semi High Mast light in park near RG Compex, Sector 14, RZ
M/s Master Electric Store
P/O Semi High Mast light park, Pkt F 24, Sctor 7,R Z
M/s Master Electric Store
33 Civil R-II 3.1.06 21.11.05 260109.00 07.04.06 04.07.06 259989.00 Completed
34 Civil R-II 3.1.06 21.11.05 287822.00 514/17.03.06 08.04.06 24.06.06 287603.00 Completed
35 Civil R-II 3.1.06 21.11.05 190200.00
36 Civil R-II 3.1.06 21.11.05 266777.00 27.04.06 30.06.06 266419.00 Completed
37 Civil R-II 3.1.06 21.11.05 257336.00 20.04.06 28.06.06 257159.00 Completed
38 Civil R-II 3.1.06 21.11.05 230707.00 04/13.04.06 30.04.06 25.06.06 230531.00 Completed
39 Civil R-II 3.1.06 21.11.05 213899.00 23.04.06 20.07.06 213449.00 Completed
40 Civil R-II 3.1.06 21.11.05 592050.00 30.04.06 02.09.06 427796.00 Completed
41 Civil R-II 3.1.06 21.11.05 104684.00 28.05.06 P 51990.00 In Prog.
42 Civil R-II 3.1.06 21.11.05 199200.00 02.09.06 P 97273.00 In Prog.
43 Civil R-II 3.1.06 21.11.05 108102.00 21.05.06 12.08.06 108092.00 Completed
44 Civil R-II 3.1.06 21.11.05 198000.00 30.06.06 P 95970.00 In Prog.
45 Civil R-II 3.1.06 21.11.05 107142.00 20.05.06 17.07.06 107137.00 Completed
Const of lane by RMC & drainage system from G 182 to G 191 in Prashant vihar in C 33-I
517/17.03.06/EE(R )-II
M/s Krishna Const.Co
Const of Lane by pdg RMC and Drainage system from E -25 to end of
M/s Friends Const. &
B.M.SuppliersConst of berms by pdg inter locking tiles and Drainage system from A -1 /60 to PWD road in Sec-8 in C 33-IConst of lane by pdg inter locking tiles and Drainage system from A -1/60 to PWD road in Sec-8 in C -33-I
22/17.04.06/EE(R )-II
M/s Konark Const.Co
Const of lane by pdg RMC & Drainage system from E -13 to E -18 and adj lane in Parshant Vihar in C 33-I
09/17.04.06/EE(R )-II
M/s Mukesh Kumar Bansal
Const of Berms by pdg CC & Inte lociing toel from D 14/72 in C infront of PWD road in Sector-8, RZ
M/s Konark Const.Co
Const of berm by pdg CC & Intelocking tiles & Drainage system along vikas sheet apptt in sector -9,R Z
01/13.04.06/EE(R )-II
M/s Krishna Const.Co
Const of road & side berms by pdg PMP and I/l tiles along Jhang Aptt. In Sector 13 RZ
24/17.04.06/EE( R)-II
M/s Krishna Const.Co
Const of Ahatas by I/l prefeb pavers from H.n o. 1 to 8,37 to 54, and 83 to 90 in pkt D 8, Secto-6, RZ
126/26.05.07/EE-R-I/
M/s Chauhan Const.Co
Const of Ahatas by I/l prefeb pavers from H.n o. 19 to 27 & 277 to 288 in pkt D 6, Secto-6, RZ
125/26.05.06/EE(R )-II
M/s Chauhan Const.Co
Const of Ahatas by I/l prefeb pavers from H.n o. 247 to 265 & 99 to 112 in pkt G-22 sec-7, RZ
101/11.05.06/EE(R )-I
M/s Krishna Const.Co
Const of Ahatas by I/l prefeb pavers from H.n o. 391 to 399 & 241 to 251 in pkt D-6 sec-6, RZ
116/24.05.06/EE(R )-I
M/s R.B Builders &
Consts.Const of Ahatas by I/l prefeb pavers from H.n o. 181 to 192 & 343 to 354 in pkt D-6 sec-6, RZ
100/11.05.06/EE(R )-II
M/s Krishna Const.Co
46 Civil R-II 3.1.06 21.11.05 106665.00 08.06.06 26.07.06 106456.00 Completed
47 Civil R-II 3.1.06 21.11.05 106773.00 22.05.06 30.06.06 106724.00 Completed
48 Civil R-II 3.1.06 21.11.05 295044.00 26.03.06 24.06.06 294123.00 Completed
49 Civil R-II 3.1.06 21.11.05 302000.00 23.04.06 P 177182.00 In Prog.
50 Civil R-II 3.1.06 21.11.05 532987.00 07.05.06 01.07.06 529652.00 Completed
51 Civil R-II 3.1.06 21.11.05 198500.00 10.07.06 P 103852.00 In Prog.
52 Civil R-II 3.1.06 21.11.05 126726.00 30.05.06 31.07.06 126136.00 Completed
53 Civil R-II 3.1.06 21.11.05 126986.00 08.06.06 31.07.06 126350.00 Completed
54 Civil R-II 3.1.06 18.10.05 134150.00 10.04.06 22.08.06 133722.00 Completed
55 Elect. EEE-VII 27.2.06 13.10.05 142715.00 383/31.03.06 31.03.06 05.05.06 98460.00 Completed
56 Elect. EEE-VII 27.2.06 13.10.05 177482.00 380/31.03.06 31.03.06 04.05.06 124055.00 Completed
57 Elect. EEE-VII 27.2.06 13.10.05 180261.00 379/31.03.06 31.03.06 05.05.06 127260.00 Completed
58 Elect. EEE-VII 27.2.06 13.10.05 177752.00 378/31.03.06 31.03.06 04.05.06 123500.00 Completed
59 Elect. EEE-VII 27.2.06 13.10.05 148668.00 381/31.03.06 07.04.06 05.05.06 102690.00 Completed
60 Elect. EEE-VII 27.2.06 13.10.05 180967.00 08.04.06 02.05.06 101820.00 Completed
61 Elect. EEE-VII 27.2.06 13.10.05 177752.00 31.03.06 04.05.06 123360.00 Completed
Const of Ahatas by I/l prefeb pavers from H.n o.367 to 378 in pkt A-1, Sect-6, & 301 to 312 in pkt D 6, sec-6, RZ
128/29.05.06/EE(R )-II
M/s Krishna Const.Co
Const of Ahatas by I/l prefeb pavers from H.n o.61 to 72 in Pkt B-6 Sect 5 & 443 to 456 i in Pkt D -16 , sec-7, RZ
103/12.05.06/EE(R )-II
M/s Krishna Const.Co
Const of Two Umbrella in park in Pkt G 20 & G 22 in Sect 7, RZ
508/17.03.06/EE(R )-II
M/s Pushpa Builder
Const of walkway in Central park of F 24 Sect 7 RZ
02/13.04.06/EE(R )-II
M/s Krishna Const.Co
Const of lane by Har Lal Mkt by RMC in Village Naharpur in C 33-1
70/25.04.06/EE(R )-II
M/s Sarthak Const.Co
const of Ahata by I/l Perfeb pavers H.n. 291 to 296 & H.n. 223 to 230 in Pkt B 6, Sect-7 Rohini
123/26.05.06/EE(R )-II
M/s J.M.D Const.Co
const of Ahata by I/l Perfeb pavers 327, H.n. 121 to 127, 144 to 150 & 254 tp 260 in Pkt B 6, Sect-7 Rohini
124/26.05.06/EE(R )-II
M/s J.M.D Const.Co
const of Ahata by I/l Perfeb pavers 327, H.n. 231 to 237, 91 to 97, 114 top 120 in Pkt B 6, Sect-7 Rohini
139/07.06.06/EE( R)-II
M/s J.M.D Const.Co
Const of Arya Samaj Mandir road by C C in Pkt C 7, Sector 7, RZ
542/29.03.06/EE(R )-II
M/s Om Const.Co
P/O 40 nos HPSV Stree Light arrangement in Secot -6 and 8, Rohini under RZ
M/s Bansal Electric Store
P/O 40 nos HPSV Stree Light arrangement in Secot -7, Rohini under RZ
M/s Bansal Electric Store
P/O 50 nos HPSV Stree Light arrangement in Block A, B and C, Prashant Vihar under Rohini under RZ
M/s Bansal Electric Store
P/O 50 nos HPSV Stree Light arrangement in Secot-8, Rohini under RZ
M/s Bansal Electric Store
P/O 40 nos HPSV Stree Light arrangement in village Naharpur and Rajapur , Rohini,. under RZ
M/s Prince Engg.Works
P/O 50 nos HPSV Stree Light arrangement in Block A, B and C, Sector-5, Rohini under RZ
382/31.03.06/EE(E)-VII
M/s Maya Elect.
P/O 50 nos HPSV Stree Light arrangement in Sector-5, Rohini under RZ
384/31.03.06/EE(E)-VII
M/s Master Electric Store
62 Elect. EEE-VII 27.2.06 13.10.05 148114.00 06.04.06 13.04.06 84992.00 Completed
63 Elect. EEE-VII 27.2.06 13.10.05 165103.00 M/s Seth Const. 06.04.06 13.04.06 106940.00 Completed
64 Elect. EEE-VII 27.2.06 13.10.05 181216.00 M/s Seth Const. 06.04.06 13.04.06 114930.00 Completed
Prov. Of HPSV 70w Street light arrangement in Swaroop Nagar & Yadav Nagar ni W.no. 34 Under RZ
385/31.03.06/EE(E)-VII
M/s Maya Elect.
Prov. Of HPSV 70w Street lights arrangement in Block A, B , C and D block Sector-15, Rohini
387/31.03.06/EE(E)-VII
Prov. Of HPSV 70w Street lights arrangement in village Badli under Rohini Zone
386/31.03.06/EE(E)-VII
0.00
0.27
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
1.99
0.00
0.00
0.00
2.43
0.00
2.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.07
1.83
0.00
1.17
1.70
4.52
4.83
0.85
0.00
0.00
0.00
0.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
28.34852
Status Report of MLA, Sh.Jagdish Mukhi, AC No. 12 2005-06
0.00
0.00
1.95
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.32
5.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.18
2.41
0.18
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.00
10.59
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.92
0.00
0.00
0.00
0.000.00
0.00
0.00
0.00
4.98
0.00
0.00
0.00
5.68
0.00
0.00
0.62
0.00
0.00
0.180.10
0.63
0.00
0.00
0.00
0.00
0.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.00
14.22
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.16
0.79
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.15
1.700.000.000.000.000.000.000.000.000.000.00
3.80009
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
5.68
2.71
0.19
0.00
0.00
1.28
0.26
0.00
0.00
0.00
0.15
2.62
3.62
0.00
0.00
0.00
2.08
2.77
0.00
0.03
0.00
0.00
0.00
0.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.93
2.21
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.00
26.86
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
1.48
4.87
2.95
0.00
0.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.00
10.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.49
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.002.10
0.00
0.00
0.00
0.00
0.00
0.39
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.39
0.00
0.00
0.00
0.13
0.00
1.22
0.00
0.00
2.80
1.36
0.00
0.00
0.00
0.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.006.30
0.00
2.46
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.003.22
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.90
0.00
0.00
0.00
0.00
0.00
0.53
1.02
0.00
1.02
0.00
0.00
0.00
0.00
1.25
0.00
0.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.008.41
deptt. deptt. deptt. deptt. Div. Div. Div. Div. Div. Div.
civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)
Status Report of MLA,Sh.Kulwant Rana, AC No. 21 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil R-II 6.6.05 31.5.05 165950 103/20.6.05 5.9.05 28.10.05 162273 Completed
2 Civil R-II 6.6.05 31.5.05 192500 104/20.6.05 10.9.05 27.9.05 191954 Completed
3 Civil R-II 6.6.05 31.5.05 190700 105/20.06.05 16.09.05 P 126765 In Prog.
4 Civil R-II 6.6.05 6.6.05 177200 102/20.6.05 10.9.05 26.9.05 176277 Completed
5 Elect. EEE-VII 27.07.05 01.05.05 176035 242/04.01.06 04.01.06 21.01.06 172124 Completed
6 Elect. EEE-VII 05.08.05 05.07.05 198791 98/07.11.05 14.11.05 12.12.05 195783 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
const of D/System & main lane by CC in Sanjay Mkt village Mangolpur Kalan in C 35 R_II
M/s SM Const Co.
Pdg CC pav in damaged lane from H.no 40 to 48 & 57 to 49 in B block Sanjay Mkt Mangolpur Kalan C-35.
M/s Gobinda Enterprises
Pdg CC pav in damaged lane from H.no 1 to 10 and H.no. 11 to 20 in B block Sanjay Mkt Mangolpur Kalan C-35.
M/s Parkash Const.
Pdg CC pav in damaged lane from H.no 1 to 30 and H.no. 31 to 39 in B block Sanjay Mkt Mangolpur Kalan C-35.
M/s Trimurti Trading
P/O boring with submersible pump set of physical centre in vill pooth kalan in ward no 36 under R Z
M/s V.V Enterprises
Provision of 39 Nos street light arrangement in Vijay Vihar Ph II under R Z
M/s Kamal Electriclas
7 Elect. EEE-VII 05.08.05 05.07.05 198914 71/24.10.05 25.10.05 7.11.05 195558 Completed
8 Elect. EEE-VII 05.08.05 04.07.05 198914 101/7.11.05 8.11.05 14.11.05 195515 Completed
9 Elect. EEE-VII 05.08.05 07.07.05 199100 149/22.11.05 30.11.05 19.12.05 195606 Completed
10 Elect. EEE-VII 05.08.05 08.07.05 199100 143/22.11.05 24.11.05 20.12.05 195606 Completed
11 Elect. EEE-VII 05.08.05 08.07.05 198976 118/16.11.05 18.11.05 30.11.05 195405 Completed
12 Elect. EEE-VII 05.08.05 06.07.05 199100 114/16.11.05 23.11.05 22.12.05 195567 Completed
13 Elect. EEE-VII 05.08.05 11.07.05 199409 119/16.11.05 18.11.05 12.12.05 195963 Completed
14 Elect. EEE-VII 05.08.05 06.07.05 198791 158/06.12.05 12.12.05 12.01.06 195241 Completed
15 Elect. EEE-VII 05.08.05 06.07.05 199409 126/16.11.05 24.11.054 22.12.05 195963 Completed
Provision of 39 Nos street light arrangement at karman panna, Mahajan panna near Kanjhawala road pooth kalan ward no 36 under Rohini Zone
M/s Repair Shop
Provision of 39 Nos street light arrangement on phirni road , pooth kalan , ward no 36 under R Z
M/s Punjab Eletric Co.
Provision of 39 Nos street light arrangement in shah bad Daulatpur Village , ward no 36 under R Z
M/s Sheela Electric Works
Provision of 39 Nos street light arrangement in prahladpur village ward no 36 under R Z
M/s MJ Electricals & Electronics
Provision of 39 Nos street light arrengement in Rithala village ward no 35 , under R Z
M/s Krishna Eletricals
Provision of 39 Nos street light arrengement in Barwala village ward no 36 under R Z
M./s Kamal Electicals
Provision of 39 Nos street light arrengement in Vir Singh Colony Azad Colony ,Shiv Colony and Chandu Lal Colony ,Budh Vihar Ph II under R Z
M/s Bansal Eletric store
Provision of 39 Nos street light arrargement in Vijay Vihar Phase I under R Z
M/s Paras Const.CO
Provision of 39 Nos street light arragement in Harsh Dev Park , Mange Ram Park and Jaswant Colony, Budh Vihar Phase II undr R Zone
M/s AK Electricals
16 Elect. EEE-VII 05.08.05 04.07.05 199162 69/24.10.05 25.10.05 2.11.05 195819 Completed
17 Elect. EEE-VII 05.08.05 07.07.05 199223 125/16.11.05 17.11.05 22.11.05 195819 Completed
18 Elect. EEE-VII 05.08.05 08.07.05 199223 116/16.11.05 17.11.05 22.11.05 195863 Completed
19 Elect. EEE-VII 05.08.05 07.07.05 198976 122/16.11.05 24.11.05 22.12.05 195323 Completed
20 Elect. EEE-VII 05.08.05 04.07.05 199285 84/27.10.05 3.11.05 30.11.05 195906 Completed
21 Elect. EEE-VII 05.08.05 05.07.05 199162 70/24.10.05 2.11.05 30.11.05 195863 Completed
22 Elect. EEE-VII 05.08.05 07.07.05 199285 85/27.10.05 28.10.05 5.11.05 195927 Completed
23 Elect. EEE-VII 05.08.05 12.07.05 199223 97/7.11.05 14.11.05 9.12.05 195857 Completed
24 Elect. EEE-VII 05.08.05 06.07.05 198976 123/16.11.05 23.11.05 19.12.05 195558 Completed
25 Civil R-II 14.9.05 13.9.05 160210 02.12.05 23.02.06 160203 Completed
Provision of 39 Nos street light arragement in Mangolpur Kalan Village under R Zone
M/s Bansal Eletric store
Provision of 39 Nos street light arragement in A to Y Block ,Budh Vihar Phase I under R Zone
M/s Sakshma Electricals * Electonics
Provision of 39 Nos street light arragement in A-1 to Y-1 Block ,Budh Vihar Phase I under R Zone
M/s Sakahsm Electricals & Electronics
Provision of 39 Nos street light arragement in Rithala Extension ward no 35 under R Zone
M/s Gyan Enterprises
Provision of 39 Nos street light arragement in Dada Bhaiya Mandir Road , pooth Kalan ward No36 under R Zone
M/s S.G. Enterprises
Provision of 39 Nos street light arragement in Sector 26,Rohini under R Zone.
M/s Sangwan Eletricals
Provision of 39 Nos street light arragement in Pidhotia Mohalla pooth Kalan , ward No 36 under R Zone
M/s Oberio Electicals
Provision of 39 Nos street light arragement in Sharma colony Budh Vihar Phase II under R Zone
M/s Neeraj Electricals
Provision of 39 nos street light arrangement in Mangolpur Khurd village ward no 35 under R Zone
M/s Vivek Electricals
Imp of chowk by CC near Old Well in Village Shahbad Daulatpur in C 36 RZ
282/30.09.05/EE(R )-II
M/s Majdoor Const.Co
26 Civil R-II 14.9.05 13.9.05 183750 284//30.09.05 11.10.05 05.12.05 183723 Completed
27 Civil R-II 18.11.05 12.11.05 165393 04.05.06 09.08.06 165329 Completed
28 Civil R-II 18.11.05 12.11.05 180497 02.06.06 24.08.06 179279 Completed
29 Civil R-II 18.11.05 12.11.05 199973 01.06.06 24.08.06 198916 Completed
30 Civil R-II 18.11.05 12.11.05 87429 16.01.06 03.06.06 86562 Completed
31 Civil R-II 18.11.05 12.11.05 143831 01.06.06 26.07.06 143189 Completed
32 Civil R-II 18.11.05 12.11.05 171161 423/26.12.05 26.12.05 P 169591 In Prog.
33 Civil R-II 18.11.05 12.11.05 140747
Imp of lane by CC from SH. Ram Kishan house to Ayurvdic Disp and adj lane in village Shahbad Daulatpur in C 36 RZ
M/s Shiv Shankar Gupta
Imp of lane by CC pavement from Sh. Krishan House to Sh. Rajender House in village Barwala in 36 R II
422/06.12.05/EE(R )-II
M/s Kumar N & Sons
Imp of lane by CC pavement from Sh.Bhim Singh House to marain Singh House and Chandgi Saini to Gurudayal House in village :Barwala in C-36 Rohini II
454/13.02.06/EE( R)-II
M/s Govind Gupta
Imp of lane by CC and drainge from recreation centre to main road and vikas Tailor to Satish Hose in village Barwala in C-36 R II
446/03.02.06/EE(R )-II
M/s Tri Murti Trading Co.
Imp of lane by CC from Jeet Ram House to Ram dhan House Iswar House to Ved Bhawan and A-70 t oKuldeep Rana House in Village Shah bad Daulatpur
421/26.12.05/EE(R )-II
M/s Surya Kant Sharma
Imp of lane by CC from Ranbir Singh House to Rakesh Tele Centre and Parmanand House tro Umrao House in village Preladpur in C-36 R II
425/26.12.05/EE(R )-II
M/s Amar Chauhan
Imp of lane by CC pavement from Shri Ram polt to Prabha Dayal Kiryana store and adjacent lane in village Pralad pur in C36 R II
M/s Hari Jain Const.Co
Imp of lane by CC pavement from Pape house to Chand SinghHouse in village Parlad pur inC-36 R II
34 Civil R-II 18.11.05 12.11.05 184350
35 Civil R-II 5.12.05 12.11.05 470150 18.03.06 28.08.06 342489 Completed
36 Civil R-II 5.12.06 12.11.06 406500 18.03.06 28.06.06 289527 Completed
37 Civil R-II 5.12.07 12.11.07 576003 08.01.07 28.03.07 574595 Completed
38 Civil R-II 5.12.08 12.11.08 455700 14.03.06 09.08.06 322511 Completed
39 Elect. EEE-VII 5.12.08 20.10.05 196667 304/07.03.06 09.03.06 31.03.06 115848 Completed
40 Elect. EEE-VII 5.12.08 24.10.05 196264 303/07.03.06 08.03.06 31.03.06 128529 Completed
41 Civil EEE-VII 2.1.06 15.12.05 469800 07.07.06 13.09.06 389885 Completed
42 Civil R-II 2.1.06 17.12.05 468100 19.05.06 26.07.06 391731 Completed
43 Civil R-II 12.1.06 21.11.05 648241 05.06.06 30.10.06 648107 Completed
Imp of lane by pdg.CC and drainage system from Sh Dariyab Singh House to Sh. Bhoopender House in village Pralad pur in C-36 R II
Imp. of lane by CC pavement and drain from Sh. Tika Ram house to phirni Road in village Barwala in C-36 R II
487/09.03.06/EE(R )-II
M/s Konark Const.Co
Imp of lane by CC pavement from Girish factory to Naresh factory Pt Dayanand House to Dewan House and from Rajender house to Zile Singh house in village Barwala C-36 R II
486/09.03.06/EE(R )-II
M/s Konark Const.Co
Imp of lane by RMC from Sh. Devan singh house to Sh. Anand house in village Barwala in C-36 R II
375/08.01.07/EE®-II
M/s S.Kumar & Bros.
Imp of lane by pdg CC from Chopal to Sushil Rana house and near Raj Roop House in village Shahbad Dulatpur in C-36 R II
485/09.03.06/EE®-II
M/s Konark Const.Co
P/O 38 nos Street Light in A -I Block, Krsihan Viarh Under Rz
M/s Khanna Sales Corporation
P/O 39 nos HPSV streeet light in JS Block, Krishans Vihar under RZ
M/s Khanna Sales Corporation
Const of Two Gates at Park Mangol Pur Kalan and Mangol pur Khurd Rd no. 3, C 35.
513/17.03.06/EE(R )-I
M/s Konark Const.Co
Const of Two Gates at Pkt A1 & A2 park in Sector 4, Rohini C 35.
511/17.03.06/EE(R )-II
M/s Pushpa Builder
Pdg and laying RMC from Sh. Rajender Pradhan hs to Nidhan Hs on Main road in villaeg Shahbad Daulatpur in C 36 R-II
119/24.05.06/EE( R)-II
M/s Rajeev Mittal
44 Civil R-II 2.1.06 21.11.05 1281704 05.06.06 30.10.06 1281434 Completed
454647
Const of lane by RMC from main Auchandi Rd to Satbir Rana hs in village Shahbad Daulatpur in C 36 R-II
115/23.05.06/EE( R)-II
M/s Rajeev Mittal
Status Report of MLA,Sh.Surendra Kumar, AC No. 22 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C ExpenditureDate of
BookingDate of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
1 Elect EE(E)-II 10.6.05 28.4.05 199833.00 14.9.05 5.10.05 184769.00 Completed
2 Elect EE(E)-II 10.6.05 28.4.05 199970.00 12.9.05 5.10.05 181406.00 Completed
3 Elect EE(E)-II 10.6.05 28.4.05 199885.00 14.9.05 5.10.05 183436.00 Completed
4 Elect EE(E)-II 10.6.05 28.4.05 199885.00 M/s S.G Enterp. 16.9.05 7.10.05 183615.00 Completed
5 Elect EE(E)-II 10.6.05 28.4.05 199730.00 48/6.9.5/EEE-II 12.9.05 5.10.05 183354.00 Completed
Civil EE(Pr) R 20.6.05 14.6.05 88409.00 09.09.05 18.02.06 87409.00 Completed
6 Civil EE(Pr) R 5.7.05 6.5.05 563583.00 M/s Vijay Bansal 05.01.06 27.02.06 563402.00 Completed
7 Civil EE(Pr) R 5.7.05 6.5.05 519207.00 26.12.05 30.03.06 518172.00 Completed
8 Civil EE(Pr) R 5.7.05 6.5.05 315000.00 19.10.05 03.01.06 279282.00 Completed
9 Civil EE(Pr) R 5.7.05 6.5.05 392000.00 08.12.05 08.02.06 320601.00 Completed
10 Civil EE-Narela 28.7.05 25.7.05 179500.00 20.08.05 19.10.05 173811.00 Completed
P/o Street light fittings on Existing poles in village Bawana, pooth khurd
bultan pur and Chand puri Majra under Narela Zone W.No-37
53/6.9.05/EEE-II M/s Perfect Elect.works
P/o Street light fittings on Existing poles in village Darya pur Nangal Thakran & Bajit pur under Narela
Zone W.No-37
49/6.9.05/EEE-II M/s Bansal Elect store
P/o Street light fittings an existing poles in village Auchandi Harwali
w.No-37 NZ
54/6.9.05/EEE-II M/s Perfect Elect.works
P/o Street light fittings on existing poles in village Mungesh pur Qutab Garh, Jatkhor, Punjab Khore. W.No-
37 under Narela Zone
55/8.9.05/EEE-II
P/o Street light fittings an existing poles in village Kanjhawla Lad pur, Jounti Gandhi Randla & Nizam pur
W.No-38 NZ
M/s Bansal Elect store
Addl. Booking
Additional booking :- Imp to gali from Chopal to Zile singh House in village Nizam pur C-38 -I Narela
Zone.
163/24.08.05/EE-Narela
M/s Khatri Const.Co.
Imp to lane by RMc from Hari singh Hs to Chopal in village Bawana
W.No-37, Narela
92/30.12.05/EE(P
r)R
Imp to the road berms portion by RMC between road and drain from
canal to culvort on Delhi road in village Bawana in W.No-37 NZ
84/28.12.05/EE(P
r)R
M/s Vijay Kumar II
Imp to the lane of Ram singh & Brahm Prakash by providing brick
flooring in village Mungesh pur C-37 NZ
53/19.10.05/EE(P
r)R
M/s Naresh Kumar Garg
C/o B/Wall & beautification of park infront of Ram singh Hs in village
Harwali w.No-37 NZ
64/07.12.05/EE(P
r)R
M/s Naresh Kumar Garg
C/o culvert at Dadi Sati Mandir Marg in village Mangal thankran in C-37-I
NZ
161/11.08.05/EE-Narela
M/s Khatri Const.Co.
11 Civil EE(Pr) R 18.8.05 1.8.05 198802.00 M/s R.L Builders 06.03.06 30.06.06 197097.00 In Prog.
12 Civil EE(Pr) R 18.8.05 1.8.05 418600.00 24.12.05 15.03.06 338304.00 Completed
13 Civil EE(Pr) R 18.8.05 1.8.05 364300.00 09.12.05 11.02.06 282076.00 Completed
14 Civil EE(Pr) R 18.8.05 1.8.05 201522.00 15.12.05 13.03.06 201522.00 Completed
15 Civil 26.8.05 1.8.05 331838.00 23.01.06 25.04.06 329708.00 Completed
16 Civil 26.8.05 1.8.05 448444.00 07.02.06 27.03.06 447899.00 Completed
17 Civil 26.8.05 1.8.05 419401.00 M/s Atul Gupta 27.01.06 10.05.06 418857.00 Completed
18 Civil 26.8.05 1.8.05 99300.00 17.11.05 16.02.06 93515.00 In Prog.
19 Civil 26.8.05 1.8.05 123850.00
20 Civil 26.8.05 1.8.05 356200.00 31.01.06 11.05.06 352676.00 Completed
Providing C.C Opp M.C Primary School in village Mandan pur Dabas
W.No-38/Narela
91/30.12.05/EE(P
r.)Rural
Imp to road by PMP from Gyani Hs to Trasnformer in village Nizam pur
W.No 38
74/15.12.05/EE(P
r)R
M/s Naresh Kumar Garg
C/o drain from Phirni road to Gyani Hs in village Nizam pur W.No-38
65/07.12.05/EE(P
r)R
M/s Naresh Kumar Garg
Providing C.C from Jai Singh Hs to Baljet Hs in village Ladpur W.No-38.
76/15.12.05/EE(P
r)R
M/s Raj Engineers &
Builders
Imp to Gali by providing brick pavement from Mahar Singh Hs to Ajit Singh Hs and from well to sh
Tarif singh Advocate plot in village Khanjhawla in c-38(I)NZ
EE ( N)
313/20.01.06/EE-Narela
M/s Nishan Traders
Imp of Gali pdg brick pavement and open surface drain from Bed Prakash to Jagbir Hs in village Khanjhawla C-
38-I
EE ( N)
340/27.01.06/EE-Narela
M/s Satish Const.Co
Imp of lane by providing C.C pavement and open Surface drain
friam Rameshwar Hs to Balwan Hs in village Nizam pur in c-38 (I)
EE ( N)
328/23.01.06/EE-Narela
Imp of lane by providing C.C. pavement and open surface drain
from Dilbagh Singh Hs to Hoshyar Hs in village Nizam pur C-38-I NZ
EE ( N)
197/25.10.05/EE-Narela
M/s Khatri Const.Co.
Imp to lane by providing c.c. pavement & o/s drain from Praham singh Hs to Dayanad Hs in village
Nizam pur in C-38 NZ
EE ( N)
Imp to lane by providing c.c. pav and O/s drain from MCD Pry School to
BudhRam Hs and lane upto RamPhal Hs in Village Ladpur in C-38 NZ
EE ( N)
339/27.01.06/EE-Narela
M/s Satish Const.Co
21 Civil 26.8.05 1.8.05 390655.00 M/s Jitender Gaur 24.01.06 11.03.06 390286.00 Completed
22 Civil 26.8.05 1.8.05 296649.00 24.01.06 30.03.06 292393.00 Completed
23 Civil 26.8.05 1.8.05 392600.00 M/s B.K.Builders 11.01.06 29.03.06 378481.00 Completed
24 Civil 26.8.05 1.8.05 293579.00 16.03.06 10.07.06 293273.00 Completed
25 Civil 26.8.05 1.8.05 337201.00 08.02.06 30.03.06 336491.00 Completed
26 Civil EE(Pr.) Rural 2.9.05 25.8.05 313522.00 08.01.06 03.03.06 289186.00 Completed
27 Civil EE(Pr.) Rural 2.9.05 25.8.05 314158.00 M/s Balwan Singh 16.02.06 30.06.06 263970.00 Completed
28 Civil EE(Pr.) Rural 2.9.05 25.8.05 278741.00 22.12.05 13.03.06 278418.00 Completed
29 Civil EE(Pr) R 2.9.05 25.8.05 271272.00 M/s Dev Const. Co 2.01.06 17.03.06 270601.00 Completed
30 Civil EE(N) 6.9.05 1.8.05 199700.00 M/s Rakesh Kumar 27.10.05 10.12.05 193319.00 Completed
Imp of lane by providing brick pavement from Azad Hs to Bhagwan
singh Plot and lane along PyreHs , Anil Hs and Prem Plot in village
ladpur C-38 NZ
EE ( N)
315/20.01.06/EE(N)
Imp of lanes by providing c.c pavement O/s drain from Bhoop
Singh Hs to Darampal Hs and Ajit singh hs to Raghbir Singh Hs and
lane upto Randhir Hs in village Ladpur C-38-I NZ
EE ( N)
316/20.01.06/EE-Narela
M/s Dev Const. Co
Imp of lanes by providing c.c pavement O/s drain from Ram
Chander Hs to Jagroop Hs in village Jaunti C-38-I NZ
EE ( N)
245/13.12.05/EE-Narela
Imp of lanes by providing c.c. pavement and open Surface drain
from Satbir Hs to Dharmvir Hs and its link lane upto Chander Bhan Hs in
village Jaunti in c-38-I NZ
EE ( N)
395/07.03.06/EE-Narela
M/s Gaj Raj Singh
Imp of lanes by providing c.c. pave farom Roop chand Hs to Jagdish Hs
and brick pav form umed Hs to Mulitab Hs in village Ladpur C-38
EE ( N)
348/06.02.06/EE-Narela
M/s A.K Const.Co-II
C/o drain from Om Parkash Hs to Chowk in village Nithari in C-38/Narela.
87/30.12.05/EE (Pr)R
M/s Joginder Saroha
Imp of road by M/P from Chowk to opp M.C Pry School in village ithari in
C-38/Narela
96/16.01.06/EE(Pr.)Rural
Pro C.C in lane of Meer Singh in village Lad pur in C-38/ Narela
72/15.12.05/EE(Pr)R
M/s Naresh Kumar Garg
Pro C.C in lanes of Jile Singh, Ram Kishan , Kehar and Amar Singh in village
Nizampur C-38/Narela
93/02.01.06/EE(Pr)R
Imp of lane by Prov C.C pavement from Naresh to sat Narayan Hs in village
Harawali in C-37-II/Narela NZ
200/25.10.05/ EE Narela
31 Civil EE(N) 6.9.05 1.8.05 165800.00 199/25.10.05/EE(N) M/s Gobind Gupta 08.11.05 02.01.06 160644.00 Completed
32 Civil EE(N) 6.9.05 1.8.05 99200.00 201/25.10.05/EE(N) 08.11.05 02.01.06 96155.00 Completed
33 Civil EE(N) 6.9.05 1.8.05 84400.00 M/s Bittu Const.Co 12.12.05 24.01.06 81874.00 Completed
34 Civil EE(Pr) R 8.9.05 24.8.05 459932.00 19.02.06 P 343205.00 In Prog.
35 Civil EE(Pr)-R 8.9.05 1.8.05 190537.00 04.01.06 07.07.06 171081.00 In Prog.
36 Civil EE(Pr)-R 8.9.05 1.8.05 140600.00 M/s K.C.Builders 13.12.05 14.02.06 86229.00 Completed
37 Civil EE/Narela 15.9.05 1.8.05 388519.00 M/s Raj Associates 24.01.06 20.03.06 387715.00 Completed
38 Civil EE/Narela 15.9.05 1.8.05 608376.00 05.04.06 08.06.06 597541.00 Completed
39 Civil EE/Narela 15.9.05 1.8.05 354339.00 M/s Rajesh Dabas 30.01.06 30.05.06 353590.00 Completed
Pro C.C. pavement and drain from Sh. Dalel Singh Hs to Jat Ram Hs and Kekh Ram to Shishpal hs in village Sultanpur
Dabas C-37-I/ Narela
Pdg C.C. pavement from Karan Singh to Bijender , Bal Kishan to Rajinder and
Dayanand Mahavir wali gali in village Bajit Pur in C-37-I/Narela
M/s Ankit Associates
Imp of lane by providing c.c. pavement and O/s drain fraom Santra Sukhla Hs to
Kuldeep Hs and Hari Singh to Ghanshyam Hs in village Karala in C-38-
II/Narela
203/25.10.05/EE-Narela
Imp to lanes from Jagbir Singh Hs to Prem Singh Hs and Kishan Hs to Ram Kishan hs by providing M/P & drain in
village Bawana in C-37/Narela
107/06.02.06/(Pr) Rural
M/s Kaushik Enterprises
Imp to road surface by M/P and c.c along the walls of park an Mukhtyar Singh Marg
in village Bawana C-37/Narela
83/26.12.05/EE(Pr.)R
M/s Vijender Bhardwaj
Imp to Chowk at Punjabi pana ( Takia) by Kota stone flooring & drain in village
Bawana in c-37/Narela
69/12.12.05/EE(Pr)R
Imp of lane by providing brick pavement and O/s drain from Jeet Ram Hs to Hari Singh Hs via park and lane from Mange Ram Hs to Daya Nand Hs in Vill. Karala
C-38-II.Narela Zone
322/20.01.06/EE-Narela
Imp of gali by providing c.c. pave and open surface drain from Ganga Ram Hs
to Niranjan Hs Via Raju Pehlwan in village Majri C-38-II/Narela
345/06.02.06/EE-Narela
M/s Barawal Builders
Imp of gali by Providing c.c. pavment from Jagdish (ASI) Hs to Karan Singh Hs in vill
Karala in C-38-II/Narela
335/23.01.06/EE-Narela
40 Civil EE/Narela 15.9.05 1.8.05 339882.00 08.02.06 03.06.06 338414.00 Completed
41 Civil EE/Narela 15.9.05 1.8.05 330444.00 15.02.06 29.03.06 330322.00 Completed
42 Civil EE/Narela 15.9.05 1.8.05 346248.00 319/20.01.06/EE(N) 21.01.06 10.03.06 344749.00 Completed
43 Civil EE/(Pr)Rural 21.11.05 24.8.05 84407.00 27.02.06 01.06.06 84335.00 Completed
44 Civil EE/(Pr)Rural 21.11.05 1.8.05 473000.00 M/s Jai Kumar 21.03.06 14.04.06 385907.00 Completed
45 Civil EE/(Pr)Rural 21.11.05 1.8.05 382207.00 M/s Anil Kumar 03.07.06 08.09.06 382175.00 Completed
46 Civil EE/(Pr)Rural 21.11.05 1.8.05 430400.00 29.03.06 14.07.06 350440.00 Completed
47 Civil EE/(Pr)Rural 21.11.05 1.8.05 420200.00 M/s Anil Kumar 18.03.06 20.06.06 383593.00 Completed
48 Civil EE/(Pr)Rural 21.11.05 1.8.05 259282.00 M/s Sudeh Kumar 08.03.06 15.11.06 241327.00 Completed
49 Civil EE/(Pr)Rural 21.11.05 1.8.05 377093.00 M/s Bajaj Const.Co 15.02.06 23.06.06 376914.00 Completed
50 Civil EE/(Pr)Rural 21.11.05 1.8.05 450906.00 M/s Sudeh Kumar 20.03.06 20.07.06 394752.00 Completed
Imp of Gali by pdg c.c. pavement and o/s drain from Kishan Hs to Sansar Public
School in village karala C-38-II NZ
344/06.02.06/EE-Narela
M/s Ankur Associates
Imp of gali by providing c.c. pav and open surface drain farom Ramesh Mathur Hs to
Ajit Hs to village Karala C-38-II/Narela
309/20.01.06/EE-Narela
M/s Ankit Associates
Imp of lane by providing c.c. pave and o/s drain from Mehar Chand Khanna Hs to Azad Hs in village Karala C-38-II Narela
M/s Mehboob Const.Co
Imp of lane by prov brick flooring of Pardhan Balwan singh & ornamental lane
of vill Darya pur in c-37/Narela
116/20.02.06/EE(Pr.)R
M/s Parvesh Const.Co
Imp to lane from Gotu Hs to Mir Singh Hs by RMC in village Darya pur in
C-37/Narela
125/11.03.06/EE(Pr)R
Imp to road by Providing M/P and RMC on Berms from Umesh kumar Sharma Hs
to Khanjawala la Banwana road in Ishawar coloney , Bawna in C-37/Narela
21/27.06.06/EE (Pr)R
Imp to lane by RMC & drain fron Balbir Hs to Sheela Hs & Harigobind Hs in Iswarh
Coloney Bawnana C-37/Narela
138/22.03.06/EE(Pr)R
M/s Bharadwaj Const.Co
Imp to lane by RMC & drain front Chander Bhan Hs to chopal in village Bawana in C-
37/Narela
127/11.03.06/EE(Pr)R
C/o drain from Dhani Ram Hs to Mohan hs in village Bawna in C-37/Narela
126/1.03.06/EE(Pr)R
Imp to road from Mahivdev Singh hs to Raj Singh hs and Ravider hs to Jaipal
Hs in village Bawana C 37 NZ
111/14.02.06/EE(Pr)R
C/o drain from Mahiinder Singh Hs to Raj Singh Hs and Ravinder Hs to Jaipul Hs in
vill Bawana in C-37/Narela
124/11.03.06/EE(Pr.)R
51 Civil EE/Narela 21.11.05 2.9.05 191200.00 M/s Sujit Kumar 21.01.06 08.03.06 186042.00 Completed
52 Civil EE/Narela 21.11.05 16.9.05 132100.00 18.01.06 06.03.06 127870.00 Completed
53 Civil EE/Narela 21.11.05 16.9.05 199600.00 M/s Raj Associates 25.01.06 14.02.06 193391.00 Completed
54 Civil EE/Narela 21.11.05 1.8.05 364672.00 06.03.06 22.05.06 364155.00 Completed
55 Civil EE/Narela 21.11.05 1.8.05 275192.00 325/23.01.06/EE(N) 30.01.06 21.03.06 274737.00 Completed
56 Civil EE/Narela 21.11.05 1.8.05 193564.00 326/23.01.06/EE(N) 30.01.06 21.03.06 193238.00 Completed
57 Civil EE/Narela 21.11.05 1.8.05 653361.00 M/s Om Const.Co 15.03.06 26.06.06 652710.00 Completed
58 Civil EE/Narela 21.11.05 1.8.05 497225.00 334/23.01.06/EE(N) M/s Raj Associates 30.01.06 23.03.06 496778.00 Completed
59 Civil EE/Narela 21.11.05 1.8.05 324263.00 M/s Deep Const.Co 16.03.06 19.06.06 324124.00 Completed
Pdg C.c. pavement and drain from Phool Singh hs to Singh Ram Hs and pl Chopal to Muni Ram and Jiya Ram wali gali in vil.
Bawana in c-37-I/Narela
291/16.01.06/EE-Narela
Pdg C.C.pavement from Sameer Singh hs to Chander Parkesh and Jagdish wali glai
in vill Auchandir in C-37/Nareala
295/16.01.06/EE-Narela
M/s Jagdamba Trading Co.
C/o O/s drain Transtermer to Sohatemor ( main road) in vill Qutab garh in
C-37/Narela
296/16.01.06/EE-Narela
Pro B/P from Khadark Singh Hs to Mahander singh , Gyanverden to Om
parkash Hs and adj lane in vill Mengesh pur in C-37-II/Narela
391/02.03.06/EE-Narela
M/s Devinder Kumar
Pdg C.C. pavement & drain from Om Parkash Hs to Suresh Hs in vill Qutab
garh inC-37-II/Narela
M/s D & G Const.Co
Imp to lane by pdg C.C, pavement farom Ganga Elect shop to Chandan, Lakhmi to Sureat, Jai Bhagwan to Tara Chan and Sureder to Ashok hs in vill Harwali in C-
37-II/Narela
M/s D & G Const.Co
Pdg M/P and drain from Mahavir Hand on main road to Om Parkash S/o Chander Singh Hs in vill Chand pur Kalan in C-
37/Narela
409/08.03.06/EE-Narela
Pdg c.c. pavement and drian from Raghbir to Jasbir Hs via Jagdish , Mehender to Rattan, Ramphel to
Raghunath Bhard waj and link gali in vill Pooth Khurd in C-37-/Narela
Pdg c.c. pavement and drain farom Jai Karn Hs to Chattan Singh and main prem
Pio road to Hawa Singh Balmikji Hs in village Sultanpur Dabas in C-37-/Narela
400/08.03.06/EE-Narela
60 Civil EE/Narela 21.11.05 1.8.05 299086.00 10.03.06 12.05.06 298846.00 Completed
61 Civil EE/Narela 21.11.05 1.8.05 190922.00 03.02.06 04.04.06 190758.00 Completed
62 Civil EE/Narela 21.11.05 1.8.05 227050.00 13.03.06 14.06.06 226785.00 Completed
63 Civil EE/Narela 21.11.05 1.8.05 215340.00 17.03.06 14.08.06 214963.00 Completed
64 Civil EE/Narela 21.11.05 2.9.05 391520.00 09.03.06 15.06.06 390986.00 Completed
65 Civil EE(Pr)Rural 23.11.05 3.10.05 586000.00 05.04.06 24.04.07 467172.00 In Prog.
66 Civil EE(Pr)Rural 23.11.05 3.10.05 431343.00 M/s Rajesh Kumar 16.02.06 27.03.06 402431.00 Completed
67 Civil EE(Pr)Rural 4.1.06 3.1.06 89000.00 20.02.06 15.03.06 78332.00 Completed
68 Civil EE(Narela) 9.1.06 1.8.05 266500.00 05.04.06 19.05.06 195841.00 Completed
69 Civil EE(Pr)Rural 9.1.06 14.10.05 593220.00 M/s Rajesh Kumar 22.05.06 03.08.06 582840.00 Completed
70 Civil EE(Pr)Rural 9.1.06 14.10.05 194560.00 M/s Rajesh Kumar 05.04.06 28.09.07 193810.00 Completed
71 Civil EE(Pr)Rural 16.1.06 13.1.06 196800.00 M/s Jai Kumar 02.04.06 03.05.06 179565.00 Completed
Pdg c.c. pavement and drain farom Rati Ram to Dayanand via Bhim Singh ,
Rambhaj to Nanhu ram Balmik , Pratap singh lane Ram pha to Balbir Singh Om
Prakash lane in vill Pooth Khurd in C-37/Narela
406/08.03.06/EE_narela
M/s D & G Const.Co
Pdg c.c pavement and drain from Bhoop Singh to Chander Bhan Hs and Surajmal
to Hoshyar Singh Hs in vill Salahpur Majra in c-37/Narela
324/23.01.06/EE_narela
M/s D & G Const.Co
C/o O/s drain from Ajit Singh Hs to Pt Ram Kumar Hs in village Slahpur Majra in
C-37-I/Narela
407/08.03.06/EE-Narela
M/s D & G Const.Co
Imp to lane by providing c.c.pavement from Rambir Hs to Rajender Hs in village
Bajit pur in C-37/-I/Narela
405/08.03.06/EE-Narela
M/s D & G Const.Co
Imp of drainge system from Khanjhwala Rd upto outfall drain in Village Bawana C-
37 -I Narela
390/02.03.06/EE-Narela
M/s Devinder Kumar
Pdg M/P from Pry school to Mubarakpur rd in village Kirari C 38 NZ
144/27.03.06/EE(Pr)R
M/s Raj Engg.& Builders
Const of Drain from Laxmi Shop to Culvert in villag Kirari in C 38NZ
113/14.02.06/EE(Pr)R
Pdg RCC pipe culvert on main road of Nizampur in village Jounti in C 38 NZ
117/20.02.06/EE(Pr)R
M/s Raj Engineers & Builders
Imp of gali by pdg Brick Pavment from Kulveer singh Hs to Balwant hs in Village
karala in C 38 NZ
453/31.03.06/EE-Narela
M/s Kaushik Enterprises
Const of drain from Maha Rishi Daya Nand school to S.O.S. in village Bawana
C 37 NZ
14/15.05.06/EE (Pr)R
Const of drain from Rajiv Dabas tent Hs to Pole NO. 08/19/02/05 in village Majra
Dabas C 37 NZ
143/27.03.06/EE(Project)R
Imp to lane by RMC and drain from pandit Chaju Hs to Dada Bhaiya Chowk in village
Bawana in C 37 NZ
142/27.03.06/EE(Project)R
72 Civil EE(Pr)Rural 16.1.06 13.1.06 248634.00 27.09.06 07.11.06 245472.00 Completed
73 Civil EE(Pr)Rural 22.2.06 8.2.06 522200.00 08.05.06 08.08.06 381834.00 Completed
Status Report of MLA,Sh Jai Kishan , AC No. 23 2005-06
Const of Culvert on pjhirni rd of village Pooth Khurd from Shivan Propertioes to
MCD Store (Pooth Khurd) C 37 NZ
08/01.05.06/EE(Pr.)South
M/s Shyam Lal Gupta
Pdg CC In berms on Tau Bihari Rd and cost of Drain near Crimation Ground in
vIllage Lad Pur C 38, Narela
07/01.05.06/EE (Pr) R
M/s Shyanti Lal Gupta
S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XXVIII 9.6.05 7.6.05 767989 380/24.01.06 01.07.06 30.03.07 765066.00 Completed
2 Elect EEE-III 24.8.05 18.8.05 175063.00 05.11.05 02.12.05 172176.00 Completed
3 Elect EEE-III 24.8.05 18.8.05 174999.00 03.11.05 17.11.05 171849.00 Completed
4 Elect EEE-III 24.8.05 18.8.05 174999.00 04.11.05 17.11.05 171803.00 Completed
5 Elect EEE-III 24.8.05 18.8.05 174999.00 15.12.05 16.01.06 170032.00 Completed
6 Elect EEE-III 22.9.05 7.9.05 274161.00 12.03.06 30.03.06 261993.00 Completed
7 Elect EEE-III 22.9.05 7.9.05 374253.00 28.02.06 13.03.06 351344.00 Completed
8 Civil XXVIII 30.9.05 17.9.05 253988.00 17.03.06 23.06.06 253988.00 Completed
9 Civil XXVIII 30.9.05 17.9.05 266742.00 20.02.06 31.07.07 266742.00 Completed
10 Civil XXVIII 30.9.05 17.9.05 317192.00 20.02.06 19.04.06 317093.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp of park by pdg B/wall with MS grill at Sultanpur Mazra Village in Sultanpuri in C-40
M/s Trilok Sharma
P/O Semi High Mast light at L -15, Udhog Nagar under NGZ
217/28.10.05/E
E(E)III
M/s Bhima Electricals
P/O Semi High Mast light at Sulatan Pur Majra Village under NGZ
260/03.11.05/E
E(E)III
M/s A.K Electronics
P/O Semi High Mast light at near Bus Terminal Sultanpur under NGZ
262/03.11.05/E
E(E)III
M/s Bindra Motors & Elect.
P/O Semi High Mast light at Nagin Lake appartment Peera Garhi under NGZ
368/08.12.05/E
E(E)III
M/s Malhotra Elect.
Prov. Of Street Light at Rd starting from S block Mangolpuri terminal to A -B Ext , Sultanpuri under NG
509/10.03.06/E
E(E)III
M/s Perfect Elect.Work
Prov. Of Street Light at Sultanpuri Rd from Rly. Xing to East Friends Encl. under NGZ
505/27.02.06/E
E(E)III
M/s Perfect Elect.Work
Const of Walkway in the park opp H.no. D 2/44 & Pdg Passage near D 1/444 and D 2/228 in Sultanpuri C 40 NGZ
454/16.03.06/E
E-XXVIII
M/s Shiv Kumar Gupta
Const of Walkway in the park opp H.no. F6/276 in Sultanpuri in C 40 NGZ
390/06.02.06/X
XXIII
M/s Bhagwan Const.Co
Const of Walkway in the park opp H.n. E 1/268 and pdg Passage near H.n. E 2/288 and opp Nursury park in Sultanpuri in C 40 NGZ
381/24.01.06/X
XXIII
M/s Bhagwan Const.Co
11 Civil XXVIII 30.9.05 17.9.05 330380.00 19.02.06 04.04.06 330380.00 Completed
12 Civil XXVIII 30.9.05 17.9.05 237018.00 23.03.06 19.05.06 232687.00 Completed
13 Civil XXVIII 30.9.05 17.9.05 227348.00 17.03.06 23.06.06 227279.00 Completed
14 Civil XXVIII 30.9.05 17.9.05 166981.00 19.02.06 03.04.06 166981.00 Completed
15 Civil XXVIII 30.9.05 17.9.05 167418.00 M/s Anil Goel 07.02.06 17.02.06 167418.00 Completed
16 Civil XXVIII 30.9.05 17.9.05 334061.00 02.03.06 24.07.07 334061.00 Completed
17 Civil XXVIII 3.10.05 17.9.05 282407.00 03.04.06 08.06.06 282407.00 Completed
18 Civil XXVIII 3.10.05 17.9.05 498446.00 03.04.06 25.10.07 496013.00 Completed
19 Elect EEE-III 7.10.05 5.10.05 199358.00 04.11.05 11.12.05 190908.00 Completed
20 Elect EEE-III 7.10.05 5.10.05 199358.00 04.11.05 11.12.05 188483.00 Completed
Const of Walkway and passage in the park opp H.no. E 7/493 in Sultanpuri C 40 NGZ
411/10.02.06/E
E-XXVIII
M/s K.K.Const.Co-I
Const of Walkway in the park opp P 4/1 in Sultanpuri in C 40 NGZ
455/16.03.06/E
E-XXVIII
M/s Shiv Kumar Gupta
Const of walkway in the park opp H.no. E 3/493 and Imp to passage by pdg Red Stone in Sultanpuri in C 40 NGZ
453/16.03.06/E
E-XXVIII
M/s Shiv Kumar Gupta
to Imp of lane by KSF from H.No. D 6/ to D/E18 and D/E11 to & xing in in Sultanpuri in C 40 NGZ
410/10.02.06/E
E-XXVIII
M/s K.K.Const.Co-I
Imp of lane by KSF from H.no.D 6/24 to 37, D 6/111 to 142, D 6/36 to 85 and xing in Sultanpuri in C 40 NGZ
393/06.02.06/X
XVIII
Const fo walkway in the park near H.no. P3/199 in Sultanpuri in C 40 NGZ
412/10.02.06/E
E-XXVIII
M/s K.K.Const.Co.
Imp of park by pdg B/wall with Marble wash and MS grill infornt fo C 8/97 in C 8 block in Sultanpuri in C 40 NGZ
452/16.03.06/E
E-XXVIII
M/s Shiv Kumar Gupta
Imp of road/lane by pdg RMC from C 8/241 to C 8/288 C 2/228 to C 4/1 & c 7/37 to C 7/27 in Sultanpuri in C 40 NGZ
502/24.03.06/E
E-XXVIII
M/s V.K Chaudhary &
Co.
Prov. Of Street light in Resettlement colony of Sultanpuri A,B,,C, and D blockUnder NGZ
263/03.11.05/E
E(E)III
M/s Sachdeva Electriclas
Prov of street light in resettlement colony Sultanpuri harizan Basti Friedns Sultanpuri Harizan Basti 80 sq yds and G,H block Sultanpuri under NGZ
264/03.11.05/E
E(E)III
M/s Sachdeva Electriclas
21 Elect EEE-III 7.10.05 5.10.05 199358.00 371/EE(E)III 09.12.05 15.12.05 191209.00 Completed
22 Civil XXVIII 24.10.05 30.9.05 401963.00 M/s Anil Goel 02.04.06 29.06.06 401963.00 Completed
23 Civil XXVIII 24.10.05 30.9.05 398260.00 19.05.06 28.06.06 391783.00 Completed
24 Civil XXVIII 24.10.05 30.9.05 150744.00 82/12.05.06 26.07.06 19.08.06 150700.00 Completed
25 Civil XXVIII 24.10.05 30.9.05 524713.00 15.03.06 30.06.06 524258.00 Completed
26 Civil XXVIII 2.11.05 17.9.05 461016.00 04.04.06 23.06.06 450270.00 Completed
27 Civil XXVIII 31.1.06 12.1.06 441006.00 19.10.06 30.11.06 440684.00 Completed
28 Civil XXVIII 08.03.06 03.03.06 408823.00 M/s A.S Traders 01.06.06 28.08.06 408823.00 Completed
29 Civil XXVIII 08.03.06 03.03.06 408823.00 M/s A.S Traders 01.06.06 28.08.06 408381.00 Completed
Prov of street lightin resettlement Colony Sultanpuri E,F, P-1, P-3 and P-4 block, under NGZ
M/s Pragati Enginers.
Imp of park by pdg B/wall with MS grill and Red Sand stone at C 8/36 and C 2/228 Sultanpuri in C 39.
503/24.03.06/E
E-XXVIII
Imp of lane by KSF from A5/37 to 48, 13 to 12, 60 to 61, 143 to 121 in A -5 blockand A 2/193 to 180,157 to 228,157 to 324, 72 to 409, 394 to 349, 393 to block Sultanpuri in C 39 NGZ
501/24.03.06/E
E-XXVIII
M/s Vijay Bansal
Imp of park by Pdg walkway infrong fo C 6/97, C 6 block Sultanpuri in C 39 NGZ
M/s Nirvan Const.CO
Imp of walkway of NH Park by pdg CC tiles & other Miscellaneous work at Jalebi Chowk Sultanpuri in C 39
449/08.03.06/E
E-XXVIII
M/s Ashoka Traders
Const of Hut in NH Park near Jelabi Chowk Sultanpuir inC 39 NGZ
465/08.03.06/E
E-XXVII
M/s S.S Contractors
Imp of B/wall of park by pdg Red Sand Stone, Marble Wash & MS Grills opp E 7-336 on main road Sultanpuri in C 40 NGZ
202/11.09.06/E
E-VIII
M/s Naresh Kumar Bansal
Dev of park & const. Of water body in park near P-3/50 opp.
Gurudwara in Sultanpuri C-40/N.G zone
108/25.05.06/EE-XXVIII
Dev of park and const.of water body in park near F-1/97
Sultanpuri C-40 N.G zone
106/25.05.06/EE-XXVIII
30 Civil EE-XXVIII 08.03.06 03.03.06 415281.00 28.06.06 25.08.06 414866.00 Completed
31 Civil EE-XXVIII 08.03.06 03.03.06 346789.00 M/s A.S Traders 25.05.06 31.08.06 346077.00 Completed
32 Civil EE-XXVIII 08.03.06 03.03.06 487094.00 M/s A.S Traders 07.06.06 18.08.06 485994.00 Completed
33 Civil EE-XXVIII 08.03.06 03.03.06 526958.00 05.06.06 20.08.06 526676.00 Completed
34 Civil EE-XXVIII 08.03.06 17.09.05 532134.00 04.07.06 31.08.06 532134.00 Completed
35 Civil EE-XXVIII 08.03.06 03.03.06 521961.00 04.07.06 31.08.06 521623.00 Completed
36 Civil EE-XXVIII 17.03.06 12.01.06 623432.00 05.01.07 19.02.07 622858.00 Completed
37 Elect EE(E)-III 17.03.06 05.01.06 335533.00 05.10.06 31.10.06 327922.00 Completed
38 Elect EE(E)-III 30.03.06 05.01.06 163067.00 25.07.06 14.08.06 157887.00 Completed
Imp. Of lanes by pdg. R.M.C from B-687 to b-806 B-686 to B-619 & Sanatan Dharam Mandir to Jahaj Apartment C-39/N.G zone
114/25.05.06/EE-XXVIII
M/s Surinder Const.Co
Imp. Of lanes by pdg. Kota Stone in C-1 market near bus stand in
Sultampuri C-39/N.F zone
113/25.05.06/EE-XXVIII
Const. Of hut in aprk opp. T-46 in T-Block Mangolpuri C-39/N.G
zone
112/25.05.06/EE-XXVIII
Const.of hut in Ambedkar Park near B-3 Block Sultanpuri C-39/
N.G zone
109/25.05.06/EE-XXVIII
M/s Ram Chander Dagar
Const. Of hut in Hans Park near H.NO E-7/493 in Sultanpuri C-
40/N.G zone
104/25.05.06/EE-XXVIII
M/s Pawan Builders
Const. Of hut park near H.NO. F-6/277 in Sultanpuri in C-40/N.G
zone
105/25.05.06/EE-XXVIII
M/s Pawan Builders
Imp of central verge with M.S grill on main Sultan Puri Road from Jalebi Chowk to wards
railway x-in in C-40/N.G zone
356/27.11.06/EE-XXVIII
M/s Shankar Builder
Provision of street light on main road of Resettelment colony, D-1,D-2,D-3,D-6,D-7,F-6,F-7,P-1 and P-2 Block Sultanpuri and
Friends Enclave under N.G zone
262/04.10.06/EE(E)-III
M/s Suchdeva Electricals
P/O Lighting arrangment with 2X250 watt flood light fitting on 12 M long street tubular Pall at
main road near kali mandir Sultanpuri N.G zone
184/24.07.06/EE(E)-III
M/s Neeraj Electricals
Status Report of MLA,Sh Raj Kumar Chouhan, AC No. 24 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C ExpenditureDate of
BookingDate of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
1 Civil XXVIII 4.7.05 30.6.05 189548.00 09.08.05 15.11.05 454992 Completed
2 Civil XXVIII 4.7.05 30.6.05 455037.00 171/XXVIII 9.8.05 15.11.05 454220 Completed
3 Civil XXVIII 4.7.05 30.6.05 455037.00 10.08.05 10.11.05 455037 Completed
4 Civil XXVIII 18.7.05 5.7.05 189548.00 14.09.05 18.12.05 189447 Completed
5 Civil XXVIII 18.7.05 5.7.05 189718.00 14.09.05 02.01.06 189685 Completed
6 Civil XXVIII 18.7.05 5.7.05 190327.00 18.10.05 P 181960 In Prog.
7 Civil XXVIII 18.7.05 5.7.05 190567.00 05.10.05 P 185462 In Prog.
8 Civil XXVIII 18.7.05 5.7.05 198150.00 14.09.05 29.11.05 188678 Completed
9 Civil XXVIII 18.7.05 5.7.05 199900.00 M/s R.S.Const 23.09.05 20.12.05 189462 Completed
10 Civil XXVIII 18.7.05 5.7.05 189896.00 14.09.05 P 184896 In Prog.
11 Civil XXVIII 9.8.05 19.7.05 389585.00 M/s Hari Ram 08.09.05 02.12.05 389585 Completed
12 Civil XXVIII 9.8.05 19.7.05 395812.00 09.11.05 30.03.06 395812 Completed
13 Civil XXVIII 9.8.05 19.7.05 451736.00 30.08.05 02.12.05 451191 Completed
Const of Hut in Indira Gandhi Park in I block Mangolpuri in C-41.
172/08.08.05/X
XVII
M/S Paplaj Const Co
Const of Hut in Centre park near CTC Complex in F block Mangolpuri.
M/S Paplaj Const Co
Const of Hut in park infornt of C 210 in Mangolpuri C-41.
170/08.08.05/X
XVIII
M/S Paplaj Const Co
Pdg MS gate on Kala Mandir ground in Mangolpuri in C42 NGZ
199/13.09.05/X
XVIII
M/s Goela Associates
Imp of berms by RMC near Mother Dairy Booth on G block mangolpuri.
205/13.09.05/X
XVIII
M/s Rajinder Singh Dagar
Imp of berm by RMC from Indira Gandhi Park to balmiki Mandir in I Block Mangolpuri in C-41.
225/18.10.05/X
XVIII
M/s Deep Const Co.
Imp of berm by RMC infront of Water Tank to K block Mangolpuri in C-42.
220/04.10.05/X
XVIII
M/s Dabas Const.Co
Imp of berms by pdg RMC infront of Mini Mkts S block Mangolpuri in C-42.
204/13.09.05/X
XVIII
M/s Parveen Const.
Pdg MS Grill on FP of Slip way in S block Mangolpuri.
202/13.09.05/X
XVIII Pdg MS Grill on FP in F 2 block Mangolpuri in C-41.
198/13.09.05/X
XVIII
M/s Pawan Kumar
Const of Designer Gate of park near Y block Nursury in Mangolpuri in C-41.
185/30.08.05/X
XVIII Const of Designer Gate of park side Petrol Pump along PWD rd in Mangolpuri in C42.
252/09.11.05/X
XVIII
M/s Shree Shamgiri Enter
Const of Hut in J block park near H.no. 1198 inJ block Mangolpuri in C41.
187/30.08.05/X
XVIII
M/s Vinod Dhawan
14 Civil XXVIII 9.8.05 19.7.05 147774.00 M/s Hari Ram 13.09.05 29.11.05 147710 Completed
15 Civil XXVIII 9.8.05 19.7.05 389779.00 30.08.05 02.12.05 389779 Completed
16 Civil XXVIII 9.8.05 19.7.05 189723.00 06.09.05 13.12.05 189692 Completed
17 Civil XXVIII 9.8.05 19.7.05 189811.00 10.09.05 12.01.05 189775 Completed
18 Civil XXVIII 9.8.05 19.7.05 190242.00 06.12.05 05.02.06 190242 Completed
19 Civil XXVIII 9.8.05 19.7.05 190157.00 22.09.05 05.02.6 190012 Completed
20 Civil XXVIII 9.8.05 19.7.05 451736.00 M/s Hari Ram 30.08.05 20.12.05 451736 Completed
21 Civil XXVIII 25.8.05 1.8.05 167118.00 30.11.05 28.02.06 167118 Completed
22 Civil XXVIII 25.8.05 1.8.05 167483.00 30.11.05 28.02.06 167479 Completed
23 Civil XXVIII 25.8.05 1.8.05 167764.00 M/s R.K.V Co. 30.11.05 28.02.06 167729 Completed
24 Civil XXVIII 25.8.05 1.8.05 167815.00 30.11.05 28.02.06 167815 Completed
25 Civil XXVIII 25.8.05 1.8.05 168192.00 30.11.05 28.02.06 167654 Completed
Pdg Premixing Carpet on road from Water tank to S block Chowk in Mangolpuri in C42.
200/13.09.05/X
XVIII Const of Designer Gate of Ambedkar park in M block Mangolpuri in C-42.
188/30.08.05/X
XVIII
M/s Vinod Dhawan
Const of Storm Water Drain infront of Mother Dairy booth to road no 3 G block, Mangolpuri, C-41.
193/05.09.05/X
XVIII
M/s Ajay Kumar
Const of strom Water Drain from O block, MC Pry School to LP road, Mangolpuri in C-42
191/05.09.05/X
XVIII
M/s Gaur Const.Co
Const of Strom Water Drain from M-962 to park in Mangolpuri in C-42.
293/28.11.05/X
XVIII
M/s Sehwag Const.
Const of Strom Water Drain Ambedkar Park to M 221 in Mangolpuri in C-42.
203/13.09.05/X
XVIII
M/s Shokeen Enterprises
Const of Hut in park near Masjid in Y block Mangolpuri in C-41.
186/30.08.05/X
XVIII P/F stone sunk on B/wall of park near petrol pump in Mangolpuri C-42
283/28.11.05/X
XVIII
M/s P.K.Sharma
P/F stone sunk on B/wall of park infront of M.C pry School C Bolck in Mangolpuri C-42
286/28.11.05/XXVIII
M/s Ashok Kumar
P/F stone sunk on B/wall of IndiraGandhi park I Block in Mangolpuri C-41
284/28.11.05/XXVIII
P/F stone sunk on B/wall of park near gas Agency in T Block in Mangolpuri C-42
287/28.11.05/X
XVIII
M/s R.K. Const.
P/F stone sunk on B/wall of infront of B 1202 in Mangolpuri C-42
285/28.11.05/X
XVIII
M/s R.K. Const.
26 Civil XXVIII 25.8.05 1.8.05 167125.00 M/s R.S.Const 28.12.05 28.02.06 167112 Completed
27 Civil XXVIII 25.8.05 1.8.05 166546.00 M/s R.S.Const 20.12.05 28.02.06 166546 Completed
28 Civil XXVIII 25.8.05 1.8.05 167815.00 30.11.05 28.02.06 167803 Completed
29 Civil XXVIII 25.8.05 1.8.05 189139.00 30.11.05 20.012.05 189068 Completed
30 Civil XXVIII 25.8.05 1.8.05 190186.00 19.10.05 20.12.05 190039 Completed
31 Civil XXVIII 25.8.05 1.8.05 450620.00 28.12.05 28.07.06 450441 Completed
32 Civil XXVIII 25.8.05 1.8.05 197500.00 213/26.9.05 27.9.05. 22.11.05 188008 Completed
33 Civil XXVIII 25.8.05 1.8.05 190000.00 214/26.9.05 27.9.05. 24.10.05 189942 Completed
34 Civil XXVIII 18.10.05 13.10.05 187416.00 09.11.05 10.02.06 186884 Completed
35 Civil XXVIII 18.10.05 13.10.05 188982.00 10.11.05 13.12.05 188933 Completed
36 Civil XXVIII 2.1.06 20.12.05 367783.00 06.04.06 P 364328 In Prog.
37 Civil XXVIII 2.1.06 20.12.05 425439.00 23.03.06 26.06.06 424700 Completed
P/F stone sunk on B/wall of infront of Nirankari Bhawan in Mangolpuri C-42
339/19.12.05/X
XVIII P/F stone sunk on B/wall of infront of B 263 in Mangolpuri C-42
340/19.12.05/X
XVIII
P/F stone sunk on B/wall of infront of B 277 in Mangolpuri C-42
292/28.1.05/XX
VIII
M/s P.K.Sharma
Const of walkway on park back side of Shan Ghar H Bolck Mangolpuri C 41
282/31.03.06/X
XVIII
M/s Bansal Const
Imp. of drain & footpath infront of Indira Gandhi park I Block Mangolpuri C 41
226/18.10.05/X
XVIII
M/s B.P.Dabas & Bros.
Const. Of hut in H Block nursary park in Mangolpuri C 41
350/21.12.05/E
E-XXVIII
M/s R.K Enterprises
Imp. of main roads by pdg. M.S grill on foot path , B Block road ,Police station road & Mangolpuri C 41
M/s Harish Kumar
Imp. of main roads by pdg. M.S grill on foot path , Sanjay Gandhi road ,L.P road & S.T road Mangolpuri C 42
M/s Shree Shamgiri Enter
Const of Walkay ofpark infornt of F 1/174 inMangolpuri C 41 NGZ
251/09.11.05/E
E-XXVIII
M/s Vipin Kumar Dagar
Const of Walkay of park infornt of P 1/84 in Mangolpuri C 41 NGZ
250/09.1.05/XX
VIII
M/s Harish Kumar
Const of Culverts in B block Chowk & Y 1244 in Mangolpuir in C 41 NGZ
514/28.03.06/E
E-XXVIII
M/s K.K Const. Co-II
Const of Centra Verge ad FP from Indira Gandhi park to CTC Complex on Police Station rd Mangolpuri in C 41 NGZ
472/23.03.06/E
E-XXVIII
M/s Rama Const.Co
38 Civil XXVIII 2.1.06 20.12.05 181451.00 27.04.06 26.07.06 181170 Completed
39 Civil XXVIII 2.1.06 20.12.05 338797.00 27.04.06 14.07.06 338772 Completed
40 Civil XXVIII 2.1.06 20.12.05 271213.00 27.04.06 02.08.06 271032 Completed
41 Civil XXVIII 2.1.06 20.12.05 433739.00 27.04.06 14.07.06 433602 Completed
42 Civil XXVIII 2.1.06 20.12.05 473921.00 516/28.03.06 30.03.06 28.04.06 473837 Completed
43 Civil XXVIII 2.1.06 20.12.05 478061.00 480/23.03.06 24.03.06 28.04.06 477848 Completed
44 Civil XXVIII 2.1.06 20.12.05 486331.00 27.04.06 04.08.06 485596 Completed
45 Civil XXVIII 2.1.06 20.12.05 475612.00 27.04.06 15.12.08 475441 Completed
46 Civil XXVIII 2.1.06 20.12.05 478488.00 06.05.06 24.07.07 478116 Completed
47 Civil XXVIII 2.1.06 20.12.05 498237.00 27.04.06 07.09.06 498237 Completed
48 Civil XXVIII 2.1.06 20.12.05 470459.00 23.03.06 24.08.06 470217 Completed
49 Civil XXVIII 2.1.06 20.12.05 467042.00 475/23.3.06 24.03.06 28.04.06 466923 Completed
Const of Culverts in S block chowk in Mangolpuri in C 42.
29/27.04.06/EE-
XXVIII
M/s P.K.Sharma
Const of Culverts in Q block Chowk & near Designer Gate in Mangolpuri in C 42 NGZ
30/27.04.06/EE-
XXVIII
M/s Garg Enterprises
Const of walkway of park and MS Gate ifront of D 898 in Mangolpuri in C 41 NGZ
33/27.04.06/EE-
XXVIII
M/s Anil Const.Co
Const of walkway in park infront of G 781 an surrounding pond in Block B, Mangolpuir in C 41 NGZ
27/27.04.06/EE-
XXVIII
M/s K.K Const. Co-II
Const of walkway of park infornt of Q-11/36 in Mangolpuri inC 42 NGZ
M/s Anil Goyal
Const of Walkway & MS gates infront of B-900, B-421, B 720 and B 840i Mangolpuri in C 42 NGZ
M/s Anil Goyal
Const of walkway & MS gates on Veer Kumwar Singh Park in Mangolpuri in C 42 NGZ
26/27.04.06/EE-
XXVIII
M/s Harish Kumar
Const of Walkway of park & MS Gate infront of E 770 in Mangolpuri inC 41 NGZ
25/27.04.06/EE-
XXVIII
M/s Indians Apply Agencies
Const of Walkway of park & MS Gate near Mini Mkt R block Mangolpuri in C 42 NGZ
36/27.04.06/EE-
XXVIII
M/s K.K Const. Co-II
Const of B/wall of park in block A. Mangolpuri insdustrial area in Mangolpuir in C 42 NGZ
40/27.04.06/EE-
XXVIII
M/s Vinod Associates
Const of Walkway & Pdg MS Gate in F block park infront of F 497 in Mangolpuri in C 41 NGZ
466/23.03.06/E
E-XXVIII
M/s Dev Const.
Const of Walkway of park in Y block <Nursary near (Road no. 3) in Y block in Mangolpuir in C 41 NGZ
M/s Anil Goyal
50 Civil XXVIII 2.1.06 20.12.05 426849.00 27.04.06 19.07.06 419328 Completed
51 Civil XXVIII 2.1.06 20.12.05 481008.00 25.05.06 15.12.08 444940 Completed
52 Civil XXVIII 2.1.06 20.12.05 527230.00 23.03.06 30.06.06 527230 Completed
53 Civil XXVIII 2.1.06 20.12.05 519158.00 23.03.06 22.06.06 519149 Completed
54 Civil XXVIII 2.1.06 20.12.05 518234.00 23.03.06 30.06.06 516121 Completed
55 Civil XXVIII 07.03.06 14.12.05 1011023.00 11.05.06 26.07.06 1011023 Completed
56 Civil XXVIII 07.03.06 20.12.05 519374.00 28.03.06 09.06.06 519374 Completed
57 Civil XXVIII 07.03.06 20.12.05 348312.00 17.04.06 09.06.06 347500 Completed
58 Civil XXVIII 23.03.06 07.03.06 191250.00 17.04.06 25.05.06 191228 Completed
59 Civil XXVIII 23.03.06 07.03.06 192300.00 17.04.06 25.05.06 192300 Completed
60 Civil XXVIII 23.03.06 07.03.06 199600.00 17.04.06 19.06.06 199500 Completed
61 Civil XXVIII 23.03.06 07.03.06 187150.00 17.04.06 20.07.06 187076 Completed
Const of Walkway of park infornt of Masjid I block Mangol puri in C 41 NGZ
35/27.04.06/EE-
XXVIII
M/s K.K Const. Co-II
Const of walkway in CRP Park in industrial area Mangolpuri in C 42 NGZ
116/25.05.06/X
XVIII
M/s Indians Apply Agencies
Imp of passage by RMC in A block Mkt back sid eof Dispensary in Mangolpuri in C 41 NGZ
474/23.03.06/E
E-XXVII
M/s Brama Nand
Imp of lane by RMC from I-720 to I -676 in Mangolpuri inC 41 NGZ
473/23.03.07/E
E-XXVIII
M/s Garg Enterprises
Imp of passage by RMC surrounding CTC Complex & Dhalao in I block in Mangolpuri in C 41 NGZ
471/23.03.06/E
E-XXVIII
M/s Garg Enterprises
Imp of B/wall of park by pdg. Stone wall lining near parking & infront of N-480 Mangolpuri C-
42/ N.G zone
67/10.05.06/EE-
XXVIII
M/s Pawan Builders
Const of B/wall of park in front of R-577 in Mangolpuri C-42 N.G zone
519/28.03.06/EE-XXVIII
M/s Pawan Builders
Const of B/wall of park in front of R-577 in Mangolpuri C-42 N.G zone
10/17.04.06/EE-XXVIII
M/s Pawan Builders
Const. Of Snan Ghar and urinal Block near Ramlila Park in R-block in Mangopuri C-42/N.G zone
05/17.04.06/EE-XXVIII
M/s Lakshay Builders
Const. Of huts in R-block park Mnagolpuri in C-42/N.G zone
06/17.04.06/EE-XXVIII
M/s Harish Kumar
Const. Of Walkway surounding skirting ring in H-block park in
Mangolpuir C-41/N.G zone
08/17.04.06/EE-XXVIII
M/s Rajeev Const.Co
Pdy passage by precast terrazo tile flooring in park near shan ghar Mnagolpuri C-42/ N.G zone
07/17.04.06/EE-XXVIII
M/s K.K Const. Co-II
62 Civil XXVIII 23.03.06 07.03.06 207008.00 M/s Bramanand 28.06.06 P 206745 In Prog.
63 Civil XXVIII 23.03.06 07.03.06 206028.00 M/s Bramanand 28.03.06 P 205770 In Prog.
64 Civil XXVIII 23.03.06 07.03.06 327755.00 28.04.06 13.07.06 327694 Completed
65 Civil XXVIII 23.03.06 07.03.06 350042.00 27.04.06 09.06.06 349755 Completed
66 Civil XXVIII 23.03.06 07.03.06 514160.00 27.04.06 26.07.06 512000 Completed
67 Civil XXVIII 28.03.06 20.12.05 514056.00 27.04.06 27.03.08 513834 Completed
Pdg G.I pipe line on park in front of MC primary School C-blcok Mangolpuri C-42
509/28.03.06/XXVIIII
Pdg. G.I pipr line on chatt puja park in P-block in Mangolprui C-42/ N.G zone
517/28.03.06/XXVIII
Const of B/Wall of Agarsain vatika and passage in S-block in Mangolpuir C-42
32/27.04.06/EE-XXVIII
M/s Anil Const.Co
Imp of B/wall of park and Pdg M.S gate on H-block park Crimenation ground Mangolpuri C-41
31/27.04.06/EE-XXVIII
M/s K.K Const. Co-II
Const. Of lane from road No. 3 to y-2073 in Mangolpuri C-41
28/27.04.06/EE-XXVIII
M/s Garg Enterprises
Imp of road bearn by RMC from 901 B.stand to J-Block X-ing in Mangolpuri C-42
34/27.04.06/EE-XXVIII
M/s K.K Const. Co-II
Status Report of MLA,Sh Bejinder Singh , AC No. 25 2005-06Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XXVIII 15.7.05 4.7.05 568800.00 06.01.06 20.03.06 552738 Completed
2 Civil XXVIII 15.7.05 3.7.05 564300.00 05.11.05 03.11.06 552956 Completed
3 Civil XXVIII 15.7.05 5.7.05 569000.00 25.10.05 9.01.06 550232 Completed
S.No.
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Pdg RMC from H.no. 281 to H.no. 935 in Vill. Mundka in C-44 NGZ
357/30.12.05/XXVIII
M/s Surender Kumar Vats
Pdg RMC from Usha General Store to H.no. 279 in vill Mundka in C-44.
235/31.10.05/XXVIII
M/s Akshita Builders
Pdg RMC from Mange Ram Hous to Rohtak Rd I Vill Mundka Vill in C-44.
231/20.10.05/XXVIII
M/s V.K.Chaudhry
4 Civil XXVIII 15.7.05 5.7.05 1914916.00 17.01.06 04.04.06 1913240 Completed
5 Civil XXVIII 15.7.05 5.7.05 1510500.00 361/30.12.05 15.03.06 31.07.07 1509923 Completed
6 Civil XXVIII 25.7.05 5.7.05 761600.00 392/06.02.06 10.03.06 14.06.07 735821 Completed
7 Elect. EEE-III 24.8.05 17.8.05 54861.00 15.02.06 28.02.06 50228 Completed
8 Elect. EEE-III 24.8.05 17.8.05 273366.00 03.01.06 27.01.06 253534 Completed
9 Elect. EEE-III 20.12.05 22.11.05 480344.00 16.05.06 15.06.06 464032 Completed
Pdg RMC from Narain Singh House to DS Saini Hosue Jaipal to Chander Boss Hs, Bharat Singh to Jai Singh Hs, H.no. 722 to Anand hs, Shri Bhagwati to Lalit Hs, Rajender to Jai Bhagwan Hs, Balbir to Partap Hs and Bhim Singh to Dharam Veer Hs in vill Mundka C-44 NGZ
374/16.01.06/XXVIII
M/s K.K.Const.Co-
II
Imp to lane by pdg RMC from Chajju Ram Dharam Kanta to Todar Mal Chowk in Vill Mundka C-44. NGZ
M/s Sanjeev Kumar
Imp to lane by RMC fromS ita Ram House to Pond & Chander Bhan Hs to Phirni Rd in village Mundka in C-44 NGZ
M/s Raj Enterprises
P/O Street lighting in Kavita Cly rd near Mela Ground Nursury in nangloi Assembly Constituency under NZ
487/14.02.06/EE(E)III
M/s Akansha Elect.
P/O Street lighting in Nangloi Village, Kamruddin nagar connecting rd in Nangloi assembly Constituency under NZ
442/29.12.05//EE(E)III
M/s Khanna Sales Corp.
P/O Street Lighting o n the road frm Nolthi Community Centre to Najafgarh Drain W. o. 44 under NGZ
82/10.05.06/EE(E)-III
M/s Bansal Elect.Store
10 Elect. EEE-III 28.12.05 22.11.05 226360.00 18.05.06 15.06.06 216706 Completed
11 Civil EEE-III 28.12.05 27.9.05 2228362.00 12.10.06 P 2187657 In Prog.
12 Civil XXVIII 6.1.06 27.10.05 259300.00 22.05.06 06.06.06 221412 Completed
P/O S treet lighting on the main connecting road Kammrudin Nagar vill to Rhtak Road in W.no. 44 NGZ
103/10.05.06/EE(E)III
M/s Perfact Electrical Works.
stg of Carriage way by Dense carpetting from Hari Vatika to Bake Bihar Sweets at Nangloi Najafgarh rd in C 44 NGZ
169/25.07.06/EE-XXVIII
M/s Competent Const.Co
Pdg Water arrangment in the park of GH -5 and 7, GH-13, GH-14 and Bhera Enclave in Paschim Vihar in C 43 NGZ
70/12.05.06/EE-XXVIII
M/s Naresh Kumar Bansal
Status Report of MLA,Sh.Dayanand Chandela, AC No. 26 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil EE-XV 17.8.05 14.7.05 371400.00 18.01.06 18.03.06 371140 Completed
2 Civil EE-XV 17.8.05 14.7.05 348300.00 24.11.05 27.02.06 266821 Completed
3 Civil EE-XV 17.8.05 14.7.05 338759.00
4 Civil EE-XV 17.8.05 14.7.05 416900.00
5 Civil EE-XV 17.8.05 14.7.05 440600.00 8.12.05 25.1.06 440543 Completed
6 Civil EE-XV 17.8.05 14.7.05 222243.00
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
C/o Built up section drain from H.no. 157A 138 in A block Nursing Garden in
W.no. C 45 WZ
269/17.01.06/
EE-XV
M/s Paramvir Const.Co
C/o Built up section drain from H.no. 112 to 102 in A
block Nursing Garden in W.no. C 45 WZ
200/21.11.05/
EE-XV
M/s Krishan Kumar Gupta
C/o Built up section drain from H.no. opp RZ 189B to
opp RZ 69B in Nursing Garden in C 45.
C/o Built up section drain from RZ 80A to RZ 68A in A block Nursing Garden in C45
WZ
C/o built up section drain from h.no. 137 to 113A in A block,
Nursing Garden in C 45.
216/5.12.05/X
V
M/s Rami & Co.
Imp of rd by pdg MP from RZ 94A to RZ 81A in A block,
Nursing garden in C 45.
7 Civil EE-XV 17.8.05 14.7.05 413400.00 18.01.06 17.03.06 413400 Completed
8 Civil EE-XV 17.8.05 14.7.05 232531.00
9 Civil EE-XV 26.8.05 14.7.05 558000.00 11.02.06 25.03.06 494886 Completed
10 Elect EEE-III 15.9.05 15.9.05 99870.00 10.01.06 01.02.06 92385 Completed
11 Elect EEE-III 23.9.05 15.9.05 145407.00 10.11.05 9.12.05 145202 Completed
C/O built up section drain from RZ 94A to RZ 81A in A block, Nursing garden in C 45.
268/17.01.06/
EE-XV
M/s Parveen Kumar
Contractor
Imp to lane by pdg MP from H.no. 121 to 126 in Nursing
Garden in C 45.
Imp to laneby CC from RZ 40A to RZ 18 and 135 in
Ablock, Nursing Gardenin C 45
306/10.02.06/
EE-XV
M/s Rawat Builder & CO.
P/o 70 watt June Interigal Post Top latern fittings in theKabristan at Khyala Bridge under WZ
449/04.01.06/
EEE-IIIQ
M/s A.K.Electrical
s
P/o Lighting arrangm,ent in Kabristan of khayla village under WZ
265/30.11.065
/EEE_III
M/s Sachdeva Electicals
Status Report of MLA,Sh.Mukesh Sharma, AC No. 27 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Elect. EEE-III 06.05.05 5.5.05 160761.00 20.9.05 1.10.05 155568.00 Completed
2 Civil XXIII 31.5.05 3.5.05 195900.00 27.7.05 28.9.05 193930.00 Completed
3 Civil XXIII 3.06.05 3.05.05 239810.00 11.03.06 P 233758.00 In Prog.
4 Civil XXIII 3.06.05 3.05.05 239683.00 11.03.07 P 234353.00 In Prog.
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
prov. Of Boring with Subermsible pumps set in the park of Vani Vihar, Uttam Nagar W>no. 48, under Wz
45/20.9.05/E
EE-III
M/S Sri Bala JI Electicals
Imp to lane by pdg Brick Flooring fropm Daya Nand hs to near Gorakh Nath Mandir in village Baprola in C-48 WZ
163/26.7.05/EE_XXIII
M/s N.K Const
C/o Open surface Drainf rom G-12A to G 24(Both side) in Kanwar Singh Nagar in C-48 WZ
565/10.03.06/EE-XXIII
M/s Saniay Vir
C/o Open surface Drainf rom G-59 to G 72 (Both side) in Vani Vihar in C-48 WZ
564/10.03.06/EE-XXIII
M/s Saniay Vir
5 Elect. EEE-III 29.6.05 13.6.05 155849.00 15.12.05 20.12.05 142346.00 Completed
6 Elect. EEE-III 29.6.05 13.6.05 159546.00 5.11.05 18.11.05 144072.00 Completed
7 Elect. EEE-III 29.6.05 13.6.05 168481.00 10.12.05 28.12.05 153398.00 Completed
8 Elect. EEE-III 29.6.05 13.6.05 155849.00 1.12.05 9.12.05 142444.00 Completed
9 Civil EE-XXIII 6.7.05 10.06.05 195828.00 21.04.06 65.05.06 195776.00 Completed
10 Civil EE-XXIII 6.7.05 10.06.05 203957.00 19.03.06 P 200527.00 In Prog.
P/o lighting arrangement with 2x250 watt flood lighjt fitttings at East Uttam Nagar near Pali Factory under Wz
380/15.12.05
/EEE-III
M/s M.J Electicals
P/o lighting arrangement with 2x250 watt flood lighjt fitttings on 12m Long Steel Tabular pole at Hastsal Village Chowk near Park under Wz
261/03.11.05
/EEE-III
M/s Bindra Motors & Electicals
P/o lighting arrangement with 2x250 watt flood lighjt fitttings at Najafgarh Nangloi Rd near Farm hs under Wz
369/08.12.05
/EEE-III
M/s Malhotra Electricals
P/o lighting arrangement with 2x250 watt flood lighjt fitttings at East Uttam Nagar near Polic Chowky under Wz
399/30.11.05
/EEE-III
M/s Sachdeva Electicals
Imp to lane by pdg CC apv & c/o Drain both side from H.o. E 4 and H.no. E -5E to E 6 in E block Kiran Garden under Wz
37/12.04.06/EE-XXIII
M/s Deepak Gupta
Imp to lane by pdg CC apv & c/o Drain both side from H.o. E-10 and H.no. E -13 front and back , E block Kiran Garden under Wz
560/10.03.06/EE-XXIII
M/s Deepak Gupta
11 Civil EE-XXIII 6.7.05 10.06.05 278320.00 23.02.06 P 276560.00 In Prog.
12 Civil EE-XXIII 6.7.05 10.6.05 256450.00 19.03.06 P 252749.00 In Prog.
13 Civil EE-XXIII 6.7.05 10.6.05 199874.00 12.8.05 17.9.05 199856.00 Completed
14 Civil EE-XXIII 6.7.05 10.6.05 197631.00 21.09.06 05.11.06 196761.00 Completed
15 Civil EE-XXIII 6.7.05 22.6.05 309522.00 23.09.06 23.12.06 309014.00 Completed
16 Civil EE-XXIII 6.7.05 22.6.05 230751.00 26.04.06 P 228204.00 In Prog.
Imp to lane by pdg CC apv & c/o Drain both side from H.no. E-5E & B-28 in E block Kiran Garden in C 48 WZ
469/14.02.06/EE-XXIII
M/s Deepak Gupta
Imp to lane by pdg CC apv & c/o Drain both side from H.no. A-110 to A-130 in Gulab Bagh C -48 WZ
557/10.03.06/EE-XXIII
M/s Vashist Const.Co
C/o Various culverts infornt of H.no. RZ-22A, Sonu Photo Corner and infornt of Friends Art Service, Santosh park andj R -1 n Vani Vihar C -48. Wz
175/8.8.05/E
E-XXIII
M/s Raghav Enginners
Imp to lane by pdg CC pav and Covering of drain by Precast Slabs from H.no. T -115 to Adarsh Public School near H.no. RZ 97 in T block Uttam Nagar I C 48WZ
221/18.09.06/EE-XXIII
M/s Vashist Const.Co
Imp to lane by pdg CC Pav and Drain both side from H.no. C -56 to C 49 ni C block in Kiran Garden in C 48, WZ
243/20.09.06/EE-XXIII
M/s Munish Atri
Imp to lane by pdg CC Pav and Drain both side from H.no. C -25 to C 30 and H.no. C 17 to C 20 back lane in Kiran Garden in Wz
554/10.03.06/EE-XXIII
M/s Deepak Gupta
17 Civil EE-XXIII 6.7.05 22.6.05 259545.00 19.03.06 P 253828.00 In Prog.
18 Civil EE-XXIII 6.7.05 22.6.05 283614.00 20.12.05 03.03.06 283426.00 Completed
19 Civil EE-XXIII 6.7.05 22.6.05 236361.00 19.03.06 P 233721.00 In Prog.
20 Civil EE-XXIII 6.7.05 22.6.05 239728.00 19.03.06 P 236125.00 In Prog.
21 Civil EE-XXIII 6.7.05 22.6.05 257138.00 27.01.06 29.03.06 256299.00 Completed
22 Civil EE-XXIII 6.7.05 22.6.05 276331.00 19.03.06 P 273803.00 In Prog.
Imp to lane by pdg CC Pav and Drain both side from H.no. C -25 to C 30 front lane in Kiran Garden in C 48 Wz
559/10.03.06/EE-XXIII
M/s Deepak Gupta
C/o Outfall drain from H.no. T 139 to T 151 in T block Uttam Nagar C-48 Wz
365/20.12.05/EE-XXIII
M/s Aman Consts.CO.
Imp to lane by providing CC Pav and C/O drain both side H.No. T-A-28 to T-182 in T- Block Uttam Nagar C-48/WZ
558/10.03.06/EE-XXIII
M/s Vashist Const.Co
Imp. to lane by providing CC pavemnt and C/O drain both side from H.No. B1/59A to B1/54 and Pole no. 43 to Pole no. 55 Sewak Park C-48/WZ
556/10.03.06/EE-XXIII
M/s Vashist Const.Co
Imp. to lane by providing CC pav and C/O drain both side from H.No.P-45 to P-83 in Vijay Vihar C-48/WZ
417/18.01.06/EE-XXIII
M/s Eagle Enterprises
Imp. to lane by providing CC pav and C/o drain both side from H.No. RZ-A-1 to WZ-14A and RZ-25 to RZ-15A in Parja Pati colony Indra Park C 48/WZ
561/10.03.06/EE-XXIII
M/s Deepak Gupta
23 Civil EE-XXIII 6.7.05 22.6.05 294164.00 17.03.06 P 281034.00 In Prog.
24 Civil EE-XXIII 6.7.05 22.6.05 258047.00 19.03.06 P 255162.00 In Prog.
25 Civil EE-XXIII 6.7.05 25.06.05 276280.00 08.06.06 P 273518.00 In Prog.
26 Civil EE-XXIII 6.7.05 25.06.05 245822.00 24.05.06 P 200173.00 In Prog.
27 Civil EE-XXIII 6.7.05 25.06.05 401293.00 22.11.06 28.01.07 400777.00 Completed
28 Civil EE-XXIII 18.8.05 14.6.05 225933.00 M/s Varun 15.02.06 16.03.06 224593.00 Completed
Imp. to lane by providing CC pav and C/o drain both side from H.No.RZA-135 to RZA-108 in Praja Pati colony Indra Park C48/WZ
563/10.03.06/EE-XXIII
M/s Deepak Gupta
Imp. to lane by providing CC pav and C/o drain both side from H.no. RZA-59 to 60, H.No.RZA-64 and RZA-90 to RZA-98 in Praja Pati colony Indra Park C48/WZ_
562/10.03.06/EE-XXIII
M/s Deepak Gupta
Imp. to lane by providing CC pav and C/o drain both side from H.No.RZ-176 B to RZ-G-66 in Praja Pati colony Indra park C48/WZ
553/10.03.06/EE-XXIII
M/s Deepak Gupta
Imp. to lane by providing CC pav and C/o drain both side from H.No.RZ-144 to RZ-161 and RZ-151 to RZ-322 in Praja Pati colony Indra park C48/WZ
555/10.03.06/EE-XXIII
M/s Deepak Gupta
C/O out Fall drain from H.No. n-1 to S-13 in Vijay Vihar C-48/WZ
251/20.09.06/EE-XXIII
M/s Rajdhani Const.Co
P/F Inter locking tiles and Central verge from outer ring road to oxford school in Vikas Puri C-47/WZ
460/14.02..06/EE-XXIII
29 Civil EE-XXIII 18.8.05 14.6.05 533400.00
30 Civil EE-XXIII 18.8.05 14.6.05 232558.00 04.12.05 P 231496.00 In Prog.
31 Civil EE-XXIII 18.8.05 18.6.05 519900.00 15.07.06 28.09.06 414061.00 Completed
32 Civil EE-XXIII 18.8.05 18.6.05 369630.00 07.12.05 P 193520.00 In Prog.
33 Civil EE-XXIII 18.8.05 18.6.05 349823.00 25.11.05 21.02.06 341876.00 In Prog.
34 Civil EE-XXIII 18.8.05 14.7.05 357561.00 04.12.05 P 284381.00 In Prog.
35 Civil EE-XXIII 18.8.05 14.7.05 543227.00 19.10.06 P 542793.00 In Prog.
Beautification of Is Land at the Inter section of N.G road and Virza road marg in Vikas Puri C-47/WZ
P/F Inter locking tiles and Central verge from N.G road to side -IV in Vikas Puri C-47/WZ
266/16.11.05/EE-XXIII
M/s S.S.Builders
Imp. of B/Wall of Park by providing M.S grill and grit wash in front of H.No. FG-I/6 and FG-I/62 in FG-I Block Vikas Puri C-47/WZ
117/21.06.06/EE-XXIII
M/s Anean Builders
Imp. of B/Wall of Park by providing stone lining in front of H.No. 96 in site-IV Vikas Puri C-47/WZ
297/28.11.05/EE-XXIII
M/s S.S.Builders
Imp. of B/Wall of park by providing stone lining from H.No. 224 to H.No. 140 in F-Block Vikas Puri C-47/WZ
263/16.11.05/EE-XXIII
M/s Ricky Consts.
Imp. of B/Wall of park by providing stone lining from H.No. 180 to H.No. 214 in F-Block Vikas Puri C-47/WZ
265/16.11.05/EE-XXIII
M/s S.S.Builders
Providing dense carpetting as Shaheed Sukhdev Marg from C-245 to C-325 in C-Block Vikas Puri C-47/WZ
552/10.03.06/EE-XXIII
M/s Mukesh Associates
Pvt.Ltd.
36 Civil EE-XXIII 18.8.05 14.7.05 175161.00 25.11.05 04.02.06 174923.00 Completed
37 Civil EE-XXIII 18.8.05 16.7.05 404511.00 25.11.05 22.02.06 399296.00 In Prog.
38 Civil EE-XXIII 18.8.05 16.7.05 279569.00 18.04.06 06.05.06 277985.00 Completed
39 Civil EE-XXIII 18.8.05 16.7.05 407876.00 07.08.06 29.11.06 405936.00 Completed
40 Civil EE-XXIII 18.8.05 1.8.05 695700.00
41 Civil EE-XXIII 18.8.05 1.8.05 510384.00 02.12.05 P 428426.00 In Prog.
42 Civil EE-XXIII 18.8.05 18.6.05 323410.00 06.01.06 28.03.06 322670.00 Completed
C/O walk way in the park opp. H.No. 140 in F Bolck Vikas Puri C-47/WZ
289/28.11.05/EE-XXIII
M/s A.K.&Co
Imp. of B/Wall of park by providing M.S grill and grit wash infront of H.No. FG-I/86 and FG-I/79 in FG-I Block Vikas Puri C-47/WZ
264/16.11.05/EE-XXIII
M/s Ricky Consts.
Imp. of B/Wall of Tikona park by providing M.S grill and grit wash opp. F-258 F Block Vikas Puri C-47/WZ
628/30.03.06/EE-XXIII
M/s Bhardwaj Const.Co
Imp.of park by providing M.S grill and grit wash infront of H.No. 153,H.No. 97 and H.No. 93 in DG-II Block Vikas Puri C-47/WZ
149/01.08.06/EE-XXIII
M/s Aman Consts.CO.
Imp. of B/Wall of park by providing stone lining infront of H.No. C-245 to C-349 in C- Block Vikas Puri C-47/WZ
Imp. of B/Wall of park by providing stone lining infront of H.No. C-356 to C-350 in C- Block Vikas Puri C-47/WZ
267/16.11.05/EE-XXIII
M/s S.S.Builders
C/O designer gate of park opp. Flat no. 400 in Janta Flats Hastsal C-47/Wz
391/27.12.05/EE-XXIII
M/s A.K & Co.
43 Civil EE-XXIII 18.8.05 14.7.05 331393.00 12.01.06 3.11.06 268490.00 Completed
44 Civil EE-XXIII 18.8.05 16.7.05 292417.00 10.01.06 27.03.06 281184.00 In Prog.
45 Civil EE-XXIII 18.8.05 16.7.05 293814.00 12.01.06 3.11.06 264950.00 Completed
46 Civil EE-XXIII 18.8.05 16.7.05 324114.00 10.01.06 01.04.06 324031.00 Completed
47 Civil EE-XXIII 18.8.05 18.6.05 701900.00 05.03.06 03.06.06 485455.00 Completed
48 Civil EE-XXIII 18.8.05 1.8.05 197400.00
49 Civil EE-XXIII 18.8.05 1.8.05 197900.00 15.11.04 01.12.04 195583.00 Completed
C/O designer gate of park infront of H.No. AG-I/112 and AG-I/124 in AG-I Block Vikas Puri C 47/WZ
390/27.12.05/EE-XXIII
M/s A,K, Const.
C/O designer gate of park infront of H.No. C-29 Janta Flats Hastsal in C-47/WZ
396/04.01.06/EE-XXIII
M/s Ravindra Const.Co-II
C/O designer gate of park infront of H.No. FG-I/86 in FG-I Block Vikas Puri C-47/Wz
388/27.12.05/EE-XXIII
M/s A.K.&Co
C/O designer gate of park opp. Flat no. 23 in Janta Flats Hastsal In C-47 / WZ
389/27.12.05/EE-XXIII
M/s A.K & Co.
Imp. Drainage system and berms by pdg Inter Locking tiles from H.No. 386 to St. Peter Convent School and C-65 to C-49 in C-Block Vikas Puri C-47/WZ
489/24.02.06/EE-XXIII
M/s Manish Nayyar
Imp. to roads by providing mix seal surfacing in C-Block , M-Block , MG-I Block , KG-I Block in Vikas Puri C 47/Wz
Imp. to roads by providing mix seal surfacing in DG-I , DG-II and F - Block Vikas puri C 47/WZ
240/25.10.05/EE-XXIII
M/s Sona Consultant &
Contractor
50 Civil EE-XXIII 26.8.05 16.8.05 597000.00 06.05.06 10.08.06 410328.00 Completed
51 Civil EE-XXIII 26.8.05 16.8.05 390514.00 10.12.05 09.03.06 390045.00 Completed
52 Civil EE-XXIII 26.8.05 10.8.05 295880.00 17.12.05 24.02.06 295154.00 Completed
53 Civil EE-XXIII 26.8.05 10.8.05 212192.00 05.12.05 P 174889.00 In Prog.
54 Civil EE-XXIII 26.8.05 10.8.05 419218.00 17.12.05 27.02.06 418782.00 Completed
55 Civil EE-XXIII 26.8.05 10.8.05 199501.00 26.10.05 6.10.05 199260.00 Completed
Imp. of lanes by providing CC and drain from C-67 to 68, C-75 C-66 K C-58 and C-31 to C-39 in Nawada Housing Complex in C-48/WZ
83/05.05.06/EE-XXIII
M/s Bhardwaj Const.Co
Imp. of lanes by providing CC and C/O drain from C-21 to C-13 , C-7 to C-12 and C-6 to C-1 in Nawada Housing Complex in C-48/WZ
357/19.12.05/EE_XXIII
M/s A.K.&Co
Imp. of lanes by providing CC and drain from H.No. A-1/20 to A-1/24 , A-1/28 to A 1/32 and A-1/19 to A-1/18 in A Block Mohan Garden C-48/WZ
351/16.12.05/EE-XXIII
M/s J.R.Consts.
Imp. to lane by providing R.M.C and drain from A-13 to A-20 in A Block Mohan Garden C-48/WZ
299/28.11.05/EE-XXIII
M/s Madan Lal Gupta
Imp. of lane by providing R.M.C and drain from Gurudwara to A/10 in A Block Mohan Garden C-48/WZ
350/16.12.05/EE-XXIII
M/s J.R.Consts.
Imp. of lanes by providing C.C and drain from A-94 to A-103 and A-105 to A-6 in A-Block Mohan Garden in C-48/Wz
249/25.10.05/XXIII
M/s Apoorv Builders and Contractors
56 Civil EE-XXIII 26.8.05 10.8.05 225600.00 20.12.05 28.02.06 225518.00 Completed
57 Civil EE-XXIII 8.12.05 16.7.05 196809.00 18.02.06 20.03.06 195491.00 Completed
58 Civil EE-XXIII 8.12.05 16.7.05 198538.00 16.01.06 08.02.06 198361.00 Completed
59 Civil EE-XXIII 12.12.05 16.7.05 446471.00 16.05.06 28.06.06 445780.00 Completed
60 Civil EE-XXIII 12.12.05 16.7.05 438744.00 16.05.06 20.07.06 438330.00 Completed
C/O drain from a-109 to A-105 (out side) and Imp. to drainge system in lane A - 21 to A - 40 in A-Block Mohan Garden C-48/WZ
358/19.12.05/EE-XXIII
M/s A.K.&Co
Imp to road by pdg RMC from Abheer Electronic to
H.NO C-163 in J..J Coloney Binda pur in C-48/WZ
474/17.02.06/EE-XXIII
M/s Kritika consts.
Imp to drainage system by pdg Culvert infront of H.NO A-1, B-168, B-112 Shyam ji STD near Mather dariry in Binda pur J.J coloney in C-
48/WZ
405/16.01.06/EE-XXIII
M/s Kritika consts.
Imp to road by pdg RMC Con from from Pole No
173 near J.P. Auto Works to Pole no 0176 near
Community Centre on Binda pur Talab road in Binda Pur in C-48 /WZ
588/21.03.06/EE-XXIII
M/s Chittar Mal
Imp to road by pdg RMc con from DESU
Transfermer to Pol No 0174 near New Fountain M.C Pry School on Binda Pur Talab road in Binda pur C-48/WZ
36/12.04.06/EE-XXIII
M/s Chittar Mal
61 Civil EE-XXIII 12.12.05 16.7.05 447853.00 16.05.06 20.07.06 447694.00 Completed
62 Civil EE-XXIII 12.2.05 16.7.05 432455.00 22.06.06 14.09.06 428015.00 Completed
63 Civil EE-XXIII 12.2.05 16.7.05 444397.00 29.03.06 27.06.06 443778.00 Completed
64 Civil EE-XXIII 12.12.05 16.7.05 345309.00 18.04.06 19.08.06 345245.00 Completed
65 Civil EE-XXIII 16.12.05 7.12.05 187307.00 30.01.06 30.01.06 187306.00 Completed
66 Civil EE-XXIII 16.12.05 7.12.05 199162.00 26.12.05 25.01.06 198933.00 Completed
67 Civil EE-XXIII 16.12.05 7.12.05 193083.00 16.01.06 15.02.06 193009.00 Completed
Imp to road by pdg RMC Con from Community
Centre to H.NO E-71 and E-82 to H.No-7 Pkt -IV in Binda pur in C-48/CLZ
34/12.04.06/EE-XXIII
M/s Chittar Mal
C/o Out fall drain from H.No-7 Pkt -IV to H.NO-E-82 in Pkt -IV Binda pur J.J
Colony in C-48/WZ
118/21.06.06/EE-XXIII
M/s Harish Kumar
C/o Out fall drain from Abheer Electronics to
Ashish Coaching Centre in Pkt -IV Bimla pur J.J Coloney in C-48/WZ
584/20.03.06/EE-XXIII
M/s A.B Builders
C/o S.W. drain both side from H.NO D-33 to D-27
AH.No D-19 to C-1 in OM Viar C-48/WZ
45/12.04.06/EE-XXIII
M/s Chittar Mal
Pdg dense Carpetting on road from Hastsal Phirni road to park in LIG flats ,
Hastsal in C-47/WZ
374/23.12.05/EE-XXIII
M/s Mukesh Associates
Pvt.Ltd.
Imp to road sides by pdg RMC from N.G. road to Mandir on main road of Vikas Puri on C-47/WZ
379/23.12.05/EE-XXIII
M/s Puneet Nayyar
Imp to road sides by pdg RMC from outer ring road to gurudwara , main road to Gurudwara , main road in
Vikash puri c-47/WZ
409/16.01.06/EE-XXIII
M/s Neel Traders
68 Civil EE-XXIII 16.12.05 7.12.05 196720.00 17.01.06 24.03.06 195851.00 Completed
69 Civil EE-XXIII 16.12.05 7.12.05 193135.00 30.01.06 31.12.06 193122.00 Completed
70 Civil EE-XXIII 16.12.05 7.12.05 189396.00 06.01.06 12.02.06 189379.00 Completed
71 Civil EE-XXIII 16.12.05 7.12.05 198187.00 01.01.06 15.02.06 195977.00 Completed
72 Civil EE-XXIII 16.12.05 6.12.05 191453.00 23.12.05 22.02.06 191265.00 Completed
73 Civil EE-XXIII 16.12.05 6.12.05 175766.00 29.12.05 25.01.06 174623.00 Completed
74 Civil EE-XXIII 16.12.05 6.12.05 189104.00 24.12.05 31.01.06 188492.00 Completed
Imp to road sides by pdg RMC on Shaheed Sukhdev Marg in C- block Vikas Puri
C-47/WZ
410/16.01.06/EE-XXIII
M/s A.K.&Co
Pdg carpetting on road from PWD road to park in Janta flats Hastsal in C-47/WZ
383/23.12.05/EE-XXIII
M/s Vinod Kumar
Imp of footpath by fixing Kerb stones from gate to kumar tiles in Janta flats
Hastsal C-47/W.Z
384/23.12.05/EE-XXIII
M/s Rajeev Kumar Gupta
Imp to road sides by pdg RMC from PWD road to
Hastsal phivni road in Hastsal C-47/WZ
376/23.12.05/EE_XXIII
M/s Mahendar
Kumar Khurana
P/f Kerb stones on Hastsal Phevni and from LIG Janta chowk to Transfermer in
Hastsal C-47/WZ
382/23.12.05/EE-XXIII
M/s Ricky Consts.
Imp to lane by pdg RMc infront of flat no- 865, 493 and 745 in Lig flats Hastsal
in c-47/WZ
381/23.12.05/EE-XXIII
M/s Mukesh Builders
Imp to road sides by pdg rMC from flats no 1016 to
336 upto flat no 241 in Janta flats Hastsal in
c-47/WZ
377/23.12.05/EE-XXIII
M/s Som Sons.
75 Civil EE-XXIII 16.12.05 6.12.05 191260.00 02.01.06 31.01.06 190880.00 Completed
76 Civil EE-XXIII 16.12.05 6.12.05 191503.00 02.01.06 03.02.06 188392.00 Completed
77 Civil EE-XXIII 16.12.05 6.12.05 193477.00 03.01.06 31.01.06 192638.00 Completed
78 Civil EE-XXIII 16.12.05 18.6.05 329819.00 06.03.06 29.05.06 329735.00 Completed
79 Civil EE-XXIII 16.12.05 14.6.05 671000.00
80 Elect. EEE-III 19.12.05 16.12.05 594964.00 12.05.06 11.06.06 534867.00 Completed
81 Civil EE-XXIII 19.12.05 6.12.05 425455.00 12.04.06 03.07.06 423111.00 Completed
Imp to road sides by pdg RMC from flat no 953 to 481 and infront of Mkt. In Janta flats , Hastsal in C-
47/WZ
380/23.12.05/EE-XXIII
M/s Parveen Kumar Gupta
Imp to road sides by pdg RMC from flat no 32 to park both sides and link roads in janata flats in hastsal in C-47/WZ
375/23.12.05/EE-XXIII
M/s Vikash Const.Co
Imp to road sides by pdg RMC from 985 to 480 in
LIG flats Hastsal in C-47/WZ
378/23.12.05/EE-XXIII
M/s Harshit Jaggi
C/o designer gates of park Opp flat no 91 in janta flat
Hastsal in C-47/WZ
481/21.02.06/EE-XXIII
M/s Sahil Builders
Imp to footpath and side berms by interlocking tiles
from DESU office to opp C-398( both side) in c- block
Vikash puri C-47/WZ
P/o semi high mast light ( 2 No) at Hastsal Vill Bridge
near DAV School and Juno type lights in park of Hastsal
Janta DDA flats in C-47/WZ
47/03.05.06/EE(E)-III
M/s M.J Electicals & Electronics
Imp of boundary wall of park by pdg stone lining near Kumar Property in
Janta flats GP-2 Hastsal pur C-47/WZ
624/30.03.06/EE-XXIII
M/s J.R.Consts.
82 Civil EE-XXIII 19.12.05 6.12.05 469631.00 3.12.06 P 47062.00 In Prog.
83 Civil EE-XXIII 24.1.06 5.1.06 193161.00 10.02.06 28.06.06 192934.00 Completed
84 Civil EE-XXIII 24.1.06 5.1.06 198344.00 10.02.06 24.06.06 197842.00 Completed
85 Civil EE-XXIII 24.1.06 5.1.06 196613.00 06.02.06 08.04.06 163040.00 Completed
86 Civil EE-XXIII 24.1.06 27.12.05 198344.00 07.02.06 12.07.06 197015.00 Completed
87 Civil EE-XXIII 15.02.06 16.08.05 594000.00
88 Civil EE-XXIII 28.2.06 18.1.06 393336.00 13.04.06 05.06.06 393286.00 Completed
89 Civil EE-XXIII 28.2.06 18.1.06 181962.00 09.03.06 24.04.06 181084.00 Completed
Const of Dhobi Platform in various blocks in Vikas puri
C-47/WZ( AG-1 block,D block,C block, Fblock, KG-1 , DG-II and DG-III block
Vikash puri)
250/20.09.06/EE-XXIII
M/s A.K.&Co
Const of road by M/P from Dhalo to Old Bridge on Kali Basti road T-Camp Hastsal
C-47/WZ
447/02.02.06/EE-XXIII
M/s G.Pee Const.Co.
Const of road by M/P from Dhalo to Old Bridge on to
opp Pole no -104 in T-Camp Hastsal C-47/WZ
448/02.02.06/EE-XXIII
M/s A.K.&Co
Const of road by M/P from pole no 105 to 16 B in T-Camp Hastsal C-47/WZ
449/02.02.06/EE-XXIII
M/s Rajeev Kumar Gupta
Const of road by M/P from Angawadi Centre to park in Kali Basti Hastsal C-47/WZ
450/02.02.06/EE-XXIII
M/s Neel Traders
C/o S.W. drain (both side) from F-66 to F-54, H-75 to H-64 in Kanwarl Singh Nagar C-48/WZ
Imp of lane by pdg RMC and Drain from WZ 4 to W ZA-27 and A 31 to A 34 in Nawda Village in C 48 WZ
39/12.04.06/EE-XXIII
M/s Rohit Const.Co
Imp to lane by pdg CC and Drain from H.no. 118A to H.. A 13 in Nawada Villag in C 48 WZ
533/08.03.06/EE_XXIII
M/s Kritika consts.
90 Civil EE-XXIII 28.2.06 18.1.06 198907.00 18.03.06 24.05.06 198817.00 Completed
91 Civil EE-XXIII 28.2.06 18.1.06 189120.00 16.03.06 13.09.06 188069.00 Completed
92 Civil EE-XXIII 28.2.06 18.1.06 199046.00 09.03.06 11.05.06 198462.00 Completed
93 Civil EE-XXIII 3.3.06 27.12.05 271790.00 15.12.06 20.04.07 261156.00 In Prog.
94 Civil EE-XXIII 3.3.06 27.12.05 340444.00 15.12.06 22.04.07 340444.00 Completed
95 Civil EE-XXIII 29.03.06 18.01.06 412266.00 05.09.06 17.10.06 412225.00 Completed
Status Report of MLA,Sh Ranbir Kharb, AC No. 28 2005-06
Imp to Drain along main rd and pdg RCC slabs near H.n. G 44, G 49, F 101, F 23 , H 51 and H 28 in Kanwar Singh Nagar in C 48 WZ
573/16.03.06/EE-XXIII
M/s Rohit Const.Co
Imp to rd by pdg RMC from A 1/15 towards NG Rd near A1/5 in Mohan Garden in C 48 WZ
534/08.03.06/EE-XXIII
M/s Neel Traders
Imp to lane by pdg CC and Const of Drain from A 16 to B 28 in Nawada village in C 48 Wz
532/08.03.06/EE-XXIII
M/s Apoorv Builders and Contractors
Imp to B/wall of park by pdg Stone Lining opp H.no. 71 in D block Vikas puri in C47 Wz
222/18.09.06/EE-XXIII
M/s Jatin Jaggi
Imp to B/wall of park by pdg Stone Lining opp H.no. D 32 in D block Vikas puri in C47 Wz
214/5.09.06/EE-XXIII
M/s Rajiv Kumar Gupta
Imp to drainage system and pdy CC in lane from H.no 4 to 6, A-27 to A-21, A-12 to A-10 and A-28 to A-30 in Nawada Village C-48/W.Z
207/04.09.06/EE-XXIII
M/s Deepak Gupta
S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil Naj. 9.5.05 7.5.05 197200.00 22.7.05 9.9.05 187792 Completed
2 Civil Naj. 9.5.05 7.5.05 196400.00 8.8.05 12.9.05 187037 Completed
3 Civil Naj. 29.6.05 7.5.05 197600.00 10.09.05 04.11.05 188156 Completed
4 Civil Naj. 29.6.05 7.5.05 194900.00 03.08.05 05.10.05 185604 Completed
5 Civil Naj. 29.6.05 7.5.05 197200.00 26.7.05 30.8.05 187753 Completed
6 Civil Naj. 29.6.05 7.5.05 199300.00 23.7.05 23.8.05 189636 Completed
7 Civil Naj. 29.6.05 7.5.05 189500.00 27.7.05 23.8.05 180442 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp of chowk by pdg CC near Panchahyat Ghar in C 50 vill Mundhela Kalan in C-50
274/EE.NG /
22.7.05
M/s Satish Kumar & Co
Pdg Drian & CC from Kawal Pahalwan Hs to Zile Singh Hs in vill mundhela Kalan in C-50.
324/EE.NG /
8.8.05
M/s Rana Entep
Imp of lane by CC & Raising of Drain from Bimla Hs to Jain Electronics in Najafgarh, NGZ
438/08.09.05
/EE N.G
M/s Suresh Bros.
Imp of lane by pdg CC & Raising of drianf rom ABC Cyber Hills to Arya Samaj mandir Najafgarh, C-49.
296/05.07.05
/EE N.G
M/s Deep Const.Co
Imp of lane by CC & Raising of Drain from Om parkash etc to Raju Gipt Hs in Najafgarh in C-49.
293/EE.NG/2
5.7.05
M/s Harish Kr.
Imp of lane by CC & Raising of Drain from Ram Mandir to Daya Kaj Baton Shop in Najafgarh C-49.
264/EE.NG/ 22.7.05
M/s Vipin Kumar Dagar
Imp of laen by CC & Raising of drain from Verma time centre to Mahende Hs in Najafgarh in C-49.
276/EE.NF 25.7.05
M/s Rajender singh Dagar
8 Civil Naj. 29.6.05 7.5.05 199200.00 9.8.05 18.9.05 189706 Completed
9 Civil VI 30.6.05 22.6.05 191754.00 30.8.05 29.9.05 191370 Completed
10 Civil VI 30.6.05 22.6.05 193213.00 03.10.05 29.11.05 193094 Completed
11 Civil VI 30.6.05 22.6.05 191176.00 07.11.05 P 164221 In Prog.
12 Civil VI 14.7.05 20.6.05 794200.00 10.11.05 P 532918 In Prog.
13 Civil VI 14.7.05 20.6.05 572159.00 10.10.05 12.01.07 571678 Completed
14 Civil VI 14.7.05 20.6.05 478354.00 10.10.05 10.02.06 474845 Completed
15 Civil VI 14.7.05 28.6.05 689300.00 05.12.05 27.02.06 562368 Completed
Imp of lane by CC & Raising of derainf rom BS singla Hs to Ram Narain hs in Najafgarh in C-49.
316//EE.NG/
8.8.05
M/s Goela Assoc.
Imp of Najafgarh Khaira link road by PMP from Bhal Singh Tmber store Towards Buddha Temple in NGZ
72/EE-IV/26.
9.05
M/s Gaur Const Co.
Imp of rd by PMP from Kair Village towards Pipe Factory on Mundhela Kair Link rd in NGZ
78/26.09.05/
EE VI
M/s Manish Kumar
Imp of Khaira Najafgarh link road by PMP near by Surya Gas Agency Godwon in NGZ
108/03.11.05
/EE-NG
M/s R.L Builders
Imp & Cosnt of Phirni rd of vill Bakkargarh by Pdg MP from Mandir to Pond in NG Z
112/10.11.05
/EE-VI
M/s Rakesh Kumar
Const of drain on Phirni rd from H/o Shubram towards H/o Prabhu in vill. Mundhela Khurd in NGZ
84/05.10.05/
EE VI
M/s Sachin Const
Imp and Raising of Phirni rd by PMP from H/o Shubram towards H/o Prabhu in vil Mundhela hurd in NGZ
83/05.10.05/
EE VI
M/s Balvant Singh
Imp/Const of approach road of Cremation Ground by pdg RMC in Ujwa Village in NGZ
119/23.11.05
/EE VI
M/s Puneet Const
16 Civil VI 21.7.05 20.6.05 1722573.00 24.11.05 03.02.06 1721960 Completed
17 Civil VI 21.7.05 20.6.05 1694154.00 28.11.05 28.02.06 1693022 Completed
18 Civil Naj. 29.7.05 27.7.05 197300.00 10.9.05 26.9.05 187888 Completed
19 Civil Naj. 29.7.05 26.7.05 199800.00 29.8.05 12.10.05 190293 Completed
20 Hort. DDH/Naj 1.8.05 28.7.05 99277.00 10.10.05 08.11.05 99277 Completed
21 Hort. DDH/Naj 1.8.05 28.7.05 99277.00 02.02.06 06.03.06 98843 Completed
22 Hort. DDH/Naj 1.8.05 28.7.05 99277.00 02.02.06 11.03.06 98843 Completed
23 Hort. DDH/Naj 1.8.05 28.7.05 99277.00 02.02.06 06.03.06 98843 Completed
24 Hort. DDH/Naj 1.8.05 28.7.05 99277.00 02.02.06 10.03.06 98843 Completed
Imp of approach rd of vill Mundhela Khurd by pdg RMC from Mungesh pur drain to Tubewell in NGZ
120/23.11.05
/EE Vi
M/s Ram Kumar Gupta
Imp of chowk and lane by RMC in Mundhela Khurd in vill. In NGZ
122/23.11.05
/EE VI
M/s Sunil Enterprises
Imp of rd by pdg RMC at Najafgarh Gurgaon rd infront of PNB Bank to State Bank Najafgarh in C-49.
421/8.9.05/E.
NG
M/s Dabas Const co
Imp of road by MP at Nangloi Najafagrh rd opp Airforece offcie Bapdolla Village in C-49.
383/EE.NG/2
6.8.05
M/s Rajender singh Dagar
p/F of MS Tree garuds on road side at Jaffarpur to Ujwa road in W> no. 50.
60/10.10.05/
ADH/N.G
M/s Lucky Enterprises
P/F MS Tree Garuds on road side at Baker Garh Vill Bakar Garh Border in W.no. 50.
126/02.02.06
/ADH.N.G
M/s Lucky Enterprises
P/F MS Tree Gaurds on road side at Dhans Vill to Dhansa Border in W.no. 50.
127/02.02.06
/ADH/N.G
M/s Lucky Enterprises
P/F MS Tree Gaurds on road side on Mundhela Moar to Mundhela Vill in W.no. 50.
128/02.02.06
/ADH/N.G
M/s Lucky Enterprises
P/F MS Tree Gaurds on road side at Malikpur Phirni approach rd in W>no. 50.
124/02.02.06
/ADH/N.G
M/s Lucky Enterprises
25 Hort. DDH/Naj 1.8.05 28.7.05 99277.00 02.02.06 06.03.06 98843 Completed
26 Hort. DDH/Naj 1.8.05 28.7.05 99277.00 02.02.06 28.03.06 98843 Completed
27 Hort. DDH/Naj 1.8.05 28.7.05 99277.00 M/s Lucky 10.10.05 21.10.05 99068 Completed
28 Hort. DDH/Naj 1.8.05 28.7.05 99277.00 02.02.06 28.03.06 98843 Completed
29 Hort. DDH/Naj 1.8.05 28.7.05 99277.00 M/s Lucky 10.10.05 25.10.05 99068 Completed
30 Hort. DDH/Naj 1.8.05 28.7.05 99277.00 10.10.05 31.10.05 99277 Completed
31 Hort. DDH/Naj 1.8.05 28.7.05 99277.00 10.10.05 28.10.05 99277 Completed
32 Hort. DDH/Naj 1.8.05 28.7.05 99277.00 30.01.06 01.02.06 98843 Completed
P/F MS Tree Gaurds on road side at main Dhansa Rd Issapur Moar to Dhansa Vill. In W.no. 50.
125/02.02.06
/ADH.N.G
M/s Lucky Enterprises
P/F MS Tree Gaurds on road side at Kher Road Turning to Khar Khari Jat mal vill Turning (Right Hand Side ) in W.n. 49.
131/02.02.06
/ADH NZ
M/s Lucky Enterprises
P/F MS Tree Gaurds on road side at Khera Dabar vill to Way to School in W>no. 49.
56/ADH. N.G.
10.10.05
P/F MS Tree Gaurds on road side at Khera Moar to Kharkheri Moar (Left Hand Side) in w.no. 49.
130/02.02.06
M/s Lucky Enterprises
P/F MS Tree Gaurds on road side at Khera Moar to Khera Vill in W>no. 49.
57/ADH/N.G 10.10.05
P/F MS Tree Gaurds on road side on Najafgarh Nangloi road (RHS) to Baprola vill. In w.no. 49.
59/10.10.05/
ADH/N.G
M/s Lucky Enterprises
P/F MS Tree Gaurds on road side at Najafgarh to Kakrola Regulator & Nangllhi Dairy Gashipur rd in W>no. 49.
58/10.10.05/
ADH/N.G
M/s Lucky Enterprises
P/F MS Tree Gaurds on road side on road Najafgarh Nangloi rd (LHJS) upto Baprol vill in W>no. 49.
115/30.01.06
/ADH/N.G
M/s Lucky Enterprises
33 Civil Naj. 2.8.05 19.7.05 199100.00 14.11.05 22.12.05 189443 Completed
34 Civil Naj. 2.8.05 19.7.05 199000.00 14.10.06 22.11.05 189529 Completed
35 Civil Naj. 2.8.05 19.7.05 196000.00 14.10.05 29.10.05 186619 Completed
36 Hort. DDH/Naj 5.8.05 28.7.05 99277.00 02.02.06 27.03.06 98843 Completed
37 Hort. DDH/Naj 24.8.05 28.7.05 98913.00 08.01.06 13.01.06 92141 Completed
38 Hort. DDH/Naj 24.8.05 28.7.05 98913.00 06.01.06 10.01.06 92141 Completed
39 Hort. DDH/Naj 29.8.05 29.7.05 99176.00 27.10.05 08.11.05 99060 Completed
40 Hort. DDH/Naj 29.8.05 29.7.05 99176.00 27.10.05 08.11.05 99060 Completed
41 Civil Naj, 14.9.05 13.9.05 191100.00 16.10.05 23.12.05 180550 Completed
Imp of rd by PMP from Pnd to Heigher Sec. School in village Mitrau in C 50.
536/14.11.05
/EE. N.G
M/s Goela Assoc.
Imp of road by PMP from Dichau Road near Dichau Vill in C-50.3
470/14.10.05
/EE. N.G
M/s R.S.Const
Imp of rad by PMP on Jharoda Rd near CRPF Camp & near Jharoda Vill. In C-50.
467/14.10.05
/EE N.G
M/s Lakshay Builders
P/F MS Tree Gaurds on orad side at Khakhari nahar (Phirni) vill W.no. 49.
129/02.02.06
M/s Lucky Enterprises
P/F MS Tree Gaurds on Phirni rd side of Kharkhari Jatmal in W.no. 49 NZ
103/05.01.06
/ADH/N.G
M/s Gurmeet
Enterprises
P/F MS Tree Gaurds on Phirni rd at Khera dabar Village W.no. 49 NZ
102/05.01.06
/ADH/N.G
M/s Gurmeet
Enterprises
P/F MS Tree Gaurds on Phirni rd side at Ujwa Village to Kair College in W.no. 49 NZ
85/27.10.05/
ADH/N.G
M/s S.K.Enginers
& Cond.
P/F MS Tree Gaurds on Road side at Ujwa Village to Samaspur village in W.no. 50 NZ
83/27.10.05/
ADH.N.G
M/s S.K.Enginers
& Cond.
Imp of lane by pdg CC & drainj from Birkha hs to Kedar hs upto Tuliram Hs invill Kair in C 50.
472/14.10.05
/EE N.G
M/s R.S Const.
42 Civil Naj, 14.9.05 13.9.05 198500.00 24.10.05 12.01.06 188999 Completed
43 Civil Naj, 14.9.05 13.9.05 199700.00 14.10.05 22.11.05 190139 Completed
44 Civil Naj, 14.9.05 13.9.05 197500.00 24.11.05 23.12.05 188077 Completed
45 Civil Naj, 14.9.05 13.9.05 131800.00 14.10.05 29.10.05 125179 Completed
46 Civil Naj, 14.9.05 13.9.05 197700.00 14.10.05 29.10.05 188881 Completed
47 Civil Naj, 14.9.05 13.9.05 199600.00 24.10.05 19.12.05 184690 Completed
48 Civil Naj, 14.9.05 13.9.05 199000.00 14.10.05 23.12.05 189547 Completed
49 Civil Naj, 14.9.05 13.9.05 198500.00 24.11.05 23.12.05 188983 Completed
50 Civil Naj, 14.9.05 13.9.05 193700.00 14.10.05 20.11.05 184436 Completed
51 Civil Naj, 14.9.05 13.9.05 194200.00 24.10.05 12.01.06 184934 Completed
Imp of lane by pdg CC & Drain from Chetram Hs to Bhoop Singh hs in vill Kair in C 50
483/24.10.05
/ EE N.G
M/s Bittoo Const.
Pdg CC & Drain from Jai Kishan H sto Balra hs in vil Kair in C 50
461/14.10.05
/EE N.G
M/s Vipin Kumar Dagar
Const of O/S drain both side from Chopal to Shishram Khatri in vill Kair in C 50
554/24.11.05
/EE N.G
M/s Deep Const.Co
Imp to lane by pdg CC & Drain from Jagdish wali gali in vill Kair in C 50
468/14.10.05
/ EE.N.G
M/s Dabas Builders
Imp of rd by PMP from Chopal to Shishram Khatri Hs in vill kair in C 50
464/EE.NG 14.10.05
M/s Satish Kumar & Co
Imp of lane by CC and drain fromBus stand to Jhula in vill. Mundhela Khurd in C 50
485/24.10.05
/EE N.G
M/s Sanjeev Kumar &
Bros.
Imp of rd by PMP fromChopal to Harijan Basti in Vill kair in C 50
462/14.10.05
/EE N.G
M/s Rana Entep
Imp of lane by pdg CC and drain from Jile Singh hs to Chopal in vill. Kair in C 50
552/24.11.05
/EE N.G
M/s R.K.Enterpris
es
Imp of lane by pdg CC and drain from Jagdish Hs to Ghirhari in village Kair in C 50
474/EE.NG/1
4.10.05
M/s Apoorv Builders &
const
Const of Drain both sides from Chopal to Harijan basti in village Kair in C 50
484/24.10.05
/EE N.G
M/s Vidaya Const. Co
52 Civil Naj, 14.9.05 13.9.05 188200.00 14.10.05 20.11.05 172734 Completed
53 Civil Naj, 14.9.05 13.9.05 285000.00 11.09.06 12.12.06 212308 Completed
54 Civil Naj, 14.9.05 13.9.05 263300.00 26.03.06 P 167298 Completed
55 Civil Naj, 7.12.05 5.12.05 199300.00 05.02.06 15.03.06 189746 Completed
56 Civil Naj, 7.12.05 5.12.05 199460.00 28.12.05 23.01.06 189951 Completed
57 Civil EE N.G 4.1.06 22.7.05 199600.00 24.01.06 10.02.06 189851 Completed
Imp of lane by pdg CC and Drain from Chopal to MC Pry school in village Kair in C 50
466/EE.NG/1
4.10.05
M/s Harish Kr.
Imp of chowk by pdg CC and Drain from Pandit Ramphal hs toPond in vill Mundela Kalan in C 50
222/04.09.06
/EE-NG
M/s Jai Const.CO
Imp of lane by pdg CC and Drain from Hawa Singh hs gto Hoshiyar in village Samaspuri inC 50
895/21.03.06
/EE-NG
M/s Narender
Dager Const
Imp of lane by c.c & drain from Main road to end of road in village Jaffarpur in C-50/NGZ
717/30.01.06
/EE(NG)
M/s R.S Const.Co.
Imp of lane by pdg c.c. and drain from chowk to Kharb Niwas in vill Mundela Kalan in C-50/NGZ
635/28.12.05
/EE N.G
M/s Satish Kumar & Co
Imp of Lane by CC from Raj Karam Hs to Ram Kishan hs in Kharkhari Nahar in C 49 NGZ
708/23.01.06
/EE N.G
M/s Apoorv Builders &
const
Status Report of MLA,Sh. Mahabal Mishra, AC No. 29 2005-06
S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil Naj. 7.6.05 4.6.05 196400.00 02.08.05 02.12.05 187034 Completed
2 Civil Naj. 7.6.05 4.6.05 169900.00 17.08.05 10.09.05 161598 Completed
3 Civil Naj. 7.6.05 4.6.05 199700.00 17.08.05 15.11.05 190117 Completed
4 Civil Naj. 7.6.05 4.6.05 152700.00 17.08.05 10.09.05 144090 Completed
5 Civil Naj. 7.6.05 4.6.05 188700.00 31.07.05 26.10.05 179616 Completed
6 Civil Naj. 15.6.05 9.6.05 389113.00 30.8.05 7.10.05 389031 Completed
7 Civil Naj. 23.6.05 22.6.05 197800.00 28.9.05 11.11.05 188196 Completed
8 Civil Naj. 23.6.05 22.6.05 109300.00 26.07.05 01.11.05 104084 Completed
9 Civil Naj. 23.6.05 22.6.05 199700.00 09.09.05 15.11.05 190099 Completed
10 Civil Naj. 23.6.05 22.6.05 199200.00 J.s const 17.08.05 p 188686 In Prog.
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Pdg Drainage System and CC fromH.no. F 206 to F 29 and F 236 to F 440/8 in Sadh Nagar inC 52.
289/25.07.05/ N.G
M/s Ram Kishore Bairwa
Imp of lane by CC from H.no. RZ F 222/51 to RZ 238/3 in Sadh nagar in C-52.
337/08.08.05/N.
G
M/s Subhash Singh
Pdg Drainage system & CC from RZ-426/51 to RZ 654/6 in Sadh Nagar in C52.
334/08.08.05/N.
G
M/s Bansal Const. Co
Pdg D/System from F 206 to 178A/36 in Sadh Nagar in C-52.
336/08.08.05/N.
G
M/s Subhash Singh
Imp of alne by CC from H.no. 178A/36 to F 206 in Sadh Nagar in C-52
270/22.07.05/ N.G
M/s Parveen Const.Co
Imp of alane by CC & Drain from b-100 to R 14 in Mahavir Encl. in C51.
396/EE.NG/29.
8.05
M/s Ishwar Singh Dagar
Pdg CC from H.no. RZ 20H/6 to RZ 20F/B & MC Pry School to MCW Centre Sagarpur (Main) in C52.
326/EE.NG/ 8/8/05
M/S Goyal consection
Imp of lane by CC from H.no. RZ 47 to RZ 206/5A in main Sagarpur in C 52.
286/25.07.05/N.
G
M/s J.K Const.Co
Pdg D/system & CC from h.no. 440 J to RZ F 20A in Sadh nagar in C 52.
424/08.09.05/N.
G
M/s Rajeev Kumar
Pdg D/system & CC from H.no. 448 J to RZ F 29A in Sadh Nagar & RZ 20H/16 to RZ 20F/B in Sagarpur main in C 52.
327 8/8/05 N.G
11 Civil Naj. 30.6.05 22.6.05 199000.00 19.08.05 15.11.05 188985 Completed
12 Civil Naj. 30.6.05 22.6.05 198900.00 M/s S.J Const. 17.09.05 12.12.05 189304 Completed
13 Civil Naj. 8.7.05 6.7.05 176000.00 31.08.05 15.10.05 167567 Completed
14 Civil Naj. 8.7.05 6.7.05 197500.00 M/s Rana Entps. 26.08.05 30.10.05 187991 Completed
15 Civil Naj. 15.7.05 22.6.05 199800.00 494/31.10.05 01.11.05 07.01.06 189709 Completed
16 Civil Naj. 28.7.05 29.6.05 559800.00 82/01.05.06 01.05.06 19.05.06 399967 Completed
17 Civil Naj. 28.7.05 29.6.05 337800.00 15.12.05 P 164459 In Prog.
18 Civil Naj. 2.8.05 15.7.05 186000.00 09.09.05 15.11.05 177025 Completed
19 Civil Naj. 24.8.05 29.6.05 263400.00 13.05.06 P 169632 In Prog.
20 Civil Naj. 24.8.05 29.6.05 364500.00 663/03.01.06 07.01.06 08.04.06 246,530 Completed
21 Civil Naj. 24.8.05 29.6.05 265000.00 21.05.06 05.07.06 177236 Completed
22 Civil Naj. 24.8.05 29.6.05 372200.00 26.02.06 31.03.06 256211 Completed
23 Civil Naj. 24.8.05 29.6.05 281200.00 29.12.05 P 166077 In Prog.
Imp of drainage sytem from C 14 to B-111 and B-67 to B 130 in Mahavir Encl in C 51..
312/08.09.05/N.
G
M/s Apoorv Builders &
Cont.Imp of lane by CC & Drain from H/1/13 to H 1/10 and H1/24 to H1/26 in Mahavir Encl In C-51.
428/08.09.05/N.
G
Imp of lane by CC from Hn.o. RZ 28/29 to RZ 99 in Sagarpur (West) in C-52.
343/22.08.05/N.
G
M/s Vipin Kumar Dagar
Imp of lane by CC from H.no. RZ 669/8 to RZ 835/3 in Sadh nagar in C 52.
390/26.08.05/N.
G Imp of lanes by CC from b-111 to RZ C-14 and b 130 to b 67 in Mahavir Encl in C-51.
M/s Bansal Const. Co
Imp of laen by RMC from H.no. RZ 20B/1H to RZ 729 in Sagarpur (West ) in C 52.
M/s Daba & Const.Co
Imp of lane by CC from H.no. RZ 2/179 to RZ-23 & RZ 17 to RZ 13 A in Durga Park in C52.
581/06.12.05/E
E-NG
M/s Aditya Const.CO
Imp of lane by CC & Drain from H.n. RZ 86 to RZ 201 in Vaishali In C-51.
429/08.09.05/N.
G
M/s Apoorv Builders &
Cont.Pdg. Drainag system & CC from H No RZ 1/266 to 7 A /266 in (w) sagarpur in C52 \N.G.Z
93/12.05.06/EE(
NG)
M/s Prem Singh Surhera
Pdg. Drainag system & CC from H No RZ 31/261 to shiv mandir in (w) sagarpur in C52 \N.G.Z
M/s Ved Const.co
Pdg. Drainag system & CC from H No RZ A2/30A to RZ 4B in Durga park inC52 \N.G.Z
95/12.05.06/EE(
NG0
M/s Rakesh Kumar Gole
Pdg. Drainag system & CC from H No RZ 123/1 in Sagar pur main in C52 \N.G.Z
811/17.02.06/N.G
M/s Bhagwati Pd. Shukla
Pdg Drainage system & CC from H.no. 1117 to RZ 1127 and D 84 to C 125/2 in Sadh nagar in C 52
601/20.12.05/E
E-NG
M/s Mukesh Builders
24 Civil Naj. 24.8.05 29.6.05 294800.00 08.09.06 P 139887 In Prog.
25 Civil Naj. 24.8.05 6.7.05 371500.00 810/17.02.06 20.02.06 15.05.06 251884 Completed
26 Civil Naj. 24.8.05 6.7.05 488200.00 30.12.05 28.03.05 339117 Completed
27 Civil Naj. 24.8.05 6.7.05 169700.00 23.10.05 20.12.05 161563 Completed
28 Civil Naj. 24.8.05 6.7.05 404800.00 809/17.02.06 20.02.06 15.05.06 274628 Completed
29 Civil Naj. 29.8.05 20.7.05 392733.00 02.11.06 15.12.06 392642 Completed
30 Civil Naj. 29.8.05 20.7.05 207160.00 19.06.06 14.08.06 207097 Completed
31 Civil Naj. 29.8.05 20.7.05 202802.00 22.08.06 01.11.06 202720 Completed
32 Civil Naj. 29.8.05 20.7.05 535100.00 02.05.06 08.08.06 370028 Completed
33 Civil Naj. 29.8.05 20.7.05 396700.00 31.03.06 03.06.06 296202 Completed
Pdg Drainage system and CC from H.no. 1196A to 1197 in Sadh Nagar in C 52
600/20.12.06/E
E-NG
M/s Prem Singh Surhera
Pdg Drainge System & CC fom H.no. RZ 7B to RZ 20B to RZ C-1/B to RZ 1/97 in Durga Park in C 52.
M/s Suresh Kumar Gupta
Pdg Drainge sytem & CC from H.no. RZ 10 to RZ 16A and H.no. RZ 1/63 to RZ 101 A in Durga Park in C 52.
623/21.12.05/N.
G
M/s Deepak Const.Co
Pdg Drainage System and CC from H.no. RZ 50 to 2/385 in Sagarpur (W) in C 52.
480/14.10.05/N.
G
M/s Panwar Const.Co
Pdg Drainge system and CC from H.no. RZ 188 t RZ 14B & H.no. 45B/207 to 2/5 in Durga Park in C 52.
M/s Suresh Kumar Gupta
Pdg drainage system & CC from H.no. RZ 46/286 to RZ 26/284 & RZ 180/234 to RZ 77/284 in Geetanjali Pak Sagarpuri in C 52
329/01.11.06/E
E-NG
M/s Raj Enterprises
Imp of lane by CC from H.no.RZ 42/1 to RZ 10/11 in Geetanjali park Sagarpur in C 52.
132/19.06.06/E
E(NG)
M/s Gupta Const.Co
Imp of lane by CC and Drainage from H.no. RZ-234/294 to 259/292 & RZ 48/28 to Deep Model School in Geetanjali park in Sagarpur inC 52.
169/21.08.06/E
E(NG)
M/s Jai Const.Co
Pdg Drainge and CC from H.no. RZ 25/324 to RZ 324 & RZ 29 to RZ 94/116 & RZ 14 to RZ 42C & RZ 6/287 to 271/291 in Geetanjali Park Sagarpur in C 52.
83/01.05.06/EE(
NG)
M/s Jai Const.Co
Imp of lane by RMC from Tilak Medical Sote to H/o Hiralal in C 52 in Sadh nagar
840/28.02.06/E
E(NG)
M/s RSD & Co.
34 Civil Naj. 29.8.05 20.7.05 453600.00 846/01.03.06 31.03.06 03.06.06 337483 Completed
35 Hort DDH Naj 14.9.05 23.8.05 97555.00 135/03.02.06 06.02.06 03.04.06 93523 Completed
36 Hort DDH Naj 14.9.05 23.8.05 97555.00 133/06.02.06 06.02.06 03.04.06 93520 Completed
37 Hort DDH Naj 14.9.05 23.8.05 97555.00 134/06.02.06 06.02.06 03.04.06 93520 Completed
38 Hort DDH Naj 14.9.05 23.8.05 97555.00 136/06.02.06 06.02.06 03.04.06 93520 Completed
39 Civil Naj. 6.12.05 7.9.05 457600.00 170/21.09.06/ 22.08.06 15.11.06 344650 Completed
40 Civil Naj. 6.12.05 7.9.05 261216.00 08/04.04.06 05.04.06 30.05.06 261108 Completed
41 Civil Naj. 6.12.05 7.9.05 268431.00 05/04.04.06 05.04.06 30.05.06 268157 Completed
42 Civil Naj. 6.12.05 7.9.05 255396.00 21.04.06 21.06.06 255127 Completed
43 Civil Naj. 6.12.05 7.9.05 362145.00 05.04.06 23.06.06 362136 Completed
44 Civil Naj. 6.12.05 7.9.05 414974.00 812/20.02.06 21.02.06 29.04.06 414647 Completed
45 Civil Naj. 6.12.05 7.9.05 364682.00 05.04.06 25.06.06 364447 Completed
Imp of lane by RMC from Pardhan Chowk to Shiv Mandir Gali NO. 14 Sadh Nagar In C 52.
M/s Bhagwati Pd. Shukla
P/F of CPA in park Phase-I Mangpapuri near H.no. 422 w.no. 51 NGZ
M/s Pahwa Builders
P/F of CPA in park Ph-II Manglapuri near H.no. 176 W.n. 51 NGZ
M/s Pahwa Builders
P/F CPA in park Sarai Sohal village near H.no. 84 Wn.o. 51 NGZ
M/s Pahwa Builders
P/F of CPA in park mangla puri village (Main rd wala) w.no. 51 NGZ
M/s Pahwa Builders
C/o built up section Drain from A 4 to G 167 in Mahavir Enclaver in C 51 NGZ
M/s Jai Const.Co
Imp ofl ane by CC & Drain from H.no. H1/43A to H-1/42 and h 31/3 to Dr. Mandip Singh hs in Mahvir Encl in C 51 NGZ
M/s Ishwar Singh Dagar
Imp of lane by pdg CC & Drain fromH.no. RZ-51A to RZ 62A in Vashit Park in C 51 in NGZ
M/s R.S.D & Co
Imp of lane by CC & Drain frm H.no. RZ 41 to RZ 54 in Dabri Ext in C 51 NGZ
45/20.04.06/EE(
NG)
M/s Ishwar Singh Dagar
Imp ofane by pdg RMC from H.no. RZ 55 to RZ 1567 I n Vashiali inC 51 NGZ
09/04.04.06/EE(
NG)
M/s Ishwar Singh Dagar
Pdg Drainage system & CC from RZ 7A to Temple in Dabri Ext. in C 51 NGZ
M/s Rajeev Const.Co
Imp of lane by RMC from RZ 30 to RZ 176 in Vaishali in C 51 NGZ
10/04.04.06/EE(
NG)
M/s Ishwar Singh Dagar
46 Civil Naj. 6.12.05 7.9.05 367773.00 07/04.04.06 05.04.06 30.05.06 367725 Completed
47 Civil Naj. 6.12.05 7.9.05 429145.00 21.04.06 17.06.06 429132 Completed
48 Civil Naj. 6.12.05 7.9.05 260916.00 21.04.06 20.06.06 260733 Completed
49 Civil Naj. 6.12.05 15.7.05 690700.00 15.03.06 22.06.06 599980 Completed
50 Civil Naj. 6.12.05 15.7.05 292484.00 06/04.04.06 05.04.06 30.05.06 292457 Completed
51 Civil Naj. 7.12.05 28.11.05 198500.00 M/s N.A const 28.02.06 30.03.06 188885 Completed
52 Civil Naj. 7.12.05 28.11.05 196000.00 28.12.05 01.03.06 186491 Completed
53 Civil Naj. 7.12.05 28.11.05 199200.00 729/03.02.06 29.03.06 10.05.06 189007 Completed
54 Civil Naj. 7.12.05 10.10.05 199000.00 M/s Jain Entps 25.01.06 04.03.06 148816 Completed
55 Civil Naj. 7.12.05 10.10.05 156300.00 30.12.05 04.03.06 187326 Completed
56 Civil Naj. 7.12.05 10.10.05 199345.00 12.01.06 28.02.06 199208 Completed
Imp of lane by CC & Drian from H.no. A 19 to G 21 and G 94 to G 94A and A 6 to A 11 in Mahavir Encl niC 51 NGZ
M/s Ishwar Singh Dagar
Imp of lane by RMC from RZ 40 to Palam Dabri rd in Vaishali in C 51 NGZ
48/20.04.06/EE(
NG)
M/s Jai Const.Co
Pdg Draiage system & CC from H.no. RZ -54 to RZ 67A in Dabri Ext in C 51 NGZ
51/20.04.06/EE(
NG)
M/s Manish Const.Co
Const of outfall Drain in C 55 to B 52 in Sitapuri in C 51 NGZ
882/14.03.06/E
E(NG)
M/s Parresh Const.Co
Imp of lane by CC & Drain from RZ 49 to RZ 7 in Sitapuri in C 51 NGZ
M/s Ishwar Singh Dagar
Imp of Drainge sytem & CC from Palam Railway Station to Indira Park gali no 1 in Sadh Nagar in C 52 NGZ
730/03.02.06/N.
G
Imp ofl ane by CC & Drainge system from Nutan Bal Vidaylaya Nehru Mket to Chutt Mandir in Sagarpur in C 52 NGZ
636/28.12.05/N.
G
M/s Apoorv Builders &
Cont.
Pdg RMC from Railway rd infront of Gali 14 to Immam Chand Patwari in Sadh nagar in C 52 NGZ
M/s Sehwag Const.Co
Imp of lane by CC from RZ 27/252 to Masjid in Jagdama Vihar in Sagarpur(W) in C52 NGZ
683/16.01.06/N.
G
Imp of lane by CC fro Juice Corner to Shiv Mandir in Sadh Nagar in C 52 NGZ
644/28.12.05/E
E(NG)
M/s Bansal Const. Co
Pdg Drainage system & CC from H.no. RZ 3/52 to RZ 3/6B & RZ 3/52 to 9/F/178 in Durga Park in C 52 NGZ
681/12.01.06/N.
G
M/s Lakshay Builders
57 Civil Naj. 7.12.05 10.10.05 198874.00 28.12.05 08.02.06 198800 Completed
58 Civil Naj. 7.12.05 10.10.05 184000.00 08.02.06 31.03.06 164298 Completed
59 Civil Naj. 14.12.05 20.07.05 290750.00 889/17.03.06 18.03.06 27.04.06 216152 Completed
60 Civil Naj. 14.12.05 20.07.05 374100.00 842/28.02.06 01.03.06 27.04.06 252901 Completed
61 Civil Naj. 14.12.05 20.07.05 350500.00 835/24.02.06 05.03.06 08.05.06 332865 Completed
62 Civil Naj. 14.12.05 20.07.05 569800.00 814/20.02.06 28.02.06 31.03.06 390062 Completed
63 Civil Naj. 17.03.06 21.02.06 198400.00 29.04.06 05.06.06 188255 Completed
64 Civil Naj. 17.03.06 21.02.06 196600.00 21.04.06 15.06.06 186602 Completed
65 Civil Naj. 17.03.06 21.02.06 196200.00 21.04.06 01.07.06 186758 Completed
66 Civil Naj. 30.03.06 20.07.05 290369.00 19.12.06 20.02.07 290319 Completed
67 Civil Naj. 30.03.06 20.07.05 382733.00 22.02.07 23.05.07 382625 Completed
Pdg Drainage ssytem from H.n. RZ 20B/14 to RZ 729 in Gali no 4 Sagarpur(W) in C 52 NGZ
637/28.12.05/N.
G
M/s Daba & Const.Co
Pdg Drainage sytem & CC from H.no. RZ 486A/1 to Z 442/C-2 in Gail no. 23 in Sadh Nagar in C 52 NGZ
718/30.01.06/N.
G
M/s Deep Const.Co.II
Imp of lane by CC fromH.n. Rz 299 to 317 in Sadh Nagar in C 52 NGZ
M/s Gupta Engineers and Construction
Imp of lane by pdg Drainage & CC from H.no. 608A/11 to RZ 708/223 & E 225 to RZ 708H Gali no. 16C in Sadh Nagar in C 52 NGZ
M/s Gupta Engineers and Construction
Imp of lane by CC from WZ 251 to WZ 162 & WZ 120 to WZ 124 in Sadh Nagar in C 52 NGZ
M/s Gupta Engineers and Construction
Pdg Drainage system & CC from WZ 250 to WZ 230 in Sadh Nagar in C 52 NGZ
M/s Ishwar Singh Dagar
Imp of lane by RMC from RZ-E-55 to RZ-E-53 and RZ-E-56 to RZ-E-69 in Mahavir Enclave C-51/NG zone
62/20.04.06/EE(
NG)
M/s Sehwag Const.Co
Imp of lane by RMC & drain from H.NO RZ-185 to RZ-146 in Vaishali in C-51/N.G zone
40/20.04.06/EE(
NG)
M/s Sachin Kumar Gupta
Pdg drainage system from H.NO C-4E to Dabri Palam Road in Mahvir Enclave in C-51/NG zone
37/20.04.06/EE(
NG)
M/s J.S Const.Co
Pdg. Drainge and cc from H.NO. WZ 250 to RZ-140 A and RZ C 1 to RZ 22 A in Sadh Nagar in NZ
595/19.12.06/EE-NG
M/s Shri Ram Const.Co
Pdg drainge system and cc from WZ 932 to RZ 902 and WZ 770/4 to WZ 933 in Sadh Nagar in C 52 NZ
813/15.02.07/EE(M)-II/NG
M/s Vijay Kumar
68 Civil Naj. 30.03.06 19.11.05 226127.00 06.09.6 01.11.06 226105 Completed
69 Civil Naj. 30.03.06 19.11.05 343140.00 11.09.06 01.11.06 343123 Completed
Imp of lane by RMC from H.NO 59 to RZ J-4 in Sagar pure West in C-52
230/06.09.06/EE(NG)
M/s Shri Ram Const.Co
Imp of lane by Pdg RMC from H.NO RZ 48 A to Bondary Ball in Sagar Pur West in C-52
247/11.09.06/EE(NG)
M/s Shri Ram Const.Co
Status Report of MLA,Sh.Dharam Dev Solanki, AC No. 30 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
3 Civil Naj. 30.6.05 27.6.05 187700.00 6.9.05 26.9.05 181593 In Prog.
11 Civil Naj. 6.7.05 4.7.05 185410.00 30.01.06 P 176497 In Prog.
14 Civil Naj. 6.7.05 4.7.05 199700.00 20.09.05 P 191192 In Prog.
17 Civil Naj. 15.7.05 4.7.05 186065.00 28.09.08 P 180598 In Prog.
38 Civil Naj. 23.9.05 20.9.05 197460.00 07.11.05 P 183140 In Prog.
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp of rd by pdg 2 cm Premix from Pandwalan Phirni towards in C 53.
335/EE.NG/8.
8.05
M/s Bansal const co
PMP of road in Kiran Garden enar Kahender Hs in C53.
645/28.12.05/
EE-NG
M/s Mittal & Co.
Pdg Brick Flooring near Mandir in Goela Dairy in C-53.
411/31.08.05/
N.G
M/s Panwar Const co
PMP of Phirni rd in village Ambrahi from DDA flat to Ram Singh Hs in C53.
415/31.08.05/
N.G
M/s Vidaya Cosnt.Co
Pdg CC from Shiv mandir Palam to Ganga Ram Wli Gali
in Palam C 53
502/31.10.05/EE-NG
M/s Sehrawat Const.Co-I
0.00
0.00
0.64
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.02
1.41
1.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.003.91
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.06
1.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.17
0.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.003.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.00
0.000.000.000.000.000.000.000.000.00
00.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.08
0.05
0.00
0.00
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.22
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.41
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.41
0.00
0.00
3.39
4.17
0.00
2.22
Liabilities Rs.lacs
0.00
2.33
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.00
12.10
0.00
0.00
0.06
0.05
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.03
0.02
0.04
0.00
0.00
0.00
0.03
0.06
0.00
0.03
0.04
0.00
0.03
0.13
0.03
0.03
0.46
0.00
0.00
5.33
0.01
0.00
1.76
0.08
0.73
0.00
0.00
0.05
0.00
0.00
6.96
0.82
0.00
0.00
0.11
0.00
0.00
0.00
1.97
0.00
0.00
0.00
0.00
0.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.71
0.00
0.00
4.23
0.00
0.00
0.00
0.00
5.94
0.00
0.00
0.00
0.00
0.00
0.11
0.00
0.00
36.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.27
2.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.002.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.11
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
1.73
0.00
0.94
0.00
0.00
0.00
1.15
1.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.005.48
0.06
0.09
0.09
0.05
0.14
0.000.000.000.000.000.000.000.000.000.00
Liabilities Rs.lacs
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.43
deptt. deptt. deptt. deptt. Div. Div. Div. Div. Div. Div.
civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)
Status Report of MLA,Sh Vijay Lochav, AC No. 31 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil NG 6.7.05 26.6.05 199900.00 561/24.11.05/N.G 03.12.05 19.02.06 189189
2 Civil EE-VI 28.7.05 5.7.05 282200.00 8/05.10.05/EE VI 26.10.05 P 277088
3 Civil EE-VI 28.7.05 5.7.05 291700.00 192/09.01.06/EE-VI 20.05.06 14.06.07 289233
4 Civil EE-VI 28.7.05 6.7.05 990800.00 123/23.11.05/EE VI 28.11.05 01.02.06 976879
5 Civil Naj 12.8.05 8.8.05 194900.00 493/31.10.05//N.G 04.11.05 07.01.06 183183
6 Civil Naj 12.8.05 8.8.05 198700.00 463/14.10.05/N.G 17.10.05 28.11.05 188003
7 Civil Naj 12.8.05 8.8.05 388900.00
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Pdg Drainage system from Rishi Hs to Manoj Hs in Mahipal Pur in C56.
M/s Om Parkash Mittal
Const of Phirni rd by MP of vill Bijwasan Between Palam Vihar NGZ
M/s Sonu Const.Co
C/o Road and drian on the Phirni rd of vill Kanganheri rom H/o Khem Chand to Pond in NGZ
M/s Ajit Singh
Pdg CC on the Phirni rd of vill Bamnouli from MCD school to H/o Sh Azad Singh in NGZ
M/s Sehrawat Const.Co
pdg CC and Channel from Shankar to Suraj Bhan hs Ishwar Hs to Bijwasan Rd and Kishan Hs to Phirni in Villaeg Chhawla in C 55
M/s A.K Const.Co
Const of Covered drain from Jaage hs Naresh hs on Khati Mohalla rd in Vill Kapashere inC 55
M/s Rana Entps
Pdg RMC from Hari Kishan hs upto Bank on rd in front of MLA hs in village Bamnoli in C 55.
8 Hort. DDH Naj 24.8.05 22.7.05 99867.00 13.12.05 26.12.05 99866
9 Hort. DDH Naj 24.8.05 22.7.05 99867.00 13.12.05 23.12.05 99866
10 Hort. DDH Naj 24.8.05 22.7.05 99867.00 13.12.05 05.01.06 99866
11 Hort. DDH Naj 24.8.05 22.7.05 99867.00 13.12.05 02.01.06 99866
12 Hort. DDH Naj 24.8.05 22.7.05 99867.00 13.12.05 04.01.06 99866
13 Hort. DDH Naj 14.9.05 22.8.05 99176.00 27.10.05 26.12.05 99060
14 Hort. DDH Naj 14.9.05 22.8.05 99176.00 27.10.05 23.12.05 99060
15 Hort. DDH Naj 14.9.05 22.8.05 99176.00 27.10.05 26.12.05 99060
16 Hort. DDH Naj 14.9.05 22.8.05 99176.00 27.10.05 22.12.05 99060
17 Hort. DDH Naj 14.9.05 22.8.05 99176.00 27.10.05 23.12.05 99060
18 Civil Naj 28.9.05 26.8.05 529657.00 07.04.06 08.07.06 528512
p/F of Children Play Apptt inpark of C 8 opp. F.no. 8262, 8555 Vasant Kunj in W.no. 56.
98/13.12.05/ADH N.G
M/s M.S Enterprises
p/F of Children Play Apptt inpark of C 9 opp. F.no. 9554, 9472 Vasant Kunj in W.no. 56.
95/13.12.05/ADH N.G
M/s M.S Enterprises
p/F of Children Play Apptt inpark of B 4 opp. F.no. 3014 Vasant Kunj in W.no. 56.
92/13.12.05/ADH NG
M/s M.S Enterprises
p/F of Children Play Apptt inpark of D 7 opp. F.no. 7130, 7353 Vasant Kunj in W.no. 56.
96/13.12.05/ADH NG
M/s M.S Enterprises
p/F of Children Play Apptt inpark of D 3 opp. F.no. 3307, 3196 Vasant Kunj in W.no. 56.
99/13.12.05/ADH NG
M/s M.S Enterprises
P/F MS tree Gaurds onMainr d Bamnoli More to Bijwasan Vill W.no. 55
86/27.10.05/ADH N.G
M/s S.K Engineer &
Cont.
P/F of MS tree Gaurds on rd side at main rd Chhawla vill to Jhatikra More (RHS) in W.no. 55 NGZ
88/27.10.05/ADH N.G
M/s S.K Engineer &
Cont.
P/F of MS tree Gurads on rd from MC pry school Bijwasant o kapashere village W.n. 55
87/27.10.05/ADH N.G
M/s S.K Engineer &
Cont.
P/F of MS tree Gurads on rd Kaganheri vill to Badu sarai vill (RHS) w.no. 55 NGZ
84/27.10.05/ADH N.G
M/s S.K Engineer &
Cont.
P/F of MS tree Gurads on rd Kanganheir village to Chhawla vill (RHS) w.n. 55 NGZ
89/27.10.05/ADH N.G
M/s S.K Engineer &
Cont.
pdg RMC from Phirni to Bijwasan rd near Khazan hs in vill Bijwasan in C 55 NGZ
927/30.03.06/EE(NG
)
M/s Raj Entps.
19 Civil Naj 28.9.05 26.8.05 486599.00 813/20.02.06/N.G 27.01.06 28.06.06 484970
20 Civil Naj 28.9.05 26.8.05 286088.00 03.04.06 06.07.06 282723
21 Civil Naj 28.9.05 26.8.05 337340.00 925/30.03.06/NG 06.04.06 15.05.06 335404
22 Civil Naj 28.9.05 26.8.05 254108.00 743/06.02.06/N.G 07.02.06 21.03.06 254108
23 Civil Naj 28.9.05 26.8.05 450509.00 729/13.02.06/NG 14.02.06 28.04.06 449267
24 Civil Naj 28.9.05 26.8.05 199000.00 556/24.11.05/N.G 26.11.05 04.02.06 189489
25 Civil Naj 28.9.05 26.8.05 197100.00 613/20.12.05/N,G 21.12.05 04.02.06 186911
26 Civil Naj 28.9.05 26.8.05 280650.00 794/13.02.06 20.02.06 14.04.06 280538
27 Civil Naj 28.9.05 26.8.05 197500.00 555/24.11.05/N.G 25.11.05 30.12.05 185355
28 Civil Naj 28.9.05 26.8.05 198100.00 553/24.11.05/N.G 01.12.05 07.01.06 188356
29 Civil Naj 28.9.05 26.8.05 194000.00 27.12.05 09.06.06 184699
Pdg RMC from Jai Chand Hs to gali no 8 onKhati Mohalla rd in village Kapashere in C 55.
M/s Raj Entps.
Pdg RMC from Ram, Saroop hs tochowk Rajeshhs to main rd in vill. Chhawala in C 55.
926/30.03.06/EE(NG
)
M/s Raj Entps.
Pdg RMC from Baljit hs to Chander Hs & Chander Bhan hs to Bishma Chowk in Vill Bijwasan in C 55
M/s Raj Entps.
pdg CC from Mahender Hs to Rajroop Hs and Pardhan Wali in Vill Kapashere in C 55
M/s Halash Kumar
Pdg RMC & Drain from Kohli Building to Najafgarh Bijwasan Rd in vill Bijwasan in C 55
M/s Raj Entps.
PDG RMC from Kanwar Singh Yadav hs to main rd back side of MC pry school (B) in Vill Kapashere in C 55
M/s Jain Entps
Pdg RMC & Drain in laen in back side of MCD Disp. And Baljit Plot wali gali in Vill Bijwasan in C 55
M/s Ajay Kumar
Pdg RMC & Drain from Sh. Khazan hs to Surajmal School in Vill Bijwasan
M/s Raj Entps.
Pdg RMC & Drain from Red Cross centre to Naresh hs in village Jhatikra in C 55.
M/s Madanlal
Gupta
Pdg RMC from Bhagwan Singh hs to Jai Parkash Hs in vill Bijwasan in C 55.
M/s Shokeen Entps
Pdg RMC & Drain from Chopal to Poppal Shop in village kapashere in C 55 NGZ
615/20.12.05/EE(NG
)
M/s Mittal & Co
30 Civil Naj 28.9.05 26.8.05 452894.00 20.02.06 15.05.06 450557
31 Civil Naj 28.9.05 26.8.05 347689.00 747/06.02.06/NG 08.02.06 14.04.06 347464
32 Civil Naj 28.9.05 8.8.5 571123.00 01.04.06 01.07.06 568819
33 Civil Naj 28.9.05 8.8.5 585956.00 746/06.02.06/Ng 07.02.06 14.04.06 582880
34 Civil EE-VI 6.10.05 27.9.05 479798.00 243/08.02.06/EE-VI 20.06.06 23.01.07 478354
35 Civil EE-VI 23.11.05 2.11.05 411491.00 36/08.02.06/EE-VI 20.06.06 14.08.06 411454
36 Civil N.G 24.1.06 21.12.05 186432.00 762/07.02.06/N.G 11.02.06 12.05.06 186101
37 Civil N.G 24.1.06 21.12.05 189507.00 759/07.02.06/NG 11.02.06 01.04.06 185586
Pdg RMC from Ramniwas Hs to Sunder Hs and Raman Hs to Juglal hs in village Bijwasan in C 55
793/13.02.06/EE(NG
)
M/s Raj Entps.
Pdg RMC & Drain from Sh. Sat Parkash X.MLA old Hs to Chowk near Mange Ram Hs & CC & Chhannel from Baljit Dhoopan Hs to Sat Parkash Wali gali ni village Bijwasan in C 55
M/s Raj Entps.
Pdg RMC from Mam chand hs near MC Pry school (G) to Old NG-8, Mata chowk to Old NG-8, Yadav Hs to main rd and SW drain & RMC from Sewa Ram Hs to Sarjit Hs and CC in Sibba Harizan wali gali in vill Kapashere C 55.
923/30.03.06/EE(Ng)
M/s Chend Singh
Pdg RMC from Dharam Singh Hs to Phirni RMC from Shookeen Hs to Chowk Rajiv Hs to Vinod Hs Rajesh Hs to Main rd near Harizen Basti and Onkar Hs to Phirni in village Chhawala in C 55 NGZ
M/s Raj Entps.
C/o Rd by MP on the Phirni rd of village Kangan heri from main Nanakheri rd to H/o Sh Jagdish in NGZ
M/s Ajit Singh
Const of drain on the Phirni rd of vill Badu Sarai frok Mandir to Culvert on Kangan Heri Rd in C 55 NGZ
M/s Ajit Singh
Const of Drain from Kalwati hs to EP-51, EP 21 to Phirni & Pardhan Hs to Harijan Basti in vill Badu Sarai in C 55 NGZ
M/s Rana Entps
Pdg CC and Drain from Sh Chiranjipal hs to Bheem Hs in village Bijwasan in C 55 NGZ
M/s Madanlal
Gupta
38 Civil N.G 24.1.06 21.12.05 185805.00 17.02.06 05.05.06 183764
39 Civil N.G 24.1.06 4.11.05 499096.00 28.08.06 13.11.06 495853
40 Civil N.G 24.1.06 4.11.05 218591.00 50/20.04.06/EE-NG 08.06.06 P 216175
41 Elect EE(E) III 08.03.06 06.03.06 169865.00 18.05.06 24.05.06 164785
Pdg RMC from Azad hs to Phirni in village Bijwasan in C 55 NGZ
772/10.02.06/EE(NG
)
M/s Rajender
Singh Dagar
Const of outfall Drain from pond to Phirni in Village Bamnoli I C 55 NGZ
171/21.08.06/EE-NG
M/s Jai Const.CO
Pdg RMC & Drian from Sh. Malkhan Singh Hs to Sh. Bharat Singh hs & Drain from hs. Bhagwan Singh hs to Sh Birham Singh hs & Sh. Ompal hs to Sh Nafe Singh hs in Village Hassanpur in C 55 NGZ
M/s Jai Const.CO
P/o lighting arrangment in sector -A pocket-B Park Vasany Kunj in W.NO-56 under NGZ
123/18.05.06/EE(E)-III
M/s Saksham
Electricals &
Electronics
Status Report of MLA,Sh. Balram Tanwar, AC No. 32 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XXIV 4.7.05 25.6.05 156131.00 365/XXIV23.8.05 2.9.05 17.10.05 156131.00
2 Civil XXIV 4.7.05 25.6.05 191538.00 328//XXIV/26.7.05 5.8.05 5.9.05 191538.00
3 Civil XXIV 4.7.05 25.6.05 193840.00 03.04.06 17.04.06 193840.00
4 Civil XXIV 4.7.05 25.6.05 193084.00 03.11.05 22.11.05 192853.00
5 Civil XXIV 4.7.05 25.6.05 190576.00 13.10.05 21.01.06 190356.00
6 Civil XXIV 4.7.05 25.6.05 189603.00 361/XXIV /23.8.05 24.8.05 30.9.05 189603.00
7 Civil XXIV 4.7.05 25.6.05 193436.00 350/XXIV 12.8.05 8.9.05 12.10.05 192069.00
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Imp of lanes by pdg RMc & drainage adj. Chemderkant Chamoli house to Kirat Singh hs in Chhatarpur vill. In w.No-58/SZ
M/s Satish Kumar
Imp of lane by RMc & drainage from Parkash hs to Church in Fatehpur Beri vill in W.No-58 S/Z
M/s Dwarka Parsad Goyal
Imp of lane by RMC concrete from Syndicate Bank to Im Parkash Hs in Fatehpur Beri vill in w.No 58 S.Z
763/24.03.06/EE-XXIV
M/s Pappu Seth
Imp of lane by RMC from Om Parkash Patwari hs to Mahender Tyagi Hs in Chhatterpur vill in w.no-58/Sz
355/17.08.05/EE-XXIV
M/s B.M.B.Ente
rprisesImp of lane by RMc & drainage from Hs of Anand Rathi to nawal Hs and road berm along main road in Rajpur vill in W.No-58/S.Z
341/05.08.05/EE-XXIV
M/s Jindal Builders
Imp of lane by RMc from Bhoj Hs to Valmiki chanpal in chhatterpur vill in w.no-58 .SZ
M/s Neelam Const
Imp of lane by RMC from Satbir Hs to Nitin Niwas in Chhatterpur Vill in W.No 58 S.Z
M/s Sona Consulatan
t & Contactor
8 Civil XXIV 4.7.05 25.6.05 193566.00 13.09.05 07.11.05 192947.00
9 Civil XXIV 4.7.05 25.6.05 190831.00 23.05.06 31.05.06 190831.00
10 Civil XXIV 4.7.05 25.6.05 190546.00 364/XXIV/23.8.05 8.9.05 21.03.07 189746.00
11 Civil XXIV 4.7.05 25.6.05 193619.00 303/XXIV/21.7.05 22.9.05 31.10.05 193594.00
12 Civil XXIV 4.7.05 25.6.05 191863.00 15.02.06 22.05.06 191863.00
13 Civil XXIV 4.7.05 25.6.05 193210.00 06.06.06 30.06.06 193108.00
14 Civil XXIV 4.7.05 25.6.05 193428.00 308/XXIV/21.7.05 2.9.05 13.10.05 192951.00
15 Civil XXIV 29.7.05 7.7.05 199380.00 440/XXIV 14.10.05 14.10.05 29.10.05 199380.00
16 Civil XXIV 29.7.05 7.7.05 194259.00 441XXIV/14.10.05 5.10.05 17.11.05 193863.00
17 Civil XXIV 29.7.05 7.7.05 199500.00 02.09.05 24.09.05 193389.00
18 Civil XXIV 29.7.05 7.7.05 489500.00
19 Civil XXIV 29.7.05 7.7.05 495400.00 04.08.06 P 346005.00
20 Civil XXIV 29.7.05 8.7.05 198663.00 400/XXIv/23.6.05 23.9.05 24.10.05 197239.00
Imp of lanes by RMC from Ganesh Hs to Rajender Hs in Chhatterpur Vill in W.No 58/SZ
375/30.08.05/EE-XXIV
M/s Sulabh Gupta
Imp of lane by RMc from Yusuf Hs to Masjid in Chhatterpur vill in w.No 58
747/21.03.06/EE-XXIV
M/s Sunil Constructio
n Imp of lane by RMC from subedar Nahar Singh Hs to Man singh hs in Maidan Garhi vill in w.no 58/SZ
M/s Satish Kumar
Imp of lanes by RMC & drainage Adj Hs of Raghu Nath Maharvvr and Shaid pal in Jaina pur Vill in W.No 58 S.Z
M/s K.K. Const Co
Imp of lanes by RMc adj Hs to Satya Parkash gupta to Jai Parkash sharma and Hs of Zile singh in Fatehpru Beri vill in w.No 58/SZ
349/12.08.05/EE-XXIV
M/s Sona Consulatan
t & Contactor
Imp of lanes by RMc from Ved parkash Hs to Phirni road near J.r Royal Public School and road berm, along Market in Janua pur w.No 58/S.Z
169/06.06.06/EE-XXIV
M/s Bagga Builders
Imp of lane by RMC from Iqbal Electrical to Rambir hs near Masjid in Chhatterpur vill in W.No 58/SZ
M/s Kuldeep Const
Imp of lane by RMc from H.No 50 to H.No 54 in Sultanpur coloney in W.no 28 s.Z.
M/s Satish Kumar
Imp of lane by RMc adj. Kukum chand Hs to Siboo Hs in vill Satbari in w.No-58 /SZ
M/s Satish Kumar
Imp of drainage system from chhatterpur M.C Pry School to Dharmshala Chhatterpur Mandir in W.No-58/SZ
376/01.09.05/EE-XXIV
M/s J.K. const Co.
Imp of approach rod byu RMc from Phirni road Aya Nagar Vill to D.S. Aswal Hs in Aya Nagar in w.No 58/SZImp of dreinage system of Aya Nagar Vill near Shamshan Ghat to Revines in Aya Nagr in w.no 58/S.Z
668/09.03.06/EE-XXIV
M/s Sachin Gupta
Imp of lane by RMc from Hari Singh Hs to Mahipal Hs and lane adj. Dharampal Hs in jainapur vill in w.no 58/SZ
M/s J.K. const Co.
21 Civil XXIV 29.7.05 7.7.05 198803.00 15.06.06 06.07.06 198803.00
22 Civil XXIV 29.7.05 7.7.05 198440.00 30.03.06 20.04.06 197523.00
23 Civil XXIV 29.7.05 7.7.05 197919.00 19.05.06 P 197689.00
24 Civil XXIV 29.7.05 7.7.05 492125.00 23.05.06 04.07.06 355234.00
25 Civil XXIV 29.7.05 7.7.05 495800.00 23.05.06 04.07.06 357512.00
26 Civil XXIV 29.7.05 10.7.05 199500.00 26.12.05 P 107343.00
27 Civil XXIV 29.7.05 10.7.05 196825.00 18.01.06 21.06.06 196825.00
28 Civil XXIV 29.7.05 10.7.05 194944.00 15.02.06 30.05.06 194103.00
29 Civil XXIV 29.7.05 10.7.05 199295.00 22.03.06 23.05.06 198835.00
30 Civil XXIV 29.7.05 10.7.05 199879.00 15.06.06 06.07.06 199879.00
31 Civil XXIV 29.7.05 10.7.05 199855.00 380/XXIV 7.9.05 8.9.05 18.10.05 199855.00
32 Civil XXIV 29.7.05 10.7.05 199830.00 06.03.06 28.03.06 199163.00
33 Civil XXIV 8.8.05 29.7.05 194143.00 31.10.05 20.12.05 193999.00
Imp of lane by RMc from Daya Ram Hs to Balaji Medical store in chhatterpur vill in W.No 58/SZ
167/06.06.06/EE-XXIV
M/s Bagga Builders
Imp of lane by RMC form Chander pal hs to Firtey hs in jannapur Vill in w.No -58/S.Z
701/6.03.06/EE-XXIV
M/s J.K. const Co.
Imp of lane from Kesti Cable to S.R. Kapoor Hs and adj lane by RMc concrete in Chhatterpur vill in W.No-58 S.Z
758/21.03.06/EE-XXIV
M/s Dinesh Kumar
Imp of drainage system from Pt ram Chand Hs Dara road to Satbir hs in S.S.N. Marg in w.no 58/S.Z
626/28.02.06/EE-XXIV
M/s Karambir Tanwar
Const.co
Imp of drainage System from Vrindhavan form to Nandan Farm Dera Bhatti road in W.No-58/SZ
627/28.02.06/EE-XXIV
M/s Karambir Tanwar
Const.co
Imp of lane by RMC from Chet Ram hs to Ved Ram hs in Aya Nagar Vill in w.No 58 S.Z
470/08.11.05/EE-XXIV
M/s B.M.B.Ente
rprises Imp of chowk near Masjid and lane from Durga Hs to P lata Hs by RMC Concrete in Chhattarpur vill in w.no 58 S.Z
483/10.11.06/EE-XXIV
M/s Jindal Builders
Imp of lane by RMc from Balraj Hs to Karan Hs in Jaunapur vill in w.no 58/S.Z
578/04.01.06/EE-XXIV
M/s Neelam Const
Imp of lane by RMc from M.C School to Nanda Namberdar hs in Jauna pur Vill in W.No 58/S.Z
699/16.03.06/EE-XXIV
M/s Ganpati
Const.Co. Imp of entrance road by RMc from Dena Bank building to DVB office in chhatterpur vill in W.No 58/SZ
168/06.06.06/EE-XXIV
M/s Bagga Builders
Imp of lane by RMC from Ami Chand hs to Ratan Hs and to shiv raj hs in Jauna pur vill in W.No 58/S/Z
M/s Kuldeep Const
Imp of lane from Kulvant singh hs to Harpal Singh hs by pdg RMC Concrete in Chhatterpur vill in w.NO 58/S.Z
619/23.02.06/EE-XXIV
M/s Ganpati
Const.Co. Pdg R.M.C near super Tyre Hs along Old M.N. road in vill Lado Sarai in w.No 57 s.Z
452/27.10.05/EE-XXIV
M/s Bagga Builders
34 Civil XXIV 8.8.05 29.7.05 198429.00 02.11.05 14.11.05 198002.00
35 Civil XXIV 8.8.05 29.7.05 192475.00 23.11.05 20.12.05 191996.00
36 Civil XXIV 8.8.05 29.7.05 193281.00 26.09.05 27.01.06 192819.00
37 Civil XXIV 8.8.05 29.7.05 190940.00 10.11.05 17.01.06 190791.00
38 Civil XXIV 8.8.05 29.7.05 193202.00 418/XXIV 4.10.05 1.10.05 31.10.05 193088.00
39 Civil XXIV 8.9.05 22.8.05 197562.00 412/XXIv/28.9.05 29.9.05 18.11.05 197244.00
40 Civil XXIV 8.9.05 22.8.05 195951.00 413/XXIV/28.9.05 20.9.05 10.10.05 195845.00
41 Civil XXIV 23.9.05 30.8.05 199629.00 20.12.06 09.03.07 199411.00
42 Civil XXIV 18.1.05 10.1.06 196185.00 24.02.06 28.03.06 194758.00
43 Civil XXIV 18.1.05 10.1.06 184948.00 24.03.06 28.04.06 184416.00
44 Civil XXIV 18.1.05 10.1.06 193576.00 05.04.06 03.05.06 193405.00
45 Civil XXIV 31.03.06 16.03.06 199380.00 81/22.05.06/EE-XXIV 01.06.06 30.06.06 199299.00
46 Elect. EE(E)-IV 31.03.06 30.03.06 192941.00 54/26.05.06/EE(E)-IV 28.05.06 05.06.06 187452.00
Pdg RMC near H.No F-343 along old M.B. road in vill Lado Sarai in W.NO 57/S.Z
469/08.11.05/EE-XXIV
M/s B.M.B.Ente
rprisespdg RMC near H.NO S.N genrators along Old M.B road in vill Lado Sarai in W.No 57 S.Z
499/23.11.05/EE-XXIV
M/s Neelam Const
Pdg R.M.C near uphar Tent Hs along Old M.B road in vill Lado Sarai in w.No 57/S.Z
401/23.09.05/EE-XXIV
M/s J.K. const Co.
pdg R.M.C . Near Suraj Bhawan along Old M.B. road in village Lado Sari in w.no 57//SZ
477/10.11.05/EE-XXIV
M/s Jindal Builders
Pdg RMC near Anchal Bai Centre along M.B road in village Lado Sarai in w.NO 57/SZ
M/s Harshit Jaggi
Imp & widening of main entrance road of sultanpur from M.G road by RMC near M.C School Sultanpur in W.NO-58/SZ
M/s Neelam Const
Imp of road by RMC near Joyce Clinic in Fatehpur Beri village in W.No-58 S.Z
M/s Neelam Const
Const of Sump well for Impreovement of drainage system of Sultanpur village near sultanpur Estate entry from Mandi road in w.no 58 /SZ
235/20.12.06/EE(Pr.)
South
M/s Vinod Enterprises
Const and Imp of drain from Budhiya wali Masjid to Kalra factory in Chhatterpur vill in
w.No-58/WZ
621/24.02.06/EE-XXIV
M/s Ganpati
Const.Co.Const and imp of drain from Raju hs to Jarnail Singh hs in Chhatterpur vill in w.No-58/WZ
764/24.03.06/EE-XXIV
M/s R.K Constructio
nConst and imp of drain from Daya Ram Hs to Balaji Property in Chhatterpur vill in w,no 58/SZ
705/17.03.06/EE-XXIV
M/s A.K.Constr
uctionImp of lane by Pdg. R.M.C from Sunil oil
depot. To Mahendra house aya nagar W-58/ S.Z
M/s Sachin Gupta
Prov. Of street lighting arangment from M.B Road to Lado Sarai village in W-57/ S.Z
M/s Perfect electric works
47 Elect. EE(E)-IV 31.03.06 30.03.06 184437.00 52/26.05.06/EE(E)-IV 28.05.06 05.06.06 179244.00
48 Elect. EE(E)-IV 31.03.06 30.03.06 203933.00 57/26.05.06/EE(E)-IV 28.05.06 06.06.06 198325.00
49 Elect. EE(E)-IV 31.03.06 30.03.06 211687.00 53/26.05.06/EE(E)-IV 28.05.06 06.06.06 205831.00
Prov. Of street lighting arangment on road Addresss to MCD School Lado Sarai W-57/ S.Z
M/s Perfect electric works
P/o street lighting arrangment on road Opp. DDA Nursary Lado Sarai in W-57 / S.Z
M/s Perfect electric works
P/O Lightin Arrangment from H.NO 700 to Golf View D.D.A Flats Lado Saraia W.NO. 57 /S.Z
M/s Perfect electric works
Status Report of MLA,Sh Vijay Jolly, AC No. 33 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C ExpenditureDate of
BookingDate of Consent
Amount booked
Work order no. with date i/c division
Name of agency
1 Elect EE(E)-IV 12.8.05 18.7.05 494642.00 16.12.05 16.01.06 494425.00
2 Civil EE-XXIV 18.8.05 22.7.05 336400.00 26.12.05 15.02.06 251759.00
3 Civil EE-XXIV 18.8.05 22.7.05 458500.00 16.12.05 02.03.06 343308.00
4 Civil EE-XXIV 18.8.05 22.7.05 456900.00 17.12.05 08.03.06 343290.00
5 Civil EE-XXIV 3.10.05 28.7.05 499400.00 17.03.06 P 326134.00
6 Civil EE-XXIV 3.10.05 22.7.05 499900.00 09.03.06 P 393775.00
7 Civil EE-XXIV 3.10.05 22.7.05 183197.00 03.01.06 03.03.06 183007.00
8 Civil EE-XXIV 3.10.05 13.9.05 198989.00 29.04.06 29.04.06 194829.00
9 Elect EE(E)-IV 19.10.05 5.8.05 448251.00 9.12.05 20.12.05 433475.00
10 Civil EE(E)-IV 19.10.05 5.8.05 197621.00 10.12.05 23.12.05 133062.00
11 Civil EE(E)-IV 19.10.05 7.8.05 206255.00 03.02.06 06.04.06 139849.00
12 Civil XXIV 26.10.05 13.9.05 196725.00 12.02.06 11.04.06 196616.00
13 Civil XXIV 26.10.05 13.9.05 198780.00 17.02.06 05.09.06 198780.00
P/o lighting arrangement at park D block Saket and P/o lighting arrangement in Sec-VII & Sector-VII& Sector-III Pushp vihar in W>no 59/S/Z
119/09.12.05/EE(E)-IV
M/s Hitesh Elect.
Pdg RMC at back lane of the J-57 to J-65 in J block Saket in W.No 59/S.Z
519/06.12.05/EE-XXIV
M/s Dinesh Builders
Pdg RMC at Side berms of main road from M.C pry School G block Saket to M.B. road T Junction in G block Saket W.No-59/S.Z
548/06.12.05/EE-XXIV
M/s Dinesh Builders
Pdg RMC at side berms of road along H block form H.No H-72D to opp M.C Pry School in G block Saket W.No-59/S.Z
520/07.11.05/EE-XXIV
M/s R.D.Const.
Const of central verge from M.B road T-Junction to Bihari park Devli road W.No 59/SZ(by C.C Kerb stone)
633/07.03.06/EE-XXIV
M/s Nageshwer
Builders Pdg laying RMC in lane opp C-1 Krishna park adjoining Devli road in W.No -59/SZ
632/07.03.06/EE-XXIV
M/s Nageshwer
Pdg of RMC at side berm of road opp G-109 to G-124 in G block , Saket in w.No 59/SZ
564/21.12.05/EE-XXIV
M/s Ganpati Const.
Imp & strg of PVR road from M.B. road X-ing to Red rose Public school in Saket W.No-59 /SZ/ ( by dense carpeting)
33/24.04..06/EE-XXIV
M/s Mukesh
Associates Pvt.Ltd.
Pro. Of Street lighitng agangement in Saket , block No.A,C,D,E,F,G,H,J,L,M&N etc in W.No 59/SZ
107/EE(E)_IV /8.12.05
M/s Sushma
ElectricalsPro of street lighting arrangement in Devli village in W.No-60 SZ
118/09.12.05/EE(E)-IV
M/s Krishna
Electriclas Pro of semi high mast light at J- block Saket near Gurudwara W.NO-59/SZ
166/26.12.05/EE(E)-IV
M/s Indus India
International
Const of drainage system near G-60 Saket in W.NO 59/SZ
597/02.02.06/EE-XXIV
M/s A.K.Const.
Const of drainage system near main dividing road G&H blocks in G block Saket W.No-59 S.Z
609/14.02.06/EE-XXIV
M/s R.K Constructio
n
14 Civil XXIV 26.10.05 13.9.05 198989.00 30.03.06 P 193989.00
15 Civil XXIV 26.10.05 13.9.05 198989.00 30.03.06 P 192072.00
16 Civil XXIV 10.11.05 28.10.05 182302.00 09.12.05 P 179898.00
17 Civil XXIV 10.11.05 28.10.05 199364.00 03.01.06 23.02.06 199305.00
18 Civil XXIV 10.11.05 13.9.05 198989.00 29.04.06 29.04.06 196429.00
19 Civil XXIV 29.11.05 21.10.05 198997.00 03.01.06 20.02.06 198927.00
20 Civil XXIV 29.11.05 21.10.05 198489.00 09.02.06 06.04.06 198404.00
21 Civil XXIV 29.11.05 22.11.05 197277.00 30.12.06 16.01.07 197240.00
22 Civil XXIV 29.11.05 22.11.05 198508.00 28.02.06 P 193489.00
23 Civil 2.1.06 15.12.05 599000.00 06.04.06 26.06.06 491144.00
24 Civil 2.1.06 15.12.05 491358.00 20.05.06 18.07.06 491294.00
25 Civil 2.1.06 15.12.05 591300.00 06.04.06 26.05.06 484535.00
I/s of PVR road from SFS ,DDA flats to road No-15 (press Enclave road) in W.No 59 S.Z by dense carpeting surface.
769/30.03.06/EE-XXIV
M/s Sona Consultant
& Contractors
I/s of PVR road from red rose Public school to PVR Cinema in Saket W.No 59/S.Z by dense carpet surfacing)
768/30.03.06/EE-XXIV
M/s Sona Consultant
& Contractors
Imp to raod jby metelling along Maleria office in Devlai village in C-60/SZ
508/30.11.05/EE-XXIV
M/s Ganpati Const.
Pdg of RMC near T -Junction of press Enclave marg road No-15) & Mandir Marg in Saket W.No-59/SZ
542/28.12.05/EE-XXIV
M/s Ganpati Const.
Imp& stg of PVR road from PVR Cinema to SFS DDA flats in Saket w.NO-59/SZ
34/24.04.06/EE-XXIV
M/s Mukesh
Associates Pvt.Ltd.
pdg RMC in lane adj. H.NO A-9 in Krishna park on Devli road w.no-59 S.Z
543/28.12.05/EE-XXIV
M/s Ganpati Const.
pdg RMC from H.NO A-20 to A-25 in Krishna park W.no-59/SZ
598/02.02.06/EE-XXIV
M/s A.K.Const.
pdg RMC in lane from H.NO- A-7 to A-11 in Jawahar park in W.NO-59 S.Z
433/27.11.06/EE-XXIV
M/s R.K Constructio
nPdg RMC in lane from H.NO-A-40 to 48 , in krishna Park W.No-59/S.Z
538/23.12.05/EE-XXIV
M/s B.M.S.Ente
rprises Imp/Stg of road by RMC from Police Chowki at M.B. road to Qtr NO 497 in sec-III Pushp
Vihar w.no-59/ S.Z
EE(Pr.)-S.Z
306/27.03.06/EE(Pr)
South
M/s Raj Enterprises
Imp/st of road by RMC around Samaj Sadan & upto mather dairy borth at main road in
sec-I ,. Pushp Vihar w.no- 29/S.Z
EE(Pr.)-S.Z
303/27.03.06/EE(Pr.)South
M/s Inder Const.Co
Imp/stg of road by RMC from block -112 to sub-Satation No-10 in sec-IV , Pushp Vihar
w.no-59/S.Z
EE(Pr.)-S.Z
304/27.03.06/EE(Pr)South
M/s Dinesh Builders
26 Civil 2.1.06 15.12.05 591300.00 06.04.06 26.05.06 485585.00
27 Civil 2.1.05 15.12.05 482245.00 20.05.06 18.07.06 481216.00
28 Civil 2.1.05 15.12.05 587900.00 06.04.06 26.05.06 482539.00
29 Civil XXIV 17.1.05 22.11.05 499400.00 31.03.06 06.06.06 397112.00
30 Civil XXIV 17.1.05 22.11.05 199400.00 23/20.04.06/EE-XXIV 29.06.06 05.06.06 164955.00
31 Civil XXIV 8.02.06 16.08.05 454800.00 01.08.06 16.08.06 384253.00
32 Elect EE(E)-IV 30.03.06 08.03.06 206992.00 69/13.06.06/EE(E)-IV 15.06.06 P 180560.00
33 Civil XXIV 31.03.06 16.08.05 386600.00 21.01.07 16.03.07 305829.00
34 Civil XXIV 31.03.06 16.08.05 363900.00 21.01.07 16.03.07 287787.00
35 Civil XXIV 31.03.06 16.08.05 432100.00 21.01.07 16.03.07 355071.00
36 Civil XXIV 31.03.06 16.08.05 409300.00 09.03.07 16.03.07 329344.00
37 Civil XXIV 31.03.06 16.08.05 570000.00 07.12.06 29.12.06 459430.00
38 Civil XXIV 31.03.06 28.03.06 187132.00 73/17.05.06/EE-XXIV 23.05.06 02.06.06 187053.00
Imp/Stg of road by RMC from Block-7 to block -58 in sect.-IV Pushp Vihar w.no-59/Sz
EE(Pr.)-S.Z
301/27.03.06/EE(Pr)South
M/s Dinesh Builders
Imp/ Stg of road by RMC From DMS booth Qtr No. 1260 in sect-VII , PUshpVihar ,w.NO-
59/SZ
EE(Pr.)-S.Z
302/27.03.06/EE(E)South
M/s Inder Const.Co
Imp/Stg of road by RMC from Central school to block -160 and Qtr. NO 489 in sect-III Push
Vihar W.No-59/SZ
EE(Pr.)-S.Z
305/27.03.06/EE(Pr)South
M/s Dinesh Builders
Pdg RMC in lane from H.No C-1 to C-18 in Krishna Park C-59/SZ
781/31.03.06/EE-XXIV
M/s Inder Const.Co
Pdg RMC in lane from H.No C-19 to 23 Krishna park C-59/SZ
M/s Inder Const.Co
C/o Road by pdg R.M.C in lane from Radha Krishna Temple to Transformer in Devli
Village in C-60/sz
243/21.06.06/EE-XXIV
M/s Dinesh Builders
Provision of Sami High Mast light near Barat Ghar Devli Village New Delhi under S.Z
W.NO-60
M/s M.K Enetrprises
Pdg. Rmc in lane from 365/1 to 354 in Devli Village in C-60 South Zone
557/11.01.07/EE-XXIV
M/s Ravi Gupta
Pdg. Rmc in lane from H.No.399 to A-389 Devli Village in C-60 South Zone
556/11.01.02/EE-XXIV
M/s Chatter Singh
Const.Co.
Pdg. Rmc in lane From H.NO.450 to A-463 in Devli Village in C-60 South zone
553/11.01.07/EE-XXIV
M/s Sandeep
GuptaPdg. Rmc in lane from H.NO. 490 to A-465 in
Devi Village in C-60 South Zone690/08.03.07/EE-
XXIVM/s Chatter
Singh Const.Co.
pdg. Rmc from H.NO. 264 Santra Devi to H.NO 1 Nirmla Devi in Devli Village C-60 South zone
459/04.12.06/EE-XXIV
M/s Jagdish
pdg. Rmc from A-74 to Jalebi Chowk Devli Village C-60 South Zone
M/s Ganpati
Const.Co.
39 Civil XXIV 31.03.06 28.03.06 171826.00 14.09.06 20.09.06 171797.00Pdg. Cc Pav from MC Primary School NO.1 Devli to Shiv Tempal in Devli Village C-60 South Zone
324/25.08.06/EE-XXIV
M/s Amit Gupta
Status Report of MLA, Sh.Prem Singh, AC No. 34 2005-06
S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XXIV 27.6.05 17.6.05 198392.00 5.8.05 14.9.05 198392.00
2 Civil XXIV 27.6.05 17.6.05 198162.00 24.10.05 29.11.05 188259.00
3 Civil XXIV 27.6.05 17.6.05 198385.00 22.7.05 14.9.05 197672.00
4 Civil XXIV 27.6.05 17.6.05 199235.00 25.07.05 26.08.05 198904.00
5 Civil XXIV 27.6.05 17.6.05 199114.00 381/XXIV .7.9.05 17.9.05 25.05.06 198944.00
6 Civil XXIV 27.6.05 17.6.05 198499.00 302/XXIV 30.7.05 1.9.05 198328.00
7 Civil XXIV 27.6.05 17.6.05 198710.00 31.07.05 21.11.05 198710.00
8 Civil XXIV 27.6.05 17.6.05 198306.00 363/XXIV 2.9.05 31.10.05 198306.00
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Imp of road and side berms from H.NO 19/1 to 19/17 by pdg & laying RMC in
block NO 19 Dakshinpuri Extn. In C-62 S/Z
342/05.08.05/EE-XXIV
M/s Jindal Builders
Imp of road and road side berms from H.NO 19/17 to 19/214 by P/L RMc in
block NO 19 Daskhinpuri Extn. In c-62/S.Z
420/05.10.05/EE-XXIV
M/s Pappu Seth
Imp of road and its side berms from H.NO 19/17 to 19/193 by P/L RMC in block NO -
19 Dakshin puri Extn. In C-62 S.Z
292/12.07.05/EE_X
XIV
M/s Bhoj Extps
Imp of road Surface near L.S.C Mkt Madangir by P/L RMC in C-62 S.Z
307/21.07.05/EE-XXIV
M/s J.K.Const.
Rasing & imp of RCC culvert near H.NO D-1/133,D-1/177 ,D-1/157 D-1/265 , D-1/1 and C-1 near Sheetla Mandir in Madangir
PH-I in c-62/S.Z
M/s Kuldeep const.
Raising & imp of RCC culvert near Masjid in c-1, B-1 /329 CPO/113 ,E-1/155 & E-
1/242 in Mandangir PH-I in C-62.S.Z
M/s Kuldeep const.
, B-323, B-2 and A-1 in A block Dakshinpuri in C-62 S.Z
306/21.07.05/EE-XXIV
M/s Ganpati
Const.CO.
Raising & imp of RCC culvert near C block Dakshin Puri near H.NO 404 and
425 in C-62.S.Z
M/s Dinesh kumar
9 Civil XXIV 27.6.05 17.6.05 199777.00 31.03.06 02.07.06 199527.00
10 Civil XXIV 27.6.05 17.6.05 198771.00 02.09.05 01.03.06 197231.00
11 Civil XXIV 27.6.05 17.6.05 198287.00 02.01.06 28.02.06 197679.00
12 Civil XXIV 27.6.05 17.6.05 197986.00 03.01.06 05.06.06 197986.00
13 Civil XXIV 27.6.05 17.6.05 198874.00 352/XXIv 12.8.05 22.8.05 20.11.05 195394.00
14 Civil XXIV 27.6.05 17.6.05 199271.00 01.04.06 26.07.06 198775.00
15 Civil XXIV 27.6.05 17.6.05 197076.00 373/XXIV/30.8.05 9.9.05 18.04.06 196516.00
16 Hort XXIV 8.7.05 7.7.05 96234.00 30.01.06 09.03.06 96242.00
17 Hort XXIV 8.7.05 7.7.05 97234.00
18 Hort XXIV 8.7.05 7.7.05 98226.00 19.01.06 27.01.06 98226.00
Raising and Imp of RCC culvert in block NO 18 near Church and H.NO 376 and in
L block near H.No-1 Dakshinpuri in C-62/S.Z
754/21.03.06/EE-XXIV
M/s Dinesh kumar
Raising & Imp of culvert in "K" block Dakshinpuri near H.No 285 286,331&332 377 400 and 638 in "K" block Dakshinpuri
in c-62
360/23.08.05/EE-XXIV
M/s Neelam Const.
Imp of drain & road Surface from M.C Pry School no-4 ,Sec-6 to Subhash camp
road by P/L RMc in C-62
537/23.12.05/EE-XXIV
M/s B.M.B.Enterprises
Imp of drainage system near Mahila mangal in A block , Dakshinpuri & its Side
berm by P/L RMc in c-62
535/23.12.05/EE-XXIV
M/s Sunil Const.
Raising & Imp of culvart in 'K' block Dakshinpuri near H.No 23
70,171,172,201,202,&240 in ' K' block Dakshinpuri in c-62
M/s Harshit Jaggi
Raising & Imp of culvert near block No-10 Post office Dakshinpuri Extn and
Madangir Village ner Crown Tailor in C-62
753/21.03.06/EE-XXIV
M/s Bagga
Builders
Raising & Imp of Culvert in "k' block Dakshinpuri near H.No 573 ,350 568 and H.No-1 in block no 19 Dakshinpuri Extn in
C-62
M/s Shalabh Gupta
P/f of M.s Tree ground in park D-11 Mandangir w.no-61/S.Z
96/30/01.06/DDH(S
.Z)
M/s Varsha Const.
P/f of M.s Tree Ground in park Sec-III Ambedkar Nagar w.Np-=61
P/f of M.S tree Ground in park sector-IV NO_1 Ambedkar Nagar w.Np-62 S.Z
86/19.01.06/DDH(S
.Z)
M/s Raj Kumar
19 Hort XXIV 8.7.05 7.7.05 98226.00 19.01.06 27.01.06 98226.00
20 Hort XXIV 8.7.05 7.7.05 98226.00 19.01.06 27.01.06 98226.00
21 Hort XXIV 8.7.05 7.7.05 98226.00 19.01.06 27.01.06 98226.00
22 Hort ADH(S) 8.7.05 7.7.05 98226.00 23.01.06 09.03.06 97769.00
23 Hort ADH(S) 8.7.05 7.7.05 97234.00 23.01.06 09.03.06 97234.00
24 Hort ADH(S) 8.7.05 7.7.05 98226.00 23.01.06 09.03.06 97767.00
25 Hort ADH(S) 8.7.05 7.7.05 97234.00 25.01.06 09.03.06 97234.00
26 Hort ADH(S) 8.7.05 7.7.05 98226.00 25.01.06 09.03.06 97877.00
27 Hort ADH(S) 8.7.05 7.7.05 98226.00 25.01.06 09.03.06 97877.00
28 Hort ADH(S) 8.7.05 7.7.05 97234.00 30.01.06 09.03.06 97234.00
29 Hort ADH(S) 8.7.05 7.7.05 96242.00 30.01.06 09.03.06 96242.00
30 Hort ADH(S) 8.7.05 7.7.05 96242.00 30.01.06 09.03.06 96242.00
P/f of M.s tree Ground in park Sec-IV NO-2 Ambedkar Nagr w.no-62
87/19.01.06/DDH(S
.Z)
M/s Raj Kumar
P/f of M.s tree Ground in park in Khanpur J.J colony near Khanpur Gaon w.Np=-61
88/19.01.06/DDH(S
.Z)
M/s Raj Kumar
P/f of M.s tree grouds at park in R.P.s colony near Barat Ghar W.No-61
89/19.01.06/DDH(S
.Z)
M/s Raj Kumar
P/f of M.S tree guard at Raja Ram Market park Madangir W.No-62/S.Z
91/23.01.06/DDH(S.Z)
M/s R.K.Trd.
P/f of M.S Tree gaurds in Budha Park , Madangir J.J Coloney W.No 61/SZ
90/23.01.06/DDH(S.Z)
M/s R.K.Trd.
P/f of M.S Tree gaurds in CSF park Madangir village W.No-62 S/Z
92/23.01.06/DDH(S.Z)
M/s R.K.Trd.
P/f of M.S Tree gaurds in park in Gali no 30 to 41 DDA flat Madangir W.No 61/SZ
93/25.01.06/DDH(S
.Z)
M/s Aravali
Builders
P/f of M.S Tree gaurds in park in Gali no 6 to 14 DDA flat Madangir W.NO 61/S.Zone
94/25.01.06/DDH(S
.Z)
M/s Aravali
Builders
P/f of M.S Tree guard in park in gali no 15 jto 18 DDA flat Madangir W>no-61/S.Z
95/25.01.06/DDH(S
.Z)
M/s Aravali
Builders
P/f of M.S Tree gaurds in B block park , Dakshinpuri ,W>no 62/SZ
98/30.01.06/DDH(S.Z)
M/s Varsha Const.
P/f of M.S Tree gaurds in A block park , Dakshinpuri W.NO 62/SZ
97/30.01.06/DDH(S.Z)
M/s Varsha Const.
P/f of M.S Tree Gaurds at park C block Dakshinpuri W.NO 62 S.Z
99/30.01.06/DDH(S.Z)
M/s Varsha Const.
31 Hort ADH(S) 8.7.05 7.7.05 96242.00 30.01.06 09.03.06 96242.00
32 Hort ADH(S) 8.7.05 7.7.05 96242.00 30.01.06 09.03.06 96242.00
33 Hort ADH(S) 8.7.05 7.7.05 96242.00
34 Hort ADH(S) 8.7.05 7.7.05 96242.00
35 Hort ADH(S) 8.7.05 7.7.05 96242.00
36 Civil XXIV 29.8.05 26.8.05 199507.00 23.10.05 21.12.05 199500.00
37 Civil XXIV 29.8.05 26.8.05 199364.00 06.11.05 05.05.06 199364.00
38 Civil XXIV 29.8.05 26.8.05 198993.00 03.12.05 16.02.06 198990.00
39 Civil XXIV 29.8.05 26.8.05 199436.00 23.12.05 21.12.05 198761.00
40 Civil XXIV 29.8.05 26.8.05 197772.00 03.04.06 16.06.06 197072.00
P/f of M.S Tree gaurds at 6 block park Dakshin puri Ext. W.No 62/SZ
100/30.01.06/DDH(S.Z)
M/s Varsha Const.
P/f of M.S Tree gaurds at 4 block Tikona park Dakshimpuri Extn. W.No-62
101/30.01.06/DDH(S.Z)
M/s Varsha Const.
P/f of M.S tree Gaurds at 7 block park Dakshinpuri Extn. W.No 62/S.Z
P/f of M.S Tree gaurds in Arya Samaj Mandir park Madangir Village W.No 62/SZ
P/f of M.S Tree gaurds in park in RPS colony near Brahm Kumari Ashram in
W.No 61/SZ
Imp of lane by laying of K/stone flooring from H.No 171 to 255 19 to 35 35 to 194 and 35 to 66 in c block Dakshinpuri c-62
433/14.10.05/EE-XXIV
M/s Jindal Builders
Imp of lane by laying of K/stone flooring from H.No 125 to 141,68,90 and 45 to 67
in L block Dakshinpuri c-62
449/27.10.05/EE-XXIV
M/s Pappu Seth
Imp to lane by laying of K/stone flooring from H.No 24 to 46 , 70 to 92 ,109 to
1245 and 156 to 171 in K Block Dakshin puri in C-62
500/23.11.05/EE-XXIV
M/s Neelam Const.
Imp of lane by laying of K/stone flooring from H.No 293 to 321, 237 to 264 ,198 to
216 , and 159 to 177 in L block Dakshinpuri in c-62
431/14.10.05/EE-XXIV
M/s Harshit Jaggi
Imp of lane by laying of K/stone flooring from h.No 633 to 662 603 to 632 543 to 572 463 to 503 and 62 391 in B block
Dakshinpuri in c-62
759/24.03.06/EE-XXIV
M/s Pushpa Const.
41 Civil XXIV 29.8.05 26.8.05 198803.00 24.10.05 19.12.05 198803.00
42 Civil XXIV 29.8.05 26.8.05 198555.00 24.10.05 22.12.05 195218.00
43 Civil XXIV 29.8.05 26.8.05 194125.00 23.12.05 13.01.06 194125.00
44 Civil XXIV 29.8.05 26.8.05 198678.00 03.03.06 20.07.06 198678.00
45 Civil XXIV 29.8.05 26.8.05 198547.00 21.03.06 13.06.06 198192.00
46 Civil XXIV 29.8.05 26.8.05 199123.00 26.12.05 28.02.06 199123.00
47 Civil XXIV 29.8.05 26.8.05 198078.00 13.10.05 23.11.05 197801.00
48 Civil XXIV 29.8.05 26.8.05 198595.00 06.11.05 07.07.06 198381.00
Imp of lane by laying of k /Stone flooring form H.No 354 to 369 384 to 398 252 to
270 and 233 to 252 in B block Dakshinpuri inc-62
428/14.10.05/EE-XXIV
M/s Dwarka Prasad Goyal
Imp of lane by laying of k /Stone flooring form H.No - 79 to 107, 137 to 165 166 to 194 290 to 323 and 339 to 353 in 2 in B
block Dakshinpuri inc-62
434/14.10.05/EE-XXIV
M/s Jindal Builders
Imp of lane by laying of K/stone flooring from H.No1 to 35 and Dakshinpuri in c-62
463/08.11.05/EE-XXIV
M/s B.M.B.Enterprises
Imp of lane by laying of K/stone flooring form H.No 309 to 331,332 to 354 400 to
416 535 to 550 and 460 to 475 in K block Dakshinpuri in c-62
617/22.02.06/EE-XXIV
M/s Sona Consultan
t & Contractor
Imp of lane by laying of K/stone flooring from H.NO 172 to 186 202 to 217 ,240 to
262 and 286 to 308 in K block Dakshinpuri c-62
453/27.10.05/EE-XXIV
M/s Bagga
Builders
Imp of lane by laying of K/stone flooring from H.No 66 to 78 53 to 65 and 39 to 27 in "B" block Dakshinpuri and 69 to 104 in
A block Dakshipuri in c-62
536/23.12.05/EE-XXIV
M/s B.M.B.Enterprises
Imp of lane by laying of K/stone flooring foarm H.No 642 to 663 404 to 484 536 to
707 and 620 to 641 in C block Dakshinpuri in c-62
417/03.10.05/EE-XXIV
M/s Ganpati
Const.CO.
Imp to lane by laying K/stone flooring form H.No 556 to 576 536 to 555, 492 to 513
and 448 to 469 in " C" block Dakshimpuri in c-62
450/27.10.05/EE-XXIV
M/s Pappu Seth
49 Civil XXIV 29.8.05 26.8.05 199650.00 24.10.05 21.12.05 199650.00
50 Civil XXIV 29.8.05 26.8.05 198804.00 27.10.05 22.12.05 198800.00
51 Civil XXIV 27.9.05 26.8.05 199442.00 22.06.06 11.08.06 198633.00
52 Civil XXIV 27.9.05 26.8.05 199185.00 09.01.06 09.02.06 198811.00
53 Civil XXIV 13.10.05 10.10.05 198943.00 05.01.06 22.02.06 198688.00
54 Civil XXIV 13.10.05 10.10.05 198712.00
55 Civil XXIV 13.10.05 10.10.05 199604.00 05.01.06 25.02.06 199492.00
56 Civil XXIV 13.10.05 10.10.05 198945.00 03.02.06 23.02.06 198724.00
57 Civil XXIV 18.11.05 4.10.05 198570.00 03.01.06 24.02.06 193324.00
58 Civil XXIV 18.11.05 4.10.05 199340.00 12.02.06 18.08.06 199301.00
Imp of lane by laying of K/stone flooring form H.No 395 to 427, 327 to 360 ,234 to
304 and 187 to 205 in "A" block Dakshinpuri in c-62
435/14.10.05/EE-XXIV
M/s Jindal Builders
Imp of lane by laying of K/stone flooring foarm H.No 380 to 403, 332 to 355, 238,
to 290 and 203,256 in "C' block Dakshinpuri in C-62
438/14.10.05/EE-XXIV
M/s Harshit Jaggi
Imp of road side berms from 521 Bus Stand to Central Mkt. J block Dakshin puri
by P/L RMC in C-62/SZ
220/12.06.06/EE-XXIV
M/s B.M.B.Enterprises
Imp of road surface and drain near B-block park in B-block Dakshinpuri by P/l
RMC in C-62/SZ
559/30.12.05/EE-XXIV
M/s Jindal Builders
Imp of road surface by M/P from DDA park near Virat Cinema to opp of block
No-9 park Dakshinpuri Extn. In C-62 S.Z
575/04.01.06/EE-XXIV
M/s Dinesh kumar
Imp/stg of road surface by P/l Asphaltic concrete from DDA park to Mahila Mangal
Dakshinpuri in C-62/SZ
Imp to road surface by M/P from Virat Cinema to Mahila Mangal in "A" block
Dakshinpuri in C-62/SZ
574/04.01.06/EE-XXIV
M/s Satish Kumar
Imp to road by RMC and its drain from k block Community Centre Dakshimpuri to
School road in "K" block Dakshinpuri in C-62/SZ
592/24.01.06/EE-XXIV
M/s B.M.B.Enterprises
pdg RMC in lane adj H>NO-250, Khanpur vill in w.no-61/S.Z
547/28.12.05/EE-XXIV
M/s Dwarka Prasad Goyal
Pdg RMC in J-II aj H.NO -1 to 17 Madangir PH-II w.no-61 S.Z
599/02.02.06/EE-XXIV
M/s A.K Constructi
on
59 Civil XXIV 20.1.05 26.12.05 499700.00 27.05.06 20.07.06 398588.00
60 Civil XXIV 20.1.05 26.12.05 499100.00 05.06.06 27.02.07 396805.00
61 Civil XXIV 20.1.05 2.12.05 197277.00 06.07.06 23.11.06 196800.00
62 cse CSE-IV 07.02.06 19.10.05 1405196.00 06.08.07 P 1383205.00
63 cse CSE-IV 07.02.06 19.10.05 99820.00 23.08.07 01.10.07 90849.00
64 Civil XXIV 28.02.06 23.02.06 198688.00 26.03.06 13.05.06 198688.00
65 Civil XXIV 28.02.06 23.02.06 199000.00 14.05.06 06.06.06 199000.00
66 Civil XXIV 28.02.06 23.02.06 198976.00 04.05.06 12.06.06 197838.00
67 Civil XXIV 08.03.06 02.12.05 199600.00 08.11.06 29.11.06 153077.00
68 Civil XXIV 08.03.06 02.12.05 199300.00 22.11.06 15.12.06 155959.00
Providing RMC in Gudri Mahalla Khanpur village in C-61/S.Z
90/26.05.06/EE-XXIV
M/s Dinesh Builders
Providing RMC in Gudri Mahalla Khanpur village in C-61/S.Z
89/26.05.06/EE-XXIV
M/s Dinesh Builders
P/l c.c. paveement from H.No 86 to 107 and 108 to 150 in C-II Madangir W.No-
61/SZ
248/26.06.06/EE-XXIV
M/s Dinesh Kumar
Reconstruction of culvert on central Market Nallah Bhumiya Chowk Madangir
in W.NO 61/SZ
45/27.07.07/EE(DEMS)SZ
M/s Bijender Lohia &
Co.
Const. Of urinal cum toilet block at Guru nanak Mkt. 10-11 no Block D-Dakshinpuri
in W.no 62/SZ
79/31.08.06/EE(DEMS)-IV/SZ
M/S R.S. Sirsiya
const. Co.
Const. Of road surface by P/L RMC from H.NO J-1 to J-359 in J-block Dakshinpuri
in C-62/SZ
698/16.03.06/EE-XXIV
M/s Ganpati
Const.CO.
Const. Of road surface by P/L RMC from urinal block near mother dairy to J-359 in
J-block Dakshinpuri in C-62/SZ
46/04.05.06/EE-XXIV
M/s Kuldeep const.
Pdg and fixing drain X-ing of MS grating of lanes in Madangir Ph-I Dakshinpuri and
Dakshinpuri Ext in C-62 SZ
39/24.04.06/EE-XXIV
M/s Satish Kumar
P/L RMC pavement from H.No 259 to 279 and 179 to 194 in C-II Madangir W.NO
61/SZ
401/08.11.06/EE-XXIV
M/s Mehra Bros.
P/L RMC pavement from H.NO 194 to 216 and 280 to 301 in C-II Madangir
W.NO 61/SZ
423/22.11.06/EE-XXIV
M/s Karambir Tanwar
Const.Co
69 Civil XXIV 22.03.06 18.02.06 199200.00 12.06.06 06.10.06 153799.00
70 Civil XXIV 22.03.06 06.02.06 199600.00
71 cse CSE-IV 30.03.06 18.02.06 818725.00 6.08.07 26.09.07 814932.00
Pdg of RMC from H.NO 45 to 65 & 280 to 322 in A-II block Madangir Ph-II C-61/SZ
136/02.06.06/EE-XXIV
M/s Inder Const.Co
Imp of road surface by pdg/laying RMC from Bhumia Chowk to Harijan Basti in
Khanpur Village in W.NO-61 SZ
Reconstruction of culvert Opp. B-II Madangiri on RPS Nallah in Word No.61
SZ
44/19.07.07/EE(DEMS)
M/S R.S. Sirsiya
const. Co.
Status Report of MLA, Sh.Ramesh Bidhuri, AC No. 35 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil Br-I 8.6.05 20.4.05 498700.00 515/30.03.06/EE(Br)-I 18.10.05 04.03.06 239310.00
2 Civil Br-I 8.6.05 20.4.05 498000.00 516/30.03.06/EE(Br)-I 12.09.05 P 352976.00
3 Civil Br-I 8.6.05 20.4.05 458000.00 396/10.01.07/EE(Br.)-I 16.01.07 21.04.07 299082.00
4 Civil Br-I 8.6.05 20.4.05 498000.00 517/30.03.06/EE(Br)-I 15.01.06 28.02.06 207986.00
5 Civil Br-I 8.6.05 20.4.05 498800.00 395/10.01.07/EE(Br.)-I 12.01.07 21.04.07 234993.00
6 Civil Br-I 8.6.05 20.4.05 595100.00 518/30.03.06/EE(Br.)-I 02.05.06 P 307546.00
7 Civil Br-I 8.6.05 31.5.05 199500.00 163/05.07.05 12..07.05 13.10.05 193131.00
8 Civil Br-I 8.6.05 31.5.05 199500.00 164/05.07.05/EE(Br.)-I 11.07.05 20.10.05 187245.00
9 Civil Br-I 10.06.05 31.5.05 180600.00 162/5.7.05/EE(Br.)-I 12.7.05 13.10.05 173825.00
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Imp of lane by pdg CC & Drian from Ram Pal hs to MC pry school (B) Bhagar Mohalla tuglababad Vill (Lal Dora) in W.no .63.
M/s Garg Const.Co.
Imp of lane by pdg CC & Drian from Cahupal (Prajapti Mohalla) to post office in tuglababad Vill (Lal Dora) in W.no .63.
M/s Gerg.Const.CO
Imp of lane by pdg CC & Drian from Cahupal (Prajapti Mohalla Chotey Ram Hs in Churiya Mohalla tuglababad Vill (Lal Dora) in W.no .63.
M/s Rai Bros & Assocites
Imp of lane by pdg CC and OSD from Prajapti Chaupal to MCD School (B) in Bhangar Mohall Lal dora vill Tuglakabad vill w.no. 63.
M/s Garg Const.Co.
Imp of laneby pdg CC & Drian from Devi Singh hs Prajapti Mohall to Holi Chowk Bazar Mohalla to Kuan Chowk in Lal Dora Village Tugakabad Village in w.no. 63 CZ
M/s Rai Bros & Assocites
Imjp of lane by pdg CC and Drain from Kaun Chowk to Shanti Niwas Kauan Mohalla in Lal Dora Village Tugakabad Village in w.no. 63 CZ
M/s Garg Const.Co.
Imp of laen by pdg CC & drain from Holi Chowk Bazar Mohalla to Ado Narender Hs in Pandit Mohalla in Lal Dora Village Tugakabad Village in w.no. 63 CZ
M/s Dwarka Parsad Goyal
Imp of lane by pdg CC and Drain from Post Office to Adv. Narender Hs in Pkt Mohalla Lal Dora Village Tugakabad Village in w.no. 63 CZ
M/s Dwarka Parsad Goyal
Const of Drain in Gali no 5 (RHS) in Tuglakabad Ext w no 63.
M/s Ganpati Const co.
10 Civil Br-I 14.6.05 8.6.05 194512.00 197/25.07.05/EE(Br.)-I 02.08.05 P 188887.00
11 Civil Br-I 14.6.05 8.6.05 187320.00 176/5.7.05/EE(Br.)-I 12.7.05 13.09.05 186709.00
12 Civil Br-I 20.6.05 9.6.05 499800.00 12.09.05 12.01.06 347993.00
13 Civil Br-I 20.6.05 10.06.05 499300.00 281/9.9.05/EE(Br.)-I 9.9.05 14.11.05 360259.00
14 Civil Br-I 27.6.05 22.6.05 199486.00 226/05.08.05/EE(Br.)-I 10.09.05 30.11.05 195097.00
15 Civil Br-I 27.6.05 22.6.05 180839.00 227/05.08.05/EE(Br.)-I 12.08.05 P 170148.00
16 Civil Br-I 27.6.05 22.6.05 199611.00 231/05.08.05/EE(Br.)-I 12.08.05 P 66642.00
17 Civil Br-I 8.7.05 4.7.05 199262.00 255/12.08.05/EE(Br.)-I 16.08.05 03.11.05 186848.00
18 Civil Br-I 8.7.05 4.7.05 197725.00 252/12.08.05/EE(Br.)-I 18.08.05 17.08.06 190018.00
19 Civil Br-I 8.7.05 20.6.05 498900.00 498/27.03.06/EE(Br.)-I 22.05.06 13.12.06 357019.00
20 Civil Br-I 8.7.05 20.6.05 659700.00 499/29.03.06/EE(Br.)-I 15.02.06 05.06.06 423746.00
21 Civil Br-I 8.7.05 20.6.05 498900.00 371/15.12.06/EE(Br.)-I 21.12.06 23.03.07 331358.00
22 Civil Br-I 25.7.05 8.7.05 672300.00 199/23.08.06/EE(Br.)I 28.08.06 P 480187.00
23 Civil Br-I 25.7.05 8.7.05 199850.00 293/21.10.05 25.10.05 03.01.06 199833.00
24 Civil Br-I 3.8.05 5.7.05 499200.00 105/31.05.06/Br-I 18.08.06 P 393775.00
Imp of link lane by pdg CC and drainf rom Hr 228 to gali no 7 HR block Pul Pehladpur w.no. 64
M/s G.Pee.Const.Co.
Imp of lane by pdg CC from H.no. ERZ 540 to RZ 551 in gali no 22 Tuglakabad Ext w.no. 63.
M/s Ganoati Const.
Imp of lane by Pdg CC and Drain in Gali no 5 and link lane from H.no. 218 to Tube well in HR block Pul Pehlad pur w.no. 64 CZ
418/14.03.06/EE(Br.)-II
M/s Ashoka Contractor.
Imp of laneby pdg CC and Drain from Sh Neki Hs Bazar Mohalla to Sh Tekream hs in Lal Dora Village Tugakabad Village in w.no. 63 CZ
M/s S.V.K.Const Co.
Imp oflane by pdg CC from H.no. HR 96 to HR 229 in Glai no 04 HR block, Pul Pehlad pur, w.no. 64 CZ
M/s Dwarka Parsad Goyal.
Const of Drian in Gali no 5 (LHS) Tuglakabad Ext no 63 CZ
M/s Ajay Associates.
Imp of lane by pdg CC near Sardar Kashmir Hs, Braham Pal hs in Jatav Mohalla Lal Dora Village Tugakabad Village in w.no. 63 CZ
M/s Sunil Const.
Imp of lane by pdg CC from Sh Chote Ram hs to sh Vijay al hs in Churiya Mohalla Lal Dora Village Tugakabad Village in w.no. 63 CZ
M/s Sona Consallants & Contractors
Imp of lane by pdg CC I link lane and back lane of gali no 15 Tuglakabad Ext w.no. 63
M/s L.Gee. Const.Co
Imp of laen by pdg CC and Drain from Somchand hs to Vijay hs in jatav Mohalla Lal Dora Village Tugakabad Village in w.no. 63 CZ
M/s Ravi Gupta
Const of FP and p/L CC on road Side LIG & Janta flats road RHS in Pul Pehlad pur w.no. 64. CZ
M/s M.K Builders
Const of FP on 60' Rd (RHS) in HR block Pul Pehlad pru W.no. 64
M/s M.K Builders
P/l CC on road side bersm LHS on 60' rd HR block Pul Pehlad pur w.no. 64 C Z
M/s A.D Const.Co
Imp of approach rd of Tughlakbad vill near Bus Stand by pdg Metalling and Premixing in W>no. 63 CZ
M/s Ajay Associates
Const of FP on 60' Rd LHS HR block Pul Pehladpur W.no. 64.
M/s A.D Const.Co
25 Civil Br-I 3.8.05 5.7.05 449000.00 130/01.06.06/EE(Br.)-I 09.06.06 P 375920.00
26 Civil Br-I 9.8.05 27.7.05 199893.00 289/21.10.05 24.10.05 P 191758.00
27 Civil Br-I 9.8.05 28.7.05 199794.00 288/21.10.05/EE(Br.)-I 28.10.05 09.06.06 198325.00
28 Civil Br-I 2.8.05 9.8.05 198437.00 314/27.10.05/EE(Br.)-I 29.10.05 P 194927.00
29 Civil Br-I 2.8.05 12.8.05 199725.00 305/27.10.05 31.10.05 20.12.05 199440.00
30 Civil Br-I 31.8.05 27.7.05 499800.00 497/27.03.06/EE(Br.)-I 04.04.06 P 313610.00
31 Civil Br-I 03.10.05 20.09.05 676400.00 495/27.03.06/EE(Br.)-I 14.08.06 12.12.06 427464.00
32 Civil Br-I 05.10.05 09.09.05 199788.00 340/21.12.05/EE(Br.)-I 28.12.05 08.04.06 199688.00
33 Civil Br-I 05.10.05 09.09.05 199938.00
34 Civil Br-I 16.11.05 29.10.05 199569.00 339/21.12.05 28.12.05 22.02.06 198525.00
35 Civil Br-I 16.11.05 29.10.05 199939.00 356/23.12.05 28.12.05 P 194030.00
36 Civil Br-I 16.11.05 30.10.05 199716.00 343/21.12.05 29.12.05 20.02.06 190952.00
37 Civil Br-I 16.11.05 30.10.05 199966.00 337/21.12.05/EE(Br.)-I 28.12.05 21.03.06 199031.00
38 Civil Br-I 16.11.05 30.10.05 599500.00 571/9.03.07/EE(Br)-II 10.04.07 P 456696.00
I/R of B/wall of park by pdg Stone Grit wash plaster & MS Grill near 34A, Pkt A-21, Kalkaji Ex w.no. 63 CZ
M/s A.D Const.Co
Imp of lane by pdg CC in Gali no 5 Tughlakabad Ext w.no. 63 CZ
M/s L.Gee. Const.Co
Imp of lane by pdg CC near Amir Chand Hs and sh Ram Kumar Hs in Kuan Mohalla Lal Dora Village Tugakabad Village in w.no. 63 CZ
M/s Ganpati Const co.
Imp of service lane by pdg CC near flat no 76A, 66A, 31A, 9A, in Pkt -A-3, Kalkaji ext in .wno. 63.
M/s Plan UP Consts.
Imp of rd side berms by pdg interlocking tiles from Mandir to gate no 2 in pkt A 3, Kalkaji Ext w.nol 63 CZ
M/s R.K.Const.
P/L CC on road side bems (RHS) on 60' rd HR Block, Pul Pehladpur, W.no 64 CZ
M/s Devinder & Co.
Imp of lane by pdg C.C.in E Block Lal kuanW No 64 C/Zone
M/s Devinder & Co.
Imp of lane by pdg C.C.near G 80 G-72 A,G -74 & G-48 in G Block Lal kuanW No 64 C/Zone
M/s Ganpati Const co.
Imp of lane by pdg C.C. near Mangey Ram house (Kuan Mohella) and Tarifa house to Sh. P.K.house in Pandit Mohalla Lal dora Village Tughlakabud W No 63
Imp to alne by CC interlcokign paver near Sh. Chander Pal House Sh Firey Hous and Sh. Nebi House in Bhangar Mohalla in Lal Dora Village Tughkbad W.no. 63
M/s R.K.Const.
Imp of lane by pdg Drain of approach rd from MB road Tughlakabad w.n. 63
M/s Ajay Associates
Imp of lane by pdg CC fom Sh. Karam Hosue to Sh Dayanand House in Bangar Mohalla in Lal Dora Village Tughlakabad w.no. 63
M/s Sunil Const.
Const of drain from J-48/07 to Okhla rd in Tughlakabad Ext w.no 63
M/s S.S Engineers
Imp of lane by pdg CC in Gali no 26 Tughlakabad Ext w.no. 63 CZ
M/s Ganpati Const co.
39 Civil Br-I 18.11.05 9.11.05 199757.00 407/22.02.06/EE(Br.)I 01.03.06 03.10.06 199284.00
40 Civil Br-I 12.12.05 5.12.05 199855.00 354/23.12.05 24.12.05 21.01.06 193651.00
41 Civil Br-I 12.12.05 7.12.05 199224.00 358/23.12.05/EE(Br.)-I 03.01.06 24.01.06 194417.00
42 Civil Br-I 14.12.05 7.12.05 199801.00 351/23.12.05/EE(Br.)-I 27.12.05 P 158847.00
43 Civil Br-I 21.12.05 17.12.05 199876.00 352/23.12.05/EE(Br.)-I 30.12.05 14.07.07 199852.00
44 Civil Br-I 21.12.05 19.12.05 199779.00 350/23.12.05/EE(Br.)-I 30.12.05 P 187641.00
45 Civil Br-I 21.12.05 20.12.05 199785.00 347/23.12.05 30.10.05 16.01.06 192517.00
Imp of lane by pdg CC from Madhya Marg to shiv mandir Marg in Gali NO. 13, Tughlakabad Ext w.no. 63.
M/s R.K.Const.
Imp tomain approach road of v illage Tughlakabad from MB Road near Doongar House by pdg RMC in W.no. 63
M/s S.S.Engineers
Imp of Main approach rd of Thghlakabad villag from MB Road near Shiv Mandir by pdg RMC in W.no. 63.
M/s Ganpati Const co.
Im0 of lane by pdg CC near 1403, 14/39, 14/01 in Mkt Block No. 14 Dakshinpuri Ext W.no. 64
M/s Ajay Associates
Imp. Of main approach road of village Tughlababad from M.B Road near Sh.Leelu (S.T.D Shop) by pdy. R.M.C in W.no. 63/CZ
M/s L.Gee. Const.Co
Imp. Of main approach road of village Tughlababad from M.B road near Sr.sec. School Village Tughlababad road by Pdy. R.M.C in W.no.63/CZ
M/s Plan UP Consts.
Imp. Of main approach road of village Tughlababad from M.B road near Sh. Chandi Bidhnri house by Pdy. R.M.C in W.no.63/CZ
M/s Sunil Const.
Status Report of MLA,Sh.Ram Vir Singh Bidhuri, AC No. 36 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
2 Civil Br-I 6.6.05 5.5.05 199900.00 169/05.07.05 20.07.05 P 186408.00
5 Civil Br-I 6.6.05 5.5.05 198200.00 152/05.07.05 12.08.05 P 188125.00
6 Civil Br-I 6.6.05 5.5.05 199400.00 151/05.07.05 11.08.05 P 189304.00
9 Civil Br-I 7.6.05 5.5.05 573187.00 363/18.01.06 03.10.05 P 560213.00
11 Civil Br-I 10.6.05 27.5.05 167474.00 175/05.07.05 14.07.05 P 134045.00
13 Civil Br-I 10.6.05 27.5.05 183360.00 184/05.07.05 23.12.05 P 169414.00
16 Civil Br-I 10.6.05 27.5.05 169367.00 194/25.07.05 03.08.05 P 161201.00
17 Civil Br-I 10.6.05 27.5.05 180120.00 167/05.07.05 23.12.05 P 91755.00
19 Civil Br-I 10.6.05 27.5.05 181450.00 160/05.07.05 14.07.05 P 136591.00
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
P/L RMC from H.no. D1 to B 12/1 in village Harkesh Nagar in W.no. 66 CZ
M/s R.K.Const.Co
P/L RMC from Braham singh mari Hs to H.no. 163 in Vill The Khand in wno 66.
M/s L.G.Const.Co
P/L RMC from h.no. 163 tio 157 in vill Tehkhand in .wno. 66.
M/s A.K.Const.Co
Pdg Lyaing RMC from Telephoen exchange to pump hs in villag Tehkhand in w.no. 66.
M./s Dev Const.Co
Imp of D/system and back lane from flat no J 121 to J-140 in Pkt J , Sarita Vihar W>no. 65 (by pdg B/w & CC)
M/s Ajay Associates
Imp of D/system and back lane from flat no J 251 to J-280 in Pkt J , Sarita Vihar W>no. 65 (by pdg B/w & CC)
M/s Sona Consultant & Contractors
Imp to Drainge system and back lane from flat no J-203 to J 220 in Pkt J Sarita Vihar w.n. 65 CZ (By pdg B/w & CC)
M/s G.Pee Const.Co
Imp to Drainge system and back lane from flat no J-1 to J 60 in Pkt J Sarita Vihar w.n. 65 CZ (By pdg B/w & CC)
M/s Sona Consultant & Contractors
Imp to berm by pdg Inter lokcing tiles near G block Mkt in Pkt-G, Sarita Vihar, W.no. 65 CZ
M/s Ajay Associates
24 Civil Br-I 10.6.05 5.5.05 198200.00 166/5.7.05 25.7.05 P 187165.00
27 Civil Br-I 29.6.05 12.5.05 1691200.00 326/11.11.05 12.10.05 P 205928.00
28 Civil Br-I 29.6.05 12.5.05 2321595.00 389/11.11.05/EE(Br.)-I 12.05.06 P 2311246.00
30 Civil Br-I 22.7.05 5.7.05 198000.00 287/21.10.05/EE(Br.)-I 26.10.05 P 192634.00
39 Civil Br-I 06.03.06 13.02.06 1196115.00 201/28.08.06/Br-I 04.09.06 P 1185353.00
40 Civil Br-I 30.03.06 09.03.06 456480.00 240/29.09.06/EE(Br.)-I 06.10.06 P 444787.00
41 Civil Br-I 30.03.06 09.03.06 464576.00 289/10.11.06/EE(Br.)-I 16.11.06 P 453122.00
42 Civil Br-I 30.03.06 09.03.06 456251.00 241/29.09.06/EE(Br)-I 05.10.06 P 444852.00
43 Civil Br-I 30.03.06 09.03.06 456298.00 290/10.11.06/EE(Br.)-I 13.11.06 P 443664.00
P/L RMC from Ration Shop to Mavi Mohalla Chopal in village Tehkhand W.no. 66.
M/s Kuldeep Const co.
Imp of rod by pdg RMC from Tajpur vilalge to Shahshan Ghat in village Tajpur w.no. 65.
M/s M.K Gupta
Imp to rd by pdg RMC from Taj Pur village to Shamshan Ghat in village Tajpur in w.no. 65.
M/s Shri Gopal Goyal
P/L RMC from Middle school to STD Shop in village Tehkhand in w.no. 66 CZ
M/s R.K Const.
Imp. To lane from Transfarmer to G-46 and G-89 to Bhahwati Oil Shop by Pdg. R.M.C in Harkesh Nagar W.NO.66/CZ
M/s Dev Const.Co
Pdg. & Laying RMC near H.No. 60,280,105& near H.NO. 103,283 in Allaha Mohalla Village Tehkhand W.NO.66/CZ
M/s Dev Const.Co
Pdg. & Laying RMC in G-Block from H.NO. G-1 to G-14 & near G-50 in Harkesh Nagar W.NO. 66/CZ
M/s Dev Const.Co
P/L RMC from MC Primary School to Allaha Mohalla Chupal in Village Tehkhand W.NO.66/CZ
M/s Dev Const.Co
P/L RMC near H.NO.A-59,133 & 206 near Jagdish house in Allaha Mohalla Village Tehkhand W.NO.66/CZ
M/s Dev Const.Co
Status Report of MLA, Sh.Brahm Pal, AC No. 37 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XXX 20.7.05 1.6.05 328362.00 22.11.05 31.01.06 327326.00
2 Elect EE(E)-V 9.8.05 5.8.05 408908.00 21.02.06 17.03.06 344523.00
3 Elect EE(E)-V 9.8.05 31.7.05 407946.00 04.01.06 09.02.06 325720.00
4 Elect EE(E)-V 9.8.05 28.7.05 407946.00 06.01.06 10.02.06 335302.00
5 Elect EE(E)-V 9.8.05 26.7.05 409870.00 21.01.06 18.02.06 355078.00
6 Elect EE(E)-V 9.8.05 4.8.05 408465.00 05.01.06 11.02.06 338237.00
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Imp of foot path and road side berms on Khudi ram Bose Marg by pdg c.c. pav. From Chilla Chowk to Pdt.-II Gate Mayur Vihar PH-I
in Ac-37/67
88/08.11.05/EE-XXX M/s P.K Builder
P/o boring with submersible pump set in Mayur vihar Ph-1 Pkt-III Pkt-v Green belt near Raghunath mandir and T.P block-4 Mpl park
under Sh.S Zone
221/20.02.06/EE(E)-V
M/s HL-Tech
Electriclas
P/o boring with submersible pump set in T.P. block 30 entra middle park Chilla Chowlk
park Mayur vihar Ph-1 Pkt-2.&DDA flat Chilla under Sh.S Zone
126/03.01.06/EE(E)-V
M/s Khana Sales
Corporation
P/o boring with sumbersible pump set in T.P block 2,7, and 10 mpl park under Sh.S Z.
132/04.01.06/EE(E)-V
M/s ACE Engineers
BureauP/o boring with submersible pump set in T.P
vlock 3,16 and Mahila park under Sh. S Zone 186/20.01.06/EE(E)-
V M/s Repair
Shop
P/o boring with submerssible pump set in T.P block 22,27, and 30 extra Mpl park under Sh.
S Zone
130/04.01.06/EE(E)V
M/s Vinaya Kam
Enginers & Traders.
7 Elect EE(E)-V 25.8.05 30.7.05 407946.00 17.02.06 25.05.06 333787.00
8 Civil XXX 30.8.05 20.7.05 265700.00 23.12.05 30.06.06 265700.00
9 Civil XXX 30.8.05 20.7.05 376247.00 15.02.06 17.06.06 376247.00
10 Civil XXX 30.8.05 15.6.05 1724469.00 12.10.07 1724469.00
11 Civil XXX 30.8.05 17.6.05 1846603.00 12.10.07 1094664.00
12 Civil XXX 2.9.05 17.5.05 1640641.00 12.05.06 01.09.06 1640641.00
13 Civil XXX 08.03.06 17.06.05 415130.00 31.08.06 18.01.07 414720.00
14 Civil XXX 08.03.06 15.09.05 1521802.00
74/27.09.06/EE-XXX 03.10.06 06.12.06 1506575.00
P/o boring with submerisble pump set at mpl park in Mayur vihar ph-I pkt-III opp H.No
411,441 and 359 under sh.S Zone
205/10.02.06/EE(E)-V
M/s M.J Electricals
& Electronics
Imp of lane by pdg c.c pav from 19 B to Mazar near H.No 181 and const of drain from H.NO
19 B to B-9 in kotla vill
109/14.12.05/EE-XXX
M/s Bansal Brothers
Const of drain opp H.NO 381/80 near Chilla village in W.no-67/37 Sh.S
158/06.02.06/EE-XXX
M/s Sharma & Sharma
Const.Co
Imp of stg of road by dense carpeting from block no 25/481, to 13/30 24/280 to 24/231
21/481 20/30 ,20/280 to 20/231 and 19/481 to 19/30 in W.No 67/37 Trilok puri Sh.S
26/03.05.06/EE-XXX M/s Vinod Kumar
Imp /stg of road by pdg dense Carpeting from block no 31 to 36 (Wireless) road in w.no
67/37 Trilok puri Sh.S
26/03.05.06/EE-XXX M/s Vinod Kumar
Imp of lane by pdg drainage system from H.No. 480 to 461 31 to 60,61 to small park
110 to small park 125 to 111,126 to 140 160 to 141 161 to 180 181 to Small park 210 to small park 230 to 211,230 410 to 391 , 411 430 431 to Small park 460 to small park 280 to 251 281 to 310 and 311 to small park in
block in 5 trilok puri W.no 68 Sh.S Zone
25/01.05.06/EE-XXX M/s Vijay Const.Co
Imp of lanes by pdg. C.c pcv ment from Dheer Singh house to Hardas Singh house along
Gyan house and limks in Village Dallu pure in W.no 68 Sh.S zone
47/23.08.06/EE-XXX M/s Pooja Enterprises
Imp of lanes pdg drianges sysytems from H.NO. 15 to 286, 16 to 285, 45 to 261, 46 to
small park, 70 to 241, 240 to 231, 71 to 80, 70 to 81, 230 to 221, 211 to 250, 100 to 61, 91 to 220, 115 to small park 116 to small park, 145
to 176, 146 to 175 in Block 9 in Trilokpuri W.NO 68 Sh.S zone M/s Satish
Budhiraja
15 Civil XXX 08.03.06 15.09.05 1265144.00
76/11.10.06/EE-XXX 23.10.06 08.12.06 1259413.0016 Civil XXX 08.03.06 20.06.05 3758900.00 89/01.10.07/EE-XXX
24.04.08 05.05.08 3758900
Imp of lanes by pdg. Drainrgs system from H.NO 1 to 30,31 to 60,61 to small park , 110 to small park, 125 to small park, 126 to small
park, 141 to 160, 161 to 180, 181 to small park, 210 to small park, 211 to 230, 231 to small park, 360 to small park 375 to small park, 411 to 430, 431 to small park, 460 to
small park, 461 to 480 & 481to 500 in H.NO. 18 Trilok puri W.no. 68 Sh.S zone M/s Satish
BudhirajaImp /stg of road by pdg dense Carpeting from block no26/30 to 36/481, 27/231 to 35/280,
28/30 to 34/473, 29/231 to 33/281, 33/481 to Sulabh Sauchalya, 30/231 to 32/281 and 30/30 to 32/28 in W.no 67/37 Sh.S zone
M/s Asian Resurfacing of road rpad ageny pvt. Ltd.
Status Report of MLA, Sh.Amrish Singh Gautam, AC No. 38 2005-06
S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XXX 19.9.05 16.8.05 457334.00 10.03.06 24.05.06 368718.00
2 Civil XXX 19.9.05 16.8.05 227871.00 17.03.06 29.05.06 210331.00
3 Civil XXX 19.9.05 12.8.05 474177.00 31.03.06 07.06.06 471108.00
4 Civil XXX 19.9.05 12.8.05 314359.00 161/17.02.06/XXX 24.02.06 26.05.06 314359.00
5 Civil XXX 19.9.05 12.8.05 453397.00 31.03.06 28.06.06 453397.00
6 Civil XXX 19.9.05 12.8.05 531505.00 156/06.02.06/XXX 24.12.06 07.04.06 531505.00
7 Civil XXX 19.9.05 12.8.05 249955.00 01.04.06 06.06.06 249955.00
8 Civil XXX 19.9.05 16.8.05 495847.00 24.06.06 10.01.07 472061.00
9 Civil XXX 23.9.05 12.8.05 977107.00 30.04.06 27.07.06 967095.00
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Imp of lane by pdg c.c. near H.No 245 & 317 in pocket E. Mayur Vihar Ph-II
AC38/69 Sh.S
164/02.03.06/EE-XXX
M/s H.L Puri & Sons.
Imp of lane by pdg c.c. & drain near H.No 241 & opp Kabristan in patpar Ganj Vill in
AC-38/69 Sh.S
178/10.03.06/EE-XXX
M/s Satish Budhiraji
Imp of drain from H.NO 379 to 544 in vill Gharoli W-70 A
171/10.03.06/EE-XXX
M/s Vijay Const.Co
Const of B/wall in block w no-2 near Bus Stand & Imp of green belt in front of mkt of block W no-3 in Khichripur R/ C W-70
Sh.S
M/s Satish Budhiraji
Imp of lane by pdg c.c. pav in Mkt. Of block no 3 & 5 and pdg M.S crossing in block no 345 in Khichripur R/C W-70 B
Sh.S
203/21.03.06/EE-XXX
M/s Satish Bhudhiraji
Imp of park near H.NO 14/110 and 14/141 in block no 14 and near H.NO 12/181 in
block no 12 in Kalyanpuri W-70 Sh.S
M/s Satish Budhiraja
Imp of lane by pdg c.c. pav in market of block no 9 and from mother dairy to
maindir along khichripur road in block no 9 r/c Kichripur W-70 Sh.S
170/10.03.06/EE-XXX
M/s Vijay Const.Co
Imp of drainage system of Patparganj road infront of E block pandav nagr in AC-
38/69 in Sh.S
30/15.06.06/EE-XXX
M/s Darshan
Singh Gujral
Const of walkway from H.NO B-514 to 1362 in central park of Gharoli Dairy from
in 70 A Sh.S
17/21.04.06/EE-XXX
M/s Narendra
Const.
10 Civil XXX 23.9.05 16.8.05 1257253.00 30.03.06 17.07.06 1252707.00
11 Civil XXX 23.9.05 16.8.05 1088888.00 12.05.06 P 1081160.00
12 Civil XXX 30.9.05 12.8.05 781651.00 31.03.06 28.06.06 781490.00
13 Civil XXX 09.03.06 04.12.05 335655.00 17.04.07 11.06.07 305655.00
14 Civil XXX 14.03.06 09.12.05 395739.00
20.01.07 30.03.07 395739.0015 Civil XXX 14.03.06 09.12.05 260980.00 01.09.06 05.11.06 260980.00
16 Civil XXX 14.03.06 09.12.05 449170.00
26.12.06 12.06.07 449169.0017 Civil XXX 14.03.06 09.12.05 233958.00
22.11.06 17.05.07 233958.0018 Civil XXX 14.03.06 09.12.05 182605.00 10.01.07 28.01.08 167065.00
19 Civil XXX 14.03.06 09.12.05 296943.00 30.09.06 26.12.06 296943.00
Imp of drain from chilla Chwok to kukreja Nirsing home in Acharya Niketan in AC-
38/69 Sh.S
199/21.03.06/EE-XXX
M/s Narendra
Const.
Imp of outfall drain in pocket D Mayur vihar Ph-II in AC-38/69 Sh.S
19/21.04.06/EE-XXX
M/s Vijay Const.Co
Imp of drain from state Bank of patialx to Laxmi Tent hs in Kondli ( R) vill w.no 70 A
200/21.03.06/EE-XXX
M/s Narendra
Const.
Imp of drain from Transfarmer to X-ing of Gheroli Vill (LHS) Ac-38/70A
46/23.08.06/EE-XXX
M/s Puri Builders & Associate
s
Imp of side berms of road by pdg cc from Jeewan Anmol Hospital to Qubristan in Ac-38/69
40/23.08.06/EE-XXX
M/s Ram Gopal Sharma
Imp of lanes by pdg. Cc near community hall at Kichripur village in Ac-38/69
42/23.08.06/EE-XXX
M/s Puri Builders & Associate
s
Imp of lanes by pdg. C.C.A arain opp. MC by School and it linkes in village Khichripur Ac 38/69
41/23.08.06/EE-XXX
M/s Puri Builders & Associate
s
Imp of culvert opp. DDA Market in Mayur Vihar Ph-II Ac-38/69
43/23.08.06/EE-XXX
M/s Puri Builders & Associate
s
Imp of culvert near Radha Swami satrang Bhawan Mayur vihar Ph-II Ac-38/69
51/23.08.06/EE-XXX
M/s Raj pal Bharti
Imp of lane near Sulabh Sauchalya by pdg cc and drain in Village Khichripur Ac-38/69
44/23.08.06/EE-XXX
M/s Puri Builders & Associate
s
20 Civil XXX 14.03.06 09.12.05 386893.00 13.03.07 20.09.07 386893.00
21 Civil XXX 23.03.06 04.12.05 719531.00 07.10.06 31.01.07 719531.00
22 Civil XXX 23.03.06 04.12.05 682810.00 11.10.06 19.01.07 682810.00
23 Civil XXX 23.03.06 04.12.05 626332.00 27.11.06 31.01.07 626332.00
24 Civil XXX 23.03.06 04.12.05 541123.00 02.12.06 06.03.07 541123.00
25 Civil XXX 23.03.06 04.12.05 632674.00 21.09.06 14.12.06 592686.00
Imp of road by pdg M/P CC and drain from D-40 to c-2 in Acharya Niketen Ac-38/69
45/23.08.06/EE-XXX
M/s Puri Builders & Associate
s
Imp of lanes by pdg. CCA drain from H.NO B-627 to B634, 490 to 491 1257 to 1262 A-25 to park 1255 to 1258 B-137 to 144 in Gheroli Dairy Farm Ac-38/70 A Sh(S) zone
73/27.09.06/EE-XXX
M/s Narendra
Const.
Imp of side berms by pdg cc Adrash from H.No A-698 to A-1312 Gheroli Dairy Farm in Mayur Vihar Ph-III W.no 70A SH.(S) zone
67/21.09.06/EE-XXX
M/s Sanjay Builders
Imp of lanes by pdg CC and drain from National Harward School to Kishan Sharma house, Mahesh house to Ajju house in Pandit Mohalla and Ram Chetter house to Devi Ram house in Kondli Village in Ac-38/70 A Sh(S) zone
102/17.11.06/EE-XXX
M/s Narendra
Const.
Imp of open surface by pdg CCA drain near H.NO 13/180, 4/61, 9/236 A14/180 in Khichripur Kalyan puri Ac-38/70 B Sh(s) zone
115/22.11.06/EE-XXX
M/s Satish & Bros.
Imp of open surface by pdg CCA drain near H.NO 16/481, 19/150, 11/440 & B.NO 17 near Sulabh Sauchaly Kalyan Puri Ac-38/70 Sh(S) zone
69/21.09.06/EE-XXX
M/s Vijay Const.Co
Status Report of MLA, Smt.Meera Bhardawaj, AC No. 39 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Elect XI 6.12.05 21.10.05 522300.00 452/17.03.06/EE-XI 26.03.06 24.06.06 377072.00
2 Elect XI 6.12.05 21.10.05 556300.00 450/17.03.06/EE-XI 22.03.06 23.06.06 402811.00
3 Elect XI 6.12.05 21.10.05 588550.00 451/17.03.06/EE-XI 26.03.06 24.06.06 427142.00
4 Elect XI 6.12.05 21.10.05 567500.00 106/26.06.06/EE-XI 29.06.06 23.10.06 422614.00
5 Elect XI 15.12.05 5.12.05 699600.00 468/22.03.06/EE-XI 01.04.06 24.06.06 524325.00
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Imp to gali from H.No 647 to R 558 and H.No 410 and adj H.No 554 and 195 by pdg c.c. & drain in Mandawali Fajal pur in C-72 /AC-39
M/s Singhala Const.Co
Imp to gali from H.No 218 to R 129/1 130 to 14, H.No 95 to 228 and adj H.No 34 A , 35 by pdg c.c. & drain in Mandawali Fajal pur in
C-72 /AC-39
M/s Maneet
Const.Co
Imp to Gali by pdg c.c. & drain from H.No A/24 , A/198 to 39/A, A/43 to A/44 in
Mandwal, Fazal pur in c-752/AC-39 Sh (S)
M/s Maneet
Const.CoImp to gali by pavement and drain from
Buddha Marg to H.No 348 A., H.Ni A-362 to 318 , adj H.No 1324,A-1599 , 209 and H.No A217/3 to 217/9 B in Mandawali Fazal pur C-
72 AC-39 Sh (S)
M/s Aspiration Builders
Imp to gali from H.No A-117 to A-140 , A-65 A-58 to A-60 , A-22 to A-56 , A-53 to A-54 and
A-38 to A-50 by pdg c.c. and drain in Mandawali fazal pur in (No-72/AC-39
M/s Suresh Enterprises
Status Report of MLA, Sh.Ashok Kumar Walia, AC No. 40 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XIV 2.8.05 31.5.05 311015.00 221/30.8.05/XIV 8.9.05 23.11.05 310625.00
2 Civil XIV 2.8.05 31.5.05 245316.00 230/12.9.05/XIV 23.9.05 12.12.05 244248.00
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Imp of drainage system and berm of lane from HNO 7/197 to main Nallah in block 7
& 5 in Geeta coloney C-73 AC-40
M/s Bacchan Const co
Imp of lanes by pdg drain and c.c adj. HNO 5/210 and 7/156 in Geeta coloney
C-73/AC-40
M/s Lalit Asso.
3 Civil XIV 2.8.05 31.5.05 334900.00 20.03.06 15.06.06 233472.00
4 Civil XIV 2.8.05 31.5.05 425000.00 21.10.05 27.09.06 356996.00
5 Civil XIV 2.8.05 31.5.05 188347.00 242/19.9.05/ XIV 22.9.05 7.11.05 187927.00
6 Civil XIV 2.8.05 17.5.05 232400.00 413/28.12.05/XIV 10.01.06 01.03.06 225103.00
7 Civil XIV 2.8.05 18.5.05 223910.00 281/10.10.05/XIV 14.10.05 16.12.05 222096.00
8 Civil XIV 2.8.05 18.5.05 449200.00 287/18.10.05XIV 20.10.05 17.12.05 429744.00
9 Civil XIV 2.8.05 18.5.05 445000.00 261/30.9.05/XIV 1.10.05 21.11.05 444814.00
10 Civil XIV 2.8.05 18.5.05 285000.00 288/18.10.05/XIV 20.10.05 17.12.05 271214.00
11 Civil XIV 2.8.05 18.5.05 169438.00 22.09.05 25.11.05 165772.00
12 Civil XIV 4.8.05 18.5.05 480000.00 262/30.9.05/XIV 1.10.05 21.11.05 455818.00
13 Civil XIV 2.8.05 18.5.05 224979.00 21.09.05 15.12.05 220711.00
Imp of lanes by pdg c.c. & drain adj. To HNO 15/57 in block 15 Geeta Coloney in
C-73/AC-40
473/27.01.06/EE-XIV
M/s Kamal Enterprise
s
Imp of lanes by pdg RMC and drain adj. To HNO 21 to 15 in west Laxmi Market
shastri Nagr in C-73/AC-40
290/18.10.05/EE-XIV
M/s Maneet
Const.Co
Imp of side berm adj to HNO 15/42 and Culverts of service lane in block 15 Geeta
Coloney in c-73/AC-40
Ms Anuj Enterp
Imp of back lane by pdg RMC near H.No 156 in Bank enclave C-74 Sh.S
M/s Maneet
Const.Co
Imp of lane near H.No-9 in K- block by pdg D/s and c.c. in Laxmi Ngr C-74/41
M/s Sharma & Sharma
Const.Co
Imp of lane by pg D/s and RMC near H.No F-40 back side of state bank of India Mangal Bazar in Laxmi Ngr C-74
Ms Singhlaji Const Co
Imp of lane by pdg RMC in bank enclave near H.NO 285 in Laxmi Nagr C-74
M/s Subhash Kr Goyal
Imp of lane by pdg RMC and D/s near H.No F-234 B and near F-90 A in Mangal
Bazar in Laxmi Nagr C-74
M/s Singhlaji Const co
Imp of lane by pdg c.c & d/s near H.NO 8 in east end enclave in Laxmi Ngr Sh.S C-
74
258/22.09.05/EE-XIV
M/s Dhanesh
Mittal
Imp of back lane near H.NO 10 and along park by pdg R.M.C in Bank enclave Laxmi
Nagr C-74/40
M/s Subhash Kr Goyal
Imp of D/s & pdg c.c. in the links pf gali no 6 and damagd portion of c.c. in main gali no 6 in D- block Laxmi Ngar C-74/41
233/24.09.05/EE-XIV
M/s Uday Const.Co
14 Civil XIV 11.8.05 28.7.05 380000.00 20.03.06 28.04.06 282587.00
15 Civil XIV 11.8.05 28.9.05 310000.00 16.01.06 03.04.06 230990.00
16 Civil XIV 11.8.05 28.9.05 326977.00 396/21.12.05/XIV 13.01.06 04.03.06 326941.00
17 Civil XIV 11.8.05 28.9.05 294541.00 20.11.05 02.03.06 294084.00
18 Civil XIV 6.9.05 2.8.05 429300.00 25.01.06 24.04.06 291453.00
19 Civil XIV 6.9.05 2.8.05 216782.00 15.12.05 11.08.06 140262.00
20 Civil XIV 6.9.05 2.8.05 557300.00 414/28.12.05/XIV 09.01.06 03.04.06 557300.00
21 Civil XIV 6.9.05 2.8.05 259825.00 02.02.06 20.04.06 249380.00
22 Civil XIV 6.9.05 2.8.05 480000.00 02.02.06 24.03.06 357551.00
23 Civil XIV 8.9.05 28.7.05 199976.00 311/XIV/ 9.11.05 11.11.05 14.12.05 199710.00
24 Civil XIV 8.9.05 26.8.05 198618.00 05.01.06 03.03.06 192785.00
Imp of lane by pdg RMC near H.No E-24 and damaged poriton of c.c. near H.No B-
30 Jawahar park Laxmi Ngr C-74/40
477/27.01.06/EE-XIV
M/s M.G.Goel Const.Co
Imp of lane by pdg RMC near H.NO C-2 and Link Aurna park Laxmi Ngr C-74/40
407/27.12.05/EE-XIV
M/s Saraswati Const.Co
Imp of d/s and c.c. in gali no 3 & damaged portion of c.c in gali ni 4 Mohan park
Laxmi Nagr C-74/40
M/s N.P.A Engg. & Const
Imp of side link of gali no 12 by pdg RMC and D/s in Ramesh park Laxmi Nagr AC-
40
324/18.11.05/EE-XIV
M/s M.G Const.Co
Imp of gali no no-11 by pdg c.c. and drain adj to H.NO 15 &12 in New Lahore Sastri
Ngr in C-73/AC-40
440/16.01.06/EE-XIV
M/s Pankaj
Const.Co
Imp to lane by pdg c.c & drain from H.NO 125 to 136 and link in New Lahore Sastri
Ngr in C-73/AC-40
344/01.12.05/EE-XIV
M/s Lalit Asso.
Imp of Dayanand Marg by pdg M/P from H.NO 2/5 Geeta coloney to Jheel chowk
culvert in C-73/40
M/s Wadhawan & Co.
Imp of lanes by pdg c.c. and drain adj to H.No-9,5 & 30 in West Laxmi market
Sastri Ngr in C-73/41
427/13.01.06/EE-XIV
M/s Vikas Associate
s
Imp of drainage system and berm of Satnam road from HNo -760 to 400 Jheel
Khuranja C-73 AC-40
439/16.01.06/EE-XIV
M/s Lalit Asso.
Imp of the Nerrow links in Krishan Kunj by pdg c.c. & D/s adj to main road Krishna
Kunj in Laxmi Ngr Ac-40/74
M/s Satish & Bro
Imp of D/s & pdg c.c in lane near H.NO 144 J and K block Laxmi Nagr AC-40/74
403/26.12.05/EE-XIV
M/s Kamal
Enterprises
25 Civil XIV 8.9.05 26.8.05 217923.00 03.01.06 25.03.06 216432.00
26 Civil XIV 20.10.05 8.10.05 199000.00 09.12.05 22.07.06 198537.00
27 Civil XIV 20.10.05 8.10.05 198000.00 349/01.12.05/XIV 12.12.05 09.02.06 198000.00
28 Civil XIV 20.10.05 8.10.05 182647.00 347/01.12.05/XIV 12.12.05 03.02.06 182468.00
29 Civil XIV 20.10.05 8.10.05 150000.00 348/01.12.05/XIV 22.12.05 08.02.06 148974.00
30 Civil XIV 20.10.05 8.10.05 188000.00 08.12.05 11.03.06 187603.00
31 Civil XIV 21.1.05 10.1.05 290000.00 02.03.06 20.04.06 290000.00
32 Civil XIV 07.02.06 16.01.06 199233.00 08.03.06 17.06.06 199100.00
33 Civil XIV 07.02.06 16.01.06 194657.00 09.03.06 28.06.06 194601.00
34 Civil XIV 07.02.06 16.01.06 199987.00 20.03.06 02.05.06 199911.00
35 Civil XIV 07.02.06 16.01.06 199726.00 29.03.06 05.06.06 199726.00
Imp of d/s and c.c. in D block near H.No 369 Laxmi Nagr C-74/40
412/28.12.05/EE-XIV
M/s Singhla
Const co
Imp of d/s lane near H.No 39 and poroviding c.c. bet ween gali no 1 & 4 in I
block in W.no-74AC-=40
341/01.12.05/EE-XIV
M/s Gaurav
Const.Co
Imp of gali no 5,I block by pdg c,c, in Laxmi Ngr Ac-40/74 Sh.S
M/s Deepak Kumar
Imp of d/s and pdg c.c. in lane near H.No 147 in I block Laxmi Ngr AC-40/74
M/s Vijay Const.
Imp of Gurudwara road by pdg c.c. berms opposite I block Laxmi Nagr AC-40/41
M/s Bharat
Bhushan
Imp of D/s of gali no 5 in Mohan park Laxmi Nagr C-40/74
350/01.12.05/EE-XIV
M/s Prinkle
Const.Co
Imp of lane by pdg RMC ner H.No 34 to 88 Kishan Kunj Maxmi Ngr AC-40/74
540/02.03.06/EE-XIV
M/s Sarasweth Const.Co
Imp of Gali no.6 J.Exts by pdg CC in Laxmi Nagar Ac 40/74 Sh(S) zone
532/28.02.06/EE-XIV
M/s Wadhawan & Co.
Imp of gali no.6 pdg D/s in Ramesh park Laxmi Nagar Ac 40/74 Sh(S) zone
535/28.02.06/EE-XIV
M/s Baldev
Raj Gupta
Pdg D/S Ac.C in J-block near NO 72 Laxmi Nagar AC-40/74 Sh(S) zone
530/28.02.06/EE-XIV
M/s Bhagwan Dass Aco.
Pdg RMC & D/S in gali no. 2A & 4 in D block, Laxmi Nagar Ac-40/74 Sh(S) zone
653/28.03.06/EE-XIV
M/s Prem Kumar
36 Civil XIV 16.02.06 16.01.06 339310.00 30.06.06 12.08.06 339027.00
37 Civil XIV 16.02.06 16.01.06 257687.00 29.05.06 25.07.06 257687.00
38 Civil XIV 16.02.06 16.01.06 280000.00 14.06.06 11.08.06 231007.00
39 Civil XIV 06.03.06 16.01.06 347697.00 29.05.06 25.07.06 347623.00
40 Civil XIV 22.03.06 12.02.06 431429.00 26.06.06 21.08.06 430228.00
41 Civil XIV 22.03.06 12.02.06 560000.00 04.07.06 12.09.06 397284.00
42 Civil XIV 22.03.06 12.02.06 460000.00 26.06.06 07.08.06 354647.00
43 Civil XIV 22.03.06 12.02.06 405401.00 02.07.06 11.09.06 403144.00
44 Civil XIV 27.03.06 16.01.06 597600.00 09.05.06 03.07.06 597600.00
Imp of D/S and pdg C.c in Lalita park gali no.9 and link in Laxmi Nagar Ac-40/74
16/04.05.06/EE-XIV
M/s Ajay Associate
s
Imp of LHS D/S opp. Anarwali Masjid in J-exts and pdg CC in link near H.NO 3/116
and 3/129 in Laxmi Nagar Ac-40/74
32/26.05.06/EE-XIV
M/s Bacchan Const co
Imp of D/S in gali no.4 J-Exts Laxmi Nagar AC-40/74
17/04.05.06/EE-XIV
M/s Ajay Associate
s
Imp to D/s and pdg CC in gali no.8 and CC neaar H.NO 7/317 in Lalita park,
Laxmi Nagar Ac-40/74
03/25.04.06/EE-XIV
M/s Sarasweth Const.Co
Imp of chowk by pdg are in AC.c pavement adjacent to H.NO 3/48 and
3/91 in block 3 Geeta Colony in Ac-40/73
35/08.06.06/EE-XIV
M/s Suresh Kumar Goel
Imp of Chowk by pdg drain and CC pavement adjacent to H.NO 3/39 and 3/100 in block 3 Geeta Colony in Ac-
40/73
33/08.06.06/EE-XIV
M/s Singla Const.Co
Imp of side lane by pdg CC pavement from Telephone Exchange to H.NO 512/2
in Jheel Khuranja Ac-40/73
34/08.06.06/EE-XIV
M/s Adrash
Const.Co
Imp of lane by pdg drain and CC from H.NO 13/254 to 13/230 in block 13 Geeta
colony Ac-40/73
36/08.06.06/EE-XIV
M/s Vikas Associate
s
Imp of D/S and pdg R.M.C in the link road between main bazar Laxmi Nagar and
P.P.G road in Laxmi Nagar C-74/40
15/02.05.06/EE-XIV
M/s P.S Const.Co
Completed 0.00
In Prog. 0.05
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
3.89
Present Position
Liabilities Rs.lacs
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.02
Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.003.96
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Present Position
Liabilities Rs.lacs
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
4.90
In Prog. 1.49
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.00
Completed 0.00
Completed 0.00
In Prog. 0.92
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.007.31
Present Position
Liabilities Rs.lacs
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 1.73
In Prog. 1.06
Completed 0.00
In Prog. 0.04
Completed 0.00
Completed 0.00
In Prog. 0.66
Completed 0.00
Completed 0.00
In Prog. 0.05
In Prog. 0.07
In Prog. 0.02
Completed 0.00
In Prog. 0.03
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.05
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.26
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.003.98
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Present Position
Liabilities Rs.lacs
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
0.97234
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
0.96242
0.96242
0.96242
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
1.98712
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
In Prog. 0.21991
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
Completed 0
1.996
Completed 0
000000000000000000000
8.06263
Completed 0.00
In Prog. 1.45
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 2.88
Completed 0.00
Completed 0.00
Completed 0.00
Present Position
Liabilities Rs.lacs
In Prog. 0.06
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.11
In Prog. 1.33
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 1.92
Completed 0.00
In Prog. 1.05
In Prog. 0.73
In Prog. 0.08
Completed 0.00
In Prog. 0.04
Completed 0.00
In Prog. 1.86
Completed 0.00
Completed 0.00
2.00
Completed 0.00
In Prog. 0.06
Completed 0.00
Completed 0.00
In Prog. 1.43
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 0.41
Completed 0.00
In Prog. 0.12
Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
15.52
In Prog. 0.13
In Prog. 0.10
In Prog. 0.10
In Prog. 0.13
In Prog. 0.33
In Prog. 0.14
In Prog. 0.08
In Prog. 0.88
In Prog. 0.45
Present Position
Liabilities Rs.lacs
In Prog. 0.11
In Prog. 14.85
In Prog. 0.10
In Prog. 0.05
In Prog. 0.11
In Prog. 0.12
In Prog. 0.11
In Prog. 0.11
In Prog. 0.13
0.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.00
18.05
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Present Position
Liabilities Rs.lacs
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
In Prog. 7.52
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.007.52
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Present Position
Liabilities Rs.lacs
Completed 0.00
In Prog. 0.08
Completed 0.00
In Prog. 0.30
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
0.000.00
0.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.38
Completed
Completed
Completed
Completed
Completed
Present Position
Liabilities Rs.lacs
0.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Completed 0.00Completed 0.00Completed 0.00Completed 0.00Completed 0.00
0.00Completed 0.00Completed 0.00Completed 0.00Completed 0.00
0.00Completed 0.00Completed 0.00
0.00
0.000.00
Completed 0.00Completed 0.00
0.00Completed 0.00Completed 0.00Completed 0.00Completed 0.00Completed 0.00Completed 0.00Completed 0.00Completed 0.00
0.000.000.00
Completed 0.00
Completed 0.00
Present Position
Liabilities Rs.lacs
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
Completed 0.00
0.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.00
deptt. deptt. deptt. deptt. Div. Div. Div. Div. Div. Div.
civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)
Status Report of MLA,ShArvindra Singh Lovely, AC No. 41 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XIV 8.7.05 20.4.05 335173.00 26.12.05 14.02.06 296292.00 Completed
2 Civil XIV 8.7.05 20.4.05 381106.00 20.09.05 08.11.05 371716.00 Completed
3 Civil XIV 11.7.05 27.6.05 156970.00 22.8.05 27.9.05 155477.00 Completed
4 Civil XIV 11.7.05 27.6.05 199975.00 22.8.05 25.10.05 199885.00 Completed
5 Civil XIV 11.7.05 27.6.05 199369.00 20.8.05 29.9.05 199278.00 Completed
6 Civil XIV 18.7.05 30.6.05 275515.00 25.10.05 19.01.06 268826.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Pdg C.c. pav& drainage in link from HNO 5514 to 5538 & link
near HNO 5517 to 5527 Seelam pur Village C-76/41 Sh.S.
306/09.11.05/EE-XIV
M/s Jitender Kumar
Imp the drainage system in gali from HNO 3741 to 3720 shanti
Mohalla C-76/41 Sh.S.
239/14.09.05/XIV
M/s Surender
Kumar Garg
Imp of depresred portion of Ashok gali by pdg C.C. pav. & D/S
inGandhi Nagar.
211/17.8.05/ XIV
M/s Satish & Bro
Imp of lane back side of Janta gali by pdg C.C. pav and D/S in
Gandhi Ngr. C-75/41
209/17.9.05/XIV
M/s Gajinder Kumar
Imp of Subhash road from XI/152 to IX /1267 by pdg C.C. Pav & D/s
in Gandhi Ngr. C-75/41.
208/11.8.05/XIV
M/s Rajesh Assoc.
Imp to lane near Satyanagreyan Mandir by pdg C.C pav and D/S
inGadhi Ngr. C-75/41
295/18.10.05/XIV
M/s Surender
Kumar Garg
7 Civil XIV 18.7.05 30.6.05 321423.00 20.09.05 21.11.05 313271.00 Completed
8 Civil XIV 18.7.05 30.6.05 555000.00 20.09.05 07.12.05 347042.00 Completed
9 Civil XIV 18.7.05 27.6.05 194931.00 22.8.05 5.10.05 194375.00 Completed
10 Civil XIV 18.7.05 30.6.05 234304.00 25.01.05 10.01.06 233884.00 Completed
11 Civil XIV 18.7.05 30.6.05 286888.00 20.09.05 21.12.05 277275.00 Completed
12 Civil XIV 18.7.05 30.6.05 366614.00 20.09.06 06.12.05 354556.00 Completed
13 Civil XIV 18.7.05 30.6.05 285059.00 20.09.05 21.11.05 277212.00 Completed
14 Civil XIV 18.7.05 30.6.05 212126.00 25.01.05 12.01.06 206888.00 Completed
15 Civil XIV 18.7.05 30.6.05 420632.00 25.10.05 24.01.06 406752.00 Completed
Imp to syam Gali and its lines by pdg C.C pav and D/S in Gandhi
Nagr.C-75/41
232/14.09.05/XIV
M/s Surender
Kumar Garg
Imp to lane near DAV School by pdg C.C pav and d/S in Gandhi
Ngr.
238/14.09.05/XIV
M/s Surender
Kumar Garg
Imp to Subhash road from IX/1271 to police port by pdg C.C.
pav & D/S in Gandhi Ngr.
212/17.8.05/XIV
M/s N.K.G Enterprise
is
Imp to d/s system of Gali no 5 Dharam pura from III link to Nallah
in Ghandhi Nagar c-75/41
296/18.10.05/XIV
M/s Surender
Kumar Garg
Imp to lane from Mahavir chowk to Subhash Mohalla road by pdg C.C. pav and d/s in Gandhi Ngr.
C-74
237/14.09.05/XIV
M/s Surender
Kumar Garg
Imp to Gyan Mohalla gali No 3 by pdg C.C pav and D/S in Gandhi
Ngr. C-75
236/14.09.06/XIV
M/s Surender
Kumar Garg
Imp to Dharma pura Gali no 3 from Iind link to Nalla by pdg C.C pav and D/s in Gandhi Ngr. C-75
235/14.09.05/XIV
M/s Surender
Kumar Garg
Imp to Seelampur gali no 10 & its link by pdg c.c. pav & D/s in
Gandhi Ngr.C-75
297/18.10.05/XIV
M/s Surender
Kumar Garg
Imp to Kailash Ngr gali no 16 by pdg C.C pav and d/s in Gandhi
Ngr.
298/18.10.05/XIV
M/s Surender
Kumar Garg
16 Civil XIV 18.7.05 30.6.05 256670.00 25.10.05 13.01.06 248834.00 Completed
17 Civil XIV 28.7.05 20.4.05 259400.00 21.9.05 P 197781.00 In Prog.
18 Civil XIV 28.7.05 20.4.05 176470.00 13.9.05 P 168169.00 In Prog.
19 Civil XIV 28.7.05 20.4.05 188480.00 16.8.05 26.9.05 187896.00 Completed
20 Civil XIV 28.7.05 20.4.05 163983.00 16.8.05 P 155018.00 In Prog.
21 Civil XIV 18.8.05 15.7.05 357478.00 24.11.05 19.12.05 339770.00 In Prog.
22 Civil XIV 18.8.05 15.7.05 411981.00 05.01.06 14.02.06 368060.00 Completed
23 Civil XIV 1.9.05 15.7.05 319629.00 06.12.05 13.02.06 287351.00 In Prog.
24 Civil XIV 1.9.05 15.7.05 346222.00 15.02.06 04.04.06 325879.00 Completed
25 Civil XIV 1.9.05 15.7.05 262700.00 15.02.06 31.03.06 151947.00 Completed
Imp to Dharma pura Extn. Gali no 1 by pdg C.C pav and d/S in
Gandhi Ngr C-75
299/18.10.05/XIV
M/s Surender
Kumar Garg
pdg c.c pav & drainage in gali near HNO 4792 & its link from
Seelam pur road to Nala Seelam pur village C-76/41.
222/30.8.05/XIV
M/s Vinod Const co
Pdg c.c. pav & & drainage in Harijan gali & link near HNO 4770
Seelam pur Village in C-76/41.
228/7.9.05/XIV
M/s Jai Chanda Asso.
Pdg c.c pave & drainage in link of Harijan gali near HNO 4767,4769 and near HNO 4782,4783 Seelam
pur Village .
203/11.8.05/IV
M/s Jai Chanda Asso.
Pdg c.c pav & drainage in link from HNO 5319 to 5333 and near
HNO 5538 Seelam pur Village.
204/11.8.05/XIV
M/s Jai Chanda Asso.
Pdg C.c. pav on Raghubar pura road C-76/41 Sh.SZ
327/23.11.05/XIV
M/s Atul Const.Co
pdg c.c pav and drainage in main road Ajeeh Ngr from M.C pry
School to Gali no -11 Ajeeh Nagar C-76/41
325/18.11.05/EE-XIV
M/s Vee-CEE
enterprises
Imp of drainage system in gali no 6 & its link near H.No 2653
Raghubar pura -II C-76/41 Sh.S
331/24.11.05/EE-XIV
M/s Atul Const.Co
Pdg c.c. pav and drainagy in gali no 1 & its link Raghubar pura -I C-
76/41 Sh.S Zone
358/07.12.05/EE-XIV
M/s Shree Associate
s
pdg c.c. pav & drainage in gali no 9 A from H.NO 4335 to 4314 Ajeet
Nagr C-76/41 Sh.S
375/13.10.05/EE-XIV
M/s Sunil Bhuteri
26 Civil XIV 1.9.05 15.7.05 269091.00 01.05.06 06.06.06 254774.00 Completed
27 Civil XIV 1.9.05 15.7.05 357051.00 14.02.06 04.04.06 342361.00 Completed
28 Civil XIV 2.9.05 22.8.05 583150.00 05.01.06 22.02.06 561535.00 Completed
29 Civil XIV 2.9.05 22.8.05 790200.00 03.05.06 10.07.06 771080.00 Completed
30 Civil XIV 2.8.05 30.6.05 194200.00 10.10.05 24.11.05 193478.00 Completed
31 Civil XIV 9.9.05 15.7.05 423200.00 16.12.05 9.1.06 422818.00 Completed
32 Elect EE(E)V 24.11.05 10.9.05 199677.00 27.02.06 08.03.06 193238.00 Completed
33
Civil
EEE_V
24.11.05 30.6.05 234987.00
20.03.06 07.06.06 223384.00 Completed
34
Civil
EEE_V
24.11.05 30.6.05 283705.00
22.02.06 20.05.06 281214.00 Completed
35
Civil
EEE_V
24.11.05 30.6.05 203968.00
568/10.03.06/EE-XIVM/s Atul Const.Co17.03.06 07.06.06 191684.00 Completed
Pdg c.c. pav & drainage in lane near H.NO 1734 , 1769, 1770 and
1798 Rajgarh coloney C-76/41 Sh.S
628/13.03.06/EE-XIV
M/s Shree Associate
s
Pdg c.c. pav & drainage in Tagore gali and its link near h.No 138,149
in Ram Nagar C-76/41
359/07.12.05/EE-XIV
M/s Shree Associate
s
Imp to Subhash Mohalla road by pdg RMC in Gandhi Nagr C-75/41
416/02.01.06/XIV
M/s Rajesh Assoc.
Imp to Seelampur road by pdg RMC in Gandhi Nagr C-75/41
01/25.04.06/EE-XIV
M/s Lalit Associate
s
Imp to lane from Dhavampura Gali no to Kailash Nagr gali no 16 by pdg c.c. pav and D/s in Gandhi
Ngr C-75/41
274/04.10.05/XIV
M/s R.P.Const
.Co
pdg c,c pav & drainage in gali no 12 & its inks in Raghubar pura -II
C-76/41
383/13.12.05/XIV
M/s Atul Const co
P/o 150 W HPSv fittings in Kaushil puri , Old Seekampur , New
Chand Mohalla Raghuverpura No-2 in Ac-41 Sh (s) Zone
230/27.02.06/EE(E)V
M/s Krishna Electric Works
Imp to Seelam pur gali no-11 by pdg c.c. pav & D/s in Gandhi Nagar in C-75/41
587/13.03.06/EE-XIV
M/s Prakash Builders
Imp to Seelam pur gali no-12 by pdg c.c. pav & D/s in Gandhi Nagar in C-75/41
500/15.02.06/EE-XIV
M/s Atul Const.Co
Imp to Seelam pur gali no 13 by pdg c,c, pav D/S in Gandhi Nagar C-75/41
36
Civil
XIV
24.11.05 30.6.05 230825.00
21.02.06 27.03.06 216355.00 Completed
37
Civil
XIV
24.11.05 30.6.05 239196.00
17.02.06 27.03.06 227636.00 Completed
38
Civil
XIV
24.11.05 30.6.05 225227.00
17.02.06 27.03.06 223195.00 Completed
39
Civil
XIV
24.11.05 30.6.05 300068.00
499/15.02.06/EE-XIVM/s Atul Const.Co22.02.06 28.04.06 288692.00 Completed
40
Civil
XIV
24.11.05 30.6.05 325346.00
511/17.02.06/EE-XIVM/s Atul Const.Co24.02.06 24.05.06 313982.00 Completed
41
Civil
XIV
24.11.05 30.6.05 309452.00
566/10.03.06/EE-XIVM/s Atul Const.Co17.03.06 12.06.06 294511.00 Completed
42 Civil XIV 24.11.05 30.6.05 269406.00544/02.03.06/EE-XIVM/s Atul Const.Co09.03.06 02.06.06 258276.00 Completed
43 Civil XIV 24.11.05 1.9.05 199645.00 27.02.06 31.03.06 193392.00 Completed
44
Civil
XIV
28.11.05 30.9.05 694500.00
28.02.06 6.09.06 662182.00 Completed
45
Civil
XIV
28.11.05 29.8.05 697200.00
24.02.06 07.04.06 696601.00 Completed
Imp to IIIrd link of Dharmapura from gali no -5 Dharampura to gali no 17 Kailash Nag by pdg c.c. pav A D/s in Gandhi Nagar
501/15.02.06/EE-XIV
M/s Atul Const.Co
Imp to Dharmpura Extn gali no-2 by pdg c.c. pav A D/s in Gnadhi Ngar in C-75/41
502/15.02.06/EE-XIV
M/s Atul Const.Co
Imp to Dharmapura Extn gali no 3 by pdg c.c. pav A D/s Gandhi nagar C-75/41
503/15.02.06/EE-XIV
M/s Atul Const.Co
Imp to Malhotra gali by pdg no 3 by pdg c.c. pav & D/s in Gandhi Ngr C-75/41
Imp to Dhrampura Gali no -1 by pdg cc. Pav & D/s in gandhi Ngar C-75/41
Imp to Kailash Ngr gali no 9 by pdg C.C pav and d/s in Gandhi Ngr. In C-75/41
Imp to lane near M.L. pry School Ashok gali by pdg c.c. pave & D/s
in Gandhi Ngr. C-75/41
P/o 150 W HPSv fittings in main road Gandhi Ngr , Netaji gali Shavitri gali , Mukherji gali
kashyap mohalla, Subhash road kothi Bhagwan Dass in AC-41 Sh-
19.
231/27.02.06/EE(E)-V
M/s Krishna Electric Works
Pdg c.c. pave & drainage in gali no and its link shanti Mohalla C-76/41 Sh s Zone
529/28.02.06/XIV
M/s Vikas Associate
s
pdg c.c. pave in gali no 4 Raghubarpura -II C-76/41 Sh S Zone
525/23.02.06/EE-XIV
M/s Shree Associate
s
46
Civil
XIV
28.11.05 29.8.05 480400.00
25.01.06 06.03.06 479185.00 Completed
47
Civil
XIV
28.11.05 1.8.05 571100.00
09.01.06 29.03.06 567583.00 Completed
48
Civil
XIV
28.11.05 30.9.05 515900.00
620/13.03.06/EE-XIVM/s Jitender Kumar22.03.06 21.06.06 335978.00 Completed
49
Civil
XIV
29.11.05 14.9.05 262300.00
05.04.06 30.05.06 220878.00 Completed
50
Civil
XIV
29.11.05 14.9.05 527800.00
11.03.06 29.03.06 525969.00 Completed
51
Civil
XIV
29.11.05 3.10.05 742600.00
11.05.06 06.07.06 732620.00 Completed
52
Civil
XIV
29.11.05 3.10.05 481000.00
20.03.06 24.05.06 466393.00 Completed
53
Civil
XIV
29.11.05 8.11.05 471894.00
10.10.06 24.11.06 465493.00 Completed
54
Civil
XIV
20.12.05 30.11.05 198704.00
27.01.06 23.02.06 198689.00 Completed
Pdg c.c pav & drainage in link from H.No 5319 to 5333 and near HNO 5538 Seelam pur Village.
419/06.01.06/XIV
M/s Lalit Associate
s
Imp to lane from 1*/1348 to Aggarwal sweeta by pdg c.c pav and D/s in Shembhu Nath bldg South Gandhi Ngr C-75/41
418/06.01.06/XIV
M/s Atul Const.Co
Imp to gali no-2 in shambhau Nath bldg by pdg C.c. pav & D/s in South Gandhi Nagr C-75/41
Imp to drainage system in gali no 18 & 22 Shanti Mohalla C-76/41
638/23.03.06/EE-XIV
M/s Saraswati Const.CO
Imp to lane from 11*/3877 to IX /3839 in Dharampura Extn. By pdg RMC in Gandhi Ngar C-75/41
564/10.03.06/XIV
M/s S.C.Goel
Acco.
Imp to Nehru gali by pdg RMC in Gandhi Ngr C-75/41
25/04.05.05/EE-XIV
M/s Lalit Associate
s
Imp to lanes in Rehishi Phool singh by pdg c.c. pav & D/s in Gandhi Ngar C-75/41
581/13.03.06/EE-XIV
M/s Vikas Associate
s
Imp to Partap gali by pdg RMC in Gandhi Nagr C-75/41
89/05.10.06/EE-XIV
M/s Surender
Kumar Garg
Pdg c,c pav & drainage in link of satsang marg near H.No 1263, 1266 and 1277 in Raj Garh colony C-76/41 Sh S. Zone.
461/24.01.06/XIV
M/s R.A Assocites
55
Civil
XIV
20.12.05 30.11.05 199764.00
25.01.06 23.02.06 199621.00 Completed
56
Civil
XIV
20.12.05 30.11.05 198276.00
01.02.06 06.03.06 197767.00 Completed
57
Civil
XIV
20.12.05 30.11.05 198493.00
01.02.06 02.03.06 198225.00 Completed
58
Civil
XIV
16.1.05 8.11.05 198633.00
04.04.06 02.06.06 196612.00 Completed
59
Civil
XIV
16.6.05 5.10.05 695600.00
01.05.06 21.06.06 690624.00 Completed
60
Civil
XIV
30.01.06 20.01.06 137762.00
16.02.06 24.03.06 137431.00 Completed
pdg c,c, pav & drainage in gali no 2 and its kink from H.No 930 to 871 in Chand mohalla C-76/41 Sh S.Zone
459/24.01.06/XIV
M/s Ashwini Kumar
Aggarwal
pdg c.c. pav & drainafge in gali no 10 and link between gali no 11 & 12 Ajeet Ngr C-76/41
465/24.01.06/XIV
M/s N.K.G Enterprise
is
Pdg c.c pav & drainage gali no 12 and 12 a H.No 4127 to 4113 Ajeet Ngr C-76/41
460/24.01.06/XIV
M/s Kausal
Builders
Imp to subhash raod near Tikona park by pdg c.c. pav andD/s in Gandhi Ngr C-75/41
658/28.03.06/EE-XIV
M/s Himalya
Const.Co
Imp to lane behind sibal public school by pdg RMC in Gandhi Ngr C-75/41
02/25.04.06/EE-XIV
M/s Surender
Kumar Garg
Pdg CC pavement and drainage in gali no.10 Raghubar pura-II in C-76/41 (Additional Amt booked)
495/15.02.06/XIV
M/s Shree Associate
s
Status Report of MLA,Sh Harshwardhan, AC No. 42 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C ExpenditureDate of
BookingDate of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
1 Elect EE(E)-IV 4.8.05 6.7.05 165400.00 29.03.06 25.05.06 157701.00 Completed
2 Elect EE(E)-IV 4.8.05 13.7.05 165171.00 14.02.06 13.03.06 131195.00 Completed
3 Elect EE(E)-IV 4.8.05 19.7.05 167388.00 19.12.05 3.1.06 159478.00 Completed
4 Elect EE(E)-IV 4.8.05 8.7.05 166279.00 19.12.05 3.1.06 155867.00 Completed
5 Elect EE(E)-IV 4.8.05 16.7.05 165844.00 20.12.05 12.01.06 159722.00 Completed
6 Elect EE(E)-IV 4.8.05 4.7.05 163980.00 19.12.05 3.1.06 160263.00 Completed
7 Elect EE(E)-V 9.8.05 20.7.05 166279.00 12.01.06 14.01.06 160507.00 Completed
8 Civil XIV 31.8.05 11.8.05 295620.00 20.03.06 03.07.06 295620.00 Completed
P/o Semi high Mast ner J.K. properties , Krishna Nagr in Ac-42
under Sh.North
261/21.03.06/EE(E)V
M/s Chandra
Electricals Contractor & Builder
P/o Semi high mast near Raju puri Walan Shiv puri patpar Ganj road
under Sh.south Zone.
195/07.02.06/EE(E)-V
M/s Kohinoor Electriclas
P/o Semi high mast at parking site of musical fountain Balder
park under sh.S
29/12.12.05/EEE-IV
M/s Sushma
Electrical
P/o Semi high mast ner Channder Nagr Bus Stop in Ac-42 under
Sh.South
30/12.12.05/EE(E)-V
M/s Sushma
Electrical
P/o Semi high mast ner Jitar Nagr Mandir in AC-42 under Sh.S
37/14.12.05/EE(E)V
M/s Khanna Sales Const.
P/o Semi high mast near Mahesh Timber, Shastri park Chander
Nagar road in AC-42 under Sh.South
28/12.12.05/EE(E)-V
M/s Sushma
Electrical
P/o Semi high mast at near Suri paint Chandra Ngr. Road (Dr.
Chandi wala) under Sh.S.
35/14.12.05/EE(E)V
M/s Khanna Sales Const.
Imp to road by pdg mastic arphalt from H.No G-39 to g-32 in Radhey
puri in C-77/42 Sh.S
597/13.03.06/EE-XIV
M/s Balaji &
Associates
9 Civil XIV 31.8.05 11.8.05 489555.00 5.10.07 22.11.07 483857.00 Completed
10 Civil XIV 31.8.05 11.8.05 535247.00 5.10.07 22.11.07 525524.00 Completed
11 Civil XIV 22.9.05 11.8.05 198472.00 17.11.05 04.01.06 196876.00 Completed
12 Civil XIV 22.9.05 7.9.05 199439.00 16.11.05 06.01.06 197080.00 Completed
13 Civil XIV 28.9.05 11.8.05 191058.00 20.02.06 20.02.06 161013.00 Completed
14 Civil XIV 28.9.05 11.8.05 597350.00 24.01.06 18.03.06 597350.00 Completed
15 Civil XIV 28.9.05 11.8.05 554700.00 10.01.06 25.01.06 543908.00 Completed
16 Civil XIV 28.9.05 7.9.05 565000.00 30.01.06 20.03.06 564003.00 Completed
Imp to raod by pdg mastic asphalt from H.No F-4/1 to E-14/2 in e
block Krishna Nagr in C-77/42Sh.S
616/13.03.06/EE-XIV
M/s Pawan Bros.
Imp to road by pdg mastic arphalt from M.c pary School Kanti Nagr to transforme H.No A34 to road
no 57 in A block Kanti Nagr in C-77/42 Sh.S
617/13.03.06/EE-XIV
M/s Pawan Bros.
Imp to road by pdg c.c pav from A-9 to A-1 in A block kirhsna Nagr
in C-77/44
310/09.11.05/XIV
M/s Wadhawan Acco.
Imp to pav. & imp to drain from H.No F-12 to F-23 in Radhey puri
Sh.S
312/.9.11.05/XIV
M/s S.C.Goels
& Co
Imp to lane by pdg c.c. pav. & drain near H.No A2/25 ,A-2/9 A2/2
in A block Krishan Nagr in C-77/42 Sh.S
374/13.12.05/EE-XIV
M/s Jagdish
Pdsharma
Imp to road by pdg mastic arphalt from H.No C-10/1 to C-10/14 in
Krishan Ngr. C-77/42 Sh.S
444/16.01.06/XIV
M/s Balaji &
Associates
Imp to road by pdg mastic Asphalt from H.No 2/1 to H-1/18 in H
block Krishan Ngr. In c-77/42Sh.S
388/15.12.05/XIV
M/s A.K Enterprise
s
Imp to road by pdg mastic Asphalt from H.No B-8/ to Mandir marg in
B block Krishna Nagr C-77/42Sh.S
438/16.01.06/XIV
M/s Amit Const.CO
17 Civil XIV 28.9.05 7.9.05 555550.00 2.12.05 18.1.06 550274.00 Completed
18 Civil XIV 28.9.05 7.9.05 682700.00 2.12.05 25.01.06 679795.00 Completed
19 Civil XIV 28.9.05 7.9.05 558286.00 05.01.06 10.02.06 557528.00 Completed
20 Civil XIV 28.9.05 7.9.05 540000.00 10.01.06 25.01.06 540000.00 Completed
21 Civil XIV 3.10.05 12.8.05 295620.00 24.05.06 28.08.07 295580.00 Completed
22 Civil XIV 3.10.05 12.8.05 514027.00 13.10.06 31.01.07 512877.00 Completed
23 Civil XIV 3.10.05 12.8.05 509137.00 5.10.07 15.11.07 508683.00 Completed
24 Civil XIV 3.10.05 12.8.05 522192.00 5.10.07 15.11.07 522114.00 Completed
Imp to road by pdg mastic Asphalt from H.No C--1 tp C-18 & H.NO E-15/13 to C-39 in C block east
Krishna Nagr C-77/42Sh.S
351/1.12.05/XIV
M/s M.G. Goyal
Cont Co
Imp to road by pdg mastic Asphalt from H.No ,F-12/1 to F-12/9 , F-12/10 to F-12/28 f-12/24 to F-
12/35in F block Krishna Nagr C-77/42Sh.S
401/22.12.05/XIV
M/s M.G. Goyal
Cont Co
Imp to road by pdg mastic Asphalt from H.No f-10/10 to F-10/35 in F block Krishna Nagr C-77/42Sh.S
408/27.12.05/XIV
M/s Subhash
Bros.
Imp to road by pdg mastic Asphalt from H.No f-5/10 to f-5/35 in f
block Krishan Nagr Krishna Nagr C-77/42Sh.S
387/15.12.05/XIV
M/s A.K Enterprise
s
Imp to road by pdg mastic Asphalt from Patpar Ganj raod to H.No 9
Shiv Puri Extn C-78/42 Sh.S
596/13.03.06/EEXIV
M/s Balaji &
Associates
Imp to main raod near H.NO 13 A shiv puri extn and Semi or Sr. Sec School chander Nagr in C-78/42
by pdg mastic ashphat
615/13.03.06/EE-XIV
M/s Pawan Bros.
Imp to Bhagat Singh road from Vaish eye entre to Kamal Tailors
in C-78/42 by mastic arphalt
613/13.03.06/EE-XIV
M/s Pawan Bros.
Imp to main raod from Haryawan Dair to H.No 16 in Shyam Nagr in
C-78/42.
614/13.03.06/EE-XIV
M/s Pawan Bros.
25 Civil XIV 3.10.05 12.8.05 258667.00 29.12.08 P 245622.00 In Prog.
26 Civil XIV 3.10.05 12.8.05 377735.00 24.12.08 P 358848.00 In Prog.
27 Civil XIV 3.10.05 12.8.05 445500.00 04.01.06 21.03.06 445500.00 Completed
28 Civil XIV 3.10.05 12.8.05 245600.00 06.02.06 06.03.06 245600.00 Completed
29 Civil XIV 3.10.05 12.8.05 410700.00 02.01.06 07.02.06 410247.00 Completed
30 Civil XIV 10.10.05 3.10.05 154390.00 06.12.05 13.01.06 154151.00 Completed
31 Civil XIV 10.10.05 3.10.05 319828.00 15.04.06 23.05.06 317030.00 Completed
32 Civil XIV 10.10.05 3.10.05 415018.00 22.02.06 30.03.06 415014.00 Completed
33 Civil XIV 21.10.05 11.8.05 190348.00 19.12.05 20.01.06 187246.00 Completed
Imp to road by pdg mastic arphalt from H.No A-23 to f-15 New Gonid pura ext in C-78/42
593/13.03.06/EE-XIV
M/s Balaji &
Associates
Imp of main road from gali no-7 New gobid pura to apawana raod
in C-78/42 by mastic asphalt
594/13.03.06/EE-XIV
M/s Balaji &
Associates
Imp to side berms from H.No 18/17/12 Old Gobind pura to Parwana road along muricla
fountain in C-78/12
399/22.12.05/XIV
M/s Rajesh
Associates
Imp to side lane along Chopal in village Ghodli in C-78/12/by C.c.
483/03.02.06/XIV
M/s Bachan
Const.Co
Imp of road by pdg mastic from patpar Ganj road to H.No /C in
Pandit park in C-78/42
389/15.12.05/XIV
M/s A.K Enterprise
s
Imp to lane along H.No B-27 west Chander Ngr & H.No 33 Silver
park in C-78/42
352/05.12.05/XIV
M/s Baldev
Raj Gupta
Imp of lane along K-15,I-II,4 K-27 A & Adj. Potion in different lanes
by pdg C.c. in New Gobind pura in C-78/42
634/20.03.06/EE-XIV
M/s Amit Associate
s
Imp of parwana road by pdg mastic asphalt faorm Bhagat
Singh road to patpar Ganj road in in C-78/42
516/21.02.06/XIV
M/s Man Mohan Singh
Wadhwa
Imp to lane by pdg c.c. tebein in gali no9 near H.NO 83 in East
Azad Ngr C-77.
368/07.12.05/XIV
M/s Gajender
Kumar
34 Civil XIV 25.1.05 21.9.05 541194.00 30.03.06 21.06.06 540588.00 Completed
35 Civil XIV 25.1.05 7.10.05 690000.00 02.05.06 20.06.06 689556.00 Completed
36 Civil XIV 25.1.06 7.10.05 452708.00 27.02.06 31.03.06 451810.00 Completed
37 Civil XIV 25.1.06 7.10.05 399926.00 27.02.06 31.03.06 398987.00 Completed
38 Civil XIV 25.1.06 7.10.05 637502.00 12.05.06 20.06.06 636956.00 Completed
39 Civil XIV 25.1.06 7.10.05 544501.00 22.03.06 31.03.06 544501.00 Completed
40 Civil XIV 25.1.06 24.10.05 175000.00 22.06.06 17.08.06 175000.00 Completed
41 Civil XIV 25.1.05 24.10.05 351426.00 13.04.06 20.06.06 350160.00 Completed
Imp to raod by pdg mastic asphalt from H.No F-1/1 to F-1/35 in F
block Krishna Nagr in C-77/42Sh.S
590/13.03.06/EE-XIV
M/s Balaji &
Associates
Imp to road drainage system be covering drain from Musical
fourtain Baldev park to Sukhvihar road crossing along parwana road
in C-78/42
644/27.03.06/EE-XIV
M/s S.C.Goels
& Co
Imp of road by pdg Mastic Ashphalt from H.No G-65 to
Parwana road in Jagat Puri in C-78/42
519/21.02.06/XIV
M/s Man Mohan Singh
Wadhwa
Imp of road by pdg mastic from patpar Ganj road to H.No 93, South Anakali Extn H. No 82, South Anarkali Exnt C-78/42
517/21.02.06/XIV
M/s Man Mohan Singh
Wadhwa
Imp of drainage system by coverring of drain from sukha
vihar road corssing to Jagat puri drain in East Baldev park in C-
78/42
643/27.03.06/EE-XIV
M/s R.P Const.Co
Imp of road by pdg mastic Ashphalt from H.No-83 Old
Anarkali to Ram Nagr road in Old Anarlali in C-78/42
518/21.02.06/XIV
M/s Man Mohan Singh
Wadhwa
Imp to gali by pdg c.c. pave from H.No A-1 to A-10in Lamman Park
in C-78/2
666/28.03.06/EE-XIV
M/s Rajeev Kaushik
Imp to Shiv kala Mandir road by pdg Mastic Ashphalt in Ram Nagr
in C-78/41
588/13.03.06/EE-XIV
M/s Balaji &
Associates
42 Civil XIV 25.1.05 24.10.05 543035.00 13.04.06 22.06.06 542342.00 Completed
43 Civil XIV 25.1.06 8.11.05 440955.00 27.03.06 21.06.06 440841.00 Completed
44 Civil XIV 25.1.06 8.11.05 199211.00 23.03.06 18.05.06 198514.00 Completed
45 Civil XIV 30.1.06 24.10.05 297387.00 25.04.06 20.06.06 297190.00 Completed
46 Civil XIV 30.1.06 24.10.05 115627.00 08.04.06 17.05.06 115429.00 Completed
Imp of Parwana road from Swami Dayanand Marg to H.No F-17 ,
Jagathpuri by pdg Mastic Ashphalt in C-78/42
592/13.03.06/EE-XIV
M/s Balaji &
Associates
Imp to road by pdg Mastic Asphalt from H.No A-124 to H.No 61
South Anarkali Extn in C-78/42
589/13.03.06/EE-XIV
M/s Balaji &
Associates
Imp to side berm by pdg c.c. from H.No 188 south Anarkali to 27/4 South Anarkali Extn in C-78/42
551/10.03.06/EE-XIV
M/s Ishwar
Associates
Imp to side berm by pdg c.c. from H.No 152 Old Anarkali to Ram
Nagr Nath road in C-78/41
633/20.03.06/EE-XIV
M/s Amit Associate
s
Imp to lane by pdg c.c.along H.No 17/9 in Ram Nagr in C-78/42
641/24.03.06/EE-XIV
M/s Lalit Sharma
Status Report of MLA, Sh. Naseeb Singh, AC No. 43 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XI 24.6.05 17.6.05 199450.00 13.8.05 15.10.05 199450.00 Completed
2 Civil XI 24.6.05 17.6.05 199300.00 13.8.05 2.8.05 198437.00 Completed
3 Civil XI 8.7.05 17.6.05 455000.00 20.12.05 20.02.06 396119.00 Completed
4 Civil XI 8.7.05 17.6.05 347100.00 21.12.05 20.02.06 315526.00 Completed
5 Elect EEE-V 18.7.05 26.5.05 73999.00 02.01.06 03.02.06 61372.00 Completed
6 Elect EEE-V 5.9.05 10.8.05 73691.00 16.03.06 30.03.06 73691.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp to road metalling & Premixing from J.J. Slum office to 18 Qtr
road in W.W.80/AC43.Sh.S
158/4.8.05/EE-XI
M/s Alakar builder
Imp to road by metalling & premixcing on 18 Qtr road from Pandav road to Viswas road in
w.NO 80/Ac43 sh.S
157/4.8.05/EE-XI
M/s Deepak
Associates
Imp to back lane by c.c. pav. HNO-438 to 452 , 408 to 411 ,403 to 392 and 365 in c. block Yojha
Vihar in w.no 80/AC-43/Sh.S
232/19.12.05/EE-XI
M/s Vinod Const.Co
Imp of road by Premixcing ner HNO 205 to 226 ,105 to 160 100 to 120 and jain Mandir to 227 in suraj Mal Vihar A block w.no 80
Sh.S
222/12.12.05/EE-XI
M/s Kapil Const.CO
P/o lighting arrangement at Apprached road to New Sanjay
Amar colony near working womens Hostel in W.no 80 under
Sh.s. Zone.
79/27.12.05/EE(E)V
M/s Illuminator cuircuters
P/o lighting arrangement in Kasturba Gandhi park and 18 Qtr
Chowk in W.NO-80
251/14.03.06/EE(E)-IV
M/s Forward
Engineers
7 Civil XI 5.9.05 10.8.05 693200.00 31.12.05 03.04.06 523265.00 Completed
8 Civil XI 5.9.05 10.8.05 504300.00 05.12.05 09.02.06 357434.00 Completed
9 Civil XI 5.9.05 10.8.05 688900.00 15.05.06 13.06.06 673004.00 Completed
10 Civil XI 5.9.05 10.8.05 688200.00 20.12.05 24.03.06 559831.00 Completed
11 Civil XI 5.9.05 10.8.05 300000.00 21.12.05 31.03.06 242953.00 Completed
12 Civil XI 5.9.05 10.8.05 599800.00 10.12.05 09.02.06 451308.00 Completed
13 Civil XI 5.9.05 10.8.05 699500.00 28.02.06 03.03.06 654971.00 Completed
Imp to 18 Qtr link road near Kasturba Nagr drain by pdg RMC pur in vishwas Ngr w.no 80/Ac-
43/ShS
248/26.12.05/EE-XI
M/s Jindal Builders
Imp to gali no 17 by pdg c,c pav and drain in Bhikam singh coloney
in W.No 80/AC-43 Sh.S
209/01.12.05/EE-XI
M/s Bansal
Builders
Imp to road along ( K. Nagar drain ) Nalla side from Patel gali to Bagichi gali by pdg RMC and
drain in vishwas nagar in W.No 80/AC 43 sh.S
404/10.03.06/EE-XI
M/s Anil Kumar Sharma
Imp to road along ( K. Nagar drain ) Nalla side from Patel gali by pdg RMC and drain in vishwas nagar
in W.No 80/AC 43 sh.S
230/19.12.05/EE-XI
M/s M.G Goel
Const.Co
pdg & laying ready wise corner on lane near D block Vivek Vihar market in w.No 80/AC43/Sh.S
228/19.12.05/EE-XI
M/s M.G Goel
Const.Co
Imp to lane parallel to Kasturba Nagr drain farom gali no 5 to 15 in Bhikam singh coloney by pdg
c.c. pave & drain in w. no 80/ AC-43 Sh.S
198/01.12.05/XI
M/s Mittal Const.CO
Imp to lanes in Tosh factory (P.R.S) near Mahender hs
between karkari road and gali no 3 by ready mise conc & drain in
Vishwas Nagr in w.No-80 AC-43/ShS
367/28.02.06/XI
M/s Baldev
Raj Gupta
14 Civil XI 5.9.05 10.8.05 699400.00 03.04.06 06.07.06 627884.00 Completed
15 Civil XI 5.9.05 10.8.05 699000.00 04.02.06 07.05.06 629220.00 Completed
16 Civil XI 5.9.05 10.8.05 672300.00 11.03.06 18.06.06 648959.00 Completed
17 Civil XI 26.9.05 17.6.05 1705400.00 08.02.06 02.06.06 1144996.00 Completed
18 Civil XI 26.9.05 17.9.05 685600.00 31.05.06 04.06.06 531153.00 Completed
19 Civil XI 8.11.05 17.6.05 1302400.00 26.06.06 12.07.06 771908.00 Completed
20 Civil Sh (S)Prj. 10.10.06 29.8.05 1152000.00 21.06.06 1152000.00 Completed
21 Civil Sh (S)Prj. 10.10.06 29.8.05 1626000.00 21.06.06 1626000.00 Completed
22 Civil Sh (S)Prj. 10.10.06 29.8.05 100500.00 21.06.06 100500.00 Completed
Imp to lane to connectling link from gali no 3 to Karkai road ( near tas factory ) by RMC &
drain in Vishwan Nagar in W.No-80 /AC 43/ Sh.S
488/31.03.06/EE-XI
M/s Wadhwan
& Co.
Imp to lanes in Tasfactory ( V.R.S. ) near H.No 1/190 bet Karkari road and gali no-3 by RMC &
drain in Vishwan Nagar in W.No 80/AC43/Sh.S
337/30.01.06/EE-XI
M/s Wadhwan
& Co.
Imp to road along ( K.Nagr drain ) Nalla side from Bagichi gali to
Nellur gali by pdg RMC & drain in Vishwas Nagar in W.No 80/AC-
43/Sh.S
403/10.03.06/EE-XI
M/s Anil Kumar Sharma
Pro. And fixing precast RCC slab grating on 30' and 50' road in c
block Anand Viahr in w.No-80/AC-43 Sh.S
336/30.01.06/XI
M/s Man Mohan Singh
wadhwa
P/f Precent RCC Slab grating on 30' road at B block Anand vihar in
W-80/AC-43/Sh.S
487/31.03.06/EE-XI
M/s Wadhwan
& Co.
Pro & Fix preent RCC slab grating on 30' to 45' prc "A" block Anand
Vihar in W.Np 80/ Sh.S
90/29.05.06/EE-XI
M/s Man Mohan Singh
wadhwa
Imp/Stg of road inchitra Vihar in Ac-43 by pdg B.M.& M.SS
34/07.06.06/
EE(Pr.)Sh.South
M/s Echo Builders
Imp/stg of road in AGCR Enclave in AC-43 by pdg B.M & M.SS
34/07.06.06/
EE(Pr.)Sh.South
M/s Echo Builders
Imp/stg of main road in Dayanand Vihar in AC-43 by pdg B.M. &
MSS
34/07.06.06/
EE(Pr.)Sh.South
M/s Echo Builders
23 Civil Sh (S)Prj. 10.10.06 29.8.05 316000.00 21.06.06 316000.00 Completed
24 Civil Sh (S)Prj. 10.10.06 29.8.05 881000.00 21.06.06 881000.00 Completed
25 Civil Sh (S)Prj. 10.10.06 29.8.05
1038400.00
21.06.06 1038400.00 Completed
26 Civil Sh (S)Prj. 10.10.06 29.8.05
915000.00
21.06.06 915000.00 Completed
27
Civil
Sh (S)Prj.
10.1.06 25.8.05 453400.00
28.04.06 02.08.06 338911.00 Completed
28
Civil
Sh (S)Prj.
10.1.06 29.8.05 614000.00
21.06.06 614000.00 In Prog.
Imp/stg of road in "A" block in Preet Vihar in AC-43 by pdg B.M
to MSS
34/07.06.06/
EE(Pr.)Sh.South
M/s Echo Builders
Imp/stg of road in in East Guru Anged Nagr in AC-43 by pdg B.M
to MSS
34/07.06.06/
EE(Pr.)Sh.South
M/s Echo Builders
Imp/ Stg of road in "E" block Preet Vihar in AC-43 by pdg BM & MSS
34/07.06.06/
EE(Pr.)Sh.South
M/s Echo Builders
Imp/stg of road in Swasthya Vihar in AC-43 by pdg B.M.& MSS
34/07.06.06/
EE(Pr.)Sh.South
M/s Echo Builders
Const of Culvert near Vivekanand Public School, Anand Vihar AC-
43/Sh(s)
21/25.04.06/EE(Pr.)/Sh.South
M/s Deep Builders
Imp/stg of road in Priya Enclave in Ac-43 by pdg B.M & MSS
34/07.06.06/
EE(Pr.)Sh.South
M/s Echo Builders
Status Report of MLA, Sh Narendra Nath, AC No. 44 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XI 8.9.05 17.8.05 197000.00 05.12.05 02.02.06 197000.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp to lane by pdg RMC near B pocket and B pocket market in Dilshad Garden in C-82/AC-44
215/01.12.05/EE-XI
M/s Jindal Builders
2 Civil XI 8.9.05 17.8.05 197500.00 21.11.05 12.01.06 195924.00 Completed
3 Civil XI 8.9.05 17.8.05 195100.00 23.11.05 22.02.06 194914.00 Completed
4 Civil XI 19.9.05 17.8.05 551700.00 05.01.06 08.03.06 432069.00 Completed
5 Civil XI 21.9.05 31.5.05 311072.00 16.03.06 31.08.06 298323.00 Completed
6 Civil XI 21.9.05 24.8.05 469269.00 15.03.06 15.06.06 469186.00 Completed
7 Civil XI 21.9.05 24.8.05 181227.00 25.05.06 22.09.06 181227.00 Completed
8 Civil XI 21.9.05 24.8.05 197100.00 06.02.06 03.05.06 169652.00 Completed
9 Civil XI 21.9.05 16.9.05 257100.00 28.01.06 29.03.06 250198.00 Completed
10 Civil XI 21.9.05 16.9.05 243700.00 03.02.06 31.03.06 239859.00 Completed
11 Civil XI 21.9.05 16.9.05 248900.00 04.02.06 24.04.06 231380.00 Completed
12 Civil XI 21.9.05 16.9.05 95000.00 06.02.06 19.04.06 92066.00 Completed
IMp to lane and drainage system near H.No E-140,110 ,14 and E-56 by RMC and Culvert in E block Jhilmil coloney inC-82/AC-44
190/17.11.05/EE-XI
M/s Deepak
Associates
Imp to lanes by RMc near H.NO 121, park 145,191 169,205 .217 240,243 in Gobikd Khand in c-82/ AC-44
191/17.11/05/EE-XI
M/s Vinod Const.Co
Imp of road by M/P from B-13/1 to B-23 in Jhilmil Ind. Area in C-82/AC-44
307/06.01.06/
M/s Narender
Const.Imp to portion of lanes in 7 and 8 ( Idgarh road to Mani Ram Mandir road) by pdg c.c. flooring ijn Bola Nath Nagr
419/14.03.06/EE-XI
M/s Shankar
Associates
Imp to lane by pdg RMC drain in front at Lal Bekri/ Prop w.no- A 100 in Tejab Mill Bhola Nath Nagr C-81/ AC-44
411/14.03.06/EE-XI
M/s Hans Kumar Jain
Imp of road side berms & drain at Idgarh road ( from gai no-5 towards road w-57) in Behari coloney C-81/AC-44
341/30.01.06/EE-XI
M/s Bhagwati Const.Co.
Imp of portion of gali no 7 and nearby in Behari coloney by pdg c.c. flooring in C-81/AC-44
340/30.01.06/EE-XI
M/s Bhagwati
Const. Imp to Ajay Mandichowki by pdg c.c pav in Shahdra vill C-81
333/27.01.06/XI
M/s Shankar
AssociatesImp to diff lanes by c.c pav adj to H.No 800 near gali no 5 in Jwala Nagr in C-81/AC-44
334/27.01.06/EE-XI
M/s Shankar
AssociatesImp to lane by pdg c. c pave adj to prop no B-115 in Janta coloney circular road Shadra C-81 AC-44
346/30.01.06/EE-XI
M/s Bhagwati Const.Co.
Imp to portion of lane by c.c. pav adj to H.No R-44 in Behari Coloney C-81/AC-44
345/30.01.06/EE-XI
M/s Bhagwati Const.Co.
13 Civil XI 21.9.05 16.9.05 198700.00 23.01.06 10.03.06 191354.00 Completed
14 Civil XI 21.9.05 19.9.05 99000.00 21.01.06 11.03.06 99000.00 Completed
15 Civil XI 21.9.05 19.9.05 319668.00 08.01.06 03.04.06 318831.00 Completed
16 Civil XI 21.9.05 19.9.05 303400.00 27.12.05 10.02.06 303400.00 Completed
17 Civil XI 21.9.05 15.9.05 247087.00 14.02.06 08.06.06 236325.00 Completed
18 Civil XI 21.9.05 19.9.05 238700.00 02.01.06 08.03.06 234860.00 Completed
19 Civil XI 21.9.05 22.8.05 241400.00 03.02.06 29.03.06 237085.00 Completed
20 Civil XI 21.9.05 19.9.05 297608.00 01.08.06 6.11.06 283353.00 Completed
21 Civil XI 21.9.05 19.9.05 314712.00 15.07.06 24.11.06 305003.00 Completed
22 Civil XI 21.9.05 22.8.05 301138.00 433/17.03.06 23.03.06 17.08.09 300654.00 Completed
23 Civil XI 21.9.05 22.8.05 371174.00 06.03.06 10.07.06 353452.00 Completed
24 Civil XI 21.9.05 22.8.05 99400.00 03.02.06 31.03.06 94999.00 Completed
Imp to lane by c.c pav adj to prop no P-141 in Behari Coloney C-81/AC-44
317/16.01.06/XI
M/s Shankar
AssociatesImp to lane by prov c.c. adj to prop w 64/4K/1 in Teliwara in Shahdra vill C-81/AC-44
316/16.01.06/XI
M/s Shankar
AssociatesImp to lane adj to Prop no 413 438 and Vatsalya temple by pdg c.c. pav in Jwala Nagar C-81/AC-44
280/04.01.06/EE-XI
M/s Guru Kirpal Enter.
Imp to lane by pdg c,c pave adj to Prop no 4/1581 and 4/1788 in Mahavir block Shadra C-81/AC-44
260/26.12.05/XI
M/s Satish & Bros
Imp to lane by c,c pav adj to H.No 104 B tejab mill and gali no 14 ( Idgarh roadto Satgarah road ) in Bhole Nath Nagr.
362/13.02.06/EE-XI
M/s Shankar
Associates
Imp to drain & berms at road in back of Old Zonal office forash Bazzr Shadra C-81
273/28.12.05/XI
M/s Shankar
AssociatesImp to lane by pdg C,C. flooring adj to Prop NO 27/94 near Triangula park Jwalal Nagr behind MC School Mukerh Nagr Jwala Nagr C-81/AC-44
335/27.01.06/EE-XI
M/s Shankar
Associates
Imp to Chowk and lane adj P.N.B back Gujju Katra by c.c. pav in Shadra Vill C-81/AC-44
426/14.03.06/EE-XI
M/s Shankar
AssociatesImp to portion of gali no 3 ( adj H.No 4/2754) by pdg c.c. flooring in Behari Coloney C-81/AC-44
422/14.03.06/EE-XI
M/s Shankar
AssociatesImp to portion of Idgarh road ( from gai no 5 to 4/2409 ) by pdg M/P in Behari Coloney in W-81 AC-44
M/s Aarkaj Consts
Imp to portion of gali o 15 ( H.No 280) in Bhola Nath Nagr and gali no 7 ( H.No 4/3251) in Behari coloney by pdg c.c. flooring in w-81 Sh.S
368/28.02.06/EE-XI
M/s Shankar
Associates
P/F M.s Crossings at diff drain corssing in Bhola Nath Nagr & Behari coloney C-81
347/30.01.06/EE-XI
M/s Bhagwati
Const.
25 Civil XI 21.9.05 22.8.05 199348.00 23.12.05 20.03.06 198808.00 Completed
26 Civil XI 21.9.05 22.8.05 199014.00 19.12.05 08.03.06 198567.00 Completed
27 Civil XI 21.9.05 22.8.05 196714.00 02.01.06 27.02.06 195533.00 Completed
28 Civil XI 21.9.05 22.8.05 192909.00 02.01.06 27.02.06 192230.00 Completed
29 Civil XI 21.9.05 22.8.05 198500.00 18.12.05 08.02.06 198500.00 Completed
30 Civil XI 21.9.05 22.8.05 137400.00 12.01.06 08.06.06 135586.00 Completed
31 Civil XI 21.9.05 24.8.05 184400.00 02.01.06 03.03.06 179212.00 Completed
32 Civil XI 21.9.05 20.9.05 257900.00 02.01.06 08.03.06 252644.00 Completed
33 Civil XI 21.9.05 27.6.05 192784.00 07.12.05 09.02.06 192784.00 Completed
34 Civil XI 21.9.05 27.6.05 168706.00 23.12.05 24.02.06 167827.00 Completed
35 Civil XI 21.9.05 16.9.05 310174.00 20.03.06 17.07.06 297837.00 Completed
36 Civil XI 21.9.05 22.8.05 414945.00 417/14.03.06 14.08.06 13.02.07 393824.00 Completed
Imp to lanes by c.c. flooring adj to H.No 319 & 475 in Jwala Nagr w.no-81/AC-44
239/19.12.05/XI
M/s Mayur Enterprises
Imp to lanes by pdg c.c flooring adj indira park ,MC pry School in Jwala Nagr W.noi 81/AC-44
219/12.12.05/XI
M/s Mani Blds.
Imp to roads by pdg premixing adk to P no 1/17 and near by in Shalimar park Shadrah C-81
243/26.12.05/XI
M/s Vikas Jain
Imp to road by premixing adj to P no 94/7A/4 near Amar Ashram and Triangula park in jwala nagr in C-81
244/26.12.05/EE-XI
M/s Laxman Sharma
Re of drian in lanes prop w 460/B/4 in Mahabir block in Shadara c-81
220/12.12.05/XI
M/s Sharma & Sharma Const.
Const of RCC Culvert under Rly bridge at Bhola Nath Nagr road C-81/44 , Bhola Nath Nagr.
309/06.01.06/EE-XI
M/s Manoj Kumar
Imp to D/s near Status of Maharaja Aggarsenji in Ajay Mandir Shadard vill C-81
274/28.12.05/XI
M/s Shankar
AssociatesImp to lane by pdg c.c. pave adj to prop 438 in Mohalla mahavn Shahdra villa C-81 AC-44
272/28.12.05/XI
M/s Shankar
AssociatesImp to lane by pdg c.c. flooring adj to P/W 422 & 429 Markara Kuan and 4/20 in Pathan piura in Shahdra C-81 /AC-44
210/01.12.05/XI
M/s Kirti Associates
Imp to gali no 2 in Mukesh Nagr and lanes adj to H.No 95 ,401 loni gate Shahdra in C-81
238/19.12.05/XI
M/s Appear Const. &
Engg.Imp to gali no 4 and lane adj to Nalah in Shalimar park by pdg c.c. pav in C-81 AC-44
421/14.03.06/EE-XI
M/s Shankar
AssociatesImp to approach of Teliwara along railway line storing from railway bridge at Bhola Nath Nagr road in Teliwara Shahdra C-81
M/s Shankar
Associates
37 Civil XI 21.9.05 24.8.05 290577.00 21.03.06 8.02.07 275475.00 Completed
38 Civil XI 21.9.05 24.8.05 196572.00 18.03.06 28.08.06 181050.00 Completed
39 Civil XI 21.9.05 31.5.05 288723.00 09.03.06 28.08.06 277857.00 Completed
40 cse CSE Sh (S) 24.11.05 18.11.05 672000.00
41 cse CSE Sh (S) 24.11.05 18.11.05 508600.00 02.05.06 P 326418.00 In Prog.
42 Civil XI 28.11.05 28.10.05 266600.00 18.03.06 09.06.06 199740.00 Completed
43 Civil XI 28.11.05 28.10.05 548700.00
44 Civil XI 28.11.05 28.10.05 58900.00 22.03.06 22.05.06 46438.00 Completed
45 Civil XI 28.11.05 28.10.05 76760.00 27.06.06 28.08.06 76583.00 Completed
46 Civil XI 28.11.05 28.10.05 195400.00 23.03.06 25.05.06 145416.00 Completed
47 Civil XI 28.11.05 28.10.05 450588.00 20.03.06 22.07.06 448966.00 Completed
48 Civil XI 28.11.05 28.10.05 339300.00 16.03.06 08.06.06 245041.00 Completed
Imp to lane by pdg c.c. flooring adj to Prop no 152/7/215 and 1/155 etc
Mohalla Jwahar, Shahdra vill in C-81
418/14.03.06/EE-XI
M/s Shankar
AssociatesImp to portion of lane no 6 ( Mani ram
mandir road to Shiv Jharkhandi mandir road and gali no 9 from
school lane to Maharaja Aggarsen marg by c.c. in Bhola Nath Nagr.
420/14.03.06/EE-XI
M/s Shankar
Associates
Imp to portion of lanes w 3,4,5,6,9, adj to Satgarah road in Bhola Nath
Nagr by pdg c.c. flooring C-81
386/02.03.06/EE-XI
M/s Shankar
AssociatesP/l of RCC Pipe line along Rly Ember
in Mukesh Ngr Sh (s)Imp of Nalla along block N& M Dilshad Garden in W.No-82 sh (s)
106/14.03.06/
EE(CSE)South
M/s Sachin Const.Co
Imp to lane adj lane to Shp NO-1697 by pdg c.c. pave in Mahabir Block Sh C-81
436/17.03.06/EE-XI
M/s Aarkaj Consts
Imp to Shri Gopal Shrama Marg by pdg bitumen Mastic in Mohalla Mehram Sh. Vill C-81 Ac-44Imp to drainage in lane adj to Prop No 106/6 in Teliwara in Sh in c-81/ AC-44
434/17.03.06/EE-XI
M/s Aarkaj Consts
Imp to lane portion by pdg CC pav adj to H.No 753 Jwala Nagr in C-81/ AC-44
104/26.06.06/EE-XI
M/s Aspiration Builders
Imp to lane by c.c. pav adj to Prop No 4/2918 Sri Ram Coloney Behari Coloney C-81/ AC-44
435/17.03.06/EE-XI
M/s Aarkaj Consts
Imp to portion of gali no 6 y pdg c.c. flooring in Jwala Nagr C-81
423/14.03.06/EE-XI
M/s Surender
Kumar Garg
Imp to lane by c.c pave adj to prop no 700/5 in Tejab mill Bhola Nath Nagr in C-81/ AC-44
425/14.03.06/EE-XI
M/s A.S.Const.
Co
49 Civil XI 12.12.05 21.10.05 370000.00 18.03.06 07.04.06 324847.00 Completed
50 Civil XI 12.12.05 21.10.05 386300.00 18.03.06 10.05.06 317525.00 Completed
51 Civil XI 10.10.06 21.12.05 211138.00 26.04.06 28.07.06 211138.00 Completed
52 Civil XI 10.1.06 26.12.05 214218.00 24.04.06 11.07.06 212368.00 Completed
53 Civil XI 20.03.06 26.12.05 352236.00 08.06.06 08.08.06 350774.00 Completed
54 Civil XI 20.03.06 26.12.05
437637.00
14.06.06 14.11.06 434314.00 Completed
55 Civil XI 20.03.06 26.12.05
345192.00
15.06.06 24.08.06 344403.00 Completed
56 Civil XI 20.03.06 06.02.06
261934.00
09.06.06 04.08.06 261661.00 Completed
57 Civil XI 20.03.06 06.02.06430160.00
14.6.06 16.10.06 430142.00 Completed
58 Civil XI 20.03.06 06.02.06
184636.00
14.06.06 04.08.06 183883.00 Completed
59 Civil XI 20.03.06 06.02.06
232108.00
15.06.06 06.08.06 231566.00 Completed
Imp to road by M/P hear DDA block Mpl school Gurudwara interline road etc in Dilshed Garden in c-82/44 Sh (s) Zone.
448/17.03.06/EE-XI
M/s Beldev Raj Gupta
Imp to lanes by pdg RMC adj to park near flat No-55,68 etc in B pkt Dilshed Garden in C-82/AC-44 Sh (s) Zone
449/17.03.06/EE-XI
M/s Lalita Associates
Imp to lane & links by c.c. pav adj to Shop No 240 in Jwala Ngar in C-81 AC-44
35/21.04.06/EE-XI
M/s Y.K Builders
Imp to lane by pdg c.c. pav adj to Shop no P-157 and 2668 in beheri (by inC-81)AC-44
34/21.04.06/EE-XI
M/s Y.K Builders
Imp of lane by pdg cc pevement near veer Abhimanyu park in Beherkly C-
81 Ac-44
102/08.06.06/EE-XI
M/s Guru Kirpa Enter.
Imp to portion of gali no 13 by pdg CC pevement in Bhola Nath Nagar C-81 Ac-44
101/08.06.06/EE-XI
M/s Guru Kirpa Enter.
Imp of portion of lane no.11 *14 (Shiv Jharkhendi Road to Mahiram Mandir Marg) by pdg CC pevement in Bhola Nath Nagar in C-81 Ac-44
100/08.06.06/EE-XI
M/s Guru Kirpa Enter.
Imp to lanes near Ram Lila ground Shiv Mandir and links of gali no-6 in Jwala Nagar by pdg cc pevement in C-81 Ac-44
99/08.06.06/EE-XI
M/s Guru Kirpa Enter.
Imp to Hari Mandir gali by pdg cc pav. In Jwala Nagar C-81
94/08.06.06/EE-XI
M/s Kapil Cosnt.Co
Imp to lane by pdg CC pav. Adj. CSE office Shalimar park in C-81, AC-44
95/08.06.06/EE-XI
M/s Surender
Kumar Garg
Imp to drain to road Adj. To property no 4/1600 in mahavir block shahdara C-81 /Ac-44
98/08.06.06/EE-XI
M/s Guru Kirpal Enter.
60 Civil XI 20.03.06 06.02.06
354978.00
09.06.06 15.09.06 353710.00 Completed
61 Civil XI 20.03.06 06.02.06
242652.00
12.06.06 04.09.06 240478.00 Completed
62 Civil XI 20.03.06 06.02.06
313047.00
14.06.06 31.08.06 310358.00 Completed
Imp to lanes by pdg CC pav near school in Dalahi Mohalla Mahavir block Shahdara C-81 ac-44
97/08.06.06/EE-XI
M/s Guru Kirpal Enter.
Imp to back lane and links of Shiv Shakti Temple in Jwala Nagar by CC Pav. In C-81
96/08.06.06/EE-XI
M/s Guru Kirpal Enter.
Imp of circular road by pdg CC pav. In Shahdara vill C-81 Ac-44
103/08.06.06/EE-XI
M/s Guru Kirpal Enter.
8954075 7121812
Status Report of MLA, Sh.Veer Singh Dhingan, AC No. 45 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XIX 28.6.05 20.6.05 199900.00 4.9.05 24.10.05 199806.00 Completed
2 Elect EE(E)-VI 6.7.05 16.5.05 128441.00 12.01.06 25.01.06 109166.00 Completed
3 Elect EE(E)-VI 6.7.05 16.5.05 128441.00 19.10.05 19.11.05 109084.00 Completed
4 Elect EE(E)-VI 6.7.05 16.5.05 128441.00 27.11.05 19.12.05 109409.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp of road by pdg RMC M-15 Inside pocket D along B/wall towards road ni 68 in GTB enclave in 83 AC-45 Sh.N
108/25.8.05/XIX
M/s Jindal builders
Dev. Of tubewell with Submarsible pump set in Mpl park NO-22, F
PKT. GTB envlave W.No-83
282/06.01.06/EE(E)VI
M/s Mani Elect.
D/o tubewell with Submersible pump set in mpl park E-4 Nand
Nagri w.No 83
134/28.10.05/EE(E)VI
M/s S.K Enterprise
s
D/o tubewell with submerible pump Set in Mpl park W.NO E-3
Nand Nagri W.no-83, Sh.N
218/23.11.05
M/s Seth Const
5 Elect EE(E)-VI 6.7.05 16.5.05 128441.00 12.12.05 21.12.05 109258.00 Completed
6 Elect EE(E)-VI 6.7.05 16.5.05 128869.00 30.10.05 18.11.05 109004.00 Completed
7 Elect EE(E)-VI 6.7.05 16.5.05 128869.00 01.03.06 20.03.06 109507.00 Completed
8 Elect EE(E)-VI 6.7.05 16.5.05 128869.00 14.03.06 28.03.06 109542.00 Completed
9 Elect EE(E)-VI 6.7.05 16.5.05 129071.00 03.10.05 18.11.05 109759.00 Completed
10 Elect EE(E)-VI 6.7.05 16.5.05 129071.00 23.02.06 14.03.06 98088.00 Completed
11 Elect EE(E)-VI 6.7.05 16.5.05 129071.00 30.11.05 08.12.05 108791.00 Completed
12 Elect EE(E)-VI 6.7.05 16.5.05 128441.00 07.04.06 21.04.06 109406.00 Completed
13 Elect EE(E)-VI 6.7.05 16.5.05 128869.00 29.10.05 25.11.05 107302.00 Completed
14 Elect EE(E)-VI 6.7.05 16.5.05 129071.00 30.10.05 16.11.05 106822.00 Completed
D/o tubewell with Submersible pump set in mpl park 12F Pkt.
GTB envlave w.No 83
228/20.11.05/EE(E)-VI
M/s Illuminator
s and Ciccutres
D/o tubewell with Submersible pump set in Mpl park no 15 F-pkt
GTB enclave W.No-83.
154/29.10.05/EE(E)VI
M/s Sangwan
Elect.
D/o tubewell with Submessible pump set in Mpl park Janta flat
Nand Ngari W.NO 83 Sh.N
336/23.02.06/EE(E)-VI
M/s Punjab
Elect.Co
D/o Tubewell with Submessible Pump set in Mpl park (Masjid
wala) W.No 83 D pkt. Janta flat Sh.N
345/13.03.06/EE(E)VI
M/s Siwatch
Engineers
D/o tubewell with Submessible pump set in Mpl park E-1 Nand
Nagri W,No 83 Sh.N
150/28.10.05/EE(E)VI
M/s Hites Elect.
D/o tubewell with Submessible pump set in mpl park A pkt Janta
flat W.No-83 Sh.N
327/15.02.06/EE(E)VI
M/s Ajay Elect.
D/o tubewell with Sub messible pump set in Mpl park D pkt Janta
flat W.No-83 Sh.N
211/23.11.05/EE(E)VI
M/s Jaywanti
Elect.
D/o tubewell with Submessbile Pump set in Mpl prk ( Ambedkar park) W.No-83 Sh.N ( Janta flat
GTB envlave)
366/31.03.06/EE(E)-VI
M/s Gyan Enterprise
s
D/o tubewell with Submessible pump set in Mpl park (lothra park)
E pkt. GTB enclave W.No-83 Sh.N
133/28.10.05/EE(E)-VI
M/s Bhima
Electricals
D/o tubewell with submessible purmp set in Mpl park Staff Qtra
Eblock Nand Nagri W.No-83 Sh.N
165/29.10.05/EE(E)VI
M/s Cheena &
Co
15 Civil XIX 6.7.05 31.5.05 1624600.00 23.05.06 P 1173539.00 In Prog.
16 Civil XIX 11.7.05 30.6.05 699600.00 03.12.05 01.02.06 457375.00 Completed
17 Civil XIX 11.7.05 30.6.05 641700.00 03.12.05 27.03.06 484554.00 Completed
18 Civil XIX 11.7.05 30.6.05 573600.00 02.11.05 28.02.06 380084.00 Completed
19 Civil XIX 11.7.05 30.6.05 627650.00 5.12.05 30.12.05 602600.00 Completed
20 Civil XIX 11.7.05 30.6.05 548600.00 28.10.05 23.12.05 541911.00 Completed
21 Civil XIX 11.7.05 30.6.05 425300.00 23.11.05 11.02.06 285672.00 Completed
Const of Boundray wall of Rajeev Gandhi park by pdg M.S Grill and marble washed plaster infront Of I Block School in Sunder Ngri in
W.No-84 Sh.N
01/07.04.06/EE-XIX
M/s Avtar Builders
Imp of way to to 6 Janta flat by pdg c.c. slab at 20 no flat from
1324 to flat no 1446 and adjacement 2142 Janta flat GTB
enclave w.No 83 AC-45 Sh.N
218/24.11.05/XIX
M/s Bhati Const.Co
Imp of way to 6 Janta flat by pdg c.c slab at 18 NO flat form 1225 to 1323 and Adj 2142 Janta flat GTB
enclave W.83 AC -45 Sh.N.
248/24.11.05/XIX
M/s Shivalik
Enterprises
Imp of road by pdg RMC M-15 from village of hope foundation gate through MCD Pry School upto subhash park in Leprosy
complex W-83 AC-45 Sh.N
158/21.10.05/XIX
M/s Ishwar
Associate
Imp to road by pdg RMC M-151 road W.No 64 to MCD leprosy
Dispensary and upto MCD ( Bracks) (near Subhash park) in ( Leprosy Complex Tahirpur W.No
83 AC-45
260/5.12.05 XIX
M/s S.P. Singh
Imp of B/wall and fixcing M-S grill by Stone grit wash towards police
station alloted lane in f pokcet GTB enclave W.No-83 Ac-45
Sh.N
159/21.10.05/XIX
M/s S.K. Assocates
Imp of drain & small links by pdg RMc & Grit Wash with Covering & fixing c.c. tiles in 7 Passage in D
pocket GTB enclave W-no-83 AC-45 Sh.North.
199/09.11.05/EE-XIX
M/s Prinkle
Const.Co
22 Civil XIX 11.7.05 30.6.05 641700.00 23.11.05 01.02.06 491797.00 Completed
23 Civil XIX 18.7.05 9.6.05 540800.00 30.12.05 P 276049.00 In Prog.
24 Civil XIX 18.7.05 9.6.05 464560.00 01.12.05 14.03.06 317573.00 Completed
25 Civil XIX 18.7.05 9.6.05 329550.00 23.11.05 20.12.05 328782.00 Completed
26 Civil XIX 18.7.05 9.6.05 468250.00 25.01.06 04.03.06 303900.00 Completed
27 Civil XIX 18.7.05 9.6.05 275050.00 21.02.06 28.02.06 207115.00 Completed
28 Civil EE(E)-VI 18.7.05 9.6.05 198864.00 29.03.06 26.04.06 192191.00 Completed
29 Civil 18.7.05 9.6.05 586419.00 586419.00 Completed
Imp of way to 6 Janta flat by pdg c.c. Slab at 18 No flat No from 850 to 889 to lat W.No 781-810
and adj 2142 Janta flat GTB Enclace W.83 AC-45 sh.N
207/14.11.05/XIX
M/s Chohan
Const.Co
Const of walkway in G block in G block park near H.No G-60 in
Dilshad colony in W.No 84 Sh.N
170/21.10.05/EE-XIX
M/s Pal Const.Co
Const of walkway in B block park near Hni B-9 in Dilshad coloney in
W.No 84 Sh.N
181/28.10.05/EE-XIX
M/s Chauhan Const.Co
Const of walkway in E block park(infront of express building in Dilshad coloney W.No-84 Sh.N
162/21.10.05/XIX
M/s Hillgrane const co
Const of walkway in G block park near H.No G-54 in Dilshand
cloney in W.No-84 Sh.N
191/28.10.05/XIX
M/s Akshit Builders
Const of walkway in f- block park near M.C Pry School in F block Dilshand Colony in W.No-84
Sh(N) Zone.
300/02.01.06/XIX
M/s Rakesh Rawal
Prov of street light arrangement in pocket F, GTB enclace W-83 AC-
45.Sh.N
355/23.03.06/EE(E)-VI
M/s Perfect Electric Works
Allocation of funds for purchase of TATA Sumo Ambulance the MLA fund of veer Singh Dhingan AC-45
for SDN Hospital
SDN Hospital
Adavanse to MS/ SDNH, MCD vide
Comm. order dt. 12.01.06
M/s Tata Motors
Adavanse to MS/ SDNH, MCD vide Comm. order
dt. 12.01.06
30 Civil EE(E)-VI 09.03.06 20.02.06 189998.00 20.09.06 01.10.06 141725.00 Completed
31 Civil EE(E)-VI 09.03.06 21.02.06 181964.00 21.09.06 13.10.06 135062.00 Completed
32 Civil EE(E)-VI 09.03.06 22.02.06 157057.00 21.09.06 11.10.06 117865.00 Completed
33 Civil EE(E)-VI 09.03.06 20.02.06 159869.00 21.09.06 13.10.06 120282.00 Completed
34 Civil EE(E)-VI 09.03.06 23.02.06 136160.00 21.09.06 11.10.06 102066.00 Completed
35 Civil EE(E)-VI 09.03.06 23.03.06 132718.00 20.09.06 10.10.06 100485.00 Completed
36 Civil EE(E)-VI 09.03.06 23.02.06 134636.00 20.09.06 05.10.06 101040.00 Completed
37 Civil EE(E)-VI 09.03.06 19.02.06 132236.00 21.09.06 13.10.06 99775.00 Completed
38 Civil EE(E)-VI 09.03.06 14.07.05 199993.00
P/O semi high mast pole light in MPL borial ground Tahirpur AC45
SH.N
57/19.09.06/EE(E)-VI
M/s Saksham Electrical
& Electronic
s
P/o semi high mast pole light near green field School TEE point
Tahirpur Ac45 SH.N
63/19.09.06/EE(E)-VI
M/s Pragati
Engineers
P/o semi high mast pole in MPL park nursary Janta Flat G.T.B
enclave AC45 Sh.N
62/19.09.06/EE(E)-VI
M/s Sachdwa Electricals
P/o semi high mast pole in F-block new seema puri near
Kabristan AC45 Sh.N
64/19.09.06/EE(E)-VI
M/s Pragati
Engineers
P/o 12 m long pole near H.NO C-65 X-4 Dilshad Garden Ac45 Sh.N
65/19.09.06/EE(E)-VI
M/s Forwad
Engineers
P/o 12 m long pole F-2 block Sunder Nagri Near J.E store Ac45
Sh.N
60/19.09.06/EE(E)-VI
M/s Sachdwa Electricals
P/o 12 m long pole near H.NO C-63X1 Dilshad Garden Ac45 Sh.N
56/19.09.06/EE(E)-VI
M/s Maya Electricals
P/o 12 m long pole near E 4/30 Nand Nagri Chowk AC45 Sh.N
66/19.09.06/EE(E)-VI
M/s Malhotra
Electricals
P/o street light arrangment in I.J.K.L.G and H. block Sunder
Nagri ward AC45 Sh.N
39 Civil EE(E)-VI 09.03.06 19.02.06 132718.00 20.09.06 10.10.06 101139.00 Completed
40 Civil EE(E)-VI 09.03.06 13.07.05 199993.00
41 Civil EE(E)-VI 09.03.06 18.07.05 198864.00
42 Civil EE(E)-VI 09.03.06 16.07.05 199069.00
Civil EE(E)-VI 09.03.06 22.02.06 64533.00 28.09.06 12.10.06 45801.00 Completed
P/o 12 m long pole M block park near dispensary Sunder Nagri
Ac45 Sh.N
61/19.09.06/EE(E)-VI
M/s Sachdwa Electricals
P/o street light arrangment in M,N,O,F-1 & F-2 block Sunder
Nagri ward 84 Ac45 Sh.N
P/o street light arrangment in A,B,C,D & Janta Flat G.T.B enclave W-83 Ac45 Sh.N
P/o street light arrangment in pocket E GTB enclave ward 83
Ac45 Sh.N
P/o street light arrangment from A pocket GTB enclave to Nand
Vihar MC pry. School AC45 Sh.N
71/20.09.06/EE(E)-VI
M/s Sangwan
Elect.
Status Report of MLA, Sh.Baljor Singh , AC No. 46 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XIX 21.6.05 20.6.05 349500.00 31.10.05 15.12.05 260917 Completed
2 Civil XIX 21.6.05 20.6.05 263499.00
3 Civil XIX 21.6.05 20.5.05 400500.00 22.10.05 8.12.05 399440 Completed
4 Civil XIX 5.7.05 27.6.05 199600.00 5.8.05 7.9.05 199572 Completed
5 Civil XIX 5.7.05 27.6.05 199600.00 17.08.05 17.10.05 199089 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp of Loni road by pdg c.c. Kerb stone & c.c. infront of BSES , power grid on Loni road in W.No-86 sh.N
171/28.10.0
5/XIX
M/s Bhati
Const coImp of drainage System by pdg M.s (Xing Grating) and drain in East Gokal pur and Gokal pur village in W.No 86 sh.N
Imp of drainage Sytem by Pdg RCC culverts/stabs on main road drains etc. Brij puri road in w.No-86 Sh.N
155/21.10.0
5/XIX
M/s
Bhopal
SinghImp of lane from A-412 to A-435 , A-367 to A-387 & links by pdg c.c. pav & drain in R/c Gokal puri in w.No 86 sh.N
96/3.8.05/
XIX
M/s
Prinkle
const coImp of roads from House of sh. Raju to house of Sh. Girver pardhan near Ram Kumar house by pdg c.c. pav & drain in vill Gokal puri in w.No 86 Sh.N
99/03.08.05
/XIX
M/s Appar
Const.&
Engg.
6 Civil XIX 8.7.05 27.6.05 199600.00 19.9.05 24.11.05 199493 Completed
7 Civil XIX 8.7.05 27.6.05 199500.00 03.02.06 17.03.06 199371 Completed
8 Civil XIX 8.7.05 27.6.05 199700.00 5.9.05 7.10.05 199584 Completed
9 Civil XIX 8.7.05 27.6.05 599500.00 28.11.05 16.05.06 449129 Completed
10 Civil XIX 18.7.05 7.7.05 199721.00 07.12.05 06.01.06 199404 Completed
11 Civil XIX 18.7.05 7.7.05 199400.00 16.12.05 30.03.06 199400 Completed
12 Civil XIX 18.7.05 7.7.05 192600.00 5.9.05 11.10.05 192526 Completed
Imp of lanes from H.No A-502 to a-525, A-457 to A-478 & links lanes by pdg c.c. pav and drains in Gokalpuri R/C in W.No 86 sh.N
120/7.9.05
XIX
M/s
Dawar
Associate Imp of lane from A-301 to A-322 and from A-229 to B-271 ( along with M.C pry School) by pdg c.c. pav. & drain in R/c Gokal puri w.no 86 Sh.N
148/06.10.0
5/EE-XIX
M/s Shiv
Const.CoImp of lane in A block market & from A-562 to H.No A-345 by pdg c.c. pav & drain in R/c Gokal puri in w.No-86 Sh.N
109/25.8.05
/XIX
M/s
Himalya
Const coImp of main approach road of Village saboli from wazirabad road to vill Saboli by pdg M/P and drain in vill Saboli in w.no-86 Sh.N
250/24.11.0
5/XIX
M/s Pal
Const.CoImp of gali from Babu's House to Math & Ramesh house towards Rakesh Thakur house & link lanes by pdg c.c. pav & drains in village Saboli in w.No-86
219/24.11.0
5/XIX
M/s Anuj
EnterpImp of gali no 1 from Goutam marg to Johri pur drain & from main road Johripur towards house o sh. Rajpal Singh by pdg c.c. & drain in village c.c. Johripur W.No-86
247/24.11.0
5/EE-XIX
M/s Prem
KumarConst of RCC Culvert / slabs at Johri pur main road in vilage Johripur in w.no-86 Sh.N
110/31.8.05
/XIX
M/s Vijay
Const
13 Civil XIX 18.7.05 7.7.05 198525.00 2.9.05 27.10.05 198252 Completed
14 Civil XIX 18.7.05 7.7.05 196900.00 21.09.05 30.11.05 195996 Completed
15 Elect EE(E)-IV 18.8.05 7.7.05 193600.00 12.9.05 31.10.05 193218 Completed
16 Elect EE(E)-IV 20.7.05 22.6.05 142616.00 6.10.05 14.10.05 126254 Completed
17 Elect EE(E)-IV 20.7.05 5.7.05 143265.00 19.01.06 24.11.06 142633 Completed
18 Elect EE(E)-IV 20.7.05 8.7.05 144593.00 06.01.06 12.01.06 139978 Completed
19 Elect EE(E)-IV 20.7.05 8.7.05 145775.00 06.01.06 12.01.06 139736 Completed
20 Elect EE(E)-IV 20.7.05 13.7.05 141946.00 28.02.06 16.03.06 141839 Completed
Imp of road from Loni road near Govt. Se.Sec School Gokal purta house of sh Ashok vikkal by pdg RMC and drain in village Gokal pur in w.No-86 Sh.N
112/31.8.05
/XiX
M/s Anuj
EnterpImp of main loni road near Petraol pump & in front of BSES Power grid & in R/c Gokal puri by pdg premixe Carpet Surface in w.No 86 sh.N
134/19.09.0
5/XIX
M/s N.K
TomarImp of main Brijpuri road in front of Brijpuri gali NO 3 Bhagirathi vihar gali No 3 Indra vihar & infornt of Chaman park by pdg premix Carpet Surface in w.No-86 Sh.N
113/31.8.05
/XIX
Ms Mayur
EnterpP/o boring with Submersible pump set in B-4 Central park in Nand Nagri w.no 85/AC-46
96/6.10.05/
EEE_III
M/s Cheena
CoP/o boring with Submersible pump set at B-1 Central Park in Nand Nagri W.No-85 AC-46 under sh.N
305/19.01.0
6/EE(E)VI
M/s
Akansha
Elect.P/o boring with sibmerssible pump set at C-2 Central park in Nand Nagri W.No-85
294/06.01.0
6/EE(E)VI
M/s Anurag &
CoP/o boring with Submesible pump set at mPl D-1 Park opposite temple in Nand Nagri W.No 85 AC-46 under Sh.N
295/06.01.0
6/EE(E)VI
M/s Vinay
Kaur
Engg.P/o boring with submersible pump set at MPL park B-5 Green belt Nand Nagri w.no-85 AC-46 Sh.N
328/20.02.0
6/EE(E)VI
M/s Himanshu Enterprise
s
21 Elect EE(E)-IV 20.7.05 4.7.05 146602.00 07.02.06 16.03.06 145874 Completed
22 Elect EE(E)-IV 25.07.00 24.6.05 143551.00 06.01.06 13.01.06 139381 Completed
23 Elect EE(E)-IV 20.7.05 17.6.05 140260.00 28.12.05 09.01.06 139528 Completed
24 Elect EE(E)-IV 20.7.05 1.7.05 140609.00 10.12.05 25.12.05 139831 Completed
25 Elect EE(E)-IV 20.7.05 28.6.05 141256.00 04.01.06 11.01.06 136226 Completed
26 Civil XIX 20.7.05 7.7.05 582100.00 03.03.06 25.04.06 572864 Completed
27 Civil XIX 20.7.05 7.7.05 444900.00 31.10.05 31.11.05 319524 Completed
28 Civil XIX 20.7.05 7.7.05 422500.00 30.11.05 10.11.06 422500 Completed
29 Civil XIX 20.7.05 7.7.05 490500.00 9.01.06 12.10.06 352882 Completed
P/O boring with Submersible pump set in c-1 Central park in Nand Nagri W.No-85 AC-46.Sh.N
342/07.03.0
6/EE(E)VI
M/s Siwatch Engg. & Traders
P/o Boring with Siubmersible Pump set at B-2 park behind mkt. In Nand Nagri w.No-85 Ac-46 Sh.N
296/06.01.0
6/EE(E)VI
M/s Tyagi
Elect. &
TradingP/o boring with Submersible pump set at MPL park B-2 Nand Nagri W.No-85 AC-46 Sh.N
272/28.12.0
5/EE(E)VI
M/s Krishna Elect.
P/o boring with submersible pump set at mpl D block park (Billu wala park) Gokal puri W.No-86 AC-46 Sh. N
240/02.12.0
5/EE(E)VI
M/s
Sushma
Elect.P/o boring with Submersible pump set at MPl C& D park gokal puri W.No 86 AC-46 Sh.N
280/04.01.0
6/EE(E)VI
M/s M.K.Enter
prisesImp of lane by RMC and drain from H.No 1205 to A-709 in Mandoli Vivek Vihar -85 Sh.N
305/02.01.0
6/EE-XIX
M/s Akash
Const.CoImp of lane by pdg RMC and drain from H.No 1165 to 1130 and its link in Mandoli village w.No 85 Sh.N
187/28.10.0
5/EE-XIX
M/s Bhati
Const coImp of road by pdg M/P and Imp of drain from C-3/470 to road W-68 C-3 block Nand Nagri W.Sh.N
251/24.11.0
5/EE-XIX
M/s Darshan Const.Co
Imp of road by pdg M/P and Imp of drain along Jail boundary from Ankur General Store to Gali no -5 in Mandoli village
233/24.11.0
5/EE-XIX
M/s
Prinkle
const co
30 Civil XIX 20.7.05 7.7.05 481300.00 03.01.06 04.07.06 344878 Completed
31 Civil XIX 20.7.05 3.7.05 429300.00 20.12.05 01.03.06 338627 Completed
32 Civil XIX 20.7.05 3.7.05 175300.00 18.11.05 10.02.06 174802 Completed
33 Civil XIX 20.7.05 3.7.05 175300.00 3.9.05 3.11.05 174574 Completed
34 Civil XIX 20.7.05 3.7.05 175300.00 12.12.05 27.01.05 174945 Completed
35 Civil XIX 20.7.05 3.7.05 199800.00 23.09.05 23.12.05 199800 Completed
36 Civil XIX 20.7.05 3.7.05 175300.00 18.11.05 23.12.05 175300 Completed
37 Civil XIX 20.7.05 3.7.05 525100.00 10.11.05 23.12.05 515605 Completed
38 Civil XIX 20.7.05 3.7.05 214400.00 11.08.06 30.11.06 124425 Completed
Imp of road by pdg M/P and drain along jail boundary from 20' road to H.NO D-133 in Modoli village w.No-85 Sh.N
224/24.11.0
5/EE-XIX
M/s
Prinkle
const coImp of lane by pdg RMc from H.No 200 to 696 ,C-3 block Nand Nagri ward 85 Sh.N
180/28.10.0
5/XIX
M/s
Universal
Savitary
EmporiumImp of lane by pdg RMC from H.NO 181 to 290 ,C-3 block along recreation Centre Nand Nagri W.NO-85 Sh.N
203/09.11.0
5/XIX
M/s Goel
& CoImp of lane by pdg RMc from H.No 395 to 408 c-2 block , Nand Nagri W-85 Sh.N
136/19.9.05
/XIX
M/s Satish
& BrosImp of lane by pdg RMC from H.No 399 to 418 C-block Nand Nagri w-85 Sh.N
212/16.11.0
5/XIX
M/s Gupta
Bros.Imp of lane by pdg RMc from H.No 287 to 316 ,C-1 block Nand Nagri W-85 Sh.N
141/20.09.0
5/XIX
M/s Dinesh Kumar Sharma
Imp of lane by pdg RMc in C-1 block Nand Nagri from H.No 471 to H.No 490 w-85 sh.N
151/19.10.0
5/XIX
M/s Ashok
const.CoImp of lane by pdg RMC from H.No A-43 to A-48 A-70 to A-84 , A-84 to A-98 and A-105 to A-112 in Mondoli w-85 85 sh.N
172/28.10.0
5/XIX
M/s
Tomar
Const.CoImp of footpath on Loni road by pdg c.c. Kerb stones from entry pt of Loni road to main road af vill gokulpur and interlocking tiles in W.No-86 Sh.N
437/28.03.0
6/EE-XIX
M/s
Sarvoday
Consts.
39 Civil XIX 1.8.05 12.7.05 554000.00 31.10.05 06.01.06 394505 Completed
40 Civil XIX 1.8.05 12.7.05 432500.00 28.10.05 27.02.06 340255 Completed
41 Civil XIX 1.8.05 12.7.05 397200.00 05.11.06 6.12.05 276980 Completed
42 Civil XIX 1.8.05 12.7.05 586800.00 31.10.05 06.01.06 416465 Completed
43 Civil XIX 1.8.05 12.7.05 595400.00 09.11.05 16.03.06 427500 Completed
44 Civil XIX 27.10.05 20.8.05 575000.00 6.12.06 P 413829 In Prog.
45 Civil XIX 27.10.05 20.8.05 570000.00 02.01.06 13.10.06 563470 Completed
Imp of main road from A-1( Aggarwal sweet) to Dalao of A block road along with MCD stonre by pdg ready mix Concrete & drain in in R/c Gokul puri in W-86 W Sh.N
189/28.10.0
5/XIX
M/s
Bhopal
SinghImp of road from Loni road ( near Doulat Dhavem Kanta) to gali no 15 by pdg M/P &drain in village Gokul pur in w.No 86 Sh.N
190/28.10.0
5/XIX
M/s
Bhopal
SinghImp of drainage system from Dalao at B block Gokul puri chowk to House no B-551 in R/c Gokul puri in w.no 86 sh.N
183/28.10.0
5/EE-XIX
M/s R.M
Associate
sImp to road Hs no A344/2 B-253 by pdg RMC in R/C Gokal puri w.,no-86
188/28.10.0
5/XIX
M/s Bhopal Singh
Imp of road from Dalao at B block in r/c Gokal puri to House no B-551 by pdg M/P in R/c Gokal puri in W.NO-86
198/08.11.0
5/EE-XIX
M/s
Tomar
Const.CoImp of main road of vill. Gokal pur by pdg RMC and drainage system from Loni road to drain w.No 1 in vill Gokal pur in w.no 86 Sh.N
132/24.11.0
6/EE-XIX
M/s Akash
Const.CoImp of road from Pt. Roop Chand Jouripur main road to Hs of Sh.Tarachand by pdg B/pavement M/Pre , and drian in vill Johripur in w.no 86 Sh.N
304/02.01.0
6/EE-XIX
M/s
Prinkle
const co
46 Civil XIX 24.11.05 20.8.05 599800.00 10.05.06 20.06.06 435832 Completed
Civil XIX 24.11.05 20.8.05 435000.00 17.04.06 20.06.06 334088 Completed
Civil XIX 24.11.05 20.8.05 591000.00 18.05.06 07.07.06 450545 Completed
Civil XIX 24.11.05 20.8.05 349900.00 22.02.06 P 235443 In Prog.
Imp to drainage road of village Johripur from main Johri pur road towards Ambedkar gali by pdg RMC in vill Johripur in w.No-86 Sh.N
06/21.04.06
/EE-XIX
M/s R.A
Associate
sImp to drainage system on main road from Johri pur road towards Ambedkar gali in vill. Johripur in w.No-86 Sh.N
398/14.03.06/EE-XIX
M/s R.S Const. &
Co
Imp of main road of east gokalpur from Loni road to gali no 4 east gokal pur by pdg RMC in east Gokal pur in w.No-86 sh.N
11/21.04.06/EE-XIX
M/s Satish & Bros
Imp of raod from Johri pur road to hs af Sh Avtar Singh by pdg c.c. pav & drain in vill Johri pur in w.no-86
379/22.02.06/XIX
M/s Bhopal Singh
Status Report of MLA, Sh.Ram Babu Sharma, AC No. 47 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil Sh.N 26.7.05 19.7.05 93335.00 5.10.05 3.12.05 93335.00 Completed
2 Civil Sh.N 26.7.05 19.7.05 178000.00 16.11.05 P 167500.00 In Prog.
3 Civil Sh.N 26.7.05 19.7.05 132400.00 30.9.05 29.11.05 126044.00 Completed
4 Civil Sh.N 26.7.05 19.7.05 145307.00 103/9.9.05 17.12.05 29.11.05 145307.00 Completed
5 Civil Sh.N 20.10.05 28.9.05 464258.00 02.01.05 20.02.06 464258.00 Completed
6 Civil Sh.N 27.10.05 7.7.05 663368.00 15.01.06 05.07.06 621220.00 Completed
7 Civil Sh.N 10.11.05 12.9.05 191188.00 28.12.05 02.03.06 191188.00 Completed
8 Civil Sh.N 10.11.05 12.9.05 153916.00 28.12.05 02.03.06 153740.00 Completed
9 Civil Sh.N 14.11.05 12.9.05 370882.00 12.05.06 28.03.08 302191.00 Completed
10 Civil Sh.N 14.11.05 12.9.05 247184.00 12.01.06 18.03.06 247184.00 Completed
11 Civil Sh.N 1.12.05 31.8.05 260403.00 15.02.06 09.06.06 260403.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp of lane along H.NO A-124 to A-120/2 and links by pdg c.c. and drain in A block
Ashok Nagar C-88
108/30.9.05 sh.N
M/s Kamal Enterp
Imp of lane along HnO 4649/72 A to 4649/68 B by pdg c.c. & drain in New
Modern Shadra.
119/18.10.05/Sh.North
M/s Vipin Const.Co
Imp of lane NO-1 Jagatpuri and Kardom wali gali in Hardev Puri by pdg c.c. drain
in W.No-88
102/9.9.05/ sh.N
M/s Mayur Entp
Imp of lane no 4 by pdg c.c. and drain in New Modern Shadra C-88
M/s Kamal Enterp
Imp of side berms of RPS block of M.S park DDA flats C-88 ( Mansarover park)
128/14.11.05/Sh.North
M/s Kanhaya Lal
Imp of lane w no-6 and links by pdg cement concrete and raising of drain in c-
88 Ashok Nagr Sh.N
178/06.01.06/Sh.North
M/s R.P Aggarwal
Imp of lane ( by providing cc. ) in front of Sewage pumping station Kabool Nagr w-
87
148/19.12.05/Sh.N
M/s Krishan Gopal Mittal
Imp of road berms along M.C primary School Naveen Shadadra W.no-87
147/19.11.05/Sh.N
M/s Sandeep
Enterprises
Imp of lane c.c. & drain along 1/1249 ,1/1269 and F-300 East Rohtash
Nagr w.no-87
226/03.03.06/Sh.North
M/s Vikas & Co.
Imp of lane by c.c. & drain from E-1 to E-14 in Naveen Shadra w.no-87
184/12.01.06/Sh.North
M/s Satish Kumar Sharma
Imp of lanes by c.c pav near H.No 1/1547 ,1/1563,1/1494 D-3 Mansarover
park w-87
195/13.02.06/Sh.North
M/s S.P Enterprises
12 Civil Sh.N 8.12.05 28.9.05 122869.00 13.04.06 P 92002.00 In Prog.
13 Civil Sh.N 8.12.05 28.9.05 109977.00 27.04.06 03.01.07 109977.00 Completed
14 Civil Sh.N 25.1.05 26.10.05 314941.00 28.03.06 16.06.06 314941.00 Completed
15 Civil Sh.N 25.1.05 26.10.05 629000.00 20.09.06 19.10.06 482251.00 Completed
16 Civil Sh.N 25.1.05 12.9.05 610359.00 29.08.06 06.11.06 603815.00 Completed
17 Civil Sh.N 25.1.05 28.9.05 551797.00 03.04.06 15.06.06 551797.00 Completed
18 Civil Sh.N 25.1.05 26.10.05 1500363.00 04.05.06 30.08.06 1500363.00 Completed
19 Civil Sh.N 6.2.06 30.1.06 422763.00 20.03.06 09.06.06 422763.00 Completed
20 Civil Sh.N 14.2.06 11.1.06 579700.00 02.08.06 18.10.06 574686.00 Completed
21 Civil Sh.N 14.2.06 26.10.05 742433.00 06.09.06 05.12.06 742433.00 Completed
22 Civil Sh.N 14.2.06 22.11.05 1444300.00 16.09.06 10.11.06 1201967.00 Completed
23 Civil Sh.N 24.02.06 30.01.06 383584.00 26.06.06 29.08.06 383584.00 Completed
24 Civil Sh.N 24.02.06 30.01.06 197000.00 17.08.06 5.05.07 173895.00 Completed
Imp of drain crossing by pdg RCC slab culverts in Ashok Ngr. C-88
200/15.02.06/Sh.North
M/s S.K Associates
Imp of drain crossing by pdg RCC (Slb) culverts in Chander Lok C-88
203/24.02.06/Sh.North
M/s S.P Singh
Imp of area along telephone excleange shadadra by c.c. pav and drains in Raj
block shah w-87
250/20.03.06/Sh.North
M/s Chauhan Const.Co
Imp of Ahiusha Marg from G.T road to Mother dariy by c.c. pav Kabool Ngr W-87
242/20.03.06/EE(Sh.)North
M/s Chouhan Const.Co
Re. Drainage system from 718 G.T. road to CSE pump hs on Loni road w-87
63/28.08.06/EE(Sh.)North
M/s Chouhan Const.Co
Imp of lane No-9 and link by pdg c.c and drain in c and B block Ashok Ngr c-88
243/20.03.06/EE(Sh)North
M/s Ganjender
Kumar
Imp and raising of lane near 1/7220,1/7184,1/6974 & 1/6943 by c.c. &
drain in shiva ji park w-87
09/25.04.06/EE(Sh)North
M/s Satish & Bros.
Pdg Cement concrete from Loni road to H.No 1449/2 A gali w.no-5 Durgapuri
Extn. C-88
215/03.03.06/Sh.North
M/s N.K.G Enterprises
Pdg C.C Pav from E-10 to F-10 IN Mansarover Park c-87
41/24.07.06/EE.Sh.North
M/s Sharma Const.Co
Remodelling of Drainage systme on Ahinsha Marg from G.T. road to Mother
Dariy Kabook Nagr W-87
62/28.08.06/EE(Sh.)N
M/s Sanjay Builders
pdg c.c on roads from G.T. road to D-46 and D-50 to G.T. road in Mausarovar park
W-87
82/15.09.06/ EE (Sh.)North
M/s Ram Kumar Gupta
Const. Of boundary wall of LIG flat near mother dairy East of Loni road W.NO 88
28/22.05.06/EE(Sh.)/North
M/s A.K Enterprises
P/L fly ask time brick flooring LIG flats near mother dairy east of Loni road C-88
746/20.03.06/EE(Sh)/North
M/s Kumar Const.Co
Status Report of MLA, Sh Vinay Sharma, AC No. 48 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Elect EE(E) 1.8.05 26.6.05 198864.00 29.11.05 12.12.05 192290 Completed
2 Elect EE(E) 1.8.05 28.6.05 199993.00 25.01.06 23.02.06 193780 Completed
3 Elect EE(E) 1.8.05 29.6.05 199993.00 06.11.05 02.12.05 193480 Completed
4 Elect EE(E) 1.8.05 30.6.05 199069.00 15.01.06 13.02.06 192890 Completed
5 Elect EE(E) 28.9.05 2.9.05 126963.00 18.11.05 07.12.05 109150 Completed
6 Elect EE(E) 28.9.05 5.9.05 125357.00 14.11.05 13.12.05 110167 Completed
7 Elect EE(E) 28.9.05 14.9.05 122447.00 16.11.05 05.12.05 107533 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Prov of Street light arrangement in A&B block in Kabir Nagar Ac-48
Sh.N.Zone
229/28.11.05/EE(E)VI
M/s Pragati Engg.
Prov. Of street light arrangement in Jyoti Coloney AC-48 Sh.N.Zone
304/19.01.06/EE(E)VI
M/s Punjab
Elect.Co
Prov. Of Street light arrangement in Jyoti Nagar AC-48 Sh.N.Zone.
153/29.10.05/EE(E)VI
M/s Sachdava
Elect.
Prov of Street light arrangement in Kardam Puri AC-48 Sh.N.Zone
287/06.01.06/EE(E)VI
M/s ACE Engg. Burear
P/o 12 m long pole at chowk near Peepleshwar Mandir Balbir Nagr
Extn. In w.no 90 AC-48 Sh.N
789/14.11.05/EE(E)VI
M/s Oberai Elect.
P/o 12 m long pole at chowk near Aggarsen Dharam Shala west
Jyoti Nagr H Block Extn. In w.no 90 AC-48 Sh.N
192/14.11.05/EE(E)VI
M/s Oberai Elect.
P/o 12 m long pole at RishiRaj Chowk Balbir Nagr Extn W-90
AC-48 Sh.N
191/14.11.05/EE(E)VI
M/s Oberai Elect.
8 Elect EE(E) 30.9.05 5.9.05 126487.00 09.12.05 22.12.05 126487 Completed
9 Elect EE(E) 30.9.05 30.8.05 128983.00 30.11.05 19.12.05 125578 Completed
10 Elect EE(E) 30.9.05 27.8.05 129232.00 16.12.05 31.12.05 122082 Completed
11 Elect EE(E) 30.9.05 25.8.05 129097.00 03.12.05 12.12.05 120390 Completed
12 Civil Sh.N 8.11.05 29.8.05 475846.00 27.03.06 13.04.06 430180 Completed
13 Civil Sh.N 8.11.05 29.8.05 826200.00 06.04.06 24.05.06 778792 Completed
14 Civil EE(E)-Vi 8.11.05 29.8.05 134636.00 29.09.06 11.10.06 90664 Completed
15 Civil EE(E)-Vi 21.11.05 5.10.05 144277.00 21.09.06 11.10.06 113218 Completed
16 Civil EE(E)-Vi 21.11.05 5.10.05 135974.00 29.09.06 09.10.06 103130 Completed
P/o 12 m long pole at main Babarpur road near Kabristan in
w.no 90 AC-48 Sh.N
253/08.12.05/EE(E)VI
M/s Suryalite
Engg.
P/o tubewell with submessible pump set B3 block mpl park New
jafrabad AC-48 Sh.N
226/28.11.05/EE(E)VI
M/s A.K.Elect.
P/o tubewell bore with sbumessible pump set at Mahila mpl park New Jafrabad in w-89
AC-48 Sh.N
258/09.12.05/EE(E)-VI
M/s Chandra Electrical
& Contractor
s
P/o tubewell bore with submessible pumps set at west
jyoti Nagr mpl . Park A block Shiv Parvati Mandir in AC-48 Sh.N
244/02.12.05/EE(E)VI
M/s Krishna
Elect.Works
Imp of drain in Kabootar Market road in welcome Seelampur in C-
89 Sh.N
175/3.01.06/EE SH(N)
M/s Kay Cee
Const.Co
Imp of lane along H.No. D-17 to D-10 and near Shanti Nurshing Home by pdg RMC & drain in
Panchsheel garden in C-89 Sh.N
219/03.03.06/Sh.North
M/s N.K Tomar
Provision of 12 m long pole at Ajad Chowk kardam puri AC-48
74/28.09.06/EE(E)-VI
M/s A.K Electrical
Provison of 12 m long pole at Kardampuri pulia in Karam puri w
no-90 AC-48
50/19.09.06/EE(E)-VI
M/s Khana Sales Corp.
P/o 12 m long pole near police chowki main road Babarpur w no-
90 AC-48 Sh.N
72/28.09.06/EE(E)-VI
M/s Seth Conts.
17 Civil Sh.N 22.11.05 29.8.05 470984.00 03.04.06 18.09.06 271726 Completed
18 Civil Sh.N 22.11.05 29.8.05 361370.00 23.02.06 18.09.06 358578 Completed
19 Civil Sh.N 22.11.05 29.8.05 414939.00 21.01.06 29.03.06 407350 Completed
20 Civil Sh.N 22.11.05 29.8.05 459374.00 08.02.06 27.03.06 398525 Completed
21 Civil Sh.N 22.11.05 29.8.05 474635.00 19.05.06 1.08.06 466483 Completed
22 Civil Sh.N 18.1.02 29.8.05 445985.00 02.03.06 1.04.06 443183 Completed
23 Civil Sh.N 19.1.06 29.8.05 313400.00 13.04.06 28.06.06 313400 Completed
24 Civil Sh.N 14.2.06 20.9.05 769174.00 01.06.06 P 768870 In Prog.
25 Civil Sh.N 14.2.06 20.9.05 802360.00 22.06.06 25.08.06 802096 Completed
Imp to main on Bagh wala Masjid road in welcome Seelampur in C-
89 Sh.N
197/14.02.06/EESh(N)
M/s Shri Nath
Const.Co
Imp to main on Rani Jhansi road in Subhash park Extn. In C-89
Sh.N
196/14.02..06/EESh(N)
M/s Shri Nath
Const.Co
Imp to road along M.C primary School (Hindi) in Welcome
Seelampur in C-89 Sh.N by c.c. pav & drain
176/03.01.06/Sh.North
M/s Kay Cee
Const.Co
Imp of lane along Pkt. B DDA flats by pdg c.c. pav and drain in
Jafrabad Awas Khand in C-89 Sh.N
150/19.12.05/Sh.North
M/s Sanjay
Builders
Imp to lane from Community Hall to DJB pump Hs by pdg c.c. pav
and drain in jafrabad awas Khand in C-89 Sh.
206/01.03.06/Sh.North
M/s S.P Enterprise
s
Imp of lane along h.No c-109 to C-40 by pdg c.c. pav and drain in Jafrabad Amas Khand in C-89
Sh.N
224/03.03.06/Sh.North
Ms Sharma
Const.Co
Const of RCC culvert near Dalao Sudamapuri near BSES office
Jafrabad & near Hari OM gali east Babarpur& near F.C. bridg at
Drain W-1 in C-90
241/20.03.06/Sh.North
M/s Gaurav
Associates
Imp of Loni road adj drain and footpath from Kardam Marg to
CSE office in sh.N
10/25.04.06
/EE-Sh.North
M/s Chauhan Const.Co
Const of outfall drain from Hanuman Mandir to East Gorakh
Park in sh.N
03/17.04.06/Sh.North
M/s Sanjay
Builders
26 Civil Sh.N 14.2.06 20.9.05 406200.00
27 Civil Sh.N 14.2.06 29.8.05 314300.00
28 Civil Sh.N 14.2.06 29.8.05 591000.00
29 Civil Sh.N 14.2.06 29.8.05 641500.00 25.08.06 27.10.06 641378.00 Completed
30 Civil Sh.N 14.2.06 20.9.05 1093325.00
31 Civil Sh.N 14.2.06 2.2.06 286380.00
32 Civil Sh.N 31.03.06 02.02.06 192000.00 06.12.06 18.01.07 153339 Completed
33 Civil Sh.N 31.03.06 02.02.06 495500.00 12.08.06 10.11.06 390221 Completed
34 Civil Sh.N 31.03.06 02.02.06 782300.00 20.09.06 09.11.06 617702 Completed
35 Civil Sh.N 21.03.06 02.02.06 696500.00 12.08.06 10.11.06 549332 Completed
Imp of gali no 3 & adj. Lane in B block kabir Nagr in c-90 by c.c. Const of Central verge on Loni
road from 52 Cusec drain to Durgapuri chowk in Sh.N
Const of footpath from 52 Cusec drain to Durgapur chowk at Loni
rd in Sh.N
Raising /Imp of Loni road carriage way ( Durgapuri side) by pdg M/P
from Durgapuri Chowk to 52 Cusec drain in Sh.N
01/17.04.06/
EE(Sh.)North
M/s Ram Kumar Gupta
Imp of Service lane of Loni road (west jyoti Nagr side) in sh.N ( by
interlocking pavers.)
Imp of Gandhi gali and Drupat gali and Adjoining lane in Chajjupur
in c-90
Pdg drain crossing in east Babarpur Balbir Nagar and ext w
in C-90
107/19.10.06/EE-Sh.(N)
M/s Garvit Const.Co
Pdg cc road along 52 cusec drain from h. no. 1/7571 east Gorakh park to Babarpur road in C-90
59/04.08.06/EE-
Sh.North
M/s Chauhan Const.Co
Pdg cc road along 52 cusec drain from h.no. 1/4706 to 1/4804 in
Balbir Nagar ext. in C-90
68/28.08.06/EE-
Sh.North
M/s M.G Goel
Const.Co
Pdg cc road alaong 52 cusec drain from h.no 1/4817 to gali no.
14 east gorakh park in c-90
58/04.08.06/EE-
Sh.North
M/s Chauhan Const.Co
36 Civil Sh.N 21.03.06 02.02.06 637800.00 12.08.06 10.11.06 503155 Completed
37 Civil EE(E)-VI 21.03.06 25.01.06 134404.00 21.09.06 11.10.06 100899 Completed
Pdg road along 52 cusec drain from h.no 157 to gali no. 13 Balbir
Nagar ext. to h.no. 101 E Prem gali east Babar pur in C-90
60/04.08.06/EE-
Sh.North
M/s Chauhan Const.Co
P/o 12 m long pole in gali no. 8 Balbir Nagar ext, near pulia chowk
Ac48 Sh.N
70/19.09.06/EE(E)-VI
M/s M.J Electricals
& Electronic
s
Status Report of MLA, Sh.Mateen Ahmad, AC No. 49 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XIX 24.5.05 29.12.04 321168.00 61/16.6.05 18.6.05 15.7.05 320211 Completed
2 Civil XIX 24.5.05 11.2.05 380700.00 59/16.6.05 18.6.05 23.9.05 378435 Completed
3 Civil XIX 24.5.05 11.2.05 326917.00 58/16.6.05 18.6.05 23.9.05 326810 Completed
4 Civil XIX 24.5.05 29.12.04 525000.00 75/28.6.05 1.7.05 22.8.05 511939 Completed
5 Civil XIX 24.5.05 29.12.04 273373.00 60/16.6.05 20.6.05 20.7.05 272452 Completed
6 Civil XIX 24.5.05 8.11.04 369905.00 30.09.05 21.10.05 369138 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp of Gali NO 20 and links by pdg c.c. pav and Imp of drain in Chauhan Bangar C-91 Sh.North.
M/s R.S Const &
Co
Imp of Gali pdg RMC & drain from Pahari wala Gali to
trasnfarmer in A block Chauhan Bangar in w.No-91 Sh.N
M/s R.S Const &
Co
Imp of gali by pdg RMC and drain from Brahampuri road to gali no 6 in A block Chauhan Bangar in W-
91 Sh.N
M/s R.S Const &
Co
Imp of main Gautam puri road by RMC in c-91 Sh.N.
M/s R.S Const &
Co
Imp of gali no 19 & 20 and link in B block chauhan bangar c-91(by
pdg c.c.)
M/s R.S Const &
Co
Imp of lane by c.c. pav in gali ni 5,6,7, of c block and Noorani
Masjid road in Chauhan Bangar C-91 Sh.N
144/23.09.05/XIX
M/s Maha Laxmi
Const Co
7 Civil XIX 24.5.05 29.12.05 245000.00 20.01.06 08.03.06 242134 Completed
8 Civil XIX 20.6.05 11.2.05 513500.00 104/24.8.05 25.8.05 23.9.05 372342 Completed
9 Civil XIX 5.7.05 30.6.05 400000.00 08.08.05 09.09.05 375272 Completed
10 Civil XIX 8.7.05 22.6.05 467245.00 97/12.8.05 13.8.05 6.10.05 466119 Completed
11 Civil XIX 8.7.05 30.6.05 311050.00 30.12.05 P 204243 In Prog.
12 Civil XIX 8.7.05 30.6.05 345800.00 21.11.05 09.01.06 306120 Completed
13 Civil XIX 8.7.05 30.6.05 446700.00 21.10.05 14.12.05 404737 Completed
14 Civil XIX 8.7.05 30.6.05 303000.00 18.11.05 30.01.06 204845 Completed
15 Civil XIX 8.7.05 30.6.05 360750.00 22.10.05 31.01.06 360689 Completed
Imp of lane in Brahmpuri road to D block Cross link in Chauhan
Banger in w.No 91 Sh.N.(by pdg)
80/11.07.05/XIX
M/s Bhati Const.CO
Imp of gali no 6 and link by pdg c.c. &drain in C block chauhan Bangar W.No-91 B W.No-C-91
Sh.N
M/s R.S Const &
Co
Imp of road by pdg RMC and drain from 1st Pusta road to B-81 in New Ushman pur W.No C-91
Sh.N
95/03.08.05/XIX
M/s Prinkle
Const.CO
Imp of road from A-35 A-35 to A-188 by pdg RMC and drain in New
Usman pur W.No-91 A Sh.N
M/s Maha Laxmi
Const Co
Imp of gali no -7 from H.NO T-83 to HNO T-300 by pdg c.c. & drain
in Gautam puri W.No-91 sh.N
233/24.11.05
M/s MP Const co
Imp of dispensary wali gali in Gautam puri by pdg c.c. & drain
from Brahampuri road to Hanuman Mandir W.No-91 Sh.N
206/14.11.05/XIX
M/s Rakesh Rawal
Imp of gali no 1,2,3,4, and 5, in Kaithwara by pdg c.c. & drain in
w.No 91 Sh.N
143/23.09.05/XIX
M/s M.P Const.CO
Imp of gali no 8,9, and links by pdg c.c & drain in A block Sastri
park in W,No-91 Sh.N.
201/09.11.05/XIX
M/s Subhash
Enterprises
Imp of drainage system by P/F M.S Greating crossing at dift
lanes/gali in shastri park A,B,C, D,E F,H, block Sh.N. W.NO-91
160/21.10.05/XIX
M/s Ganesh
Enterprises
16 Civil XIX 8.7.05 30.6.05 438000.00 03.12.05 02.03.06 393389 Completed
17 Civil XIX 8.7.05 22.6.05 448140.00 17.11.05 30.11.05 447319 Completed
18 Civil XIX 8.7.05 22.6.05 356300.00 14.9.05 17.11.05 323923 Completed
19 Civil XIX 8.7.05 22.6.05 351600.00 12.04.06 25.07.06 227305 Completed
20 Civil XIX 8.7.05 22.6.05 282180.00 16.11.05 23.12.05 281983 Completed
21 Civil XIX 8.7.05 30.6.05 352615.00 30.12.05 06.02.06 352124 Completed
22 Civil XIX 12.7.05 11.7.05 382500.00 17.11.05 09.02.06 256969 Completed
23 Civil XIX 12.7.05 11.7.05 430857.00 07.11.06 16.01.06 429689 Completed
Imp of Jain Mandir gali from HNO T-83 to DDA land and gali upto no
7 by pdg c.c.& drain in Gautam puri W.No-91.
239/24.11.05/XIX
M/s Subhash
Enterprises
Imp of road by pdg /laying RMC and Imp of drain from Nandia park
road to Jain Medical store in B block Usman pur in W.No-91
Sh.N
177/28.10.05 XIX
Ms R.s Const Co
Imp of market road by P/L RMC and Imp of drain fron H.No B-109 to gali no 9 in B block Usman pur
in W.NO 91 Sh.N
116/1.9.05/XIX
M/s Maha Laxmi
Const Co
Imp to Samdriya Masjid road and its link by pdg c.c. & drain from
Brasham puri road to gali no 7 in A block Chauhan Bangar W.No-
91 Sh.N
184/28.10.06/EE-XIX
M/s Sanjay Kumar
Imp of Zafrabad road and its link from H.No C-5/17 to H.No 193/4
by pdg c.c. & drain in A block Chauhan Bangar in w.no 91 sh.N
205/14.11.05/XIX
M/s Tomar
Const.Co
Imp of side at road by P/f interloking Parvr from Elect
transformer to Baba Ganga Das Gali in w.No-91 sh.N
192/28.10.05/XIX
M/s M.P.Const
.Co
Imp of gali from H.NO 203 to 199 and HNO 188 to H1 36 by pdg c.c pav in H block in New Selampur
W.No-92
197/08.11.05/XIX
M/s Tomar
Const.Co
Imp to gali by pdg c.c. pav from HNO H1 92 to H1 42 in H block in
New Seelampur W.No-92 Sh.N
178/28.10.05/EE-XIX
M/s R.S Const &
Co
24 Civil XIX 18.7.05 11.7.05 399036.00 03.12.05 25.02.06 399036 Completed
25 Civil XIX 18.7.05 11.7.05 315600.00 05.11.05 14.02.06 286605 Completed
26 Civil XIX 18.7.05 11.7.05 350250.00 06.11.05 25.01.06 277313 Completed
27 Civil XIX 18.7.05 30.6.05 329468.00 19.01.05 08.02.06 329468 Completed
28 Civil XIX 18.7.05 30.6.05 232200.00 15.12.05 14.02.06 228422 Completed
29 Civil XIX 18.7.05 30.6.05 505900.00 7.11.05 20.12.05 465584 Completed
30 Civil XIX 2.8.05 30.7.05 533155.00 10.9.05 26.10.05 511769 Completed
31 Civil XIX 12.8.05 30.6.05 291810.00 13.12.05 03.03.06 196132 Completed
Imp to gali by pdg c.c. pav from HNO H1 92 to H1 42 in H block in
New Seelampur W.No-92 Sh.N
229/24.11.05/XIX
M/s R.S Const &
Co
Imp of gali by pdg c.c. pav from H.No 111 to 98, H.No 117 to 112, H.No 98 to 84 and H.NO 56 to 70
and H.No 70 to 83 in E block in New Seelampur c-92
175/28.10.05/XIX
M/s Jain Associate
s
Imp to gali by pdg c.c. pav from H.No E-1 to E-14 and H.No 50 to
E-69 and E-29 to E-34 and adj lane in e block in New Seelam pur
in c-92 Sh.N
182/28.10.05/XIX
M/s Chander Prakash Arora.
Imp of road by pdg c.c. pav from H.No M-92 to M-1 in M block Welcome Seelampur w.No-92
Sh.N
202/09.11.05/XIX
M/s Subhash
Enterprises
Imp of gali by pdg c.c. pav from H.no M-56 to M-92 M68 to H.No
12 and H.No M-11 to M-44 in Welcome Seelampur W.No-92
sh.N
272/05.12.05/XIX
M/s R.S Const &
Co
Imp of gali no 39/9 H.No 943 and link H.NO 1127 to 1120 and H.No
950 to H.Nop 1150 by pdg c.c. pav in Jafrabad C -92 Sh.
174/28.1.05/XIX
Ms Jaina Asso
Imp of lane by pdg c.c. pav in lane no 13/8 ,13/6 and 13/5 of D block Chauhan Bangar in C-91 B Sh.N
121/9.9.05/XIX
Ms Avtar Builders
Imp of gali no 39/6,39/7 by pdg c.c. pav in Zafrabad C-92 Sh.N
Zone
290/05.12.05/XIX
M/s Subhash
Enterprises
32 Civil XIX 18.8.05 22.6.05 172200.00 16.03.06 26.05.06 160499 Completed
33 Civil XIX 28.9.05 13.9.05 314250.00 29.02.06 22.04.06 232638 Completed
34 Civil XIX 28.9.05 13.9.05 160541.00 26.11.05 27.12.05 160541 Completed
35 Civil XIX 28.9.05 13.9.05 191794.00 03.12.05 24.12.05 191794 Completed
36 Civil XIX 28.9.05 13.9.05 194989.00 14.12.05 28.02.06 194668 Completed
37 Elect EE(E)-IV 30.9.05 24.8.05 148111.00 14.11.05 22.11.05 144260 Completed
38 Civil sh.N 7.1.05 23.7.05 265011.00 28.12.05 01.03.06 265011 Completed
39 Civil sh.N 30.11.05 12.7.05 190345.00 24.02.06 P 182974 In Prog.
40 Civil XIX 16.02.06 02.12.05 355145.00 20.04.06 30.06.06 354026 Completed
Imp of Shiv Mandir gali and links and H.No 137/5 to 137/20 by pdg
c. c & drain in B block Shanti Mohalla in w.no-91
390/10.03.06/EE-XIX
M/s R.S Const &
Co
Imp of gali no 21 by pdg c,c, pav in Jafrabad in C-92 Sh.N
357/22.02.06/XIX
M/s Ganesh
Enterprises
Imp of lane of the H.No 1/6 to C-1/13 , in c block in Seelmpur C-92
Sh.N ( by c.c.)
222/24.11.05/XIX
M/s R.A.Assoc
iates
Imp of lanes by c.c. from H.No C-1/6 , C-1/18, C-1/27 to C-1/22 to C-1/36 in c- block Seelam pur in
C-92 Sh.N
258/24.11.05/XIX
M/s Kumar
Const.Co
Imp of lane by pdg c.c. pav in from H.NO 412 to 424 ,H.NO 451
to 428 and 450 in Jafrabad in w.No 92 Sh.N
254/24.11.05/XIX
M/s Ishwar
Associate
Pro of Semi high mast pole C blcok Shastri park opp Community Centre Shastri park aC-49 w.no-
91 Sh.N
178/14.11.05/EE(E)VI
M/s Bharat Elect.&
Electronices
Imp of lane No 2 of B- block and lane No-2 of c block by pdg c,c pave in Shastri park in c-91 a
Sh.N
237/24.11.05/XIX
M/s Akash Const.Co
Imp to B/wall & footpath opp Dwarka Mandir at G.T. road in
Sh.N (by pdg B/W & interlocking tiles)
188/01.02.06/Sh.North
M/s Virender
Singh
Imp of gali no. 1,2,7 and links by pdg cc and drain in A block
Shastri Park in w.no.91 Sh.N
431/28.03.06/EE-XIX
M/s Ashok Kumar Rana
41 Civil XIX 16.02.06 02.12.05 189750.00 22.02.06 28.03.06 188921 Completed
42 Civil XIX 16.02.06 02.12.05 194260.00 25.02.06 01.04.06 194260 Completed
43 Civil XIX 16.02.06 02.12.05 175706.00 03.03.06 13.04.06 175703 Completed
44 Civil XIX 20.02.06 15.02.06 898084.00 18.04.06 17.05.06 779277 Completed
45 Civil XIX 20.02.06 15.02.06 272000.00
46 Civil XIX 20.02.06 15.02.06 321508.00 12.06.06 12.07.06 317244 Completed
Imp of Mubarik Masjid gali from H.no c-268 to c-42/4 in Chohan
Bangar by pdg RMC and drain in w.no. 91B Sh.N
375/22.02.06/
M/s Asuresh
Enterprises
Imp of gali no. 6 in A block Chohan Bangar by pdg RMC and
drain in W.No 91 Sh.N
374/22.02.06/EE-XIX
M/s Ashok Kumar Rana
Imp of road by pdg cc pav from gali no. 45 to gali no.35 and adj
links on main road Jafrabad w.no.92 Sh.N
376/22.02.06/EE-XIX
M/s Prem Kumar
Imp of berm by pdg earth etc. along Shastri Park towar track of
G.T road in Sh.N
06/17.04.06/Sh.North
M/s R.P Aggarwal
Imp to Central Varge from Chintamani sharma Chowk to ISBT turn at G.T road in Sh.N
Imp to Footpath along Matro track from Welcome metro station to
subway at G.T road in Sh.N
13/25.04.06/EE(Sh.)N
M/s N.K Tomar
Status Report of MLA, Sh.Bhishm Sharma, AC No. 50 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XXII 16.6.05 12.6.05 332084.00 26.7.05 21.11.05 329368 Completed
2 Civil XXII 16.6.05 12.6.05 393187.00 18.8.05 7.12.05 375941 Completed
3 Civil XXII 16.6.05 12.6.05 485307.00 182/10.8.05 18.8.05 5.12.05 465464 Completed
4 Civil XXII 16.6.05 12.6.05 328000.00 08.08.05 26.06.06 307705 Completed
5 Civil XXII 21.6.05 12.6.05 486183.00 25.11.05 01.03.06 465897 Completed
6 Civil XXII 21.6.05 12.6.05 138178.00 25.7.05 15.10.05 138178 Completed
7 Civil XXII 18.8.05 10.8.05 492959.00 26.11.05 31.01.06 470386 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp of Gali no 13 II in X block Braham Puri in C-93
152/22.7.05 XXII
M/s Suresh Chand
Const Co.Imp of lane near H.No 75/16 a H-
75/23 a ,H-62 and H 6/3 in H block Jai prakash Nagr in c-93 Sh.N
183/10.8.05/XXII
Parvesh kr Verma
Imp to lane near H.No H-75/11 , H-61/12 H-67 , and H-62/5 in H block
Jai Prakash Nagar in c-93 Sh.N
M/s Parvesh Kr
Verma Imp to gali no 13&14 in Gamri extn.
By intrlocking tiles in Ac-50 C-93 Sh.N
170/01.08.05/EE-XXII
M/s K.P Enterprises
Imp to gali from Ambedkar Gali to gali no 4 Gautam Vihar by pdg RMc in
Gautam Vihar c-93 Sh.N
258/09.11.05/XXII
M/s Sanjay Kumar Jain
Imp to Almirah Wali gali in Sudamapuri c-93 Sh.N
147/18.7.05/XXII
M/s Vijender Singh Tyagi
Imp of gali no ready wise conc from fateh Singh Marg to Ambedkar gali in
Gautam Vihar C-93 Sh.N
234/19.10.05/XXII
M/s Darshan Const.
8 Elect EE(E)-VI 30.8.05 29.7.05 198699.00 27.10.05 15.11.05 184820 Completed
9 Elect EE(E)-VI 30.8.05 29.7.05 198041.00 31.10.05 19.11.05 191448 Completed
10 Elect EE(E)-VI 30.8.05 28.7.05 197877.00 31.10.05 19.11.05 191048 Completed
11 Elect EE(E)-VI 30.8.05 17.7.05 198699.00 05.11.05 18.11.05 193125 Completed
12 Elect EE(E)-VI 30.8.05 30.7.05 118571.00 14.11.05 27.11.05 113216 Completed
13 Elect EE(E)-VI 30.8.05 19.7.05 197876.00 102/21.10.05 21.10.05 27.10.05 189389 Completed
14 Civil XXII 9.9.05 20.8.05 440000.00 16.12.05 23.03.06 429994 Completed
15 Civil XXII 9.9.05 20.8.05 572000.00 13.12.05 20.02.06 557571 Completed
16 Civil XXII 9.9.05 20.8.05 268600.00 20.12.05 14.03.06 266288 Completed
17 Civil XXII 9.9.05 20.8.05 355300.00 04.02.06 30.03.06 255539 Completed
18 Civil XXII 9.9.05 25.8.05 530700.00 02.02.06 10.04.06 352735 Completed
19 Civil XXII 9.9.05 25.8.05 664200.00 1.01.08 P 511858 In prog.
P/o Street lighting arrangement in Gamari & Gamari Ext. AC-50 Under
Sh.N
138/28.10.05/EE(E)VI
M/s Tyagi Elect.and Trading
Co.P/o Street lighting arrangement in Braham puri X-block Gali no 1 to 15
AC-50 under Sh.N
146/28.10.05/EE(E)VI
M/s ACE Engg.
BureauP/o street lighting arrangement in
Brahampuri Old gali no 1 to 20 AC-50 under Sh.N
147/28.10.05/EE(E)VI
M/s ACE Engg.
BureauP/o Street lighting arrangement in Vijay Coloney & New Usman pur
AC-50 under Sh.N Zone
136/28.10.05/EE(E)VI
M/s Tyagi Elect.and Trading
Co.P/o Submersible pump set at Mpl park Gandhi w.No. 9. AC-50 under
Sh.N
197/14.11.05/
M/s Sanjay Engg.
P/o Street lighting arrangement in Jai Parkash Nagr & IIIrd Pusta AC-50
under Sh.N
M/s Sanjay Engg.
Imp of gali by c.c. near H.No C-4/30 , C-7 A/1 and C-17/8 in Sudama puri in
C-93 AC-50 Sh.N
331/14.12.05/XXII
M/s Parvesh Kr
Verma Imp to gali by pdg c.c. near H.NO C-
4/42 , C-4/22 and C-174/8 and its links in Sudama puri in c-93 Sh.N
315/08.12.05/XXII
M/s Anuj Enterprises
Imp of gali no-5 by pdg c.c. in Gamri extn in C-93 AC-50 Sh.n
341/15.12.05/XXII
M/s Vijender Singh Tyagi
Imp to links by pdg c.c. from gali no 1 to 7 in Arvind Nagr in C-93 AC-50
Sh.N
515/02.02.06/XXII
M/s R.S.const.
CoImp to gali by CC near H.No V-127
and V-136 in Arvind Nagr Mohalla in C-93 AC-50 Sh.N
345/19.12.05/EE-XXII
M/s Anand Const.
Const of drain from Gautam Vihar Chowk to Ambedkar gali at Ballu Ki Tubewell wala road in Gautam Vihar
in AC-50 C-93 Sh.N
353/1.01.08/EE(M)-II
M/s Mani Builders
20 Civil XXII 9.9.05 25.8.05 437200.00 24.12.05 24.03.06 310449 Completed
21 Civil XXII 9.9.05 25.8.05 472800.00 16.12.05 15.02.06 460613 Completed
22 Civil XXII 9.9.05 25.8.05 654800.00 11.05.06 10.05.07 460704 Completed
23 Civil XXII 14.9.05 17.8.05 245000.00 17.01.06 22.02.06 242396 Completed
24 Civil XXII 14.8.05 17.8.05 535673.00 20.01.06 07.04.06 534575 Completed
25 Civil XXII 14.8.05 17.8.05 559603.00 11.10.05 06.01.06 559213 Completed
26 Civil XXII 26.9.05 20.9.05 385300.00 17.12.05 24.03.06 377086 Completed
27 Civil XXII 26.9.05 20.9.05 195300.00 02.01.06 24.03.06 192651 Completed
28 Civil XXII 8.12.05 2.8.05 220096.00 16.01.06 02.03.06 219587 Completed
29 Civil XXII 8.12.05 12.9.05 199580.00 16.01.06 14.02.06 199423 Completed
30 Civil XXII 8.12.05 12.9.05 199628.00 16.01.06 14.02.06 199518 Completed
Imp to Indra gali by pdg c.c. in Gautam Vihar C-93 AC-50 Sh.N
344/19.12.05/XXII
M/s Anand Const.
Imp to Lal Bahadur Sastri Marg and gali from H.NO V-263 to V-280and its
links by cement concrete in C-93 Sh.N
336/15.12.05/XXII
M/s Mahendar Const.Co
Const of drain from Fateh Singh Marg to Ambedkar gali at Ballu Ki Tubewell wala road in Gautam Vihar AC-50 C-
93 Sh.N
562/06.03.06/EE-XXII
M/s Anand Const.
Imp to lane by pdg RMC of nestev Bibooti wali gali in Gamri village back
side of Jan kalyan School in w.NO 94/50 Sh.N
293/24.11.05/XXII
M/s Sararwati Const.Co
Imp of Pahari hotel wali gali by RMC 4th Pusta Kartar Nagr w.NO 94/50
Sh.N
294/24.11.05/EE-XXII
M/s Vijay Const.Co
Imp to Suraj gali & links by RMC 4th pusta Karta Ngr w.no 94/50 Sh.N
219/04.10.05/XXII
M/s Dharam
Const.CoImp of gali by pdg c.c. near H.NO L-35 and J-57 at gali no 2 Jai Parkash
Nagr in C-93 AC-50 Sh.N
332/15.12.05/XXII
M/s Bharat Bhushan
Imp to drain Xing in Braham puri X-block, Braham puri vill Ghonda & Jai
Prakash Nagr in C-93 Sh.N
389/02.01.06/XXII
M/s Kapil Const.Co
Imp to lane by pdg c.c.near Usmani Masjid in Usman pur C-94 Sh.N.Zone
420/09.01.06/XXII
M/s Mahendar Const.Co
Imp to Mandir wala link by pdg c.c. in Jagjit Ngr. C-94 Sh.N
425/10.01.06/XXII
M/s Bijendar Singh
Chohan
Imp to link of adj. Indra Gali by pdg c.c. in Jagjit Ngr C-94 Sh.N
426/10.01.06/XXII
M/s Ashwani Kumar
Aggarwal
31 Civil XXII 8.12.05 12.9.05 199331.00 16.01.06 27.02.06 199008 Completed
32 Civil XXII 23.12.05 3.10.05 411848.00 22.08.06 20.10.06 411476 Completed
33 Civil XXII 24.1.05 20.9.05 719100.00 25.05.06 20.09.06 549154 Completed
34 Civil XXII 24.1.06 3.10.05 469565.00 02.08.06 27.09.06 469481 Completed
35 Civil XXII 24.1.06 3.10.5 591300.00 19.04.07 20.06.07 345349 Completed
36 Civil XXII 24.1.06 3.10.5 678300.00 29.05.06 09.08.06 522831 Completed
37 Civil XXII 24.1.06 3.10.5 495800.00 28.04.06 16.06.06 381836 Completed
38 Civil XXII 24.1.06 3.10.5 630600.00 29.05.06 14.08.06 495413 Completed
39 Civil XXII 24.1.06 3.10.5 413615.00 22.08.06 20.10.06 413433 Completed
40 Civil XXII 24.1.06 1.12.05 584000.00 29.05.06 10.07.06 454088 Completed
41 Civil XXII 17.03.06 15.02.06 562200.00 04.08.06 28.09.06 435636 Completed
42 Civil XXII 17.03.06 15.02.06 510400.00 04.08.06 15.01.07 396819 Completed
Imp to Ansari gali by pdg c.c. in Jagjit Ngr w.no-94 sh.N
424/10.01.06/XXII
M/s R.A.Associ
atesImp to pal wali gali and link by pdg c.c. in Vijay Colony Jagget nagar
w.no-94 Sh.N
116/04.06.06/EE-XXII
M/s Guru Kirpa
EnterprisesImp to Gamri road by pdg RMC from
state Bank of india ( Ghonda) to Dispeusary on Gamri road in
C-93/AC-50 Sh.N
86/22.05.06/EE-XXII
M/s S.K Const.Co
Imp to lane from Gokal Puri drain to Bhajan pura market ( lane no -6) by pdg RMC in Bhajan Pura C-94/50
Sh.N
105/28.06.06/EE-XXII
M/s H.L Puri & Sons
Imp to gali w.no-6 and link by pdg c.c. in Vijay coloney jagjeet Nagar w.no-
94 AC-50 sh.N
551/29.01.07/EE-XXII
M/s H.L Puri & Sons
Imp to Mukhtiyar wali gali and link bh pdg c.c. in A block Gamri w.no 94
AC-50 Sh.N
69/11.05.06/EE-XXII
M/s Verma Const.Co
Imp to Hafiz wali gali & link by pdg c.c. in Jagjeet Nagar w.no 94 AC-50
Sh.N
10/20.04.06/EE-XXII
M/s Adarsh Const.Co
Imp to gali no -1 with Chowk and gali no 7 E by pdg RMC in D- block at
Bhajan pura C-94/ 50 Sh.N
54/08.05.06/EE-XXIII
M/s Dharam
Const.CoImp to Ch Rattan Singh wali gali by
pdg RMC ( 3rd pusta) in Jagjeet Nagar C-94/50 Sh.N
106/28.06.06/EE-XXII
M/s H.L Puri & Sons
Imp to Ram Sawroop Rothere wali Gali & link by pdg RMC in X-block
Brahampuri C-94/Sh.N
70/11.05.06/EE-XXII
M/s Verma Const.Co
Imp to gali no.30 pdg cement conc. In Jai Prakash Nagar in Ac50 Sh.N
112/02.08.06/EE-XXII
M/s Rajesh Kumar Verma
Imp of gali no.5 and its links by pdg cc in Jai Prakash Nagar in Ac 50/C-
93 Sh.n
113/02.08.06/EE-XXII
M/s Rajesh Kumar Verma
43 Civil XXII 17.03.06 15.02.06 281543.00 19.09.06 04.01.07 274530 Completed
44 Civil XXII 17.03.06 17.01.06 197467.00 22.08.06 23.09.06 196656 Completed
45 Civil XXII 17.03.06 17.01.06 199125.00 12.05.06 29.06.06 198869 Completed
46 Civil XXII 17.03.06 17.01.06 199851.00 28.04.06 12.06.06 199587 Completed
47 Civil XXII 17.03.06 18.01.06 195807.00 04.05.06 20.06.06 195767 Completed
48 Civil XXII 28.03.06 18.01.06 400000.00 08.08.06 04.09.06 315230 Completed
49 Civil XXII 28.03.06 02.02.06 297502.00 14.09.06 20.10.06 297194 Completed
Imp to gali no.3 and its link by pdy cc in Jai Prakash Nagar in Ac50/C-93
Sh.S
179/19.09.06/EE-XXII
M/s Sirohi Associates
Imp of Dina nath wali gali by pdg. Cc pav in D-block Gamri W.no. 94 Ac 50
Sh.N
101/15.06.06/EE-XXII
M/s Atul Mittal
Imp of Morya wali Gali by pdg cc pav in Jagjeet Nagar w.no.94 Ac50 Sh.N
25/28.04.06/EE-XXII
M/s Shir Shakti
Const.CoImp of Jagat Singh wali gali by pdg cc
pav. In (3/1/2 pusta) Kartar Nagar w.no 94 Ac50 Sh.N
18/25.04.06/EE-XXII
M/s Mani Builders
Imp of gali no.2 (Ram Lakhan wali gali) by pdg cc pav in Kartar Nagar
w.no.94 Sh.N
19/28.04.06/EE-XXII
M/s Kansal Builders
Imp of gali no.9 by pdg cc pav in Kartar Nagar w.no.94 Sh.N
111/31.07.06/EE-XXII
M/s Adarsh Const.Co
Imp of Neta Chakki wali gali by pdg RMC in Jagjeet Nagar w.no. 94 Sh.N
114/02.08.06/EE-XXII
M/s Sirohi Associates
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.62
0.08
0.00
0.09
0.18
0.00
0.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.29
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.13
0.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.32
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
6.72
1.82
0.00
5.49
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.00
14.03
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
2.00
1.99
1.99
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
15.14
0.00
2.63
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.61
0.00
0.00
0.00
0.00
1.14
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.005.39
0.00
0.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.06
3.14
5.91
0.00
10.93
2.86
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
26.92
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
1.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.07
0.00
0.00
0.00
0.00
0.00
2.72
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.003.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.52
deptt. deptt. deptt. deptt. Div. Div. Div. Div. Div. Div.
civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)
Status Report of MLA, Sh Sahib Singh Chauhan, AC No. 51 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XXII 16.6.05 10.6.05 273100.00 28.7.05 3.9.05 198664 Completed
2 Elect EE(E)-IV 1.8.05 26.6.05 122858.00 M/s A.K.Elect. 04.11.05 24.11.05 116276 Completed
3 Elect EE(E)-IV 1.8.05 4.7.05 125726.00 06.11.05 24.11.05 110609 Completed
4 Elect EE(E)-IV 1.8.05 1.7.05 126159.00 23.11.05 30.11.05 107849 Completed
5 Elect EE(E)-IV 1.8.05 5.7.05 125913.00 5.11.05 25.11.05 109641 Completed
PresIn Prog.
Date o
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp of front back and side lane from C-11/62 to C-11/172 by pdg RMC in c-11 block Yamuna Vihar C-96 Sh.N
150/20.7.05 XXII
M/s Suresh Kr. Goel
P/o boring with Submessible pump set in Mpl park c-11 Yamuna Vihar
W-96 AC-51 Sh.N
164/29.10.05/EE(E)VI
P/o boring with submersible pump set in Mpl park Kesav Vatika C-5 Yamuna Vihar W-96 AC-51 under
Sh.N
162/29.10.05/EE(E)VI
M/s Krishna Elect.
P/o boring with submersible pump set in C-1 Yamuna Vihar W-96 AC-
51 under Sh.N
214/23.11.05/EE(E)VI
M/s Parasar Elect.
P/o boring with submerssible pump set in mpl park C-11/100, Yamuna
Vihar W-96 AC-51 under Sh.N
125/ 28.10.05/EE(
E)-IV
M/s Sanjay Engineers
6 Elect EE(E)-IV 1.8.05 30.6.05 124609.00 12.12.05 27.12.05 115453 Completed
7 Elect EE(E)-IV 1.8.05 28.6.05 125914.00 16.10.05 24.10.05 108508 Completed
8 Elect EE(E)-IV 1.8.05 02.01.00 125086.00 5.04.06 17.03.08 120793 Completed
9 Elect EE(E)-IV 1.8.05 14.7.05 199992.00 10.11.05 28.11.05 194176 Completed
10 Elect EE(E)-IV 1.8.05 11.7.05 199986.00 4.11.05 24.11.05 194274 Completed
11 Elect EE(E)-IV 1.8.05 8.7.05 199828.00 29.10.05 7.11.05 193130 Completed
12 Elect EE(E)-IV 1.8.05 18.7.05 199957.00 29.11.05 05.12.05 191165 Completed
13 Elect EE(E)-IV 1.8.05 16.7.05 199935.00 12.01.06 19.01.06 194200 Completed
14 Elect EE(E)-IV 1.8.05 19.7.05 199964.00 3.11.05 23.11.05 194264 Completed
P/o Boring with Submersible pump set in Mpl park Rajesh Pilot Park
( Tikona Park ) C-5 Yamuna Vihar W-96 Sh.N
255/08.12.05/EE(E)VI
M/s Vivek Elect.
P/o boring with submersible pump set in Mpl park shishu Vatika) C-
7/130 Yamuna Vihar W.No-96 AC-51 under Sh.N
95/6.10.05 EE(E)VI
M/s Cheena & co
P/o boring with submwesible pump set in Mpl park c-5/100 Yamuna
Vihar W.No 96 AC-51 under Sh.N
340/7.03.06/EE(E)-II
M/s Amit Electrical Service
Pro street light arrangement in c-6,C-8 C-9 block yamuna vihar W.NO-96
Ac-51 under Sh.N
169/10.11.05 EE(E)-VI
M/s Illuminater &
CircuitearPro of street light arrangement in
west Gondha Gali no 8,9,10, 19&17 Subhash Vihar Gali no 16,17
Dispensary road W.No 95 AC-51 Sh.N
129/28.10.05/EE(E)_IV
M/s Khanna Sales
Coorporation
Pro of street light arrangement in Bajrang Bali Mohalla, Puri Gali & C-7 block Yamuna vihar w.No-96 Ac-51
under Sh.N
160/29.10.05/EE(E)-VI
M.s Seth Constractions
Pro street light arrangement in Shivaji road , Ram Gali no 2 Bhalla Gali Moujpur , Drishan Kaunj Gali & Police Cly road Thana Bhajan pura
W.No 95 AC-51
235/28.11.05/EE(E)-VI
M/s Paras Const.Co
Pro of street light arrangement in Gangotri vihar gali no 9 gali no-7 and
Gali no 10 Gali no 13, gali no-154 Chhonda Chowk to DTC Depto
Yammuna Vihar & Vir Abdula House and Chwok w.No-95 Ac-51 sh.N
284/06.01.06/EE(E)VI
M/s Mani Elect.
Pro of street light arrangement in c-1,C-2,C3, block Yamuna Vihar W.No
96 AC-51 under Sh.N
143/ 28.10.05 EE(E)-VI
M/s Repair Shop
15 Elect EE(E)-IV 1.8.05 3.7.05 199967.00
16 Elect EE(E)-IV 1.8.05 5.7.05 199994.00 3.11.05 23.11.05 194292 Completed
17 Elect EE(E)-IV 1.8.05 7.7.05 199994.00 18.01.06 24.01.06 191633 Completed
18 Elect EE(E)-IV 1.8.05 10.7.05 199982.00 16.11.05 01.12.05 193040 Completed
19 Civil EE(E)-IV 9.8.05 19.7.05 171210.00 23.11.05 20.01.06 171038 Completed
20 Civil EE(E)-IV 1.8.05 19.7.05 141020.00 26.10.05 26.12.05 140863 Completed
21 Civil XXII 29.8.05 15.7.05 393036.00 02.12.05 02.02.06 392904 Completed
22 Civil XXII 29.8.05 15.7.05 399628.00 285/22.11.05/ 30.11.05 30.01.06 399442 Completed
23 Civil XXII 29.8.05 15.7.05 162238.00 30.11.05 20.01.06 161845 Completed
24 Civil XXII 29.8.05 19.7.05 395261.00 19.11.05 12.01.06 394580 Completed
Pro of street arrangement c-10 ,c-11 & C-12 block Yamuna Vihar W.No-96
AC-51 under Sh.NPro of street light arrangement in Ambardark Basti d block Geeta
Bhawan Road Yammuna Vihar s.No 95 AC-51 under Sh.N
131/ 28.10.05/ EE(E)_VI
Ms Sushina Electrical
Pro of street light arrangement in Satya Gali ni 2 Harsh Vardan gali ,
Gali no 13 & gali no 15 North gondha w.No 95 AC-51 under sh.N
300/14.01.06/EE(E)VI
M/s Gyan Enterprises
Pro of street light arrangment in vijay park , main Krishan Gali , main
Durga Gali road , mata Mandir Marg , Gali no 2 A Maujpur w.no 96 AC-51
under sh.N
200/16.11.05/EE(E)VI
M/s Kohinoor Elect.
Imp of gali no 6 form Puri Gali to H.No D-21 by pdg RMc in links Ashok Mohalla Maoujpur c-96
Sh.Nzone
263/14.11.05/XXII
M/s Himalya Const.
Imp of gali no 6 from H.No D-21/1A to H.No 2/3 gali no-1 by pdg RMc & its links in Ashok Mohalla Maujpur c-
96 Sh.N Zone.
229/18.10.05/XXII
M/s Aggarwal Builders
Imp of Gali no 5from Bhagat Singh Chowk to gali no 8 by pdg RMC in K block Gangorti Vihar W.No -95 Sh.N
288/23.11.05/XXII
M/s Parvesh Const.Co
Imp of lane from H.No K-5/16 to Gamri road by pdg RMC in K block
Gangotri Vihar W.No 95 Sh.N
M/s Mani Elect.
Imp of links in gali no 15 by pdg RMC in c block Bhajanpura w. no-95 sh.N
286/22.11.05/XXII
M/s Mani Elect.
Imp of lane from C-1/24 a to Dividing road & its link by pdg RMC in C-1 block Yamuna Vihar w.no 96 sh.N
279/18.11.05/XXII
M/s Mahesh Baural
25 Civil XXII 29.8.05 15.7.05 278861.00 6.12.05 12.1.06 278565 Completed
26 Civil XXII 29.8.05 15.7.05 282221.00 06.12.05 12.01.06 281927 Completed
27 Civil XXII 29.8.05 15.7.05 352750.00 06.12.05 27.11.06 352427 Completed
28 Civil XXII 26.9.05 22.8.05 328200.00 03.01.06 08.02.06 324206 Completed
29 Civil XXII 26.9.05 18.8.05 388692.00 03.02.06 25.04.06 387824 Completed
30 Civil XXII 26.9.05 20.8.05 645700.00 24.02.06 10.05.06 567937 Completed
31 Civil XXII 5.10.05 3.10.05 394802.00 02.02.06 25.04.06 394640 Completed
32 Civil XXII 5.10.05 18.8.05 390888.00 17.02.06 08.05.06 390728 Completed
33 Civil XXII 5.10.05 18.8.05 388448.00 03.02.06 25.04.06 388305 Completed
34 Civil XXII 5.10.05 3.10.05 394807.00 11.02.06 20.04.06 394178 Completed
35 Civil XXII 18.10.05 3.10.05 79776.00 24.01.06 10.03.06 79690 Completed
36 Civil XXII 18.10.05 3.10.05 79228.00 24.01.06 10.03.06 79142 Completed
Const of drain from Wazirabad road to pump Hs in C block Bhajanpura
w.No-95 Sh.N ( L.H.S)
300/5.12.05/XXII
M/s Amar Builder
Const of drain from Wazirabad road to pump Hs in C block Bhajanpura
w.No-95 Sh.N (RL.H.S)
301/05.12.05/XXII
M/s Amar Builder
Imp of road by M/P from Gali no -9 to pump Hs at tanki road C- block
Bhaganpura W.No-95 Sh.N
298/30.11.05/XXII
M/s Bhardwaj Const.Co
Imp of gali no 4 by pdg RMC in K block Ghonda C-95 Sh.N
383/02.01.06/XXII
M/s Vijender Singh Tyagi
Imp of drain by pdg RCC precast Slab from Pyarelal School to H.No B-53 ( R.H.S) on rubbew factory road
w.no-95 Sh.N
505/01.02.06/EE-XXII
M/s Salar & Associates
Imp of drain by pdg RCC Slab from Aggarwal general store to Sh.
Pyarelal School on Rubbev factory road w.No-95 Sh.N
546/21.02.06/EE-XXII
M/s Kanshik Traders
Imp of drain by pdg RCC Slab from H.No F-3 to H.No B-268(LHS) on rubber factory road w.no-95 sh.N
475/23.01.06/EE-XXII
M/s Satish Kumar Goel
Imp of drain by pdg RCC slab from H.No C-1 to Ghonda chowk ( RHS) on Noor Elahi road w.no--5 Sh.N
509/02.02.06/EE-XXII
M/s Salar & Associates
Imp of drain by pdg RCC slab from H.No C-35 toC-33 ( Gali no -8) RHS on Noor Elahi road w.no--95 Sh.N
473/23.01.06/`EE-XXII
M/s Mahender Const.Co
Imp of drain by pdg RCC slab from H.No C-33 toC-33 ( Gali no -8) RHS on Noor Elahi road w.no--95 Sh.N
506/02.02.06/EE-XXII
M/s Atul Kumar Gupta
Imp of drain by pdg RCC slab from H.No B268 to Shivaji road LHS on Rubbew Factory road w.no--95 Sh.N
461/18.01.06/EE-XXII
M/s Core Kush
Enterprises
Imp of drain by pdg RCC Slab from H.NO B-53 to Shivaji road (LHS) on rubbev factory road w.no-95 Sh.N
462/18.01.06/EE-XXII
M/s Core Kush
Enterprises
37 Civil XXII 28.10.05 18.8.05 341239.00 25.01.06 31.03.06 341089 Completed
38 Civil XXII 28.10.05 18.8.05 312869.00 27.01.06 31.03.06 312697 Completed
39 Civil XXII 28.10.05 18.8.05 107096.00 11.02.06 30.03.06 107012 Completed
40 Civil XXII 28.10.05 23.8.05 196579.00 05.01.06 11.02.06 196432 Completed
41 Civil XXII 28.10.05 25.8.05 388448.00 18.01.06 20.04.06 388333 Completed
42 Civil XXII 28.10.05 22.8.05 214077.00 16.01.06 16.03.06 213881 Completed
43 Civil XXII 28.10.05 20.8.05 267659.00 13.01.06 16.03.06 267659 Completed
44 Civil XXII 28.10.05 3.10.05 154289.00 24.01.06 30.03.06 153962 Completed
45 Civil XXII 28.10.05 3.10.05 155356.00 24.01.06 30.03.06 154982 Completed
46 Civil XXII 28.10.05 25.8.05 388448.00 18.01.06 20.04.06 388226 Completed
47 Civil XXII 28.10.05 28.9.05 500939.00 16.01.06 13.03.06 500636 Completed
48 Civil XXII 28.10.05 28.9.05 394641.00 18.01.06 20.04.06 394548 Completed
Imp of gali no 14 and its links by pdg RMC in K block Gonda C-95 Sh.N
435/16.01.06/XXII
M/s Bhardwaj Const.Co
Imp to links of gali w 13 by pdg RMC in K block Ghonda C-95 Sh.N
457/18.01.06/XXII
M/s Bhardwaj Const.Co
Imp of gali no 20 B by pdg RMC in K block Ghonda C-95 Sh.N
514/02.02.06/XXII
M/s Sandiya Builders
Imp of gali ni 33 its links by pdg RMC in K block Gangotri Vihar w.no-95
Sh.N
395/05.01.06/XXII
M/s Deepak Associates
Imp of drain by pdg RCC Slab from gali no 3 to sps Ghonda LHS on
main Gamri road in k block Gangotri vihar w.no 95 Sh.N
438/16.01.06/EE-XXII
M/s Mahender Const.Co
Imp of back and side land from B-3/165 to B-3/165 by pdg RMC in B-3 block Yammuna Vihar W.No-95 sh.N
446/16.01.06/XXII
M/s Amar Builder
Imp of gali no 10 Sh Ram Gopal by pdg RMC in C block H.No 269 to 241
Bhajanpura W.No -95 Sh.N
422/10.01.06/XXII
M/s Mahesh Baural
Imp of drain by pdg RCC slab from Yamuna Vihar petrol pump to
fransfarmer ( LSH) on Noor Elahi road w.no-95 Sh.N
463/18.01.06/EE-XXII
M/s Kush Enterprises
Imp of drain by pdg RCC Slab from Yamuna vihar deport To H.NO C-35
LHS on Noor Elahi road w.no-95 Sh.N
460/18.01.06/EE-XXII
M/s Core Kush
Enterprises
Imp of drian by pdg RCC slab from gali no 20 B to gali no 3 (LHS) on
main gamri road in K block Gangotri vihar W.No-95
440/16.01.06/EE-XXII
M/s Mahender Const.Co
Imp of gali no 3 from Thana road h.no 120/1 to H.NO 97/1 by pdg
RMC in C block Bhajan pura w.no-95 Sh.N
436/16.01.06/XXII
M/s Bhardwaj Const.Co
Imp of drain and pdg RCC Slab from Dispensary to gali no 9 on Thana road Bhajanpura w.no 95 Sh.N
439/16.01.06/EE-XXII
M/s Mahender Const.Co
49 Civil XXII 28.10.05 28.9.05 450466.00 27.01.06 28.04.06 450393 Completed
50 Civil XXII 28.10.05 28.9.05 644500.00 10.03.06 25.05.06 455225 Completed
51 Civil XXII 28.10.05 9.9.05 641100.00 17.03.06 14.06.06 441102 Completed
52 Civil XXII 28.10.05 9.9.05 696500.00 17.03.06 14.06.06 458385 Completed
53 Civil XXII 10.11.05 10.9.05 405989.00 10.01.06 31.03.06 405989 Completed
54 Civil XXII 10.11.05 4.10.05 512800.00 01.02.06 08.03.06 363650 Completed
55 Civil XXII 21.12.05 25.10.05 472807.00 05.04.06 P 264900 In Prog.
56 Civil XXII 21.12.05 25.10.05 153186.00 28.02.06 31.03.06 152959 Completed
57 Civil XXII 16.02.06 25.10.05 723100.00 17.06.06 05.08.06 537151 Completed
58 Civil XXII 16.02.06 12.01.06 199273.00 21.04.06 25.05.06 198966 Completed
59 Civil XXII 16.02.06 12.01.06 197374.00 21.04.06 08.06.06 197374 Completed
60 Civil XXII 16.02.06 17.01.06 193354.00 22.03.06 31.03.06 193316 Completed
61 Civil XXII 16.02.06 17.01.06 196734.00 22.03.06 31.03.06 196470 Completed
Imp of drian and pdg RCC slab from gali no thana road Bhajanpura w.no
-95 Sh.N
484/24.01.06/EE-XXII
M/s Darshan Const
Imp of drain and pdg RCC Slab from gali no 3 to pump Hs ( BPS) on thana
road Bhajapura w.no-95 Sh.N
584/09.03.06/EE-XXII
M/s Darshan Const
Imp of gali no -9 its links by pdg RMC in E block Subhash Vihar w.no
95 Sh.N
560/06.03.06/EE-XXII
M/s S.G Const.Co
Imp of gali no 6 and its links by pdg RMC from H.No B-592 to Chitra Gupta road in B block Subhash
Vihar W.No 95 Sh.N
561/06.03.06/EE-XXII
M/s S.G Const.Co
Imp of Pandace gali and its links by pdg RMC in Maujpur C-96 Sh.N
414/09.01.06/EE-XXII
M/s Bhardwaj Const.Co
Imp of gali no 19 by pdg RMC in vijay park Moujpur in C-96 Sh.N
501/31.01.06/XXII
M/s Bhardwaj Const.Co
Imp of gali no 2&2 A and its links by pdg RMC in Mata Mandir marg
Moujpur C-96 Sh.N
618/27.03.06/EE-XXII
M/s R.K Builders
Imp of side lane of Gautam Budh park by pdg RMC in C-8 block
Yamuna Vihar C-96 Sh.N
555/27.02.06/EE-XXII
M/s Rajesh Kumar Verma
Imp of gali no.2 in Gurudwara Mohalla Moujpur by pdg RMC in C-
96 Sh.N
96/15.06.06/EE-XXII
M/s Darshan Const
Imp of different crossing by pdg MS graeting in Vijay Park Adrash
Mohalla etc. in C-96 Sh.N
11/20.04.06/EE-XXII
M/s Dinesh Kumar
SharmaImp of different crossing by pdg RCC culverts in Vijay Park Yamuna Vihar
Moujpur etc. in C-96 Sh.N
9/20.04.06/EE-XXII
M/s Anuj Enterprises
Const. Of drain from gali no.3 to police colony gate on Thana road
Bhajanpura w.no.95 Sh.N
600/22.03.06/XXII
M/s Shri Paras Nath Const.Co
Const. Of drain from police colony gate to pump house on Thana road
Bhajan pura w.no.95 Sh.N
599/22.03.06/XXII
M/s Vikash Jain
62 Civil XXII 03.03.06 27.01.06 155177.00 06.05.06 06.06.06 154962 Completed
63 Civil XXII 21.03.06 17.01.06 398887.00 09.11.06 15.01.07 398706 Completed
64 Civil XXII 21.03.06 17.01.06 407706.00 07.10.06 6.01.07 407706 Completed
65 Civil XXII 21.03.06 17.01.06 501605.00 09.11.06 25.01.07 501605 Completed
66 Civil XXII 21.03.06 12.01.06 250026.00 15.11.06 25.01.07 249640 Completed
Imp of road from gali no.15 Vijay Park to Krishna Park in C-11
Yamuna vihar by pdg RMC in C-blcok Yamuna Vihar C-96 Sh.N
51/05.05.06/EE-XXII
M/s Rajeev Const.Co
Imp of drain and pdg RCC slab from wazirabad road to Pump House in C-
block Bhajanpura W.no 95 Sh.N (LHS)
244/30.10.06/EE-XXII
M/s Mani Builders
Imp of drain and pdg RCC slab from wazirabad road to Pump House in C-
block Bhajanpura W.no 95 Sh.N (RHS)
205/28.09.06/EE-XXII
M/s Amar Builder
Imp of road by M/P from wazirabd road to Pump House in C-block
Bhajanpura w.no 95 Sh.N
232/30.10.06/EE-XXII
M/s Bhardwaj Const.Co
P/F M.S crossing and culverts in Subhash Mohalla, Bajrang Mohalla and Madhuban Mohala in w.no.95
Sh.N
266/06.11.06/EE-XXII
M/s Pankaj Const.CO
Status Report of MLA, Sh Mohan Singh Bisht, AC No. 52 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XXII 16.6.05 16.6.05 378071.00 19.09.05 P 291832 In Prog.
2 Civil XXII 20.7.05 4.6.05 387054.00 27.12.05 24.03.06 386593 Completed
3 Civil XXII 20.7.05 4.6.05 409838.00 23.12.05 23.03.06 400590 Completed
4 Civil XXII 20.7.05 16.6.05 353336.00 27.12.05 25.03.06 353336 Completed
Date o
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp of lane by pdg c.c. pav in gali no 10 from H,No 5 A-1 to H.No A-10/34
in Dayal puri extn. In c-98
207/06.09.05/EE-XXII
M/s P.K Sharma
Imp of road by premix and drain from Karawal Nagar road to govt Se.
Sec School Dayal pur in C-98
361/22.12.05/XXII
M/s Ramesh Chand Jain
Imp of road by premix and drain from School to Kavita Gift Centre on
approach road in Dayal pur C-98
362/22.12.05/XXII
M/s Ramesh Chand Jain
Imp of road from Dubey house to C-3/108 A in Dayal Pur village in c-98
Sh.N
360/22.12.05/XXII
M/s Ramesh Chand Jain
5 Civil XXII 20.7.05 9.7.05 199866.00
6 Civil XXII 20.7.05 9.7.05 199866.00
7 Civil XXII 20.7.05 9.7.05 199866.00
8 Civil XXII 20.7.05 9.7.05 199866.00 22.12.05 28.12.05 198193 Completed
9 Civil XXII 26.7.05 4.6.05 613100.00 16.11.05 19.01.06 422753 Completed
10 Civil XXII 26.7.05 4.6.05 618400.00 16.12.05 14.03.06 430918 Completed
11 Civil XXII 26.7.05 4.6.05 421200.00 10.02.06 26.04.06 291946 Completed
12 Civil XXII 26.7.05 4.6.05 411996.00 17.02.06 10.04.06 411954 Completed
13 Civil XXII 26.7.05 4.6.05 458200.00 10.11.05 27.12.05 325874 Completed
14 Civil XXII 26.7.05 4.6.05 617100.00 10.01.06 18.09.09 438419 Completed
15 Civil XXII 26.7.05 4.6.05 593100.00 11.1.05 10.04.06 408976 Completed
16 Civil XXII 26.7.05 4.6.05 615200.00 30.1.05 21.01.06 438023 Completed
Imp of road by pdg B.M near Mavi Hospital Karawal Nagar road in c-98
sh.NImp to road by pdg B.M near
Inderprastha school on Karawal Nagar road in c-98 Sh.N
Imp of road by pdg B.M at Karawal Nagar Chowk on Karawal nagar
road in c-97 Ac-52Imp of road by pdg B.M near Dayal
pur School on Karawal Nagar road in c-98 Sh.N
214/26.09.05/XXII
M/s C.Parkashan
& CoImp of road by pdg RMc & drain near
H.No 123 to Santosh Medicos in Karawal Nagar village AC-52/97
256/09.11.05/XXII
M/s Puri Builders & Associates
Imp of road by pdg RMc & drain from Jaiswal shop to Nitin Sweets in
Karawal Nagar AC-52/97
339/15.12.05/XXII
M/s Puri Builders & Associates
Imp of side link in gali w.no-6 by pdg RMc & drain near H.No F-30 to f-41
in Sadat Pur exnt. AC-52/97
507/02.02.06/XXII
M/s Lalit Associates
Imp of road by pdg RMC & drain near Yadram Hs to near Bhagat singh Hs in Sadatpur Village AC-
52/97
433/12.01.06/XXII
M/s Puri Builders & Associates
Imp of gali by pdg RMc & drain near Babu Ram Hs Raghubar , Ram
Prasad Hs in Sadatpur Village AC-52/97
238/02.11.05/XXII
M/s Mahesh Bansal
Imp of road by pdg RMC & drian near D-1/4 to near Main road
Karawal nagar in D Block Khajoori coloney AC-52/97
408/6.01.06/XXII
M/s Vijay Const.Co
Imp of gali by pdg RMc & drain in Bhagatju wali gali in Sabeypur village
AC-52/97
255/09.11.05/EE-XXII
M/s Puri Builders & Associates
Imp of road by pdg RMc & drain near Bhule Ram Hs and Prakash Hs in
Sebhay pur Village Ac-52/97
291/23.11.05/XXII
M/s M.P.Const.Co
17 Civil XXII 26.7.05 4.6.05 552500.00 06.12.05 21.01.06 522497 Completed
18 Civil XXII 26.7.05 4.6.05 432108.00 16.1.05 16.01.06 431970 Completed
19 Civil XXII 26.7.05 4.6.05 612800.00 22.11.05 19.01.06 427036 Completed
20 Civil XXII 4.8.05 12.7.05 497000.00 27.01.06 29.05.06 367679 Completed
21 Civil XXII 4.8.05 12.7.05 294209.00 10.01.06 13.03.06 293597 Completed
22 Civil XXII 30.9.05 16.6.05 205408.00 05.12.05 27.12.05 205408 Completed
23 Civil XXII 20.12.05 25.11.05 616400.00 28.03.06 03.05.06 456329 Completed
24 Civil XXII 20.12.05 25.11.05 616200.00 30.03.06 03.05.06 455592 Completed
25 Civil XXII 20.12.05 25.11.05 617100.00 29.03.06 03.05.06 456623 Completed
26 Civil XXII 20.12.05 25.11.05 618100.00 28.03.06 11.05.06 515566 Completed
27 Civil XXII 20.12.05 25.11.05 606400.00 14.05.06 04.09.06 505212 Completed
28 Civil XXII 20.12.05 25.11.05 627500.00 01.04.06 21.06.06 512787 Completed
Imp of gali by pdg RMc and drain near Tejpal Hs and Ramesh Hs in
Sabhey pur Village Ac-52/97
290/23.11.05/XXII
M/s M.P.Const.Co
Imp of road by pdg RMc and dain Near Gali no 4 to B-5 in Karawal
Nagar Village Ac-52/97
254/09.11.05/XXII
M/s Puri Builders & Associates
Imp of raod by pdg RMc & drain near vaisno Properties to Lavaniya General Store in karawla Nagr
villagfe c-52-97
257/09.11.05/XXII
M/s Puri Builders & Associates
Imp of road by RMc from Unique coaching Centre to Anand Market in
Dayla pur Village c-98 Sh.N
477/23.01.06/EE-XXII
M/s Dharam Const.Co
Imp of lane by pdg c,c, interlocking tile form Rajdhani medico to Ac-1/15
in viullage Takuir pur C-98 Sh.N
394/05.01.06/XXII
M/s A.S.Const.Co
Imp of Culvert&xing in Sadatpur village AC-52.97
232/19.10.05/XXII
M/s Durga Const.Co
Imp of road by pdg RMC &drain near H.NO 28.15 to vijay dairy in Karawal
Ngr village AC-52.97
590/13.03.06/EE-XXII
M/s Mahesh Bansal
Imp of road by pdg RMC &drain from main road Karawal Nagr to gali no -1
in Karawal Ngr village AC-52.97
591/13.03.06/EE-XXII
M/s Mahesh Bansal
Imp of road by pdg RMC & drain from Raj Electric work to Usha
Sillicate factory in Karawal Nagr village AC-52/97
592/13.03.06/EE-XXII
M/s Mahesh Bansal
Imp of road by pdg M/P and drain near H.NO 12 to 106 in New Subhey
pur Gujaran village AC-52/97
598/22.03.06/EE-XXII
M/s Mahesh Bansal
Imp of road by M/P and drain near H.No 194 to near H.No 85 in New
Subhey pur Gujaran village AC-52.97
49/05.05.06/EE-XXII
M/s Raginder Const.Co.-II
Imp of road by pdg M/P and drain near H.NO 218 to near 211 in New
Subhey pur Gujaran village AC-52.97
617/27.03.06/EE-XXII
M/s Darshan Const.
29 Civil XXII 20.12.05 25.11.05 621150.00 30.03.06 12.05.06 509399 Completed
30 Civil XXII 20.12.05 25.11.05 673000.00 29.03.06 08.05.06 421751 Completed
31 Civil XXII 17.02.06 18.01.06 751345.00 15.06.06 P 702060 In Prog.
Imp of road by pdg M/P and drain near H.No 114 to 202 in new subhey
pur Gujaran village AC-52/97
597/22.03.06/EE-XXII
M/s Mahesh Bansal
Imp to lane by pdg interlocking tiles from lovely juice corner to Ashish electriclas in Dayal pur colony D
block in C-98 Sh.N
595/22.03.06/EE-XXII
M/s Mahesh Bansal
Imp of approach road to village Dayal pur by pdg M/P from OM iron store to
Bhati Dairy in C-98
93/08.06.06/EE-XXII
M/s Sanjay Kumar Jain
Status Report of MLA, Sh Mange Ram Garg, AC No. 53 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Elect. EEE-VII 17.5.05 02.03.05 199310.00 55/12.8.05 17.8.05 30.9.05 192637 Completed
2 Elect. EEE-VII 17.5.05 3.03.05 148778.00 128/16.11.05 18.11.05 12.12.05 143264 Completed
3 Elect. EEE-VII 17.5.05 4.3.05 195265.00 54/12.8.05 17.8.05 30.9.05 189029 Completed
4 Elect. EEE-VII 17.5.05 5.3.05 166779.00 130/16.11.05 18.11.05 12.12.05 160942 Completed
Date o
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
P/O Lighting arrangment with post top lantern in parks of SFS flats near flat No
214 and near SFS mkt and near B & C mkt Ashok Vihar Ph-IV & With 10 mtr
pole in the park of B-3 block Ashok Vihar Ph-II RZ
M/s Kawatra Eletric Works
P/O Post Top Lighting in the parks of Nimri Cly near H.nos. 338 and near
H.no. 348 in W.no. 99 RZ
M/s Paras Const.Co
P/O Post Top Lighting in the parks of SFS flat s near flat no 153, Ashok Vihar
Ph-IV in W.no. 99 RZ
M/s Kawatra Eletric Works
P/O Post Top Lighting in the parks of Ashok Vihar Ph-III near Hs no A-60 in
W.no. 99 RZ
M/s Paras Const.Co
5 Elect. EEE-VII 17.5.05 6..03.05 197781.00 129/16.11.05 25.11.05 20.12.05 186299 Completed
6 Civil RD-I 20.5.05 9.3.05 259600.00 258/02.08.05 11.8.05 12.9.05 215548 Completed
7 Civil RD-I 20.5.05 9.3.05 199900.00 173/20.06.05 21.06.05 P 179323 In Prog.
8 Civil RD-I 20.5.05 9.3.05 259600.00 308/25.8.05 26.8.05 8.10.05 218409 Completed
9 Civil RD-I 20.5.05 9.3.05 198700.00 339/20.09.05 20.09.05 22.11.05 185276 Completed
10 Civil RD-I 20.5.05 9.3.05 198700.00 328/12.09.05 13.09.05 05.11.05 185970 Completed
11 Civil RD-I 20.5.05 9.3.05 198700.00 271/10.8.05 11.8.05 13.10.05 186133 Completed
12 Civil RD-I 20.5.05 9.3.05 198700.00 300/24.8.05 24.8.05 1.11.05 186401 Completed
13 Civil RD-I 20.5.05 9.3.05 80000.00 299/24.8.05 25.8.05 18.9.05 73478 Completed
14 Civil RD-I 20.5.05 9.3.05 144821.00 15/4.8.05 4.8.05 4.10.05 144148 Completed
15 Civil RD-I 20.5.05 9.03.05 199000.00 340/20.09.05 20.09.05 25.11.05 186669 Completed
16 Civil RD-I 20.5.05 14.03.05 263700.00 259/2.8.05 11.8.05 4.10.05 263700 Completed
17 Civil RD-I 14.6.05 14.03.05 92369.00 190/28.6.05 7.7.05 16.9.05 92343 Completed
18 Civil RD-I 20.6.05 13.06.05 199904.00 195/29.6.05 8.7.05 26.11.05 184042 Completed
Prov of Boring with Subermsible pump set at park in B-3 Block, Ashok Vihar
Ph-II in W.no. 100 RZ
M/s Paras Const.Co
Cosnt of Walkway in park infront of H.no. D-110 in AV, Ashok Vihar Ph-I C-
100 RZ
M/s Supreme Const.
Imp of lane by RMC from H.no. L-70 to L-92 JJ Cly Wazirpur in C-99 RZ
M/s Anhal Const.Asso.
Const of walkway infront park in H.no. E-48 in Satyawati Cly in Ashok Vihar
Ph=-III
M/s AB Builders
Const of Umberella in F block park in JJ cly wazirpur in C-99 RZ
M/s Raminder Const.Co
Const of Umberalla in C block park in JJ cly Wazirpur in C-99 RZ
M/s Nishant Const.Co
Const of Umberalla in H block park in JJ cly Wazirpur in C-99 RZ
M/s Gujral Const.
Const of Umberalla in j-III block park (Behind Mandir) in JJ Cly Wazirpur in
C-99 RZ
M/s Rakesh Kr Goel
Imp of lane by pdg RMC from H.no. L-103 to L-166 and L-201 to L-212 in JJ
Cly Wazirpur-RZ
M/s Rakesh Khanna Goel
Imp of park near flat no B-4/73, B4/37, B4/25, B4/26A in B4 block in Ahsok
Vihar Ph-II by Grit Wash
M/s Surender Const co.
Cosnt of Umberalla in park near DTC Stand (Bus Stand) Bharat Nagar in C-99
RZ
M/s Ravinder Const.Co
Const of B/wall of Open Sapce near H.no. A-172 and H-344 by block Masonery in JJ Wazirpur C-99.
M/s Harish Const Co.
Imp of lane by pdg CC flooring along super bazar in Ashok Vihar PH-II C-100.
M/s Subhash Singh
Imp of side berms by RMC along park near H.no. B-45 in Satyawati Cly in C-99
RZ
M/s BMB Enterprises
19 Civil RD-I 20.6.05 13.06.05 199238.00 29.11.05 03.02.06 167735 In Prog.
20 Civil RD-I 27.06.05 175915.00 144/28.11.05 06.12.05 06.12.05 175915 Completed
21 Civil RD-I 27.06.05 199800.00 40/8.9.05 20.09.05 20.10.05 199800 Completed
22 Civil RD-I 27.06.05 23.06.05 198600.00 45/12.09.05 23.09.05 29.03.06 188499 In Prog.
23 Civil RD-I 27.06.05 199972.00 138/25.11.05 21.12.05 12.01.06 199588 Completed
24 Civil RD-I 27.06.05 549022.00 20.06.06 P 547305 In Prog.
25 Civil RD-I 01.07.05 490584.00 12.11.05 30.05.07 490581 Completed
26 Civil RD-I 06.07.05 04.07.05 199996.00 10.09.05 09.11.05 199996 Completed
27 Elect. EEE-VII 12.07.05 08.06.05 187300.00 257/06.02.06 10.02.06 28.02.06 179261 Completed
28 Elect. EEE-VII 12.07.05 08.06.05 197197.00 22.11.05 05.12.05 180194 Completed
29 Elect. EEE-VII 12.07.05 08.06.05 184582.00 67/24.10.05 24.10.05 4.11.05 158610 Completed
30 Civil RD-I 25.07.05 22.07.05 199100.00 57/22.09.05 23.09.05 P 188479 In Prog.
Raising/Imp of B/wall from Corner of Maharaj Aggersain Public School to DTC Stand in Neemari Cly C-99 RZ
143/28.11.05/EE (Br)-III
M/s Ravinder Const.Co
Imp of drainage system from ch Gulab Singh Marg to corner of Kulachi Hant Raj School along Pocket A in Ashok
Vihar Ph III C-100 R Z
14.3.05 revaledated
19.5.05
M/s Ravinder Const.Co
Imp of B/Wall and room in park in afront of Pragati Market in C-2 Block in Ashok
Vihar Ph II C 100
14.3.05 revaledated
19.5.05
M/s Gaurav Const Co.
Imp of ope spaceby intrerlocking parers in front of flat No 6 in M.I.G flats Ashok
Vihar IV C 100 R Z
M/s Surya Kant Sharma
Imp of roads by M/P in B-4 Pkt from B-4 /73A to 76 A,36A to 22A 1A to 8Aand 30 A to 24 A in Ashok Vihar Ph II C
100
9.3.05 revaledated
19.5.05
M/s Mittal Traders
Stg. of internal roads in SFS flatsby BM with mix seal inAshok Vihar (Shakti
Apptt.) Ph III in C 99 RD I
9.3.05 revaledated
19.5.05
105/09.11.05/EE-(R-I)
M/s Vinod Kumar
Imp of out fall drain from Deep Cinema Roa to C 3 Block in A.V Ph- II C100 RZ
(Ashok Vihar)
14.3.05 revaledated
19.5.05
64/29.09.05/EE(M)-I
M/s Gupta Brothrs.
Imp of back lane by cc flooring from H No B 4/109 to B4/91 and 8A to 1A in B4
pocket Ashok Vihar Ph II C100 R Z
28/30.08.05/EE(Br)-III
M/s Pankaj Builders
P/O semi high mast light in the park near house no B129 Ashok Vihar Phase I
underRohini Zone
M/s Aman Electriclas
P/o stg arrrangement in park near Sanatan Dharam Mandir Ph II in park of B Block Ph I Ashok Vihar and in park
of central market Ashok Vihar Ph I under Rohini Zone
124/16.11.05/EE(E)-VII
M/s Illuminator & Circuiters
P/O semi high mast light in the park near house no B-195 Ashok Vihar Phase I
underRohini Zone
M/s Sachdeva Electricals
Imp to approach road by M/P of H.G drain in JJ Colony wazirpur C-99 R Z
M/s Globe Const.
31 Civil RD-I 25.07.05 22.07.05 197700.00 22/22.8.05 25.8.05 22.10.05 197700 Completed
32 Civil RD-I 25.07.05 22.07.05 197600.00 19/22.08.05 24.08.05 10.12.05 197176 Completed
33 Civil RD-I 29.07.05 199930.00 61/29.9.05 9.10.05 30.10.05 199918 Completed
34 Civil RD-I 29.07.05 199800.00 41/09.09.05 20.09.05 28.10.05 199774 Completed
35 Civil Br-III 29.07.05 05.07.05 198700.00 52/20.9.05 30.9.05 29.11.05 198673 Completed
36 Civil Br-III 29.07.05 26.06.05 28150.00 60/29.9.05 M/s S.M. Const 24.9.05 15.10.05 27425 Completed
37 Elect. EEE-VII 18.08.05 08.06.05 115697.00 223/23.12.05 23.12.05 23.1.06 105311 Completed
38 Elect. EEE-VII 18.08.05 08.06.05 170159.00 161/06.12.05 09.12.05 12.01.06 158594 Completed
39 Elect. EEE-VII 18.08.05 08.06.05 171910.00 222/23.12.05 M/s Seth Const 26.12.05 23.1.06 161965 Completed
40 Civil EEE-VII 18.08.05 785131.00 20.05.06 14.08.06 782750 Completed
41 Civil Br-III 18.08.05 10.08.05 124098.00 142/28.11.05 29.11.05 24.01.06 123789 Completed
42 Civil Br-III 18.08.05 10.08.05 150456.00 100/26.10.05 28.10.05 27.12.05 150456 Completed
43 Civil Br-III 18.08.05 10.08.05 196327.00 81/11.10.05 13.10.05 26.11.05 196239 Completed
C/O walary & Imp to park near E-27 Satyawati Colony C99 R Z
M/s Hari Jain Cosnt.Co.
Widening of road byM/P along park near K Block dalao in wazir pur C99 R Z
M/s Aggarwal Builders
Imp to lane by i/locking brick pavers in L.I.G flats no 57 A to 51 A 74 A 63 A to 68 A , 68 A to 45 A in J Bolck Ashok
Vihar Ph I C100
9.3.05 revaledated
19.5.05
M/sAmar Chaukar
Imp of lanes by i/lockin parvers from central park to 44 A and 75 A to 80A in L.I.G flats in J Block Ashok Vihar Ph I
C100
9.3.05 revaledated
19.5.05
M/s Mahesh Const.& Co
Imp of roads side berms. By i/locking parvers from H noB 3 Block Ashok
Vihar Ph II C100 R Z
M/s Gaurav Associates
Making Add. Water arrangement in M.C primeryschool . Sawan park in C 99 R Z
P/O Lighting arrangement in park near H no B38 Ashok Vihar Ph I under R Z
M/s ACE Engineers
Bureau
P/o boring with submersible pump set at park opposite H NO H 185 Ashok Vihar Ph I in ward No 100 under Rohini Zone
M/s Tyagi Elect & Trading Co
P/o boring with submersible pump set at park central market, Ashok Vihar Ph I in
ward No 100 under Rohini ZoneImp to drainage system in B 2 Bolck behind mandir in Ashok Vihar Ph II
C100 R Z
14.3.05 revaledated
19.5.05
03/07.04.06/EE-(Br)-III
M/s Gupta Brothrs.
Imp of site by kota flooring in front of Patherwala park in JJ Colony wazir pur
in C 99 RZ
M/s Pankaj Const co.
Imp to road side berm by into paversfrom K -17 to Gujrati Mndir in
wazir pur JJ Colony C 99 RZ
M/s Prakash Traders
C/o umbrella in D Block park in wazirpur JJ Colony C 99 RZ (near D 70)
M/s Prakash Traders
44 Civil Br-III 18.08.05 10.08.05 137143.00 126/21.11.05 22.11.05 25.01.06 136978 Completed
45 Civil Br-III 18.08.05 10.08.05 179543.00 133/25.11.05 27.11.05 07.03.06 179305 Completed
46 Civil Br-III 18.08.05 10.08.05 179934.00 134/25.11.05 27.11.05 07.03.06 179930 Completed
47 Civil Br-III 18.08.05 10.08.05 198771.00 96/20.10.05 21.10.05 21.07.06 198718 Completed
48 Civil Br-III 18.08.05 10.08.05 204209.00 82/11.10.05 20.10.05 17.12.05 203596 Completed
49 Civil Br-III 19.08.05 04.08.05 598900.00 16.02.06 16.05.06 402869 Completed
50 Civil Br-III 19.08.05 04.08.05 581100.00 11.03.06 10.06.06 402366 Completed
51 Civil Br-III 19.08.05 04.08.05 391596.00 116/17.11.05 26.11.05 06.02.06 391502 Completed
52 Civil Br-III 19.08.05 04.08.05 583900.00 03.03.06 10.05.06 396397 Completed
53 Civil Br-III 19.08.05 04.08.05 391496.00 163/14.12.05 15.01.06 19.03.06 391403 Completed
54 Civil Br-III 19.08.05 04.08.05 359405.00 120/17.11.05 30.11.05 4.1.06 359405 Completed
55 Civil Br-III 19.08.05 04.08.05 598100.00 03.03.06 10.05.06 404143 Completed
56 Civil Br-III 30.08.05 25.08.05 176189.00 29.12.05 02.08.06 175706 Completed
57 Civil Br-III 30.08.05 24.08.05 294012.00 145/28.11.05 20.01.06 09.03.05 293903 Completed
Imp to B/wall & C/o walkway in F Block park wazirpur JJ Colony C99 RZ near F
270
M/s Satish Gupta & Co.
Imp to B/wall by stone guit finish near C17 to near A 10 in satyawati colony
C99 RZ
M/s Pankaj Const co.
Imp to B/wall by guit wash near H No A 11 to mandir in satyawati colony C99 Rz
M/s Pankaj Const co.
C/o B/wall by brick Masonary in font of C 31 Satyawati Colony C99 RZ
M/s Vijay Kumar-II
Imp of B/wall bystone grit finish of park near C17 in satya wati colony C 99 Rz
M/s Vijay Kumar-II
Imp to drainage system from H No D12 to D 67 in D Bolck in Ashok Vihar Ph II
C100 R Z
226/31.01.06/EE(Br)-III
M/s Ashok Kumar gupta
Imp of drainage system from H no D 68 to D 203 in D Block in Ashok Vihar Ph I
C 100 RZ
254/02.03.06/EE(Br.)-III
M/s Ashok Kumar gupta
Imp of drainage system from H No F 136 to F 149 in F Block in Ashok Vihar Ph I
C 100 RZ
M/s Rajan Builders
Imp of drainage system from H No 108 to 136 Ph F Block in Ashok Vihar Ph I C
100 RZ
229/06.02.06/EE(Br)-III
M/s K.K.Enterprises
Imp of drainage system rom H No E 151 to E Block school in E Block in Ashok
Vihar Ph I C 100 RZ
M/s Pankaj Const co.
Imp of drainage system from H No B218 to B 226 in B Bolck Ashok Vihar Ph I C
100 RZ
M/s RM Auto Centre
Imp of drainage system from H no 42 to 71 on main road in A bolck in Ashok
Vihar Ph II C 100 RZ
230/06.02.06/EE(Br)-III
M/s K.K.Enterprises
Const of walkway and Imp of Radha Kunj park in Satya wati colony in C 99
RZ
174/28.12.05/EE(Br.)-III
M/s Neeraj Const.Co
Imp of draimage system fromvH NI E II to corner of E Bolck school on main road
E Block Ashok Vihar Ph I C 100
M/s Krishna Const.Co
58 Civil Br-III 30.08.05 24.08.05 198600.00
59 Civil Br-III 30.08.05 24.08.05 195100.00
60 Civil Br-III 12.9.05 25.8.05 195856.00 121/17.11.05 26.11.05 27.12.05 195082 Completed
61 Civil Br-III 12.9.05 8.9.05 256960.00 70/7.10.05 10.10.05 26.11.05 254191 Completed
62 Civil Br-III 12.9.05 22.9.05 118045.00 127/21.11.05 22.11.05 28.1.06 118045 Completed
63 Civil Br-III 7.10.05 5.10.05 143194.00 162/14.12.05 23.12.05 P 107074 In Prog.
64 Civil Br-III 10.10.05 6.10.05 189929.00 150/2.12.05 2.12.05 P 149917 In Prog.
65 Civil Br-III 19.10.05 18.10.05 197132.00 212/27.01.06 28.01.06 04.01.06 196677 Completed
66 Civil Br-III 5.12.05 18.10.05 199855.00 170/21.12.05 23.12.05 01.03.06 199654 Completed
67 Civil Br-III 5.12.05 18.10.05 195967.00 211/27.01.06 27.01.06 21.03.06 195805 Completed
68 Civil Br-III 5.12.05 18.10.05 199100.00 28.01.06 03.04.06 187559 Completed
69 Civil Br-III 5.12.05 21.11.05 199975.00 208/27.01.06 28.01.06 15.06.06 199975 Completed
70 Civil Br-III 5.12.05 21.11.05 199680.00 07.01.06 25.03.06 198800 Completed
71 Civil Br-III 5.12.05 21.11.05 199153.00 22.12.05 13.09.06 199028 Completed
Imp of roads by mix seal in K C Block in Ashok Vihar Ph I C 100 RZ
Imp of internal roads by mix seal in B.A Block in Ashok Vihar Ph I C 100 RZ
Imp of rd by Premix Carpet from H.no. 39 to Park near H.n. 395 and upto H.no.
411 in Nimri Cly, in C 99 RZ
M/s Prakash Traders
C/o of Footpat at T-Point of GS Marg & SN Nagar (Swami Nayyar marg) in C 99
RZ
M/s Sajjan Engg. & Builders
Imp fo B./wall by pdg Grit wash & grill 48 DDA mkt, near Sanatan dharam
Mandir infront G block in Wazirpur in C 99
M/s Rakesh Kumar Goel
Imp of B.wall of park by Brick Masonary & Imp to walkway in front of E-16
Wazirpur JJ Cly in C 99.
M/s Dhruv Const.
Widening of rd at T point of Swami Narayan marg & GS Marg in W.no. 99
M/s Subhash Singh
C/o Walkway in oark infront of 109 Nimri Cly C 99
M/s Vashista const.Co
imp to B/Wall of park by Brick masonry in front of H No 448 Nimri Colony in C
99 RZ
M/s B.M.B.Enterpri
sesImp of parking by interlocking tiles in C pocket Ashok Vihar Ph III in C99 RZ
M/s Praveen Kumar Garg
C/o B/Wall of demolished lav Block Space by brick masonary near B-107 & in F Block Wazirpur JJ Colony C99 RZ
207/27.01.06/EE(Br)-III
M/s M.P Associates
Const of walkway in park in front of H no 367 &369 in Nimri Colony in C99 RZ
M/s Baba & Co.
Imp to lane by cement Concrete pavements near House No 357 to 367
and 345 to 355 Nimri Colony in C 99 R Z
191/05.01.06/EE(Br)-III
M/s Jatin Const.
Imp to lane by cement Concrete pavements near House No 325 to 335
and 337 to Mandir in Nimri Colony in C 99 R Z
167/21.12.05/EE(Br.)-III
M/s Mittal Traders
72 Civil Br-III 5.12.05 21.11.05 198392.00 28.01.06 P 170748 In Prog.
73 Civil Br-III 5.12.05 21.11.05 199910.00 04.02.06 31.05.06 199910 Completed
74 Civil Br-III 5.12.05 21.11.05 199690.00 10.01.06 P 198381 In Prog.
75 Civil Br-III 5.12.05 21.11.05 199852.00 209/27.01.06 28.01.06 01.10.07 199852 Completed
76 Civil Br-III 5.12.05 21.11.05 199406.00 214/27.01.06 27.01.06 06.03.06 198805 Completed
77 Civil Br-III 5.12.05 21.11.05 199447.00 215/27.01.06 M/s Ancon 28.01.06 P 186246 In Prog.
78 Civil Br-III 9.12.05 8.12.05 199994.00 210/27.01.06 28.01.06 24.03.06 199402 Completed
79 Civil Br-III 13.12.05 10.11.05 196193.00 178/27.01.06 02.01.06 08.03.06 195520 Completed
80 Elect. EEE-VII 2.1.06. 24.10.05 191627.00 04/03.01.06 03.01.06 09.01.06 180144 Completed
81 Elect. EEE-VII 2.1.06. 24.10.05 145493.00 05/03.01.06 03.01.06 09.01.06 141711 Completed
82 Civil Br-III 5.1.06 4.1.06 199700.00 221/31.1.06 1.02.06 14.2.06 199511 Completed
83 Civil Br-III 5.1.06 4.1.06 99050.00 03.03.06 P 98699 In Prog.
84 Civil Br-III 5.1.06 15.12.05 199800.00 23.02.06 23.06.06 199700 Completed
85 Civil Br-III 5.1.06 15.12.05 199600.00 14.02.06 20.04.06 198981 Completed
86 Elect. EEE-VII 24.1.06 18.1.06 191470.00 27.03.06 13.04.06 120023 Completed
Imp to lane by RMC from H no D 539 to D-560 and D 625 to D 646 in JJ Colony
Wazir pur R Z
216/27.01.06/EE(Br.)III
M/s Kumar Const.co.
Imp of road by RMC from Sanatan Dharam Mandir to MC pry School
Sawan Park in C99 R Z
213/27.01.06/EE(Br)-III
M/s Prakash Const.Co
Imp of road by M/p from Railway X-ing to Sawan Park in C99 R Z
189/05.01.06/EE(Br)-III
M/s Surya Kant Sharma
Imp of B/ Wall with B/M of park near Bharat Nagar Bus Stand in C-99 R Z
M/s Om Const.Co
Imp to open Space by interlocking tiles in front of House No 485 to 445 Nimri
Colony in C-99 RZ
M/s Surjit Kumar
Imp to open Space by interlocking tiles in front of House No 443 and 523 Nimri
Colony in C-99 RZ Imp to lane by CC pav from H.nl. 315 to 271 Double Storey Bharat nagar in C 99.
M/s Maruti Const.
Imp to open space for park pdg B/wall in front of H.n. 17 Bharat Ngar, C 99
M/s Hari Jain Cosnt.Co.
P/o Semi High mast Light at park in H 48, Ashok Vihar Ph-I, in W.no. 100 RZ
M/s Master Elect. Store
P/O boring with Subermsible Pump set at park in Bunkar Colony and laying its line
in adjacent park in W.no. 99 RZ
M/s Master Elect. Store
P/F I/l Precast Pav on central verge on S.N. Marg in W.no. C 99
M/sMahesh Chand & Co.
Imp to road by Premix Carpet near H.no. 603 to main road & nar 159 in Nimri
Colony in C 99
252/22.02.06/EE(Br)-III
M/s Surya Kant Sharma
Imp of lane by CC flrooring from H-66 to H 86 and H 87 to H 107 in JJ Colony
Wazirpur in C 99
253/22.02.06/EE(BR)-III
M/s Gaurav Associates
Imp to lane by CC flooring from H 173 to H 193 and H 259 to H 279 in JJ cly
Wazirpur in C 99
239/18.02.06/EE(Br.)-III
M/s Esskay Enterprises
P/O Post Top Lantern I the park infont of flat no. C 50, LIG Flats Ashok Vihar Ph-
II, In W.n. 100
336/21.03.06/EE(E)-VII
M/s Repairs Shop
87 Elect. EEE-VII 24.1.06 18.1.06 257466.00 368/31.03.06 M/s Seth Const 31.03.06 14.04.06 159619 Completed
88 Elect. EEE-VII 24.1.06 18.1.06 196022.00 339/21.03.06 21.03.06 29.03.06 141002 Completed
89 Elect. EEE-VII 24.1.06 18.1.06 190772.00 340/21.03.06 21.03.06 29.03.06 139377 Completed
90 Elect. EEE-VII 24.1.06 18.1.06 218837.00 06.04.06 31.05.06 115120 Completed
91 Civil Br-III 6.2.06 4.2.06 199907.00 284/21.03.06 21.03.06 30..05.06 199890 Completed
92 Civil Br-III 20.02.06 18.1.06 199936.00 259/06.02.06 06.03.06 30.03.06 199929 Completed
93 Civil Br-III 20.02.06 18.1.06 198998.00 24.04.06 26.06.06 198989 Completed
94 Civil Br-III 20.02.06 18.1.06 199748.00 20.03.06 P 199748 In Prog.
95 Civil Br-III 20.02.06 18.1.06 199950.00 29.03.06 23.05.06 198442 Completed
96 Civil Br-III 20.02.06 4.2.06 99200.00 300/28.03.06 29.03.06 22.04.06 89597 Completed
97 Civil Br-III 24.2.06 23.02.06 199950.00 288/24.03.06 25.03.06 13.09.06 199910 Completed
98 Civil Br-III 28.2.06 23.02.06 33800.00
Status Report of MLA, Sh.Charan Singh Kandera, AC No. 54 2005-06
P/O Post Top Tantern in the aoprk in fornt of Flat NO. C 10, LIG Flats Ashok
Vihar ph-IV in w.no. 100.Prov of Semi High Mast light at park in C block Ashok Vihar Ph-III in w.no. 100
M/s Saksham Elect. &
Electronics
Prov of Semi High Mast light near Sindhi Dharamshala, Ashok Vihar Ph-II,
w.n. 100
M/s Saksham Elect. &
ElectronicsP/O Street light arrangement on the road (a) near Laxmi Narayan Mandir, Ashok Vihar Ph-II, and (b) near B-3/25, Ashok
Vihar Ph-II and (c) neare DDA Mkt Shakti Nagar Ext in Under RZ
369/31.03.06/EE(E)-VII
M/s Kawatra Eletric Works
C/o of Island on Swami Narayan Marg in C 99 (New Gulab Singh Marg)
M/s Subhash Singh
Imp to Side berms by pdg CC tiles paver near 8A, 11A to 17A to 22a to 18A and
34A in KC block, Ashok Vihar in C 1000
M/s Shiv Shankar Gupta
Imp to drainage system and side berm from A 25 to 27, near A 15, and A 30 in A block, Ph-II, Ashok Vihar in C 100
261/06.03.06/EE(Br.)-III
M/s Ram Kishore Berwa
Imp of Drainage system from A-8 to A 13 and A 18 to A 22 in A block, Ashok
ViharPh-II in C 100
269/09.03.06/EE(Br.)-III
M/s Krishna Const.Co
Const of drain and culvert on Sh. Gulab Singh rd near Dda Park , WP-I
Wazirpurvillage, Ashok Vihar Ph-I in C 100.
299/28.03.06/EE(Br.)-III
M/s Anhal Const.Asso.
C/o of Island near K block, dalao in Wazirpur in JJ Cly
M/s Shiv Shankar Gupta
Imp to lane by CC flooring fro H.no.150 to 129, 107 to 918 & 97 to 118 in F Block, JJ Cly in Wazirpur in C 99
M/s Mittal Traders
Pdg & laying interlocking pavers in Walkway in park near H.no. 385 infornt of Gurudwara in Nimri Cly in C 99 RZ
S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil Narela 2.6.05 24.5.05 155200.00 118/16.6.05 22.6.05 11.8.05 150351.00 Completed
2 Civil Narela 2.6.05 24.5.05 186600.00 119/16.6.05 22.6.05 22.8.05 180909.00 Completed
3 Civil Narela 2.6.05 24.5.05 282100.00 214/25.2.05 25.10.05 P 122665.00 In Prog.
4 Civil Narela 2.6.05 24.5.05 308816.00 07.10.05 P 308541.00 In Prog.
5 Civil Narela 2.6.05 24.5.05 330800.00 15.10.05 12.01.06 247953.00 Completed
6 Civil Narela 2.6.05 24.5.05 199400.00 120/16.6.05 24.6.05 22.8.05 193361.00 Completed
7 Civil Narela 2.6.05 24.5.05 176900.00 M/s R.B.Traders 25.07.05 12.12.05 171565.00 Completed
8 Civil Narela 2.6.05 31.5.05 199200.00 23.6.05 15.10.05 193288.00 Completed
9 Civil Narela 2.6.05 24.5.05 591900.00 25.10.05 P 397857.00 In Prog.
10 Civil Narela 2.6.05 24.5.05 233116.00 11.10.05 7.1.06 232842.00 Completed
11 Civil Narela 8.6.05 20.5.05 542526.00 11.10.05 9.1.06 540633.00 Completed
Date of
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Pro. C.C from Transformer to oriental Bank of Commerce in village Holambi Khurd C-
102-I NZ
M/s D.& G Const co.
Pdg B/P and O/s drain from Sh. Ishwar Singh Hs to MED Singh Hs in Apni colony Alipur
Garhi in C-102-I NZ
M/s Rakesh Kumar
Pdg B/P and O/s drain from chandhary dilip singh Pardhan Hs in village Khera Khurd
Garhi in C-102-I NZ
M/s Pushp Const CO.
Pdg B/P and drain form Poultry farm to Rajinder Hs and Kasturi Hs to Pyre lal hs in
village Khera Khurd C-102 NZ
185/07.10.05/EE-
Narela
M/s Rajinder Singh Dahiya
Pdg B/P and drain from Prem Raj Hs to Silas Ekka Hs in village Khera Khurd in c-102-I
NZ
186/07.10.05/EE-
Narela
M/s Rajinder Singh Dahiya
Pdg B/P and drain from Michacl Minge to Amar Singh Hs and Silas Ekka to Sabertian House in Village Khera Kherd C-102-I NZ
M/s Vipin kumar Dagar
Pdg C.C pavement around the temple streets in village Holambi Kalan in c-102-I NZ
115/16.06.05/EE-
Narela
Imp of road by PMP from Gas Agency office to police chowki in Metro vihar in c-102 NZ
125/16.6.05/Nare
la
M/s Trimurti trading Co.
Pdg M/P and drain from Pt Shiv Raj Shastri to Sh Nanak Hs in village Khera Khurd in C-
102 NZ
212/25.10.05/EE-
Narela
M/s Pushp Const CO.
PMP and drain foarm Pratap Singh Hs to Mahepal Hs and Balmiki chowpal to OM
parakash hs in village Naya Bans in c-102-I NZ
188/11.10.05/EE Narela
M/s Rakesh Kumar
Providing B/P and drain from Nani Singh Hs to Chander Hs Dharam Singh and Same Singh in village Sunger pur C-102 NZ
190/11.10.05/EE Narela
M/s Jagdamba Trading CO.
12 Civil Narela 8.6.05 20.5.05 327553.00 21.11.05 12.1.06 327494.00 Completed
13 Civil Narela 8.6.05 20.5.05 284163.00 25.10.05 15.02.06 284118.00 Completed
14 Civil Narela 8.6.05 20.5.05 262867.00 8.11.05 1.2.06 262353.00 Completed
15 Civil Narela 8.6.05 20.5.05 260004.00 13.10.05 17.12.05 260004.00 Completed
16 Civil Narela 8.6.05 20.5.05 258595.00 8.11.05 18.1.06 257794.00 Completed
17 Civil Narela 8.6.05 20.5.05 479955.00 20.03.06 29.03.06 479260.00 Completed
18 Civil Narela 8.6.05 20.5.05 363878.00 M/s S.S.Engg. 11.10.05 31.01.06 362620.00 Completed
19 Civil EE(Pr.)R 8.6.05 3.6.05 409500.00 14.12.05 06.02.06 315315.00 Completed
20 Civil EE(Pr.)R 8.6.05 3.6.05 792200.00 31.05.06 17.07.06 599424.00 Completed
21 Civil EE(Pr.)R 8.6.05 3.6.05 162500.00 11.03.06 09.06.06 122551.00 Completed
22 Civil Narela 10.6.05 9.6.06 198070.00 20.12.05 16.1.06 139378.00 Completed
23 Civil Narela 10.6.05 9.6.05 371100.00 16.12.05 24.02.06 272665.00 Completed
Pdg C.C pav and drain from OM Parkash Hs Mandir to Zile Singh Hs in village Singhu in
c-102 NZ
229/21.11.05/EE Narela
M/s Sahil Builiders
Providing B/P and drain from Anil Hs Ram Singh Hs and and Upto Charan singh Hs in
village Sunger pur C-102 NZ
213/25.10.05/EE(
N)
M/s Pushp Const CO.
Pdg C.C in the lanes from Het Ram Hs to towards Attar Singh Hs in village Tiggipur C-
102 -IINZ
215/8.11.05/EE Narela
M/s Gupta Const co.-II
Pdg C.C pav and drain from Madan Hs towards Rattan Hs and upto Dulichud Hs and adjoing lanes in village Bakoli in c-102-IINZ
191/13.10.05/Nar
ela
M/s Deep Const co.
Pdg C.C in the lames fsorm Darshan singh to Reedy Singh Uttam Singh to Joginder and
side lanes of Balbir Hs in village Jhingola C-102-IINZ
217/8.11.05/Nare
la
M/s Gupta Const co.-II
Raising of lanes by C.C from M.C. School upto Bishme Hs and Adjoing lanes in vilage
Jhirgola C-102/II NZ
303/.20.01.06/EE
-Narela
M/s Deep Const co.
Raising of lane by C.C. from Balwant Hs to wards Ram Niwas Hs and adjoing lanes in
village Palla in c-102-II NZ
189/11.10.05/EE-Narela
Imp of lane by providing brick pavement and c/o O/s drain faorm Ramesh Hs to Balmiki Chopal in Landless colony Singhu in c-102
NZ
59/07.12.05/EE(Pr)R
M/s Jagdamba Trading CO.
C/o O/s drain from Munder to Kartar Singh Hs upto Transfermer in Landless Colony
Singhu in c-102 NZ
18/31.05.06/EE(Pr.)R
M/s Puneet Const.Co
Imp of lane of Providing B/Promt and c/o O/s drain form Jagbir Hs to M.C Pry School in
landless coloney Singhu c-102 NZ
123/11.03.06/EE(Pr.)R
M/s Dev Const.Co.
Imp of lane by providing CC Pavment from Coner of park to H. no. 93 in Punjaby
Coloney in c-101 NZ
236/13.12.05/Narela
M/s Sahil Builiders
Imp of lane by providing C.C pav and O/s drain from Pandit Jai Kishan Hs to Shyam
Singh Hs near Phirni in village Sanooth in c-101 NZ
237/13.12.05/EE-Narela
M/s Sahil Builiders
24 Civil Narela 10.6.05 9.6.05 301700.00 21.11.05 14.02.06 217766.00 Completed
25 Civil Narela 5.7.05 24.5.05 470746.00 22.12.05 03.03.06 470746.00 Completed
26 Civil Narela 7.7.05 24.5.05 258051.00 08.11.05 15.02.06 257142.00 Completed
27 Civil Narela 11.7.05 1.7.05 199200.00 M/s Suresh Bros. 04.08.05 24.02.06 191770.00 Completed
28 Civil Narela 4.10.05 20.5.05 509781.00 21.02.06 30.03.06 509781.00 Completed
29 Civil Narela 4.10.05 2.8.05 199800.00 16.01.06 20.04.06 193640.00 Completed
30 Civil Narela 4.10.05 2.8.05 218551.00 08.03.06 01.05.06 218551.00 Completed
31 Civil Narela 7.11.05 7.11.05 140500.00 23.01.06 16.02.06 104851.00 Completed
32 Civil Narela 7.11.05 7.11.05 181914.00 09.06.06 31.07.06 180468.00 Completed
33 Civil Narela 7.11.05 7.11.05 419000.00 24.1.06 24.02.06 305527.00 Completed
34 C/o Culvert in Pujabi coloney in C-102-II/NZ Civil Narela 7.11.05 7.11.05 302900.00 20.02.06 P 244211.00 In Prog.
35 Civil Narela 8.11.05 7.11.05 281263.00 23.01.06 22.03.06 281262.00 Completed
36 Civil Narela 8.11.05 7.11.05 596400.00 21.02.06 30.03.06 432172.00 Completed
37 Civil Narela 10.11.05 7.11.05 191800.00 M/s Atul Gupta 16.01.06 21.03.06 185600.00 Completed
Imp of lane by pdg C.C pav from Phirni road to shri Kishan Hs and lane along Zile Singh Hs and Ashok Hs in viilage Ghoga in c-101
NZ
218/08.11.05/EE(N)
M/s Gupta Const co.-II
C/o road by PMP premixing from Kishan S/o Maxmi chand Hs to Anil Bariwala ( on Phirni
road) in Alipur C-102 NZ
238/03.12.05/EE(N)
M/s Rakesh Kumar
Pdg M/P and drain from Prem Singh Hs to Nandu Hs in village Khera Khurd in C-102
NZ
216/08.11.05/EE-Narela
M/s Gupta Const co.-II
Imp of road by M/P from Sannoth drain to Mill on Holambi Kalan Sannoth road in C-
102 -II NZ
155/26.07.05/EE-Narela
Pdg C.C. Pav.& drain from Sr. Sec School towards Om Shanti Near Chopal & adj. Lanes
in vill Bakatawarpur in C-102/II , Narela Zone.
377/21.02.06/EE-Narela
M/s Om Const.Co.
Providing C.C. pave & drain from Radhey Hs to Rajpal Via Inder Singh Hs in vill Tajpur in
C-102/-II N.Z
292/16.01.06/EE-Narela
M/s Prem Brothers
Providing C.C. pave & drain from Pala Ram to Jai Bhagwan , Ram Gopal to Ram Sharan & Balber to Sukh Lal Hs in Vill Tajpur in C-
102-II NZ
404/08.03.06/EE-Narela
M/s D.& G Const co.
C/o drain from Phirni to Jai Bhagwan fectory and Satpal Hs in vill Sanoth in C-101-II N.Z
305/20.01.06/EE-Narela
M/s Popular Enterprises
C/o Culvert near Transfermar and M.c School in vill Sanoth in C-102-II/N.Z
31/01.06.06/EE-Narela
M/s Ankit Associates
Imp of road by providing M/P from Bawana road to Sanoth vill in C-102-II/NZ
327/23.01.06/EE-Narela
M/s Popular Enterprises
386/27.02.06/EE(N)
M/s Shanker Const.Co.
Pdg C.C. from Prem Singh Hs Towards Phool Singh hs in vill. Hiranki in C-102/NZ
331/23.01.06/EE-Nareal
M/s Govind Gupta
Pdg C.C pavement & drain from Dharam pal Hs to Thanu Hs Via Jagdish Hs in vill Tajpur
in C-102-II/N.Z
384/21.02.06/EE-Narela
M/s Raj Associates
C/o drain from Jas Ram Sweets Corner to Sant Gaganeshwar Public school in Vill
Khampur in C-102-II/N.Z
293/16.01.06/EE-Narela
38 Civil Narela 10.11.05 7.11.05 161100.00 16.01.06 18.02.06 154595.00 Completed
39 Elect EEE-II 22.11.05 27.9.05 150576.00 02.04.06 25.05.06 120275.00 Completed
40 Civil Narela 23.11.05 7.11.05 454223.00 27.02.06 30.05.06 454223.00 Completed
41 Civil Narela 23.11.05 7.11.05 280800.00 06.09.06 15.11.06 212254.00 Completed
42 Civil Narela 23.11.05 7.11.05 455961.00 16.03.06 20.05.06 455961.00 Completed
43 Civil Narela 23.11.05 7.11.05 230500.00 M/s Ajay Assos. 14.07.06 P 175330.00 In Prog.
44 Civil Narela 23.11.05 7.11.05 485855.00 16.03.06 26.06.06 485548.00 Completed
45 Civil Narela 23.11.05 7.11.05 536300.00 10.03.06 29.03.06 405048.00 Completed
46 Civil Narela 5.12.05 7.11.05 290000.00 18.03.06 28.04.06 202956.00 Completed
47 Civil Narela 7.12.05 7.11.05 464680.00 22.03.06 20.06.06 463622.00 Completed
48 Civil Narela 8.12.05 7.11.05 1052332.00 16.11.06 20.02.07 1052100.00 Completed
49 Civil Narela 14.12.05 7.11.05 989600.00 10.05.06 13.09.06 846927.00 Completed
50 Civil Narela 16.12.05 7.11.05 598200.00 07.08.06 17.10.06 479393.00 Completed
51 Civil Narela 27.12.05 7.11.05 429580.00 22.03.06 20.06.06 428095.00 Completed
Pdg C.C and drain from Sukhbir Hs to Rai Singh Hs in vill Khera Kalan in C-102-II?N.Z
294/16.01.06/EE(N)
M/s Om Const.Co.
P/o Semi High Mast light at shah pur garhi near park Chauraha w.no. 102 Narela
251/24.03.06/EE(E)-II
M/s Bansal Electrci Store
Pdg RMC and Drain from Vijay pal hs to Sukhbir hs on Prhnir rd in village khera kalan
in C102 I Nz
387/27.02.06/EE-Narela
M/s Khatri Const.Co
Imp of Drian from Kanwar singh hs to China Ram Hs in village khera Kalan C 102 I NZ
90/06.09.06/EE-Narela
M/s Raj Associates
Pdg CC and drain from Ravi to Kali Ram via Banwari Hs and side lanes in village
Bakhtawar pur C 102 II NZ
425/16.03.06/EE-Narela
M/s Mehboob Const.Co
Pdg M/P along MC School in village Jind pur C 102 I NZ
50/05.07.06/EE(Narela)
Pdg M/P on Bakoli - Hamid pur road in C 102 II NZ (Link Road)
433/16.03.06/EE-Narela
M/s Dev Const.Co.
Imp of lane by pdg Dry Brick Flooring and O/S drain from Yamin Hs to Rajbir HS and its parallel lanes in Punjabi Cly in c 101 II
NZ
411/08.03.06/EE-Narela
M/s Shanker Const.Co.
Imp of lane (small lanes) by pdg CC Pav in Bagri Mohalla in Panna Udyhan in Narela in
C 101 -I, NZ
415/08.03.06/EE-Narela
M/s Ankit Associates
Pdg CC and brick pavment and drain from Mukesh saini to Horam and Vijay to
Mahender Hs in village Bakoli C 102-II, NZ
436/22.03.06/EE-Narela
M/s Om Const.Co.
Const of rd by pdg M/P from GT road to Anil Factory on phirni rd in viillage Alipur in C
102-I,NZ
192/16.11.06/EE-Narela
M/s Bajaj Const.Co
C/o Phirni rd by M/P from Meer Singh Hs to Mahender Hs in village Jindpur in C 102-I,
NZ
22/10.05.06/EE-Narela
M/s Khatri Const.Co
Pdg M/P on Phrni rd from Jai Parkash HS to Community Centre in village Akbar Pur
Majra in C 102-II, NZ
398/07.03.06/EE-Narela
M/s Dev Const.Co.
Pdg CC and drain from Puran Jogi to Ashok via Devender and along shiv mandir in village Bakhtawar Pur in C 102-II, NZ
435/22.03.06/EE-Narela
M/s D & G Const.Co
52 Elect EEE-II 6.1.06 24.10.05 148491.00 14.07.06 12.08..06 138401.00 Completed
53 Civil Narela 6.1.06 2.1.06 485012.00 03.04.06 06.07.06 376263.00 Completed
Civil Narela 17.03.06 20.01.06 196200.00 05.05.06 16.06.06 195850.00 Completed
P/OI Semi High Mast light at Holambi Kalan (Near Bus stand) w.no. 102, Narela Zone
64/05.07.06/EE(E)-II
M/s Master Electric Store
Imp to lane by pdg CC pav from Safia Bad turn to Raghunath Mandir in Pana Udyan
w.no. 101-I, NZ
452/31.03.06/EE-Narela
M/s P.K Const.Co
Imp of lane by Pdg. CC Pav & O/s Drain from Gopi Chand House to Rajinder House in
G-Block Punjabi Colony C-101-II/ Narela
439/30.04.06/EE-Narela
M/s Gaj Raj Singh
0.00
4.68
Status Report of MLA, Sh.Jile Singh Chauhan, AC No. 55 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
Civil EE-XII 9.5.05 6.5.05 1718560.00 15.05.06 P 1712396.00 In Prog.
Date o
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
1 Imp to lane by RMC from Deergesh Devi Hs to 25 foota road in Parvatiya Anchal Sant Nagar Village , Burari C-104/CLZ
63/12.05.06/E
E-XII
M/s K.K Const.Co
2 Civil EE-XII 9.5.05 6.5.05 1317441.00 09.11.05 08.11.06 1317381.00 Completed
3 Civil EE-XII 16.5.05 17.2.05 188300.00 21.07.05 26.10.05 187529.00 Completed
4 Civil EE-XII 3.6.05 2.6.05 195350.00 198/22.7.05 1.8.05 2.9.05 195159.00 Completed
5 Civil EE-XII 24.6.05 1.6.05 179885.00 138/4.7.05 4.7.05 30.7.05 179841.00 Completed
6 Civil EE-XII 24.6.05 1.6.05 198806.00 20.7.05 24.9.05 198534.00 Completed
7 Civil EE-XII 24.6.05 1.6.05 197500.00 223/22.7.05 23.7.05 29.9.05 197422.00 Completed
8 Civil EE-XII 13.7.05 17.2.05 556947.00 14.8.05 14.11.05 543539.00 Completed
9 Civil EE-XII 13.7.05 17.2.05 545192.00 248/5.8.05 14.8.05 18.10.05 544408.00 Completed
10 Civil EE-XII 14.7.05 17.2.05 581110.00 25.08.05 24.012.05 579051.00 Completed
C/o drain from Burari Raod to Durgesh Devi to 25 foota road in Parvatiya Anchal Sant Nagr Village Burari C-104/CLZ
405/07.11.05/
EE-XII
M/s A.K.& Co.
C/o drain and lane by B/P from Mange Ram Hs to Company and Yasim Hs to Arora Hs in Burari Garhi C-104/CLZ
169/18.07.05/
EE-XII
M/s Globe CONst CO.
Imp of drain from Jawala Tent Hs to front of Police Post Mukand pur C-104 CLZ
M/sJyoti Const
Imp to Phivni road by c.c. from Bhupender Rana to Babool tree in village Kadipur in c-104/CLZ
M/s Saurabh Const
Imp to Phirni road by c.c. from Ravinder to Samsher in village Kadepur C-104/CLZ
167/18.7.05/X
II
M/s Globe CONst CO.
Imp to lane by c.c. in block B from H.NO B-265 to H.NO B-736 in Jahangir Puri colony C-103, CLZ
M/s Sarout Const Co.
C/o drain from R.K. Bulders to Rajesh Hs in c block Amrit vihar village Nathu pura c-104/CLZ
247/5.8.05/XI
I
M/s jaswant singh Dabas
C/o Drain from Ram Kishan to Omkar (flood Nallah) in C block Interprastha Colony Village Nathu Pura C 104 CLZ
M/s Jaswant Singh Dabas
C/o drain from Ramdas to Bala Ram ( flood Nallah) in B- block , Inderprastha Coloney village Nathu pura c-104/CLZ
270/16.08.05/
EE-XII
M/s Bhaiji.Contractor & Supplier
11 Civil EE-XII 2.8.05 1.6.05 502320.00 19.11.05 2.1.06 502004.00 Completed
12 Civil EE-XII 2.8.05 1.6.05 276300.00
13 Civil EE-XII 2.8.05 1.6.05 348690.00 29.03.06 26.05.06 348424.00 Completed
14 Civil EE-XII 2.8.05 1.6.05 694900.00 17.12.05 15.04.06 694900.00 Completed
15 Civil EE-XII 2.8.05 12.7.05 812109.00 16.11.05 02.03.06 811674.00 Completed
16 Civil EE-XII 2.8.05 29.7.05 199200.00
17 Civil EE-XII 2.8.05 29.7.05 198687.00 09.10.05 02.11.05 197457.00 Completed
18 Civil EE-XII 2.8.05 29.7.05 188229.00 28.09.05 27.11.05 187985.00 Completed
Imp to lane by brick flooring from flood road to Marshal Modern School Milan vihar Jharoda in c-104/CLZ
421/17.11.05/
XII
M.s Dinesh const co.
Imp to lane by brick flooring & drain in gali No-7 from Khasra No 385 jto Dalip Kumar hs in part-II , village Jharoda in c-104/CLZ
Imp to lane by brick flooring from Electric transfer to Munshihal in part-III Surender colony in Village Jharoda c-104/CLZ
715/20.03.06/
EE-XII
M/s Naveen Const.& co
Imp to lane by B/ flooring and drain in from Burari road to Devender Hs on 25 foota road near upkaar Colony in Village Burari C-104/CLZ
484/08.12.05/
EE-XII
M/s Shyam Lal Gupta
Imp to lane by B/floring and drain from Vijinder to Ram singh Hs in Tomar colony in vilage Burari C-104/CLZ
402/07.11.05/
EE-XII
M/s S.S Enterprises
Imp to road by Provding RMC from Banwari Hs to Shakti Singh hs and Naresh hs to Ramesh Hs in Kadipur village in C-104/CLZ
Imp to Phirni road by providing RMC from Farm Hs to Babul Tree in village Kadipur C-104/CLZ
342/29.09.05/
EE-XII
M/s Havshit Builders
Imp to Phirni road by providing RMC from Dall Mill to Farm Hs in Village Kadipur in C-104/CLZ
328/21.9.05/X
II
M/s S.M. Const.
19 Civil EE-XII 8.8.05 1.6.05 1004948.00 11.11.05 01.03.06 1004739.00 Completed
20 Civil EE-XII 8.8.05 1.6.05 1533809.00 16.11.05 01.03.06 1520604.00 Completed
21 Civil EE-XII 8.8.05 1.6.05 630698.00 03.01.06 28.06.06 630514.00 Completed
22 Civil EE-XII 11.8.05 17.1.05 516313.00 20.03.06 01.07.06 515633.00 Completed
23 Civil EE-XII 2.9.05 1.9.05 315972.00 01.01.06 31.05.06 315481.00 Completed
24 Civil EE-XII 18.11.05 1.8.05 199773.00 31.12.05 04.03.06 199747.00 Completed
25 Civil EE-XII 18.11.05 1.8.05 196900.00 17.03.06 08.05.06 196659.00 Completed
Imp to lane by Brick flooring and drain from sonia Clinic to Balak Ram Hs and B.D Sharma to K.K builders in D block Kamal Vihar , Kamal pur
village Burari C-104/CLZ
400/07.11.05/EE-XII
M/s S.S Enterprises
Imp to lane by Brick flooring and drain in gali no-5 from Ram Chander
to Hemram , virender to Surja and gali no- 6 from Dhermpal to Siya Ram in A block , Kaushik enclave
Village Burari C-104/CLZ
401/07.11.05/EE/XII
M/s S.S Enterprises
Imp to lane by brick flooring and drain Parmood to Manoj Hansraj to
Harish uttaranchal school to Shiv Singh and ceble factory to Tilak Raja
in uttaranchal Enclave kamal pur village Burari C-104/CLZ
541/02.01.06/EE-XII
M/s Satish Const.&Co.
Imp to lane by Brick flooring and drain from Dayanand to Manoj Jain
in Tomar Colony in village Burari C-104/CLZ
696/17.03.06/EE-XII
M/s Harsh Consts.
Imp to lane by Brick pavement from Darshan to Gursharan Hs and fron
Nitu Sharma to Shiv Mandir in Village Jharoda in C-104/CLZ
502/22.12.05/EE-XII
M/s Hazarika Builders
Imp of lane by CC from Chet Ram hs to Khem Chand Hs in village
Mukand pur C-104 CLZ
540/30.12.05/EE-XII
M/s Sorout Const.Co
Imp of lane by CC in block J pkt, -J-3, in Jahangir Puri Resettlement
Colony W.n. 103 CLZ
711/17.03.06/EE-XII
M/s Globe Const CO.
26 Civil EE-XII 29.11.05 1.8.05 448942.00 01.04.06 16.06.06 448939.00 Completed
27 Civil EE-XII 29.11.05 1.8.05 609993.00 28.04.06 27.08.06 609308.00 Completed
28 Civil EE-XII 29.11.05 1.8.05 483971.00 27.12.05 21.03.06 483948.00 Completed
29 Civil EE-XII 29.11.05 1.8.05 466281.00 15.01.06 11.04.06 464777.00 Completed
30 Civil EE-XII 29.11.05 1.8.05 455592.00 17.03.06 12.07.06 455400.00 Completed
31 Civil EE-XII 29.11.05 1.8.05 477180.00 17.03.06 13.07.06 477115.00 Completed
32 Civil EE-XII 29.11.05 1.8.05 628641.00 01.06.06 25.09.06 628513.00 Completed
33 Civil EE-XII 29.11.05 1.8.05 493923.00 11.01.06 11.04.06 493445.00 Completed
C/o drain from H.NO A-793 to R-648 in Bhalswa Dairy conlony in C-
103/CLZ
794/31.03.06/EE-XII
M/s Lamba Brothers
C/o drainage from Om Parkash hs to Dr. Bhardwaj Hs in Bhalswa Dairy
colony in C-103/CLZ
19/19.04.06/EE-XII
M/s Sorout Const.Co
C/o drian from Babulal Hs to Kali Charan hs in Bhalswa Dairy colony
in C-103/CLZ
519/26.12.05/EE-XII
M/s P.K.Const.Co.
Imp to lane by pdg B/ pavement from Shashi Sharma hs to Kamla Hs front of Swami Parmanand and park
in Bhalswa dairy coloney in C-103/CLZ
578/10.01.06/EE-XII
M/s Tyagi Const.Co.
Imp to lane by pdg BP from Santosh Ram Hs to Dalip Kumar Hs and Ashraf Ali hs to Raish Ali Hs in
Bhalaswa Dairy Cly in C 103 CLZ
705/17.03.06/EE-XII
M/s Ankit Associates
Imp to lane by providing B/ pavement from Goyal property to
Homed pathic Clinic along Masjid in Bhalswa Dairy colony in C-103/CLZ
704/17.03.06/EE-XII
M/s Ankit Associates
Imp to lane by bric pavement from Shaukat Ali to Surender Singh and
S.V.M public School to Tanisha Electronics in Bhalswa Dariy colony
in C-103//CLZ
87/31.05.06/EE-XII
M/s Sorout Const.Co
Imp to lane by pdg B/pavement from Tilak Raj Hs to Anita Hs along
Masjid in Bhalswa Dariy coloney C-103/CLZ
571/09.01.06/EE-XII
M/s S.S.Enterprise
s
34 Civil EE-XII 29.11.05 1.8.05 474851.00 11.01.06 12.04.06 474670.00 Completed
35 Civil EE-XII 29.11.05 1.8.05 478787.00 10.01.06 12.04.06 478610.00 Completed
36 Civil EE-XII 5.12.05 22.11.05 199950.00 04.01.06 10.03.06 199499.00 Completed
37 Civil EE-XII 5.12.05 22.11.05 181900.00
38 Civil EE-XII 12.12.05 17.2.05 361990.00 28.12.05 24.05.06 361899.00 Completed
39 Civil EE-XII 12.12.05 17.2.05 389615.00 01.03.06 07.06.06 389608.00 Completed
40 Civil EE-XII 12.12.05 17.2.05 401320.00 15.02.06 28.03.06 401075.00 Completed
41 Civil EE-XII 12.12.05 8.12.05 474564.00 30.03.06 14.07.06 474375.00 Completed
42 Civil EE-XII 12.12.05 8.12.05 214391.00 30.03.06 28.07.06 214345.00 Completed
Imp to lane by providing Brick pavement from Babu Ram Hs to
Ram Kirpal Hs to Kali Charan hs in Bhalswa Dairy colony in C-103/CLZ
572/09.01.06/EE-XII
M/s S.S.Enterprise
s
Imp to lane by pdg B/P from Mohini hs to Ram Chander Hs to Rajender Kr to Nawab Singh along Partap
Singh hs in Bhalswa Dairy colony in C-103/CLZ
570/09.01.06/EE-XII
M/s. S.S.Enterprise
s
Imp to lane by pdg interlocking pavers from Pankaj hs to Brij
Kishore Hs in Burari village in c-104/CLZ
560/03.01.06/EE-XII
M/s Mahesh Chand & Co.
Imp to lane by interlocking paves from Ravi Shankar to Satish Tyagi Hs in village Burari C-104/ CLZ
Imp to lane from Burari road to Suraj mal in Sant Ngar vill Burari in
C-104/clz
526/26.12.05/EE-XII
M/s Sorout Const.Co
Imp to gali no 110 from Ravinder singh to Chanderlal in Sant Ngr ,
Village Burari c-104/CLZ
645/22.02.06/EE-XII
M/s Narendra Conat.Co
Imp to lane in gali no-112 from 25 foota to Ranjeet Singh in Sant Ngr.
Vill Burari c-104/ CLZ
636/13.02.06/EE-XII
M/s Ess kay Enterprises
Imp to lane and drain from Apex road to Delip Dass to 25 foota in
Sant Ngr in Vill Burari c-104/CLZ
735/21.03.06/EE-XII
M/s S.S Contractor
Imp to gali no C-6 from 25 foota to R.K. hs in vill. Nathu pura
C-104/CLZ
734/21.03.06/EE-XII
M/s S.S Contractor
43 Civil EE-XII 22.12.05 22.12.05 866600.00 26.03.06 P 382873.00 In Prog.
44 Civil EE-XII 28.2.06 1.9.05 364800.00 02.04.06 14.07.06 283358.00 Completed
45 Civil EE-XII 09.03.06 06.07.05 1438999.00 09.07.06 17.11.06 1438477.00 Completed
C/o Drain and road from Electric Transformer to Arora farm in B Block, Baba Colony in Village
Burari
708/17.03.06/EE-XII
M/s Shyam Lal Gupta
Imp to lane by Brick Pavement and Const of Drain from Som Vir to City Convent School in Village Burari in
C 104 CLZ
770/24.03.06/EE-XII
M/s Elise Enterprises
C/o lane from Mamraj to Ramavadh Sita Ram to Raja Ram and InderJeet to Flood Nala in Village Mukand pur
C/104/CLZ
125/30.06.06/EE-XII
M/s Narendra Conat.Co
Status Report of MLA, Sh.Mangat Ram Singhal, AC No. 56 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
Civil Br-II 6.6.05 20.4.05 4407546.00 23.03.06 17.01.07 4406786.00 Completed
Civil EE-XVI 15.7.05 17.6.05 455600.00 7.10.05 11.12.05 337413.00 Completed
Civil EE-XVI 17.8.05 17.8.05 528300.00 21.11.05 30.01.06 515957.00 Completed
Civil EE-XVI 17.8.05 23.7.05 1015166.00 05.06.06 11.10.06 1014810.00 Completed
Civil EE-XVI 17.8.05 23.7.05 56034.00 14.12.05 20.02.06 55924.00 Completed
Civil EE-XVI 5.9.05 17.8.05 944288.00 17.05.06 16.10.06 889050.00 Completed
Civil EE-XVI 5.9.05 17.8.05 1194100.00 21.12.05 08.03.06 1194000.00 Completed
Date o
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
1 Imp of Shah Alam Bandh road by providing W.B.M from Bhobi Ghat
Road to G.T. Rd in C-106/CLZ
89/13.03.06/E
E(Pr.)II
M/s Rakesh Kumar Goel
2 Imp to road by M/P from Plot no 18 to park corner in Rajasthani Udhyogi
nagar in C-106/CLZ
234/3.10.005/
XVI
M/s Subhash Const co.
3 Imp to lane along Green belt by pdg RMC & drainage system in block
"A" from H.No A-1861 to A-1890 in Jahangir puri C-106 C.L.Z
327/21.11.05/
EE-XVI
M/s Tarun Const.Co
4 Reconstrcution of B/Wall of Central park near flat No 305 in Sanjay
Enclave in C-106/CLZ
92/26.05.06/E
E-XVI
M/s Raj Kumar Kesar
5 Imp to rd berms near Campa Cola Factary in Niran Kari Colony C-
106/CLZ ( By pdg c.c. pavers)
397/14.12.05/
EE-XVI
M/s Prem Bros.
6 Imp to G- block road between M.C Pry School and G-I, G-2 Pkt by
providing RMC and drainge system in Jahangir puri C-106/CLZ
70/09.05.06/E
E-XVI
M/s Shiva Const.CO
7 Imp of lane by providing RMC and drainge system in Block -H from
H.No H-1 to H-50 in Jahangir puri C-106/CLZ
412/20.12.05/
EE-XVI
M/s Jaswant Singh Dabas
Civil EE-XVI 5.9.05 17.8.05 975900.00 08.02.06 07.06.06 975011.00 Completed
Civil EE-XVI 16.9.05 24.8.05 568420.00 05.05.06 04.09.06 568111.00 Completed
Civil EE-XVI 16.9.05 20.8.05 601547.00 29.03.06 28.07.06 601170.00 Completed
Elect EE-(E)II 23.11.05 17.11.05 175486.00 11.02.06 14.03.06 137007.00 Completed
Elect EE-(E)II 23.11.05 11.11.05 173653.00 16.02.06 14.03.06 132892.00 Completed
Elect EE-(E)II 6.12.05 1.12.05 172792.00 22.05.06 27.11.06 118752.00 Completed
Elect EE-(E)II 6.12.05 1.12.05 175244.00 27.05.06 28.11.06 138201.00 Completed
Elect EE-(E)II 12.12.05 19.11.05 132475.00 06.02.06 13.03.06 100249.00 Completed
8 Imp of H block Mangal Bazar road by providing M/P from Shah Alam
Band to Kushal Cinema road in Jahangir puri C-106/CLZ
480/30.01.06/
EE-XVI
M/s Jaswant Singh Dabas
9 Imp to B/Wall and passage by Kota stone in Main park in Block "A"
( Pkt A-1) in Jahangir puri C-106/CLZ
51/27.04.06/E
E-XVI
M/s K.K Const.Co-I
10 Imp/ Reconst of B/wall and walkway in main park in block "H" near H.no. H-2/ 662-663 ( Baradaroi wala park) in Jahangir puri C-106/CLZ ( by pdg
marble girl Wastand sand stone)
592/20.03.06/
EE-XVI
M/s K.K Const.Co-I
11 P/o Boring with submerrsible pump set at Municipal park H.No A-140,
Jahangir puri, C-106/CLZ
200/11.02.06/
EE(E)-II
M/s Pragati Engineers
12 P/o Boring with submerrsible pump set at Municipal park H.No H-4
1884-85 Green Belt , Jahangir puri, C-106/CLZ
203/16.02.06/
EE(E)-II
M/s M.J.Electricla
s & Electronics
13 P/o Garden light at subash park, Adarsh Ngr. , part-I w.no-105/CLZ
26/18.05.06/E
E(E)-II
M/s Amit Clevetor Services
14 P/o Garden light at subash park, Adarsh Ngr, park-II in
W.No-105/CLZ
27/18.05.06/E
E(E)-II
M/s Bharat Elcttriclas and
Electronics
15 P/O boring with submessible pump sets at Municipal park, Sweeper
Qtrs , Jahangir puri (Mandir Wala park) W.No-16
187/06.02.06/
EE(E)-II
M/s Bharat Elcttriclas and Electronics
Elect EE-(E)II 12.12.05 18.11.05 132475.00 01.02.06 14.03.06 102591.00 Completed
Elect EE-(E)II 12.12.05 11.11.05 134842.00 07.02.06 14.03.06 103287.00 Completed
Elect EE-(E)II 12.12.05 18.11.05 132475.00 07.02.06 14.03.06 100702.00 Completed
Elect EE-(E)II 12.12.05 19.11.05 132475.00 14.02.06 14.03.06 102554.00 Completed
Elect EE-(E)II 12.12.05 17.11.05 133000.00 06.02.06 14.03.06 101977.00 Completed
Elect EE-(E)II 12.12.05 17.11.05 133258.00 18.05.06 25.05.06 99262.00 Completed
Elect EE-(E)II 15.02.06 11.11.05 133376.00 21.04.06 25.05.06 93938.00 Completed
Elect EE-(E)II 15.02.06 11.11.05 134231.00 18.05.06 25.05.06 110776.00 Completed
Elect EE-(E)II 15.02.06 17.11.05 131549.00 21.04.06 25.05.06 104802.00 Completed
16 P/o boring with submessible pump set at municipal park ,H Block Ram
Lila Ground Jahagir puir W.No-106/CLZ
190/06.02.06/
EE(E)-II
M/s Sri Balaji Electriclas
17 P/o boring with submessible pump set at Municipal park A block behind
NDPL office Jahangir puri W.no-106/CLZ
196/07.02.06/
EE(E)-II
M/s A.K.Electricla
s
18 P/o boring with submerssible pump set at Municipal park , B-88, pubjabi Basti Jahangir puri , W.no-106/CLZ
195/07.02.06/
EE(E)-II
M/s A.K.Electricla
s
19 P/o boring submerssible pumps set at municipal park , Azad park ,
Nirankari colony W.no-106/CLZ
189/06.02.06/
EE(E)-II
M/s Sri Balaji Electriclas
20 P/o boring with submerssible pump set at Municipal park , Basrola w.no-
106/CLZ
191/06.02.06/
EE(E)-II
M/s Sri Balaji Electriclas
21 P/O 12m Long street light at Municipal Park, B-28, Gandhi vihar
in w.rno. 106
32/18.05.06/E
E(E)-II
M/s Khanna Sales Corp.
22 P/o 12" long Street light at Municipal Park, Sarai Pipal Thala,
Opp.Municipal School. W.No. 106/CLZ
06/21.04.06/EE(E)-II
M/s S.T.Electric.C
o
23 P/o 12" long Street light at Municipal Park, A block behind NDPL office at
Jhangir puri W.No. 106/CLZ
28/18.05.06/EE(E)-II
M/s Saksham Electricals & Electronics
24 P/o 12" long Street light at Municipal Park,B-88, Punjabi Basti W.No.
106/CLZ
3/21.04.06/EE
(E)-II
M/s Sri Balaji Electriclas
25 Elect EE-(E)II 15.02.06 17.11.05 131641.00 18.05.06 25.05.06 94240.00 Completed
26 Elect EE-(E)II 15.02.06 17.11.05 131641.00 17.04.06 25.05.06 94959.00 Completed
27 Elect EE-(E)II 15.02.06 17.11.05 131558.00 26.06.06 19.01.07 100776.00 Completed
28 Elect EE-(E)II 15.02.06 17.11.05 131549.00 18.05.06 25.05.06 96075.00 Completed
29 Elect EE-(E)II 15.02.06 17.11.05 133258.00 26.04.06 25.05.06 102197.00 Completed
30 Elect EE-(E)II 15.02.06 17.11.05 133258.00 21.04.06 25.05.06 99628.00 Completed
31 Elect EE-(E)II 15.02.06 17.11.05 133258.00 17.04.06 25.05.06 95322.00 Completed
32 Elect EE-(E)II 15.02.06 17.11.05 131549.00 21.04.06 25.05.06 97376.00 Completed
33 Elect EE-(E)II 22.2.06 17.11.05 131558.00 21.04.06 25.05.06 102538.00 Completed
P/o 12" long Street light at Azad Park, Nirankari colony W.No.
106/CLZ
25/18.05.06/E
E(E)-II
M/s Neeraj Electricals
P/o 12" long Street light at Municipal Park, Sweeper Qtrs., Jahangir puri
opp. Block No. 25 W.No. 106/CLZ
2/17.04.06/EE
(E)-II
M/s Neeraj Electricals
P/o 12" long Street light at Municipal Park, Sweeper Qtrs., Jahangir puri opp. Block No.08 W.No. 106/CLZ
24/18.05.06/E
E(E)-II
M/s Kamal Electricals
P/o 12" long Street light at Municipal Park, Sweeper Qtrs., Jahangir puri opp. Block No.32 W.No. 106/CLZ
29/18.05.06/EE(E)-II
M/s S.T.Electric.C
o
P/o 12" long Street light at Municipal Park, E-75 Gandhi Vihar W.No.
106/CLZ
16/26.04.06/EE(E)-II
M/s Seth Const.
P/o 12" long Street light at Municipal Park, E-235 Gandhi Vihar W.No.
106/CLZ
7/21.04.06/EE(E)-II
M/s Illuminators & Circuiters
P/o 12" long Street light at Municipal Park, A Block Gandhi Vihar opp.
Jaganath Smiriti Park W.No. 106/CLZ
1/17.04.06/EE(E)-II
M/s Eminent Traders(India)
P/o 12" long Street light at Municipal Park, Bharola Village W.No.
106/CLZ
5/21.04.06/EE(E)-II
M/s S.T.Electric.C
o
P/o 12" long Street light at Municipal Park, Near B-88 -86 in Punjabi Basti
in W.No. 106/CLZ
4/21.04.06/EE(E)-II
M/s Raj Electricals
Status Report of MLA, Smt..Anjali Rai, AC No. 57 2005-06
S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil EE-III 1.12.05 1.12.05 190491.00 10.01.06 09.03.06 190372.00 Completed
2 Civil EE-III 1.12.05 1.12.05 183376.00 28.12.05 25.01.06 183203.00 Completed
3 Civil EE-III 1.12.05 1.12.05 198327.00 07.03.06 20.04.06 198287.00 Completed
4 Civil EE-III 1.12.05 1.12.05 199032.00 08.02.06 04.04.06 198434.00 Completed
5 Civil EE-III 1.12.05 1.12.05 196592.00 10.01.06 25.03.06 196419.00 Completed
6 Civil EE-III 1.12.05 1.12.05 198748.00 28.12.05 06.02.06 198145.00 Completed
7 Civil EE-III 1.12.05 1.12.05 195215.00 08.02.06 15.04.06 195058.00 Completed
8 Civil EE-III 1.12.05 1.12.05 195745.00 17.04.06 22.05.06 195654.00 Completed
Date o
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp of gail Fazal Hussain & its lane by CC Pv in C 107 SPZ
414/29.12.05/
EE-III
M/s Deepak Kumar
Imp to rd from Slum store to GB Road school by CC pav in C 107 SPZ
418/29.12.05/
EE-III
M/s V.K.Associate
s
Imp top gali Ravi dass and its adj lanes by CC pav in C 107, SPZ
528/03.03.06/
EE-III
M/s Rajesh Const.Co
Imop to gali Jaungli Kauan and its adj lanes by CC pav in C 107 Spz
450/24.01.06/
EE-III
M/s Puneet Nayyar
Imp to FP by pdg Iterlcokcing tiles at hauz Qauji to Chori walan Chowk in C 107 SPZ
408/29.12.05/
EE-III
M/s Bajaj Const.Co.
Impt to gali Phatak Teleiyan and its adj lanes by CC pav in C 107 SPZ
398/19.12.05/
EE-III
M/s Som Dutt Duevedi
Imo to gali Sapru rd its adj lanes by CC Pav in C 107 SPZ
458/24.01.06/
EE-III
M/s Manish Nayyar
Imp tord from Turkman Gate to towards Uchi Masjid by CC pav in C 107 SPZ
547/20.03.06/
EE-III
M/s Rajesh Const.Co
9 Civil EE-III 1.12.05 1.12.05 191113.00 24.11.06 28.01.07 191077.00 Completed
10 Civil EE-III 1.12.05 1.12.05 178542.00 08.02.06 04.04.06 178437.00 Completed
11 Civil EE-III 1.12.05 1.12.05 196609.00 M/s Arya & Co 10.02.06 25.03.06 196276.00 Completed
12 Civil EE-III 1.12.05 1.12.05 196996.00 10.01.06 23.03.06 196870.00 Completed
13 Civil EE-III 6.12.05 6.12.05 192600.00 26.12.05 22.02.06 192025.00 Completed
14 Civil EE-III 6.12.05 6.12.05 198400.00 31.12.05 24.02.06 197823.00 Completed
15 Civil EE-III 6.12.05 6.12.05 190600.00 03.02.06 17.04.06 190189.00 Completed
16 Civil EE-III 6.12.05 6.12.05 195700.00 03.02.06 22.04.06 194188.00 Completed
Imp to lanes from Bazar Sita Ram road to Anuuman chowk by CC Pav in C 107 SPZ
405/22.11.06/
EE-III
M/s Prem Const.Co
Imp to gali Bansi Koyala and Uchi masjid by pdg Interlocking tiles in C 107 SPZ
449/24.01.06/
EE-III
M/s Puneet Nayyar
Imp to gali Lajpat and its ajd lanes by CC pav in C 107 SPZ
445/19.01.06/
EE-III
Imp to roads from Dispensary to MC Pry school (Chori walan) by pdg CC Pav in C 107 SPz
413/29.12.05/
EE-III
M/s Deepak Kumar
Imp to gali katra Sharif Bagh by pdg CC Bazar Sita Ram in C 108 SPZ
401/21.12.05/
EE-III
M/s Ved Pal Bhatia
Imp to lane by pdg CC from Shop NO. 700 to 731 side by lane in Kundawalan in C 108 SPZ
406/29.12.05/
EE-III
M/s Bajaj Const.Co.
Imp to gali Shish Mahal by pdg CC in Kucha Patti Ram in C 108 SPZ
453/24.01.06/
EE-III
M/s Neel Traders
Imp to Gali Kashimiriyan & Mohalla Imli From H.no. 1945 to 834 by pdg CC in Kucha Pati Ram I C 108 SPZ
447/24.01.06/
EE-III
M/s Manish Nayyar
17 Civil EE-III 6.12.05 6.12.05 194700.00 30.12.05 20.02.06 194221.00 Completed
18 Civil EE-III 6.12.05 6.12.05 191900.00 21.12.05 22.02.06 191471.00 Completed
19 Civil EE-III 6.12.05 6.12.05 195400.00 30.01.06 23.03.06 194736.00 Completed
20 Civil EE-III 6.12.05 6.12.05 194900.00 M/s Arya & Co 06.02.06 28.05.06 194306.00 Completed
21 Civil EE-III 6.12.05 6.12.05 195300.00 30.01.06 28.04.06 194960.00 Completed
22 Civil EE-III 6.12.05 6.12.05 199000.00 12.01.06 30.03.06% 198812.00 Completed
23 Civil EE-III 6.12.05 6.12.05 196400.00 28.12.05 25.02.06 196007.00 Completed
24 Civil EE-III 6.12.05 6.12.05 197700.00 25.01.06 26.04.06 196870.00 Completed
Imp to lane by CC Hotel PG To Community Centre at Kucha Pati Ram in C 108 SPZ
407/29.12.05/
EE-III
M/s Bajaj Const.Co.
Imp to gali Lodhan by pdg CC from H.no. 552 to 647 and adj lanes b Kucha Pati Ram in C 108 SPZ
396/19.12.05/EE-III
M/s Som Dutt Duevedi
Imp to lane by CC from Hotel Dhawni to 3214 in Pahar Ganj in C 108 SPZ
464/24.01.06/EE-III
M/s Deepak Kumar
Imp to lane by CC Shop no. 3 to Pergo Behind Thapar Chamber at Pahar Ganj in C 108 SPZ
443/19.01.06/EE-III
Imp to gali Bandook wali by pdg CC pav at Ajmeiri Gate in C 108 SPZ
454/24.01.06/EE-III
M/s Neel Traders
Imp to lane by pdg CC from 731 to 792 and 782 to 782A in Kundein walan in C 108 SPZ
422/05.01.06/EE-III
M/s Sumit Const.Co
Imp to gali Inder Wali by CC from Hn.o. 913 to 924 and adj lanes from Kucha Pati Ram in C 108 SPZ
399/21.12.05/EE-III
M/s Ved Pal Bhatia
Imp to lane by pdg CC from 664 to 606 ad side by lanes in Kucha Pati Ram in C 108 SPZ
549/24.01.06/EE-III
M/s Prem Const.Co
25 Civil EE-III 6.12.05 6.12.05 195100.00 10.01.06 25.03.06 194608.00 Completed
26 Civil EE-III 6.12.05 6.12.05 191600.00 22.03.06 26.06.06 190969.00 Completed
27 Civil EE-III 6.12.05 6.12.05 199300.00 25.01.06 28.04.06 198540.00 Completed
28 Civil EE-III 8.12.05 8.12.05 192800.00 06.02.06 29.04.06 192244.00 Completed
29 Civil EE-III 8.12.05 8.12.05 191500.00 27.01.06 24.03.06 191077.00 Completed
30 Civil EE-III 8.12.05 8.12.05 194500.00 30.12.05 10.03.06 193820.00 Completed
31 Civil EE-III 8.12.05 7.12.05 199440.00 07.02.06 06.03.06 199440.00 Completed
Imp to lane by pdg CC from H.no. 747 to Atma Ram School and Atma Ram School to Urinial Block in Kundewalan in C 108 SPZ
421/05.01.06-EE-III
M/s Prem Const.Co
Imp to lane by pdg CC from 550 to 505 and adj lanes in Kucha Pati Ram in C 108 SPz
548/20.03.06/EE-III
M/s Rajesh Const.Co
Imp to lane by pdg CC from 827 to 550 in Kucha Pati Ram in C 108 SPZ
452/24.01.06/EE-III
M/s Essco Traders
Impt o lane by Pdg CC from 505 to Sita Ram Bazar and Gali Nai Basti in Kucha Pati Ram in C 108 SPZ
457/24.01.06/EE-III
M/s Manish Nayyar
Imp to lane by CC from 3240 to 3259 behind Commuinty Centre at Pahar ganj in C 108 SPZ
465/24.01.06/EE-III
M/s Deepak Kumar
Imp to lane by cC from Gupta Traders to D B Gupta road behind Thapar Chambers at Pahar Ganj in C 108 SPZ
417/29.12.05/EE-III
M/s V.K.Associate
s
Imp of road from narang road ways Shop to Jai Ambe Resturant by pdg CC pav at SN Marg in C 107 SPZ
415/29.12.05/EE-III
M/s V.K.Associate
s
32 Civil EE-III 8.12.05 7.12.05 199871.00 28.12.05 16.02.06 199635.00 Completed
33 Civil EE-III 8.12.05 7.12.05 199617.00 28.12.05 06.02.06 199473.00 Completed
34 Civil EE-III 8.12.05 7.12.05 199783.00 08.02.06 10.04.06 199656 Completed
35 Civil EE-III 8.12.05 7.12.05 194378.00 09.01.06 25.03.06 194330.00 Completed
36 Civil EE-III 8.12.05 7.12.05 196227.00 M/s Arya & Co 07.02.06 29.03.06 195774.00 Completed
37 Civil EE-III 8.12.05 7.12.05 195323.00 10.2.06 08.04.06 195243 Completed
38 Civil EE-III 8.12.05 7.12.05 193186.00 10.02.06 07.04.06 193104 Completed
Imp to road from CSE store to dispensary (MCD) by pdg CC pavment and near GB Road in C 107 SPZ
400/21.12.05/EE-III
M/s Ved Pal Bhatia
Imp to road from Transformer to Ashok Traderes and Engineers by prd CC pav in Ajmeri Gate in C107 SPZ
394/19.12.05/EE-III
M/s Som Dutt Duevedi
Imp of road from Nath Brothers to Fawaz Medical Centre by pdg CC pav at in C 107 SPZ
460/24.01.06/EE-III
M/s Neel Traders
Imp of road from Shop no. 4577 to 4566 (Community Centre) by CC pav in Mohala shatava in C 107 SPZ
423/05.01.06/EE-III
M/s Prem Const.Co
imp to road by Ratan Kumar to Harshika Communication shop by CC Pav in Bazar Sita Ram in C 107 SPZ
442/19.01.06/EE-III
Imp of road from PIO to Bharat Oil Depot Shop by pdg CC pav in Kucha Pandit in C 107 SPZ
451/24.01.06/EE-III
M/s Essco Traders
Imp to road opoosite Hauz Qazi Poilce Station by Pdg CC Pav at Hauz Qazi in C 107 SPZ
448/24.01.06/EE-III
M/s Puneet Nayyar
39 Civil EE-III 8.12.05 7.12.05 198332.00 10.01.06 10.03.06 198332 Completed
40 Civil EE-III 8.12.05 7.12.05 197046.00 08.01.06 25.03.06 196914.00 Completed
41 Civil EE-III 8.12.05 7.12.05 179145.00 10.01.06 25.03.06 179098.00 Completed
42 Civil EE-III 8.12.05 7.12.05 185833.00 28.12.05 06.02.06 185532.00 Completed
43 Civil EE-III 8.12.05 7.12.05 198448.00 07.02.06 27.02.06 197879.00 Completed
44 Civil EE-III 8.12.05 7.12.05 198611.00 M/s Arya & Co 10.02.06 25.03.06 198503.00 Completed
45 Civil EE-III 8.12.05 8.12.05 199900.00 02.02.06 20.04.06 199381.00 Completed
46 Civil EE-III 8.12.05 8.12.05 192600.00 02.02.06 20.04.06 192259.00 Completed
Imp to gali Vakil by pdg CC in Kucha Pandit in C 107 SPZ
437/12.01.06/EE-III
M/s Rajesh Const.Co
Imp of orad from Katra Dina Nath Sita Ram Bazar towards Shop Multe Beds 2038 by pdg CC Pav in C 107 SPZ
424/05.01.06/EE-III
M/s Sumit Const.Co
Imp of road between GB Road and Fazil road by pdg CC pav in C 107 SPZ
409/29.12.05/EE-III
M/s Bajaj Const.Co.
Imo its side brems at Hauz Qazi Chowk nerar Metro Station by pdg CC pav in C 107 SPZ
395/19.12.05/EE-III
M/s Som Dutt Duevedi
Imp to gali NalBadhab by pdg CC pav at Shahganh in C 107 SPZ
416/29.12.05/EE-III
M/s V.K.Associate
s
Imp of road from Metro Hardware to AN Welding and Machine by pdg CC pav in Ajmeri Gate in C 107 SPZ
444/19.01.06/EE-III
Imp to gali Bari wali from H.no. 895 to 1124 Kucha Herjasmal and adj lnaes by pdg CC in C 108 SPZ
456/24.01.06/EE-III
M/s Essco Traders
Imp to lane by pdg CC from H.no. 1945 to 1126 Kucha Harjasmal and adj lanes in C 108 SPZ
455/24.01.06/EE-III
M/s Manish Nayyar
47 Civil EE-III 28.12.05 9.9.05 305500.00 21.05.06 06.10.06 223858.00 Completed
48 Civil EE-III 28.12.05 9.9.05 309100.00 04.04.06 22.05.06 225375.00 Completed
49 Civil EE-III 28.12.05 9.9.05 318700.00
50 Civil EE-III 28.12.05 9.9.05 298200.00
51 Civil EE-III 28.12.05 9.9.05 291300.00 05.02.07 30.03.07 212975.00 Completed
52 Civil EE-III 28.12.05 9.9.05 296600.00 12.02.07 21.03.07 216089.00 Completed
53 Civil EE-III 28.12.05 9.9.05 307300.00 03.04.06 20.05.06 224245.00 Completed
54 Civil EE-III 28.12.05 9.9.05 308900.00 15.05.06 04.07.06 225153.00 Completed
Imp to lane by pdg CC from 3885 to 4089 in Kesru Walan in C 108 SPZ
95/12.05.06/EE-III
M/s Sonu Builders
Imp to lane by pdg CC from 4060 to Sr. Sec school in Kesruwalan at C 108 SPZ
594/31.03.06/EE-III
M/s Ved Pal Bhatia
Imp ot lane by pdg CC from 8952 to 8932 in Multani Dhanda in C 108 SPZ
Imp ot lane by pdg CC from H.no. 9140 to 9149 in Multani Dhanda in C 108 SPZImp to lane by pdg CC from 8826 to 8855 in Multani Dhanda in C 108 SPZ
672/09.02.07/EE-III
M/s Islam-uddin
Imp to lane by pdg CC from 9107 to 9078 in Multani Dhanda in C 108 SPZ
670/09.02.07/EE-III
M/s Islam-uddin
Imp to lane by pdg C from H.no. 8923 to 8897 in Multani Dhanda in C 108 SPZ
595/31.03.06/EE-III
M/s Ved Pal Bhatia
Imp to lane by pdg CC from 8329 to 8299 in Multani Dhanda in C 108 SPZ
25/08.05.06/EE-III
M/s Sehgal Contractors
55 Civil EE-III 31.03.06 20.12.05 323300.00 11.08.06 06.10.06 236345.00 Completed
56 Civil EE-III 31.03.06 20.12.05 597500.00 28.04.07 20.06.07 597500 Completed
57 Civil EE-III 31.03.06 20.12.05 598400.00 08.03.07 16.04.07 557994 Completed
58 Civil EE-III 31.03.06 05.12.05 304600.00 24.08.06 30.11.06 222454.00 Completed
59 Civil EE-III 31.03.06 05.12.05 287000.00 05.06.06 02.08.06 206918.00 Completed
60 Civil EE-III 31.03.06 21.12.05 287500.00 02.06.06 12.07.06 222337.00 Completed
Imp of lane by pdg cc from Quality Hotel to elect. Transformer, in W.no
108 SP Zone
208/11.08.06/EE-III
M/s Sonu Builders
Imp to shahganj road from G.B.Road to gali Masjid wali by pdg Mastic in W.no 107/SPZ
821/28.03.07/EE-III
M/s Arora Const.Co
Imp to road from Himmat Garj upto gali Shankar School by pdg Mastic in W.no 107/SPZ
645/05.02.047/EE-III
M/s Arora Const.Co
Imp to lane by pdg cc from Hotel nest to Kabeer to Hotel M.Shine In W.no 108/SPZ
252/07.09.06/EE-III
M/s Kalra Const.
Imp to lane by pdg cc in gali Ram Nath Patwa in C-108/SPZ
122/01.06.06/EE-III
M/s Ved Pal Bhatia
Imp to lane by pdg cc from 8307 to 8375 in Multani Dhanda in C-108/SPZ
116/01.06.06/EE-III
M/s Ganesh Builders
Status Report of MLA, Sh.Shoaib Iqbal, AC No. 58 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C ExpenditureD
ate of
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
1
Civil EE-II 28.6.05 16.6.05 155500.00
2
Civil EE-II 28.6.05 16.6.05 152320.00 19.05.06 07.06.06 139685.00
Completed
3
Civil EE-II 28.6.05 16.6.05 155112.00 22.05.06 09.06.06 144055.00
Completed
4
Civil EE-II 28.6.05 16.6.05 154005.00
5
Civil EE-II 28.6.05 16.6.05 154901.00
6
Civil EE-II 28.6.05 16.6.05 153362.00 24.05.06 21.06.06 153362.00
Completed
7Civil EE-II 30.6.05 27.6.05 322253.00 01.12.05 27.01.05 322253.00
Completed
8
Civil EE-II 30.6.05 27.6.05 196091.00 23.9.05 15.10.05 196007.00
Completed
Imp/ Stg of road portion infornt Haj Manzil Turkman gate Chowk to Chithi Qabar road Xing in c-109(B) city Zone by bitumastic surfacing CZ
Imp/ stg of road portion from Mohalla Qabristan chowk to kucha Mir Hashim by providing bitumastic Surfacing in c-109(B) CZ
503/13.03.06/EE-II
M/s U.K Traders
Imp/Stg of road portion from Gali Kucha Mir Hashim to Chitliqabar chowk by provding bitumastic surfacing in C-109(B) cz
504/13.03.06/EE-II
M/s U.K Traders
Imp/stg of road portion from Delite Cinema to Chatta Lal Mian road by bitumastic Serfaceing in C-109(B) CZ
Imp/Stg of road portion from Turkman Gate o Ganj Mir khan road by bitumastic surfacing in c-109 (B) CZ
Imp/stg of road portion from Old Matia Mehal school Pahari Imli xing rd on Choori walan road by bitumastic surfacing in C-109(B) CZ
505/13.03.06/EE-II
M/s U.K Traders
Imp to gali Gariya and its side lanes by providing c.c. pav at Matia Mahal in C-110/C.Z
334/21.10.05/EE-II
M/s Deen Dayal
Enterprises
Imp to road by providing CC pav from SS road to Kucha Challan turning in area C-110 C.Z (H.no. 2847 to 2911)
286/23.9.05/EE-II
M/s Sumit Const co.
9
Civil EE-II 30.6.05 27.6.05 231473.00 08.10.05 02.12.05 231473.00
Completed
10
Civil EE-II 30.6.05 27.6.05 195968.00 13.02.06 12.07.06 195654.00
Completed
11
Civil EE-II 6.9.05 5.8.05 398709.00 12.05.06 06.06.06 397659.00
Completed
12
Civil EE-II 6.9.05 5.8.05 382178.00 22.05.06 16.06.06 382178.00
Completed
13
Civil EE-II 6.9.05 5.8.05 437429.00 26.04.06 P 424400.00
In Prog.
14Civil EE-II 6.9.05 5.8.05 237159.00 25.12.05 7.02.06 231195.00
Completed
15
Civil EE-II 6.9.05 5.8.05 273700.00 31.01.06 19.06.06 273700.00
Completed
Imp to CC pavement, Sewer line and Lav. block near H.No 2581 ,S.S road and near H.No 1260 gali Jamun wali in Area C-110 C.Z
322/07.10.05/EE-II
M/s Yogender Sachdeva
Imp to C.C pavement , drainage system and Lav. block near H.No 357 gali Gahaiya, H.no 462 gali Matia Mehal and H.No 3076 Pratap Street c-110 C.Z
397/29.12.05/EE-II
M/s Dinesh Kumar
Imp/ Stg of Rakab Ganj Chowk , Sheesh Mehal Chowk Basti Nughara and its surrouding by bitumastic surfacing in c-109/CZ
493/08.03.06/EE-II
M/s M.V.S Const.Co
Imp/ Stg of Chowk Thana Chandni Mehal and Chandni Mehal road from Chitti Qabar Bazar road to Turning of Sui walan Chowk by bitumastic Surfacing in C-109/C.Z
495/08.03.06/EE-II
M/s M.V.S Const.Co
Imp/Stg of Sui walan Chowk and its surrounding and road partion upto Chitle Qabar Bazar road by bitumanstic Surfacing in C-109/C.Z
494/8.03.06/EE-II
M/s M.V.S Const.Co
Imp/stg of lanes and by lanes of Madarsa Husain Baksh by P/L C.C inC-109,C.Z
365/5.12.05/EE-II
M/s Monu Enterprises
Imp/Stg of Gali Do Katan and its lanes and Chennel side portion of Chitli Qabar road from Turakman gate chowk to Mohalla Qabristan chwok in C-109 C.Z(By Pdg CC)
434/30.01.06/EE-II
M/s Bhagwati Enterprises
16
Civil EE-II 6.9.05 5.8.05 404000.00 09.05.06 15.06.06 392406.00
Completed
17
Civil EE-II 6.9.05 5.8.05 300563.00 02.03.06 05.04.06 300563.00
Completed
18
Civil EE-II 6.9.05 5.8.05 482550.00 31.05.06 07.08.06 474147.00
Completed
19
Civil EE-II 6.9.05 5.8.05 273748.00 01.03.06 27.04.06 273748.00
Completed
20
Civil EE-II 16.9.05 5.8.05 446775.00 16.06.06 07.07.06 408907.00
Completed
21
Civil EE-II 2.11.05 18.10.05 641184.00 06.06.06 04.07.06 641184.00
Completed
22
Civil EE-II 2.11.05 18.10.05 651048.00 24.04.06 12.06.06 636995.00
Completed
Imp/Stg of gali Takhat wali and down lanes to Hauz Sui walan and its surrouding by CC and disposal of surface water in C-109/C.Z
538/27.03.06/EE-II
M/s N.K Const.Co
Imp/Stg of road portion from Ganj Mir khan chowk to kalyan pura Gali chhuna Mal and Masjid Madarsa Hauz Sui walan of providing CC in C-109 C.Z
410/17.01.06/EE-II
M/s N.K Const.Co
Imp/Stg of Channel side portion of Fazeel road ,Rakabganj , Ganj Mir khan, Chandni Mahal road, Suiwalan and Hauz sui walam , Sheehs Mahal Basti Naughara road by pdg C.C in C-109/C.Z
539/27.03.06/EE-II
M/s N.K Const.Co
Imp to drainage system and C.C flooring of Madarsa Husann Bux H.No 1013, H.NO 868 to 869 and 1047 and 1737 to 1764 Hauz Sui walan in C-109/C.Z
421/19.01.06/EE-II
M/s Dinesh Kumar
Imp/Stg of rd Chowk of Mohalla Qabristan and its surrending approches by bitumastic surfacing in C-109/CZ
571/31.03.06/EE-II
M/s U.K Traders
Imp and Stg of road from post office Darya Ganj to Tiraha Beram Khan by providing mastic Ashphalt surfacing in area C-110, C.Z
540/27.03.06/EE-II
M/s Jai Bhagwan
Imp/Stg of Motia Mahel road from Jama Masjid gate No 1 to Dujana Hs Shop No 1400 by providing mastic Ashphalt surfacing in area C-110, C.Z
541/27.03.06/EE-II
M/s Jai Bhagwan
23
Civil EE-II 2.11.05 18.10.05 476203.00 22.05.06 14.06.06 475952.00
Completed
24
Civil EE-II 2.11.05 18.10.05 761600.00 19.09.06 26.09.06 627587.00
Completed
25Civil EE-II 2.11.05 21.10.05 176630.00 19.07.06 20.09.06 175930.00
Completed
26
Civil EE-II 14.11.05 18.10.05 471334.00 05.05.06 12.05.06 471168.00
Completed
27
Civil EE-II 14.12.05 11.11.05 263657.00 02.03.06 25.03.06 263243.00
Completed
28
Civil EE-II 14.12.05 11.11.05 246008.00 27.05.06 30.06.06 240007.00
Completed
29Civil EE-II 16.1.06 1.10.05 189000.00
30
Civil EE-II 16.1.06 1.10.05 173700.00
Imp/Stg of Chitle Qabar road Shop No 3754 to Shop No 810 by providing mastic ashphalt Surfacing in area C-110, city Zone (Tiraha Beram khan to chitle Qabar)
478/08.03.06/EE-II
M/s Ashok Kumar Gupta
Imp/stg of Chowk Chitle Qaba from Shop No 810 to 1333 by providing mastic Ashphalt Surfaicing in area C-110, C.Z
188/10.08.06/EE-II
M/s U.K Traders
Imp/stg of Fish Market road by pdg C.C pavement at Urdu Bazar road in area C-110 C.Z
583/31.03.06/EE-II
M/s Puneet Const.Co
Imp/stg of Kucha Walan road from Kalan Mehal to S.S road by providing mastic Astsphalt surfacing in area C-110 C.Z
477/08.03.06/EE-II
M/s Ashok Kumar Gupta
Imp of lane & by lanes by pdg CC pav & drainage system and Lav Block of Khawas pura H.no. 1770 at Kala Mahal rd in C 110 C
457/01.03.06/EE-II
M/s Monu Enterprises
Imp of road side berms by pdg CC pavment from Jama masjid gate no-I to opp Gali Khan Khana at Urdu Bazar rd in area C 110 CZ
38/02.05.06/EE-II
M/s Sudhir Const.
P/L CC in gali Teliyan, Gali Kumaran and Gali Sheesh Mahal quarters in C 109 CZ
P/L CC in Basti Naughara Lanes Katra 632, Rang Mahal and side portion of Chandni Mahal in C 109 CZ
31
Civil EE-II 16.1.06 1.10.05 186200.00
32
Civil EE-II 16.1.06 1.10.05 184900.00
33Civil EE-II 16.1.06 1.10.05 189200.00 21.08.06 03.11.06 189200.00
Completed
34
Civil EE-II 16.1.06 1.10.05 467015.00 05.04.06 09.08.06 467015.00
Completed
35Civil EE-II 16.1.06 1.10.05 406928.00 19.06.06 05.07.06 395141.00
Completed
36Civil EE-II 16.1.06 1.10.05 392657.00 18.09.06 09.10.06 387636.00
Completed
37
Civil EE-II 16.1.06 1.10.05 366283.00 31.03.06 30.05.06 366283.00
Completed
38
Civil EE-II 16.1.06 1.10.05 465571.00 05.04.06 04.07.06 465571.00
Completed
P/L CC In lanes and by lanes of Jatwara from Netaji subhash Marg to Turning of Kucha Tara chand in C 109 CZ
P/L CC in gali Gunna Misher Kucra Lal Mian, Gali Muftiwalan, gali Shadi Mishor and gali Raghu nath Mandir in C 109 CZ
P/L CC in gali Sujan Rai, Budhan Rai gali Dhobian and gali Motiyan in C 109 CZ
584/31.03.06/EE-II
M/s Ajay & Co.
I/s of Gali Andheri , Gali Peepal Wali, Bari and Choti Gali, Gali Pahari Rajan, Main gali of Pahari Bhojla and Gali Chamere Wali Chote & Bari, Gali Chatta Momgran by pdg CC in C-109 CZ
536/27.03.06/EE-II
M/s N.K Const.Co
I/s of Faseel rd from Delite Cinema to Bari Masjid Chowk by bitumastic surfacing in C 109 CZ
572/31.03.06/EE-II
M/s U.K Traders
I/s of Faseel road from Delite Cinema to Ganj Mirkhan Turning by bitumastic surfcing in C 109 CZ
573/31.03.06/EE-II
M/s U.K Traders
I/s of Gali Tajran and gali Katana as well as lanes of Gali Katana in Sui walan area in c 109 CZ by pdg CC
534/27.03.06/EE-II
M/s N.K Const.Co
I/s of lanes and by lanes of Kucha Mir Ashiq and Gali Batasan in Chawri Bazar by pdg Cc in c 109 CZ
535/27.03.06/EE-II
M/s N.K Const.Co
39
Civil EE-II 30.03.06 22.03.06 200151.00
04.10.06 20.10.06 196828.00
Completed
40
Civil EE-II 30.03.06 22.03.06
293352.00
22.01.06 10.04.07 293352.00
Completed
41
Civil EE-II 30.03.06 22.03.06
262964.00
10.10.06 08.11.06 261783.00
Completed
42
Civil EE-II 30.03.06 22.03.06
182328.00
09.09.06 30.09.06 182276.00
Completed
43
Civil EE-II 30.03.06 22.03.06
228200.00
09.09.06 14.10.06 168121.00
Completed
44
Civil EE-II 30.03.06 22.03.06
302303.00
21.02.07 4.04.07 221749.00
Completed
Imp. Of gali Gandnee wali, kalan Mahal Road H.no.-1440 and gali Bori Wali in C-110 C.Z(BY Pdy.
CC) 237/22.09.06/EE-II
M/s Puneet Const.Co
Imp of gali Garhaya and its side lanes at Kucha Chalan road H.no-2827 and 2786,2800 and 2770 by Pdy. CC pav. And S.W.Drainage system in C-110 C.Z 367/26.12.06/
EE-IIM/s N.K Const.Co
Imp of lanes and by lanes of Khirki Taffaful Husain H.no 3858,3868,3871,3867,1458 behind Jagat Cinema C-110 C.Z (BY pdy. CC) 205/07.09.06/
EE-IIM/s N.K Const.Co
Imp of lane and near by lanes of Kaji Wara H.no 3681 to 3104 by pdy. CC pav. And S.W.Drainage system in C-110 C.Z 202/07.09.06/
EE-IIM/s Sudhir Const.Co.
Imp of lane and near by lanes H.no 746 to onwards H.no 829 by Pdy. CC pav. And S.W.Drainge system in Haveli Azam Khan in C-110 C.Z 203/07.09.06/
EE-IIM/s Sagar Const.CO
Imp of lanes by pdy. CC flooring, Lav. Block and Drainage system of H.no 1969, gali Rajan, 3040 Kaji Wara and H.no 78 Matia Mehal in C-110 C.Z 504/12.02.07/
EE-IIM/s Dinesh Kumar
Status Report of MLA, Sh.Haroon Yushuf, AC No. 59 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1Civil EE-II 16.6.05 27.4.05 411300.00 11.10.05 26.11.05 281157.00
Completed
2Civil EE-II 16.6.05 27.4.05 446050.00 28.09.05 31.10.05 303736.00
Completed
3
Civil EE-II 11.7.05 7.5.05 270700.00 16.11.05 12.12.05 195772.00
Completed
Date o
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp of Gali Patak Dhobian and gali Chah Shirin by providing c.c. pavement in area C-111 a C.Z
327/11.10.05/EE-II
M/s Gupta Builder
Imp to main gali Samosan and its sode lanes by providing c.c. pav in Farash Khana in C-111 A C.Z
306/27.9.05/EE-II
M/S Sudhir Const
Imp to gali Choti masjid gali Lallan wali , gali Rajaji and adjoing lanes by providing c.c. in Qasab pura in W.No -112 A CZ
115/14.11.05 /EE-II
M/s Shree Madhav Builder
4
Civil EE-II 11.7.05 7.5.05 273200.00 18.10.05 14.11.05 194181.00
Completed
5
Civil EE-II 11.7.05 7.5.05 331600.00 18.10.05 20.11.05 234404.00
Completed
6
Civil EE-II 11.7.05 30.6.05 281900.00 8.10.05 9.12.05 281255.00
Completed
7
Civil EE-II 11.7.05 7.5.05 274600.00 23.11.05 15.02.06 189717.00
Completed
8
Civil EE-II 11.7.05 7.5.05 385300.00 10.02.06 09.03.06 354267.00
Completed
9Civil EE-II 11.7.05 7.5.05 393600.00 24.01.06 10.03.06 375340.00
Completed
10
Civil EE-II 11.7.05 7.5.05 492300.00 06.01.06 30.10.06 475954.00
Completed
11Civil EE-II 23.9.05 5.9.05 24000.00
Imp of Gali Kabaron wali form H.No 7505to Chowk maidan gali Jumun wali & adjoing lanes in Kesab pura by providing c.c. in w.No 112 A CZ
111/18.10.05-EE-II
M/S Sudhir Const
Imp to Narain mkt form Shop 924 B to 912 B, Khushid mkt from Shop no 102 to 68 and adjoing lanes in Sadar Bazar by providing c.c. in W.No 112 B CZ
107/18.10.05/EE-II
M/S Sudhir Const
Imp to Naya Bans road from Khari Bawri to katra Bariyn road xing by providing M/P in Area C-111 A C.Z
317/7.10.05/EE-II
M/s Monu Enterprises
Imp to Sadar Nallah road from Qutab Raod to Tattoo Shan Mandir by providing c.c. and in adjoing lanes in W.no 112 (B) CZ
117/14.11.05/EE-=II
M/S Jatender Builder
Imp of Sadar Nallah road from Tattoo Shah Mandir to Shop NO 1448 Pan Mandi by Mastic Ashphalt in W.No 112(B) CZ
129/26.09.05/EE-II
M/s Dee.Kay Enterprises
Imp to Sadar Nallah road from shop no 1448 Pan Mandi to Qutab rd by mastic Ashphalt in W.No 112 CZ
137/03.01.06/EE-II
M/s Sachin Kumar Gupta
Imp to Chamelian road from Katra Atma Ram to Nai Bastic xing by pdg Mastic Ashphalt in W.No 112 A CZ
234/22.06.06/EE-II
M/s U.K traders
Imp of gate of Katra Gauri Shankar by P/f sand stone in Kasab pura in W.No -112 A/CZ
12Civil EE-II 28.9.05 20.7.05 823900.00 03.10.06 02.02.07 767332.00
Completed
13
Civil EE-II 4.10.05 5.9.05 351800.00 24.04.06 15.09.06 284523.00
Completed
14Civil EE-II 4.10.05 5.9.05 283800.00 01.03.06 21.03.06 213473.00
Completed
15
Civil EE-II 4.10.05 5.9.05 460600.00 09.05.06 03.07.06 261843.00
Completed
16
Civil EE-II 4.10.05 5.9.05 373400.00
17
Civil EE-II 7.10.05 28.9.05 287600.00
18
Civil EE-II 27.02.06 22.02.06
126500.00
21.04.06 20.05.06 87534.00
Completed
19
Civil EE-II 27.02.06
22.02.06 450100.00
18.05.06 29.06.05 328039.00
Completed
C/o Big Hall in Katra Gauri Shankar in W.No 112 A /C.Z
235/22.09.06/EE-II
M/s Kay Const.CO
Imp of lane from Hno 5656 Hoshier Singh Marg to Sadar Nallah road by providing Mastic Ashphalt in w.no 112 A C.Z
574/31.03.06/EE-II
M/s Ashok Kumar Gupta
Imp of gali Chimni mill adjoining park by pdg C.C Qasab pura in C-112 A C.Z
455/01.03.06/EE-II
M/s Monu Enterprises
Imp of lane in the back of police coloney from Plot NO B-7 to 6562 and adj. Lane by providing interlocking tiles in Kasab pura in C-112 A ,C.Z
549/27.03.06/EE-II
M/s Shree Madhav Builder
Imp of gali Munde wali from H.No 2404 to 2453 and adj pasage and adj lanes by pdg c.c and interlocking tiles in C-112 B C.Z
Imp to gali Rajan at Farash Khana road from H.No 1021 to 1079 by providing c.c.pavement in area C-111 A C.Z
Imp to gali Fakhr-ullah Beg and its side lans by providing CC and
drainage system at Faseel Road in C/111-A-C.Z
16/20.04.06-EE-II
M/s Roop Naryan
Choudhary
Imp to Faseel Road from Mother dairy Booth shop no.599 to Farash Khana Mandir Shop no. 71 by Pdg. CC Pav. In C-111/A -C.Z 108/18.05.06/
EE-IIM/s Monu Enterprises
20
Civil EE-II 01.03.06
22.02.06 694300.00
264/26.10.06/EM/s Y.K Builde28.10.06 13.11.06 684923.00
Completed
21
Civil EE-II 24.03.06
12.03.06 92500.00
412/12.01.07/EM/S Sudhir Con20.01.07 20.04.07 78401.00
Completed
I/S of Naya Bans road from Khari Bawri crossing to Masjid Tehwar Khan by Pdg. Mastic Ashphalt in C-111/A- C.Z
Imp to Lane of H.no. 2706 Gali Chandi Mishra by Pdg. CC and Agra stone flooring in Chowk Raiji in C-111/B-CZ
Status Report of MLA, Sh.Prahlad Singh Sawhney, AC No. 60 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1Civil EE-XVI 18.5.05 23.3.05 199250.00 28.10.05 03.12.05 115682.00
Completed
Date o
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp to Gate of Targhar Neazr Burf Khana in C-114/CLZ ( by providing Stone Tiles Wrok)
309/28.10.05/EE-XVI
M/s Vinod Kumar
2Civil EE-XVI 18.5.05 12.4.05 1288400.00 26.07.05 30.09.05 1202920.00
Completed
3Civil EE-II 31.8.05 16.8.05 277800.00 07.12.05 13.01.06 196656.00
Completed
4
Civil EE-II 6.9.05 16.8.05 442800.00 18.03.06 10.05.06 325437.00
Completed
5Elect EEE-I 6.9.05 23.7.05 198736.00 30.11.05 22.03.06 185175.00
Completed
6
Civil EE-II 7.9.05 16.8.05 110900.00 07.12.05 14.02.06 68595.00
Completed
7
Elect EEE-II 15.9.05 26.7.05 154446.00 23.02.06 27.02.06 154313.00
Completed
8Elect EEE-II 15.9.05 26.7.05 154093.00 09.01.06 24.01.06 153348.00
Completed
9
Elect EEE-II 15.9.05 26.7.05 153573.00 23.02.06 27.02.06 153342.00
Completed
10
Elect EEE-II 15.9.05 26.7.05 152946.00 23.02.06 27.02.06 152889.00
Completed
Imp of Track/ pathways in Kudesia Bagh by proividing RMC and Interkocking Tiles in c-114/CLZ
169/19.07.05/EE-XVI
M/s Gupta Engg.Co.
Imp of Gali Pahar wali , near H.No 2267 in C-113 ( B) C.Z (By Providing c.c. pavement.
363/05.12.05/EE-II
M/s Monu Enterprises
Imp of Gali Sanghyan, Katra Nageen Chand, Gali Chandi Wale , Kuccha Mahajani road adj. Lanes by providing c.c in C-113 A C.Z
473/02.03.05/EE-II
M/s Monu Enterprises
P/f of 150 watt H.P.S.V. fitting in Dariba Kinari Bazar & other streets under C-113 C.Z
134/21.11.05/EEE-I
M/s Khanna Sales Corp.
Imp of Chandni Chowk road infrornt of Gurudwara Sisganj in C-113 (B) C.Z ( by pdg Polishad Kota stone flooring)
366/05.12.06/EE-II
M/s Monu Enterprises
P/o Semi High mast light at Tirath Ram Shan Hospital chowk . CLZ W.Np-114/CLZ. Site change to near Kali, Mandir, Sarai Phaze.
178/20.01.06/EEE-II
M/s Amit Elevator Services
Pro of Semi high mast light at Motia Bagh Railway coloney w.No 114 under CLZ
151/29.12.04/EEE-II
M/s Gyan Enterprises
P/o Semi high mast light at Rejindra Mkt Tis Hazari under CLZ. Site changed to near Shani Mandir Chandni Chowk.
147/29.12.05/EEE-II
M/s Sant Gian Corporation
P/o of semi high mast light at Butllar road in w.No 114 C.L.Z. Site changed to near Victoria Public School, Rajpur Road.
162/05.01.06/EEE-II
M/s Super Shine
Associates
11
Civil EE-Br-II 28.9.05 27.9.05 299974.00 13.02.06 18.04.06 299446.00
Completed
12
Civil EE-Br-II 29.9.05 29.9.05 249350.00 15.02.06 15.05.06 222870.00
Completed
13
Civil EE-Br-II 29.9.05 29.9.05 383900.00 19.03.06 09.05.07 233594
Completed
14
Civil EE-XVI 29.9.05 27.9.05 894700.00 23.05.06 31.08.06 518534.00
In Prog.
15Civil EE -Br-II 11.10.05 11.10.05 323450.00 04.02.06 10.03.06 229536.00
Completed
16
Civil EE-XVI 21.10.05 29.9.05 351276.00 01.06.07 12.07.07 350616.00
Completed
17
Civil EE-XVI 21.10.05 29.9.05 322000.00 13.03.06 22.04.06 200121.00
Completed
18
Civil EE-XVI 21.10.05 29.9.05 262000.00
C/o open drain by providing pavement RCC slab from H.No M-70 to M-16 in M block and I/s of B/wall park by pdg Marble Wash in E block Aruna Nagr in c-114 CLZ
83/08.02.06/EE(Br)-II
M/s Jindal Enterprises
Imp to lane by providing Kota stone flooring and drainge system from Qtrs no 9070,9078 9081,9106 & 9852 in Nawab Ganj in C-114 CLZ
82/08.02.06/EE-Br-II
M/s Shree Builders
Imp to lane by providing kota stonae flooring & drainage system from Qts NO-9635, 9164,9142 9152 & 9139 in Nawab ganj in C-114 CLZ
81/08.02.06/EE-Br-II
M/s Bansal Const.
Imp to Kirpa Narayan Marg by providing RMc and drainge system 4 NO Commissioner lane to Bela road in C-114/CLZ
04/03.04.06/EE-XVI
M/s Shiva Const.Co
P/L RMC pavement and drainge system in side lanes of Madarsa road in c-114/ClZ
84/08.02.06/EE-Br-II
M/s Jindal Enterprises
Imp to Ghat NO 28 to 32 in Jamuna Bazar by Providing interlocking tiles in C-114/CLZ.Site Changed to New at Pvt.katra No.4 Rajpur road CE order dated 26.03.07.
553/30.03.07/EE-XVI
M/s Vinod Kumar
Imp to lane N-68/233 to N-68/288 in Aruna Nagar , Majnu Ka tilla by paroviding kota stone flooring in C-114/CLZ
578/13.03.06/EE-XVI
M/s K.K.Const.Co
-I
Imp to lanes N-68 /322 to N-68 /356 in Aruna nagr , Majnu Ka tilla by providing Kota stone flooring in c-114/CLZ
19
Civil EE-II 11.11.05 9.11.05 73900.00 13.03.06 28.03.06 58895.00
Completed
20Civil EE-PR, CZ 11.11.05 11.10.05 2455600.00 27.04.06 P 1868829
In Prog.
21
Civil EE-II 7.12.05 7.12.05 439000.00 15.05.06 3.06.06 329883
Completed
22
Civil EE-II 7.12.05 7.12.05 558000.00 13.03.06 08.04..06 419247.00
Completed
23Civil EE-BR-II 14.12.05 1.12.05 257500.00 22.03.06 11.05.06 194267.00
Completed
24Civil EE-XVI 9.1.06 7.12.05 388095.00 M/s RCC 12.01.07 P 382389.00
In Prog.
25
Civil EE-II 20.1.06 10.1.06 251400.00 17.03.06 24.07.06 173547
Completed
26
Civil EE-II 1.02.06 27.12.05 440300.00 01.08.06 26.08.06 355391
Completed
27
Civil EE-II 8.2.06 27.1.06 559500.00 07.06.06 05.07.06 381406.00
Completed
Imp of Gali Kuccha ustad Hira from Hno 1421 to 1430 Bazar Guliyar in W.No 113(B) C.Z ( by pdg C.C.) CZ
448/23.02.06/EE-II
M/s Manu Enterprises
p/L RMC in side berms of Bijli Rd and connecting rds to Naya bazar. In c -113 CZ
01/24.04.06/EE(Pr.)
M/s Amba Contractors
Imp of gali Balmiki Katrewali and adj lanes and by lanes in Kucha Mahtir Khan by pdg RMC C 113A Cz
552/27.03.06/EE-II
M/s Deen Dayal Ent.
Imp of gali Muglan, Katra Tezab, gali Sagar Wali , gali Batlan and gali Balti Wali in Mori Gate by pdg CC C 113A cz
461/01.03.06/EE-II
M/s Monu Enterprises
Imp to Lav block and pdg K/S/F in pvt Katra No. 7 Rajpura Rd C 114 CLZ
98/21.03.06/EE(Br)-II
M/s Jindal Enterprises
Const of room for Akahara at Kudesai Ghat no. 1, Bodh Vihar C 114 CLZ
206/08.09.06/EE-XVI
Pdg Laying CC Pav in gali Hanuman Prasad from H.no. 2177 to gali Masjid Khajoor w.no. 113B CZ
479/08.03.06/EE-II
M/s Kejriwal Builders
Imp to Comman Passage by Pdg C.C flooring of Pvt Katra Shahnaj Building in Mori Gate W.NO-113 A C.Z
104/18.05.06/EE-II
M/s Sudher Const.
P/L Factory main precast CC Slabs at Esplanda Road on FP From Chandni Chowk rd to Link Rd in C 113 B CZ
125/29.05.06/EE-II
M/s M.V.S.Const.
Co
28Civil EE-II 8.2.06 10.01.06 491100.00
29Civil EE-Br-II 31.03.06 31.03.06 84300.00 M/s R.C.C 16.10.06 17.11.06 74889.00
Completed
P/L CC Pav. In Gali Chatta Partap Singh in C 113B CZ
P/L Drainage Systems in Katra no. 9110 in Nawav Ganj in C-114/C.L.Z 46/21.09.06/
EE(Br.)II
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.002.08
0.86
0.00
0.00
0.00
Liabilities Rs.lacs
2.00
2.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.49
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.007.35
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.32
0.00
0.00
0.10
0.00
0.02
0.00
0.00
0.00
0.00
0.00
0.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.99
1.95
0.00
0.00
0.00
0.36
0.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.28
0.00
0.01
0.00
0.00
0.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.87
0.00
0.00
1.59
0.00
0.00
0.00
0.00
0.00
1.94
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.00
0.06
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.76
0.00
0.00
0.00
1.99
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.82
0.00
0.00
0.00
0.00
0.00
4.84
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
11.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.19
2.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.00
6.17
Liabilities Rs.lacs
1.56
0.00
0.00
1.54
1.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.89
1.74
1.86
1.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.00
12.11
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.24
0.00
0.00
0.00
0.00
3.73
2.88
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.006.85
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.76
0.00
0.00
0.00
2.62
0.00
5.87
0.00
0.00
0.00
0.06
0.00
0.00
0.00
4.91
0.00
0.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.00
17.22
deptt. deptt. deptt. deptt. Div. Div. Div. Div. Div. Div.
civil elect hort cse M-I M-II M-III M-IV E-I EE(Pr.)
Status Report of MLA, Sh.Surender Pal Singh Bitoo, AC No. 61 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil EE-XII 25.5.05 1.5.05 199900.00 125/10.06.05 M/s Prem Bros. 29.8.05 24.1.06 199839.00 Completed
2 Civil EE-XII 25.5.05 1.5.05 309669.00 709/17.03.06/EE-XII 01.07.06 21.08.06 309465.00 Completed
3 Civil EE-Br-II 25.5.05 3.5.05 258335.00 33/28.07.05/EE-Br-II 04.08.05 22.09.05 256287.00 Completed
4 Civil EE-XII 25.5.05 1.5.05 455183.00 416/11.11.05/EE-XII M/s R.C.Bhatia 14.11.05 30.01.06 454887.00 Completed
5 Civil EE-XII 7.6.05 6.6.05 245546.00 341/6.10.05/EE-XII 20.10.05 28.12.05 245381.00 Completed
6 Civil EE-XII 7.6.05 6.6.05 340157.00 262/10.8.05/EE-XII 30.8.05 16.12.05 339698.00 Completed
7 Civil EE-XII 7.6.05 6.6.05 202092.00 258/10.8.05/EE-XII 1.9.05 16.11.05 202091.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp to lane by Providing c.c. from H.No 1557 to 1547 in Autram Lane
in C-106/CLZ
Imp to lane by Providing C.C from H.NO 1572 to 1486 in Autram lane
in C-106/CLZ
M/s Rajvinder Singh
Imp to lane by providing c.c. and drain from H.No 2434 to 2439 in
Hudson lanes in C-116/CLZ
M/s Jai Maruti Consts.
Imp to lane and drainage system from H.No 298 to 294 in Tagore
park Extn. C-116/CLZ
Imp to lane providing c.c from H.No F-21 to F-33 in Vijay Nagar
(s/s) in C-116/CLZ
M/s Lamba Brothers
C/o B/wall form H.No 1084 to H.NO 1118 in Kukherjee Nagr in c-
116/CLZ
M/s Lamba Brothers
Imp to B/wall by Providing marble washed plaster from H.No 996 to
H.No 1021 in Mukherjee Nagar C-116 C.LZ
M/s Lamba Brothers
8 Civil EE-XII 7.6.05 26.5.05 344600.00 30/18.7.05 22.7.05 1.9.05 302361.00 Completed
9 Civil EE-XII 7.6.05 3.5.05 281400.00 32/28.7.05/BR-II 4.8.05 3.10.05 250516.00 Completed
10 Civil EE-XII 7.6.05 3.6.05 170100.00 632/13.02.06/EE-XII M/s Baba & Co. 22.02.06 13.04.06 169369.00 Completed
11 Civil EE-XII 7.6.05 3.6.05 215376.00 441/18.11.05/XII 25.11.05 10.1.06 214619.00 Completed
12 Civil EE-XII 7.6.05 3.6.05 136200.00
13 Civil EE-XII 28.6.05 20.6.05 198525.00 194/22.07.05/EE-XII 03.10.05 27.10.05 198463.00 Completed
14 Civil EE-XII 28.6.05 20.6.05 196651.00 192/11.08.06/EE-XII 23.08.06 03.10.06 196411.00 Completed
15 Civil EE-XII 28.6.05 20.6.05 198812.00 256/10.8.05/XII 1.10.05 14.08.06 198549.00 Completed
16 Civil EE-XII 30.6.05 25.6.05 496600.00 439/17.11.05/EE-XII 11.12.05 10.06.06 333479.00 Completed
Imp to lane by providing c.c. and drain from H.NO 1148 to 1154 in
Mukherjee Nagar C-116/CLZ
M/s Mehndiratta
Traders
Imp to lane by providing c.c. from H.No 1195 to 1189 in Mukherjee
Nagar C-116/CLZ
M/s Sanjeev Aggarwal
Imp to lane by provding c.c. pavement from Akhara to Masjid
and from H.No D-490 to H.No 260 in Malka Ganj Nehru Kutira in C-
115/CLZ
Imp to lane by Providing c.c. from H.NO 805 to 803 from 772 to H.NO 168 and from 168 to H.NO 172 in
Nehru Kutia Malka Ganj C-115/CLZ
M/s Satbir singh
Imp to lany by providing c.c. infront of H.No D 10 and D-162 in
Malka Ganj, Meat Wali Gali C-115/CLZ
Imp to lane by Providing c.c. from H.No 278 to 351 in Parmanand
Coloney C-116/CLZ
M/s Mahesh Chand & Co.
Imp to lane Providing cc. From H.No 351 to 336 in Parmanad
Coloney in C-116/CLZ
M/s Rakesh Bansal
Imp to lane by Providing c.c. from H.NO 354 to Akhara in Parmanad
Colony C-116/CLZ
M/.s S.M. Consts
Imp to lane by Providing c.c. from H.No 1901 to 1917 in Outram lane
in C-116/CLZ
M/s Ashima Associates
17 Civil EE-XII 1.7.05 29.6.05 198525.00 449/22.11.05/EE-XII 15.12.05 31.01.06 198353.00 Completed
18 Civil EE-XII 5.7.05 5.7.05 235603.00 232/1.8.05/XII 12.9.05 28.10.5 235545.00 Completed
19 Civil EE-XII 18.7.05 4.7.05 399900.00 333/21.9.05 20.9.05 28.10.05 291010.00 Completed
20 Civil EE-XII 18.7.05 4.7.05 291532.00 334/21.9.05 22.9.05 28.10.05 291418.00 Completed
21 Civil EE-XII 18.7.05 4.7.05 416300.00 438/17.11.05/EE-XII 25.06.06 13.11.06 288387.00 Completed
22 Civil EE-XII 18.7.05 4.7.05 584300.00 436/17.11.05/EE-XII 20.01.06 10.06.06 384641.00 Completed
23 Civil EE-XII 18.7.05 4.7.05 520200.00 437/17.11.05/EE-XII 01.12.05 10.06.06 352219.00 Completed
24 Civil EE-Br-II 18.7.05 16.7.05 99900.00 61/07.12.05/EE-Br-II 05.01.06 03.02.06 99660.00 Completed
25 Civil EE-XII 22.7.05 16.7.05 660000.00 263/12.8.05/XII 21.8.05 30.11.05 659823.00 Completed
26 Civil EEBr-II 28.7.05 16.7.05 328485.00 74/27.12.05/EE(Br)-II 12.01.06 27.03.06 327051.00 Completed
Imp to lane by Providing c.c. from H.No 301 to 237 Parmanand
Coloney C-116/CLZ
M/s Pallki Const. Co.
Imp to Open Space and back lane infront of H.NO 6/27,6/40,6/20 and 6/46 in Vijay Ngr (D/s)C-116/CLZ
Interlocking tils & c.c.
M/sSanjeev Aggarwal
Imp to lane by Providing c.c. from H.No 73 to 103 in Dhaka Village in
C-116/CLZ
M/s Sandeep Associates
Imp to lane by Providing c.c. from Vayam Shalla to H.NO 468 in Parmand Coloney C 116 CLZ
M/s Sandeep Associates
Imp to lane by Providing c.c. from H.NO 2345 to 2354 in Hudson lane
in C-116/CLZ
M/s Ashima Associates
Imp to lane by Providing c.c. from H.No 2365 jto 2388 in Hudson lane
in c-116 CLZ
M/s Ashima Associates
Imp to lane by Providing c.c. from Arya Samaj Mandir to H.NO 2324
in Hudson lane in c-116/CLZ
M/s Ashima Associates
C/o B/wall of open space infront of Dr Hedge war Dharmath dispensary
in Mukherjee Nag-C-116/CLZ
M/s Deepak Aggarwal
Imp of Main road by p?l RMC wazirabad village from RDO to 400
m in c-115/CLZ
M/s Sanjeev Aggarwal
C/o walkway in park infront of Kabir Mandir in Malka Ganj in c-
115/CLZ
M/s Gupta Enterprises
27 Civil EE-XII 29.7.05 25.7.05 344099.00 805/31.03.06/EE-XII 10.06.06 07.07.06 344099.00 Completed
28 Civil EE-XII 29.7.05 25.7.05 312963.00 413/11.11.05/EE-XII 18.11.05 23.12.05 311277.00 Completed
29 Civil EEBr-II 19.9.05 1.8.05 399500.00 69/16.12.05/EE-Br-II 30.12.05 15.02.06 399500.00 Completed
30 Elect EEE-II 11.11.05 27.10.05 199619.00 158/2.1.06/EEE-II 3.1.06 7.1.06 166834.00 Completed
31 Hort. DDH Clz 18.11.05 17.11.05 581619.00 24/16.05.06/DDH/CLZ 16.05.06 17.08.06 456404.00 Completed
32 Hort. DDH Clz 18.11.05 17.11.05 379373.00 31/19.05.06/DDH-CLZ 19.05.06 08.06.06 298590.00 Completed
33 Civil EE-XII 2.12.05 26.11.05 388649.00 747/22.03.06/EE-XII 31.03.06 12.07.06 387945.00 Completed
34 Civil EE-XII 2.12.05 26.11.05 198800.00 599/23.01.06/EE-XII M/s S.M.Const. 03.04.06 02.05.06 198391.00 Completed
35 Civil EE-XII 2.12.05 26.11.05 451886.00 683/07.03.06/EE-XII 07.03.06 29.03.06 451195.00 Completed
C/o walkway in park near H.No 1677 in Autram lane in C-116/CLZ
M/s A.R Const.Co
C/o walkway in park near H.NO N-50 in Mukherjee Nagar in
C-116/CLZ
M/s Abhay Const co
Imp of lane by pdg CC And drain from Captan Singh Hs to Mintoo Hs
I gali no 6 Manoj Hs to Mandir, Dharamvir Hs to Gupta Hs in gali no 4 Wazriabad vill C 115 CLZ
M/s Gaurav Mehta
P/o of semi high mast ilght in park opp. Hs 1429 at Autromn lane in C
116 CLZ
M/s A.K Electricals
Dev of New park adjucent to BBM Depot workshop in Indira Vihar C
116 CLZ
M/s Vijay Const.Co
Dev of New Park/Green belt in near Nallah in East mukherjee Nagar,
C116 CLZ
M/s Vijay Const.Co
Imp to lane by c.c and drainage system from main road to Yogander tyagi Hs , Gali no -10 in Wazirabad
village, in C-115/CLZ
Ms/ Gaurav Mehta
Imp to lane by pdg c.c. from Gali no-6 to Gali no-8, Indira Hs to
Pramod Tyagi hs in Wazirabad vill. In C-115/CLZ
Imp to lane by pdg RMC from Krishan Tyagi Hs to Billu Bhati Hs
in Wazirabad vill in C-115/CLZ
M/s Gaurav Mehta
36 Civil EE-XII 2.12.05 26.11.05 509500.00
37 Civil EE-XII 2.12.05 26.11.05 385600.00 521/18.12.06/EE-XII 21.02.07 24.02.07 385405.00 Completed
38 Civil EE-XII 2.12.05 26.8.05 199679.00 608/23.01.06/EE-EII M/s Prem Bros. 08.02.06 17.03.06 199005.00 Completed
39 Civil EE-XII 5.12.05 14.10.05 391421.00 775/27.03.06/EE-XII 29.03.06 28.04.06 391357.00 Completed
40 Civil EE-XII 5.12.05 14.10.05 391371.00 677/07.03.06/EE-XII 22.05.06 28.06.06 390079.00 Completed
41 Civil EE-XII 5.12.05 14.10.05 205063.00 198/30.08.06/EE-XII 18.09.06 22.11.06 204547.00 Completed
42 Civil EE-XII 5.12.05 14.10.05 407094.00 744/22.03.06/EE-XII 19.05.06 28.06.06 406758.00 Completed
43 Civil EE-XII 5.12.05 14.10.05 598300.00 806/31.03.06/EE-XII 16.05.06 05.07.06 335701.00 Completed
44 Civil EE-XII 5.12.05 14.10.05 173042.00 679/07.03.06/EE-XII 16.03.06 29.03.06 172967.00 Completed
Imp to stg. Of road by dense carpet from H.NO B-409 to E-214 infront of Sarvodhiya Vidhalaya in Nehru
Vihar in C-115/CLZ
Imp to stag of road by dense Carpet from H.No D-1 to E-223 , Nehru
Vihar in C-115/CLZ
M/s Sona Consultant & Contractors
Imp to lane by c.c and drainage system from Robin Hs Brij Mohan Hs to Radhey Shyam Hs Gali no 6 in Wazirabad vill in C-115/CLZ
Imp to lane by pdg C.c. from H.NO 413 to 428 in Parmanand colony in
C-116/CLZ
M/s Kalra Const.Co
Imp to lane by pdg c.c. from H.No 28/1 to Dheer pur Mandir and H.No
29/1 in Indira Vihar colony inC-116/CLZ
M/s Gourav Mehta
C/o walkway in park near H.No 2614 in Hudson line in c-116/CLZ
M/s Sagar Const.Co
Imp to lane by pdg c.c. from H.No C-14 to C-10 B to C-17 B in Vijay
Nagar in C-116/CLZ
M/s Gourav Mehta
Imp to side berms by pdg Interlocking tiles from Round about Tagore park to Princes rd in Tagore
park in C-116/CLZ
M/s Vinod Const.Co
Imp to open Space by Interlocking tiles from H.NO E-11 to E-16/ A in
Vijay Ngr I C-116/CLZ
M/s Gaurav Mehta
45 Civil EE-XII 6.3.06 1.3.06 101526.00
46 Civil EE-XII 6.3.06 1.3.06 119759.00
47 Civil EE-XII 6.3.06 1.3.06 128631.00
48 Civil EE-XII 6.3.06 1.3.06 164586.00
49 Civil EE-XII 6.3.06 1.3.06 159596.00
50 Civil EE-XII 22.03.06 23.01.06 185591.00 793/31.03.06/EE-XII 09.04.06 02.05.06 180951.00 Completed
Imp to lane by Pdg CC from Urinal toAmbedkar Park in Ambedkar
Park Wali Gali in Malka Ganj in C 115 CLZ
Imp to lane by Pdg CC near N block and Barat ghar to Ambedkar Park in Malkaganj in C 115 CLZ
Imp to lane by Pdg CC from Shukkar Bazar Rd to Ambedkar
Park Wali gali in Malka Ganj in C 115 CLZ
Imp to lane by Pdg CC from Hs n. 143 to 159 and 268 in Ambedkar
Park Wali gali in Malka Ganj in C 115 CLZ
Imp to lane by Pdg CC from Hs n. 487 to 358 and 305 in Ambedkar
Park Wali gali in Malka Ganj in C 115 CLZ
Imp to lane and drainage system gali no-1 from Samsuddin office to
Ch. Satveer Singh,Wazirabad Village in C-115/ClZ
M/s Gaurav Mehta
Status Report of MLA, Sh.Kunvar Karan Singh, AC No. 62 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil EE-XII 24.6.05 20.6.05 99506.00 154/18.7.05 EE-XII 27.7.05 20.8.05 99322 Completed
2 Civil EE-XII 24.6.05 20.6.05 162686.00 170/18.7.05/XII 26.7.05 30.9.05 162674 Completed
3 Civil EE-XII 24.6.05 20.6.05 199600.00 192/22.7.05/XII 26.7.05 30.9.05 199599 Completed
4 Civil EE-XII 24.6.05 20.6.05 199600.00 237/1.8.05/EE-XII 20.8.05 31.10.05 199599 Completed
5 Civil EE-XII 24.6.05 20.6.05 199600.00 204/22.7.05/XII 26.7.05 14.10.05 199588 Completed
6 Civil EE-XII 24.6.05 20.6.05 199600.00 195/22.07.05/EE-XII 25.07.05 30.09.05 199591 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
C/o Culverts in F block Model Town in c-118/CLZ
M/s Soroat Const Co.
Imp to G.T.K. road infornt of Invitation Banquet Hall by M/P in C-117/CLZ
M/s Globe Const co.
Imp to lane by Providing RMC from H.No D-21 to D-17 in Rana Partap Bagh C-117/CLZ
M/s Raj Associates
Imp to Chowk by providing RMc from H.No C-5 to C2/2 in Rana Pratap Bagh C-117/CLZ
M/s Rana Const co.
Imp to lane by providing RMc from H.No B-4 A/21 to B4 A/24 in Rana Partap Bagh in C-117/CLZ
M/s Mohan & Co.
Imp to lane by providing RMc from H.No A-10/1 to A-11/1 in Rana Partap Bagh in C-117/CLZ
M/s Mahesh Chand & Co
7 Civil EE-XII 24.6.05 20.6.05 199600.00 327/21.09.05/EE-XII 28.09.05 29.10.05 199125 Completed
8 Civil EE-XII 24.6.05 20.6.05 199600.00 212/22.07.05/EE-XII M/s Prem Bros. 25.08.05 18.02.05 199476 Completed
9 Civil EE-XII 24.6.05 20.6.05 199600.00 193/22.7.05/XII 23.7.05 30.9.05 199599 Completed
10 Civil EE-XII 24.6.05 20.6.05 199600.00 240/01.08.05/EE-XII 10.08.05 01.12.05 199574 Completed
11 Civil EE-XII 24.6.05 20.6.05 199600.00 238/1.8.05/EE-XII 2.8.05 31.10.05 199599 Completed
12 Civil EE-XII 24.6.05 20.6.05 199600.00 202/22.7.05/XII 28.7.05 30.09.05 199598 Completed
13 Civil EE-XII 24.6.05 11.6.05 198966.00 203/22.7.05/XII 22.7.05 P 129277 In Prog.
14 Civil EE-XII 27.7.05 11.7.05 267300.00 506/22.12.05/EE-XII 22.12.05 02.03.06 226724 Completed
15 Civil EE-XII 27.7.05 11.7.05 226724.00 505/24.12.05/EE-XII 24.12.05 01.03.06 225987 Completed
16 Civil EE-XII 27.7.05 11.7.05 267300.00 514/26.12.05/EE-XII 26.12.05 28.02.06 222565 Completed
Imp to lane by providing RMC from H.No B-9/1 to B-7/1 IN Rana Partap Bagh C-117/CLZ
M/s Surya Kant Sharma
Imp to lane by providing RMC from H.No D-6/16 to Gurudwara , B-2/11 to B-2/22 in Rana Partab BaghC-117//CLZ
Imp to lane by Providing RMC from H.No A-19 to A-17/1 and A-7/5 to A-6/5 in Rana Partap Bagh in C-117/CLZ
M?s Rajesh Const CO
Imp to lane by providing RMC from H.No A-8/18 to A8/45 in Rana Partap Bagh in C-117/CLZ
M/s Aman Deep Const.Co.
Imp to lane by Providing RMc from H.No A-12/1 to A-12/6 in Rana Partap Bagh in c-117/CLZ
M/s Rana Const co.
Imp to lane by providing RMC from H.No C-5/18 to C5/13 in Rana Partap Bagh C-1147/CLZ
M/s Sutail Consts.
Imp to lane from H.NO 139 to 145 in Derawal Nagar "A" block C-118/CLZ(by pdg RMC)
M?s Amar chouhan
C/o hut in park behind Brahama Kumarits in Derwal Nagar A block in c-118/CLZ
M/s Harsh Consts.
C/o Hut in park near H.No A-46 in A block Derawal Nagar in C-118/CLZ
M/s Harsh Consts.
C/o Hut in D- block park in Model Town-III in C-118/W.Z
M/s Pardeep Contractor
17 Civil EE-XII 27.7.05 11.7.05 242088.00 515/26.12.05/EE-XII 26.12.05 31.03.06 242088 Completed
18 Civil EE-XII 27.7.05 11.7.05 267300.00 474/0812.05/EE-XII 08.12.05 01.03.06 267300 Completed
19 Civil EE-XII 29.7.05 28.5.05 448250.00 272/16.8.05 16.8.05 30.9.05 448092 Completed
20 Civil EE-XII 29.7.05 28.5.05 455008.00 271/16.08.05/XII 16.8.05 31.1.06 454543 Completed
21 Civil EE-XII 21.10.05 20.10.05 3629894.00 689/13.03.06/EE-XII 23.03.06 P 2281318 In Prog.
22 Civil EE-XII 25.1.06 1.10.05 517262.00 643/17.02.06/EE-XII 17.02.06 30.03.06 516929 Completed
23 Civil EE-XII 2.2.06 22.1.06 99579.00
24 Civil EE-XII 2.2.06 19.1.06 458108.00
25 Civil EE-XII 23.2.06 22.2.06 201519.00 742/22.03.06/EE-XII 22.05.06 27.07.06 196912 Completed
C/o of Hut in park of Naniwala Bagh Commercila Complex in C-118/CLZ
M/s Devender Gupta
C/o Hut in park of Kalyan vihar near H.No 62 in C-118/CLZ
M/s Harsh Consts.
Imp to lane from H.NO 14 to Arya Samaj Mandir and along DDA Market in Gurawala town part-II in C-118 /CLZ by c.c. & interlocing tiles)
M/s Bhaiji Controctor &
Suppler
Imp to lane from H.No 122 to 130 in Derawal Nagar B block in C-118/CLZ (BY CC and interlocking tiles)
M/s Bhaiji Controctor &
Suppler
Imp to Shalimar park in Model Town in C-118/CLZ
M/s Anil Gupta
Imp to lane infornt of H.no. 55 in Gujrawala town part-II C 118 CLZ (BY RMC)
M/s Narendra Const.Co.
Imp to Parking space infront of H.no. E-6 and along park in CC colony in C 118 CLZ (By CC)
Imp of lane from H>no. B 62 to b 67 in CC Cly in C 118 CLZ(by RMC)
Imp to Open Space behind stage in Ramlila Park in CC cly in C 118 CLZ
M/s Vikram Malhotra
Status Report of MLA, Sh.Shadi Ram, AC No. 63 2005-06
S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil EEXVI 17.8.05 14.8.05 1356200.00 564/10.03.06/EE-XVI M/s Vinod Kumar 20.06.06 P 890096.00 In Prog.
2 Civil Br-II 16.9.05 1.9.05 797800.00 76/27.12.05/BR-II 30.12.05 16.05.06 761681.00 Completed
3 Elect EEE-II 29.9.05 17.9.05 132881.00 194/07.02.06/EE-II 24.02.06 01.03.06 110804.00 Completed
4 Elect EEE-II 29.9.05 17.9.05 132881.00 201/11.02.06/EE(E)-II M/s Pragati Engg. 28.02.06 22.03.06 102674.00 Completed
5 Elect EEE-II 29.9.05 17.9.05 132881.00 202/11.02.06/EE(E)-II 01.03.06 25.03.06 102573.00 Completed
6 Elect EEE-II 29.9.05 17.9.05 132881.00 185/03.02.06/EE(E)-II 02.03.06 25.03.06 108805.00 Completed
7 Elect EEE-II 29.9.05 17.9.05 132881.00 192/06.02.06/EEE-II 28.02.06 24.03.06 105810.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp to lane by providing drainage system & C.C from H.NO 1UB to 16
UB , 63 U B to 100 UB & 98 UB to 100 UB in Jawahar Nagar in C-119/CLZ
Imp to lane by providing c.c. pavement and drainage system from B-1910 to B-
1831/1 and from Tikona park to B-1757/2 in Shastri Nagar C-120 /CLZ
M/s Shiva Const co.
Provision of boring with submerssible pump set at Begum park Roshanara
Bagh Shakti Ngr under CLZ
M/s A.K.Electriclas
P/o boring with submessible pump at market park Shahzada bagh Shastri Ngr
under CLZ
P/o boing with Submersible pump at park block no 2, Roop Nagr under CLZ
M/s M.J.Electtriclas &
Electronics
P/o boring with submessible pump at Park block No 30 Shakri Nagar under
CLZ W No-119
M/s M.J.Electtriclas &
Electronics
P/o boring with Submessible pump at park of Indira park, Shastri Nagr.
M/s Sri.Balaji Electriclas
8 Elect EEE-II 29.9.05 17.9.05 132881.00 193/06.02.06/EEE-II 28.02.06 24.03.06 105532.00 Completed
9 Elect EEE-II 11.10.05 17.9.05 132881.00 199/11.02.06/EE(E)-II M/s Pragati Engg. 28.02.06 22.03.06 102387.00 Completed
10 Civil EEXVI 11.10.05 18.9.05 407400.00 95/29.05.06/EE-XVI 07.06.06 30.08.06 280570.00 Completed
11 Civil EEXVI 11.10.05 18.9.05 415400.00 21/18.04.06/EE-XVI 27.04.06 10.07.06 291119.00 Completed
12 Civil EEXVI 11.10.05 18.9.05 593400.00 7/04.04.06/EE-XVI 13..04.06 30.06.06 401925.00 Completed
13 Civil EEXVI 11.10.05 18.9.05 532700.00 22/18.04.06/EE-XVI 27.04.06 30.06.06 361187.00 Completed
14 Civil EEXVI 11.10.05 18.9.05 298400.00 79/15.05.06/EE-XVI 24.05.06 30.08.06 179947.00 Completed
15 Civil EEXVI 11.10.05 18.9.05 788300.00 84/18.05.06/EE-XVI 27.05.06 21.08.06 552678.00 Completed
P/o boring with submerssible pump at park of DDA Flat Sarai Basti under CLZ
M/s Sri.Balaji Electriclas
P/o boring with submerssible pump at park Green Belt Anand Nagar under
CLZ
Imp to lane by providing drinage & RMC from H.No 40/14 to 40/16 & 40/17 to
40/19 in Shakti Nagr C-119/CLZ
M/s Rakesh Bansal
Imp to lane by providing drainage & RMC from H.NO 40/1 to 40/6 to 40/9
and 40/10 to 40/13in Shakti Ngar in C-119 CLZ
M/s Shiva Const co.
Imp to lane by providing drainage & RMc from H.No 38/2 to 38/8 , 38/3 to 38/7 ,38/8 to 38/10 in Shakri Ngar C-
119/CLZ
M/s Shiva Const co.
Imp to lane by providing drainage & RMC from 38/10 to 38/12, 38/15 to 38/16 and 38/17 to 38/20 in Shakti
Nagar in c-119/CLZ
M/s Shiva Const co.
Imp to lane by Providing drainage and footpath by pdg inter locking pavers block 40 in Shakti Nagar C-119/CLZ
M/s Bansal Consts.
Imp to lane by providing RMc pave & drainage system near flat No 33 A and 39 A in DDA (LIG) flats in Gulabi Bagh
in C-119/CLZ
M/s Shiva Const co.
16 Civil EEXVI 20.10.05 18.9.05 1051400.00 109/14.06.06/EE-XVI 23.06.06 15.09.06 721901.00 Completed
17 Civil EEXVI 20.10.05 11.10.05 510500.00 96/29.05.06/EE-XVI 28.06.06 14.08.06 361437.00 Completed
18 Civil EEXVI 15.12.05 23.11.05 424950.00 587/17.03.06/EE-XVI 22.03.06 15.05.06 288430.00 Completed
19 Civil EEXVI 15.12.05 379700.00 595/20.03.06/EE-XVI 10.04.06 20.05.06 253954.00 Completed
20 Civil EEXVI 15.12.05 24.11.05 739700.00 605/22.03.06/EE-XVI M/s Naresh Rai 10.06.06 10.11.06 516937.00 Completed
21 Civil EE_Br-II 1.2.06 29.12.05 548086.00 18/09.06.06/EE(Br.)-II 15.06.06 23.08.06 548066.00 Completed
Imp to lane by providing RMc pave & drainage system from h.No 39/21 to
39/25, 39/14 to 39/20 ,39/16 and 39/3 to 39/6 in block 39 Shakti Nagar in C-
119/CLZ
M/s Parvesh Const.Co
Imp to lane by Providing C.C. pave and drainage system from E-2/103 to E-
2/116 and E-2/52 to E-2/66 in back lane in Shastri Ngar in c-120/CLZ
M/s Bansal Consts.
Imp to lane by pdg RMC Pav and Drainage system from L 53 to L 46 in
shastri Nagar in c 20.
M/s Shiva Const co.
P/L CC Pav and Drainage System from H>no. NF-17 to New F 34 in Shastri
Nagar C 120.
28.11.0528.11.05
M/s Sanjeev Builders
Imp to lane by pdg CC and Drainage system to H>no. A 504/3 to A 529/8 and MC Pry School(A) Block to A 540/30 in
Shastri Nagar in C 120
Imp of internal lanes by pdg CC in Block 26 Shaskti Nagar C 119 CLZ (From
H.no. 26/102 to 26/105 & 26/70, 26/11 to 26/17 and 26/21)
M/s Jindal Enterprises
Status Report of MLA, Sh.Rajesh Jain, AC No. 64 2005-06
S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil EE-III 5.7.05 4.7.05 183372.00 257/8.8.05 M/s Islmuddin 23.06.05 13.9.05 183251.00 Completed
2 Civil EE-III 5.7.05 4.7.05 181562.00 256/8.8.05 M/s Islmuddin 23.06.05 13.9.05 181419.00 Completed
3 Civil EE-III 29.7.05 26.7.05 155959.00 531/03.03.06/EE-III 06.03.06 P 118575.00 In Prog.
4 Civil EE-III 29.7.05 26.7.05 157478.00 387/14.12.05/EE-III 19.12.05 23.03.06 157283.00 Completed
5 Civil EE-III 29.7.05 26.7.05 153178.00 532/03.03.06/EE-III 06.03.06 10.06.06 152597.00 Completed
6 Civil EE-III 29.7.05 26.7.05 181074.00 847/28.03.07/EE-III 15.05.07 06.07.07 180567.00 Completed
7 Civil EE-III 29.7.05 4.7.05 183310.00 80/31.05.05 M/s Islmuddin 25.6.05 5.9.05 183171.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp to road by P/L c.c. from Bara Hindu Rao xing to Nai Bastic at P.D. road in W.No 122 A/S.PZ
Imp to road by P/L C.C. From Police booth to BSES Transformer Sheesh Mahal Hathi Khana at B.G.
road in W.NO 122 A/S.P.Z
Imp to round about providing marble stone flooring at Roshanara
road in C-121/S.PZ
M/s Shree Mahadev Builders
Imp of round about by providing red stand stone flooring at Sanjay
Nagar road in C-121 B SPZ
M/s D.K.Const.Co
Imp to fountain by pdg Marble stone flooring at Roshanara
Roundabout Circle in C-121 SPZ
M/s Shree Mahadev Builders
Imp to PVT Katra No 3577 in Gali Bonwali & P/L c.c. at 3566 gali
Hanuman At G.T. road in C-121 A SZP
M/s United Const.Co.
Imp to road by P/l c.c. pavement in gali Bahuji in W.No -122 SPZ
8 Civil EE-III 9.8.05 4.7.05 323113.00 293/08.09.05/EE-III 08.9.05 16.12.05 323013.00 Completed
9 Civil EE-III 7.10.05 4.10.05 295575.00 29/08.05.06/EE-III 10.05.06 28.06.06 295158.00 Completed
10 Civil EE-III 7.10.05 4.10.05 346660.00 868/30.03.07/EE-III 29.03.07 07.05.07 346255.00 Completed
11 Civil EE-III 7.10.05 4.10.05 237932.00 251/07.09.06/EE-III 15.09.06 10.11.06 237386.00 Completed
12 Civil EE-III 24.10.05 23.10.05 220276.00 523/20.02.06/EE-III 20.02.06 16.03.06 219568.00 Completed
13 Civil EE-III 23.11.05 30.8.05 199595.00 467/24.01.06/EE-III 25.01.06 25.03.06 199386.00 Completed
14 Civil EE-III 25.11.05 22.11.05 187200.00 403/23.12.05/EE-III 28.12.05 30.01.06 186924.00 Completed
15 Civil EE-III 5.12.05 14.11.05 216800.00 487/02.02.06/EE-III M/s M.C.Aren 02.02.06 11.03.06 216762.00 Completed
Imp to pav block & Marble flooring in chowk and water fiting & imp to entreace gate Kartr (p)
4418 Chatterpartap singh gali Bahuji in W.No 122 A SPZ
M/s.Som Dutt Duevedi
Imp to Pvt. Katra No 3244,3248 in Arya pura & Imp to Pvt No 7821 in
Maula Bux at R.A . Road in C-121/SPZ(by pdg c.c. & drainge
system) SPZ
M/s D.K.Const.Co
Imp to lane by providing c.c. from Ladha Rajput Chopal to Baba
Balalknath Temple in Arya pura in C-121 A/SPZ
M/s J.P Const.CO
Imp to lane by providing c.c from Mata Mandir Chowk Balmiki Baba
to Baba Balaknath temple in C-121/SPZ
M/s J.P Const.CO
P/L C.C pavement from H.No 4456 to 4430 in gali Hera Wali in W.No-
121 A/SPZ
M/s R.P.Enterprises
P/L CC in gali Bagchee Acheegi in Bara Hindu Rai in W.no. 122A SP
M/s Rajesh Const.Co.
Imp ot road surface to the road by MP at old Rohtak Rd near Azad
mkt in w.no. 122B SPZ
M/s Essco Traders
Imp to lab block of qtrw no. 193 to 216 in Vasudev nagar in C 121 A
(By pdg CC and Ceramic Tiles etc) SPZ
16 Civil EE-III 5.12.05 14.11.05 230977.00 486/02.02.06/EE-III M/s M.C.Aren 02.02.06 11.03.06 230939.00 Completed
17 Civil EE-III 19.12.05 19.12.05 197800.00 426/12.01.06/EE-III 13.02.06 08.02.06 197190.00 Completed
18 Civil EE-III 19.12.05 19.12.05 199100.00 427/12.01.06/EE-III 13.01.06 13.03.06 198460.00 Completed
19 Civil EE-III 19.12.05 19.12.05 199130.00 591/31.03.06/EE-III 18.04.06 28.06.06 198664.00 Completed
20 Civil EE-III 19.12.05 19.12.05 199300.00 461/24.01.06/EE-III 28.01.06 29.05.06 198939.00 Completed
21 Civil EE-III 19.12.05 19.12.05 198742.00 439/19.01.06/EE-III 20.01.06 15.04.06 197608.00 Completed
22 Civil EE-III 19.12.05 19.12.05 197200.00 436/12.01.06/EE-III 20.01.06 20.03.06 196820.00 Completed
23 Civil EE-III 19.12.05 19.12.05 195880.00 504/07.02.06/EE-III 07.02.06 10.05.06 195396.00 Completed
24 Civil EE-III 19.12.05 19.12.05 198000.00 462/24.01.06/EE-III 30.01.06 29.05.06 197438.00 Completed
25 Civil EE-III 19.12.05 17.12.05 199936.00 433/12.01.06/EE-III 15.01.06 28.03.06 199422.00 Completed
Imp to CC flooring from H.no. 1781 to 1790 in Ram Gali andadj
lanes in Pahar ganj C 121 SPZ
Imp to lane by P/L CC from H>no. 10884 to 10879 and 10913 to 10915
at Amrit Puri in C 121A SPZ
M/s.Bajaj const.co.
IIMp to lane by pdg Lying CC from H.no. 10861 to 1086 and 10916 to 10917 in Amrit Puri in C 121A
SPZ
M/s V.K.Associates
Imp to lane by pdg cc from Katra NO. 1818 in Anar Kothi at Malka
Ganj in C 121A SPZ
M/s Sumit Const.CO.
Imp to lane by P/L CC in gali Kumar Wali H.no. 1985 to 1989 at
Malka ganj rd in C 121A SPZ
M/s Essco Traders
Imp to lane by P/L CC in gali Mitra H.no. 4516 to 4509 at Arya Pura in
C 121A SPZ
M/s Rajesh Const.Co.
Imp to lane by P/L CC in gali Dharamshala wali H.no. 1388 to
1597 in Shora Kothi in C 121A SPZ
M/s Prem Const.Co.
Imp to lane by P/L CC in gali Jai Puria mIll H.no. 1175 to 1147 at
Shora Kothi in C 121A SPZ
M/s Vedpal Bhatia
Imp to lane by P/L CC gali no. 18 Amrit PURi from H.no. 265 to 280
and 217 to 231 in C 121A SPZ
M/s Essco Traders
P/L CC from Shop NO. 9 to Nashta Corner in Gali no. 2 in Hathi Khana
in C 122 SPZ
M/s Punit Nayyar
26 Civil EE-III 19.12.05 17.12.05 146447.00 435/12.01.06/EE-III 03.02.06 07.03.06 146447.00 Completed
27 Civil EE-III 19.12.05 17.12.05 199502.00 430/12.01.06/EE-III 15.01.06 28.03.06 199471.00 Completed
28 Civil EE-III 19.12.05 17.12.05 185176.00 431/12.01.06/EE-III 27.01.06 11.04.06 183940.00 Completed
29 Civil EE-III 19.12.05 17.12.05 104169.00 434/12.01.06/EE-III 31.01.06 31.03.06 103573.00 Completed
30 Civil EE-III 19.12.05 17.12.05 176766.00 432/12.01.06/EE-III 13.01.06 24.03.06 176153.00 Completed
31 Elect EEE-I 20.12.05 1.12.05 195264.00 263/27.03.06/EE(E)-I 06.04.06 22.04.06 134535.00 Completed
32 Elect EEE-I 20.12.05 1.12.05 199986.00 256/24.03.06/EE(E)-I 02.04.06 25.05.06 131620.00 Completed
33 Civil EE-III 27.12.05 26.12.05 199360.00 491/02.02.06/EE-III M/s Arya & Co. 14.02.06 27.03.06 198817.00 Completed
34 Civil EE-III 28.12.05 28.12.05 90000.00 469/30.01.06/EE-III 09.02.06 28.02.06 89778.00 Completed
35 Civil EE-III 28.12.05 28.12.05 186700.00 490/02.02.06/EE-III M/s Arya & Co. 20.02.06 04.03.06 184888.00 Completed
P/L CC in lanes from 10307 to 10321, 10322 to 10325 and 9398 to 9405 at Tokri walan in C 122B SPZ
M/s Deepak Kumar
P/L CC from 1583-84 and 1622 to 1600 in gali no. 1 Hathi Khara in C
122 SPZ
M/s Neel Traders
P/L CC Pav in gali Med wali from 9525 to 9578 and 9599 to 9611 to
Tokri Walan in C 122B SPZ
M/s Rajesh Const.Co.
P/L CC pav in Gali Ram Gali from 9230 to 9244 and 9508 at Tokri
Walan IN C 122B SPZ
M/s Manish Nayyar
Imp the road from 93055 to 9484 gali Dorwali 9276 to 9279 behind
Mandir and 9256 to 9258 gali Mata Wali by pdg CC Tokri Walan in C
122B SPZ
M/s Sumit Const.CO.
P/O Lighting arrangment at Round about Roshan pura road under SP Z
M/s Repair Shop
P/O street lighting arrangment in lanes of Sadar Bazar and Subzi Mandi in W.no. 121 & 122 SPZ
M/s S.K Enterprises
pdg laying CC Pavyment from shop no. 1 to 6 and H.no. 1 to 6 in Lehna singh Mkt at RA Road C 121A SPZ
P/L CC in gali Aziz ganj in Hathi Khana in W.n. 122B SPZ
M/s Bajaj Const.Co
Imp of gali Bhahogi by pdg CC in Pahari Dheeraj C 122A SPZ
36 Civil EE-III 28.12.05 28.12.05 199500.00 483/30.01.06/EE-III 02.03.06 28.03.06 199236.00 Completed
37 Civil EE-III 28.12.05 28.12.05 197800.00 481/30.01.06/EE-III 02.02.06 28.03.06 197116.00 Completed
38 Civil EE-III 28.12.05 28.12.05 193830.00
39 Civil EE-III 28.12.05 28.12.05 197600.00 478/30.01.06/EE-III 31.01.06 31.03.06 197082.00 Completed
40 Civil EE-III 3.1.06 22.10.05 190303.00 151/07.07.06/EE-III 14.07.06 12.09.06 190245.00 Completed
41 Elect EEE-I 12.1.06 9.12.05 181329.00 261/27.03.06/EE(E)-I 06.04.06 22.04.06 148920.00 Completed
42 Elect EEE-I 12.1.06 9.12.05 182410.00 262/27.03.06/EE(E)-I 06.04.06 22.04.06 148487.00 Completed
43 Elect EEE-I 12.1.06 9.12.05 182230.00 289/31.03.06/EE(E)-I 01.04.06 12.04.06 139340.00 Completed
44 Civil EE-III 16.2.06 16.2.06 228731.00 170/04.07.06/EE-III M/s Nitin Gupta 20.07.06 18.10.06 228006.00 Completed
Imp of Gali Shyamji in Telewara by pdg CC Pav in Wno. 122B SPZ
M/s Punit Nayyar
Imp of rd by pdg CC from 1622 to Plot No. 12 in Hathi Khana w.no.
122B SPZ
M/s Manish Nayyar
P/L CC from Plot no. 19 to Goyal Enterprises and adj lanes and 1742 to 41 at Hathi Khana C 122B SPZ
P/L CC from Shop no. 35 to 37 and adj lanes in Hathi Khana in C
122BSPZ
M/s Neel Traders
Pdg CC at the entrarance of Gali Thaley Wali, 3082, gali Budha wali
and gali Nathan wali in C 121A SPZ
M/s Sanjeev Builders
P/O semi High mast Lighting arrangment near 1373 to 1384 way in Gulabi Bagh qtrs w.no. 121 SPZ
M/s Repair Shop
P/O semi High mast Lighting arrangment near 1457 to 1468 way in Gulabi Bagh qtrs w.no. 121 SPZ
M/s Repair Shop
P/O semi High mast Lighting arrangment at Choudhary Nand Lal Marg, Pratap Nagar, w.no. 121 SPZ
M/s Gyan Enterprises
P/L marble flooring infront of Nurrudin park form Masjid to main road ( R.J road ) in C-122 B /S.P.
Zone
Status Report of MLA,Sh.Subesh Sachdewa, AC No. 65 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil EE-VII 19.5.05 15.1.05 173756.00 346/8.9.05/VII
8.9.05 6.10.05 173350.00 Completed
2 Civil EE-VII 19.5.05 22.11.04 257129.00 427/21.10.05/VII 21.10.05 16.11.05 256409.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp to lane by pdg CC Pav from J-20 to j-45 and J-31 to j-37 in J block in Kirti nagar C-124 WZ
M/s Maruti Const.
Imp to lane by pdg RMC from 2/61 to 6B/34 and Imp to park side from 2/61 to 2/35 in 2 block Rameshnagar C-124 WZ
M/s Devender vaid
3 Civil EE-VII 19.5.05 22.11.04 288800.00 462/17.11.05/EE-VII 23.11.05 17.01.06 288203.00 Completed
4 Civil EE-VII 19.5.05 22.11.04 249700.00 367/16.09.05/EE-VII 23.09.05 23.02.06 184353.00 Completed
5 Civil EE-VII 19.5.05 24.1.05 311580.00 504/23.12.05/EE-VII 26.12.05 05.06.06 309284.00 Completed
6 Civil EE-VII 19.5.05 15.1.05 194188.00 806/30.03.06/EE-VII 09.04.06 05.09.06 193631.00 Completed
7 Civil EE-VII 19.5.05 15.1.05 199500.00
8 Civil EE-VII 30.05.05 24.5.05 199500.00 312/29.8.05VII 30.8.05 5.11.05 163472.00 Completed
9 Civil EE-VII 30.05.05 24.5.05 199100.00 408/18.10.05/VII 18.10.05 10.11.05 174623.00 Completed
10 Elect. EEE-III 3.06.05 17.5.05 157654.00 119/7.10.05/EEE-=III 15.10.05 15.11.05 154205.00 Completed
Imp to chowk by pdeg RMC from H.no. J120 to J 128 in J block in Kirti Nagar in C-124 Wz
M/s Bansal Const.Co-IV
Imp to Drainage system from H.no. 75 to h 51 in H block in Kavita nagar in C-124 Wz
M/s Deep Const.Co
Imp to lane by pdg RMC from A 1 to A 7 & A 8 to A 7 in furnituer block, Kavita Nagar in C-124 WZ
M/s Nirwan Associates
Imp to lane by pdg CC pav from I-6 to I-1 and I-134 to E-137 in I block Kirti Nagar in C-124 WZ
M/s Sahil Const.MPL Contractor
Imp to lane by D/system from I-113 to I-112 in I block Kirti Nagar in C124 WZ
Imp to rd by pdg RMC from Plot No A 6 to Plot No A7 (NG rd) in Kirti Nagar in C-124 WZ
M/S L.Gee const Co.
Imp to rd by pdg RMC from Plt NO A 8 to Plot No A9 (NG rd) in Kirti nagar in C-124 WZ
M/s Dabas Const co.
P/O boring with subermsible pump set in the park opp C-3/14A and E 109 Mansarovar Garden & Rajouri Garden under WZ
M/s GS Electricals
11 Elect. EEE-III 3.06.05 17.5.05 157654.00 148/10.10.05/EEE-III 10.10.05 30.10.05 150261.00 Completed
12 Elect. EEE-III 3.06.05 17.5.05 157654.00 150/10.10.05/EEE-III 18.10.05 18.11.05 155692.00 Completed
13 Elect. EEE-III 3.06.05 17.5.05 157654.00 154/18.10.05/EEE-III 20.10.05 21.11.05 155686.00 Completed
14 Elect. EEE-III 3.06.05 17.5.05 170038.00 183/18.10.05/EEE-III 18.10.05 03.11.05 164760.00 Completed
15 Elect. EEE-III 3.06.05 17.5.05 170038.00 326/30.11.05/EEE-III 1.12.05 4.1.06 164777.00 Completed
16 Elect. EEE-III 3.06.05 17.5.05 110463.00 118/07.10.05/EE(E)-III 08.10.05 07.11.05 107277.00 Completed
17 Elect. EEE-III 3.06.05 17.5.05 159914.00 94/3.10.05/EEE-III 12.10.05 11.11.05 155168.00 Completed
P/O boring with subermsible pump set in the Tikona Park opp H.no. 4/24, Jaidev park under WZ
M/s Indus India International
P/O boring with subermsible pump set in the opp 4/54 Ramesh Nagar under WZ
M/s Sant Gyan Corp.
P/O boring with subermsible pump set in the opp. C-56, Kiriti Nagar under WZ
M/s Master Electric Store
P/o Semi High Mast Light in the park of H block Kirti Nagar under WZ
M/s S.T. Electic co.
P/o Semi High Mast Light in the park near Statue of Sh. Subhash Chandra Bose, Karampura Complex under WZ
M/s Ankur Enterprises
P/o Lighting arrangment with 2x250 watt flood Light fittings on 12m pole steel tabular pole opp. J-91, Kirti Nagar under WZ
M/s G.S Electricals
P/o Lighting arrangment with 2x250 watt flood Light fittings on 12m pole steel tabular pole in Jai Dev park East Punjabi under WZ
M/s Pragati Enggs
18 Elect. EEE-III 3.06.05 17.5.05 110463.00 484/03.02.06/EE(E)-III 10.02.06 01.03.06 107257.00 Completed
19 Elect. EEE-III 3.06.05 17.5.05 165235.00 184/18.10.05/EEE-III 1.11.05 19.11.05 160162.00 Completed
20 Elect. EEE-III 3.06.05 17.5.05 114575.00 68/21.9.05/EEE-III 1.10.05 29.10.05 110454.00 Completed
21 Elect. EEE-III 3.06.05 17.5.05 510235.00 109/7.10.05/EEE-III 15.10.05 12.11.05 498522.00 Completed
22 Civil EE-VII 20.6.05 18.6.05 199000.00 176/25.05.06/EE-VII 27.05.06 30.09.06 192687.00 Completed
23 Civil EE-VII 20.6.05 18.6.05 198300.00 354/08.09.05/EE-VII 17.09.05 16.01.06 190549.00 Completed
24 Civil EE-VII 20.6.05 18.6.05 188700.00 340/05.09.05/EE-VII 20.09.05 21.02.06 182996.00 Completed
25 Civil EE-VII 20.6.05 18.6.05 194100.00 459/17.11.05/EE-VII 02.12.05 06.02.06 187788.00 Completed
26 Elect. EEE-III 20.6.05 18.6.05 159714.00 193/21.10.05/EEE-III 01.11.05 22.11.05 153320.00 Completed
P/o Lighting arrangment with 2x250 watt flood Light fittings on 12m pole steel tabular pole opp. 1-B/74 Ramesh Nagar, under WZ
M/s Paras Const.Co
P/O additional 3x70 MDH Juno Integral Post Top Lantern in Chacha Nehru park in RameshNagar under WZ
M/s Vinakyana Enggs. Tradners
P/O 1x70 watt Juno Intgral post top lantern fittings in the park of E 283, Ramesh Nagar under WZ
M/s Best Electicals and
Electonics
P/o 3x70 watt Juno Intgral Post Top Lantern fittings in the park opp 22B Ramesh Nagar and in the park opp 2A/6, Ramesh Nagar under WZ
M/s Perfect Electric works
C/o Built up section drain on road no 25 from H.no. 2 to 26 (RHS) in East Punjabi Bagh C-123 Wz
M/s Anupam Const.Co
C/o Built up section drain on road no 25 from H.no. 1 to 25 (LHS) in East Punjabi Bagh C-123 Wz
M/s Bansal Const.Co
C/o Built up section drain on road no 23 from H.no. 1 to 23 (LHS) in East Punjabi Bagh C-123 Wz
M/s Ghan Shyam Dass
C/o Built up section drain on road no 23 from H.no. 2 to 24 (RHS) in East Punjabi Bagh C-123 Wz
M/s Arora Associates
P/o Tube well with pump subemsible pump set I-B-71 Park, Ramesh nagar under WZ
M/s Ajay Electricals
27 Elect. EEE-III 28.6.05 3.6.05 205543.00 335/30.11.05/EEE-III 1.12.05 12.12.05 197498.00 Completed
28 Elect. EEE-III 28.6.05 3.6.05 159714.00 135/7.10.05/EEE-III 15.10.05 15.11.05 154663.00 Completed
29 Elect. EEE-III 28.6.05 3.6.05 314113.00 225/28.10.05/EEE-III 1.11.05 18.11.05 301205.00 Completed
30 Elect. EEE-III 28.6.05 3.6.05 170038.00 249/3.11.05/EEE-III 3.11.05 12.11.05 164757.00 Completed
31 Elect. EEE-III 1.7.05 30.6.05 109898.00 102/7.10.05/EEE-III 15.10.05 12.11.05 89354.00 Completed
32 Elect. EEE-III 1.7.05 22.6.05 169297.00 153/18.10.05/EEE-III 19.10.05 29.10.05 147388.00 Completed
33 Elect. EEE-III 1.7.05 22.6.05 169297.00 257/3.11.05/EEE-III 4.11.05 7.12.05 155586.00 Completed
34 Elect. EEE-III 1.7.05 22.6.05 179847.00 373/08.12.05/EEE-III 17.12.05 16.01.06 164211.00 Completed
35 Elect. EEE-III 1.7.05 22.6.05 175271.00 325/30.11.05/EEE-III 1.12.05 7.12.05 158002.00 Completed
36 Elect. EEE-III 1.7.05 22.6.05 179847.00 268/7.11.05/EEE-III 8.11.05 18.11.05 164152.00 Completed
P/o Tube well with pump subemsible pump set and Fountain in h 47 Kriti Nagar park in WZ
M/s Sri Balaji Electricals
P/O Tune well with subermsible pump set in the park opp. 3/8 Ramesh Nagar W no. 124
M/s Bharat Electricals and
Electonics
P/O 70 Watt Juno Integal post top Latern fitting in the Park of B block Moti Nagar in C Wz
M./s SG Enterpises
P/o Semi High Mast light in H block Park Opp Kirti Nagar in NDPL office under Wz
M/s KHJanna sales corp.
P/O 70 Watt Juno Integal post top Latern fitting in the Park near Mother Dairy opp C 150 Moti Nagar under Wz
M/s Perfect Electric works
P/O Boring with subemsible pumop set at park opp. C 59, Kirti Nagar under Wz
M/s Maste electic store
p/O bring with subemsible pump set in the park of8/30, Ramesh Nagar uner Wz
M./s AK Electicals
P/O Semi High mast light near C 73, Mansarover Garden near Lovely Marble under Wz
M/s Tyagi Elecrict &
Trading Co.
P/O 70 Watt Juno Integal post top Latern fitting in the Park of N block opp. N -23 Kirti Nagar in C Wz
Ms Sachdeva Electricals
P/O Semi High mast light Infront of Ballay Ballay Banquets Kailash Park near Moti Nagar in C Wz
M/s Forward Enggs
37 Elect. EEE-III 1.7.05 22.6.05 352183.00 424/29.12.05/EEE-III 01.01.06 19.01.06 312037.00 Completed
38 Civil EE-VII 1.7.05 18.6.05 222120.00
39 Civil EE-VII 18.7.05 15.6.05 48900.00 341/5.9.05/VII 15.9.05 10.11.05 47395.00 Completed
40 Civil EE-VII 27.7.05 18.7.05 199000.00 368/20.09.05/EE-VII 01.10.05 05.10.05 198772.00 Completed
41 Civil EE-VII 27.7.05 18.7.05 199400.00 328/31.08.05/EE-VII 07.09.05 27.01.06 193513.00 Completed
42 Civil EE-VII 27.7.05 18.7.05 194900.00 327/31.8.05/VII 1.9.05 29.10.05 194843.00 Completed
43 Civil EE-VII 27.7.05 21.7.05 196000.00
44 Civil EE-VII 27.7.05 18.7.05 63600.00 338/5.9.05/VII 12.9.05 24.11.05 61576.00 Completed
45 Civil EE-VII 27.7.05 14.7.05 62400.00 333/02.09.05/EE-VII 10.09.05 13.03.06 62007.00 Completed
P/O Electric Fittins in Fountain at L 85 Kriti nagar park unjder Wz SH:- Pdg & Installing of Full Water sparrs at L 85, Kirti nagar under Wz
M/s S.G.Enterprises
Imp to back lane from H.no. 2/6 to 40/6 by Pdg CC Pav in East Punjabi Bagh in C 123 Wz
C/O Flower Beds ni Shishu Vatika in B block Karam Pura in C 123
M/s Ghan Shyam Dass
Stg by Dense Carpeting from S 4 to opp rd no 33 and along C 10 in Bhagwan dass Nagar in C 123
M/s Asian Resar facing of road Agency
Pvt.Ltd.
Imp of Pav by pdg CC Pav from 6/57 to 6/32, opp 5/21 & opp E-30 to D 79 in Moti Nagar in C 123 Wz
M/s Hari Consts.
Imp to back lane from By P/L CC from H.no. 1/17 to 23/19, East Punjabi bagh C 123
M/s Maruti Consts.
Stg of rd by Dense Carpeting from Shiv Temple to East Avencu in Bhagwan Dass Nagar in C 123. WZ
C/o Walkway in park opp A 9/103 in Moti Nagar in C 123 (by pdg Interlocking tiles)wz
M/s Goyal Const co.
P/F MS Railing and Imp to berms infornt of Hanuman mandir in 9 block , Ramesh Nagar in C 124WZ
M/s Madan Lal Gupta
46 Civil EE-VII 27.7.05 19.7.05 199500.00 393/06.10.05/EE-VII 08.11.05 20.01.06 196900.00 In Prog.
47 Civil EE-VII 27.7.05 19.7.05 198000.00 401/6.10.05/VII 7.10.05 21.12.05 197159.00 Completed
48 Civil EE-VII 27.7.05 19.7.05 199000.00 376/28.09.05/EE-VII 29.12.05 03.01.06 198747.00 Completed
49 Civil EE-VII 27.7.05 19.7.05 129300.00 350/8.9.05/VII 20.10.05 17.11.05 126897.00 Completed
50 Civil EE-VII 27.7.05 19.7.05 130200.00 351/8.9.5/VII 12.9.05 24.10.05 130056.00 Completed
51 Civil EE-VII 27.7.05 19.7.05 199500.00 397/06.10.05/EE-VII 06.10.05 07.12.05 199438.00 Completed
52 Civil EE-VII 27.7.05 19.7.05 199460.00 353/08.09.05/EE-VII 21.02.06 09.08.06 198199.00 Completed
53 Civil EE-VII 2.8.05 653504.00 572/07.02.06/EE-VII M/s Chittarmal 07.02.06 23.03.06 652798.00 Completed
Stg of rd by Dense Carpeting from C 1 to EF Block rd in Bhagwan Dass Nagar in C 123.WZ
M/s Echo Builders
Imp of back lane b y pdg CC from H.no. 1/13 to 25/13 in East Punjabi Bagh ni C 123 Wz
M/S Vikas const CO.
Imp to back lane of rd no 19 from Hno. 2 to rd no 11 in East Punjabi Bagh in C 123 Wz
M/s Mukesh Builders
Imp to parking space from Shop no 15 to Shop no 22 and Imp to back lane of Shop no 14C in East Punjabi Bagh Mkt in C 123 Wz (By pdg CC and CC Pavers)
M/s Anil kumar Gupta
Imp to lane from Shop no 3 to 21 & Shop no 1 to B wall of Flood Deptt in Bhayona Mkt, Karam Pura in C 123 (by pdg RMC) WZ
M/s Parveen Kumar Garg
Imp to lane from Corner of Society office to Shop no 25/1 Shop no 15/1 to shop no 14/C shop no 7 & 24 and near shop no 25/1 in East Punjabi Bagh in C 123 (by pdg Kota/CC Flooring) WZ
M/s Puneet Nayyar
Stg of rd by Dense Carpeting around main park in Bhagwan Dass Nagar in C 123 WZ
M/s Sanjeev Kumar & Bros.
Imp to lane by opdg RMC from 1/44 to 1/32 Timbar Block ni Kirti Nagar at C 1234 Wz
24.1.05R-1.8.05
54 Civil EE-VII 2.8.05 21.7.05 199900.00 339/5.9.05/VII 28.9.05 2.12.05 199822.00 Completed
55 Civil EE-VII 2.8.05 18.7.05 198500.00 363/12.9.05/VII 20.09.05 10.12.05 193136.00 Completed
56 Civil EE-VII 9.8.05 4.8.05 300534.00 741/22.03.06/EE-VII 23.03.06 15.06.06 235835.00 Completed
57 Elect. EEE-III 23.8.05 17.5.05 123386.00 163/18.10.05/EEE-III 20.10.05 28.10.05 119467.00 Completed
58 Civil EE-VII 30.8.05 14.7.05 258430.00 525/10.01.06/EE-VII 13.01.06 20.04.06 235462.00 In Prog.
59 Civil EE-VII 30.8.05 18.6.05 159944.00 574/08.02.06/EE-VII 14.02.06 13.05.06 113426.00 Completed
60 Civil EE-VII 30.8.05 14.7.05 266543.00 621/9.03.06/EE-VII 25.05.06 6.09.06 154758.00 Completed
61 Civil EE-VII 13.12.05 12.12.05 111900.00 549/27.01.06/EE-VII 18.01.06 04.03.06 111479.00 Completed
62 Civil EE-VII 29.12.05 21.11.05 198000.00 750/22.03.06/EE-VII 23.03.06 12.04.06 198000.00 Completed
Imp to parking space from Shop no 25/9 to 26/8 along rd no 7, Shop no 11A to 15/1 in East Punjabi Bagh in C 123 (by pdg CC pavers) WZ
M/S Apoorv Builders and Contractors
Imp to back lane by pdg CC from 1/14 to 15/14 in East Pujabi Bagh in C-123 WZ
M/S Ess.Gee const.
C/O Chhatries in 6 block park Moti Nagar and Jija bai Park, Jai Dev Park in C 123 Wz
M/s APT Const.Co
P/O Lighting arrang. With 2x250 watt flood light fittins on 12m Steel Tabular Pole opp 2B/1, Ramesh nagar, under Wz
M/s Master Electric Store
Imp to lane by pdg CC from 3/116 to 3/62, 3/61 to 3/48, 3/110 to 3/30 to 3/3 to 3/36 in 3 block, Ramesh Nagarin C 124 wz
M/s Beeta Const.CO
Imp to rd by pdg MP from C 3/6 Rajouri Garden to E-1 in E Block, Mansarover Garden in C 124 wz
M/s Pal Const.Co
Imp to park side berms byu pdg CC from D 16 to D 37, D 84 to D 63 and infront of H.no. E 78 in D & E block Kirti nagar C 124. Wz
M/s Sandeep Const.
Imp to walk way by pdg Interlockng tiles in park opp. H.no. 76A S/S, AB block Ramesh Nagar, C 124 wz
M/s Birla Const.Co.
Imp to chowk opp B-33, (By pdg RMC) and Drainage along park opp B-16, Moti Nagr, C 123 WZ
M/s Arora Associates
63 Civil EE-VII 29.12.05 21.11.05 193571.00 555/31.01.06/EE-VII 01.02.06 28.02.06 193450.00 Completed
64 Civil EE-VII 29.12.05 21.11.05 184274.00 569/07.02.06/EE-VII 09.02.06 04.04.06 184256.00 Completed
65 Civil EE-VII 29.12.05 21.11.05 36042.00 774/24.03.06/EE-VII 04.04.06 28.04.06 36037.00 Completed
66 Civil EE-VII 29.12.05 5.8.05 234352.00 01/05.04.06/EE-VII M/s Jatin Jaggi 10.04.06 31.05.06 233375.00 Completed
67 Civil EE-VII 29.12.05 20.12.05 211264.00 34/12.04.06/EE-VII 28.04.06 28.06.05 211087.00 Completed
68 Civil EE-VII 29.12.05 20.12.05 198872.00 616/03.03.06/EE-VII 06.03.06 P 198010.00 In Prog.
69 Civil EE-VII 29.12.05 4.8.05 199695.00 734/17.03.06/EE-VII 04.04.06 09.06.06 199491.00 Completed
70 Civil EE-VII 29.12.05 2.9.05 44700.00
Imp to back lane of rd no. 7 and 9 in East Punjabi Bagh by pdg RMC C 123 WZ
M/s Ricky Consts.
Const of drain along RHS of rod no. 19 East Punjabi Bagh C 123 WZ
M/S Apoorv Builders and Contractors
Covering of Drain RHS of rd no. 19 by pdg Precast RCC Slabs in East Punjabi Bagh C 123 WZ
M/s Birla Const.Co.
Imp to walkway by pdg Sand stone flooring in L type park in C block New Moti Nagr and covering of drain in Mandir lane in Punjabi Garden C 123 WZ
Covering of drain by pdg RCC slab (Precast) on road no. 23, 25 and 7 in East Punjabi bagh C 123 WZX
M/s Ashish Const.co
Pdg RCC Slab at xing and entry points over drain in Rd no. 23, 25 and 7 in east Punjabi Bagh C 123 WZ
M/s Ravindra Const.Co
Imp to back lane by pdg CC from H.no. 35/13 to 25/13 and 29/17 to 23/17 in East Punjabi bagh C 123 WZ
M/s Sunil Const.Co
Imp to exisitng fountain in Dhingra Park Esast Punjabi Bagh by pdg Granite Stone C 123 WZ
71 Civil EE-VII 29.12.05 1.8.05 548946.00 198/06.06.06/EE-VII 10.07.06 21.07.06 535857.00 Completed
72 Civil EE-VII 29.12.05 1.8.05 546604.00 198/06.06.06/EE-VII 10.07.06 21.07.06 535857.00 Completed
73 Civil EE-VII 29.12.05 1.8.05 574767.00 198/06.06.06/EE-VII 10.07.06 21.07.06 535857.00 In Prog.
74 Civil EE-VII 29.12.05 25.8.05 299267.00 3/05.04.06/EE-VII 07.04.06 15.05.06 299131.00 Completed
75 Civil EE-VII 29.12.05 14.7.05 221545.00 4/05.04.06/EE-VII 17.04.06 23.05.06 221475.00 Completed
76 Civil EE-VII 29.12.05 14.7.05 667474.00 319/25.09.06/EE-VII M/s J.R Const. 25.09.06 24.10.06 666999.00 Completed
77 Civil EE-VII 29.12.05 24.8.05 280457.00 6/5.04.06/EE-VII 10.04.06 28.06.06 280356.00 Completed
Stg of rds by pdg Dense carpet from 6/19 to Radhy Shyam Mandir Chowk, E -270 to 159, 7/1 to 7/82 and E 404 to E 382 in Ramesh Nagar in C 124 WZ
M/s R.P Singhal & Co.
Stg of rds by pdg dense carepet from B-18/11 to B 7/1 and 18/12 to 1/1 in Ramesh Nagar C 124 WZ
M/s R.P Singhal & Co.
stg of rds by pdg Dense Carpet from 40/1 to 40/23 and 31/5 to 32/1 in Ramesh nagar c 124 WZ
M/s R.P Singhal & Co.
Imp to lane by pdg RMC from L 116 to L 101 in Kirti Nagar in C 124 WZ
M/s Sahil Builders
Imp to lane by pdg RMC from back side of E 382 to E 355, E 275 to E 289 and E 260 to E 263 in E bl;cok Ramesh Nagar in C 124 WZ
M/s Sahil Builders
Imp to lane by pdg RMC from A -1 to A 24, B-1 to B 26 and opp Shop no. 42 (Old mkt) in double storey Ramesh Nagar C 124 WZ
Imp to pavment by pdg K/S and CC Flooring in Chowk and approach lanes of 1 blcok Moti Nagar in C 123 WZ
M/s Vijay Kumar Gupta
78 Civil EE-VII 29.12.05 2.9.05 367945.00 5/5.04.06/EE-VII 7.04.06 10.07.06 367869.00 Completed
79 Civil EE-VII 5.1.06 4.1.06 144799.00 611/01.03.06/EE-VII 05.04.06 08.06.06 144640.00 Completed
80 Civil EE-VII 5.1.06 4.1.06 138437.00 589/14.02.06/EE-VII M/s Rajeev 17.02.06 20.04.06 138058.00 Completed
81 Civil EE-VII 5.1.06 4.1.06 152526.00 573/08.02.06/EE-VII 10.02.06 24.04.06 150912.00 Completed
82 Civil EE-VII 5.1.06 4.1.06 341251.00 20/10.04.06/EE-VII 17.04.06 04.09.06 328666.00 Completed
83 Civil EE-VII 5.1.06 4.1.06 349793.00 49/12.04.06/EE-VII 4.05.06 18.07.06 349684.00 Completed
84 Civil EE-VII 19.1.06 18.1.06 79400.00 320/25.09.06/EE-VII 27.09.06 15.01.07 66707.00 Completed
85 Civil EE-VII 19.1.06 17.1.06 72613.00
86 Civil EE-VII 19.1.06 17.1.06 141661.00
Imp to lane by RMC and Drain in Mother dairy Mkrt Karam Pura, Const of Tree Platform in E & F bloc Karam Pura, and Imp to Pavment along temple TC Block in New Moti Nagar in C 123 WZ
M/s Vijay Kumar Gupta
Imp to lane by pdg CC behind 19/14 to 13/14 In East Punjabi Bagh C 123 WZ
M/s R.K Enterprises
Imp to lane by pdg RMC from 2/54 to 2/41 and 2/13 to 2/13Ain 2 Block Ramesh Nagar in C 124 Wz
Imp to rd by pdg MP from 3/62 to 8/9 in ramesh Nagar in C 124 WZ
M/s Dabas Builders
Imp to lane by pdg RMC from 88A to 95 B and 1A to 95 B in A B Block S/S, in Ramesh Nagar in C 124 Wz
M/s Sahil Builders
const and stg of B/wall of park near NG Drainn in F bloci Moti Nagar C 123 Wz
M/s Vijay Kumar Gupta
Const of desginer gate in park between H.no;. I -7 to I- 26 in I Block Kirti Nagar in C 124 Wz
M/s Ravindra Const.Co
stg of Outer suface of Jai Dev park (Flatted area) B/wall (By pdg Grit wash) C 123 Wz
Const f lane and pavment infornt of H.no. E 179 and F 191 in Karam Pura in C 123 wz
87 Civil EE-VII 07.03.06 25.01.06 199406.00 794/30.03.06/EE-VII 15.06.06 10.07.06 199391.00 Completed
88 Civil EE-VII 28.03.06 25.03.06 59802.00 127/18.05.06/EE-VII 20.05.06 02.09.06 59474.00 Completed
89 Civil EE-VII 28.03.06 25.03.06 190170.00 134/18.05.06/EE-VII 25.05.06 04.07.06 189744.00 Completed
90 Civil EE-VII 28.03.06 25.03.06 199716.00 64/25.04.06/EE-VII 25.04.06 26.06.06 199492.00 Completed
91 Civil EE-VII 29.03.06 27.03.06 193577.00 105/15.05.06/EE-VII 17.05.06 20.06.06 193495.00 Completed
Status Report of MLA,Sh. Ramakant Gosomi, AC No. 66 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1
Civil EE-I 25.5.05 28.4.05 400600.00 187/06..09.05/EE-I 16.09.05 15.12.05 381036
Completed
2Civil EE-I 25.5.05 11.5.05 358400.00 126/22.08.05/EE-I 31.08.05 31.03.06 247207
Completed
Imp to lane by CC from H.no.301 to 311,275 to 299,157 to 191 and 145 to 155(Both side) In 1 block karam
pura C/123/WZ
M/s Sachin Kumar Gupta
Imp of lane by Pdy. CC from D-18 to D-14 in D-block Kirti Nagar C-
124 W.Z
M/s Mahinder Kumar Khurana
Imp of lane by Pdy.RMC from I-136 To I-112 in Kirti Nagar C-124
W.Z
M/s Mukesh Builders
Imp Of lane by CC and Drainage System from Rama Road to I-113 in
I-block Kirti Nagar C-124 W.Z
M/s Birla Const.Co.
Imp of lane and Chowk by Pdy. CC and Kota Stone Behind H.no C-149
in Moti Nagar C-123 W.Z
M/S Apoorv Builders and Contractors
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Const of skating ring adjacement to Booster Pumping station of
DJB Nagr in C-125. KBZ
M/s Rakesh Enterprises
Imp to crossing near HNO 33/9 by pdg c.c. in W.P. Nagar in C-
125 A/KBZ
M/s Kuldeep Singh
3Civil EE-I 25.5.05 28.4.05 443900.00 111/08.08.05/EE-I 09.08.05 20.10.05 303734
Completed
4Civil EE-I 25.5.05 28.4.05 443200.00 112/EE-1/8.8.05 9.8.05 6.10.05 299643
Completed
5Civil EE-I 2.6.05 28.4.05 383000.00 283/7.11.05/EE-I 8.11.05 16.02.06 237619
Completed
6
Civil EE-I 2.6.05 11.5.05 528100.00 257/10.10.05/EEI 11.10.05 29.12.05 327577
Completed
7
Civil EE-I 3.8.05 13.6.05 249200.00 273/25.10.05/EE-I 11.11.05 12.01.06 167600
Completed
8Civil EE-I 3.8.05 13.6.05 135500.00 285/07.11.05/EE-I 14.11.05 10.02.06 95031
Completed
9
Civil EE-I 23.02.06 28.01.06 189563.00 32/16.05.06/EE-I M/s J.S Const. 28.07.06 16.09.06 189424
Completed
10Civil EE-I 23.02.06 28.01.06 164388.00 553/23.03.06/EE-I M/s Jai Kumar 02.05.06 20.07.06 161374
Completed
11
Civil EE-I 23.02.06 28.01.06 192817.00 558/29.03.06/EE-I 07.04.06 10.06.06 192817
Completed
Imp to back lane by pdg c.c. from HNO1/1 to 1/8 in West Patel Nagarin C-125 B/ KBZ
M/s Hem Lata Const.Co.
Imp to back lane by pdg c.c. from HNO 3/17 to 3/32 in West
Patel Nagr in C-125 A/KBZ
M/s Kritiaka Consts
C/o walkway opp Gaushala in Gaushala Park in Prem Nagar in
C-125/KBZ
M/S pappu seth
Imp to drainage system form HNO 33/9 to Community Centre 26 block in West Patel Nagr in
C-125 AKBZ
M/S S.P.Consts
Imp to back lane by pdg c.c. pavement & S.w drainage from
14 a/ 32 jto 14 a/41 in WEA in c-126/K.B.Z
M/s Aggarwal Builders & Promotors
Imp to back lane by pdg c.c flooring from 9 A/68 to 9 A/72 in
WEA in C-126/KBZ
M/S S.K Aggarwal
Imp to road by Pdg c.c Pavment from 2253/f to 2247 and near
2253/B 7 In Ranjeet nagar in C-126/kbz
Imp to road by c.c pavement from 2252/A-7 to 2253/6 in
Ranjeet Nagar in C-126/KBZ
Imp ro road by pdg. C.c pavement from 2253/C-3 to
2253/D-7 and from Gopla Dairy to 2253/A-1 in Ranjeet Nagar in
C-126/KBZ
M/s Narendar Singh Dhankar
12
Civil EE-I 10.03.06 28.01.06 699800.00 130/26.09.06/EE-I 03.10.06 02.01.07 621666
Completed
13
Civil EE-I 10.03.06 28.01.06 698400.00 243/04.12.06/EE-I 12.12.06 10.03.07 620454
Completed
Const of Hanuman Vyayamshela Park in E&F Block Ranjeet
Nagar in C-126/KBZ
M/S S.K Aggarwal
Const of Modern Umbrella canompy in sataym park near
satyam cinema in Ranjeet Nagar in C-126/KBZ
M/s Rakesh Enterprises
Status Report of MLA,Sh. P.C. Yogi, AC No. 67S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil Pr KBZ 20.5.05 17.5.05 885200.00 33/11.11.05 18.11.05 21.11.05 699235 Completed
2 Civil EE-I 1.6.05 31.5.05 185900.00 140/EE-I 22.8.05 26.8.05 6.10.05 168384 Completed
3 Civil EE-I 1.6.05 31.5.05 80800.00 153/24.08.05/EE-I 02.09.05 29.11.05 64099 Completed
4 Civil EE-I 1.6.05 31.5.05 195800.00 143/EE-1/22.8.05 23.8.05 15.9.05 103578 Completed
5 Civil EE-I 1.6.05 31.5.05 577000.00 148/22.08.05/EE-I 23.08.05 03.11.05 435503 Completed
6 Civil EE-I 1.6.05 31.5.05 295800.00 152/24.08.05/EE-I 20.08.05 30.11.05 215293 Completed
7 Civil EE-I 1.6.05 31.5.05 162400.00 159/24.08.05/EE-I 12.09.05 05.12.05 119108 Completed
8 Civil EE-I 1.6.05 31.5.05 188200.00 142/22.08.05/EE-I 30.08.05 20.06.06 137841 Completed
9 Civil EE-I 1.6.05 31.5.05 411800.00 146/22.08.05/EE-I 23.08.05 30.11.05 317486 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp & stg of Internal roads in C block Inderpur Naraina in KBZ ,
by pdg dense Carpet.
M/s Radhey Shyam
Imp to chowk by RMC from I- 181 to I-195 in I block Naraina
Vihar in C-128/KBZ
M/s Kuldeep Singh
Imp to Nalla from gate NO-1 to gate NO-2 in I block Naraina
Vihar in C-128/KbZ
M/s Pankaj Contractors
Imp to road berms by tiles and c.c from DESU transformer to
Dalao in I block Narina Vihar in C-128/KBZ
M/s Ganga Const Co
Imp to chowk by RMC along A-6 and A-7 in A block Naraina
Indl. Area PH-II in c-128/KBZ
M/s Kuldeep Singh
Imp to gali by c.c. and drainage by open Surface drain from HNO
E-164 to E-170 in E block Narina Vihar in C-128/KBZ
M/s Abhishek Enterprises
Imp to walkway of park near HNO E-26 in E block Naraina
Vihar in C-128/KBZ
M/s Hem Lata Const.Co
Imp to gates of parks NO_5 in E block Naraina Vihar in
c-128/KbZ
M/s Kuldeep Singh
Imp to lane by RMC along A-5 and A-8 in A block Naraina Indl. Area PH-II C-128/KBZ
M/s Kuldeep Singh
10 Civil EE-I 2.6.05 1.6.05 141900.00 182/EE-I/5.9.05 10.9.05 5.11.05 91957 Completed
11 Civil EE-I 2.6.05 1.6.05 256500.00 176/05.09.06/EE-I 13.09.05 12.10.05 164665 Completed
12 Civil EE-I 2.6.05 1.6.05 399200.00 139/EE-I/22.8.05 22.8.05 14.10.05 239326 Completed
13 Civil EE-I 2.6.05 1.6.05 372900.00 141/22.08.05/EE-I 23.08.05 04.10.05 249302 Completed
14 Civil EE-I 2.6.05 1.6.05 228300.00 133/EE-I/22.8.05 24.8.05 4.10.05 157220 Completed
15 Civil EE-I 27.7.05 7.7.05 261200.00 173/EE-I/5.9.05 5.9.05 7.11.05 173628 Completed
16 Civil EE-I 27.7.05 7.7.05 394700.00 312/29.11.05 23.01.06 26.02.06 263188 Completed
Imp to lane by c.c. & drainage from 23/17 to 23/24 & by lanes
of 23 block in old Rajinder Nagre C-127 A/KBZ
M/s Inder Entp.
Imp to drainage system & side berm from shanker road to Narin
Swami Marg along block NO :4,4A 4B &4D block in old Rajinder Nagr in C-127/KBZ
M/s Inder Entp.
Imp to lanes by pdg drainage & c.c. along park in F -432 to F-
273 in New Rajinder Nagr In c-127 A/kBZ
M/s Inder Entp.
Imp to lanes by pdg drainage & c.c. along park in F -432 to F-
273 in New Rajinder Nagr In c-127 A/KBZ
M/s Inder Entp.
Imp to Square by pdg c.c near R-871 & R877 in New Rajinder
Nagr C-127 A/KBZ
M/s Manish Assoc.
Imp to lane by pdg drainage & C.C from HNO. 4A/1 to 4 A/16
& 4A/20 to 4 A/32 in old Rajinder Nagar in W.No 127 A
KBZ
M/s Inder Entp.
Imp to lane by pdg c.c from HNO R-880 to R-510 in R block,
New Rajinder Nagr W.No 127 A/KBZ
M/s P.R .Const.Co
17 Civil EE-I 27.7.05 7.7.05 318700.00 324/08.12.05/EE-I 19.12.05 12.07.05 275517 Completed
18 Civil EE-I 27.7.05 7.7.05 173400.00 269/21.10.05/EE-I 24.10.05 23.03.06 104339 Completed
19 Civil EE-I 29.7.05 22.6.05 259100.00 178/EE-I/5.9.05 5.9.05 11.10.05 172905 Completed
20 Civil EE-I 29.7.05 14.7.05 261200.00 258/10.10.05 27.02.06 08.05.06 178824 Completed
21 Civil EE-I 29.7.05 14.7.05 185733.00 295/21.11.05/EE-I 28.11.05 31.12.05 183460 Completed
22 Civil EE-I 1.8.05 31.5.05 198900.00 201/14.09.05/EE-I 12.09.05 23.12.05 198900 Completed
23 Civil EE-I 1.8.05 31.5.05 196700.00 213/20.09.05 30.09.05 29.12.05 196542 Completed
24 Civil EE-I 1.8.05 31.5.05 192700.00 167/30.08.05/EE-I 12.09.05 23.11.05 192700 Completed
Imp to lane & by lanes by pdg RMC from HNO D-169 to 173 & HNO D-140 to 150 in New
Rajinder Nagar w.no 127 A/KBZ
M/s Amit Consts.
Imp to footpath & pdg drainage system near Sindhi Pachayat & 10 block in old Rajinder Nagr in
W.NO 127 A K>B>Z
M/s Inder Entp.
Imp to lane by pdgc.c. & drainage in lane & by lanes of 4 D block from 4 D/29 to 4D/36 4D/21 to 4D/56 in old Rajinder
Nagr in w.no 127 A/KBZ
M/s Inder Entp.
pdg c.c path main entreance upto Pyres in Cremation ground Inderpuri in C-127 B/KBZ
M/s Tajinder Const.Co
Imp to outer Boundary wall by raising & fencing at Cremation
ground , Inderpuri C-127/B/KBZ
M/s Tajinder Const.Co
Imp to drainage from D-92 to D-98 , D-85 to D-88, D-56 to D-62 in D block , Naraina Vihar ,in C-
128/KBZ
M/s Sahil Consts.
Imp to drainage b y open surface drain from E-231 to E-223 in E
block Naraina Vihar in C-128/KBZ
M/s Bagga Builders
Imp to drainage system by open Surface drain along park , Tulsi garden in G block Naraina Vihar
in C-128/KBZ
M/s Harish Kumar
25 Civil EE-I 1.8.05 14.7.05 199800.00 297/21.11.05 24.01.06 05.05.06 192945 Completed
26 Civil EE-I 8.8.05 31.5.05 298900.00 303/24.11.05/EE-I 24.11.05 15.12.05 298900 Completed
27 Civil EE-I 8.8.05 31.5.05 376424.00 445/09.01.06/EE-I 08.02.06 18.06.06 366958 Completed
28 Civil EE-I 8.8.05 31.5.05 495300.00 323/05.12.05 06.03.06 12.05.06 460426 Completed
29 Civil EE-I 8.8.05 7.7.05 188500.00 27/05.05.06/EE-I 16.05.06 20.07.06 142343 Completed
30 Civil EE-I 8.8.05 7.7.05 197700.00 268/21.10.05/EE-I 21.10.05 20.06.06 148751 Completed
31 Civil EE-I 8.8.05 7.7.05 198900.00 491/23.01.06/EE-I 04.09.06 26.12.06 139374 Completed
32 Civil EE-I 8.8.05 7.7.05 420500.00 319/05.12.05/EE-I 05.12.05 07.01.06 336810 Completed
33 Civil EE-I 8.8.05 7.7.05 270800.00 321/05.12.05/EE-I 05.12.05 23.01.06 270733 Completed
Imp to Surrounding of fuel Shed by Raising of B/wall and
pdg M.S. gate in Shed at Cremation ground Inderpuri in
C-127 B
M/s Tajinder Const.Co
Imp of B/wall of park near C-96 in C block Narain Vihar in c-
128/KBZ
M/s Kuldeep Singh
Imp to B/wall of park from Pump House to C-91 in C block
Naraina Vihar in c-128/KBZ
M/s P.R .Const.Co
Imp to back lane by RMC from C-159 to C-142 in C block NIA
PH-I in W.NO 128/KBZ
M/s Kuldeep Singh
Imp to road by C.C. from E-277 to E-292, in E block , Naraina
Vihar in C-128/KBZ
M/s Raj Builders
Const of Gate of park opp E-253, E block Naraina Vihar in C-
128/KBZ
M/s P.R .Const.Co
Const of Gate of park ( Apna park) opp Union Bank of India in
E block Naraina Vihar in C-128/KBZ
M/s Amit Consts.
Imp to road by inter locking tiles from E-242 to E-248 E-249 to
E259 E-203 to E-210 and E221 to E233 in E block Naraina
Viahar in C-128/KBZ
M/s Kuldeep Singh
Imp to B/wall of park near Z-180, Loha Mandir in C-128/KBZ
M/s Kuldeep Singh
34 Civil EE-I 8.8.05 7.7.05 195200.00 172/05.09.05/EE-I 03.03.06 21.11.06 195180 Completed
35 Civil EE-I 8.8.05 12.7.05 197700.00 185/05.09.05/EE-I 02.03.06 12.01.07 197700 Completed
36 Civil EE-I 8.8.05 12.7.05 195300.00 215/20.09.05/EE-I 02.03.06 31.07.06 194942 Completed
37 Civil EE-I 9.8.05 7.7.05 264000.00 351/14.12.05/EE-I 09.01.06 16.03.06 179598 Completed
38 Civil EE-I 9.8.05 7.7.05 262500.00 16/05.05.06/EE-I 12.05.06 22.09.06 197339 Completed
39 Civil EE-I 9.8.05 7.7.05 186000.00 406/30.12.05 05.01.06 08.04.06 128038 Completed
40 Civil EE-I 9.8.05 7.7.05 199600.00 298/21.11.05/EE-I 01.12.05 14.02.06 165984 Completed
41 Civil EE-I 9.8.05 7.7.05 129900.00 292/11.11.05/EE-I 12.11.05 16.12.05 117018 Completed
42 Civil EE-I 9.8.05 7.7.05 144500.00 296/21.11.05/EE-I 01.12.05 14.02.06 129720 Completed
Imp to lane by C.C from Z-195/1 to Z174 in Z block Loha Mandir
in C-128/KBZ
M/s Jaswinder Gulati
Imp to lane by C.C from Z-145 to Z-173 in Z block Loha Mandi
in C-128
M/s R.S Const.CO
Imp to lane by C.C form Z-82/1 to Z-106 in Z block Loha Mandi
in c-128
M/s Plan-Up-Consts.
Imp to lane by pg C.C and drainage from 6/9 to 6/88 in Old
Rajinder Nagar C-127 A
M/s Kishore & Co.
Imp to lane from 7/1 to 7/46 by pg C.C and drainage system in old Rajender Nagar C-127 A
M/s Raj Builders
Imp to lane and by lanes from H.No 11 A/4 to 11 A/6 and 11
A/13 to 11 A/18 by pdg C.C and drainage in Old Rajinder Nagar
W.No 127 A
M/s Shiv Kumar Gupta
Imp to drainage and berms of road from H.No 700 to 710 and near 716 in Double storey New
Rajender Nagar in C-127 A
M/s Raj Builders
Imp to lane by pdg C.C. from H.No 23/1 to 23/6 in Old
Rajender Nagar in W.No C-127 A
M/s Inder Entp.
Imp to drainage system at Crossing , R-736 , R-724 , and R-685 in New Rajender Nagr
W.No 127 A
M/s Raj Builders
43 Civil EE-I 9.8.05 7.7.05 328700.00 25/05.05.06/EE-I 10.06.06 01.08.06 251134 Completed
44 Civil EE-I 9.8.05 7.7.05 65000.00 255/10.10.05/EE-I 12.10.05 19.01.06 64834 Completed
45 Civil EE-I 9.8.05 7.7.05 199600.00 334/14.12.05 19.12.05 28.02.06 125290 Completed
46 Civil EE-I 18.8.05 7.7.05 261500.00 461/18.01.06 28.01.06 27.04.06 182994 Completed
47 Civil EE-I 18.8.05 7.7.05 154600.00 29/05.05.06/EE-I 13.06.06 01.08.06 116278 Completed
48 Civil EE-I 20.9.05 29.8.05 343500.00 437/03.01.06/EE-I 12.01.06 24.03.06 250920 Completed
49 Civil EE-I 20.9.05 29.8.05 247200.00 550/20.03.06/EE-I 12.05.06 24.06.06 188567 Completed
50 Civil EE-I 20.9.05 15.9.05 261300.00 499/27.01.06/EE-I 27.02.06 13.07.06 183540 Completed
Imp to lane by pdg C.C. and drainage from H.No R-806, to R-800 in R block , New Rajender
Nagar W.No 127 A
M/s Sunil Enterprises
Imp to footpath and side berms near B/wall of Salwan School Mkt in Old Rajinder Nagar in
W.No 127 A
M/s S.P Consts.
Imp to footpath & drainage on Shankar road from odean park to 35 block, old Rajender Nagr in
W.No 127 A
M/s Ma Bhoomika Enterprises
Imp to back lane of 35 block by pdg C.C. & drainage from
Shanker road to water tank in old Rajender Nagar W.No 127 A
M/s Shiv Kumar Gupta
Imp to side berm by C.C from Bara Bagar Marg to Salwan
Public School in old Rajinder Nagar W.No 127 A
M/s Inder Entp.
Imp to lane by pdg RMC from D/S 670 to D/s -681 in New
Rajender Nagar C-127 A/KBZ
M/s Inder Entp.
Imp to B/Wall of park between R- block & J-block New
Rajender Nagar w.no 127 A K.B.Z
M/s Vikas Const.CO
Imp to lane of 4 D block by C.C form 4D/13 to 4 D/48 and 4D/29 to 4D/64 in Old Rajender Nagr
W.No 127 A K.B.Z.
M/s Vikas Const.CO
51 Civil EE-I 20.9.05 10.9.05 198600.00 549/20.03.06/EE-I 29.08.06 04.05.09 111335 Completed
52 Civil EE-I 20.9.05 10.9.05 161300.00 444/09.01.06 19.01.06 28.03.06 103753 Completed
53 Civil EE-I 20.9.05 10.9.05 235900.00 433/03.01.06/EE-I 05.01.06 18.02.06 164057 Completed
54 Civil EE-I 20.9.05 10.9.05 226200.00 503/27.01.06 07.03.06 02.05.06 167423 Completed
55 Civil EE-I 18.1.05 19.7.05 725000.00 52/10.02.06 08.05.06 12.05.06 695587 Completed
56 Civil EE-I 14.11.05 11.11.05 262800.00 523/23.02.06 28.02.06 3.04.06 152011 Completed
57 Civil EE-I 21.11.05 21.11.05 140860.00 472/18.01.06/EE-I 15.03.06 05.05.06 95699 Completed
58 Civil EE-I 21.11.05 21.11.05 336428.00 511/07.02.06/EE-I 27.02.06 04.04.07 336281 Completed
Imp to back lane and front lane by pdg drainage and C.C
from ,H.NO 17/11 to 17/16 in Old Rajinder Nagr in C-127
A/KBZ
M.s Amit Consts.
Imp to drainage system and berm from Shop No-27 to Shop no 52 in Market Old Rajender Nagar
C-127 A/KBZ
M/s Raj Builders
Pdg walkway of park opp R-876 in R-block New Rajender Nagar
in C-127A/KBZ
M/s Kuldeep Singh
Imp to lane by pg RMC and drainage from H.NO D/S 685 to
697 in Double storey in New Rajender Ngar in C-127 A/KBZ
M/s Vikas Const.CO
Resurfacing of carriageway from Behel Nursing home toB-96 in
B-block Naraina in KBZ (By pdg B.M. and mix seal)
M/s Sanjeev Kumar &
Bros.
Imp to foot path by kota stone along Sindhu Samaj in Old Rajinder Nagr W.NO-127 A
K.B.Z
M/s Raj Builders
Imp to lane by c.c. and drainage from WZ-114 to 110 C in
Naraina Village in C-128/KBZ
M/s Shah Builders
Imp to lane by RMC from B-104/5 B-103 in B block NIA
( Naraina Indl Area )PH-I in C-128/KBZ
M/s Kuldeep Singh
59 Civil EE-I 21.11.05 10.9.05 331442.00 514/07.02.06/EE-I 27.02.06 20.06.06 331300 Completed
60 Civil EE-I 1.12.05 11.11.05 384500.00 557/23.03.06/EE-I 18.05.06 01.07.06 219557 Completed
61 Hort ADH KBZ 21.21.05 20.9.05 109410.00 37/30.05.06 30.05.06 12.06.06 109410 Completed
62 Civil EE-I 28.12.05 16.12.05 287700.00 556/23.03.06/EE-I 20.04.06 12.06.06 205998 Completed
63 Civil EE-I 28.12.05 16.12.05 290900.00 08/05.05.06/EE-I 13.05.06 22.07.06 219175 Completed
64 Civil EE-I 2.1.06 12.09.05 131400.00 30/16.05.06/EE-(R-I) 28.07.06 24.08.06 130967 Completed
65 Civil EE-I 2.1.06 1.9.05 170300.00 85/02.08.06/EE-I 12.08.06 10.11.06 133792 Completed
66 Civil EE-I 08.03.06 16.12.05 215500.00 60/01.06.06/EE-I 05.06.06 22.07.06 162751 Completed
Imp to B/wall of park along pump Hs in c block Naraina
vihar in W.NO 128/KBZ by pdg B/work & grit wash)
M/s Vikas Const.CO
Const of Shed in Raj Guru park in Rajendra park W.NO-127A/
KBZ
M/s Inder Entp.
P/F of CPA at park infront of H.no. R 616 and R 687 in New
Rajinder Nagar in W.o. 127 KBZ
M/s Mayur Enterprises
Imp to lane by pdg CC and Drainage system H.no. 15/1 to
15/21 in 15-Block, Old Rajinder Nagar w.no. 127A KBZ
M/s Kishore & Co.
Imp to lane by pdg CC and Drainage from H.n. 15/64 to
15/84 in 15 Block. Old Rajinder Nagar in W.no. 124A KBZ
M/s Raj Builders
Imp to B/wall of I -block in Narinan Vihar in C128 KBZ by pdg B/wall, Grill near H.no. I-
183.
M/s J.S Consts.
Imp of B.wall of I block by pdg fixing Iron Grill near I 127, In I
block Narain vihar, in C 128 KBZ
M/s Vikas Const.CO
Imp of lane by pdg. C.c. and drainage from H.NO. 15/71 to 15/8 in 15-block old Rajinder
Nagar in W.NO. 127/KBZ
M/s Raj Builders
67 Civil EE-I 08.03.06 16.12.05 222700.00 56/01.06.06/EE-I 05.06.06 22.07.06 167497 Completed
68 Civil EE-I 08.03.06 29.08.05 182600.00 45/22.05.06/EE-I 12.07.06 14.08.06 182509 Completed
Imp of lane by pdg. C.c. and drainage from H.NO. 15/15 to 15/78 in old Rajinder Nagar in
W.NO. 127A/KBZ
M/s Raj Builders
Pdg. C.C from H.NO. WZ-133 to WZ-463 (upto end) in Dusghara
Village in W.NO. 127B/KBZ
M/s Sahil Consts.
Status Report of MLA,Sh S.P. Ratawal, AC No. 68 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XXIX 1.8.05 27.7.05 160000.00 125/XXIX/6.9.05 6.9.05 28.9.05 147536 Completed
2 Civil XXIX 1.8.05 27.7.05 396582.00 144/28.09.05/XXIX 28.09.05 20.10.05 396440 Completed
3 Civil XXIX 18.8.05 27.7.05 406800.00 440/16.05.06/EE-XXIX 16.02.06 29.03.06 384316 Completed
4 Civil XXIX 18.8.05 27.7.05 436900.00 407/10.02.06 15.02.06 30.03.06 417716 Completed
5 Civil XXIX 18.8.05 27.7.05 326000.00 430/15.02.06 24.02.06 10.04.06 317746 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp to intersection on B.C Marg W.E.A by pdg chequrred tiles in
C-129 B/KBZ.
M/S Shiv Shankar Gupta Imp to foot path at New Rohtak
road from Faiz road to Ramjas road in C-129 A KBZ.
M/s Ved Pal Bhatia
Imp to lanes from T/2421, to, T/2405, T/2402, T/2413 to to
T/2316, T/2412 to T/2402, T/2397 to T/2435 , T/2445 to
T/2423 by pdg c.c. pav in Subhash Nagar in C-129 /KBZ
M/s Malhotra Const.Co
Imp to lanes from H.No T/2424 to T/2431 . T/2506 T/2396
T,/2474 to T/2489,T/2492 To 2506,T/2477 to T/2487 by pdg
c.c. pav in Subhash Nagar in C-129 A/KBZ
M/s Raj Builders
Imp to road by pdg C.C pav from H,No 13 a /119 to 13 a/103, 13 a/79 to 13 a/33, 13 a/71 to 13 a/41 in 13 A block WEA ( slum
qtrd) in C-129 A/KBZ
M/s Narender Singh Dhankar
6 Civil XXIX 18.8.05 27.7.05 263500.00 189/24.11.05/XXIX 05.01.06 18.01.06 254392 Completed
7 Civil XXIX 18.8.05 27.7.05 262240.00 187/14.11.05/XXIX 13.12.05 15.12.05 253587 Completed
8 Civil XXIX 18.8.05 27.7.05 327600.00 367/23.01.06 23.01.06 25.04.06 323851 Completed
9 Civil XXIX 24.8.05 27.7.05 274250.00 204/13.11.05/XXIX 09.12.05 30.01.06 273643 Completed
10 Civil XXIX 24.8.05 27.7.05 123692.00 241/13.12.05/EE-XXIX 01.05.06 01.06.06 122358 Completed
11 Civil XXIX 24.8.05 27.7.05 256810.00 153/28.09.05/XXIX 19.10.05 21.10.05 255761 Completed
12 Civil XXIX 24.8.05 27.7.05 256742.00 190/24.11.05/XXIX 05.01.06 17.01.06 256394 Completed
13 Civil XXIX 24.8.05 27.7.05 257658.00 186/14.11.05/EE-XXIX M/s N.C & Co. 19.12.06 24.12.06 256779 Completed
14 Civil XXIX 24.8.05 27.7.05 195710.00 126/XXIX/6.9.05 6.10.05 10.10.05 195601 Completed
15 Civil XXIX 24.8.05 27.7.05 190545.00 154/28.09.05/XXIX 14.10.05 18.10.05 190412 Completed
Pdg Mastic ashphalt on Hardyan Singh road at Guru Nanak Rd E-ing in c-130/KBZ
M/s Kapoor Bros.
Imp to road by pdg mastic on Padam Singh road & Viahnu Mandir Marg X-ing in C-130
/KBZ
M/s D.K.Enterprise
s
Imp to lane from H.No 6A/Z upto H.NO 6A/66,by pdg c.c. pav in
WEA in C-129 A/KBZ
M/s Amit Const.
Imp to lane from H.No 8621 to Rattan Nagar by pdg c,c, flooring
in c-129B
M/s Som Const.Co
Imp to gali no -8 remaining portion by pdg c.c. pav in 5 A
block WEA C-129 KBZ
M/s Chirag Const.Co
Imp to X-ing of Saraswati Marg & Arya Samaj road by pdg
Mastic in C-129
M/s Bhvuk Const.Co
Pdg Mastic ashphalt on X-ing of Guru Ravi Das Marg and Tank
road in C-130
M/s A & N Bros.
Pdg Mastic asphalt on X-ing of Padam Singh road and road No-
4 in C-130
Imp to road by pdg Mastic Asphalt on Rattan Nagar main
road opp DCM& Sr. Sec School in c-129
M/s Aggarwal & Co
Imp to road by pdg Mastic asphalt from New Rohtak Road
towards 67 block in c-129
M/s Balaji Associates
16 Civil XXIX 24.8.05 27.7.05 197480.00 149/28.09.05/XXIX 10.11.05 23.12.05 197477 Completed
17 Civil XXIX 24.8.05 27.7.05 198927.00 139/21.09.05 21.09.05 18.10.05 198728 Completed
18 Civil XXIX 24.8.05 27.7.05 199572.00 159/06.10.05/EE-XXIX M/s J.S Const. 16.10.05 08.12.05 198153 Completed
19 Civil XXIX 24.8.05 27.7.05 268711.00 227/07.12.05/EE-XXIX 16.12.05 08.03.06 268407 Completed
20 Civil XXIX 26.8.05 27.7.05 264200.00 494/10.03.06/EE-XXIX 15.06.06 25.08.06 169700 Completed
21 Civil XXIX 26.8.05 17.8.05 447700.00 314/06.01.06/EE-XXIX 27.02.06 02.05.06 343998 Completed
22 Civil XXIX 26.8.05 17.8.05 575600.00 490/10.03.06/EE-XXIX 11.01.07 22.02.07 399309 Completed
23 Civil XXIX 26.8.05 17.8.05 592700.00 313/06.01.06/EE-XXIX 27.02.06 04.05.06 455388 Completed
24 Civil XXIX 26.8.05 17.8.05 588400.00 315/06.01.06/EE-XXIX 27.02.06 25.04.06 452113 Completed
25 Civil XXIX 26.8.05 17.8.05 597000.00 452/24.02.06/EE-XXIX 10.01.07 22.02.07 456996 Completed
Imp to foot path at Arya Samaj road from R/A to Gurudwara road in C-129A/KBZ (by pdg
Chequrred tiles)
M/s Amir Const.Co
Imp to Joshi road by pdg Metalling & premixing from H.No 847 upto Joshi Hospital in c-129
M/s Tyagi Associates
Imp to Joshi road by pdg metalling premixing from D.B.
gupta road upto H.No 847 in C-129 A
Imp to faiz road by C.c. in C-129/KBZ
M/s M.G.Const.Co
Imp to walkway passage in the park behind cremation ground
( Sat Nagr ) in WEA in C-129/KBZ
M/s Pawan Kumar
Imp to road No-6 pdg mastic from round abant up to Sai Baba mandir in C-129/B K.B.Z(in Dev
Nagar)
M/s Star Enterprises
Imp to Joshi road by pdg mastic from D.B.Gupta road X-ing upto
gali no-18 in C-129/KBZ
M/s Maman Chand Bansal
Imp to Joshi road by pdg mastic from round abant to gali no-6 in
C-129./KBZ
M/s Star Enterprises
Imp to Johsi road by pdg masic from gali NO-18 to round abant
in C-129/KBZ
M/s Star Enterprises
Imp to Joshi road by pdg mastic from gali NO-6 to New Rohtak
road in C-129/KBZ
M/s Maman Chand Bansal
26 Civil XXIX 26.8.05 17.8.05 260700.00
27 Elect XXIX 13.9.05 27.7.05 286037.00 02.01.06 16.01.06 277857 Completed
28 Civil XXIX 13.9.05 27.7.05 175610.00 219/1.12.05/EEXXIX 8.12.05 31.1.06 175459 Completed
29 Civil XXIX 13.9.05 17.8.05 220255.00 143/XXIX/28.9.05 M/s R& T Entp 28.9.05 1.15.02 218484 Completed
30 Civil XXIX 13.9.05 17.8.05 257898.00 209/30.11.05/XXIX 18.01.06 02.02.06 257792 Completed
31 Civil XXIX 13.9.05 17.8.05 174965.00 142/28.09.05 M/s R.S & Co. 28.09.05 01.12.05 174867 Completed
32 Civil XXIX 13.9.05 17.8.05 67386.00 240/13.12.05 22.12.05 20.03.06 67321 Completed
33 Civil XXIX 13.9.05 17.8.05 160000.00 195/24.11.05/XXIX 28.11.05 29.11.05 158446 Completed
Impt o road by pdg premix carpet from X-ing Gaushala marg ( Rattan Nagar ) upto
Nallah in C-129/KBZ
Pro and Installation testing & Commissioning of 16M high
mast in Ajmal Khan prk infront of gangeshwar Dham in C-129
under K.BZ
228/02.01.06/EE(E)-VII
M/s Himanshu Enterprises
Impt o foot path ( remaining poriton) in Tikona park in C-
130/KBZ by Red Sand stone.
M/sSehgal Bros
Imp to back lane from H.NO 12 A/5 to B.C Marg & road No-10 WEA in C-129 A (by pdg C.C)
Imp to X-ing of Saraswati Marg & Hardhyan Singh road by pdg
mastic in C-129
M/s Ashok Kumar Gupta
Imp to foot path at Faiz road in C-129 A/KBZ
Imp to foot path Manas Mandir on D.B Gupta road in C-129/KBZ
M/s Sanjeev Const.
Imp to road by pdg mastic ashphalt of remaining portion in 65 block ,New Rohtak road C-
129/KBZ
M/s Anil Const.
Status Report of MLA,Sh M.L. Sodhi, AC No. 69 2005-06S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil EE-III 11.5.05 10.5.05 246300.00 276/25.08.05/EE-III 02.01.06 21.04.06 221228.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
P/l C.C. pavement in Gali no 2 Shyam Ji Mal lane in C-1312 B SPZ
M/s Rakesh Kumar
2 Civil EE-III 3.6.05 2.5.05 182460.00 369/11.11.05/EE-III 21.06.06 26.02.07 181939 Completed
3 Civil EE-III 3.6.05 2.5.05 184075.00 78/11.05.06/EE-III 23.05.06 18.08.06 184031.00 Completed
4 Civil EE-III 3.6.05 2.5.05 188757.00 368/11.11.05/EE-III 09.12.06 31.05.07 188222 Completed
5 Civil EE-III 3.6.05 20.4.05 476801.00 345/24.10.05/EE-III 02.11.05 29.03.06 476221.00 Completed
6 Civil EE-III 3.6.05 20.4.05 460073.00 601/31.03.06/EE-III 10.04.06 15.05.06 459389.00 Completed
7 Civil EE-III 3.6.05 20.4.05 470287.00 357/07.11.05/EE-III 17.11.05 28.02.06 469110.00 Completed
8 Civil EE-III 3.6.05 2.5.05 181535.00 352/31.10.05/EE-III 08.11.05 03.04.06 181147.00 Completed
9 Civil EE-III 3.6.05 2.5.05 175355.00
10 Civil EE-III 3.6.05 2.5.05 181346.00 359/07.11.05/EE-III 05.01.06 08.02.06 181080.00 Completed
P/L C.C. in shyam ji Mal lanes gali no 1 from H.No 10578/41 to 10579 and adjoing lanes in c-131 SPZ
M/s Sachin Builders
P/L C.C. in shyam ji Mal lanes gali no 1 from H.No 10578/29 to 10579/46 and adjoing lanes in c-131 SPZ
M/s Kapoor Const.Co
P/L C.C. in shyam ji Mal lanes gali no 1 from H.No 10578/29 to 10578/41 and adjoing lanes in c-131 SPZ
M/s Sachin Builders
P/L C.C an Jhandawalan road from shop NO 10753 to Shop no 10787 in C-131 SPZ
M/s Som Dutt Duevedi
P/L C.C in Jhandawalan road from shop no 10719 to Shop no 10753 in c-131 SPZ
M/s Ganesh builders
P/l of C.C on Jhandewalan road from Idgaha road to shop 10719 in c-131 SPZ
M/s Kapoor Const.Co
P/L C.C in shyam JI Mal lane gali no-2 from H.No 10578/41 to H.No 10579 & in adjoing lanes in C-131 SPZ
M/s Deepak Traders
P/L c.c. in Ram Nagar Gali no -I from H.No 7578 to H.No 7570 and in adjoing lanes C-131 SPZ
P/L C.C in Ram Nagar near gali no-1 from Old Barajkahana to H,NO 7575 and adjoing lanes in c-131 SPZ
M/s.Sehgal Contractor
11 Civil EE-III 3.6.05 1.3.05 182671.00 327/06.10.05/EE-III 05.01.06 30.01.06 182002.00 Completed
12 Civil EE-III 3.6.05 1.3.05 182905.00 358/07.11.05/EE-III 09.01.06 08.02.06 182822.00 Completed
13 Civil EE-III 3.6.05 2.5.05 174645.00
14 Civil EE-III 6.6.05 1.6.05 220500.00 708/09.02.07/EE-III M/s Islamuddin 10.02.07 26.03.07 195801.00 Completed
15 Civil EE-III 6.6.05 1.6.05 174369.00 Completed
16 Civil EE-III 6.6.05 1.6.05 167501.00 365/11.11.05/EE-III 22.05.06 09.06.06 83941.00 Completed
17 Civil EE-III 6.6.05 1.6.06 172359.00
18 Civil EE-III 6.6.05 14.4.06 185864.00 569/27.03.06/EE-III 08.04.06 20.05.06 185766.00 Completed
Imp Gali no 2 by providing c.c. from H.NO 7770 top 7788 and adjoing lanes from H.No 7679 to 7678 and 7872 to 7770 in Ram Nagar C-131 SPZ
M/s.Shree Madhav Builders
Imp to lanes by Providing C.C from H.No 7697/20 to 7703 7695 to 7694,7690 to 7788 ,7683 to 7682,7762 to school 7756 ti 7756 (A) in Ram Nagar SPZ
M/s.Shree Madhav Builders
Imp to Gali No-2 by providing c.c. from Kutabroad to H.No 7789 and adjoing lanes from H.No 7767 to 7764 and 7759 to 7759 (A) in Ram Nagar C-131 SPZ
P/L c.c. pavement in form 6127 Jhandawalan road to 6147 and adjoing lanes in C-131 SPZ
P/L C.C in Krishna Basti from H.No A-519 to H.No A521 and adjoing lanes in C-131 SPZ
P/L C.C. ar Tail Mill road from Girls Se Sec School Ram Nagar to H.No 7408 and in adjoing lanes in C-131 SPZ
M/s Sachin Builders
P/L C.C on tail mill road from H.No 7408 to H.No 7450 and in adjoing lanes in C-131 SPZ
P/L C.C in Pvt Katra NO A-519 to A-521 Kacha Rasta in W.No 131 SPZ
M/s Chuadhary Const.Co
19 Civil EE-III 6.6.05 1.6.05 171769.00 363/11.11.05/EE-III 29.11.05 30.06.06 92261.00 Completed
20 Civil EE-III 6.6.05 1.6.05 246100.00 243/07.09.06/EE-III M/s Nitin Gupta 05.10.06 06.01.07 191653 Completed
21 Civil EE-III 6.6.05 1.6.05 186823.00 566/17.03.06/EE-III 12.04.06 22.06.06 186172.00 Completed
22 Civil EE-III 6.6.05 1.6.05 245400.00 580/30.03.06/EE-III 07.04.06 25.05.06 192993.00 Completed
23 Civil EE-III 6.6.05 1.6.05 245500.00 562/27.03.06/EE-III 03.05.06 30.06.06 191574.00 Completed
24 Civil EE-III 6.6.05 1.6.05 193313.00 563/27.03.06/EE-III 17.04.06 28.06.06 192681.00 Completed
25 Civil EE-III 29.6.05 6.6.05 200478.00 409/23.10.07/EE-III M/s Islamuddin 29.10.07 05.12.07 200372.00 Completed
26 Civil EE-III 29.6.05 6.6.05 171527.00 817/28.03.07/EE-III 18.04.07 15.06.07 171057.00 Completed
27 Civil EE-III 29.6.05 6.6.05 208236.00 289/21.09.06/EE-III 23.10.06 P 208236.00 In Prog.
P/L C.C in Marwari Basti from H.No BB-74 Gali no 2 and adjoing lanes in W-131 SPZ
M/s Ravi Kumar
Malhotra
P/L c.c. in chinot Bastic from H.No C-235 to H.No C-268 and in Adjoing lanes in W.No-131 SPZ
P/L c.c. in Gali Gurudwara (Himmat Singh) Tail mill road along with Gali no 1 and adjoing lanes in c-131 SPZ
M/s D.K Builders
Imp to lane by Providing c.c. flooring from 6552 Near (Nand Band) to 6441 factory road Pradhan chowk in c-131 SPZ
M/s D.K.Const.Co
Imp to lane by providing c.c. flooring from Idgah road to Shankar pio at Cheerch road and adjoing lanes in c-131 SPZ
M/s D.K Builders-I
Imp to lane by providing C.C. flooring from Pradhan chowk along park upto shankar Marg in Nabi Karim c-131 SPZ
M/s D.K Builders-I
P/L C.C in Aram Nagar Amar Puri form H.No A-130 to H.No A-261 and in adjoing lanes in W.No-131 SPZ
P/L c.c. in Ashoka Basti from H.NO BB-300 to H.No BB-270 and adjoing lanes in W.No-131 SPZ
M/s Kaushal Bharat
P/L C.C in Siddarth Nagar from H.No c-100/4 to H.Nop 7513 and in adjoing lanes in W.No-131 SPZ
M/s Neel Traders
28 Civil EE-III 29.6.05 6.6.05 274300.00 280/21.09.06/EE-III 08.11.06 28.11.06 217055.00 Completed
29 Civil EE-III 29.6.05 6.6.05 207476.00 190/26.07.06/EE-III 25.08.06 22.09.06 206494.00 Completed
30 Civil EE-III 29.6.05 6.6.05 168587.00 818/28.03.07/EE-III 27.04.07 16.06.07 168306.00 Completed
31 Civil EE-III 29.6.05 6.6.05 270400.00 281/21.09.06/EE-III 20.11.06 29.11.06 214180.00 Completed
32 Civil EE-III 29.6.05 6.6.05 165503.00 816/28.03.07/EE-III 17.04.07 15.06.07 165128.00 Completed
33 Civil EE-III 29.6.05 6.6.05 203474.00 408/23.10.07/EE-III M/s Sajid Khan 02.11.07 05.12.07 203254 Completed
34 Civil EE-III 29.6.05 6.6.05 265300.00 290/21.09.06/EE-III 25.09.06 P 200538 In Prog.
35 Civil EE-III 29.6.05 6.6.05 210856.00 875/30.03.07/EE-III 03.04.07 P 208253 In Prog.
36 Civil EE-III 25.7.05 1.6.05 228345.00 908/30.03.07/EE-III 30.06.07 05.09.07 226557.00 Completed
P/L M/P in Multani Dhanda gali No-13 from Mother Dariry of H.No 6971 /13 in C-131 SPZ
M/s Naveen Const.
P/L C.C. in Siddarth Nagar from H.No 7513 to H.No AB-328 and in adjoing lanes W-131 SPZ
M/s Rakesh Bansal
P/L C.C. in Siddarth Nagar from H.No AB-328 to H.No AB-427/3 and in adjoing lanes in W-131 SPZ
M/s Kaushal Bharat
P/L M/P premixing in Multani Dhanda from H.NO 8048 to H.No 8005/11 in C-131 SPZ
M/s Naveen Const.
P/L C.C in Amar Puri foarm H.No AB-02 to H.No AB-32, H.No AB-63 to H.Nmo AB-37 and in Adjoing lanes in W-131 SPZ
M/s Kaushal Bharat
P/L C.C. in Krishan Bastic from H.No A-803 to H.No A-583 and H.No A-374 to H.No A-460 and in Adjoing lanes in W-131 SPZ
P/L C.C in Chinot Basti from H.No C-365 to H.No C-328 and in adjoing lanes in W-131 SPZ
M/s Manish Nayyar
Imp to foot path by chequred tiles infront of Hari Mandir School from Slaughter Hs to Shop to 10824 in W.NO-131SPZ
M/s Naveen Const.
P/L C.C. in Laxman Puri from H.No L-243 to H.No L-255 and in Adjoing lanes C-131SPZ
M/s Amit Kumar
37 Civil EE-III 25.7.05 2.6.05 224044.00 804/05.03.07/EE-III 16.03.07 P 220644 In Prog.
38 Civil EE-III 25.7.05 2.6.05 230519.00 152/07.07.06/EE-III 24.07.06 07.09.06 229851 Completed
39 Civil EE-III 25.7.05 2.6.05 213071.00
40 Civil EE-III 25.7.05 2.6.05 226058.00 150/07.07.06/EE-III 31.07.06 21.09.06 225856.00 Completed
41 Civil EE-III 25.7.05 2.6.05 239760.00 155/07.07.06/EE-III 14.07.06 28.09.06 239048.00 Completed
42 Civil EE-III 25.7.05 2.6.05 222464.00 907/30.03.07/EE-III 19.06.07 11.08.07 220799.00 Completed
43 Elect EEE-I 2.8.05 26.7.05 199702.00 153/01.12.05/EEE-I 09.12.05 06.01.06 185494.00 Completed
44 Elect EEE-I 2.8.05 19.7.05 199568.00 158/05.12.05/EEE-I 14.12.05 12.01.06 185035.00 Completed
45 Elect EEE-I 2.8.05 26.7.05 199933.00 156/01.12.05/EEE-I 10.12.05 07.01.06 185508.00 Completed
P/L C.C. in Yogmaya from H.No MSC-72 to H.No MSC-245 and in adjoing lanes in c-131 SPZ
M/s Neel Traders
P/L C.C. in Shyam JI Mal lane from Jhandewalan road to gali no-2 urinal in c-131 SPZ
M/s Sanjeev Builders
P/L c.c. in Multani Dhanda Gali no 12 from H.No 9535 to H.No 9483 and in Adjoing lanes in c-131 SPZ
P/L C.C in Bagichi Allanddin gali no-1 from H.No 10404 to H.No 10417 and in Adjoing lanes in W.No 131 SPZ
M/s Sanjeev Builders
P/L C.C. in Bagichi allanddin Gali no 3 form H.No 10463 to H.No 10468 and in adjoing lanes in C-131 SPZ
M/s Rajesh Const.Co
P/L c.c. in 52 Qtrs from H.No 9512 to H.No 9532 and adjoing lanes in W.No-131SPZ
M/s Amit Kumar
P/O lighting arrangement in w.No131 Laxman Puri, Nabi Karim and adjoing area under S.P.ZSPZ
M/s Miglani Electricals
P/O lighting arrangement in w.No132S.P.Z (LIG,MIG, flats motia khan and gali no 6&8 Motia Khan under S.P.Z
M/s Miglani Electricals
P/O lighting arrangement in W.No 131 Ram Nagar ( Old& New) Prem Nagar and Kadam Sharif under S.P.Z
M/s Miglani Electricals
46 Elect EEE-I 2.8.05 26.7.05 199585.00 155/01.12.05/EEE-I 10.12.05 08.01.06 184787.00 Completed
47 Elect EEE-I 2.8.05 26.7.05 191452.00 154/01.12.05/EEE-I 10.12.05 08.01.06 191299.00 Completed
48 Civil EE-III 4.10.05 17.8.05 182500.00 371/30.11.05/EE-III M/s Arya & Co. 02.12.05 18.01.06 181891.00 Completed
49 Civil EE-III 4.10.05 17.8.05 183800.00 463/24.01.06/EE-III 01.09.06 P 102649.00 In Prog.
50 Civil EE-III 4.10.05 17.8.05 190500.00 356/16.10.06/EE-III 30.11.06 10.02.07 190119.00 Completed
51 Civil EE-III 4.10.05 17.8.05 191600.00 406/22.11.06/EE-III 09.12.06 10.01.07 191319.00 Completed
52 Civil EE-III 4.10.05 17.8.05 195400.00 397/19.12.05/EE-III 14.01.06 27.03.06 194802.00 Completed
53 Civil EE-III 10.10.05 6.10.05 194700.00 370/30.11.05/EE-III Ms/ Arya & Co. 02.12.05 20.01.06 194156.00 Completed
P/o lighting arrangement in W.No 132 Manak pura, and adjoing area S.P.Z ( Model Bastic, Katra Chajju Mal Pandit & Doro walan SPZ
M/s Miglani Electricals
P/O Focus light at D.B Gupta road near Jhandawalan Mandir W.No-
132 S.P.Z
M/s Miglani Electricals
P/L C.C. on Qutab road from Shop No 6542 to Shop No.7203 and in Adj lanes in C-131
P/L C.C on Qutab road from Khewajan Dargah Baki Billa to shop no 5646 and in adj lanes in c-131. SPZ
M/s E & Co.traders
P/l C.C. and Qutab road from Shop No 7203 to shop no 7219 and in adj lanes in w.no 131. SPZ
M/s Sumit Const CO.
P/l C.C in Shankar Marg Balmiki Mandir from shop no 6596/1 to shop no 6671 and in adj lanes in w.no-131 SPZ
M/s sumit Const CO.
P/L C.C in Shankar Marg from shop No 7203 to Shop no 6596/1 and in adj lanes in w.no-131 SPZ
M/s Som Dutt Duevedi
Imp to footpath by providing interlocking tiles o Desh Raj Bhatia Marg from Hari Mandir school to Slaughta Hs and in adj lanes in c-131/SPZ
54 Civil EE-III 10.10.05 6.10.05 195500.00 360/7.11.05/EE-III 28.11.05 21.12.05 195325.00 Completed
55 Civil EE-III 16.11.05 16.11.05 246166.00 542/06.03.06/EE-III 16.02.06 17.03.06 226378.00 Completed
56 Civil EE-III 5.12.05 8.9.05 198000.00 319/27.09.05/EE-III 30.09.05 27.12.05 197949.00 Completed
57 Civil EE-III 5.12.05 5.12.5 199500.00 320/27.09.05/EE-III 30.09.05 28.12.05 198435.00 Completed
58 Civil EE-III 14.12.05 14.12.05 189800.00 412/29.12.05/EE-III 20.02.06 15.03.06 188841.00 Completed
59 Civil EE-III 30.03.06 08.09.05 192000.00 484/30.01.06/EE-III 18.03.06 28.3.06 191349.00 Completed
60 Civil EE-III 30.03.06 08.09.05 193200.00 485/30.01.06/EE-III 14.03.06 28.3.06 192797.00 Completed
61 Civil EE-III 30.03.06 08.03.06 197500.00 39/10.05.06/EE-III 28.05.06 17.08.06 197500.00 Completed
62 Elect EE(E)-I 31.03.06 10.08.05 191452.00 155/01.12.06/EE(E)-I 10.12.06 08.01.07 160252.00 Completed
63 Elect EE(E)-I 31.03.06 28.11.05 199838.00 102/05.10.06/EE(E)-I 14.10.06 13.11.06 133098.00 Completed
Imp to fooppath by providing interlocking tiles of Desh Raj Batia Marg from Shop no 10599 to hs main gate of hari Mandir school and in adj lanes in C-131 SPZ
M/s sumit Const CO.
P/l C.C. pavement in Arya Ngr in Bagh Rooji from H.No T-935 to T-955 and adj lanes in C-132 A SPZ
M/s D.K.Const.Co
Imp to FP by pdg Kota Stone along Jhande Walan Temple in C 132 SPZ
M/s Manish Nayyar
P/L CC In block A 22 to 228 from Gurudwara and adj lane in C 132B SPZ
M/s Neel Traders
P/L cc in A block from A 225 to 249 Mitia Khan LIG Flats adj lanes in C 132 SPZ
M/s Deepak Kumar
P/L cc in Block C10 to C25 D/S Motia Khan and adj. Lanes in C-
132 (B)/SPZ
M/s Puneet Naiyer
P/L cc in B block from B11 to B40 D/S Qtrs. Motia Khan and adj. Lanes in C-132(B)/SPZ
M/s Puneet Naiyer
Imp to road by cc from inst. Opp. Chowk of Udasheen Ashram in Aram Bagh in C-132(B)/SPZ
M/s Bajaj Const.Co
P/O lighting arrangment in W.no 132 near Jhandwalan Mandir opp. Main gate in SPZ
M/s M.J Electricals & Electronics
P/o lighting arrangment in area of Ambedkar Bhawan in W.no.132/SPZ
M/s Pragati Engineers
64 Elect EE(E)-I 31.03.06 30.11.05 150913.00 136/13.11.06/EE(E)-I 13.11.06 28.11.06 102016.00 CompletedP/o semi high mast light near Dargha near Varun Nalya buiding
C-132/SPZ
M/s Sechdeva Electricals
Status Report of MLA,Sh. Rajesh Lilothia, AC No. 70S.No. Name of Work deptt. Div. D.O.S D.O.C Expenditure
1 Civil XXIX 21.7.05 18.7.05 134107.00 87/XXIX/3.8.05 4.8.05 3.9.05 134086.00 Completed
2 Civil XXIX 21.7.05 18.7.05 141779.00 92/XXIX/10.8.05 11.8.05 9.9.05 141011.00 Completed
3 Civil XXIX 21.7.05 18.7.05 172435.00 130/13.9.05 22.9.05 6.12.05 172371.00 Completed
4 Civil XXIX 21.7.05 18.7.05 172071.00 86/XXIX 5.8.05 31.8.05 172023.00 Completed
5 Civil XXIX 21.7.05 18.7.05 166455.00 151/28.09.05/XXIX 07.10.05 06.01.06 164807.00 Completed
6 Civil XXIX 21.7.05 18.7.05 139713.00 120/29.8.05 20.9.05 18.11.05 139034.00 Completed
Date of Booking
Date of Consent
Amount booked
Work order no. with date i/c division
Name of agency
Present Position
Imp to drainage system and pdg c.c pavement in Basant Nagr
near Hno 49 in C-133 A K.B.Z
M/s Manish & Assoc.
Imp to gali no 3 & 5 Bagh kare Khan by pdg c.c. pavement in c-
133, K.B.Z
M/s Shiv Kumar Gupta
P/l c.c. pave. Along Service road Kishan Ganj Mkt. From shop NO 42 to 72 and Adj in
remaing portion in C-133 B KBZ
M/s Manchanda
Consts
Imp to lane in Indl. Area Anand parbat from factory No P_10 to approach road in c-133 KBZ by
pdg c.c. pavement
M/s Aggarwal & Co.
P/l C.C pave along HNO 176 to 190 & 62 and Kota stone in back
lane in Vivekanand puri in C-133/KBZ
M/s Bansal Consts
P/l C.C pavement & drainage system along HNO 211/4 Padam
Nagr in C-133 A /KBZ
M/s Vipin Gupta
7 Civil XXIX 21.7.05 18.7.05 164514.00 138/21.09.05/XXIX 30.09.05 21.11.05 163080.00 Completed
8 Civil XXIX 21.7.05 18.4.05 141613.00 123/29.08.05/XXIX 07.09.05 06.12.05 141389.00 Completed
9 Civil XXIX 21.7.05 18.4.05 169256.00 88/XXIX/3.8.05 4.8.05 31.8.05 167404.00 Completed
10 Civil XXIX 21.7.05 18.4.05 173475.00 133/13.9.05 31.8.05 19.113.05 172666.00 Completed
11 Civil XXIX 1.8.05 20.7.05 195098.00 147/28.09.05/XXIX 03.10.05 22.10.05 193422.00 Completed
12 Civil XXIX 21.7.05 18.4.05 235400.00 132/XXIX/13.9.05 6.9.05 14.9.05 232909.00 Completed
13 Civil XXIX 1.8.05 18.7.05 218387.00 184/11.11.05/XXIX 12.11.05 24.12.05 216115.00 Completed
Imp to drainage system at Bhagat Singh road from old Rohatak
road to main gate of Rama park on both side in C-133/K.BZ
M/s Som Const.CO
pdg drainage system in Anand Parbat from Gadodea road to
M.C pry School Anand Parbat (Khadewala) in C-133 B/KBZ
M/s M.G.Const.Co
P/l drainage system at Old Rohtak road from Gita Bhawan
Mandir to Gali no-2 Padam nagar in the remaining portion in
c-133/KBZ
M/s Manish & Assoc.
P/l c.c. pavement in gali no 4 from factory NO 290/2 to 4/51 in
remianing portion APIA in c-133/KBZ
M/s Kritika Const
Imp to S.W drain by pdg RCC Slab from HNO 196/7C to turn
of gali no 6 and along Satya Narayan Mandir in Jhan singh
Nagr on C-134 A KBZ
M/s Ved Pal Bhatia
Pdg Mastic Ashphaltic Concrete Surfacing from gali no 10 towards DB Gupta road on
Military road in C-134 A K>B.Z
M/s Shiv Kumar Gupta
Const of footpath in the C.P Hostel in Tealher & lane Nai Bastic Anand Parbat in C-133
A/KBZ
M/s R & I Enterprises
14 Civil XXIX 6.10.05 5.10.05 128412.00 10/22.05.06 24.05.06 27.06.06 127891.00 Completed
15 Civil XXIX 6.10.05 5.10.05 135690.00 07.02.06 09.03.06 135638.00 Completed
16 Civil XXIX 6.10.05 5.10.05 135144.00 395/31.01.06/XXIX 07.02.06 10.03.06 135100.00 Completed
17 Civil XXIX 6.10.05 5.10.05 127176.00 406 / 6.2.06 EEXXIX 4.3.06 26.03.06 126992.00 Completed
18 Civil XXIX 6.10.05 5.10.05 175500.00
19 Civil XXIX 6.10.05 5.10.05 178369.00 258/13.12.05/XXIX 14.12.05 09.01.06 178332.00 Completed
20 Civil XXIX 6.10.05 5.10.05 178144.00 259/13.12.05/XXIX 14.12.05 09.01.06 178056.00 Completed
Imp to lane by C.C flooring near H.NO T-45 and T-607 J-96 and
adj. In Baljeet Nagr in C-134 B/KBZ
M/s M.G.Const.Co
Imp to lane by C.C flooring near H.NO BNB-790 and BNB 793
and Adj in Baljeet Nagr in C-134 B/KBZ
402/06.02.06/EE-XXIX
M/s Shiv Kumar Gupta
Imp to lanes by drainage System & C.C flooring near H.NO T-
482/2 B , T-482/2E5 and Adj. In Baljeet Nagar in C-134/B/KBZ
M/s M.G.Const.Co
Imp to lane by drainage system & c.c. flooring from H.NO
17/111 to H.NO 17/114 at Gali no -1 Nehru Nagr in C-134
B/KBZ
M/s Shiv Kumar Gupta
Const of S.W drain near H.NO T-289, T-287, T-29/F and T-29/k and adj in Baljeet Nagr in c-134
B/KBZ
Imp to lanes by drainage system & C.c flooring near H.NO A t-53/1A,AR-52/2E AT-50/1 and adj in Baljeet Nagr in C-134
B/KBZ
M/s Ansal Const.Co.
Imp to lanes by drainage system & C.C flooring near H.NO ,AT
50/1 T-1799/A and adj in Baljeet Nagar in C-134 B/KBZ
M/s Ansal Const.Co.
21 Civil XXIX 6.10.05 5.10.05 163543.00 423/10.02.06/EEXXIX 11.2.06 15.03.06 163079.00 Completed
22 Civil XXIX 18.11.05 24.10.05 462101.00 11/22.05.06/EE-XXIX 30.05.06 14.08.06 460847.00 Completed
23 Civil XXIX 18.11.05 24.10.05 451135.00 12/22.05.06/EE-XXIX 31.05.06 30.08.06 451135.00 Completed
24 Civil XXIX 18.11.05 24.10.05 508017.00 13/22.05.06/EE-XXIX 31.05.06 17.08.06 507853.00 Completed
25 Civil XXIX 18.11.05 24.10.05 169974.00 62/11.08.06/EE-XXIX 12.08.06 14.10.06 169969.00 Completed
26 Civil XXIX 18.11.05 24.10.05 464734.00 14/22.05.06/EE-XXIX 31.05.06 30.08.06 464360.00 Completed
27 Civil XXIX 18.11.05 24.10.05 460652.00 15/22.05.06/EE-XXIX 31.05.06 30.08.06 460030.00 Completed
28 Civil XXIX 18.11.05 24.10.05 455573.00 71/28.08.06/EE-XXIX 29.08.06 06.12.06 455573.00 Completed
29 Civil XXIX 18.11.05 24.10.05 452851.00 72/28.08.06/EE-XXIX 29.08.06 06.12.06 452851.00 Completed
Imp to lane by drainage system & C.C flooring fron H.NO
17/109 to H.NO 17/87 at Gali No-1,Nehru Nagar in C-134
A/KBZ
M/s Shiv Kumar Gupta
P/l c.c. flooring on cement road from gali no-6 to teachers lane in
C-133 KBZ
M/s Raj Builders
P/l c.c. flooring on lane from teachers lane to ramjas no-2
school in C-133/KBZ
M/s Rakesh Bansal
P/l cement concrete pavement from new Rohtak road to F.NO-92 in gali no -11 Anand parkbat industrial Area in C-133/KBZ
M/s D.K Const.Co
Pdg c.c. & drainage system in gali no -4 Nai Basti Anand
Parbat in C-133/KBZ
M/s Manish & Assoc.
P/l C.c. pavment from Gadodia road to coal depat Anand parbat
C-133/KNZ
M/s Rakesh Bansal
P/l c.c. pavement from coal depat to Ramjas pry school in Anand Parbat in C-133/KBZ
M/s Rakesh Bansal
P/l c.c. pavement from Ramjas Prymary School to Ramjas
Public Nursury deptt. In Anand Parbat in C-133 KBZ
M/s Tyagi Associates
P/l c.c. pavement from Ramjas Nursury deptt. Towards faridpuri in Anand Parbat in C-133/KBZ
M/s Tyagi Associates
30 Civil XXIX 24.11.05 14.11.05 230910.00 16/22.05.06/EE-XXIX 31.05.06 30.08.06 226093.00 Completed
31 Civil XXIX 6.1.06 24.12.05 386462.00 17/22.05.06/EE-XXIX 25.05.06 31.07.06 386065.00 Completed
32 Civil XXIX 6.1.06 24.12.05 304990.00 18/22.05.06/EE-XXIX 06.06.06 28.07.06 303683.00 Completed
33 Civil XXIX 6.1.06 24.12.05 227992.00 08/12.05.06 19.05.06 24.07.06 227755.00 Completed
34 Civil XXIX 6.1.06 24.12.05 246057.00 09/12.05.06 19.05.06 24.07.06 245934.00 Completed
35 Civil XXIX 6.1.06 24.12.05 517800.00 19/22.05.06/EE-XXIX 26.05.06 28.08.06 367773.00 Completed
36 Civil XXIX 20.03.06 18.07.05 63100.00 07/12.05.06/EE-XXIX 22.05.06 21.08.06 62889.00 Completed
P/l cement concrete pavementalong Auto kinks
starting from New Rohtak Rd Service road towards Railway line in Harijan Basti in C-133
K.B.Z
M/s Shah Builders
Imp to lane by Drainge ssytem in Gali NO. 10, Than Singh Nagar
in C 134A KBZ
M/s Bansal Enterprises
Imp0 to lanes by Drainag system and CC flooring near H.no.
660/7, 657/3 and adj in Gail No. 1, Punjabi Basti Anand parbat in
C 134A KBZ
M/s Bansal Enterprises
Imp to lane sby Drainage system in Gali no 2 Than Singh Nagar
inC 134A KBZ
M/s Harish Kumar
Imp to lane by Drainage system in Gali no. 1, Than Singh Nagar
in C 134A KBZ
M/s Harish Kumar
Imp to lanes by Drainage system in Gali no 11, Than singh Nagar
in C 134A KBZ
M/s Shah Builders
P/F Grill/Barbed fencing out the To wall at Park Anand Parbat in
C-133/KBZ
M/s Markanda Consts.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
1.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.02
1.20
1.29
1.65
1.60
0.00
13.20
0.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.49
0.00
1.00
4.58
0.00
0.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
19.76
Status Report of MLA, Sh.Shadi Ram, AC No. 63 2005-06
4.66104
0
0
0
0
0
0
Liabilities Rs.lacs
0
0
0
0
0
0
0
0
0
0
0
0
0
0
00000
000000000000000000000000
4.66104
0
0.37
Liabilities Rs.lacs
0.37
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.22
0.00
0.00
0.00
0.00
1.96
0.00
0.00
0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.45
0.00
0.00
0.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.73
1.42
0.00
0.00
0.00
0.00
0.00
9.41934
Liabilities Rs.lacs
00000000000
0000000000000000000000000000000
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.00
0
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.607
00000
00000000000000000000000000000000
0000000000000000000000000
5.214
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.75
0.00
0.00
0.00
1.75
0.00
0.00
0.00
1.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.65
0.03
0.00
0.03
0.00
2.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.008.87
0.00
0.00
0.00
0.00
0.00
0.00
Liabilities Rs.lacs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.76