    Standard Work

  • 7/30/2019 2_ANPS___()

    2/27

    Standard Work What is Standard Work

    Definition AStandard Workis a combination of men,

    materials and machine to carry out production ina maximally efficient way.

    Standard Work is different from Standard

    Operation Procedure

  • 7/30/2019 2_ANPS___()

    3/27

    Standard Work Functions of Standard Work (1/2) (1/2)

    (1) Training materials for newcomer

    (2) Tools for management

    a) Design of Production Line b) Manpower Requirement plan

    c) Equipment Requirement plan

  • 7/30/2019 2_ANPS___()

    4/27

    Standard Work Functions of Standard Work (2/2) (2/2)

    d) On-Hand WIP plan

    e) Target of production speed

    f) Visual Management

    (3) Tool for Kaizen

    No improvement can take place without Standard Work being

    defined first.

  • 7/30/2019 2_ANPS___()

    5/27

    Standard Work Elements of Standard Work

    (1) TAKT Time

    (2) On-Hand Work-In-Process

    (3) Operator Work Sequence

  • 7/30/2019 2_ANPS___()

    6/27

    Standard Work TAKT TIME

    Definition Takt Time = Target Time = T.T

    Example :

    Working Time per day Units demand per day T.T =

    8 Hours x 3600 sec.T.T =1000 Units/day

    = 28.8 Sec/Unit

  • 7/30/2019 2_ANPS___()

    7/27

    Standard Work On-Hand Work-In-Process

    Meaning Refers to theminimum WIP needed to perform

    repetitive operations, e.g., parts mounted to

    machines, parts on conveyors, parts needing

    time to cool.

  • 7/30/2019 2_ANPS___()

    8/27

    Standard Work Operator Work Sequence

    Meaning The order of operations in which an operator carries

    objects, mounts them on machines and removesthem etc..

    This should be distinguished from theproduct

    process sequenceaccording to which a product ismade, which will influence the number of On- Hand

    WIP.

    S d d k

  • 7/30/2019 2_ANPS___()

    9/27

    Standard Work Forms of Standard Work

    (1)Value Stream/Process Flow Chart

    /(2) Time Measurement Sheet (3) Process Capability Sheet (4) Standard Work Combination Sheet

    (5) Process/Cycle Time Chart (6) Standard Work Sheet

    d d k

  • 7/30/2019 2_ANPS___()

    10/27

    Standard Work Symbols for Value Stream/ProcessFlow Chart /(1/4)

    Customer

    Supplier Material push flow

    Material pull flow by withdraw kanban

    Material pull flow by production kanban

    Material pull flow by signal kanban

    W

    P

    S

    S d d k

  • 7/30/2019 2_ANPS___()

    11/27

    Standard Work Symbols for Value Stream/ProcessFlow Chart /(2/4)Information flow

    Buffer Inventory

    Safety Inventory

    Production Cell

    Leveling (Heijunka)

    Supermarket

    B

    S

  • 7/30/2019 2_ANPS___()

    12/27

    Standard Work Symbols for Value Stream/ProcessFlow Chart /(3/4)

    Kanban Post

    Production Planning Control

    Material, before process

    Finished Goods, after process

    Process and sequence number

    ppc

    1

  • 7/30/2019 2_ANPS___()

    13/27

    Standard Work Symbols for Value Stream/ProcessFlow Chart /(4/4)

    Self 100% Inspection

    Walking operation

    QA Sampling Inspection

    Waiting/Storage /

    Combine Operation

    With inspection

    2

    4

    3

  • 7/30/2019 2_ANPS___()

    14/27

    Standard Work Time Measurement and Calculation (1/2)

    HT = Human Work Time MT = Machine Work Time PBS = Process Batch Size m = Number of station of

    specific process

    OT = Overlapping Time

    between HT and MT

  • 7/30/2019 2_ANPS___()

    15/27

    Standard Work Time Measurement and Calculation (2/2)

    PT = Process Time PT = HT+MT-OT

    CT = Cycle Time CT = PT /PBS / m

    When PBS = 1 piece

    m = 1 station

    Then CT = PT

  • 7/30/2019 2_ANPS___()

    16/27

    Standard Work Procedure of Standard Work (1/2) (1/2)

    (1)Value Stream/Process Flow Chart by product(2) Time Measurement by process(3) Process Capability Sheet (4) Standard Work Combination Sheet(5) Decide On-Hand WIP Quantity

    St d d W k

  • 7/30/2019 2_ANPS___()

    17/27

    Standard Work Procedure of Standard Work (2/2) (2/2)

    (6) Trial Operation by supervisor (7) Correction if necessary (8) Standard Work Sheet (9) Maintain Standard Work (10) Kaizen Standard Work

    S d d W k

  • 7/30/2019 2_ANPS___()

    18/27

    Standard Work Standard Work and Kaizen (1/10) (1/10)

    The Need of Kaizen No Standard Work = No Kaizen

    Standard Work : Decided by supervisor to express

    his/her expectation of operation in

    the production line.

    St d d W k

  • 7/30/2019 2_ANPS___()

    19/27

    Standard Work Standard Work and Kaizen (2/10) (2/10)

    Pre-Standard Work : Write down current operation situation.

    Standard (Expectation)()

    Difference (Problem) :()

    Need of Kaizen

    Actual (Current)()

    St d d W k

  • 7/30/2019 2_ANPS___()

    20/27

    Standard Work Standard Work and Kaizen (3/10) (3/10)

    T.T

    CT >TT CT

  • 7/30/2019 2_ANPS___()

    21/27

    Standard Work Standard Work and Kaizen (4/10) (4/10)

    Step of Kaizen Start from Operation Kaizen

    Later do Equipment Kaizen

    Operation Kaizen Spend little money, by eliminating

    MUDA first

    Use the wisdom of own company

    Standard Work

  • 7/30/2019 2_ANPS___()

    22/27

    Standard Work Standard Work and Kaizen (5/10) (5/10)

    Equipment Kaizen Spend lot of money,

    Hide MUDA

    The wisdom from equipment supplier

    St d d W k

  • 7/30/2019 2_ANPS___()

    23/27

    Standard Work Standard Work and Kaizen (6/10) (6/10)

    Sequence of Operation Kaizen Shorten Distance Relayout of By Flow LineOf Transportation Machine Production Change operation Eliminating By StandardSequence/ Waiting Muda, WorkCombination Work to T.T/ TT

    Standard Work

  • 7/30/2019 2_ANPS___()

    24/27

    Standard Work Standard Work and Kaizen (7/10) (7/10)

    Sequence of Operation KaizenKaizen in Reduce Human By MotionOperation Work Time EconomyMotion Jidoka

    Standard Work

  • 7/30/2019 2_ANPS___()

    25/27

    Standard Work Standard Work and Kaizen (8/10) (8/10)

    The Cycle of Kaizen Standard Work before Kaizen

    Pre- Standard Work

    The need of Kaizen

    Find out areas of Muda and problem

    Dig out the root cause

    Standard Work

  • 7/30/2019 2_ANPS___()

    26/27

    Standard Work Standard Work and Kaizen (9/10) (9/10)

    The Cycle of Kaizen Implement Kaizen Actions

    Standardization

    Issue Standard

    Work SheetThis is my ideal Production line

    Standard Work

  • 7/30/2019 2_ANPS___()

    27/27

    Standard Work Standard Work and Kaizen(10/10) (10/10)

    Kaizen Categories by Standard Work

    Reduce Manhours

    Reduce WIP Quantity

    Reduce Defects

    Increase Productivity

    Reduce Space