State of Wisconsin Department of Natural Resources dnr.wi.gov Due Date: April 15 Motorized Recreation Grant Application For: (choose all that apply) Form 8700-159 (R 12118) ATV/UTV Trail Aid Page 1 ots � Snowmobile Trail Aid D Motorized Stewardship - 20% County match required Notice: Completion of this form is required under Wisconsin Statutes 23.09(26) and 23.33. Failure to complete this form will result in denial of financial assistance. Personally identifiable information found on this form is not intended to be used for any other purpose. The Department of Natural Resources (DNR) may provide this inrmation to requesters as required by Wisconsin's Open Records law {ss. 19.31 - 19.39, Wis. Stats.}. Instructions: Applications may combine more than one source of funds. They may DNR Use Only be submitted for consideration of traditional ATV, UTV, Snowmobile and Motorized Category Number Stewardship funding. Submit one copy of all rms and attachments. See Page 2 for necessary attachments. Send applications to your Community Services Specialist. Secon 1: Applicant Inrmaon 0 Applicant / Organization Name Dane County Parks Check Recipient: Individual other than authorized individual to act on behalf of the applicant. D Select if the same as applicant. Individual Authorized to Act on Behalf of Applicant per Resolution Darren Marsh Check Recipient Name (Name to Appear on Check) Dane County Title Title Parks Director Address Address 5201 Fen Oak Drive 5201 Fen Oak Drive City Madison State ZIP Code 53718 City Madison Telephone Number (608) 224-3730 Email Address [email protected] MTV 9-Streiff/Brewery Spring Valley Creek Bridge County Township Range @E Green 04 N 7 OW Project Description Summa Section ¼ ¼ 14 NE 0 ¼ SW GPS Coordinates: Lat. 42.819802 Long. -89.63369 State ZIP Code 53718 Priority replacement of a 13' x 31' Bridge over Spring Valley Creek on State Corridor #21 in Green Coun. Dane County has asked that the bridge be removed d abdoned. There are two main ctors r the iediate removal of this bridge. 1) ) Local flooding in recent years has compromised the stream banks at the easement site. 2) The bridge sucture and footings have deteriorated to the point that the bridge can no longer support snowmobile use. Proposed replacement bridge is 12'x40' bridge with a 25,000# Load Capacity I certify that all maintenance land use agreements are on file. $50,600.00 $50,600.00 Leave Blank - DNR Use Onl #28 - Dane - MTV 9 Bridge Rehab

Transcript of #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the...

Page 1: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

State of Wisconsin Department of Natural Resources dnr.wi.gov

Due Date: April 15

Motorized Recreation Grant Application For: (choose all that apply) Form 8700-159 (R 12118)

□ ATV/UTV Trail Aid Page 1 ots

� Snowmobile Trail Aid

D Motorized Stewardship - 20% County match required

Notice: Completion of this form is required under Wisconsin Statutes 23.09(26) and 23.33. Failure to complete this form will result in denial of financial assistance. Personally identifiable information found on this form is not intended to be used for any other purpose. The Department of Natural Resources (DNR) may provide this information to requesters as required by Wisconsin's Open Records law {ss. 19.31 - 19.39, Wis. Stats.}.

Instructions: Applications may combine more than one source of funds. They may DNR Use Only be submitted for consideration of traditional ATV, UTV, Snowmobile and Motorized Category Number Stewardship funding. Submit one copy of all forms and attachments. See Page 2 for necessary attachments. Send applications to your Community Services Specialist.

Section 1: Applicant Information 0

Applicant / Organization Name

Dane County Parks

Check Recipient: Individual other than authorized individual to act on behalf of the applicant. D Select if the same as applicant.

Individual Authorized to Act on Behalf of Applicant per Resolution

Darren Marsh

Check Recipient Name (Name to Appear on Check)

Dane County Title Title

Parks Director Address Address

5201 Fen Oak Drive 5201 Fen Oak Drive City

Madison

State ZIP Code

WI 53718

City

Madison Telephone Number

(608) 224-3730

Email Address

[email protected]

MTV 9-Streiff/Brewery Spring Valley Creek Bridge County Township Range

@E

Green 04 N 7 OW Project Description Summary

Section ¼ ¼

14 NE

0

¼

SW

GPS Coordinates: Lat. 42.819802 Long. -89.63369

State ZIP Code

WI 53718

Priority replacement of a 13' x 31' Bridge over Spring Valley Creek on State Corridor #21 in Green County. Dane County has asked that the bridge be removed and abandoned. There are two main factors for the immediate removal of this bridge. 1) ) Local flooding in recent years has compromised the stream banks at the easement site.2) The bridge structure and footings have deteriorated to the point that the bridge can no longer support snowmobile use.

Proposed replacement bridge is 12'x40' bridge with a 25,000# Load Capacity

[g] I certify that all maintenance land use agreements are on file.

$50,600.00 $50,600.00 Leave Blank - DNR Use Onl

#28 - Dane - MTV 9 Bridge Rehab

Page 2: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

Dane County Parks Motorized Recreation Grant Application Form8700-159 (R12/18) Page3of5

Appendix A - Required for Bridge Rehab/Replace, New, or Reroute with New Bridge

[g] Bridge Rehab/Replace D New Bridge D Reroute with new bridge

County Township Range Section ¼¼ ¼ GPS Coordinates: (!)E

Green 04 N 7 ow

Water Body Name Spring Valley Creek Funded Trail Name or Number (SNARS if agglicable) State Trail Cooridor #21 Bridge is located on: @ Private property

Q Public property Landowner Where Bridge is Located Streif

Lat.--, 42.819802 14 NE SW Long. -89.63369

Bridge Name -I County Inventory Number

MTV9-Streiff/Brewery Spring Valley Dane 15

Has this bridge site ever received development or rehabilitation funds in the past? QYes Q No Year: $

Old Bridge/Culvert Size New Bridge/Culvert Size Telephone Number length of Trail Use Agreement (5 year

minimum)

Current maximum load 500 lbs. IAge of Bridge

I Bridge Material

Proposed maximum load 25,000 lbs. 20 Steel/Wood Sponsoring Club Name Club Contact Te!ephone Number Mt. Vernon Valley lliders Snowmobile Club Bob Zantow (608) 832-6685Do you have your trail bridges posted as to maximum load? What is the maximum load of the other bridges on the system if

QYes Q No What is the weight of your puller & drag/grading equipment?•

11,900 What other recreational trail uses are planned for this bridge? None

groomed with this bridge? 14,000 lbs

If there are other Recreational uses planned, how much of the bridge cost will be paid for by non-snowmobile or non-A TV users?

QYes O No QYes O No QYes O No QYes O No

Have you contacted your local DNR Water Management Sgecialist (WMS) regarding a permit? Is a permit needed? (Please provide any written correspondence from WMS.) Have you contacted your County Zoning Dept. regarding a floodplain determination? Will an H & H (hydrologic and hydraulic) study be required?

Bridge Project Detailed Description

The old MVT 9 bridge will be removed and hauled away. A new longer bridge with a designated load capacity will be

installed. New bridge will sit higher over the stream, meeting all WI DNR Waterway requirements, and the extended·

length will reach beyond the banks to provide for sound footing for the abutments The bridge will have load capacity of

25,000 lbs that will allow for more flexibility for larger maintenance equipment. Bridge will use Steel I-Beams and

Crossmembers, which are predrilled and have a red oxide primer finish, MCA Southern Yellow Pine treated lumber and

all hardware. All lumber is Pre Stained. The footings will be a floating pan design.

Page 3: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

Dane County Parks

Appendix A (continued)

Motorized Recreation Grant Application Form 8700-159 (R 12/18) Page 4 of 5

Summarize Costs in Appropriate Categories:•

I>

Bridge Dimensions:

Bridge Manufacturer:

Design Weight Load

Bridge Str=ucture Quote 1

(!) Steel O Wooden

40'x12'

Custom Manufacturing, Inc.

25,000 lbs.

Quote 2

· 0 Steel (!) Wooden

40'x12'

Wheeler Lumber LLC

25,000 lbs.

Cost of Structure: 1. Engineering

2. Structure$-----�-

$ ____ 4_0�,8_0 _0_

$ ______ _

$ ___ 4_2�,0 _80_

Installation Costs:

1. Engineering

2. Site Preparation

3. Abutments

4. Pilings/Piers

5. Approaches

6. Riprap

7. Labor

8. Equipment Rental

9. Culverts

10. H & H Study

11. Wetland Delineation

12. Other Delivery

Subtotal $ ____ 4 _0_,_,8_0 _0_

Quote 1

(!) Contractor or O Sponsor Estimate

$-------

$ 1,000 ----�--

$-------

$-------

$-------

$-------

$-------

$ 8 000 ----�--

$-------

$-------

$-------

$ 800 -------

$ _ _ __ 42_,_, _08_0_

Quote 2

0 Contractor · or (!) Sponsor Estimate

$-------

$ 1 000 ----�--$ ____ 1_,_,_83_5_

$ -------

$ -------

$ -------

$ 5,000 ____ .,__ __

$ 5,000 ____ .,__ __

$ ------� $

-------

$ -------

$ -------

Subtotal $ 9,800 $ 12,835

Total Cost $ 50,600 $ 54,915

For the application grant, you must take the lowest of the two quotes.

!Entire Deck and Railing Projects

Bridge Dimensions:

Design Weight Load

1. Materials

2. Labor

Qtoritractor O $ponsor O Club

______ lbs.

$-------

$-------

Total $ 0-------

Page 4: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

0

Custom Manufacturing, Inc. 606 Delco Drive, P.O. Box 279

Clinton, WI 53525 4744 608-676-2282 Fax: 608-676-2283 Please Indicate The Above Number When Ordering

[email protected]

To: Darren Marsh, Parks Division

Dane County Land & Water Resources

Department

5201 Fen Oak Drive, Room 234

Madison, WI 53718

Estimated Ship Date

4 weeks

Shipped VIA

Advise best way

F.O.B

Clinton, WI

Terms

Net 30

1

Description

2020 GRANT APPLICATION ESTIMATE

Along Hwy 92 – New Glarus, WI

40’ Bridge x 12’ Wide - 25,000# Load

Double Decked - 42” Horizontal Railing –

Hardware On 2 sets of Galvanized Sill Pans

Stamped Engineered Drawings

Removal of Existing Bridge – Site Preparation

Installation – Equipment Rental

Delivery Charges

Total

Above prices do not include sales tax or any

necessary permits

Bridge kit includes all Steel I-Beams and

Crossmembers, which are predrilled and have a

red oxide primer finish, MCA Southern Yellow

Pine treated lumber and all hardware.

All lumber is Pre Stained.

Bridge Kit Meets - WI DNR Guidelines –

25,000# Load

Price

$40,800.00

1,000.00

8,000.00

800.00

Total

$50,600.00

We are pleased to submit the above quotation for your consideration. Should you place an order, be assured it will receive our

prompt attention. This quotation is valid for __30_ days. Thereafter it is subject to change without notice.

BY: ___________________________ ACCEPTED: _____________________ DATE: _____________

Date: April 28, 2020 Salesperson: Tina Forrest

Inquiry Date: Inquiry Number

Page 5: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

T21843 QUOTATION 6/9/2020

Page 1 of 4

Project: State Trail 21 Snowmobile Bridges

Dane County

New Glarus, Wisconsin

Date: Letting Time:

Place:

Wheeler Lumber LLC 9531 W 78th Street, Ste. 100 | Minneapolis, MN 55344

Jake Silkey | Sales Engineer [email protected] | 262.229.4068

Prefabricated Timber Panel-Lam Recreation Bridge

Bridge Size: See Below No. of spans: 1

Live Load: 90 psf Vehicle Load: H12.5 Design Code: AASHTO LRFD

Decking: Wood panel Species: DF Treatment: QNAP

Railing: Wood Species: SYP Treatment: MCA

Safety Railing: 42" Horizontal Rail Spacing: AASHTO

Additional Notes: Bridge deck to be shipped as 2 panels and railing in pieces as a field assembled kit.

Bridge (MTV 7): 30’ span x 12’ clear Lump Sum Total… $23,335.00

Optional Sill Abutments (2) Lump Sum Total… $1,835.00

Includes sill cap, footers and attaching hardware

Optional Oak Wear Course Lump Sum Total… $3,210.00

Includes untreated oak wear plank and attaching hardware

Bridge (MTV 9): 40’ span x 12’ clear Lump Sum Total… $37,960.00

Optional Sill Abutments (2) Lump Sum Total… $1,835.00

Includes sill cap, footers and attaching hardware

Optional Oak Wear Course Lump Sum Total… $4,120.00

Includes untreated oak wear plank and attaching hardware

Bridge (MTV 11): 34’ span x 12’ clear Lump Sum Total… $27,185.00

Optional Sill Abutments (2) Lump Sum Total… $1,835.00

Includes sill cap, footers and attaching hardware

Optional Oak Wear Course Lump Sum Total… $3,455.00

Includes untreated oak wear plank and attaching hardware

Page 6: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

1S1 1 4" = 1'-0"

BRIDGE PLAN

TREATED LUMBER DECKINGCOMPACTED 3 4" CRUSHED LIMESTONE SEE 3S1

2S1

TREATED LUMBER RAILING

EXACT LENGTH TO BE VERIFIED AND COMFIRMED BY CONTRACTOR

EXAC

T W

IDTH

TO

BE

VERI

FIED

6"

COMPACTED3

4" CRUSHED LIMESTONE

2" Ø SCHEDULE 40GALVANIZED PIPE

ONE EACH SIDE

MIRAFI FABRIC HP570BELOW GRAVEL PAD

2" Ø SCHEDULE 40GALVANIZED PIPE

ONE EACH SIDE

3S1

GRAVEL PAD & GALVANIZED BASE DETAILS1

2" = 1'-0"

GALVANIZED BEARING PAN

GALVANIZED BEARING PAN

2" Ø SCHEDULE40 PIPE

MAX. SLOPE 12"1" MAX. SLOPE12"

1"

ORDINARY HIGH WATER MARK

3S1

5'-0

"

EXACT LENGTH TO BE VERIFIED AND CONFIRMED BY CONTRACTOR

6"

2S1 1

4" = 1'-0"

VERIFY ACTUAL STREAM BEDAND ELEVATIONS IN THE FIELDBRIDGE ELEVATIONWATER SURFACE

12" STEEL TREAD PLATE

AT TRANSITIONS ASREQUIRED

34" CRUSHED LIMESTONE

AT TRANSITION ASREQUIRED, NOT TO EXCEED1'-0" IN DEPTH PER WDNRREQUIREMENT

COMPACTED 3 4" CRUSHED LIMESTONE

TYPICAL SUPPORT BASE, GALVANIZEDBEARING PAN, SEE 3

S1

TREATED WOOD DECKING

3 4" = 1'-0"

RISER AND BOARDWALK(TO BE DETERMINED)SEE ELEVATED BANK APPROACH

AT GRADE BANK APPROACH ALTERNATIVE

12" STEEL TREAD PLATE

AS REQUIRED

34" CRUSHED LIMESTONE

NOT TO EXCEED 1'-0" IN DEPTH

TREATED WOOD RAILING

12" = 1'-0"

RISER IF NECESSARY TO MEET 5'-0" ABOVEORDINARY HIGH WATER MARK REQUIREMENTAND ADA ACCESSIBILITY STANDARDS,DESIGN BY BRIDGE DESIGNER, TO BE APPROVED BYDANE COUNTY PUBLIC WORKS ENGINEERING DIVISION

VARI

ES

METAL FOOTING TO SUPPORTAPPROACH BOARDWALK DESIGN BYBRIDGE DESIGNER, TO BE APPROVED BYDANE COUNTY PUBLIC WORKS ENGINEERING DIVISION

COMPACTED 3 4" CRUSHED LIMESTONE PAD MINIMUM

6" DEPTH

COMPACTED 3 4" CRUSHEDLIMESTONE AT TRANSITIONNOT TO EXCEED 1'-0" IN DEPTH

TREATEDWOOD POST

ELEVATED BANK APPROACH ALTERNATIVE

LENGTH AND DESIGN OF BOARDWALK APPROACHBY CONTRACTOR AND APPROVED BY DANE COUNTYPUBLIC WORKS ENGINEERING DIVISION

FOR THE BRIDGE TO MEET THE WDNR REQUIREMENT OF5'-0" ABOVE THE ORDINARY HIGH WATER MARK, THEADDITION OF STEEL RISERS MAY BE NEEDED WITH ABOARDWALK APPROACH TO THE BRIDGE. SEE:ELEVATED BANK APPROACH ALTERNATIVE

BRIDGE, BOARDWALK APPROACH (IF NECESSARY) ANDGRAVEL APPROACHES MUST MEET THE REQUIREMENTSOF THE AMERICANS WITH DISABILITIES ACT (ADA)

BRIDGE APPROACH ALTERNATIVES:AT GRADE BANK APPROACH OR ELEVATED BANK APPROACH

NOTE:

NOTES:GENERAL NOTES:

1. DANE COUNTY IS NOT RESPONSIBLE FOR CONSTRUCTION MEANS OR METHODS OR FOR SUPERVISION OF CONSTRUCTION

2. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY CONTRACTOR PRIOR TO BRIDGE FABRICATION. ANY DIMENSIONAL DISCREPANCIES ARE TO BE BROUGHT TO THEATTENTION OF THE DANE COUNTY PUBLIC WORKS ENGINEERING DIVISION PRIOR TO PROCEEDING WITH FABRICATION OF THE BRIDGE. FINAL PLANS AND SPECIFICATIONSSHALL BE STAMPED ENGINEERING DRAWINGS APPROVED BY A WISCONSIN REGISTERED STRUCTURAL ENGINEER OR PREVIOUSLY APPROVED DRAWINGS.

3. ALL WORK IS TO BE PERFORMED IN A SAFE AND WORKMAN-LIKE MANNER IN COMPLIANCE WITH THE FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) ANDALL STATE OF WISCONSIN BUILDING CODES AND ZONING ORDINANCES AS THEY MAY PERTAIN TO THIS PROJECT. THE CONTRACTOR MUST COMPLY WITH ALL WISCONSINDEPARTMENT OF NATURAL RESOURCES (WDNR) AND ARMY CORPS OF ENGINEERS RULES AND REGULATIONS ASSOCIATED WITH CROSSING WATERWAYS. DANE COUNTYPARKS DIVISION WILL SECURE ALL NECESSARY WATER REGULATORY PERMITS AND APPROVALS FROM THE WISCONSIN DNR AND ARMY CORPS OF ENGINEERS AND DANECOUNTY PRIOR TO CONSTRUCTION. CONTRACTOR MUST ADHERE TO THE WDNR CHAPTER 30 PERMIT AND THE DANE COUNTY SHORELAND EROSION CONTROL PERMITREQUIREMENTS WHILE COMPLETING THE CONSTRUCTION OF THE BRIDGE.

4. THE CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY BRACING DURING HANDLING AND ERECTION OF THE BRIDGE.

SITE WORK:

1. CONTRACTOR IS TO PROVIDE FINAL BRIDGE DESIGN WITH NECESSARY APPROACHES AND STRUCTURAL ELEMENTS FOR APPROVAL BY DANE COUNTY PARKS.

2. THE CONTRACTOR IS TO VERIFY ALL CONDITIONS AT THE SITE, PARTICULARLY THE LOCATION OF ANY UNDERGROUND UTILITIES BEFORE EXCAVATION. ANYDISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF DANE COUNTY PUBLIC WORKS ENGINEERING DIVISION.

3. THE CONTRACTOR IS RESPONSIBLE FOR SOIL COMPACTION TESTING AND FOR PROVIDING A BRIDGE DESIGN TO MEET THE SOIL TYPE.

4. THE BEARING ELEVATION OF THE BRIDGE SHALL BE SET AT AN ELEVATION SUCH THAT THE MINIMUM BOTTOM CHORD ELEVATION OF THE BRIDGE SHALL BE 5'-0" ABOVETHE ORDINARY HIGH WATER MARK . THE ORDINARY HIGH WATER MARK IS THE POINT ON THE BANK OR SHORE UP TO WHICH THE PRESENCE AND ACTION OF THE WATERIS SO CONTINUOUS AS TO LEAVE A DISTINCT MARK EITHER BY EROSION, DESTRUCTION OR TERRESTRIAL (LAND) VEGETATION, OR OTHER EASILY RECOGNIZEDCHARACTERISTIC.

Page 7: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

1S1 NTS

BRIDGE PLAN

TREATED LUMBER DECKINGCOMPACTED 3 4" CRUSHED LIMESTONE SEE 3S1

2S1

TREATED LUMBER RAILING

APPROX. 50'-0" EXACT DIMENSIONS TO BE VERIFIED BY CONTRACTOR

12'-0

" I.D

.

6"

COMPACTED3

4" CRUSHED LIMESTONE

2" Ø SCHEDULE 40GALVANIZED PIPE

ONE EACH SIDE TYP.6'-0" LENGTH, BRIDGE ANCHORS

MIRAFI FABRIC HP570BELOW GRAVEL PAD

2" Ø SCHEDULE 40GALVANIZED PIPE

ONE EACH SIDE

3S1

GRAVEL PAD & GALVANIZED BASE DETAILSNTS

GALVANIZED BEARING PAN

GALVANIZED BEARING PAN

(2) 2" Ø SCHEDULE40 PIPE, 6'-0" LENGTHBRIDGE ANCHORS

ORDINARY HIGH WATER MARK

3S1

6"

2S1

BRIDGE ELEVATIONWATER SURFACE*VERIFY ACTUAL STREAM BEDAND ELEVATIONS IN THE FIELD

34" CRUSHED LIMESTONE

AT TRANSITION ASREQUIRED, NOT TO EXCEED1'-0" IN DEPTH PER WDNRREQUIREMENT

(2) 2" Ø SCHEDULE40 PIPE, 6'-0" LENGTH

BRIDGE ANCHORS

APPROX. 3'-0" O.H.W.M. TO O.H.W.M.

APPROX. 50'-0" EXACT DIMENSIONS TO BE VERIFIED BY CONTRACTOR

NTS

AT GRADE BANK TRANSITION

COMPACTED 3 4" CRUSHED LIMESTONE

TYPICAL SUPPORT BASE, GALVANIZEDBEARING PAN, SEE

3S1

TREATED WOOD DECKINGAND RAILING

3 4" CRUSHED LIMESTONENOT TO EXCEED 1'-0" IN DEPTH

(2) 2" Ø SCHEDULE 40 PIPE,6'-0" LENGTH BRIDGE ANCHORS

BRIDGE TO BANK TRANSITION:

NOTES:1. DANE COUNTY IS NOT RESPONSIBLE FOR CONSTRUCTION MEANS OR METHODS OR FOR SUPERVISION OF CONSTRUCTION

2. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY CONTRACTOR PRIOR TO BRIDGE FABRICATION. ANY DIMENSIONAL DISCREPANCIES ARE TO BE BROUGHT TO THEATTENTION OF THE DANE COUNTY PUBLIC WORKS ENGINEERING DIVISION PRIOR TO PROCEEDING WITH FABRICATION OF THE BRIDGE. FINAL PLANS AND SPECIFICATIONSSHALL BE STAMPED ENGINEERING DRAWINGS APPROVED BY A WISCONSIN REGISTERED STRUCTURAL ENGINEER OR PREVIOUSLY APPROVED DRAWINGS.

3. ALL WORK IS TO BE PERFORMED IN A SAFE AND WORKMAN-LIKE MANNER IN COMPLIANCE WITH THE FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) ANDALL STATE OF WISCONSIN BUILDING CODES AND ZONING ORDINANCES AS THEY MAY PERTAIN TO THIS PROJECT. THE CONTRACTOR MUST COMPLY WITH ALL WISCONSINDEPARTMENT OF NATURAL RESOURCES (WDNR) AND ARMY CORPS OF ENGINEERS RULES AND REGULATIONS ASSOCIATED WITH CROSSING WATERWAYS. DANE COUNTYPARKS DIVISION WILL SECURE ALL NECESSARY WATER REGULATORY PERMITS AND APPROVALS FROM THE WISCONSIN DNR AND ARMY CORPS OF ENGINEERS AND DANECOUNTY PRIOR TO CONSTRUCTION. CONTRACTOR MUST ADHERE TO THE WDNR CHAPTER 30 PERMIT AND THE DANE COUNTY SHORELAND EROSION CONTROL PERMITREQUIREMENTS WHILE COMPLETING THE CONSTRUCTION OF THE BRIDGE.

4. THE CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY BRACING DURING HANDLING AND ERECTION OF THE BRIDGE.

5. BRIDGE AND GRAVEL APPROACHES MUST MEET THE REQUIREMENTS OF THE AMERICANS WITH DISABILITIES ACT (ADA).

6. CONTRACTOR IS TO PROVIDE FINAL BRIDGE DESIGN WITH NECESSARY APPROACHES AND STRUCTURAL ELEMENTS FOR APPROVAL BY DANE COUNTY PUBLIC WORKSENGINEERING DIVISION.

7. THE CONTRACTOR IS TO VERIFY ALL CONDITIONS AT THE SITE, PARTICULARLY THE LOCATION OF ANY UNDERGROUND UTILITIES BEFORE EXCAVATION. ANYDISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF DANE COUNTY PUBLIC WORKS ENGINEERING DIVISION.

8. THE CONTRACTOR IS RESPONSIBLE FOR SOIL COMPACTION TESTING AND FOR PROVIDING A BRIDGE DESIGN TO MEET THE SOIL TYPE.

9. BRIDGE LOAD CAPACITY: 14,000 LBS.

Page 8: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN,GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c)OpenStreetMap contributors, and the GIS User Community

Project Location Map

Dane County MaskDane County Mask

Snowmobile TrailsClub TrailCounty Funded Trail

State Corridor TrailSnowmobile Trail Regions

Snowmobile Trail Regions

June 1, 2020 0 38,000 76,00019,000 Feet

¯

Page 9: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

!

!

!

!

!

!

!.

!.

!.

!.

!.

State

Cor

ridor

Trail

21

Dane 17Dane 16

Dane 15

Dane 14

Dane 13

Dane 12

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, EsriJapan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c)OpenStreetMap contributors, and the GIS User Community

GreenCounty

0 500 1,000Feet

¹

Dane 13 BridgeMTV 7-Martinson Spring Valley CreekLatitude: 42.841997Longitude: -89.634049

Mt. Vernon Valley Riders Snowmobile ClubDane 13, 15 and 17 Bridge Funding Requests

SnowmobileTrails

Map created April 2020 by Dane County LWRD.H:\Parks\Operations & Maintenance\Snowmobile Trail Program\2020-2021\Maps

Club TrailCounty Funded TrailState Corridor Trail

Funding Request(Snowmobile Trail Bridge)

Dane 17 Bridge MTV 11-Brewery Ditch Latitude: 42.817205 Longitude: -89.632531

Dane 15 BridgeMTV9-Streiff/Brewery Spring Valley Creek Latitude: 42.819802Longitude: -89.63369

!.

Dane 14 BridgeS-5425 bridge grant (2019)

Dane 16 BridgeS-5423 bridge grant (2019)

Page 10: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

MTV9-Streiff/Brewery Spring Valley Creek Bridge

MTV9-Streiff/Brewery Spring Valley Creek Bridge

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/AirbusDS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

HighwaysOther Road ClassState HwyCounty Hwy

Local RoadsOther Road ClassState HwyCounty HwyTown RoadVillage/City StreetParcelsMunicipal Boundaries

Floodplains0.2 PCT ANNUAL CHANCE FLOOD HAZARDAAEAE - FLOODWAY

6/1/2020, 11:44:40 AM0 210 420105 ft

0 60 12030 m

1:2,257

of any kind, expressed or implied, including but not limited to implied warrant ies for a particular purpose, are disclaimed. Assessing the accuracy and reliability of content on this site is the responsibility of the user.Green County assumes no responsibility for improper or incorrect use; the information provided is not warranted nor guaranteed for accuracy, nor intended to substitute for professional legal advice. All warranties

Page 11: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

Dane 15 – MTV 9-Streiff/Brewery Spring Valley Creek Bridge

Page 12: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

Dane 15 – MTV 9-Streiff/Brewery Spring Valley Creek Bridge

Page 13: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

Dane 15 – MTV 9-Streiff/Brewery Spring Valley Creek Bridge

Page 14: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

Dane 15 – MTV 9-Streiff/Brewery Spring Valley Creek Bridge

Page 15: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

Dane 15 – MTV 9-Streiff/Brewery Spring Valley Creek Bridge

Page 16: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

Dane 15 – MTV 9-Streiff/Brewery Spring Valley Creek Bridge

Page 17: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

Dane 15 – MTV 9-Streiff/Brewery Spring Valley Creek Bridge

Page 18: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

Dane 15 – MTV 9-Streiff/Brewery Spring Valley Creek Bridge

Page 19: #28 - Dane - MTV 9 Bridge Rehab State of Wisconsin ... · bridge (mtv 11): 34 ... attention of the dane county public works engineering division prior to proceeding with fabrication

Dane 15 – MTV 9-Streiff/Brewery Spring Valley Creek Bridge