26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone)...

12
Jun 29, 2022 S.Movchan Straw manufacturing and QC 1 na NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Mov

description

26-Feb-16S.Movchan Straw manufacturing and QC3 Bld. 217 Staff entrance Gate in front of straw module assembly area

Transcript of 26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone)...

Page 1: 26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.

May 8, 2023 S.Movchan Straw manufacturing and QC 1

Dubna NA62 straw tracker assembly area(milestone)

• halls • plans• conclusion

Presented by S.Movchan

Page 2: 26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.

May 8, 2023 S.Movchan Straw manufacturing and QC 2

Bld. 217: common view

Module entrance

Page 3: 26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.

May 8, 2023 S.Movchan Straw manufacturing and QC 3

Bld. 217

Staff entranceGate in front of

straw module assembly area

Page 4: 26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.

May 8, 2023 S.Movchan Straw manufacturing and QC 4

Straw module 3 assembly halls

Assemblyarea 1

Assemblyarea 2

Vacuum test

WiringConnectivityGas tightness

HV test

Cosmic test

Frame assembly

Page 5: 26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.

May 8, 2023 S.Movchan Straw manufacturing and QC 5

Hall and 2 rooms: common view

Total: ~ 250 m2

Page 6: 26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.

May 8, 2023 S.Movchan Straw manufacturing and QC 6

Main hall

Crane: 1.0 toneheight ~ 4.5 m

S ~ 150 m2 ( 9 x 16.6 m)

Condition system

Page 7: 26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.

May 8, 2023 S.Movchan Straw manufacturing and QC 7

Module glue @ Vacuum tests area

S ~ 40 m2( 5 x 8 m)

Entrance gate3x2 m

Page 8: 26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.

May 8, 2023 S.Movchan Straw manufacturing and QC 8

Straw module assembly area

S ~ 40 m2( 5 x 8 m)

Page 9: 26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.

May 8, 2023 S.Movchan Straw manufacturing and QC 9

Rooms 1 @ 2 (wiring and cosmic test)

S ~ 50 m2( 5.4 x 9 m) S ~ 50 m2

( 5.4 x 9 m)

Page 10: 26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.

May 8, 2023 S.Movchan Straw manufacturing and QC 10

Plans

Tooling:module assembly tooling – in manufacture (Dubna, VEMZ, August)vacuum table – order in progress

Module:module mechanics manufacture – August 2011, Italy ????delivery to Dubna - September 2011 ????

Assembly:vacuum stand assembly and tests – August 2011install module assembly tooling – September 2011

Straws:manufacture about 1000 pc and long term test – July-August 2011

Straw assembly to module:start – October (November) 2011

Page 11: 26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.

May 8, 2023 S.Movchan Straw manufacturing and QC 11

Conclusion

Dubna NA62 straw modules assembly 3 halls (S ~ 250 m2) – readyModule assembly tooling – in manufactureVacuum pump and pressure sensors – ok!Vacuum table – will be ordered

NEXT steps will be fixed on the July collaboration meeting at CERN----------------------Other ?????Straws manufacture (no tape at Dubna)Final module drawings – NO alignment/reference holes in the existing drawingsOrder module mechanics manufacture at Italy – date and quantity, cost ?Delivery module mechanics to Dubna (by track ?)

Module glue procedure (Francisco) Device for actual straw position measurement (like at CERN or …?)Straw glue procedure finalization – August 2011 ?

Materials and components: wire, pins, glue, straws supports o-rings, bushes, WEBs, gas manifolds, cowers with front end boards, …

Equipment: epoxy dispenser (2-3 pc), crimpers, wiring machine, DAQ, LV, HV, gas rack, …

Page 12: 26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.

May 8, 2023 S.Movchan Straw manufacturing and QC 12

aaa