    Standby Power systemsSAFETY MANAGEMENT & IMPROVEMENT

    HAJI ABDULLAH ALI REZA & Co.

    29th March 2011

    Mohammad Imran / Anwar Wakeel

    SOC 1st QUARTER MEETING

    HOTEL HOLIDAY INN

    AL-KHOBAR

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    2/21

    STANDBY POWER SOURCES

    Battery Banks Portable-Standby Generators

    Other standby power system (e.g.

    solar)

    POWER CONVERT/CONTROL DEVICES

    DC-AC power system

    Rectifier units

    Inverters

    AT SAUDI ARAMCO

    MAINTAINED BY UPS Technicians

    STANDBYPOWER

    SYSTEM

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    3/21

    CLASSIFYING UNITS BY FUNCTIONSTHREE FUNDAMENTAL UNITS OF A STANDBY POWER SYSTEM

    BATTERIES and BATTERY BANKS ELECTRICAL/ELECTRONIC CIRCUITS

    MECHANICAL EQUIPMENTS

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    4/21

    HAZARDSBATTERIES

    CHEMICAL

    Burn

    Explosion Electrical

    Fire

    ELECTRICAL

    Electrical Shock

    Electrocution

    Fire

    GENERATORS

    Mechanical

    Burn

    Electrical CO emission

    Fire

    ANY HAZARDS ?

    YES ..MANY HAZARDS !!!

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    5/21

    EXPLODE

    SOME DISASTEROUS EXAMPLES

    SPARK

    http://www.cpaptalk.com/wiki/index.php/Image:BBS4xPAP-battery-explosion.jpghttp://www.cpaptalk.com/wiki/index.php/Image:BBS4xPAP-battery-explosion.jpg
  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    6/21

    HAZARDS & SAFETY MANAGEMENT

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    7/21

    GENTECs SMS MANUAL

    Safety OrientationCOMPETENCY AND TRAINING

    SAFE Preventive Maintenance procedures

    SAFETY PRFORMANCE evaluations

    Emergency Preparedness

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    8/21

    Managing

    Safety

    Supervising

    Safety

    Practicing

    Safety

    MANAGEME

    NT

    LEVEL

    - SAFE-JOB STRATEGIES

    - Document safety

    goals- Communicate & Train

    employees

    - Funding and resources

    - Regulations SUPERVISOR

    LEVEL - Implement SMS

    strategies

    - Employee motivation

    - Safety training

    Attendance

    - Safety Performance

    - Incidents

    investigate/report

    - Lessons and morals

    TECHNICAL

    STAFFLEVEL

    - Comply regulations

    - PPE

    - Report incidents- Assist investigation

    - Attend Gentec Safety

    trainings

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    9/21

    been doing it for years and nothing

    happened so far"

    Seeking casual ways for Convenience

    CHANGING

    ATTITUDE

    Boosting self-esteem

    Your SAFETY is our SAFETY

    Motivating

    employees

    Follow SMS manual

    Follow ARAMCO SAFETY standards

    SAFETY

    Trainings

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    10/21

    TRAINAINGRECORD

    TRAINAINGEVALUATION

    QUARTERY

    SAFETYPERFORMANCE

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    11/21

    S.No Name Batch No COURSE/

    TRAINING

    1 Regalado Jerold M. 7996253 DIP Refresher

    e - DIR Refresher

    Work Permit Receiver

    Basic Life Support

    2 Ortega Clarito O. 7876787 DIP Refresher

    3 Sambile Nestor B 7870414 e - DIR Refresher

    4 Ardiente Rodolfo s 7030880 e - DIR Refresher

    Work Permit Receiver

    5 Garcia Arturo D 7033643 e - DIR Refresher

    Work Permit Receiver

    6 Valeroso Jose B 7061310 e - DIR Refresher

    Work Permit Receiver

    7 Armando Espino 7870415 e - DIR Refresher

    8 Carlos ZalDivar D 7061627 Work Permit Receiver

    9 Daniel Tampus 8014906 e - DIR Refresher

    10 Benito Jumarito

    11 Salah Yousef

    12

    TRAININGS TYPE

    DIP Refresher DRIVING

    e - DIR Refresher DRIVING

    Work Permit Receiver INSPECTION

    BEFORE JOB

    Basic Life Support LIFE SAFETY

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    12/21

    PPE for all of its technical staffGENTEC PROVIDED PPD

    FIRST AID KIT

    DUST MASK

    SAFETY HELMET

    COVER ALL

    SAFETY GOOGLES

    SAFETY SHOES

    SAFETY RUBBER GLOVES

    ACID WATER JUG

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    13/21

    INSULATED ELECTRICAL TOOLS

    MULTIMETERS

    CLAMP METERS

    EXTENSION CORDS

    ELECTRICAL TOOL KITS

    CIRCUIT BREAKER FINDERS

    ..

    INSULATED

    CALIBRATE

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    14/21

    MECHANICAL/GENERAL TOOLS

    AIR COMPRESSOR / BLOWER / VACCUM

    HYDROMETER

    ELECTRIC DRILLS

    FLASH LIGHTS (rechargeable)

    FREAON GAUGE METER

    WRENCHES / SCREWDRIVERS KITS

    COMBINATION PLIERS /

    ..

    INSULATED

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    15/21

    Battery Roomcommunications building at

    Musadia area, Jeddah

    Dry and

    Shaded place

    LABELS

    ACID

    RESISTANT

    PAINT

    ADEQUATEVENTILATION

    NO ACID

    SPILLAGE

    TERMINALSARE

    COVERED

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    16/21

    MEDGULF

    General Health

    Issues

    Medicalcheckup

    AL-GOSSI Incidents

    Injuries

    HEALTH

    INSURANCE

    POLICE

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    17/21

    SITE VISITS & INSPECTION

    OBSERVE GENTECTECHNICIANS AT SITE

    GENTECs safety rules conformed ? Use of relevant PPE observed ?

    Use of recommended tools ?

    Site is safe and clean

    INSPECT VEHICLES AND DRIVING

    ARAMCO SAFETY STANDARDSobserved ?

    PUBLISH AND COMMUNICATEOBSERVATIONS

    FUTUREPLAN

    Random

    site visits

    &

    Inspections

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    18/21

    GOING VACATION Pre-scheduled

    Spare technician joins before

    vacation start

    Obtain necessary IDs, permits, PPD,tools etc

    Understand job well

    Take charge

    Rejoining after VACATION Spare tech no leave immediately

    Update any changes

    FUTUREPLAN

    MANAGING

    TECHNICIANVACATIONS

    &

    ABSENCES

    Technician Vacation Plans

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    19/21

    REWARDING FOR GOODSAFETY PRACTICE

    Technicians Reward forgood safety practice

    Will bring MOTIVATION

    PENALIZE FOR VIOLATIONS Little penalties for

    SAFETY violation

    ACTIVATE SENSE OF MISTAKE

    FUTUREPLAN

    SAFETY

    REWARDS &

    PENALTIES

    For

    Technicians

    SAFETY REWARDS

  • 8/3/2019 29.3.2011 New -Gentec -Safety Presentation

    20/21

    Prepare and Prevent . Dont Repair and Repent

    KNOW SAFETY, NO INJURY. NO SAFETY, KNOW INJURY