APPLICATION REPORT
2721 / 11 / 0 6 • 5 / 2 011
Delayed coking - coke drums
COKEDRUM 1
COKEDRUM 2
FURNACE
FRACTIONATOR
BLOWDOWNDRUM
DECOKINGWATER
TANK
4-way switchvalve
Drain Drain
Fresh feed
Overhead gases
Bottom tofurnace
Coke drumoverhead vapor
Fuel to burners
Recycle
Coker naphta
Light gas oil
Heavy gas oil
Bypass
tofractionator
Process overviewDd c d f cvt
v f hv d t vb
tptt f. Fxbt pt d
-t -qpt ct
ptt d tt. Ct p-
tion is important for protable delayed coking. The
t c pc tpc pd t th
ct – fc d fctt, c
d d c hd d th cd bwdw
areas. The exact conguration will vary upon ren-
ery’s specic design strategy and existing process-
ing capabilities. The most common feedstock is
vc d; hwv, th hv t
d, ch vb t, , t
d d ptch.
The fresh feed combined with distillate recycle
htd th fd pht xch t t
about 280 – 320 °C. The prehated residue is sent
t th btt f th fctt bf ht
the furnace to about 500 °C. High-pressure steam
b fdwt jctd t th fc c
f pt vct d dc t t ct
the coke formation in the tubes. The coke drums
dwt th fc pvd ct t f
sufcient coking reaction and collection of solid
coke formed. While one coke drum is being lled
for a xed cycle time, typically 16 to 18 hours, the
th c d d th c, ctt,
and drum preparation steps. The closed blowdown
t xz hdcb d wt cv-
, pvd c f th c d d -
z pt d pt.
7/27/2019 2721_11_06en
http://slidepdf.com/reader/full/27211106en 2/6
2721/11/06 DelayeD Coking - Coke Drums
2 APPLICATION REPORT 5/11
Delayed coking challengesThe target of delayed coking process is to start
cracking the heavy feedstock in coking furnace
and complete the cracking and coking in the
coke drums downstream the furnace. Coking in
other process equipment, furnace, fractionator
and coke drum overhead line cannot be com-
pletely avoided. This must be taken into ac-
count throughout the delayed coking process
when selecting valves for control, on-off and
ESD-applications.
Health, Safety, Environment – Vv
p bth vt d ft d
to risk of re, toxicity and volatility of gases. Emer -
c htdw d /ff vv t b b
t pf th ct pc qpt
f.
Top-class products at maximum yield – Thet c f c pdct d hh qt. it
is important that the process is stable, exible and
d ct. Pp ct vv pfc
fc d fctt pv th ccc
f thhpt ct d dv ffct t th
pt pfc d th dwt p-
c.
Maintenance costs - Ctc vv c d
wtch, t, d d vhd ct
p xt ptt ccf c
d d v pc pfc. Ppf vv th pc t b vcd
bc th w hv dct pct th f-
ciency of the process.
Plant run-time – Reneries are looking for longer
pt -t c dwt pdct
d b ct cd t-
nance costs. This requires reliable equipment and
pc ct.
Metso solutionsWe are all tuned up to answer these challenges
through our refining application experience
and product offering for control, safety and
automated on/off duty that ensure high valve
performance in delayed coking plants. Our ap-
plication specific automated coke drum valves
are designed for efficient and reliable process
operation.
Safety - mt th c -
c htdw vv pp wh h th xp-
c d wd t cb tc wth
most reliable valves and actuators. Technology
ct t t pt d ht
re safe design ensure that latest emission and re
ft tdd c b ppd. rb vv
with rst intelligent, SIL3 approved safety valve
ct d pt t tt t n
ValvGuardTM will ensure that plant emergencyhtdw vv w w pf pp wh
dd.
Efficiency - Throughput losses due to heavy
d tc d p ct pfc w
b vdd wth tt ct vv. Fw
thh th pc t b chd th
need arises with rangeability of 150:1 and further
wth f b b vv. o dvcd tt
dt vv ct f ct, -ff d esD
ppct hh pt ccc d
ft p. Cct vv ct d zwth npf-p w c th bt
vv pfc d pc ct.
Availability - sp t d, fc-t-
fc d, d b vc tw d
vt t w hp t ptz
tc ctvt. rt vv hv
b vc f v wtht q-
tc d hw f .
The proven performance of Metso valves with long
t t t tht d ht-ff cpb-
t th d t f ct, -ff
d ctc c d ppct.
Reliability - Vv pfc td dt c-
ctd b t vv ct d d
by Metso FieldCare, open FDT/DTM technology
based conguration and condition monitoring soft-
w, t pb t pdct d pd t
tc qt d dc chd-
uled downtime. This gives full transparency to the
vv pfc pc ct.
7/27/2019 2721_11_06en
http://slidepdf.com/reader/full/27211106en 3/6
DelayeD Coking - Coke Drums 2721/11/06
APPLICATION REPORT 5 /11 3
Coke drum applications
sc th tpc 12 ctc vv vvd
th c d pt, vv pfc p
- th pt t z pt
xp d t c pdct d qp-
t. effctv pt f c d c
pdctvt d xtd pc p-t. Wth
hcd t p t, ct t-
t hv xhbtd xtdd vc f.
sv tc f pt wth mt
dd c vv v ptt ct v f
USD 540.000 in maintenance costs alone.
4-way switching valve (1)
Challenge - This is a very challenging application
due to the variety of uids and service parameters.
Vv t hd hh p, hv d-
t vtd tpt. a th c fd
(vp-qd cbt) xt th c ht t
p t hv c. rdc t th ht v ht d t z c cc-
t, d t v th cc, th ht.
The feed then passes through the 4-way switching
vv d t th ctv c d. ath ctc
function of the 4-way switching valve is to keep the
fd v th
t d a, d
B, t bp.
oc htd
bv th th
cc tp-
t, vv,pp, v
pump that the uid
wd t tp
in will ll with solid
c, d t
.
Metso solution – With over 25 year of experience,
the series Y4, 4-way switching valve, is another
xp f mt’ ctt t tchc
dhp thh d xcc.
Benefit – Maximum process efciency is achieved
by fully automated Metso 4-way switching. The
tt C-m bd cpb f pvd-
vc f pc cdt f hv
d. o wdd bd ctct wth
t t p t th d f x-
pv d dd wd ht ttt tht
cvt p d.
Metso Service Centers can efciently refurbish
these 4-way switching valves, increasing return on
vtt d dc pd tc
ct. o ct hv xpcd t-
c f pt f 7 wth v -
tenance cost savings of USD 140.000 for each
4-way switching valve.
Coke drum isolation valves (2)
Challenge - The coke drum isolation valves are re-
quired to ow and isolate in both directions. When
th c d ctv, th p f vv p
t dt th ch. Wh th d bc
ctv f dc d c, th t
valve must allow for the ow of steam, water and
coke in the reverse ow direction. This uid is the
t f th dc pc d bv
t. Fd th vd f th t
thh th c d d vv. at th
t, th cd c d t vv t
isolate to prevent the back-ow of decoking slurry
to the 4-way switching valve.
Metso solution – F c d t th -d d ft f th mt mBV f
b t-td b vv, t th p
ppct chc. Wth mt’ dvcd cc-
t th t cpt f ctc vv c
b cctd v cct.
Figure 2. Metso MBV coke drum isolation valve
Benefit – There is no room for errors when han-
d th hv d tht pcd th
dd c. if th pdct wd t cp
t th b/t t b , th
vv w jt z p t t . nt
d th z p, bt t t pb t t
them clean again. Take it from a valve rebuilding
xpt wh wd th pjct, “it’ th th-
t tt t ’ v f.” s
tht’ wh p p ch ptt pt f
ctc c vv’ d.
o ct hv xpcd tc
f pt f 7 wth v t-
nance cost savings of $400.000 for each pair of
c d.
Figure 1. Metso 4-way switching valvefor a customer in the USA
7/27/2019 2721_11_06en
http://slidepdf.com/reader/full/27211106en 4/6
2721/11/06 DelayeD Coking - Coke Drums
4 APPLICATION REPORT 5/11
Overhead vapor line valves (3)
Challenge - Vp t f th ctv c d
d pt. it p thh bth
vhd vp vv d th vhd vp
ct vv t w t th fctt.
D dc, th vhd vp vv
ct t th w ctv d t t t
upstream side. This prevents the steam, water and
c tht t f th dc pc f
t th vhd vp d ctt
th pdct t f th th ctv c d.
st, th cd vv f th p t
isolate on its downstream side. This prevents prod-
ct t f th ctv d f b wtd
by mixing with the decoking efuent.
Metso solution – mt mBV, f-b t-
-td b vv, t th p ppc-
t chc f vhd vp vc. mt ff f ctt d ttt
to suit specic design requirements.
Figure 3. Metso 24” MBV at customer’s Coker plant
Benefit – kw tht t cvt
cc, th ctt th mt vv
zd t tt th vv qc f f p t
full close. Typically, all of the stroking times on any
size of 2-way valve are under one minute. This
tht t f t w b d
t p th cct f d d th
b t bt . mt pc
calculates steam ow into all purge ports. We rec-
ommend orices at each purge port that control a
constant steam ow rate to each purged area thus
z th tt t qd. l t
means more prot.
Coke drum drain valves (4)
Challenge - When the coke drum in service is lled
to a specic level, the fresh charge from the heater
is switched to the empty coke drum. The full drum
td, td t v hdcb vp
and cooled by lling with water.
The combination of solid coke, water and steam
referred to as decoking efuent is removed from
the system through the coke drum drain valve. The
uid pressure and temperature can vary heavily de-
pd th c d pt pt.
Metso solution –The rugged full-bore, abrasion
resistant X-MBV ball valve provides the rener with
p ppct pfc. mt fc-
t f f b vv tht p t th -
nicant and varied challenges of the delayed coker vc, w ctt d ttt t
suit specic design requirements.
Benefit – This again is a very demanding applica-
t d t th bv t f th dc f-
uent. The full bore CR-Mo body provides excellent
b tc t w tc
d btt bt.
7/27/2019 2721_11_06en
http://slidepdf.com/reader/full/27211106en 5/6
DelayeD Coking - Coke Drums 2721/11/06
APPLICATION REPORT 5 /11 5
Overhead Vapor Line Back Pressure Control
Valve (5)
Challenge – Demand for better process efciency
q ht c d cc t. Ft d
w-p pd pbt wh dc
th v cc t. a cvt thd t
hd bc p wth th cbd vhd
vapor line back pressure control valve. This re-
q d ctbt f th vv b.
Metso solution – Metso’s special buttery valve,
wtht t , th t f bt ct
pfc.
Figure 4. Metso Neldisc special butterfly valve
Benefit – sf w vt, w ftv
, d wth v-dd pc d
t p cct. it pvt th tv
f txc vp thh th pc t th t-ph. Wth d th vv v
d t vd d vpzt tht
major safety benet.
7/27/2019 2721_11_06en
http://slidepdf.com/reader/full/27211106en 6/6
The information provided in this bulletin is advisory in nature, and is intended as a guideline only.
For specic circumstances and more detailed information, please consult with your local automation expert at Metso.
Metso Automation Inc.
Europe, Vanha Porvoontie 229, P.O. Box 304, FI-01301 VANTAA, Finland.Tel. +358 20 483 150. Fax +358 20 483 151
North America, 44 Bowditch Drive, P.O. Box 8044, Shrewsbury, MA 01545, USA.Tel. +1 508 852 0200. Fax +1 508 852 8172
South America, Av. Independéncia, 2500- Iporanga, 18087-101, Sorocaba-São PauloBrazil. Tel. +55 15 2102 9700. Fax +55 15 2102 9748/49
Asia Pacific, 20 Kallang Avenue, Lobby B, #06-00, PICO Creative Centre, Singapore 339411, Singapore.Tel. +65 6511 1011. Fax +65 6250 0830
China, 19/F, the Exchange Beijing, No. 118, Jianguo Lu Yi, Chaoyang Dist, 100022 Beijing, China.Tel. +86-10-6566-6600. Fax +86-10-6566-2575
Middle East, Roundabout 8, Unit AB-07, P.O. Box 17175, Jebel Ali Freezone, Dubai,United Arab Emirates. Tel. +971 4 883 6974. Fax +971 4 883 6836
www.metso.com/valves
APPLICATION REPORT