2
1
TAMPAK SAMPING TAMPAK DEPAN 9 x 8 x 2.45 = 176.4 Ton + Berat 1 Block Beton = ± 2.45 Ton 9 x 8 x 2.45 = 176.4 Ton 8 x 7 x 2.45 = 137.2 Ton 8 x 7 x 2.45 = 137.2 Ton 7 x 4 x 2.45 = 68.6 Ton Total Load = 695.8 Ton
-
Upload
nurfandy-dewanto -
Category
Documents
-
view
214 -
download
0
description
erty
Transcript of 2
TA
MPA
K SA
MPIN
GT
AM
PAK
DE
PAN
9 x 8 x 2.45 = 176.4 T
on +
Berat 1 B
lock Beton = ± 2.45 T
on
9 x 8 x 2.45 = 176.4 T
on
8 x 7 x 2.45 = 137.2 T
on
8 x 7 x 2.45 = 137.2 T
on
7 x 4 x 2.45 = 68.6 T
on
Total L
oad = 695.8 T
on