27150 - Singtel DC West Product Factsheet · • Fully integrated and monitored climate control...
Transcript of 27150 - Singtel DC West Product Factsheet · • Fully integrated and monitored climate control...
Copyright © 2015 Singapore Telecommunications Ltd (CRN:199201624D). All rights reserved.
JUL
2015
For more information Contact your Singtel Account Managerwww.singtel.com/datacentres [email protected]
The strategic location of our new Tier 3+ data centre, DC West, complements the development plans for Jurong to become the next largest regional and commercial hub outside the Central Business District. Estimated to be ready in Q4 2016, this new facility is highly scalable to meet the growing demands of power-intensive deployments.
Apart from its state-of-the-art facilities, it will offer diversity to our network of data centres located in the central and eastern of Singapore. Services range from entry-level rack space, high density rack solutions to caged areas to customised private vaults.
Features Descriptions
General building information • LocatedinJurong• Purpose-builtseven-storeybuildingintoastate-of-the-artdatacentrefacilities• TargetBuilding&ConstructionAuthorityandInfocommDevelopmentAuthorityofSingapore(BCA-IDA)GreenMarkPlatinum• Floorarea:over570,000sqft• Floorloading:12KN/m²• Slab-to-slabheight:6m• Raisedfloorheight:1m• 2xstagingrooms• 4xpassengerlifts• 2xcargolifts
Cooling system • Watercooledchillersystem:N+1withclosedloopchilledwaterdistributionsystem• CRACconfiguration:N+20%• Coolingdensitybuiltto2000W/sqm• Fullyintegratedandmonitoredclimatecontrolsystems• 24hrsofmakeupwaterstorageatfullload
Powersystem • FullyredundantDieselRotaryUninterruptiblePowerSupply(DRUPS)basedon2Ndesign• Fullyredundantswitchboard• Undergrounddieseltankswith18hrsbackupatfullload
Advancedfiredetectionandsuppression system
• GaseousfiresuppressionsystemandVESDA• Pre-actionsprinklerandsmokedetectionsystem• Firerateddoorsandpartitions• 24x7decentralisedfirealarmmonitoringthatlinksdirectlytoanexternalfiremonitoringagency
Security • Contact-lesscardaccesssystemstopreventunauthorisedaccess• 24x7closedcircuitTV(CCTV)monitoringsystemwithrecordingonallfloors• 24x7physicalsecurityaccessbypre-authorisation• RegularsecuritypatrolwithintheDCbuilding• TVRAcomplianceresistantwallsandwindowlessbuildingstructure• TargetinformationsecuritymanagementsystemmeetingtherequirementsofISO27001
Environmental and climate control systems
• 24x7temperatureandhumiditymonitoring• Environmentalsystemsbackedupbyemergencygeneratorpower
Network redundancy • 2xseparatemaindistributionframe(MDF)room• 2xseparatecommunicationsriser• HousesSingtel’sregionalinfrastructureservers,back-upservers,networkequipmentandInternet core switches to ensure optimum network performance
*Aboveinformationistheproposedplanneddesign,subjecttoconfirmation.
Singtel Business
Product FactsheetDC West