Standard Work
-
7/30/2019 2_ANPS___()
2/27
Standard Work What is Standard Work
Definition AStandard Workis a combination of men,
materials and machine to carry out production ina maximally efficient way.
Standard Work is different from Standard
Operation Procedure
-
7/30/2019 2_ANPS___()
3/27
Standard Work Functions of Standard Work (1/2) (1/2)
(1) Training materials for newcomer
(2) Tools for management
a) Design of Production Line b) Manpower Requirement plan
c) Equipment Requirement plan
-
7/30/2019 2_ANPS___()
4/27
Standard Work Functions of Standard Work (2/2) (2/2)
d) On-Hand WIP plan
e) Target of production speed
f) Visual Management
(3) Tool for Kaizen
No improvement can take place without Standard Work being
defined first.
-
7/30/2019 2_ANPS___()
5/27
Standard Work Elements of Standard Work
(1) TAKT Time
(2) On-Hand Work-In-Process
(3) Operator Work Sequence
-
7/30/2019 2_ANPS___()
6/27
Standard Work TAKT TIME
Definition Takt Time = Target Time = T.T
Example :
Working Time per day Units demand per day T.T =
8 Hours x 3600 sec.T.T =1000 Units/day
= 28.8 Sec/Unit
-
7/30/2019 2_ANPS___()
7/27
Standard Work On-Hand Work-In-Process
Meaning Refers to theminimum WIP needed to perform
repetitive operations, e.g., parts mounted to
machines, parts on conveyors, parts needing
time to cool.
-
7/30/2019 2_ANPS___()
8/27
Standard Work Operator Work Sequence
Meaning The order of operations in which an operator carries
objects, mounts them on machines and removesthem etc..
This should be distinguished from theproduct
process sequenceaccording to which a product ismade, which will influence the number of On- Hand
WIP.
S d d k
-
7/30/2019 2_ANPS___()
9/27
Standard Work Forms of Standard Work
(1)Value Stream/Process Flow Chart
/(2) Time Measurement Sheet (3) Process Capability Sheet (4) Standard Work Combination Sheet
(5) Process/Cycle Time Chart (6) Standard Work Sheet
d d k
-
7/30/2019 2_ANPS___()
10/27
Standard Work Symbols for Value Stream/ProcessFlow Chart /(1/4)
Customer
Supplier Material push flow
Material pull flow by withdraw kanban
Material pull flow by production kanban
Material pull flow by signal kanban
W
P
S
S d d k
-
7/30/2019 2_ANPS___()
11/27
Standard Work Symbols for Value Stream/ProcessFlow Chart /(2/4)Information flow
Buffer Inventory
Safety Inventory
Production Cell
Leveling (Heijunka)
Supermarket
B
S
-
7/30/2019 2_ANPS___()
12/27
Standard Work Symbols for Value Stream/ProcessFlow Chart /(3/4)
Kanban Post
Production Planning Control
Material, before process
Finished Goods, after process
Process and sequence number
ppc
1
-
7/30/2019 2_ANPS___()
13/27
Standard Work Symbols for Value Stream/ProcessFlow Chart /(4/4)
Self 100% Inspection
Walking operation
QA Sampling Inspection
Waiting/Storage /
Combine Operation
With inspection
2
4
3
-
7/30/2019 2_ANPS___()
14/27
Standard Work Time Measurement and Calculation (1/2)
HT = Human Work Time MT = Machine Work Time PBS = Process Batch Size m = Number of station of
specific process
OT = Overlapping Time
between HT and MT
-
7/30/2019 2_ANPS___()
15/27
Standard Work Time Measurement and Calculation (2/2)
PT = Process Time PT = HT+MT-OT
CT = Cycle Time CT = PT /PBS / m
When PBS = 1 piece
m = 1 station
Then CT = PT
-
7/30/2019 2_ANPS___()
16/27
Standard Work Procedure of Standard Work (1/2) (1/2)
(1)Value Stream/Process Flow Chart by product(2) Time Measurement by process(3) Process Capability Sheet (4) Standard Work Combination Sheet(5) Decide On-Hand WIP Quantity
St d d W k
-
7/30/2019 2_ANPS___()
17/27
Standard Work Procedure of Standard Work (2/2) (2/2)
(6) Trial Operation by supervisor (7) Correction if necessary (8) Standard Work Sheet (9) Maintain Standard Work (10) Kaizen Standard Work
S d d W k
-
7/30/2019 2_ANPS___()
18/27
Standard Work Standard Work and Kaizen (1/10) (1/10)
The Need of Kaizen No Standard Work = No Kaizen
Standard Work : Decided by supervisor to express
his/her expectation of operation in
the production line.
St d d W k
-
7/30/2019 2_ANPS___()
19/27
Standard Work Standard Work and Kaizen (2/10) (2/10)
Pre-Standard Work : Write down current operation situation.
Standard (Expectation)()
Difference (Problem) :()
Need of Kaizen
Actual (Current)()
St d d W k
-
7/30/2019 2_ANPS___()
20/27
Standard Work Standard Work and Kaizen (3/10) (3/10)
T.T
CT >TT CT
-
7/30/2019 2_ANPS___()
21/27
Standard Work Standard Work and Kaizen (4/10) (4/10)
Step of Kaizen Start from Operation Kaizen
Later do Equipment Kaizen
Operation Kaizen Spend little money, by eliminating
MUDA first
Use the wisdom of own company
Standard Work
-
7/30/2019 2_ANPS___()
22/27
Standard Work Standard Work and Kaizen (5/10) (5/10)
Equipment Kaizen Spend lot of money,
Hide MUDA
The wisdom from equipment supplier
St d d W k
-
7/30/2019 2_ANPS___()
23/27
Standard Work Standard Work and Kaizen (6/10) (6/10)
Sequence of Operation Kaizen Shorten Distance Relayout of By Flow LineOf Transportation Machine Production Change operation Eliminating By StandardSequence/ Waiting Muda, WorkCombination Work to T.T/ TT
Standard Work
-
7/30/2019 2_ANPS___()
24/27
Standard Work Standard Work and Kaizen (7/10) (7/10)
Sequence of Operation KaizenKaizen in Reduce Human By MotionOperation Work Time EconomyMotion Jidoka
Standard Work
-
7/30/2019 2_ANPS___()
25/27
Standard Work Standard Work and Kaizen (8/10) (8/10)
The Cycle of Kaizen Standard Work before Kaizen
Pre- Standard Work
The need of Kaizen
Find out areas of Muda and problem
Dig out the root cause
Standard Work
-
7/30/2019 2_ANPS___()
26/27
Standard Work Standard Work and Kaizen (9/10) (9/10)
The Cycle of Kaizen Implement Kaizen Actions
Standardization
Issue Standard
Work SheetThis is my ideal Production line
Standard Work
-
7/30/2019 2_ANPS___()
27/27
Standard Work Standard Work and Kaizen(10/10) (10/10)
Kaizen Categories by Standard Work
Reduce Manhours
Reduce WIP Quantity
Reduce Defects
Increase Productivity
Reduce Space