27 Apr 2006P J Dornan - ISS3 - RAL
Next Meeting
• 4th ISS Plenary– Irvine Aug21, 22 (NUFACT06 Aug 24 – 30)
• Workshops– Physics Group, June, Valencia– Machine Group, July 26 – 28, Princeton
27 Apr 2006P J Dornan - ISS3 - RAL
Thanks
• Ajit Kurup, Juergen Pozimski
• Debbie Loader
• Piera Brambilla
• Ken Long
27 Apr 2006P J Dornan - ISS3 - RAL
Concluding Discussion ISS RAL Meeting Apr 2006
• ISS a one year Study – commenced NuFact05– Ends NuFact06
• To Discuss Now– Focus efforts For the Final Report &
Presentation at NuFact06
– Plan the Next Step after ISS
27 Apr 2006P J Dornan - ISS3 - RAL
The ISS End Game
• Presentation– At NuFact06
• And then it is important that the results are widely distributed
• Report– Before the end of 2006– Based on the 3 Working Groups– What should this include?
27 Apr 2006P J Dornan - ISS3 - RAL
Physics
– The importance of physics– Justification for precision determination of
the oscillation parameters• to the level of the CKM parameters?
– Comparisons of Performance• Superbeam, -Beam, Factory• With various scenarios with appropriate detectors
at suitable baselines
27 Apr 2006P J Dornan - ISS3 - RAL
Physics Report
How important – gold, silver, platinum?
In the ideal scenario should we measure
e→e
→e
Specifically - how important are the tau channels?
27 Apr 2006P J Dornan - ISS3 - RAL
Muon Physics & the Factory
Intense muon beams are needed for muon physics
Could be the place for the next major advance
But - is a Factory suitable for muon experiments?
27 Apr 2006P J Dornan - ISS3 - RAL
Detectors
Which can effectively be magnetised?
Iron calorimeter, Emulsion
Liquid Argon??
How low can one reduce the threshold?
Which can identify taus?This must tie in with the relevance of gold, silver platinum
Cost?
Define the necessary R&D Programme
27 Apr 2006P J Dornan - ISS3 - RAL
Accelerator
This will concentrate on the neutrino factoryA viable baseline design
with realistic parameters and an indication of increase or decrease in performance as one moves from the baseline
Cost & TimescaleCost will not be easy - but even to €0.5BTimescale – Important to show that we could have a precision
neutrino facility by tne end of the next decade
The R&D Programme - MICE, MERIT, + …
27 Apr 2006P J Dornan - ISS3 - RAL
SuperBeams, Synergies
Little discussion on future SuperbeamsIs it assumed problems are understood?
Most synergies centre around the proton driverand it is appreciated that the proton driver used will have more than one application
- but the effort has been to understand the needs of the neutrino factory.
27 Apr 2006P J Dornan - ISS3 - RAL
Incremental Path to a NeutrinoFactory
Era ofsensitivity &
precision
Factory Beam
But Factory and beam can be on same timescale as superbeam upgrades
Path to a NeutrinoFactory or -Beam
27 Apr 2006P J Dornan - ISS3 - RAL
After ISS
• For the precision era– Superbeams, -beams, -Factory will compete for
resources– Could have 0, 1 or 2 Superbeams– plus a-beam or -Factory complex
• Decision Point– 2009-2011– Need a CDR for future neutrino complex by ~2009 -Beam and -Factory– Assume superbeam developments will come from
present proponents
27 Apr 2006P J Dornan - ISS3 - RAL
Neutrino Factory• Following ISS there needs to be a Design
Study for a Neutrino Factory– It will need engineering effort– And therefore resources– Where can these come from?
• Funding Agencies, Labs, EU
– At the BENE/ISS meeting tomorrow planning for a request to the EU FP7 programme will start
• But funding from this source will not come until mid-end 2007– Activity must start before then - it should start
this year• And maintain the momentum of the ISS study
27 Apr 2006P J Dornan - ISS3 - RAL
Organisation of the -Fact Design Study
– Should be decided by NuFact06
• Do we keep a similar structure to the ISS?– Accelerator– Detector– Physics
• How to get organised?
• Can we continue to have it truly international?
27 Apr 2006P J Dornan - ISS3 - RAL
Coherence of the Neutrino Community
• Highly Desirable– Can a -Factory IDS be incorporated with the
broader neutrino community• Superbeams -Beam
-Beam also requires a major R&D effort• Can these both be conducted under the same umbrella
• We have to convince the wider community that the precision age (-Beam or -Factory)
• is feasible and possible by ~2020