29.3.2011 New -Gentec -Safety Presentation
Transcript of 29.3.2011 New -Gentec -Safety Presentation
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
1/21
Standby Power systemsSAFETY MANAGEMENT & IMPROVEMENT
HAJI ABDULLAH ALI REZA & Co.
29th March 2011
Mohammad Imran / Anwar Wakeel
SOC 1st QUARTER MEETING
HOTEL HOLIDAY INN
AL-KHOBAR
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
2/21
STANDBY POWER SOURCES
Battery Banks Portable-Standby Generators
Other standby power system (e.g.
solar)
POWER CONVERT/CONTROL DEVICES
DC-AC power system
Rectifier units
Inverters
AT SAUDI ARAMCO
MAINTAINED BY UPS Technicians
STANDBYPOWER
SYSTEM
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
3/21
CLASSIFYING UNITS BY FUNCTIONSTHREE FUNDAMENTAL UNITS OF A STANDBY POWER SYSTEM
BATTERIES and BATTERY BANKS ELECTRICAL/ELECTRONIC CIRCUITS
MECHANICAL EQUIPMENTS
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
4/21
HAZARDSBATTERIES
CHEMICAL
Burn
Explosion Electrical
Fire
ELECTRICAL
Electrical Shock
Electrocution
Fire
GENERATORS
Mechanical
Burn
Electrical CO emission
Fire
ANY HAZARDS ?
YES ..MANY HAZARDS !!!
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
5/21
EXPLODE
SOME DISASTEROUS EXAMPLES
SPARK
http://www.cpaptalk.com/wiki/index.php/Image:BBS4xPAP-battery-explosion.jpghttp://www.cpaptalk.com/wiki/index.php/Image:BBS4xPAP-battery-explosion.jpg -
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
6/21
HAZARDS & SAFETY MANAGEMENT
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
7/21
GENTECs SMS MANUAL
Safety OrientationCOMPETENCY AND TRAINING
SAFE Preventive Maintenance procedures
SAFETY PRFORMANCE evaluations
Emergency Preparedness
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
8/21
Managing
Safety
Supervising
Safety
Practicing
Safety
MANAGEME
NT
LEVEL
- SAFE-JOB STRATEGIES
- Document safety
goals- Communicate & Train
employees
- Funding and resources
- Regulations SUPERVISOR
LEVEL - Implement SMS
strategies
- Employee motivation
- Safety training
Attendance
- Safety Performance
- Incidents
investigate/report
- Lessons and morals
TECHNICAL
STAFFLEVEL
- Comply regulations
- PPE
- Report incidents- Assist investigation
- Attend Gentec Safety
trainings
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
9/21
been doing it for years and nothing
happened so far"
Seeking casual ways for Convenience
CHANGING
ATTITUDE
Boosting self-esteem
Your SAFETY is our SAFETY
Motivating
employees
Follow SMS manual
Follow ARAMCO SAFETY standards
SAFETY
Trainings
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
10/21
TRAINAINGRECORD
TRAINAINGEVALUATION
QUARTERY
SAFETYPERFORMANCE
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
11/21
S.No Name Batch No COURSE/
TRAINING
1 Regalado Jerold M. 7996253 DIP Refresher
e - DIR Refresher
Work Permit Receiver
Basic Life Support
2 Ortega Clarito O. 7876787 DIP Refresher
3 Sambile Nestor B 7870414 e - DIR Refresher
4 Ardiente Rodolfo s 7030880 e - DIR Refresher
Work Permit Receiver
5 Garcia Arturo D 7033643 e - DIR Refresher
Work Permit Receiver
6 Valeroso Jose B 7061310 e - DIR Refresher
Work Permit Receiver
7 Armando Espino 7870415 e - DIR Refresher
8 Carlos ZalDivar D 7061627 Work Permit Receiver
9 Daniel Tampus 8014906 e - DIR Refresher
10 Benito Jumarito
11 Salah Yousef
12
TRAININGS TYPE
DIP Refresher DRIVING
e - DIR Refresher DRIVING
Work Permit Receiver INSPECTION
BEFORE JOB
Basic Life Support LIFE SAFETY
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
12/21
PPE for all of its technical staffGENTEC PROVIDED PPD
FIRST AID KIT
DUST MASK
SAFETY HELMET
COVER ALL
SAFETY GOOGLES
SAFETY SHOES
SAFETY RUBBER GLOVES
ACID WATER JUG
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
13/21
INSULATED ELECTRICAL TOOLS
MULTIMETERS
CLAMP METERS
EXTENSION CORDS
ELECTRICAL TOOL KITS
CIRCUIT BREAKER FINDERS
..
INSULATED
CALIBRATE
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
14/21
MECHANICAL/GENERAL TOOLS
AIR COMPRESSOR / BLOWER / VACCUM
HYDROMETER
ELECTRIC DRILLS
FLASH LIGHTS (rechargeable)
FREAON GAUGE METER
WRENCHES / SCREWDRIVERS KITS
COMBINATION PLIERS /
..
INSULATED
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
15/21
Battery Roomcommunications building at
Musadia area, Jeddah
Dry and
Shaded place
LABELS
ACID
RESISTANT
PAINT
ADEQUATEVENTILATION
NO ACID
SPILLAGE
TERMINALSARE
COVERED
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
16/21
MEDGULF
General Health
Issues
Medicalcheckup
AL-GOSSI Incidents
Injuries
HEALTH
INSURANCE
POLICE
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
17/21
SITE VISITS & INSPECTION
OBSERVE GENTECTECHNICIANS AT SITE
GENTECs safety rules conformed ? Use of relevant PPE observed ?
Use of recommended tools ?
Site is safe and clean
INSPECT VEHICLES AND DRIVING
ARAMCO SAFETY STANDARDSobserved ?
PUBLISH AND COMMUNICATEOBSERVATIONS
FUTUREPLAN
Random
site visits
&
Inspections
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
18/21
GOING VACATION Pre-scheduled
Spare technician joins before
vacation start
Obtain necessary IDs, permits, PPD,tools etc
Understand job well
Take charge
Rejoining after VACATION Spare tech no leave immediately
Update any changes
FUTUREPLAN
MANAGING
TECHNICIANVACATIONS
&
ABSENCES
Technician Vacation Plans
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
19/21
REWARDING FOR GOODSAFETY PRACTICE
Technicians Reward forgood safety practice
Will bring MOTIVATION
PENALIZE FOR VIOLATIONS Little penalties for
SAFETY violation
ACTIVATE SENSE OF MISTAKE
FUTUREPLAN
SAFETY
REWARDS &
PENALTIES
For
Technicians
SAFETY REWARDS
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
20/21
Prepare and Prevent . Dont Repair and Repent
KNOW SAFETY, NO INJURY. NO SAFETY, KNOW INJURY
THANK YOU
-
8/3/2019 29.3.2011 New -Gentec -Safety Presentation
21/21